A production process of ring main unit and ring main unit
By first installing the PT plug-in plug and secondary components in the production process of the ring main unit, and then installing the cabinet door, the problem of complicated steps in the existing technology is solved and the installation efficiency is improved.
Patent Information
- Application Number
- CN202410221371.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-02-28
AI Technical Summary
In the production process of ring main units, workers need to frequently open the upper, middle and lower door panels for installation, which results in cumbersome steps and reduces installation efficiency.
First install the PT plug-in and secondary components in the cabinet, and then install the upper door panel, middle door panel and lower door panel, which improves the installation sequence and reduces the operating steps.
It simplifies the operating steps of the staff and improves the installation efficiency of the ring main unit.
Smart Images

Figure CN118054325B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of ring main unit (RMU), and in particular to a production process of a ring main unit (RMU) and a ring main unit. Background Art
[0002] A ring main unit is an electrical device that is a group of high-voltage switchgear installed in a metal cabinet or made into an assembled interval ring main unit. The ring main unit is usually installed outdoors or indoors. The ring main unit has the advantages of improving power supply parameters and performance, low price and power supply safety.
[0003] The production process of the ring main unit in the related art includes the following steps:
[0004] S1, install the gas box, cable room and instrument room on the cabinet;
[0005] S2, install the upper door panel, the middle door panel and the lower door panel on the cabinet;
[0006] S3, install the transformer and cable clamp on the cabinet;
[0007] S4, installing the secondary components on the upper door panel;
[0008] S5. Assemble the secondary wires and PT plugs in the cabinet.
[0009] Since the ring main unit is installed first and then the transformer, cable clamp, secondary wire and PT plug-in connector inside the ring main unit are installed, the workers need to open the upper door panel, the middle door panel and the lower door panel before installing the transformer, cable clamp, secondary wire and PT plug-in connector inside the ring main unit, which makes the installation steps cumbersome and reduces the installation efficiency of the workers. Summary of the invention
[0010] In order to improve the problem of complicated installation steps for workers, the present application provides a production process of a ring main unit and a ring main unit.
[0011] The present application provides a production process for a ring main unit and a ring main unit, which adopts the following technical solution:
[0012] A production process of a ring main unit comprises the following steps: S1, installing a cable room, a gas box and an instrument room on a cabinet body;
[0013] S2, install the transformer and cable clamp on the cabinet;
[0014] S3, install the PT plug on the cabinet;
[0015] S4, installing the secondary components on the upper door panel;
[0016] S5, assemble the secondary line in the cabinet;
[0017] S6, install the upper door panel, the middle door panel and the lower door panel on the cabinet.
[0018] By adopting the above technical solution, the PT plug head and secondary components are first installed in the cabinet, and then the upper door panel, middle door panel and lower door panel are installed on the cabinet, thereby avoiding the problem that the staff still needs to open the upper door panel, middle door panel and lower door panel after installing them in the cabinet, reducing the operating steps of the staff, so as to speed up the installation of the ring network cabinet.
[0019] In the second aspect, a ring network cabinet provided in the present application adopts the following technical solution: the ring network cabinet includes a cabinet body and a cabinet door, the cabinet door is rotatably connected to the cabinet body, a plurality of heat dissipation holes are opened on the cabinet body, a baffle is provided on the cabinet body, a through-hole connected to the heat dissipation holes is opened on the baffle, and a sealing plate for blocking the through-hole is slidably arranged at the through-hole.
[0020] By adopting the above technical scheme, when the blocking plate does not block the perforations, since the perforations and the heat dissipation holes are connected, the outside air can circulate with the air inside the cabinet through the perforations and the heat dissipation holes, so that heat exchange can be carried out in the cabinet, thereby reducing the heat inside the cabinet; if it rains outside, the outside air is relatively humid, and the staff slides the blocking plate to block the perforations. Since the perforations and the heat dissipation holes are connected, the outside air and the air inside the cabinet cannot circulate, and the blocking plate prevents rainwater from entering the cabinet, so that the interior of the cabinet will not be too humid, thereby preventing the electrical components in the cabinet from being affected by moisture.
[0021] Optionally, a receiving groove for placing a water absorbent block is provided on the sealing plate, and a water absorbent block is arranged in the receiving groove. When the water absorbent block absorbs a sufficient amount of water, the water absorbent block drives the sealing plate to seal the perforation.
[0022] By adopting the above technical solution, a water-absorbing block is placed in the receiving groove. Since the water-absorbing block can absorb water, the weight of the water-absorbing block increases after absorbing water, so that the water-absorbing block can drive the sealing plate to slide at the perforation, so that when it rains heavily outside, rainwater can enter from the receiving groove, and the water-absorbing block absorbs the rainwater, allowing the sealing plate to seal the perforation, so that the staff does not need to slide the sealing plate, avoiding the staff being unable to slide the sealing plate in time in the first place, causing rainwater to enter the cabinet through the perforations and heat dissipation holes, so that the inside of the cabinet will not be too humid and affect the use of electrical components.
[0023] Optionally, a mounting hole connected to the accommodating groove is provided on the surface of the baffle, a sliding bar for passing through the mounting hole is slidably provided on the cabinet, the sliding bar passes through the mounting hole to squeeze the water absorbent block, and an outflow hole connected to the accommodating groove is provided on the sealing plate.
[0024] By adopting the above technical solution, the staff pulls the sliding bar, and the sliding bar passes through the installation hole to squeeze the water absorbent block, so that the moisture in the water absorbent block is squeezed out, and the moisture is separated from the receiving groove from the outflow hole, so that the weight of the sealing plate is reduced, so that after the staff lifts the sealing plate, the sealing plate will not fall down due to excessive weight, and the sealing plate will not block the perforation, so that air circulation can be maintained inside the cabinet and outside.
[0025] Optionally, a containing plate is provided in the containing groove, a containing hole is opened on the containing plate, and the water absorbing block is located on a side of the containing plate facing the bottom wall of the containing groove.
[0026] By adopting the above technical solution, the water absorbing block is located on the side of the containing plate facing the bottom wall of the containing groove, so that the water absorbing block is restricted by the containing plate to prevent the water absorbing block from escaping from the containing plate, and a containing hole is provided on the containing plate to allow rainwater to enter the containing groove from the containing hole, so that the water absorbing block is not easily escaping from the containing groove while keeping absorbing water.
[0027] Optionally, the sliding bar is rotatably connected to a linkage bar, and the linkage bar is rotatably connected to the cabinet door; when the cabinet door is opened, the linkage bar drives the sliding bar to disengage from the penetration direction of the mounting hole; when the cabinet door is closed, the sliding bar abuts against the hole wall of the mounting hole away from the penetration direction of the mounting hole.
[0028] By adopting the above technical solution, the linkage bar is rotatably connected to the sliding bar, and the linkage bar is rotatably connected to the cabinet door. When the cabinet door is opened, the cabinet door drives the sliding bar to move through the linkage bar, so that the sliding bar is disengaged from the penetration direction of the installation hole, so that the baffle can be removed from the cabinet body, so that the baffle can be replaced or repaired; when the cabinet door is closed, the sliding bar abuts against the hole wall of the installation hole away from the penetration direction of the installation hole. In the process of the cabinet door from closing to opening, the sliding bar can squeeze the water absorbent block, so that the water absorbent block can squeeze out the water, so that the staff can squeeze the water absorbent block when opening the cabinet door, avoiding the possibility that the staff forgets to squeeze the water absorbent block and the water absorbent block becomes too heavy due to daily accumulation.
[0029] Optionally, an elastic member is provided on the surface of the sliding bar, and the elastic member drives the sliding bar to abut against a hole wall of the mounting hole away from a penetration direction of the mounting hole.
[0030] By adopting the above technical solution, an elastic member is arranged on the sliding bar, so that the elastic member drives the sliding bar to abut against the hole wall of the mounting hole away from the penetrating direction of the mounting hole. When the cabinet door is closed, the elastic member can maintain the position of the sliding bar to prevent the sliding bar from moving in the mounting hole and making it impossible for the sliding bar to completely squeeze the water absorbent block.
[0031] Optionally, a mounting strip is provided on the baffle, and a mounting groove for inserting the mounting strip is opened on the cabinet, the length direction of the mounting groove is different from the length direction of the mounting hole, and when the mounting strip is inserted into the mounting groove, the sliding strip is located in the mounting hole.
[0032] By adopting the above technical solution, since the length direction of the mounting groove and the length direction of the mounting hole are different, the mounting bar is inserted into the mounting groove and the sliding bar is located in the mounting hole, so that the sliding bar and the mounting bar both limit the baffle, allowing the baffle to be fixed on the cabinet body, further preventing the baffle and the cabinet body from separating.
[0033] Optionally, a limit strip is slidably connected to the surface of the mounting strip, and an operating hole connected to the mounting slot is opened on the baffle. When the limit strip is inserted into the operating hole, the mounting strip is located in the mounting slot.
[0034] By adopting the above technical solution, the limit bar is inserted into the operating hole, and the hole wall of the operating hole limits the limit bar, so that the limit bar can limit the installation bar to prevent the installation bar from detaching from the installation groove, thereby further enhancing the firmness of the installation bar and the installation groove.
[0035] Optionally, an operating bar is slidably connected in the operating hole, and the operating bar is located on the moving path of the linkage bar. When the cabinet door is opened, the linkage bar abuts against the operating bar, and the operating bar drives the limiting bar to separate from the operating hole.
[0036] By adopting the above technical solution, when the cabinet door is opened, the cabinet door drives the linkage bar to move. Since the operating bar is located on the moving path of the linkage bar, the linkage bar can drive the operating bar to move. The operating bar is slidably connected to the operating hole, so that the operating bar can abut against the limit bar to move, allowing the limit bar to detach from the operating hole, so that the installation bar can be taken out of the installation groove, which is convenient for the staff to take out the limit bar from the operating hole.
[0037] In summary, the present application includes at least one of the following beneficial technical effects:
[0038] 1. First install the PT plug and secondary components in the cabinet, and then install the upper door panel, middle door panel and lower door panel on the cabinet, so as to avoid the problem that the staff still needs to open the upper door panel, middle door panel and lower door panel after installing them in the cabinet, and reduce the operating steps of the staff, so as to speed up the installation of the ring network cabinet.
[0039] 2. The linkage bar is rotatably connected to the sliding bar, and the linkage bar is rotatably connected to the cabinet door. When the cabinet door is opened, the cabinet door drives the sliding bar to move through the linkage bar, so that the sliding bar is disengaged from the penetration direction of the installation hole, so that the baffle can be removed from the cabinet body, so that the baffle can be replaced or repaired; when the cabinet door is closed, the sliding bar abuts against the hole wall of the installation hole away from the penetration direction of the installation hole. In the process of the upper panel from closing to opening, the sliding bar can squeeze the water absorbent block, so that the water absorbent block can squeeze out the water, so that the staff can squeeze the water absorbent block when opening the cabinet door, avoiding the possibility that the staff forgets to squeeze the water absorbent block and the water absorbent block becomes too heavy due to daily accumulation. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 is a schematic structural diagram of Example 1;
[0041] Figure 2 is a schematic structural diagram of Example 2;
[0042] Figure 3 is an exploded schematic diagram highlighting the blocking plate in Example 2;
[0043] Figure 4 yes Figure 2 Partial cross-sectional view along line AA;
[0044] Figure 5 is a schematic diagram showing the structure of the sliding groove in Example 2;
[0045] Figure 6 yes Figure 2 A partial cross-sectional view along line BB;
[0046] Figure 7 yes Figure 4 Enlarged schematic diagram of part C.
[0047] Figure numerals: 1, cabinet body; 11, heat dissipation hole; 12, sliding groove; 121, sliding bar; 122, sliding surface; 13, elastic member; 131, elastic groove; 14, linkage hole; 15, mounting groove; 16, operation hole; 17, operation bar; 171, operation surface; 2, cabinet door; 21, linkage bar; 211, linkage block; 3, baffle; 31, perforation; 32, mounting hole; 33, mounting bar; 34, limiting groove; 341, limiting bar; 4, blocking plate; 41, through hole; 42, accommodating groove; 421, water absorption block; 422, outflow hole; 423, accommodating plate; 424, accommodating hole. DETAILED DESCRIPTION
[0048] The following is combined with Figure 1-7 This application is described in further detail.
[0049] Example 1
[0050] This embodiment discloses a production process of a ring main unit, comprising the following steps:
[0051] S1, install the cable room, gas box and instrument room on the cabinet;
[0052] S2, install the integrated transformer, zero-sequence transformer and cable clamp on the cabinet;
[0053] S3, install the voltage transformer and PT plug on the cabinet;
[0054] S4, installing the secondary components on the upper door panel;
[0055] S5, assemble the secondary line in the cabinet;
[0056] S6, install the upper door panel, middle door panel and lower door panel on the cabinet.
[0057] This embodiment discloses a ring main unit. Figure 1 A ring main unit includes a cabinet body 1 and a cabinet door 2, wherein the cabinet door 2 includes an upper door plate, a middle door plate and a lower door plate. The cabinet door 2 is rotatably connected to the cabinet body 1, and the cabinet body 1 has electrical components therein, which can realize the basic functions of the ring main unit. The electrical components include an integrated transformer, a zero-sequence transformer, a voltage transformer and a PT plug and unplug head.
[0058] Example 2
[0059] Reference Figure 2 and Figure 3 The difference between this embodiment and the first embodiment is that a plurality of heat dissipation holes 11 are provided on the cabinet 1, and the plurality of heat dissipation holes 11 are used to dissipate heat for the electrical components inside the cabinet 1.
[0060] Reference Figure 3 A baffle 3 is detachably connected to the surface of the cabinet 1, and a plurality of through holes 31 are provided on the surface of the baffle 3, and the through holes 31 are the same as the heat dissipation holes 11. When the baffle 3 is installed on the cabinet 1, the surface of the baffle 3 abuts against the outer surface of the cabinet 1 where the heat dissipation holes 11 are provided, and at this time, the through holes 31 are connected to the heat dissipation holes 11.
[0061] Reference Figure 3 , a blocking plate 4 is slidably connected to the surface of the baffle 3, and the blocking plate 4 can slide in the vertical direction of the baffle 3. A plurality of through holes 41 are provided on the surface of the blocking plate 4, and the through holes 41 are connected to the through holes 31. When the through holes 31 and the through holes 41 are connected to each other, the blocking plate 4 does not block the through holes 31; when the blocking plate 4 slides downward, the blocking plate 4 blocks the through holes 31, and at this time, the through holes 41 and the through holes 31 are not connected.
[0062] Reference Figure 4A receiving groove 42 is provided on the surface of the blocking plate 4, and a water absorbing block 421 is placed in the receiving groove 42. The water absorbing block 421 can absorb rainwater. When the water absorbing block 421 absorbs rainwater, the weight of the water absorbing block 421 increases, so that the weight of the blocking plate 4 increases, allowing the blocking plate 4 to slide downward, so that the blocking plate 4 can cover the perforation 31. A receiving plate 423 is fixedly connected to the surface of the blocking plate 4, and the receiving plate 423 blocks the opening of the receiving groove 42, and the receiving plate 423 is located on the side of the water absorbing block 421 away from the bottom wall of the receiving groove 42. A receiving hole 424 is provided on the surface of the receiving plate 423, and the receiving hole 424 is the same as the through hole 41.
[0063] Reference Figure 4 and Figure 5 A sliding groove 12 is provided on the surface of the cabinet body 1 where the heat dissipation hole 11 is provided, and the sliding groove 12 extends in the horizontal direction. A sliding bar 121 is slidably connected in the sliding groove 12, and the sliding bar 121 can slide in the horizontal direction, and the sliding bar 121 can also slide in the vertical direction. A sliding surface 122 is provided between the surface of the sliding bar 121 facing the cabinet door 2 and the surface of the sliding bar 121 facing downward, and the sliding bar 121 can squeeze the water absorbing block 421 along the sliding surface 122. A mounting hole 32 connected to the receiving groove 42 is provided on the surface of the baffle 3, and the mounting hole 32 is for the sliding bar 121 to pass through, and the mounting hole 32 penetrates to the surface of the baffle 3 facing the cabinet door 2. An outflow hole 422 connected to the receiving groove 42 is provided on the surface of the blocking plate 4, and the outflow hole 422 is for rainwater to flow out of the receiving groove 42.
[0064] Reference Figure 4 and Figure 5 When the staff drives the sliding bar 121 to slide horizontally, the sliding bar 121 can slide in the mounting hole 32, so that the sliding bar 121 abuts against the water absorbing block 421, so that the water in the water absorbing block 421 is squeezed out and the water flows out from the outflow hole 422. When the water absorbing block 421 absorbs water, the water absorbing block 421 drives the blocking plate 4 to move downward. Since the sliding bar 121 is located in the receiving groove 42, the sliding bar 121 moves downward in the sliding groove 12, so that the sliding bar 121 and the blocking plate 4 can move synchronously.
[0065] Reference Figure 5 and Figure 6, an elastic groove 131 is provided on the groove wall of the sliding groove 12, and the elastic groove 131 extends along the length direction of the sliding groove 12. An elastic member 13 is provided in the elastic groove 131, and the elastic member 13 includes an elastic spring. One end of the elastic spring is fixedly connected to the groove wall of the elastic groove 131 away from the cabinet door 2, and the other end of the elastic spring is fixedly connected to the surface of the sliding bar 121. In other embodiments, the elastic member 13 may be other elastic structures. When the elastic spring is in a non-stressed state, the sliding bar 121 abuts against the hole wall of the mounting hole 32 away from the cabinet door 2, so that the initial position of the sliding bar 121 is fixed, so that when the staff pulls the sliding bar 121, it can ensure that the water absorbing block 421 is completely squeezed.
[0066] Reference Figure 5 and Figure 6 The cabinet body 1 is provided with a linkage hole 14 connected to the sliding groove 12, and the cabinet door 2 is provided with a linkage bar 21, which slides in the linkage hole 14. One end of the linkage bar 21 is rotatably connected to the surface of the cabinet door 2 facing the cabinet body 1, and the other end of the linkage bar 21 is rotatably connected to a linkage block 211. The linkage block 211 is slidably connected to the surface of the sliding bar 121 away from the elastic spring, that is, the linkage block 211 can slide on the sliding bar 121 in the vertical direction.
[0067] Reference Figure 4 and Figure 6 When the cabinet door 2 is opened, the cabinet door 2 drives the linkage bar 21 to move, so that the linkage bar 21 can move the sliding bar 121 toward the cabinet door 2, so that the sliding bar 121 squeezes the water absorbing block 421, allowing the water to flow out from the outflow hole 422. When the cabinet door 2 is closed, the elastic spring drives the sliding bar 121 to move, so that the sliding bar 121 abuts against the hole wall of the installation hole 32 away from the cabinet door 2, so that the sliding bar 121 is reset.
[0068] Reference Figure 3 The cabinet 1 is provided with a mounting groove 15 on its surface, and the mounting groove 15 extends in a vertical direction. A mounting bar 33 is integrally formed on the surface of the baffle 3, and the mounting bar 33 can be inserted into the mounting groove 15. When the mounting bar 33 is inserted into the mounting groove 15, the sliding bar 121 is located in the mounting hole 32.
[0069] Reference Figure 5 and Figure 7An operating hole 16 connected to the mounting slot 15 is provided on the cabinet body 1, and the operating hole 16 is connected to the sliding slot 12. An operating strip 17 is slidably connected in the operating hole 16, and the operating strip 17 can be completely located in the operating hole 16. An operating surface 171 is provided between the surface of the operating strip 17 facing the linkage hole 14 and the surface of the operating strip 17 away from the cabinet door 2, and the operating surface 171 is located on the moving path of the sliding strip 121. A limiting groove 34 is provided on the surface of the mounting strip 33, and the limiting groove 34 extends in the vertical direction. A limiting strip 341 is slidably connected in the limiting groove 34, and the limiting strip 341 can be inserted into the operating hole 16.
[0070] Reference Figure 6 and Figure 7 When the cabinet door 2 is opened, the cabinet door 2 drives the sliding bar 121 to move through the linkage bar 21, and the sliding bar 121 drives the operating bar 17 to disengage from the linkage hole 14 through the operating surface 171, so that the operating bar 17 is completely located in the operating hole 16, and the operating bar 17 abuts against the limiting bar 341, so that the limiting bar 341 is completely located in the limiting groove 34, so that the staff can take the installation bar 33 out of the installation groove 15.
[0071] The implementation principle of Example 2 is: when the cabinet door 2 is opened, the cabinet door 2 drives the sliding bar 121 to move through the linkage bar 21, allowing the sliding bar 121 to slide in the accommodating groove 42, so that the sliding bar 121 abuts against the water absorption block 421, allowing the water in the water absorption block 421 to flow out from the outflow hole 422, thereby reducing the weight of the sealing plate 4. Then the staff can lift the sealing plate 4 so that the perforation 31 and the through hole 41 are aligned, thereby enhancing the air circulation inside the cabinet 1 and the outside world.
[0072] Unless otherwise defined, the technical terms or scientific terms used in this application should be understood by people with ordinary skills in the field to which this application belongs. The words "first", "second", "third" and similar words used in the specification and claims of this application do not indicate any order, quantity or importance, but are only used to distinguish different components. "One" or "one" and similar words do not indicate a quantitative limit, but indicate that there is at least one. "Include" or "comprise" and similar words mean that the elements or objects appearing before "include" or "comprise" include the elements or objects listed after "include" or "comprise" and their equivalents, and do not exclude other elements or objects. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0073] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the design concept of the present application should be included in the protection scope of the present application.
Claims
1. A ring main unit, characterized in that: The ring network cabinet comprises a cabinet body (1) and a cabinet door (2), the cabinet door (2) comprises an upper door plate, a middle door plate and a lower door plate, the cabinet door (2) is rotatably connected to the cabinet body (1), a plurality of heat dissipation holes (11) are provided on the cabinet body (1), a baffle (3) is provided on the cabinet body (1), a through hole (31) connected to the heat dissipation hole (11) is provided on the baffle (3), and a blocking plate (4) for blocking the through hole (31) is slidably provided at the through hole (31); The blocking plate (4) is provided with a receiving groove (42) for placing the water absorbing block (421), and the water absorbing block (421) is arranged in the receiving groove (42). When the water absorbing block (421) absorbs a sufficient amount of water, the water absorbing block (421) drives the blocking plate (4) to block the through hole (31); A mounting hole (32) for connecting to the receiving groove (42) is provided on the surface of the baffle plate (3); a sliding bar (121) for passing through the mounting hole (32) is slidably provided on the cabinet body (1); the sliding bar (121) passes through the mounting hole (32) to squeeze the water absorbing block (421); and an outflow hole (422) for connecting to the receiving groove (42) is provided on the blocking plate (4); The sliding bar (121) is rotatably connected to a linkage bar (21), and the linkage bar (21) is rotatably connected to the cabinet door (2); when the cabinet door (2) is opened, the linkage bar (21) drives the sliding bar (121) to disengage from the penetrating direction of the mounting hole (32); when the cabinet door (2) is closed, the sliding bar (121) abuts against the hole wall of the mounting hole (32) away from the penetrating direction of the mounting hole (32); The baffle (3) is provided with a mounting strip (33), and the cabinet (1) is provided with a mounting groove (15) for inserting the mounting strip (33), the length direction of the mounting groove (15) is different from the length direction of the mounting hole (32), and when the mounting strip (33) is inserted into the mounting groove (15), the sliding strip (121) is located in the mounting hole (32); A limit strip (341) is slidably connected to the surface of the mounting strip (33); an operating hole (16) communicating with the mounting groove (15) is provided on the baffle plate (3); when the limit strip (341) is inserted into the operating hole (16), the mounting strip (33) is located in the mounting groove (15); An operating bar (17) is slidably connected in the operating hole (16), and the operating bar (17) is located on the moving path of the linkage bar (21). When the cabinet door (2) is opened, the linkage bar (21) abuts against the operating bar (17), and the operating bar (17) drives the limiting bar (341) to separate from the operating hole (16); The production process of the ring main unit includes the following steps: S1, install the cable room, gas box and instrument room on the cabinet (1); S2, install the transformer and the cable clamp on the cabinet (1); S3, installing the PT plug connector on the cabinet (1); S4, installing the secondary components on the upper door panel; S5, assemble the secondary line in the cabinet (1); S6, install the upper door panel, the middle door panel and the lower door panel on the cabinet body (1).
2. A ring main unit according to claim 1, characterized in that: A containing plate (423) is provided in the containing groove (42), a containing hole (424) is provided on the containing plate (423), and the water absorbing block (421) is located on a side of the containing plate (423) facing the bottom wall of the containing groove (42).
3. The ring main unit according to claim 1, characterized in that: An elastic member (13) is provided on the surface of the sliding bar (121), and the elastic member (13) drives the sliding bar (121) to abut against the hole wall of the mounting hole (32) away from the penetration direction of the mounting hole (32).
Citation Information
Patent Citations
Electric control cabinet and assembly method thereof
CN108565725A
Heat dissipation mechanism of power distribution cabinet
CN116365398A
Improved all-insulation ring main unit door plate structure
CN210517382U
Multifunctional power distribution cabinet
CN219874511U
Primary and secondary fusion ring main unit
CN220291394U