A digital twin driven cascade pump station group operation feedback control method and device
Through digital twin technology, combined with large system decomposition and dynamic planning, an optimized operation model of the cascade pump station group is constructed, which solves the problem of insufficient applicability and stability of the optimization model in the existing technology and realizes a more scientific and practical pump station group. Run optimization.
Patent Information
- Application Number
- CN202410069437.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-15
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-01-15
AI Technical Summary
The existing cascade pump station group scheduling optimization model has applicability limitations, lacks prior consideration of operational stability, is divorced from actual operating conditions, relies on manual operation, and lacks measured data application and feedback analysis, resulting in high operational optimization errors and dependence.
Using a digital twin-driven approach, we build a building information model, an oblique photography model and a basic rule library, and combine large system decomposition and dynamic planning aggregation methods to build a pumping station group optimization operation model, perform multi-dimensional hybrid simulation and simulation verification, and dynamic correlation Data and rules to optimize the operation plan.
It achieves stable and smooth operation of the pumping station group. The combination of optimization mechanism and rule constraints enhances the scientificity and practicality of decision-making, reduces manual dependence, and makes up for the idealized decision-making and simulation differences of existing technologies.
Smart Images

Figure CN118070379B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of pump station group optimization, and in particular to a digital twin-driven cascade pump station group operation feedback control method and device. Background Art
[0002] Cascade pump station group operation optimization and feedback control are important links to improve the benefits of water diversion and regulation projects and ensure water supply safety. High-efficiency and high-performance operation solutions are the intermediate products of cascade pump station group operation optimization. The ultimate goal is to assist the pump station group system to carry out automatic control and realize intelligent optimization and smart management.
[0003] The current mainstream solutions have the following shortcomings: the existing cascade pump station scheduling optimization model, whether single-objective or multi-objective, is carried out under the assumption of objective functions, but in reality there are many optimization objectives, which cannot be exhaustively listed at one time, the objective conditions are relatively fixed and cannot be updated iteratively, and the solution has limited applicability; the current optimization method lacks prior consideration of operational stability, and the stability threshold indicator system is in a state of constant change, which is difficult to combine with data to form a comprehensive constraint, leaving a hidden danger of incomplete consideration at the beginning of the plan formulation; the current method adopts the form of plan recommendation, operation and management personnel execution, performance analysis and plan fine-tuning when implementing, and the plan is generated based on the actual situation. The generalized model considers operation optimization, which is divorced from the actual operation status, resulting in frequent changes to the plan afterwards; the existing methods mostly use theory to guide practice, lack the application of real monitoring data, and further increase the error in operation optimization; the existing plans are not implemented in actual projects after they are generated, and it is difficult to obtain measured parameters, resulting in a lack of further feedback analysis after the existing methods formulate plans, especially the lack of consideration of the water transfer process between stations, the operating performance of the unit, and the requirements for the operating stability of the unit; after the existing methods generate the plans, they still mainly use experience knowledge and manual operation to control the operation of the pump station equipment. The operation and management personnel lack a prior reference basis, resulting in serious manual dependence during application. Summary of the invention
[0004] This application aims to at least to some extent solve the problems existing in the related technologies, such as the limitations of scheduling optimization models, the less application of real data and being out of touch with reality, the incomplete consideration of operational stability in advance, the lack of operational decision feedback analysis, and the high degree of reliance on manual experience and operations.
[0005] To achieve the above-mentioned purpose, the first embodiment of the present application proposes a digital twin-driven cascade pump station group operation feedback control method, comprising:
[0006] Establish the building information model (BIM), oblique photography model, basic rule base and basic database of the cascade pump station group;
[0007] The BIM model is processed by a BIM lightweight method to obtain a lightweight model, and the lightweight model is processed by three-dimensional visualization rendering and combined with the oblique photography model to build a twin scene;
[0008] Based on the basic rules in the basic rule base and the basic data in the basic database, the basic rules and basic data are associated to obtain a rule constraint model;
[0009] Based on the rule constraint model, a large system decomposition and dynamic programming aggregation method is used to construct an optimized operation model for a pump station group and solve and screen the operation plan. A multi-dimensional hybrid simulation is performed with the operation plan parameters as boundary conditions, and the simulation results are mapped to the twin scenario.
[0010] Based on the rule constraint model, the operation plan is checked according to the simulation results to obtain a target operation plan.
[0011] Optionally, the establishment of a building information model (BIM), an oblique photography model, a basic rule base and a basic database of the cascade pump station group includes:
[0012] Establishing the building information model (BIM) of the pump station group based on the engineering BIM modeling method, wherein the modeling process includes modeling of civil engineering and electromechanical equipment;
[0013] Establishing an oblique photography model of the landforms around the pump station group according to oblique photography modeling methods;
[0014] Based on field research and standard specifications, obtain the operation rule data of the pump station group, and establish a basic rule library according to the operation rule data;
[0015] Based on field research, the monitoring perception data of the digital twin pump station group Internet of Things is obtained, and a basic database is established based on the monitoring perception data.
[0016] Optionally, the BIM is processed by a BIM lightweight method to obtain a lightweight model, and the lightweight model is processed by three-dimensional visualization rendering and combined with the oblique photography model to build a twin scene, including:
[0017] Standardize the data structure of BIM models constructed on different platforms, convert the data structure into an IFC standard format, and obtain an IFC model;
[0018] Extracting basic attributes and attribute sets of the IFC model through semantic information, eliminating repeated component attributes and obtaining the association relationship between the basic attributes, merging and expressing the same geometric bodies that are repeatedly referenced, deleting the repeated expression instances, and obtaining the geometric model instance;
[0019] Simplifying the triangles of the geometric model instance and dividing the LoD levels to generate a multi-level-of-detail model;
[0020] Saving the attribute information, association relationship information, and unique geometric model identifier of the multi-level-of-detail model to a relational database;
[0021] The multi-level-of-detail model is compressed by using the Draco geometric compression algorithm, and the above-mentioned processing content is formed into an API interface and then integrated into the model management platform;
[0022] Based on the model management platform, a three-dimensional visualization rendering tool is used to load the model on the Web side, the model is configured to correspond to the spatial coordinates stored in the relational database, and a model publishing generation path link is obtained;
[0023] The model is loaded to publish the generated path link and the corresponding spatial coordinates, and a three-dimensional visualization scene is established in combination with the oblique photography model. The three-dimensional visualization scene is optimized and adjusted based on the attribute information, association relationship information, and unique geometric model identifier to obtain the twin scene.
[0024] Optionally, the basic rules in the basic rule base and the basic data in the basic database are associated with each other to obtain a rule constraint model, including:
[0025] Standardize the basic data and basic rules under the same category according to the data identity number, related building and equipment information, category information, and time information to generate corresponding data identifiers and rule identifiers;
[0026] The data identifier and the unique geometric model identifier of the model in the model management platform are stored in the basic database to establish an association between the geometric model and the data;
[0027] The data identifier and the rule identifier are stored in the basic rule database, the association between the data and the rule is established, and the management API of the data identifier and the rule identifier is established and integrated into the rule management platform, wherein the rule management platform is used to add, edit, read and delete rules;
[0028] According to the association relationship between geometric models and data and the association relationship between data and rules, the data, geometric models and rules are integrated to obtain a dynamic data-rule-model relationship. A rule constraint model is constructed based on the dynamic data-rule-model relationship, wherein the rule constraint model automatically retrieves the association rules for threshold judgment when calling data.
[0029] Optionally, based on the rule constraint model, a large system decomposition-dynamic programming aggregation method is used to construct an optimization operation model of a pump station group and solve and screen to obtain an operation plan, and a multi-dimensional hybrid simulation is performed with the operation plan parameters as boundary conditions, and the simulation results are mapped to the twin scenario, including:
[0030] Determine a pump station group operation optimization mathematical model, wherein the pump station group operation optimization mathematical model includes a series cascade pump station group operation optimization model, a single pump station multi-unit operation optimization model, and a single pump station single unit operation optimization model;
[0031] Taking each level of pumping station as the object, considering that the daily average head remains unchanged, the daily average head is discretized into multiple daily average heads within the feasible domain of the pumping station head, and the large system decomposition and dynamic programming aggregation method are used to perform the optimal operation calculation of the pumping station under different water volume constraints of each daily average head, and the optimal operation plan of each level of pumping station is obtained;
[0032] Using the scheme parameters of the optimization scheme as boundary conditions, one-, two- and three-dimensional hybrid simulation is performed to obtain a multi-dimensional hybrid simulation result;
[0033] Based on the multi-dimensional hybrid simulation results, data mapping within the twin scene is performed;
[0034] According to the water flow order and flow time, the multi-dimensional hybrid simulation results are mapped to the twin scene, where the flow order is from the starting pump station of the pump station group to the next pump until it reaches the end pump station, and the flow time is to keep the one-dimensional simulation results consistent with the two-dimensional simulation results time scale. If the water level and flow in the two-dimensional simulation meet the unit operation requirements, start mapping the three-dimensional simulation results.
[0035] Optionally, determining the pump station group operation optimization mathematical model includes:
[0036] Taking the minimum daily water-lifting power consumption of the cascade pump station group system as the objective function, dividing different time periods according to the preset time period electricity price distribution, taking the blade placement angle and operating head of each unit of each level of pump station in each time period as the decision variables, and taking the total water lifting amount, rated power and total water lifting head specified in the rule constraint model as the constraint conditions, the optimization operation model of the series cascade pump station group is constructed;
[0037] Taking the minimum daily operation water extraction cost of a single pumping station as the objective function, taking the start-up blade angle of each unit in each period as the decision variable, taking the total amount of water extraction and the unit power requirement specified by the rule constraint model as the constraint conditions, constructing the mathematical model for the optimal operation of the multi-units;
[0038] The mathematical model for the optimal operation of the single unit is constructed by taking the minimum total power consumption cost of daily startup operation as the objective function, the time periods divided by preset time periods as the stage variables, the blade placement angles in each time period as the decision variables, and the total water pumping amount within the specified time period and the rated power of the motor as the constraints.
[0039] Optionally, based on the rule constraint model, verifying the operation plan according to the simulation result to obtain a target operation plan includes:
[0040] Obtain the water lifting volume and flow rate of the pump station under multiple sets of the operation schemes, the water level and flow rate during the water delivery process, the head, flow rate, pulsating pressure, vibration, and swing of the unit;
[0041] According to the rule constraint model, verify whether the water lifting volume and flow rate of each level of pumping stations under the operation plan can meet the requirements of the water diversion plan. If not, fine-tune the blade placement angle and speed to increase the flow rate based on the original operation plan, and re-solve to obtain a new operation plan until the requirements of the water diversion plan are met;
[0042] According to the rule constraint model, verify whether the water level and flow rate of the water transfer process along the route under the operation plan can meet the water demand of users. If not, choose to increase the water lifting volume and flow rate based on the original operation plan, re-solve to obtain a new operation plan, and calculate the water level variation of the inter-stage water transfer channel under each operation plan for each pump station;
[0043] According to the rule constraint model and the new operation scheme optimized in the above steps, the water level fluctuation amplitude above the pump station and the water level fluctuation amplitude below the pump station at each level under each operation scheme are calculated;
[0044] Conduct stability analysis on the pulsating pressure, vibration and swing under the operation scheme, and determine the stability parameters of each unit under each operation scheme;
[0045] Calculate the minimum unit water lifting cost of each pumping station under each operation plan, using a fixed angle and constant speed operation, and the minimum unit water lifting cost under an optimized operation plan, and obtain the total savings of the cascade pumping station group;
[0046] According to the water level fluctuation, the water level fluctuation above the station, the water level fluctuation below the station, the stability parameter, the stability parameter and the total savings, the target operation plan is determined, and the target operation plan is recommended to the automatic control system and the control operation is recorded.
[0047] To achieve the above-mentioned purpose, the second embodiment of the present application proposes a digital twin-driven cascade pump station group operation feedback control device, comprising:
[0048] Establish modules for establishing the building information model (BIM), oblique photography model, basic rule base and basic database of cascade pump station groups;
[0049] A twin scene building module is used to process the BIM model through a BIM lightweight method to obtain a lightweight model, and to build a twin scene by processing the lightweight model through three-dimensional visual rendering and combining it with the oblique photography model;
[0050] A rule constraint model building module is used to associate the basic rules with the basic data based on the basic rules in the basic rule base and the basic data in the basic database to obtain a rule constraint model;
[0051] A simulation mapping module is used to construct an optimization operation model of a pump station group based on the rule constraint model by adopting a large system decomposition-dynamic programming aggregation method and to solve and screen an operation plan, perform a multi-dimensional hybrid simulation with the operation plan parameters as boundary conditions, and map the simulation results to the twin scenario;
[0052] A verification module is used to verify the operation plan based on the rule constraint model and the simulation result to obtain a target operation plan.
[0053] To achieve the above-mentioned purpose, the third aspect of the present application provides an electronic device, including: a processor, and a memory communicatively connected to the processor;
[0054] The memory stores computer-executable instructions;
[0055] The processor executes the computer-executable instructions stored in the memory to implement the method as described in any one of the first aspects above.
[0056] To achieve the above-mentioned purpose, the fourth aspect embodiment of the present application proposes a computer-readable storage medium, in which computer execution instructions are stored. When the computer execution instructions are executed by a processor, they are used to implement the method as described in any one of the above-mentioned first aspects.
[0057] The technical solution provided by the embodiments of the present application brings at least the following beneficial effects:
[0058] It is possible to build a digital twin scenario of a pump station group that can operate stably and smoothly, use operation optimization mechanism models and rule constraints to guide decision-making, dynamically associate and iteratively update data, rules, and three-dimensional geometric models, and use simulation methods to verify the rationality of the plan and adjust the operating status. It avoids the problems of over-idealization of traditional operation decision-making mechanisms, incomplete consideration of rules and constraints, lack of application of measured data, lack of feedback verification, and high degree of manual dependence. It also makes up for the defects of lack of mechanism support and poor simulation in the preview of digital twin pump station groups.
[0059] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:
[0061] Figure 1 It is a flow chart of a digital twin driven cascade pump station group operation feedback control method according to an embodiment of the present application;
[0062] Figure 2 It is a flowchart of another digital twin driven cascade pump station group operation feedback control method shown in an embodiment of the present application;
[0063] Figure 3 It is a flow chart of another digital twin driven cascade pump station group operation feedback control method according to an embodiment of the present application;
[0064] Figure 4 It is a flow chart of another digital twin driven cascade pump station group operation feedback control method according to an embodiment of the present application;
[0065] Figure 5 It is a flow chart of another digital twin driven cascade pump station group operation feedback control method according to an embodiment of the present application;
[0066] Figure 6 It is a block diagram of a digital twin driven cascade pump station group operation feedback control device according to an embodiment of the present application;
[0067] Figure 7 It is a block diagram of an electronic device. DETAILED DESCRIPTION
[0068] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.
[0069] The following describes a digital twin-driven cascade pump station group operation feedback control method and device according to an embodiment of the present application with reference to the accompanying drawings.
[0070] Figure 1 is a flow chart of a digital twin driven cascade pump station group operation feedback control method according to an embodiment of the present application, such as Figure 1 As shown, the method comprises the following steps:
[0071] Step 101, establish a building information model (BIM), an oblique photography model, a basic rule base and a basic database for the cascade pump station group.
[0072] In the present application embodiment, Figure 2 As shown, a building information model (BIM) of a pump station group is established based on the engineering BIM modeling method, wherein the modeling process includes the modeling of civil engineering and electromechanical equipment; an oblique photography model of the topography around the pump station group is established based on the oblique photography modeling method; based on field surveys and standard specifications, the operation rule data of the pump station group is obtained, and a basic rule library is established based on the operation rule data; based on field surveys, the monitoring perception data of the Internet of Things of the digital twin pump station group is obtained, and a basic database is established based on the monitoring perception data.
[0073] Among them, the monitoring perception data include unit operation performance data, unit operation stability data and pump station group operation condition data. In addition, the unit operation performance data include flow rate, head, efficiency, etc., the unit operation stability data include vibration, swing, noise, pressure pulsation, temperature, start and stop times, etc., and the pump station group operation condition data include water level along the process, flow rate along the process, etc.
[0074] Among them, the operating rule data include unit operating performance rule constraints, unit operating stability rule constraints, and pump station group operating condition rule constraints. Corresponding to the monitoring perception data, the unit operating performance rule constraints include flow, head, efficiency and other aspects of constraints; the unit operating stability rule constraints include vibration, swing, noise, pressure pulsation, temperature, start and stop times and other aspects of constraints; the pump station group operating condition rule constraints include water level along the way, flow along the way, pump station water lifting volume and other constraints.
[0075] Furthermore, as a possible implementation method, based on the basic data in the basic database, the InfluxDB database is used to store time series data, the MySQL database is used to store relational data, and based on the operating rules in the basic rule base, the Neo4j database is used to store rules according to the rule threshold indicator system.
[0076] Step 102: Process the BIM model using a BIM lightweight method to obtain a lightweight model, process the lightweight model using three-dimensional visualization rendering and combine it with an oblique photography model to build a twin scene.
[0077] In the embodiment of the present application, the process of processing the BIM model by the BIM lightweight method includes model standardization processing, data extraction and conversion, model compression and transmission, model parsing and rendering. Specifically, Figure 3 As shown, step 102 further includes:
[0078] Step 201, standardizing the data structure of the BIM model constructed on different platforms, converting the data structure into the IFC standard format, and obtaining an IFC model;
[0079] Step 202, extracting basic attributes and attribute sets of the IFC model through semantic information, eliminating repeated component attributes and obtaining the association relationship between basic attributes, merging and expressing the same geometric bodies that are repeatedly referenced, deleting the repeated expression instances, and obtaining a geometric model instance;
[0080] Step 203, simplifying the geometric model instance into triangles and dividing the LoD levels to generate a multi-level-of-detail model;
[0081] Step 204, saving the attribute information, association relationship information, and unique geometric model identifier of the multi-level-of-detail model to a relational database;
[0082] Step 205, compressing the multi-level-of-detail model using the Draco geometry compression algorithm, and integrating the above processing content into the model management platform after forming an API interface;
[0083] Step 206: Based on the model management platform, use a three-dimensional visualization rendering tool to load the model on the Web side, configure the model to correspond to the spatial coordinates stored in the relational database, and obtain a model publishing generation path link;
[0084] Step 207, load the model to publish the generated path link and the corresponding spatial coordinates, and establish a three-dimensional visualization scene in combination with the oblique photography model, optimize and adjust the three-dimensional visualization scene based on attribute information, association relationship information, and unique geometric model identifier to obtain a twin scene.
[0085] It should be noted that the process of steps 201-204 is essentially the process of extracting geometric data and non-geometric data. After the attribute information, association relationship information, and unique geometric model identifier of the multi-level detail model are saved in the relational database, the geometric information is converted into a unified Glb format to form a basic geometric unit.
[0086] It is understandable that the three-dimensional visualization rendering tools used in this application are UE, Unity3D, Three.js, Cesium.js, etc., and the above tools are also used when loading the model and publishing the generated path link.
[0087] This enables the construction of digital twin scenes with high fluency, high performance, and high loading speed.
[0088] Step 103 , based on the basic rules in the basic rule base and the basic data in the basic database, the basic rules are associated with the basic data to obtain a rule constraint model.
[0089] In the embodiment of the present application, an association relationship between geometric models, data and rules is established and integrated.
[0090] Specifically, Figure 4 As shown, step 103 also includes the following steps:
[0091] Step 301, standardize the basic data and basic rules under the same category according to the data identity identification number, the associated building and equipment information, the category information, and the time information to generate corresponding data identification and rule identification;
[0092] Step 302, storing the data identifier and the unique geometric model identifier of the model in the model management platform in the basic database, and establishing an association between the geometric model and the data;
[0093] Step 303, storing the data identifier and rule identifier in the basic rule database, establishing association between data and rules, establishing a management API for data identifiers and rule identifiers and integrating them into a rule management platform, wherein the rule management platform is used to add, edit, read, and delete rules;
[0094] Step 304, based on the association relationship between the geometric model and the data and the association relationship between the data and the rules, the data, geometric model and rules are integrated to obtain a dynamic data-rule-model relationship, and a rule constraint model is constructed based on the dynamic data-rule-model relationship, wherein the rule constraint model automatically retrieves the association rules for threshold judgment when calling the data.
[0095] It should be noted that the dynamic data-rule-model relationship is expressed by the following formula:
[0096] DKM={D,K,M}
[0097] T k ∈(D k ,M k ,K k )
[0098]
[0099] Among them, DKM is a dynamic data-rule-model relationship; D is data; K is rule; M is model; The relationship between data, models and rules; It is the evaluation relationship between data, model and rules, that is, judging the impact of data changes on related parties; D d ,M d ,K d are the changes of the three factors respectively; d i ,k i ,mi They are the data set, rule set, and model set generated by the control elements respectively; T k is the threshold set.
[0100] In addition, the data resource D is represented by the following expression:
[0101]
[0102] Among them, D P Generate data for the real physical world, such as data resources stored in storage tools; D V Producing data for the virtual world is a real-time mapping of the physical world to the digital world, including geometric model data, simulation analysis boundary conditions, spatial layout and other data; S Refers to data management process data such as data conversion, preprocessing, classification, and integration; D K Refers to rule data; D E It refers to the simulation analysis and feedback control process data after the fusion of data, rules and models.
[0103] Step 104, based on the rule constraint model, adopt the large system decomposition and dynamic programming aggregation method to build the pump station group optimization operation model and solve and screen the operation plan, perform multi-dimensional hybrid simulation with the operation plan parameters as boundary conditions, and map the simulation results to the twin scene.
[0104] In the present application embodiment, Figure 5 As shown, step 104 also includes the following steps:
[0105] Step 401, determining a pump station group operation optimization mathematical model, wherein the pump station group operation optimization mathematical model includes a series cascade pump station group operation optimization model, a single pump station multi-unit operation optimization model, and a single pump station single unit operation optimization model.
[0106] As a possible implementation method, the objective function is to minimize the daily water-lifting electricity consumption of the cascade pump station group system, and the different time periods are divided according to the preset electricity price distribution. The blade placement angle and operating head of each unit in each time period of each pump station at each level are used as decision variables. The total water lifting amount, rated power and total water lifting head specified by the rule constraint model are used as constraints to construct an optimization operation model for the series cascade pump station group.
[0107] Among them, the objective function is:
[0108]
[0109] The water withdrawal constraint is:
[0110]
[0111] The power constraint is:
[0112] N i,j,l (0 i,j,l )≤N 0,j,l
[0113] The total water lifting head constraint is:
[0114]
[0115] Among them, R is the minimum operating power consumption cost of the cascade pump station group; TJ is the number of stages included in the cascade pump station group; M l W is the electricity consumption cost of the first-level pump station; e,l is the total water lift of the first-stage pumping station; GE is the total water lift of the entire cascade water diversion system.
[0116] As another possible implementation method, a mathematical model for optimal operation of multiple units is constructed with the minimum daily water extraction cost of a single pumping station as the objective function, the blade angle of each unit in each time period as the decision variable, and the total water extraction volume and unit power requirements specified by the rule constraint model as constraints.
[0117] Among them, the objective function is:
[0118]
[0119] The water withdrawal constraint is:
[0120]
[0121] The power constraint is:
[0122] N i (0 i )≤N 0
[0123] Among them, F is the minimum power consumption cost of the pump station per day; f i is the daily operating electricity cost of the j-th water pump unit; JZ is the number of water pump units; W e The total daily target water pumping volume of the pumping station.
[0124] As another possible implementation method, the objective function is to minimize the total daily power consumption cost, the preset time periods are used as stage variables, the blade placement angles in each time period are used as decision variables, and the total water pumping amount within the specified time period and the rated power of the motor are used as constraints to construct a mathematical model for the optimal operation of a single unit.
[0125] The objective function is:
[0126]
[0127] Water withdrawal constraints:
[0128]
[0129] Power Constraints:
[0130] N i,j (0 i,j )≤N 0,j
[0131] Among them, f is the minimum power consumption cost of a single unit for 1 day of operation; s i is the electricity consumption cost of the unit in the i-th period; ρ is the water density; g is the acceleration of gravity; H i is the average head in the i-th period; Q i (θ i ) is the pump flow rate in the i-th period, and the average daily head H i When the blade is placed at a certain angle, i The function of Q i (θ i )=0 means shutdown at this stage; Δη i is the length of the i-th period; P i is the electricity price in the i-th period; W j is the total daily water extraction volume of a single unit; η z,i (θ i ) is the efficiency of the water pump device, which is related to the flow rate and head in the i-th period; η mot is the motor efficiency. When the load is greater than 60%, it can be considered to be basically unchanged. The efficiency of large motors is around 94%; η int is the transmission efficiency, the transmission efficiency of the direct-connected unit is 100%; η f The frequency conversion efficiency of high-power and high-voltage inverters is about 96%. i (θ i ) is the actual power corresponding to the blade placement angle in the i-th period, which should be less than or equal to the rated power of the motor N 0 , where the relationship between flow rate, head, power, efficiency and blade placement angle (or speed) can be obtained through the unit characteristic curve.
[0132] It can be understood that, in a possible embodiment, different time periods are divided according to 1d electricity price distribution.
[0133] Step 402, taking each level of pumping station as the object, considering that the daily average head remains unchanged, the daily average head is discretized into multiple daily average heads within the feasible domain of the pumping station head, and the large system decomposition and dynamic programming aggregation method are used to perform the optimal operation calculation of the pumping station under different water volume constraints for each daily average head, and the optimal operation plan of each level of pumping station is obtained.
[0134] In the embodiment of the present application, the optimization operation model of the series cascade pump station group in step 401 is decomposed into a single pump station multi-unit operation optimization model through a large system decomposition method, and then the multi-unit operation optimization model is decomposed into a single unit operation optimization model. At this time, the single unit optimization model is a one-dimensional dynamic programming model, and the dynamic programming method is used to solve it.
[0135] For stage variable i (i = 1, 2, ..., SN), the decision variable is the blade placement angle θ i , the state variable λ is the water extraction amount at different stages, and the corresponding recursive equation is stage i=1:
[0136]
[0137] Among them, the state variable λ i and blade placement angle θ i The discretization is the same as above and should satisfy Q i (θ i )ΔT i ≥λ i The state transfer equation is:
[0138] λ i-1 =λ i -Q i (θ i )ΔT i
[0139] Among them, i=1,2,…,SN-1.
[0140] Stage SN:
[0141]
[0142] Among them, the state variable λ SN =W j , blade placement angle θ SN The discretization of is the same as above, and should satisfy λ SN-1 =λ SN -Q SN (θ SN )ΔT SN ,λ SN ≥W j .
[0143] The total amount of water lifted when running at the maximum blade angle in each discrete time period with a certain step length W j,max , the single unit optimization operation model is used to calculate the water lifting capacity W of each pump unit j,m (m=1,2,…,max) The minimum water extraction cost f under the requirement j,m , thus obtaining a series of W j,m ~f j,m (W j,m)relation.
[0144] Then, the series of W obtained j,m ~f j,m (W j,m ) relationship (j=1,2,…,JZ; m=1,2,…,max) transforms the single pump station multi-unit optimization operation model into the following aggregation model:
[0145] Objective function:
[0146]
[0147] Total water volume constraint:
[0148]
[0149] Power Constraints:
[0150] N i,j (0 i,j )≤N 0,j
[0151] It can be understood that the aggregation model can be used as a typical one-dimensional dynamic programming model, with the stage variable j (j = 1, 2, ..., JZ) and the decision variable being the water extraction capacity W of each unit. j , and its discrete range is the discrete range W of the target water extraction capacity when optimizing a single unit j,m (m=1,2,…,max), the state variable λ is the discrete value of the total amount of water pumped by each unit in the pumping station. The dynamic programming method is used to solve the model, and the total amount of water pumped by the pumping station W can be obtained. e The M value, and the optimal water lifting capacity combination W of each unit in each pumping station corresponding to M j * (j=1,2,…,JZ), and then the optimal startup mode of each pump unit can be obtained by checking the optimization results of the single unit, that is, the optimal blade placement angle θ of each unit in each period i,j * .
[0152] In addition, for the unit speed n adjustment, the initial speed can be assumed first to obtain the optimal blade placement angle θ that meets the water lifting requirements at a fixed speed: i,j * After that, the blade placement angle is fixed, and then the decision variable in the objective equation of step 401 is changed from θ to n to obtain the unit speed at the fixed angle. The cycle is iterated until the accuracy requirement ε is finally met, and the optimal blade placement angle θ of the unit is determined. i,j * and speed n, as well as the unit flow Qj, head Hj, efficiency η, pump station flow Qz, head Hz and water lifting volume W in the corresponding situation, are stored together in the basic database established in step 101.
[0153] Step 403, performing one-, two- and three-dimensional hybrid simulation with the scheme parameters of the optimization scheme as boundary conditions to obtain a multi-dimensional hybrid simulation result.
[0154] (1) In the embodiment of the present application, it is first necessary to establish a one-dimensional non-steady flow simulation mathematical model:
[0155]
[0156] Among them, Z is the water level, Q is the flow rate, B is the water surface width, A is the cross-sectional area of the water flow, R is the hydraulic radius, C is the Xie Cai coefficient, q is the lateral inflow per unit length of the river, and t and s are the time and space coordinates respectively.
[0157] (2) Then, the differential equation is established using the Preissmann implicit format, and the flow rates Qz1 and Qz2 of the upper and lower pumping stations obtained in step 402 are used as boundary conditions for the user's water intake process. The initial conditions are the initial flow rate and initial water level of the inter-stage water transfer channel stored in the basic database.
[0158] It is understandable that if a river is divided into L sections, a total of L-1 river sections can be formed, and the upstream and downstream boundary conditions form a total of 2L algebraic equations about the water level Z and flow Q of each section, which are solved by the pursuit method. Here, the upper pump station inlet pool and the lower pump station outlet pool between the two pump stations are divided into sections at the junction of the water transfer building, and the flow Qcu and Qcd are obtained, and the water level process Zcu and Zcd are stored in the basic database.
[0159] (3) The unit head process is obtained according to the water level process Z of each section obtained by the above process and the initial water level obtained by monitoring, and compared with the initial head assumed when the unit operation plan is optimized. If the accuracy requirement is not met, step 402 is repeated with the newly obtained head process as the initial condition to obtain a new operation plan until the accuracy requirement is met. If the final operation plan that meets the accuracy requirement still does not meet the inter-stage water demand and water level limit, the water lifting amount is further increased, and step 402 is repeated to obtain an operation plan with a higher water lifting amount to meet the inter-stage water demand.
[0160] (4) Then, based on the flow rates Qcu and Qcd obtained in the above process and the water level processes Zcu and Zcd as boundary conditions, a two-dimensional shallow water simulation is performed in the inlet pool of the upper pump station and the outlet pool of the lower pump station to obtain the flow pattern. The control equation used is the shallow water equation, that is, the depth-averaged version of the Navier-Stokes equation. When solving, the finite volume method is used to divide the continuum into non-overlapping triangular units, that is, to divide the shallow water simulation grids of the inlet pool and the outlet pool, and to assign grid elevation information. The control equation used includes two parts: the continuity equation and the momentum equation:
[0161] Continuity equation:
[0162]
[0163] Momentum equation:
[0164]
[0165]
[0166] Where: p and q are the fluxes in the x and y directions, respectively, which are determined by the flow velocity, flow rate and water depth; t is time; x and y are Cartesian coordinates; h is water depth; g is gravitational acceleration; ζ is water surface elevation; C is Chezy resistance parameter; f is friction coefficient; V, V x ,V y is the velocity and its components in the x and y directions; Ω is the Coriolis force associated with latitude; P a is the atmospheric pressure; ρ w is the density of water; τ xx , τ yy , τ xy is the effective shear stress component, and its value is determined by the average flow velocity and eddy viscosity.
[0167] (5) Then, the BIM model of the pump station unit established in step 101 is simplified to obtain a numerical simulation model and divide the mesh to perform three-dimensional fluid simulation. The speed and blade placement angle of each unit obtained in step 402 are used as boundary conditions, and the water level and flow rate are used as initial conditions. The three-dimensional fluid calculation under steady-state conditions is performed using the multiple reference system method to obtain the change process of the unit inlet and outlet pressure and flow rate, determine the change process of the unit head, and verify whether the unit head and flow rate can meet the ideal situation of step 402. If not, the blade placement angle θ is fine-tuned. i,j * and speed n until the ideal requirements are met, and the final solution is stored in the basic database.
[0168] (6) Then, based on the rotation speed and blade placement angle of each unit obtained in step 402 as boundary conditions, and the water level and flow rate as initial conditions, the sliding grid method is used to perform three-dimensional fluid-solid coupling calculation under transient conditions to obtain the unit main shaft swing and vibration, as well as the unit pressure pulsation. The rule constraint model established in step 103 is used as a constraint to determine whether the unit operation can meet the stability requirements, thereby providing decision support for the unit operation and maintenance.
[0169] Step 404, based on the multi-dimensional hybrid simulation results, perform data mapping within the twin scene.
[0170] In the embodiment of the present application, it can be understood that the one-dimensional non-steady flow simulation results include the changes in water level and flow rate in the water delivery building, the water level changes are mapped by means of the changes in the height of the water body in the twin scene, and the flow rate changes are mapped by means of the changes in the flow velocity of the water body material in the twin scene;
[0171] The results of the two-dimensional shallow water simulation include the changes in the water surface flow patterns of the pump station inlet and outlet pools, including the coordinates, flow velocity, flow rate, and water depth attribute data of the fluid grid nodes. Based on the fluid grid node coordinates and the connection sequence of the divided shallow water simulation triangle grid nodes, the three-dimensional water surface grid can be reconstructed in the form of three-node connection to form a triangular face in the three-dimensional visualization rendering engine, and the fluid grid node attribute data can be assigned to the reconstructed three-dimensional water surface grid nodes to obtain the water surface flow pattern information of the inlet and outlet pools in the form of vertex coloring.
[0172] The three-dimensional fluid simulation results include the coordinates, flow velocity, and pressure data of all fluid unit nodes, as well as the coordinates and displacement data of metal structure unit nodes during fluid-solid coupling simulation.
[0173] Therefore, the process of performing data mapping in the twin scene in the embodiment of the present application may specifically be:
[0174] Extract the average flow rate and average pressure data of the inlet and outlet cross sections of the unit flow channel from the three-dimensional fluid simulation results to verify the flow rate and head parameters of the solution obtained in step 103;
[0175] Extract the velocity, pressure, and coordinate data of all unit nodes of the 3D fluid simulation results, use the particle generation system in the 3D visualization rendering engine to obtain the position coordinates and velocity vector information of the fluid unit nodes, assign pressure attributes to the particles, and select specific points according to needs to analyze the pressure pulsation parameters in the flow channel;
[0176] The coordinate data and node connection sequence of the unit nodes of the three-dimensional fluid simulation results are extracted, and the three-dimensional metal structure mesh is reconstructed in the form of triangular patches formed by three-node connection in the three-dimensional visualization rendering engine. The mesh nodes are given displacement attributes, and the displacement state is obtained to analyze the vibration and swing parameters of the metal structure.
[0177] Step 405, maps the multi-dimensional hybrid simulation results to the twin scene according to the water flow order and flow time, where the flow order is from the starting pump station of the pump station group to the next pump until it reaches the end pump station, and the flow time is to keep the one-dimensional simulation results consistent with the two-dimensional simulation results time scale. If the water level and flow in the two-dimensional simulation meet the unit operation requirements, start mapping the three-dimensional simulation results.
[0178] In the embodiment of the present application, the flow sequence is from the starting pump station of the pump station group to the next pump station until it reaches the last pump station, involving a multi-segment multi-dimensional hybrid simulation process, and the simulation results are mapped in the twin scene in sequence according to the step order.
[0179] In terms of flow time, in the multi-dimensional mixed simulation results, the time scale of the one-dimensional simulation results is kept consistent with that of the two-dimensional simulation results to achieve a smooth transition of the connecting parts. If the water level and flow in the two-dimensional simulation meet the unit operation requirements, the three-dimensional simulation results can be mapped to achieve a simulation preview of the entire operation process.
[0180] Step 105, based on the rule constraint model, the operation plan is checked according to the simulation results to obtain the target operation plan.
[0181] In the embodiment of the present application, it is necessary to verify from multiple aspects and determine the optimal operation plan through stability, smoothness, matching degree, cost and other aspects.
[0182] As a possible implementation method, the water lifting capacity and flow rate of the pumping station under multiple sets of operation plans, the water level and flow rate during the water transfer process, the head, flow rate, pulsating pressure, vibration, and swing of the unit are obtained; according to the rule constraint model, it is verified whether the water lifting capacity and flow rate of the pumping stations at all levels under the operation plan can meet the needs of the water diversion plan. If not, the blade placement angle and speed are fine-tuned on the basis of the original operation plan to increase the flow rate, and the new operation plan is re-solved until the needs of the water diversion plan are met; according to the rule constraint model, it is verified whether the water level and flow rate during the water transfer process under the operation plan can meet the water use needs of users. If not, the water lifting capacity and flow rate are increased on the basis of the original operation plan, and the new operation plan is re-solved to obtain the new operation plan, and the water level fluctuation amplitude of the inter-stage water transfer river channel of the pumping stations at all levels under each operation plan is calculated respectively.
[0183] It is understandable that the water level change in the water supply channel under a certain scheme is relatively more stable if the water level change is smaller.
[0184] As another possible implementation method, based on the rule constraint model and the new operation plan optimized in the above steps, the water level fluctuation amplitude above the station and the water level fluctuation amplitude below the station of each level of pumping station under each operation plan are calculated.
[0185] It is understandable that by analyzing and comparing which scheme has the smaller fluctuation of water levels above and below the pump station, the match with the established head will be higher during the optimized operation process; by analyzing and comparing which scheme has the smaller unit flow deviation, the match with the scheme will be higher and more in line with the actual operation situation.
[0186] As another possible implementation method, stability analysis is performed on the pulsating pressure, vibration, and swing under each operation scheme to determine the stability parameters of each unit under each operation scheme.
[0187] It can be understood that the scheme under which the pressure pulsation, vibration and swing data of the unit are smaller means that the operation stability of the pump station unit is higher under this scheme.
[0188] As another possible implementation method, the minimum unit water lifting cost of each pumping station under each operation plan using a fixed-angle constant speed operation and the minimum unit water lifting cost under an optimized operation plan are calculated separately to obtain the total savings of the cascade pumping station group.
[0189] It is understandable that the scheme with the smaller total savings will result in a higher optimized operation economy of the pumping station system.
[0190] Then, based on the comparison and analysis results of the above process, according to the water level fluctuation, the water level fluctuation above the station, the water level fluctuation below the station, the stability parameters, the stability parameters and the total savings, a comprehensive comparison is made to select a plan that meets the water diversion plan, meets the water demand of users along the water transmission line, has a more stable water level fluctuation, has a higher matching degree of unit flow and head, has higher operation stability, and is more economical as the target operation plan, and the target operation plan is recommended to the automatic control system and the control operations are recorded, thereby realizing full automation of the decision-making and control process.
[0191] The embodiments of the present application can construct a digital twin scenario of a pump station group that operates stably and smoothly, guide decisions with operation optimization mechanism models and rule constraints, dynamically associate and iteratively update data, rules, and three-dimensional geometric models, and use simulation methods to verify the rationality of the plan and adjust the operating status. It avoids the problems of over-idealization of traditional operation decision-making mechanisms, incomplete consideration of rules and constraints, lack of application of measured data, lack of feedback verification, and high degree of manual dependence, and also makes up for the defects of lack of mechanism support and poor simulation in the preview of the digital twin pump station group.
[0192] Figure 6 1 is a block diagram of a digital twin driven cascade pump station group operation feedback control device 10 according to an embodiment of the present application, including:
[0193] Establishing module 100, for establishing a building information model BIM, an oblique photography model, a basic rule base and a basic database of a cascade pump station group;
[0194] The twin scene building module 200 is used to process the BIM model through the BIM lightweight method to obtain a lightweight model, and to build a twin scene by processing the lightweight model through three-dimensional visual rendering and combining it with the oblique photography model;
[0195] A rule constraint model building module 300 is used to associate the basic rules with the basic data based on the basic rules in the basic rule base and the basic data in the basic database to obtain a rule constraint model;
[0196] The simulation mapping module 400 is used to construct an optimized operation model of a pump station group based on a rule-constrained model by adopting a large system decomposition-dynamic programming aggregation method and solve and screen to obtain an operation plan, perform multi-dimensional hybrid simulation with the operation plan parameters as boundary conditions, and map the simulation results to a twin scenario;
[0197] The verification module 500 is used to verify the operation plan based on the rule constraint model and the simulation results to obtain the target operation plan.
[0198] Regarding the device in the above embodiment, the specific manner in which each module performs operations has been described in detail in the embodiment of the method, and will not be elaborated here.
[0199] Figure 7 A schematic block diagram of an example electronic device 700 that can be used to implement an embodiment of the present application is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workbenches, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices, and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present application described and / or required herein.
[0200] like Figure 7 As shown, the device 700 includes a computing unit 701, which can perform various appropriate actions and processes according to a computer program stored in a read-only memory (ROM) 702 or a computer program loaded from a storage unit 708 into a random access memory (RAM) 703. In the RAM 703, various programs and data required for the operation of the device 700 can also be stored. The computing unit 701, the ROM 702, and the RAM 703 are connected to each other via a bus 704. An input / output (I / O) interface 705 is also connected to the bus 704.
[0201] A number of components in the device 700 are connected to the I / O interface 705, including: an input unit 706, such as a keyboard, a mouse, etc.; an output unit 707, such as various types of displays, speakers, etc.; a storage unit 708, such as a disk, an optical disk, etc.; and a communication unit 709, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 709 allows the device 700 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0202] The computing unit 701 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the computing unit 701 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various computing units running machine learning model algorithms, digital signal processors (DSPs), and any appropriate processors, controllers, microcontrollers, etc. The computing unit 701 performs the various methods and processes described above, such as the voice instruction response method. For example, in some embodiments, the voice instruction response method may be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as a storage unit 708. In some embodiments, part or all of the computer program may be loaded and / or installed on the device 700 via ROM 702 and / or communication unit 709. When the computer program is loaded into RAM 703 and executed by the computing unit 701, one or more steps of the voice instruction response method described above may be performed. Alternatively, in other embodiments, the computing unit 701 may be configured to perform the voice instruction response method in any other appropriate manner (e.g., by means of firmware).
[0203] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0204] The program code for implementing the method of the present application can be written in any combination of one or more programming languages. These program codes can be provided to a processor or controller of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that the program code, when executed by the processor or controller, implements the functions / operations specified in the flow chart and / or block diagram. The program code can be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0205] In the context of the present application, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0206] To provide interaction with a user, the systems and techniques described herein can be implemented on a computer having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user can provide input to the computer. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).
[0207] The systems and techniques described herein can be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system can be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), the Internet, and a blockchain network.
[0208] A computer system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The relationship between the client and the server is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services ("Virtual Private Server", or "VPS" for short). The server may also be a server of a distributed system, or a server combined with a blockchain.
[0209] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in this application can be executed in parallel, sequentially or in different orders, as long as the expected results of the technical solution of this application can be achieved, and this document is not limited here.
[0210] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of this application should be included in the protection scope of this application.
Claims
1. A digital twin driven cascade pump station group operation feedback control method, characterized in that: include: Establish the building information model (BIM), oblique photography model, basic rule base and basic database of the cascade pump station group; The BIM model is processed by a BIM lightweight method to obtain a lightweight model, and the lightweight model is processed by three-dimensional visualization rendering and combined with the oblique photography model to build a twin scene; Based on the basic rules in the basic rule base and the basic data in the basic database, the basic rules and basic data are associated to obtain a rule constraint model; Based on the rule constraint model, a large system decomposition and dynamic programming aggregation method is used to construct an optimized operation model for a pump station group and solve and screen the operation plan. A multi-dimensional hybrid simulation is performed with the operation plan parameters as boundary conditions, and the simulation results are mapped to the twin scenario. Based on the rule constraint model, the operation plan is checked according to the simulation result to obtain a target operation plan; Based on the rule constraint model, a large system decomposition-dynamic programming aggregation method is used to construct an optimization operation model of a pump station group and solve and screen to obtain an operation plan, and a multi-dimensional hybrid simulation is performed with the operation plan parameters as boundary conditions, and the simulation results are mapped to the twin scenario, including: Determine a pump station group operation optimization mathematical model, wherein the pump station group operation optimization mathematical model includes a series cascade pump station group operation optimization model, a single pump station multi-unit operation optimization model, and a single pump station single unit operation optimization model; Taking each level of pumping station as the object, considering that the daily average head remains unchanged, the daily average head is discretized into multiple daily average heads within the feasible domain of the pumping station head, and the large system decomposition and dynamic programming aggregation method are used to perform the optimal operation calculation of the pumping station under different water volume constraints of each daily average head, and the optimal operation plan of each level of pumping station is obtained; Perform one-, two- and three-dimensional hybrid simulations using the program parameters of the optimized operation program as boundary conditions to obtain multi-dimensional hybrid simulation results; Based on the multi-dimensional hybrid simulation results, data mapping within the twin scene is performed; According to the water flow order and flow time, the multi-dimensional hybrid simulation results are mapped to the twin scene, where the flow order is from the starting pump station of the pump station group to the next pump until it reaches the end pump station, and the flow time is to keep the one-dimensional simulation results consistent with the two-dimensional simulation results time scale. If the water level and flow in the two-dimensional simulation meet the unit operation requirements, start mapping the three-dimensional simulation results.
2. The method according to claim 1, characterized in that The building information model BIM, oblique photography model, basic rule base and basic database of the cascade pump station group are established, including: Establishing the building information model (BIM) of the pump station group based on the engineering BIM modeling method, wherein the modeling process includes modeling of civil engineering and electromechanical equipment; Establishing an oblique photography model of the landforms around the pump station group according to oblique photography modeling methods; Based on field research and standard specifications, obtain the operation rule data of the pump station group, and establish a basic rule library according to the operation rule data; Based on field research, the monitoring perception data of the digital twin pump station group Internet of Things is obtained, and a basic database is established based on the monitoring perception data.
3. The method according to claim 1, characterized in that The method of processing the building information model BIM by the BIM lightweight method to obtain a lightweight model, processing the lightweight model by three-dimensional visualization rendering and combining it with the oblique photography model to build a twin scene includes: Standardize the data structure of BIM models constructed on different platforms, convert the data structure into an IFC standard format, and obtain an IFC model; Extracting basic attributes and attribute sets of the IFC model through semantic information, eliminating repeated component attributes and obtaining the association relationship between the basic attributes, merging and expressing the same geometric bodies that are repeatedly referenced, deleting the repeated expression instances, and obtaining the geometric model instance; Simplifying the triangles of the geometric model instance and dividing the LoD levels to generate a multi-level-of-detail model; Saving the attribute information, association relationship information, and unique geometric model identifier of the multi-level-of-detail model to a relational database; The multi-level-of-detail model is compressed by using the Draco geometric compression algorithm, and the above-mentioned processing content is formed into an API interface and then integrated into the model management platform; Based on the model management platform, a three-dimensional visualization rendering tool is used to load the model on the Web side, the model is configured to correspond to the spatial coordinates stored in the relational database, and a model publishing generation path link is obtained; The model is loaded to publish the generated path link and the corresponding spatial coordinates, and a three-dimensional visualization scene is established in combination with the oblique photography model. The three-dimensional visualization scene is optimized and adjusted based on the attribute information, association relationship information, and unique geometric model identifier to obtain the twin scene.
4. The method according to claim 3, characterized in that The basic rules in the basic rule base and the basic data in the basic database are associated with each other to obtain a rule constraint model, including: Standardize the basic data and basic rules under the same category according to the data identity number, related building and equipment information, category information, and time information to generate corresponding data identifiers and rule identifiers; The data identifier and the unique geometric model identifier of the model in the model management platform are stored in the basic database to establish an association between the geometric model and the data; The data identifier and the rule identifier are stored in the basic rule database, the association between the data and the rule is established, and the management API of the data identifier and the rule identifier is established and integrated into the rule management platform, wherein the rule management platform is used to add, edit, read and delete rules; According to the association relationship between geometric models and data and the association relationship between data and rules, the data, geometric models and rules are integrated to obtain a dynamic data-rule-model relationship. A rule constraint model is constructed based on the dynamic data-rule-model relationship, wherein the rule constraint model automatically retrieves the association rules for threshold judgment when calling data.
5. The method according to claim 1, characterized in that The step of determining the pump station group operation optimization mathematical model comprises: Taking the minimum daily water-lifting power consumption of the cascade pump station group system as the objective function, dividing different time periods according to the preset time period electricity price distribution, taking the blade placement angle and operating head of each unit of each level of pump station in each time period as the decision variables, and taking the total water lifting amount, rated power and total water lifting head specified in the rule constraint model as the constraint conditions, the optimization operation model of the series cascade pump station group is constructed; Taking the minimum daily water extraction cost of a single pumping station as the objective function, taking the blade angle of each unit at each time period as the decision variable, and taking the total amount of water extraction and the unit power requirements specified by the rule constraint model as the constraint conditions, the single pumping station multi-unit operation optimization model is constructed; The single-unit operation optimization model of the single pump station is constructed by taking the minimum total daily power consumption cost as the objective function, the preset time periods as the stage variables, the blade placement angles in each time period as the decision variables, and the total water pumping amount and the rated power of the motor within the specified time period as the constraints.
6. The method according to claim 1, characterized in that The step of verifying the operation plan based on the rule constraint model and the simulation result to obtain a target operation plan includes: Obtain the water lifting volume and flow rate of the pump station under multiple sets of the operation schemes, the water level and flow rate during the water delivery process, the head, flow rate, pulsating pressure, vibration, and swing of the unit; According to the rule constraint model, verify whether the water lifting volume and flow rate of each level of pumping stations under the operation plan can meet the requirements of the water diversion plan. If not, fine-tune the blade placement angle and speed to increase the flow rate based on the original operation plan, and re-solve to obtain a new operation plan until the requirements of the water diversion plan are met; According to the rule constraint model, verify whether the water level and flow rate of the water transfer process along the route under the operation plan can meet the water demand of users. If not, choose to increase the water lifting volume and flow rate based on the original operation plan, re-solve to obtain a new operation plan, and calculate the water level variation of the inter-stage water transfer channel under each operation plan for each pump station; According to the rule constraint model and the new operation scheme optimized in the above steps, the water level fluctuation amplitude above the pump station and the water level fluctuation amplitude below the pump station at each level under each operation scheme are calculated; Conduct stability analysis on the pulsating pressure, vibration and swing under the operation scheme, and determine the stability parameters of each unit under each operation scheme; Calculate the minimum unit water lifting cost of each pumping station under each operation plan, using a fixed angle and constant speed operation, and the minimum unit water lifting cost under an optimized operation plan, and obtain the total savings of the cascade pumping station group; According to the water level fluctuation, the water level fluctuation above the station, the water level fluctuation below the station, the stability parameter, the stability parameter and the total savings, the target operation plan is determined, and the target operation plan is recommended to the automatic control system and the control operation is recorded.
7. A digital twin-driven cascade pump station group operation feedback control device, characterized in that: include: Establish modules for establishing the building information model (BIM), oblique photography model, basic rule base and basic database of cascade pump station groups; A twin scene building module is used to process the BIM model through a BIM lightweight method to obtain a lightweight model, and to build a twin scene by processing the lightweight model through three-dimensional visual rendering and combining it with the oblique photography model; A rule constraint model building module is used to associate the basic rules with the basic data based on the basic rules in the basic rule base and the basic data in the basic database to obtain a rule constraint model; A simulation mapping module is used to construct an optimization operation model of a pump station group based on the rule constraint model by adopting a large system decomposition-dynamic programming aggregation method and to solve and screen an operation plan, perform a multi-dimensional hybrid simulation with the operation plan parameters as boundary conditions, and map the simulation results to the twin scenario; A verification module, used to verify the operation plan based on the rule constraint model and the simulation result to obtain a target operation plan; Based on the rule constraint model, a large system decomposition-dynamic programming aggregation method is used to construct an optimization operation model of a pump station group and solve and screen to obtain an operation plan, and a multi-dimensional hybrid simulation is performed with the operation plan parameters as boundary conditions, and the simulation results are mapped to the twin scenario, including: Determine a pump station group operation optimization mathematical model, wherein the pump station group operation optimization mathematical model includes a series cascade pump station group operation optimization model, a single pump station multi-unit operation optimization model, and a single pump station single unit operation optimization model; Taking each level of pumping station as the object, considering that the daily average head remains unchanged, the daily average head is discretized into multiple daily average heads within the feasible domain of the pumping station head, and the large system decomposition and dynamic programming aggregation method are used to perform the optimal operation calculation of the pumping station under different water volume constraints of each daily average head, and the optimal operation plan of each level of pumping station is obtained; Perform one-, two- and three-dimensional hybrid simulations using the program parameters of the optimized operation program as boundary conditions to obtain multi-dimensional hybrid simulation results; Based on the multi-dimensional hybrid simulation results, data mapping within the twin scene is performed; According to the water flow order and flow time, the multi-dimensional hybrid simulation results are mapped to the twin scene, where the flow order is from the starting pump station of the pump station group to the next pump until it reaches the end pump station, and the flow time is to keep the one-dimensional simulation results consistent with the two-dimensional simulation results time scale. If the water level and flow in the two-dimensional simulation meet the unit operation requirements, start mapping the three-dimensional simulation results.
8. An electronic device, characterized in that: include: A processor, and a memory communicatively connected to the processor; The memory stores computer-executable instructions; The processor executes the computer-executable instructions stored in the memory to implement the method according to any one of claims 1 to 6.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-executable instructions, which are used to implement the method according to any one of claims 1 to 6 when executed by a processor.