Construction process of high-performance fireproof partition component

By using magnesium crystal fireproof boards and vacuum spraying equipment, the problems of long construction cycle and complex construction of traditional fireproof partition components have been solved, achieving efficient and low-cost construction of fireproof partition components.

CN118080296BActive Publication Date: 2026-07-24LVYI CONSTR GRP CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
LVYI CONSTR GRP CO LTD
Filing Date
2024-03-26
Publication Date
2026-07-24

AI Technical Summary

Technical Problem

Traditional fire-resistant partition construction methods suffer from problems such as long construction cycles, the need for multiple coats of paint with high surface cleanliness requirements, and complex construction of sealed fireproof coating layers.

Method used

Magnesium crystal fireproof boards with a thickness of 12mm or more are used. The construction is carried out using cleaning equipment and vacuum spraying equipment, which simplifies the cleaning process and allows for the application of multi-performance coatings in a vacuum environment, reducing construction steps and time.

Benefits of technology

It shortened the construction period, reduced construction costs, improved construction efficiency, and simplified construction difficulties.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118080296B_ABST
    Figure CN118080296B_ABST
Patent Text Reader

Abstract

The application discloses a construction process of a high-performance fireproof partition component, which comprises the following steps: step one, selecting raw materials: using magnesium crystal fireproof plates with a thickness of more than 12 mm as partition plates, grading the frame according to the specifications of the fireproof plates, and determining the grading distance according to the plate specifications; step two, cleaning the raw materials: placing the raw materials on a cleaning device for cleaning; step three, transferring the raw materials: transferring the raw materials to a spraying device, and performing vacuum treatment on the spraying device; and step four, preparing the coating: preparing fireproof, anticorrosive, antioxidant and heat-insulating coatings respectively, and uniformly mixing the coatings to obtain a required multi-performance fireproof coating; the spraying device is arranged, the fireproof partition component is placed in a vacuum spraying machine shell after cleaning, spraying is performed in a vacuum environment, the step of twice cleaning before each spraying is reduced, the workload in the construction process is reduced, the construction period is shortened, and the construction cost is reduced.