Construction process of high-performance fireproof partition component
By using magnesium crystal fireproof boards and vacuum spraying equipment, the problems of long construction cycle and complex construction of traditional fireproof partition components have been solved, achieving efficient and low-cost construction of fireproof partition components.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- LVYI CONSTR GRP CO LTD
- Filing Date
- 2024-03-26
- Publication Date
- 2026-07-24
AI Technical Summary
Traditional fire-resistant partition construction methods suffer from problems such as long construction cycles, the need for multiple coats of paint with high surface cleanliness requirements, and complex construction of sealed fireproof coating layers.
Magnesium crystal fireproof boards with a thickness of 12mm or more are used. The construction is carried out using cleaning equipment and vacuum spraying equipment, which simplifies the cleaning process and allows for the application of multi-performance coatings in a vacuum environment, reducing construction steps and time.
It shortened the construction period, reduced construction costs, improved construction efficiency, and simplified construction difficulties.
Smart Images

Figure CN118080296B_ABST