Planning and Design Methods for Central Heating Systems Using Remote Air Source Heat Pump Clusters
By adding heat pump units in heat exchange stations and adding air source heat pump clusters far from urban areas, and by optimizing configuration and operating parameters, the limitations of air source heat pump units in urban heating systems due to land occupation, noise, and climate factors have been solved, achieving a more efficient and economical heating effect.
Patent Information
- Application Number
- CN202410470964.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-18
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2044-04-18
AI Technical Summary
Existing air source heat pump units in urban heating systems are limited by factors such as floor space, noise, wind field organization, and climate, resulting in limited installed capacity and difficulty in meeting users' heating needs and achieving efficient operation.
The planning and design method of centralized heating system adopts remote air source heat pump clusters. By adding heat pump units in heat exchange stations and adding air source heat pump clusters far away from urban areas, the configuration and operating parameters of the units are optimized, and optimization algorithms are combined to reduce the return water temperature and improve the heating effect.
It has improved the heating capacity and efficiency of the heating area, reduced the impact of noise and vibration, optimized the wind field organization, adapted to climate change, and reduced energy consumption and expenses.
Smart Images

Figure CN118129220B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of heating system technology, specifically relating to a planning and design method for a centralized heating system utilizing a remote air source heat pump cluster. Background Technology
[0002] Existing air source heat pump units, when designed and planned as regional heat sources, are limited in installed capacity due to area and environmental constraints, affecting their application in large-scale heating networks. Currently, the system structure of air source heat pump units as heat sources mainly suffers from the following problems:
[0003] 1) The large land area required makes it difficult to find large land in urban areas, which restricts the design capacity of heat pump units and makes it difficult to meet the heating needs of users in the area.
[0004] 2) The air source heat pump unit generates significant vibration and noise during operation, which seriously affects the lives of nearby residents;
[0005] 3) There are many buildings in the urban area, and the airflow organization of the wind field is poor. When arranged in an array, cold air is prone to condensation and sinking, which further affects the COP of the heat pump operation.
[0006] 4) Due to climate factors, the operating COP of air source heat pumps is opposite to the trend of building heat load demand and outdoor weather temperature change, and the heating capacity of heat pumps is limited during severe cold periods.
[0007] The aforementioned problems have limited the design and planning of existing heat networks that use air source heat pumps as the heat source for urban centralized heating systems, making it difficult to utilize high-efficiency air source heat pump units for more economical heating operations.
[0008] Based on the above technical problems, a new planning and design method for centralized heating systems utilizing remote air source heat pump clusters is needed. Summary of the Invention
[0009] The technical problem to be solved by the present invention is to overcome the shortcomings of the prior art and provide a planning and design method for a centralized heating system using a remote air source heat pump cluster.
[0010] To solve the above-mentioned technical problems, the technical solution of the present invention is as follows:
[0011] This invention provides a method for planning and designing a centralized heating system using a remotely located air source heat pump cluster, the steps of which are as follows:
[0012] Preliminary modification design of the centralized heating system structure including remote air source heat pump clusters: by adding heat pump units in the heat exchange station to reduce the return water temperature of the main network; by adding remote air source heat pump clusters in places far away from the centralized heating system to heat up the cooled low-temperature return water before it flows into the original heat source return water.
[0013] Establish a configuration optimization model for heat pump units at the first-tier sites: with the optimal investment, construction cost, and operating cost of the heat pump units as the optimization objective function, and solve the problem using an optimization algorithm to obtain the optimal planning and design scheme for the configuration of the heat pump units, and determine the equipment selection for the heat pump units at each site;
[0014] Calculate the heat load deficit based on the configuration of the heat pump unit: By configuring the heat pump unit, increase the operating temperature difference on the primary network side, expand the heating range, or improve the heating effect within the original heating range, calculate the heat load deficit of expanding the heating range or improving the heating effect within the original range.
[0015] A second-layer remote air source heat pump cluster configuration optimization model is established: the equipment configuration and operation matching of the remote air source heat pump cluster is used to compensate for the heat load shortage in the heating network after the heat pump unit in the station is upgraded. Considering the heat load shortage and local heating environment conditions, the optimization objective function is to optimize the construction cost, power supply cost, site rental and construction cost, and operating energy consumption cost of the remote air source heat pump cluster. Relevant constraints are set, and the optimal planning and design scheme for the configuration of the remote air source heat pump cluster is obtained after solving the optimization algorithm. The construction site selection of the remote air source heat pump cluster, the equipment selection and quantity of air source heat pump units in the cluster are determined.
[0016] By iteratively applying the first-layer site heat pump unit configuration optimization model and the second-layer remote air source heat pump cluster configuration optimization model, the optimal planning and design scheme for the upgraded centralized heating system is obtained.
[0017] Furthermore, the preliminary modification design of the centralized heating system structure including the remote-positioned air source heat pump cluster specifically includes:
[0018] By adding heat pump units to the heat exchange station, the return water temperature of the main network can be reduced;
[0019] In locations far from centralized heating systems, remote air source heat pump clusters are installed. The cooled return water main is led to the remote air source heat pump cluster, where the cooled low-temperature return water is heated once, and then the original heat source return water is introduced into the heat source side for a second heating, raising it to the supply water temperature that meets the heating demand, and then sent to various heat exchange stations in the urban area for heat exchange and heating.
[0020] Furthermore, the optimization objective function, which optimizes the investment, construction, and operating costs of the heat pump unit, is expressed as:
[0021] minf1 = C inv +C op ;
[0022] C invThe investment and construction costs, including the purchase, installation, and commissioning costs of the heat pump unit, are related to factors such as equipment selection, system scale, and construction complexity; C op Operating costs include energy consumption costs, maintenance costs, and personnel management costs of the heat pump unit, and are related to the operating efficiency and load factor of the heat pump unit.
[0023] The first-layer heat pump unit configuration optimization model also includes setting constraints: heat pump unit equipment capacity limit, efficiency limit, pipeline flow, temperature and pressure limit, heat load balance constraint, economic cost constraint, and spatial layout constraint.
[0024] Furthermore, the calculation of the heat load deficit under the increased heating range is expressed as follows:
[0025] Q1 = q*A1 - q*A0;
[0026] Q1 represents the total heat load deficit of the heating network after increasing the heating area; A0 represents the total heating area of the heating network before increasing the heating area; A1 represents the total heating area of the heating network after increasing the heating area; q represents the heating network operation heat index;
[0027] The heat load deficit that improves the heating effect within the original range is expressed as:
[0028] Q2 = q1*A - q0*A;
[0029] Q2 represents the total heat load deficit of the heating network after improving heating efficiency; q0 represents the heating network heat index before improving heating efficiency; q1 represents the heating network heat index after improving heating efficiency; and A represents the total area of the heating network.
[0030] Furthermore, the centralized heating system planning and design method also includes: based on the configuration of heat pump unit equipment, calculating the heating design flow rate after the modification; for expandable heating network structures, determining the extent to which the capacity of the existing heat source circulation pump can be improved through hydraulic calculations; for heating networks with limited area and no need for expansion, determining the operating conditions of the circulation pump after modification through hydraulic calculations.
[0031] Furthermore, the centralized heating system planning and design method also includes: optimizing the overall network operating parameters based on the operating characteristics of the heat pump unit and the operating structure of the heating network, with the goal of reducing the return water temperature of the primary network, reducing the flow rate per unit area, and improving the transmission and distribution capacity of the heating network.
[0032] Furthermore, the optimization objective function for the remote-mounted air source heat pump cluster, which optimizes the construction cost, power supply cost, site rental and construction cost, and operating energy consumption cost, is expressed as:
[0033] minf2 = C const +C elec +C rent +Cenergy ;
[0034] C const Construction costs, including installation costs for remote air source heat pump clusters, piping costs, and control system construction costs, are related to the scale and complexity of the construction and the type of equipment selected; C elec The cost of power supply security includes the expenses related to providing a stable power supply for remote air source heat pump clusters, which consists of power line construction, transformer purchase, and power loss costs; C rent The site rental and construction costs include land rental fees, site leveling costs, and infrastructure construction costs, which are related to the site's geographical location, area, and construction requirements; C energy Operating energy costs, including the cost of electricity consumed during operation, depend on the unit's energy efficiency, operating time, and electricity price factors;
[0035] The second-layer remote air source heat pump cluster configuration optimization model sets relevant constraints, including: air source heat pump unit performance constraints, power supply constraints, site condition limitations, pipeline and fluid system constraints, start-up and shutdown constraints, and economic constraints.
[0036] Furthermore, the preliminary renovation design scheme for the centralized heating system structure containing remote air source heat pump clusters includes multiple combinations, including: distributing the station heat pump units in various heating stations in the area, adding heat pump units to some heating stations and not renovating others, depending on the actual situation; deploying multiple remote air source heat pump clusters and adding corresponding energy storage devices.
[0037] Based on various combinations of preliminary renovation schemes, a scheme combination optimization model is established. Economic cost, energy consumption, and carbon emissions are selected as objectives to obtain the optimal combination scheme for renovation design.
[0038] Furthermore, the optimization algorithm is the mongoose optimization algorithm.
[0039] The beneficial effects of this invention are:
[0040] (1) It has achieved the improvement of the heating capacity of the original heating area, optimized the original large flow and small temperature difference heating mode, adopted the operation of large temperature difference and small flow, increased the heating range and improved the heating effect, and reduced the power consumption of the source side water pump under the same heating capacity.
[0041] (2) Introduce an air source heat pump with a higher energy efficiency ratio as a heat source to assist in heating, further reducing the production cost of source-side heating;
[0042] (3) A structure for arranging air source heat pump clusters in urban and suburban areas to draw heat into the grid was proposed, which reduced the drawbacks of traditional air source heat pumps, such as large footprint, high noise and severe vibration when placed in residential areas, narrow air ducts in urban areas, and the tendency of cold air to clump and sink in array arrangement, which affected the working performance.
[0043] (4) Combine the heat pump unit in the station with the air source heat pump cluster, and use low temperature water to enter the air source heat pump cluster for heating, further reducing the operating pressure of the air source heat pump cluster and improving the operating efficiency.
[0044] (5) By using different heat source load ratios, a high-efficiency air source heat pump can replace part of the load output of a traditional heat source;
[0045] (6) It can optimize the configuration of the heat pump unit and the air source heat pump cluster in the station through the optimization model, obtain a reasonable and economical planning and design scheme, and reduce expenses.
[0046] Other features and advantages will be set forth in the description which follows, and will be apparent in part from the description, or may be learned by practicing the invention. The objects and other advantages of the invention are realized and obtained through the structures particularly pointed out in the description and the drawings.
[0047] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, preferred embodiments are described below in detail with reference to the accompanying drawings. Attached Figure Description
[0048] To more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0049] Figure 1 This is a flowchart of a centralized heating system planning and design method utilizing a remote air source heat pump cluster according to the present invention.
[0050] Figure 2 This is a schematic diagram of the structural modification of the centralized heating system of the present invention. Detailed Implementation
[0051] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0052] Example 1
[0053] Figure 1 This is a flowchart of a centralized heating system planning and design method utilizing a remote air source heat pump cluster, which is involved in this invention.
[0054] Figure 2 This is a schematic diagram of the structural modification of the centralized heating system involved in this invention.
[0055] like Figure 1 , Figure 2 As shown in the figure, this embodiment 1 provides a planning and design method for a centralized heating system utilizing a remote air source heat pump cluster. The steps are as follows:
[0056] Preliminary modification design of the centralized heating system structure including remote air source heat pump clusters: by adding heat pump units in the heat exchange station to reduce the return water temperature of the main network; by adding remote air source heat pump clusters in places far away from the centralized heating system to heat up the cooled low-temperature return water before it flows into the original heat source return water.
[0057] Establish a configuration optimization model for heat pump units at the first-tier sites: with the optimal investment, construction cost, and operating cost of the heat pump units as the optimization objective function, and solve the problem using an optimization algorithm to obtain the optimal planning and design scheme for the configuration of the heat pump units, and determine the equipment selection for the heat pump units at each site;
[0058] Calculate the heat load deficit based on the configuration of the heat pump unit: By configuring the heat pump unit, increase the operating temperature difference on the primary network side, expand the heating range, or improve the heating effect within the original heating range, calculate the heat load deficit of expanding the heating range or improving the heating effect within the original range.
[0059] A second-layer remote air source heat pump cluster configuration optimization model is established: the equipment configuration and operation matching of the remote air source heat pump cluster is used to compensate for the heat load shortage in the heating network after the heat pump unit in the station is upgraded. Considering the heat load shortage and local heating environment conditions, the optimization objective function is to optimize the construction cost, power supply cost, site rental and construction cost, and operating energy consumption cost of the remote air source heat pump cluster. Relevant constraints are set, and the optimal planning and design scheme for the configuration of the remote air source heat pump cluster is obtained after solving the optimization algorithm. The construction site selection of the remote air source heat pump cluster, the equipment selection and quantity of air source heat pump units in the cluster are determined.
[0060] By iteratively applying the first-layer site heat pump unit configuration optimization model and the second-layer remote air source heat pump cluster configuration optimization model, the optimal planning and design scheme for the upgraded centralized heating system is obtained.
[0061] In practical applications, to increase the operating temperature difference on the primary side, absorption heat pump units or centrifugal heat pump units are installed in the heat exchange station, or the original heat exchange units are replaced with units with a large temperature difference. This is achieved by retrofitting the units within the station with heat pumps, thereby increasing the operating temperature difference on the primary network side. To ensure the efficient operation of the air source heat pump cluster, the flow rate to the air source heat pump cluster can be adjusted and controlled by installing bypass valves. A schematic diagram of the process system is shown below. Figure 2 As shown: The original centralized heating system was designed with a primary network supply water temperature of 80 degrees Celsius and a primary network return water temperature of 40 degrees Celsius. By adding heat pump units and a remote air source heat pump cluster, the heat pump units lower the primary network return water temperature to 20 degrees Celsius, and the remote air source heat pump cluster raises the return water temperature to 40 degrees Celsius. The flow rate is adjusted via a bypass valve to regulate the primary network return temperature to 38 degrees Celsius. Figure 2 It is one of the structures, and the supply and return water temperatures, water pumps, and valve positions can be set according to actual conditions;
[0062] The operating flow rate of the air source heat pump unit is expressed as follows:
[0063]
[0064] G is the optimal flow rate through the air source heat pump cluster, Q is the optimal load output value of the air source heat pump cluster under the current meteorological conditions, t1 is the optimal outlet water temperature of the air source heat pump cluster under the current meteorological conditions, and t2 is the return water temperature led to the suburban air source heat pump cluster.
[0065] In practical applications, the initial design for modifying a centralized heating system structure containing remote air-source heat pump clusters does not involve modifying all heat exchange stations. Instead, it involves adding heat pump units, remote air-source heat pump clusters, and corresponding valves and pump regulating devices to the primary network return water pipelines of some heat exchange stations. This forms a hybrid energy centralized heating system containing remote air-source heat pump clusters, changing the original centralized heating system's structure where the heat source was only conventional fossil fuel heating units. After the modification, the output of conventional fossil fuel heating units can be reduced. Specifically, the remote air-source heat pump clusters are located in suburban areas, planned and deployed on the outskirts of the city, separated from the source-side conventional fossil fuel heating units. The remote air-source heat pump clusters consist of multiple air-source heat pump units connected in parallel, with each unit operating independently. The output is collected through pipelines and connected to the primary network return water pipeline. Considering the hydraulic balance and heat distribution of the heating system, corresponding valves and pump regulating devices are installed to regulate the return water flow.
[0066] Control mechanism: The heat pump unit absorbs part of the heat in the primary network return water pipeline, regulates the primary network return water flow and reduces the primary network return water temperature. At the same time, the remote air source heat pump cluster utilizes the heat energy in the air to raise the temperature and regulate the flow of the heat-absorbing primary network return water before it flows into the primary network return water pipeline.
[0067] Specifically: A portion of the primary network return water in the primary network return water pipeline is regulated and introduced into the heat pump unit for partial heat absorption, resulting in a cooled primary network return water temperature and regulated primary network return water flow rate. After lowering the primary network return water temperature and regulating the primary network return water flow rate through the heat pump unit, the remote air source heat pump cluster is activated. Through the coordinated operation of multiple air source heat pump units, heat energy is absorbed from the outdoor air through the refrigerant in the evaporator. Then, the compressor compresses the low-temperature, low-pressure gaseous refrigerant into a high-temperature, high-pressure gaseous refrigerant to absorb heat energy. The refrigerant releases heat in the condenser, heating the return water inside the condenser and raising its temperature. The refrigerant, condensed into liquid in the condenser, passes through the expansion valve, where its pressure and temperature decrease, returning to the evaporator to absorb heat energy from the air again, completing a cycle. This allows the remote air source heat pump cluster to continuously absorb heat energy from the air. Furthermore, by adjusting the flow rate of the primary network return water output by the air source heat pump cluster through valves and water pump regulating devices, the temperature of the heat-absorbing primary network return water is increased and its flow rate is regulated before it flows into the primary network return water pipeline.
[0068] By controlling the return water temperature of the primary network using a heat pump unit, a large temperature difference between the supply and return water pipelines is achieved. This ensures sufficient heat transfer even with reduced flow rate. Simultaneously, the low-flow-rate operation further reduces the power demand of the primary network-side pumps, thereby reducing energy consumption. In addition to energy savings, the large temperature difference and low-flow-rate operation also contributes to improved stability and reliability of the heating system. The reduced flow rate also minimizes hydraulic imbalances, thus enhancing the overall system performance.
[0069] The cooled primary network return water is reheated by a remote air-source heat pump cluster. This cluster utilizes the heat energy in the air to raise the return water temperature. This step not only increases the return water temperature to meet the needs of the heating system but also further realizes the cascade utilization of heat energy. Finally, the returned water, heated by the air-source heat pump, flows into the primary network return water pipeline to compensate for the heat absorbed by the absorption heat pump and reduce the heat supply from conventional fossil fuel heating units. This reduces reliance on traditional fossil fuel heating units, improves energy efficiency, and also reduces environmental pollution. Essentially, the heat supply from the remote air-source heat pump cluster replaces a portion of the heat output from conventional fossil fuel heating units.
[0070] It should be noted that the calculation is based on the heat pump unit configuration for the heating network load deficit: By configuring the heat pump units, the operating temperature difference on the primary network side is increased, the primary flow required by each station is reduced, the hydraulic radius of the hot water supply is increased, or the heating effect of the stations within the original heating range is improved. The increase in hydraulic radius and heat exchange capacity of the stations means that the heat source can provide more heat to meet the heating needs of more stations, reduce the flow requirement per unit area, and improve the heat transmission and distribution capacity under the original equipment parameters. The increase in heat transmission and distribution capacity means that the heating capacity of the original heat source will have a load deficit. Therefore, it is necessary to calculate the heat load deficit of increasing the heating range or improving the heating effect within the original range based on the hydraulic conditions of the modified heating network.
[0071] In this embodiment, the preliminary modification design of the centralized heating system structure containing a remote air source heat pump cluster specifically includes:
[0072] By adding heat pump units to the heat exchange station, the return water temperature of the main network is reduced; the operating temperature of the main network is calculated based on the operating conditions of the heat pump units after the modification, and is expressed as follows:
[0073]
[0074] T h To increase the return water temperature of the main network after the heat pump unit; m i The site's mass flow rate after the addition of a heat pump unit; T iThe design operating temperature recovery of the site after the installation of the heat pump unit; i represents the number of sites;
[0075] In locations far from centralized heating systems, remote air source heat pump clusters are installed. The cooled return water main is led to the remote air source heat pump cluster, where the cooled low-temperature return water is heated once, and then the original heat source return water is introduced into the heat source side for a second heating, raising it to the supply water temperature that meets the heating demand, and then sent to various heat exchange stations in the urban area for heat exchange and heating.
[0076] In this embodiment, the optimization objective function, which optimizes the investment and construction costs and operating costs of the heat pump unit, is expressed as:
[0077] minf1 = C inv +C op ;
[0078] C inv The investment and construction costs, including the purchase, installation, and commissioning costs of the heat pump unit, are related to factors such as equipment selection, system scale, and construction complexity; C op Operating costs include energy consumption costs, maintenance costs, and personnel management costs of the heat pump unit, and are related to the operating efficiency and load factor of the heat pump unit.
[0079] The first-layer heat pump unit configuration optimization model also includes setting constraints: heat pump unit equipment capacity limit, efficiency limit, pipeline flow, temperature and pressure limit, heat load balance constraint, economic cost constraint, and spatial layout constraint.
[0080] In practical applications, for example, a city's old urban heating system is undergoing upgrades. To improve heating efficiency and reduce energy consumption, plans are underway to add heat pump units to multiple heat exchange stations. The goal is to increase the primary network return water temperature through heat pump unit technology, thereby reducing the overall system water flow demand, optimizing heating network operation, and ensuring optimal allocation of investment, construction, and operating costs. The specific optimization process includes:
[0081] 1) Preliminary Investigation and Analysis: First, a comprehensive load analysis and current status assessment of the heating system in the old city area will be conducted to understand the heat load demand of each heat exchange station, the existing supply water temperature, return water temperature, and the hydraulic characteristics of the main network. Simultaneously, local climate characteristics, electricity pricing policies, and government preferential policies for clean energy projects will be studied.
[0082] 2) Equipment selection and configuration:
[0083] Based on the heat load characteristics and geographical conditions of each heat exchange station, suitable heat pump unit types are selected, with a focus on examining the equipment's energy efficiency ratio, reliability, service life, and adaptability.
[0084] By establishing a mathematical model, the impact of different heat pump unit configuration schemes on the primary network return water temperature, as well as the resulting operating cost savings and construction cost expenditures, is simulated. This is used as the optimization objective function to calculate the rated power and quantity of ideal heat pump units for each heat exchange station.
[0085] 3) Cost and benefit analysis:
[0086] Calculate the construction costs of the heat pump unit, including purchase cost, transportation cost, installation cost, commissioning cost, and future maintenance cost;
[0087] Based on local electricity prices and the operating efficiency of heat pump units, estimate the operating costs of different heat pump units in different seasons and time periods, including electricity expenses and possible maintenance costs;
[0088] The analysis examines the energy-saving effects of reducing the return water temperature of the main network on the entire heating system, such as reducing pump power consumption, extending pipeline life, and reducing heat waste caused by heat loss, thereby revealing the overall operating cost trend.
[0089] 4) Optimal Solution Design and Implementation: Based on the above analysis results, a heat pump unit configuration scheme that performs optimally in terms of construction and operating costs will be selected.
[0090] 5) Implementation and monitoring: After determining the equipment selection and quantity of the heat pump unit, the equipment is purchased, installed and commissioned. During the trial operation phase, the system is strictly monitored and data is collected. Strategies are continuously optimized to ensure that the actual operation effect meets the design expectations, continuously reduce the overall heating cost and improve the quality of heating services.
[0091] It should be noted that the constraints of the heat pump unit configuration optimization model can include multiple aspects. These constraints ensure that the optimization process is carried out under the premise of meeting actual engineering requirements and economic constraints. The following are some common constraints:
[0092] 1) Equipment performance constraints:
[0093] Unit capacity limitations: Each unit has its maximum and minimum output capacity, and the optimization model needs to ensure that the output of the selected unit is within its performance range;
[0094] Unit efficiency limitations: The unit's efficiency varies under different operating conditions, and the actual efficiency of the unit needs to be considered during the optimization process;
[0095] 2) System operation constraints:
[0096] Flow and pressure limitations: The piping and units in the system have certain requirements for flow and pressure. Optimization requires ensuring that these parameters are within the allowable range.
[0097] Temperature limits: These include the inlet and outlet temperatures of chilled water and cooling water, which must meet the operating requirements of the unit and terminal equipment;
[0098] Load balancing: The system needs to be able to balance the heat load of different areas to ensure that each area receives sufficient cooling or heating.
[0099] 3) Economic constraints:
[0100] Investment budget constraints: The optimization model needs to take into account the total investment budget of the project to ensure that the total cost of the selected equipment and solutions does not exceed the budget;
[0101] Operating cost constraints: The optimization process needs to consider the unit's operating costs, including electricity costs and maintenance expenses, to ensure long-term economic efficiency.
[0102] 4) Environmental constraints:
[0103] Emission standards: Emissions generated during the operation of the unit must comply with local environmental protection standards;
[0104] Noise Limitations: The noise generated during unit operation must meet relevant noise control standards;
[0105] 5) Reliability constraints:
[0106] Redundancy design: To ensure system reliability, redundant equipment or backup units may need to be set up;
[0107] Maintenance cycle: The unit requires regular maintenance, and the impact of the maintenance cycle on system operation needs to be considered during the optimization process;
[0108] 6) Energy supply constraints:
[0109] Power supply stability: Considering the volatility of the power market and the stability of supply, the optimization model needs to ensure that the selected scheme is feasible in terms of power supply;
[0110] Renewable energy utilization: If the use of renewable energy (such as solar energy, wind energy, etc.) is to be considered, the availability and stability of these energy sources need to be taken into account;
[0111] 7) Spatial layout constraints:
[0112] Space constraints in computer rooms or equipment rooms: Considering the actual size of the computer room or equipment room, the optimization model needs to ensure that the layout of the selected equipment and systems is reasonable and meets the space requirements.
[0113] In this embodiment, the calculation of the heat load deficit under the increased heating range is expressed as:
[0114] Q1 = q*A1 - q*A0;
[0115] Q1 represents the total heat load deficit of the heating network after increasing the heating area; A0 represents the total heating area of the heating network before increasing the heating area; A1 represents the total heating area of the heating network after increasing the heating area; q represents the heating network operation heat index;
[0116] The heat load deficit that improves the heating effect within the original range is expressed as:
[0117] Q2 = q1*A - q0*A;
[0118] Q2 represents the total heat load deficit of the heating network after improving heating efficiency; q0 represents the heating network heat index before improving heating efficiency; q1 represents the heating network heat index after improving heating efficiency; and A represents the total area of the heating network.
[0119] In practical applications, existing urban heating systems comprise multiple heating stations. The original primary network side (from the heat source to the heating station) operates with a small temperature difference, resulting in a large volume of circulating water required to deliver the same amount of heat. This limits the heating range and the heating efficiency of the heating stations. Therefore, heat pump unit technology is introduced to increase the temperature difference between the supply and return water on the primary network side, thereby optimizing hydraulic conditions. The specific process is as follows:
[0120] Determining the configuration and operating parameters of the heat pump unit: First, configure a suitable heat pump unit that can extract heat from a lower-grade heat source and elevate it to a higher grade for supply to the heating network. Determine the heating capacity and efficiency of the heat pump unit, as well as the specific values for increasing the temperature difference under operating conditions;
[0121] Optimization of operating parameters on the primary network side: After the renovation, the return water temperature of the primary network is appropriately reduced by using heat pump unit technology, which increases the operating temperature difference of the primary network and reduces the flow requirement per unit area.
[0122] Hydraulic radius and heating station capacity assessment: Due to the increased temperature difference, heating stations can accept lower flow rates but higher heat inputs, thus expanding the hydraulic radius, which increases the effective heating distance of the heating network. Simultaneously, the heat exchangers at heating stations may also see improved heat exchange efficiency due to the increased inlet water temperature, thereby enhancing the heating capacity of individual heating stations.
[0123] Heat load recalculation: Based on the new heating parameters, the heat load demand of each heating station within the original heating area is recalculated. Considering the increased temperature difference and decreased flow demand, areas that were previously unable to receive sufficient heating may now be better served, and there may be the capacity to further expand the heating boundary.
[0124] Heat load deficit calculation: Determine the total heat required by each new or existing heating station after the renovation of the heating network, assuming an increased heating range or improved heating efficiency. Compare this newly calculated total heat demand with the heating capacity of the original heat source before the renovation. If the new total heat demand is greater than the output capacity of the original heat source, the difference between the two is the so-called heat load deficit.
[0125] Solution Development: If there is a heat load deficit, it is necessary to consider whether to add additional heat sources (such as air source heat pump clusters), improve the efficiency of the heat sources themselves, or optimize the overall layout and operation strategy of the heating network to fill the deficit and ensure that the entire heating network can still meet the heating needs of all users after improving efficiency and expanding the heating range.
[0126] In this embodiment, the centralized heating system planning and design method further includes: based on the configuration of the heat pump unit equipment in the station, calculating the heating design flow rate after the modification; for expandable heating network structures, determining the extent to which the hydraulic radius of the existing heat source circulation pump capacity can be improved through hydraulic calculations; for heating networks with limited area and no need for expansion, determining the operating conditions of the circulation pump after modification through hydraulic calculations, and further reducing pump power consumption and improving the overall economic benefits of the heating network operation through adjustments to the pump operating conditions or selection.
[0127] In this embodiment, the centralized heating system planning and design method further includes: optimizing the overall network operating parameters based on the operating characteristics of the heat pump unit and the operating structure of the heating network, with the goal of reducing the return water temperature of the primary network, reducing the flow rate per unit area, and improving the heat network transmission and distribution capacity.
[0128] In this embodiment, the optimization objective function for optimizing the construction cost, power supply cost, site rental and construction cost, and operating energy consumption cost of the remote air source heat pump cluster is expressed as:
[0129] minf2 = C const +C elec +C rent +C energy ;
[0130] C const Construction costs, including installation costs for remote air source heat pump clusters, piping costs, and control system construction costs, are related to the scale and complexity of the construction and the type of equipment selected; C elec The cost of power supply security includes the expenses related to providing a stable power supply for remote air source heat pump clusters, which consists of power line construction, transformer purchase, and power loss costs; C rent The site rental and construction costs include land rental fees, site leveling costs, and infrastructure construction costs, which are related to the site's geographical location, area, and construction requirements; C energyOperating energy costs, including the cost of electricity consumed during operation, depend on the unit's energy efficiency, operating time, and electricity price factors;
[0131] The second-layer remote air source heat pump cluster configuration optimization model sets relevant constraints, including: air source heat pump unit performance constraints, power supply constraints, site condition limitations, pipeline and fluid system constraints, start-up and shutdown constraints, and economic constraints.
[0132] In practical applications, the investment and operating costs vary depending on the proportion of air source heat pump units in an air source heat pump cluster. Regarding operating costs, because air source heat pumps have a higher energy efficiency ratio than traditional fossil fuel heating units, operating costs decrease monotonically as the proportion of air source heat pumps increases. If investment costs are disregarded and energy conservation is the sole consideration, increasing the installed capacity of the air source heat pump cluster is the most economical approach. However, as heating systems are a matter of public concern, various factors should be comprehensively considered, including site size, the number of air source heat pump units, and parameter configurations. A site selection, scale, and parameter plan for the air source heat pump cluster should be developed, taking into account heat load shortages, to ensure the long-term stable operation of the heating system.
[0133] The specific optimization configuration process includes:
[0134] 1) Site selection for construction:
[0135] The first consideration in site selection is the energy efficiency of the air source heat pump cluster. Priority should be given to locations with sufficient sunshine throughout the year, good air quality, moderate wind speed, and conditions conducive to heat exchange, such as open areas, so that the air source heat pump cluster can maximize the absorption of energy from the air.
[0136] Secondly, taking into account both cable laying costs and distance, locations should be chosen as close as possible to power distribution facilities to reduce cable losses and power supply costs.
[0137] Finally, considering land rent or land acquisition costs, select plots with high cost-effectiveness to avoid excessive site rental costs from adversely affecting the overall economic benefits of the project.
[0138] 2) Equipment selection and quantity:
[0139] Based on the actual heat load deficit and local climate conditions, the required heat supply value is accurately calculated.
[0140] Select air source heat pump unit models with high energy efficiency ratio and stable operation to ensure efficient operation under various working conditions;
[0141] By analyzing simulation software, the number and specifications of air source heat pump units are optimized to achieve the best energy efficiency ratio and minimize initial investment costs. For example, through dynamic load balancing algorithms, the power and operating modes of multiple air source heat pump units are rationally allocated to ensure that low-cost electricity is utilized during off-peak hours while meeting energy demand during peak hours.
[0142] 3) Cost and energy consumption analysis:
[0143] Calculate the construction cost of each air source heat pump unit throughout its entire lifecycle, including purchase, installation, commissioning, and maintenance, as well as the construction and maintenance costs of the supporting power facilities. Analyze the projected energy consumption of the cluster operation and, in conjunction with local electricity pricing policies, estimate the long-term energy consumption costs.
[0144] By integrating all the above costs into a comprehensive optimization objective function, mathematical modeling and optimization algorithms are used to find the combination scheme with the lowest cost and lowest energy consumption.
[0145] It should be noted that the constraints of the remote air source heat pump cluster configuration optimization model cover multiple aspects. These conditions ensure that the optimization results not only meet practical engineering needs but also comply with economic, technical, and environmental requirements. The following are some common constraints:
[0146] 1) Equipment performance and quantity limitations:
[0147] Heat pump unit performance: Each heat pump unit has its specific performance parameters, such as heating / cooling capacity, energy efficiency ratio, etc., and these parameters must be within the specified range;
[0148] Unit quantity limit: Considering factors such as investment, site and operation management, the number of heat pump units may be limited;
[0149] 2) Power supply constraints:
[0150] Power load limit: The total power load of the heat pump cluster must not exceed the carrying capacity of the power supply system;
[0151] Power supply stability: It is necessary to ensure the stability of the power supply to meet the continuous operation requirements of the heat pump unit;
[0152] 3) Site conditions limitations:
[0153] Site size: The layout of the heat pump unit and supporting facilities is limited by the actual size of the site;
[0154] Topography and geology: Topographic relief and geological conditions (such as soil bearing capacity) may affect unit installation and infrastructure construction;
[0155] 4) Piping and fluid system constraints:
[0156] Pipe size and material: The selection of pipes must meet the requirements of flow rate, pressure and temperature;
[0157] Fluid flow restrictions: The fluid flow in the system must meet certain velocity and flow rate requirements to ensure heat transfer efficiency;
[0158] 5) Operation and maintenance constraints:
[0159] Unit operation strategy: The unit can start up or adjust its operating power according to load demand;
[0160] Maintenance cycle and requirements: The unit requires regular maintenance, and the maintenance cycle and requirements may constitute constraints.
[0161] 6) Environmental impact and emission standards:
[0162] Emission restrictions: Emissions from heat pump units (such as exhaust gas, wastewater, noise, etc.) must meet local environmental protection standards;
[0163] Energy efficiency requirements: To meet energy-saving requirements, the energy efficiency of heat pump units must meet certain standards;
[0164] 7) Economic considerations and investment restrictions:
[0165] Investment Budget: The total investment in the heat pump cluster (including equipment purchase, installation, pipeline laying, etc.) shall not exceed the predetermined budget;
[0166] Operating costs: Optimizing the model may require considering long-term operating costs, such as electricity bills and maintenance expenses;
[0167] 8) Safety and reliability requirements:
[0168] Safety precautions: The design, installation, and operation of heat pump units and supporting facilities must meet safety requirements;
[0169] Redundancy and backup: To ensure system reliability, it may be necessary to set up redundant equipment or backup systems.
[0170] In this embodiment, the preliminary modification design scheme for the centralized heating system structure containing remote air source heat pump clusters is a combination of various methods, including: distributing the heat pump units at the stations in the area, with some stations adding heat pump units and others not being modified, depending on the actual situation; deploying multiple remote air source heat pump clusters and adding energy storage devices accordingly.
[0171] Based on various combinations of preliminary renovation schemes, a scheme combination optimization model is established. Economic cost, energy consumption, and carbon emissions are selected as objectives to obtain the optimal combination scheme for renovation design.
[0172] It should be noted that during the interactive iteration of the first-level in-station heat pump unit configuration optimization model and the second-level remote air-source heat pump cluster configuration optimization model, if the installed load of the air-source heat pump cluster cannot meet the load shortage demand of the first level due to the constraints of the second level, then the maximum load of the air-source heat pump unit cluster under the constraints of the second level needs to be used as an input condition into the first-level optimization model. This allows for iterative calculation of the hydraulic conditions of the heating network, further optimization of the heating network operating parameters and the heat pump unit configuration model, and continuous approximation of the globally optimal system configuration scheme through iterative optimization. The goal and constraint models are continuously iterated and optimized until they finally stabilize in the globally optimal solution space that satisfies the two-level optimization model, yielding the optimal system configuration scheme output.
[0173] In this embodiment, the optimization algorithm is the mongoose optimization algorithm.
[0174] It should be noted that the centralized heating system planning and design method also includes: conducting simulation analysis and effect verification of the optimal planning and design scheme of the modified centralized heating system; and issuing and implementing the scheme after it meets the expected results. Specifically, this includes:
[0175] Using a simulation analysis platform, the structural modification and operation of the heating system are simulated and analyzed based on the optimal planning and design scheme of the modified centralized heating system. The system heating index, equipment performance, and technical and economic analysis are conducted to determine whether the scheme design is reasonable. If it is reasonable, the scheme is issued and implemented.
[0176] In the several embodiments provided in this application, it should be understood that the disclosed systems and methods can also be implemented in other ways. The system embodiments described above are merely illustrative; for example, the flowcharts and block diagrams in the accompanying drawings illustrate the architecture, functionality, and operation of possible implementations of systems, methods, and computer program products according to various embodiments of the present invention. In this regard, each block in a flowchart or block diagram may represent a module, segment, or portion of code, which contains one or more executable instructions for implementing a specified logical function. It should also be noted that in some alternative implementations, the functions marked in the blocks may occur in a different order than those marked in the drawings. For example, two consecutive blocks may actually be executed substantially in parallel, and they may sometimes be executed in reverse order, depending on the functions involved. It should also be noted that each block in a block diagram and / or flowchart, and combinations of blocks in block diagrams and / or flowcharts, can be implemented using a dedicated hardware-based system that performs the specified function or action, or using a combination of dedicated hardware and computer instructions.
[0177] Furthermore, the functional modules in the various embodiments of this invention can be integrated together to form an independent part, or each module can exist independently, or two or more modules can be integrated to form an independent part. If the function is implemented as a software functional module and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of this invention, or the part that contributes to the prior art, or a part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods in the various embodiments of this invention. The aforementioned storage medium includes: USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, optical disks, and other media capable of storing program code.
[0178] Based on the above-described preferred embodiments of the present invention, and through the foregoing description, those skilled in the art can make various changes and modifications without departing from the inventive concept. The technical scope of this invention is not limited to the contents of the specification, but must be determined according to the scope of the claims.
Claims
1. A method for planning and designing a centralized heating system utilizing a remotely located air source heat pump cluster, characterized in that, The steps are as follows: Preliminary modification design of the centralized heating system structure including remote air source heat pump clusters: by adding heat pump units in the heat exchange station to reduce the return water temperature of the main network; by adding remote air source heat pump clusters in places far away from the centralized heating system to heat up the cooled low-temperature return water before it flows into the original heat source return water. Establish a configuration optimization model for heat pump units at the first-tier sites: with the optimal investment, construction cost, and operating cost of the heat pump units as the optimization objective function, and solve the problem using an optimization algorithm to obtain the optimal planning and design scheme for the configuration of the heat pump units, and determine the equipment selection for the heat pump units at each site; Calculate the heat load deficit based on the configuration of the heat pump unit: By configuring the heat pump unit, increase the operating temperature difference on the primary network side, expand the heating range, or improve the heating effect within the original heating range, calculate the heat load deficit of expanding the heating range or improving the heating effect within the original range. A second-layer remote air source heat pump cluster configuration optimization model is established: the equipment configuration and operation matching of the remote air source heat pump cluster are used to compensate for the heat load shortage in the heating network after the heat pump unit in the station is upgraded. Considering the heat load shortage and local heating environment conditions, the optimization objective function is to optimize the construction cost, power supply cost, site rental and construction cost, and operating energy consumption cost of the remote air source heat pump cluster. Relevant constraints are set, and the optimization algorithm is used to solve the problem to obtain the optimal planning and design scheme for the configuration of the remote air source heat pump cluster. The construction site selection, equipment selection and quantity of air source heat pump units in the cluster are determined. By iteratively applying the first-layer site heat pump unit configuration optimization model and the second-layer remote air source heat pump cluster configuration optimization model, the optimal planning and design scheme for the upgraded centralized heating system is obtained.
2. The centralized heating system planning and design method according to claim 1, characterized in that, The preliminary modification design of the centralized heating system structure, which includes a remote air source heat pump cluster, specifically includes: By adding heat pump units to the heat exchange station, the return water temperature of the main network can be reduced; In locations far from centralized heating systems, remote air source heat pump clusters are installed. The cooled return water main is led to the remote air source heat pump cluster, where the cooled low-temperature return water is heated once, and then the original heat source return water is introduced into the heat source side for a second heating, raising it to the supply water temperature that meets the heating demand, and then sent to various heat exchange stations in the urban area for heat exchange and heating.
3. The centralized heating system planning and design method according to claim 1, characterized in that, The optimization objective function, which optimizes the investment, construction, and operating costs of the heat pump unit, is expressed as: ; The investment and construction costs include the purchase cost, installation cost, and commissioning cost of the heat pump unit equipment, which are related to factors such as equipment selection, system scale, and construction complexity. Operating costs include energy consumption costs, maintenance costs, and personnel management costs of the heat pump unit, and are related to the operating efficiency and load factor of the heat pump unit. The first-level site heat pump unit configuration optimization model also includes setting constraints: heat pump unit equipment capacity limit, efficiency limit, pipeline flow, temperature and pressure limit, heat load balance constraint, economic cost constraint, and spatial layout constraint.
4. The centralized heating system planning and design method according to claim 1, characterized in that, The calculated heat load deficit for increasing the heating area is expressed as follows: ; To address the shortfall in total heat load of the heating network after increasing the heating area; The total heating area of the heating network was increased to expand the heating area. To increase the total heating area of the heating network; For the thermal indicators of heating network operation; The heat load deficit that improves the heating effect within the original range is expressed as: ; To improve heating efficiency, the total heat load of the heating network is insufficient; To improve heating efficiency, the heating network's thermal indicators were adjusted. To improve the heating efficiency and subsequent heating index of the heating network; This represents the total area of the heating network.
5. The centralized heating system planning and design method according to claim 1, characterized in that, The centralized heating system planning and design method also includes: based on the configuration of heat pump unit equipment, calculating the heating design flow rate after the modification; for expandable heating network structures, determining the extent to which the capacity of the existing heat source circulation pump can be improved through hydraulic calculations; for heating networks with limited area and no need for expansion, determining the operating conditions of the circulation pump after modification through hydraulic calculations.
6. The centralized heating system planning and design method according to claim 1, characterized in that, The centralized heating system planning and design method also includes: optimizing the overall network operating parameters based on the operating characteristics of the heat pump unit and the operating structure of the heating network, with the goal of reducing the return water temperature of the primary network, reducing the flow rate per unit area, and improving the transmission and distribution capacity of the heating network.
7. The centralized heating system planning and design method according to claim 1, characterized in that, The optimization objective function for the remote-mounted air source heat pump cluster is to optimize the construction cost, power supply cost, site rental and construction cost, and operating energy consumption cost, which is expressed as: ; Construction costs include the installation costs of remote air source heat pump clusters, pipeline laying costs, and control system construction costs, which are related to the scale and complexity of the construction and the type of equipment selected. The cost of power supply includes the expenses related to providing stable power to remote air source heat pump clusters, which consists of power line construction, transformer purchase, and power loss costs. The construction cost for renting a site includes the cost of renting land, site leveling costs, and infrastructure construction costs, which are related to the site's geographical location, area, and construction requirements. Operating energy costs, including the cost of electricity consumed during operation, depend on the unit's energy efficiency, operating time, and electricity price factors; The second-layer remote air source heat pump cluster configuration optimization model sets relevant constraints, including: air source heat pump unit performance constraints, power supply constraints, site condition limitations, pipeline and fluid system constraints, start-up and shutdown constraints, and economic constraints.
8. The centralized heating system planning and design method according to claim 1, characterized in that, The preliminary renovation design scheme for the centralized heating system structure containing remote air source heat pump clusters includes multiple combinations, including: distributing the heat pump units at various heating stations in the area, adding heat pump units to some heating stations and not renovating others, depending on the actual situation; deploying multiple remote air source heat pump clusters and adding corresponding energy storage devices. Based on various combinations of preliminary renovation schemes, a scheme combination optimization model is established. Economic cost, energy consumption, and carbon emissions are selected as objectives to obtain the optimal combination scheme for renovation design.
9. The method for planning and designing a centralized heating system according to claim 1, characterized in that, The optimization algorithm is the mongoose optimization algorithm.
Citation Information
Patent Citations
Centralized heating low-carbon transformation system and method based on medium-deep geothermal energy
CN114183795A
Low-carbon area building energy system based on middle-deep layer hydrothermal type terrestrial heat
CN116951525A