A flood control device
By designing an automatic flood control device, which automatically raises the baffle plate using water pressure and combines it with a rotating mechanism and scraper structure, the problem of existing flood control methods being unable to respond to floods in a timely manner is solved. This achieves automated flood blocking and clearing, reduces manual intervention and clearing time, and extends the service life of the device.
Patent Information
- Application Number
- CN202410221040.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2044-02-28
AI Technical Summary
Existing flood control methods are insufficient to respond to floods in a timely and automated manner, resulting in frequent floods, wasting manpower and resources, and causing serious impacts.
A flood control device was designed, comprising an automatic flood control replenishment component, an automatic cleaning component, and a sand removal component. It automatically raises the baffle plate using water flow pressure, and combines a rotating mechanism and a scraper structure to automatically block floods, collect garbage, and remove silt.
It achieves automatic blocking and rapid response when floods occur, requiring no manual intervention, reducing manual cleanup time, and extending the service life of the device.
Smart Images

Figure CN118166706B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of flood control equipment technology, specifically to a flood control device. Background Technology
[0002] To prevent and mitigate flood disasters, this involves work related to flood forecasting, flood control scheduling, and the operation of flood control projects. The main contents of flood control include: long-term, medium-term, and short-term weather forecasting; flood and water level forecasting; scheduling and operation of flood control projects such as dikes, reservoirs, sluices, and flood storage areas; emergency rescue and relief after emergencies; and emergency measures in extraordinary circumstances.
[0003] In most cases, there is not enough time to react and implement corresponding measures when floods occur. As a result, floods frequently inundate open areas, building entrances and exits, and urban areas, causing damage to cities, severely affecting buildings and transportation, resulting in serious property losses and threatening lives. Current flood control and prevention methods mostly rely on manual handling and stacking of sandbags, manual assembly of flood barriers, or manual opening of electric floodgates. These methods are difficult to implement in a timely manner when floods occur, are energy-intensive and labor-intensive, require a lot of manpower, and can easily delay critical moments for flood control and rescue, causing huge losses. Summary of the Invention
[0004] Therefore, the purpose of this invention is to provide a flood control device to solve the technical problems mentioned in the background.
[0005] To achieve the above objectives, the present invention provides the following technical solution: a flood control device, comprising a main body of the flood control device, two sets of symmetrically arranged collection boxes fixedly installed on the upper end of the main body of the flood control device, a cover plate slidably installed on the side of the upper end of the main body of the flood control device near the collection boxes, two sets of water-pressing chambers opened inside the main body of the flood control device, an automatic flood control replenishment component provided on one side of the main body of the flood control device, a water filling chamber opened on one side of the interior of the main body of the flood control device, a partition plate fixedly installed on the inner wall of the front end of the main body of the flood control device, an automatic cleaning component provided on the side of the main body of the flood control device near the collection boxes, a sand-removing component provided on the other side of the automatic cleaning component, and a water inlet opened on the side of the front end of the main body of the flood control device located in the water-pressing chamber;
[0006] The automatic flood control replenishment component includes a lifting plate slidably installed on the inner wall of the pressure chamber. A positioning rod, fixed to the inner end of the pressure chamber cavity, is installed inside the lifting plate. A first telescopic spring is sleeved on the outer wall of the positioning rod, with its two ends fixed to the positioning rod and the end of the pressure chamber, respectively. A fixing rod is fixedly installed on the upper end of the lifting plate. A first rotating roller is mounted on the inner wall of the pressure chamber via a bearing. A second rotating roller is rotatably installed on the upper end of the main body of the flood control device. A traction rope is fixedly installed on the side wall of the fixing rod. A baffle plate, fixed to the end of the traction rope, is slidably installed on the inner wall of the main body of the flood control device near the partition. A piston cylinder is fixedly installed inside the filling chamber. A top rod, fixed to the bottom end of the baffle plate, is slidably installed inside the piston cylinder. A water replenishment pipe, fixed to the end of the piston cylinder's side wall, is fixedly installed on the side wall of the pressure chamber. A first drainage pipe, near the partition, is fixedly installed at the other end of the piston cylinder. A second drainage pipe, located on the upper right side of the partition, is fixedly installed on the upper right side of the pressure chamber's side wall.
[0007] As a preferred embodiment of the present invention, the automatic cleaning assembly includes a rotating block fixedly installed at the other end of the second rotating roller, a connecting rod rotatably installed at the other end of the rotating block, an mounting plate fixedly installed at the upper end of the partition, a connecting plate slidably installed on the side wall of the mounting plate and rotatably installed with the end of the connecting rod, a half-sector gear rotatably installed on one side of the connecting plate, a collecting plate fixedly installed at one end of the half-sector gear near the front end of the partition, and a toothed plate fixedly installed on the side wall of the mounting plate at the contact position with the surface of the half-sector gear.
[0008] As a preferred embodiment of the present invention, the sand-clearing assembly includes a first ratchet disk fixedly installed at the other end of the rotating block, a second ratchet disk bearing mounted on the inner wall of the first ratchet disk, a plurality of protrusions rotatably mounted on the outer circumference of the second ratchet disk at positions contacting the inner wall surface of the first ratchet disk, a second telescopic spring fixedly mounted at the bottom end of the protrusions and the end of the outer wall of the second ratchet disk, a first bevel gear extending outward from the outer side of the first ratchet disk fixedly mounted at the other end of the second ratchet disk, a first transmission rod rotatably installed in the cavity of the flood control device body, a second bevel gear fixedly mounted on the outer wall of the first transmission rod at a position contacting the surface of the first bevel gear, a rotating disk fixedly mounted on the side wall of the flood control device body and the end of the second bevel gear, a stroke block fixedly mounted on the side wall of the rotating disk, a multi-blade plate fixedly mounted at the other end of the stroke block, and a scraper penetrating through and extending to the side wall of the baffle plate fixedly mounted at the other end of the multi-blade plate.
[0009] As a preferred embodiment of the present invention, the side wall of the main body of the flood control device is provided with two sets of symmetrically opened sliding grooves, and the size of the sliding grooves is in contact with the edge of the side wall of the barrier plate.
[0010] As a preferred embodiment of the present invention, the side wall of the water pressure chamber is provided with a circular hole at the end of the water supply pipe, and the inner wall of the circular hole matches the outer wall of the water supply pipe.
[0011] As a preferred embodiment of the present invention, the side wall of the water pressure chamber is provided with a drain outlet at the end of the second drain pipe, and the diameter of the drain outlet matches the diameter of the second drain pipe.
[0012] As a preferred embodiment of the present invention, a piston plate fixed to the end of the push rod is slidably installed on the inner wall of the piston cylinder, and a third telescopic spring fixed to the bottom end of the piston plate is fixedly installed on the bottom end of the piston cylinder.
[0013] As a preferred embodiment of the present invention, a one-way valve is provided at the contact position between the side wall of the piston cylinder and the water supply pipe and the first drainage pipe.
[0014] As a preferred embodiment of the present invention, a travel groove is provided at the contact position between the side wall of the mounting plate and the surface of the connecting plate, and two sets of guide rods penetrating the interior of the connecting plate are fixedly installed inside the travel groove.
[0015] As a preferred embodiment of the present invention, the end of the partition is provided with a plurality of circular permeable holes, and the front end of the partition is provided with a plurality of limiting grooves for the scraper to pass through.
[0016] In summary, the present invention has the following main beneficial effects:
[0017] 1. This invention utilizes the water pressure to raise the baffle plate when the water level rises, causing the lifting plate to descend within the pressure chamber. This movement of the traction rope along the second rotating roller causes the baffle plate to extend upwards, resulting in a rapid and automatic rise to block flooding. Furthermore, during the rising and descending of the baffle plate, water is supplied to the piston cylinder, facilitating subsequent silt flushing. This allows for a timely and automatic response to flooding, enabling flood control work without manual supervision.
[0018] 2. This invention, when the water level rises and the baffle plate rises, causes the second rotating roller to rotate under the action of the traction rope, causing the rotating block to rotate and slide back and forth on both sides through the stroke groove opened on the side wall of the mounting plate. This causes the garbage accumulated at the front of the baffle plate to be pushed and pushed by the collecting plate, which in turn causes the garbage at the front of the baffle plate to flip over. As a result, the garbage at the front of the baffle plate falls into the collecting box after the collecting plate rotates, thus completing the collection of river garbage and reducing the phenomenon of river garbage accumulation at the front of the baffle plate.
[0019] 3. In this invention, when the water level drops, the first telescopic spring lifts the lifting plate, while the traction rope moves to one side and lowers the blocking plate. The one-way valve in the water supply pipe closes, while the one-way valve in the first drainage pipe opens. At this time, the water replenished inside the piston cylinder is discharged through the first drainage pipe. Simultaneously, during the lifting plate's ascent, water can be discharged through the second drainage pipe, driving the water flow to wash away the silt accumulated at the front end of the baffle. When the rotating block rotates in the opposite direction, the first bevel gear rotates, which in turn causes the first transmission rod and the second bevel gear to rotate, causing the multi-blade plate and scraper to move back and forth. This allows the scraper to repeatedly pass under the baffle, cleaning the silt accumulated below the baffle and preventing the baffle and blocking plate from being difficult to clean due to silt accumulation, thus indirectly improving the service life of the baffle and blocking plate. Attached Figure Description
[0020] Figure 1 This is a three-dimensional overall structural diagram of the present invention;
[0021] Figure 2 This is a transverse three-dimensional sectional view of the present invention;
[0022] Figure 3 This is a longitudinal three-dimensional sectional view of the present invention;
[0023] Figure 4 This is a three-dimensional structural diagram of the automatic flood control supplementary components of the present invention;
[0024] Figure 5 This is a three-dimensional structural diagram of the automatic cleaning component of the present invention;
[0025] Figure 6 This is a three-dimensional structural diagram of the sand-clearing component of the present invention;
[0026] Figure 7 For the present invention Figure 6 Enlarged structural diagram at point A in the middle;
[0027] Figure 8 This is a three-dimensional structural diagram of the multi-page plate and scraper of the present invention;
[0028] Figure 9 For the present invention Figure 3 Enlarged structural diagram at point B;
[0029] Figure 10 For the present invention Figure 6 Enlarged structural diagram at point C.
[0030] In the diagram: 100, the main body of the flood control device;
[0031] 110. Collection box; 120. Cover plate; 130. Pressure chamber; 140. Automatic flood control replenishment component; 150. Water filling tank; 160. Partition plate; 170. Automatic cleaning component; 180. Sand removal component; 190. Water inlet; 141. Lifting plate; 142. Positioning rod; 143. First telescopic spring; 144. Fixing rod; 145. First rotating roller; 146. Second rotating roller; 147. Traction rope; 148. Baffle plate; 149. Piston cylinder; 1491. Push rod; 1492. Water replenishment pipe; 14 93. First drainage pipe; 1494. Second drainage pipe; 171. Rotating block; 172. Connecting rod; 173. Mounting plate; 174. Connecting plate; 175. Half-sector gear; 176. Collecting plate; 177. Toothed plate; 181. First ratchet disc; 182. Second ratchet disc; 183. Protrusion; 184. Second telescopic spring; 185. First bevel gear; 186. First transmission rod; 187. Second bevel gear; 188. Rotating disk; 189. Stroke block; 1891. Multi-leaf plate; 1892. Scraper. Detailed Implementation
[0032] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention.
[0033] The embodiments of the present invention will now be described.
[0034] A flood control device, such as Figure 1-10 As shown, the device includes a flood control device body 100. Two sets of symmetrically arranged collection boxes 110 are fixedly installed on the upper end of the flood control device body 100. A cover plate 120 is slidably installed on the upper end of the flood control device body 100 near the collection box 110. Two sets of water pressure chambers 130 are opened inside the flood control device body 100. An automatic flood control replenishment component 140 is provided on one side of the flood control device body 100. A water filling chamber 150 is opened on one side of the interior of the flood control device body 100. A partition plate 160 is fixedly installed on the inner wall of the front end of the flood control device body 100. An automatic cleaning component 170 is provided on the side of the flood control device body 100 near the collection box 110. A sand cleaning component 180 is provided on the other side of the automatic cleaning component 170. A water inlet 190 is opened on the side of the front end of the flood control device body 100 located in the water pressure chamber 130.
[0035] The automatic flood control replenishment component 140 includes a lifting plate 141 slidably installed on the inner wall of the pressure chamber 130. A positioning rod 142, fixed to the inner end of the cavity of the pressure chamber 130, is installed through the lifting plate 141. A first telescopic spring 143 is sleeved on the outer wall of the positioning rod 142. The two ends of the first telescopic spring 143 are fixed to the positioning rod 142 and the end of the pressure chamber 130, respectively. A fixing rod 144 is fixedly installed on the upper end of the lifting plate 141. A first rotating roller 145 is mounted on the bearing of the inner wall of the pressure chamber 130. A second rotating roller 146 is rotatably installed on the upper end of the flood control device body 100. A traction rope 147 is fixedly installed on the side wall of the fixing rod 144. A baffle plate 148, which is fixed to the end of the traction rope 147, is slidably installed on the inner wall of the main body 100 of the flood control device near the partition plate 160. A piston cylinder 149 is fixedly installed inside the water filling chamber 150. A top rod 1491, which is fixed to the bottom end of the baffle plate 148, is slidably installed inside the piston cylinder 149. A water supply pipe 1492, which is fixed to the end of the side wall of the piston cylinder 149, is fixedly installed on the side wall of the water pressure chamber 130. A first drainage pipe 1493, which is near the partition plate 160, is fixedly installed on the other end of the piston cylinder 149. A second drainage pipe 1494, which is located on the side of the partition plate 160, is fixedly installed on the upper right side of the side wall of the water pressure chamber 130.
[0036] When the water level rises and the baffle plate 148 needs to be raised, the rising water flows into the pressure chamber 130 through the inlet 190. The pressure of the water causes the lifting plate 141 to descend within the pressure chamber 130. As the lifting plate 141 descends, it causes the traction rope 147 to move along the second rotating roller 146, pulling the baffle plate 148, which is fixed at the other end of the traction rope 147, to extend upwards. This causes the baffle plate 148 to rise rapidly and block the flow of water into the river. The system automatically raises to block the flood situation. As the blocking plate 148 rises and the lifting plate 141 continues to descend, the push rod 1491 and piston plate inside the piston cylinder 149 move upward synchronously. At this time, the one-way valve in the water supply pipe 1492 opens while the one-way valve in the first drainage pipe 1493 closes, allowing water to flow into the piston cylinder 149. This facilitates subsequent mud and sand flushing, enabling a timely and automatic response to the flood situation. Flood control work can be carried out without manual supervision.
[0037] Please refer to this carefully. Figure 4 and Figure 5The automatic cleaning component 170 includes a rotating block 171 fixedly installed at the other end of the second rotating roller 146. A connecting rod 172 is rotatably installed at the other end of the rotating block 171. An mounting plate 173 is fixedly installed at the upper end of the partition 160. A connecting plate 174 is slidably installed on the side wall of the mounting plate 173 and rotatably installed at the end of the connecting rod 172. A half-sector gear 175 is rotatably installed on one side of the connecting plate 174. A collecting plate 176 is fixedly installed at one end of the half-sector gear 175 near the front end of the partition 160. A toothed plate 177 is fixedly installed on the side wall of the mounting plate 173 at the contact position with the surface of the half-sector gear 175.
[0038] As the water level rises and the baffle plate 148 is raised, the second rotating roller 146 rotates under the action of the traction rope 147, causing the rotating block 171 installed at one end of the second rotating roller 146 to rotate. When the rotating block 171 rotates, it causes the connecting rod 172, which is rotated at one end, to slide back and forth on the left and right sides through the stroke groove opened on the side wall of the mounting plate 173. During the sliding process, it causes the collection plate 176 to push the garbage accumulated at the front end of the partition plate 160. When the connecting plate 174 moves to the left side and contacts the toothed plate 177, it causes the half-sprocket 175 to rotate, driving the garbage pushed and accumulated at the collection plate 176 to flip over. This causes the garbage at the front end of the partition plate 160 to fall into the collection box 110 after the collection plate 176 rotates, thus completing the collection of river garbage, reducing the time for manual garbage cleaning, and reducing the accumulation of river garbage at the front end of the partition plate 160.
[0039] Please refer to this carefully. Figure 5 and Figure 6 The sand-clearing component 180 includes a first ratchet disk 181 fixedly installed at the other end of the rotating block 171. A second ratchet disk 182 is mounted on the inner wall bearing of the first ratchet disk 181. Multiple sets of protrusions 183 at contact positions with the inner wall surface of the first ratchet disk 181 are rotatably mounted on the outer circumference of the second ratchet disk 182. A second telescopic spring 184 fixed to the bottom end of the protrusion 183 and the end of the outer wall of the second ratchet disk 182 is fixedly installed. A first bevel gear 185 extending outward from the outer side of the first ratchet disk 181 is fixedly installed at the other end of the second ratchet disk 182. (Flood control equipment) A first transmission rod 186 is rotatably installed inside the cavity of the main body 100. A second bevel gear 187 is fixedly installed on the outer wall of the first transmission rod 186 at the contact position with the surface of the first bevel gear 185. A rotating disk 188 fixed to the end of the second bevel gear 187 is fixedly installed on the side wall of the flood control device main body 100. A stroke block 189 is fixedly installed on the side wall of the rotating disk 188. A multi-blade plate 1891 is fixedly installed on the other end of the stroke block 189. A scraper 1892 that penetrates through and extends to the side wall of the baffle plate 148 is fixedly installed on the other end of the multi-blade plate 1891.
[0040] When the water level drops, the first telescopic spring 143 lifts the lifting plate 141, while the traction rope 147 moves to one side and lowers the blocking plate 148. During the descent, the weight of the blocking plate 148 causes the push rod 1491 to compress and descend inside the piston cylinder 149. At this time, the one-way valve in the water supply pipe 1492 closes while the one-way valve in the first drainage pipe 1493 opens. The water supplied to the piston cylinder 149 is then discharged through the first drainage pipe 1493. Simultaneously, as the lifting plate 141 rises, water can be discharged through the second drainage pipe 1494, driving the water flow to wash away the silt accumulated at the front end of the partition 160. At the same time, when the rotating block 171 rotates in the opposite direction, the protrusion 183, under the thrust of the second telescopic spring 184, causes the protrusion 183 to engage with the first ratchet. The gaps between the discs 181 engage so that the second ratchet disc 182 does not rotate when the rotating block 171 rotates forward, but only rotates when the rotating block 171 rotates in reverse. This causes the first bevel gear 185 to rotate when the baffle plate 148 descends, which in turn causes the first transmission rod 186 and the second bevel gear 187 to rotate, causing the rotating disc 188 and the stroke block 189 to rotate. Under the constraint of the stroke block 189, the multi-blade plate 1891 and the scraper 1892 move back and forth, causing the scraper 1892 to repeatedly pass under the partition plate 160 and clean the mud and sand accumulated under the partition plate 160. This prevents the partition plate 160 and the baffle plate 148 from being difficult to clean due to the accumulation of mud and sand, thereby indirectly improving the service life of the baffle plate 148 and the partition plate 160.
[0041] Please refer to this carefully. Figure 1 and Figure 4 The main body 100 of the flood control device has two sets of symmetrically opened sliding grooves on its side wall, and the size of the sliding grooves is in contact with the edge of the side wall of the baffle plate 148.
[0042] The baffle plate 148 slides smoothly up and down along the groove during both rising and falling.
[0043] Please refer to this carefully. Figure 4 and Figure 5 The side wall of the pressure chamber 130 is provided with a circular hole at the end of the water supply pipe 1492, and the inner wall of the circular hole matches the outer wall of the water supply pipe 1492.
[0044] When the water level rises, the water flows into the pressure chamber 130, and the continuous descent of the lifting plate 141 causes the water to flow through the circular hole into the water supply pipe 1492.
[0045] Please refer to this carefully. Figure 5 The side wall of the pressure chamber 130 is provided with a drain port at the end of the second drain pipe 1494, and the diameter of the drain port matches the diameter of the second drain pipe 1494.
[0046] When the water level drops, the lifting plate 141 moves upward continuously, causing the water inside the pressure chamber 130 to be squeezed out through the second drainage pipe 1494.
[0047] Please refer to this carefully. Figure 5 A piston plate, which is fixed to the end of the push rod 1491, is slidably installed on the inner wall of the piston cylinder 149, and a third telescopic spring, which is fixed to the bottom end of the piston plate, is fixed to the bottom end of the piston cylinder 149.
[0048] The extension force of the third extension spring can cause the descending piston plate and the push rod 1491 to move upward, so that the push rod 1491 is always in contact with the bottom end of the stop plate 148.
[0049] Please refer to this carefully. Figure 5 One-way valves are provided at the contact points between the side wall of the piston cylinder 149 and the water supply pipe 1492 and the first drainage pipe 1493.
[0050] The replenishment and discharge of water inside the piston cylinder 149 are controlled by a one-way valve installed at the connection point between the piston cylinder 149 and the water supply pipe 1492 and the first drainage pipe 1493.
[0051] Please refer to this carefully. Figure 5 and Figure 6 A travel groove is provided at the contact position between the side wall of the mounting plate 173 and the surface of the connecting plate 174, and two sets of guide rods that penetrate the interior of the connecting plate 174 are fixedly installed inside the travel groove.
[0052] When moving, the connecting plate 174 can slide smoothly left and right along the side wall of the mounting plate 173 with a travel groove.
[0053] Please refer to this carefully. Figure 1 and Figure 6 The end of the partition 160 is provided with several sets of circular water-permeable holes, and the front end of the partition 160 is provided with several sets of limiting grooves for the scraper 1892 to pass through.
[0054] When the water level rises, the baffle 160 can block the water flow and the debris in the water flow, and the water flow can be buffered by the impact force of the water flow through the circular water permeable holes.
[0055] In use, when the water level rises and the baffle plate 148 needs to be raised, the water flows into the pressure chamber 130 through the inlet 190. The pressure of the water causes the lifting plate 141 to descend within the pressure chamber 130. As the lifting plate 141 descends, the traction rope 147 moves along the second rotating roller 146, causing the baffle plate 148, fixed at the other end of the traction rope 147, to extend upwards. This causes the baffle plate 148 to rise rapidly and automatically block the river's floodwaters. During the rising of the baffle plate 148 and the continuous descent of the lifting plate 141, the push rod 1491 and piston plate in the piston cylinder 149 move upwards synchronously. At this time, the one-way valve in the water supply pipe 1492 opens, and the first row... The one-way valve inside water pipe 1493 closes, allowing water to flow into piston cylinder 149, facilitating subsequent silt flushing and enabling a timely and automatic response to flood conditions. Flood control work can be carried out without manual supervision. As the water level rises and the baffle plate 148 rises, the second rotating roller 146 rotates under the action of the traction rope 147, causing the rotating block 171 installed at one end of the second rotating roller 146 to rotate. When the rotating block 171 rotates, it causes the connecting rod 172, which is rotated at one end, to slide back and forth on the side wall of the mounting plate 173 through a travel groove. During this sliding process, the collection plate 176 pushes the debris accumulated at the front end of the partition plate 160, and the connecting plate 174 moves to the left and engages with the toothed plate 177. Upon contact, the half-sprocket 175 rotates, causing the accumulated garbage at the collection plate 176 to flip. This allows the garbage at the front of the partition 160 to fall into the collection box 110 after the collection plate 176 rotates, completing the collection of river garbage and reducing the time spent on manual garbage removal. It also reduces the accumulation of river garbage at the front of the partition 160. When the water level drops, the first telescopic spring 143 lifts the lifting plate 141, while the traction rope 147 moves to one side and lowers the blocking plate 148. During the descent, the weight of the blocking plate 148 causes the push rod 1491 to compress and descend inside the piston cylinder 149. At this time, the one-way valve in the water supply pipe 1492 closes while the one-way valve in the first drainage pipe 1493 opens. The piston cylinder 149... The internally replenished water flow is discharged through the first drainage pipe 1493. Simultaneously, as the lifting plate 141 rises, water can be discharged through the second drainage pipe 1494, driving the water flow to wash away the mud and sand accumulated at the front end of the partition 160. At the same time, when the rotating block 171 rotates in the reverse direction, the protrusion 183, under the thrust of the second telescopic spring 184, engages with the gap between the protrusion 183 and the first ratchet disc 181. This ensures that the second ratchet disc 182 does not rotate when the rotating block 171 rotates forward, but only rotates when the rotating block 171 rotates in the reverse direction. This causes the first bevel gear 185 to rotate when the blocking plate 148 descends, thereby causing the first transmission rod 186 and the second bevel gear 187 to rotate, resulting in the rotation of the rotating disc 188 and the stroke block 189.Under the constraint of the travel block 189, the multi-blade plate 1891 and the scraper 1892 are forced to move back and forth, causing the scraper 1892 to repeatedly pass under the partition 160, cleaning the mud and sand accumulated under the partition 160. This prevents the partition 160 and the baffle plate 148 from being difficult to clean due to mud and sand accumulation, thereby indirectly improving the service life of the baffle plate 148 and the partition 160. Parts not described in this device are the same as or can be implemented using existing technology.
[0056] Although embodiments of the present invention have been shown and described, these specific embodiments are merely explanations of the invention and are not intended to limit it. The specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. After reading this specification, those skilled in the art may make modifications, substitutions, and variations to the embodiments as needed without departing from the principles and spirit of the invention, but such modifications, substitutions, and variations are protected by patent law as long as they are within the scope of the claims of the present invention.
Claims
1. A flood control device, comprising a main body (100) of the flood control device, characterized in that: Two sets of symmetrically arranged collection boxes (110) are fixedly installed on the upper end of the main body (100) of the flood control device. A cover plate (120) is slidably arranged on the side of the upper end of the main body (100) near the collection box (110). Two sets of water pressure chambers (130) are opened inside the main body (100). An automatic flood control replenishment component (140) is arranged on one side of the main body (100). A water filling chamber (150) is opened on one side of the interior of the main body (100). A partition plate (160) is fixedly installed on the inner wall of the front end of the main body (100). An automatic cleaning component (170) is arranged on the side of the main body (100) near the collection box (110). A sand cleaning component (180) is arranged on the other side of the automatic cleaning component (170). An inlet (190) is opened on the side of the front end of the main body (100) located in the water pressure chamber (130). The automatic flood control supplementary component (140) includes a lifting plate (141) slidably installed on the inner wall of the water pressure chamber (130). A positioning rod (142) fixed to the inner end of the cavity of the water pressure chamber (130) is installed through the lifting plate (141). A first telescopic spring (143) is sleeved on the outer wall of the positioning rod (142). The two ends of the first telescopic spring (143) are fixed to the positioning rod (142) and the end of the water pressure chamber (130) respectively. A fixing rod (144) is fixedly installed on the upper end of the lifting plate (141). A first rotating roller (145) is installed on the inner wall bearing of the water pressure chamber (130). A second rotating roller (146) is rotatably installed on the upper end of the flood control device body (100). A traction rope (147) is fixedly installed on the side wall of the fixing rod (144). The inner wall of the main body (100) of the flood control device is slidably installed with a baffle plate (148) fixed to the end of the traction rope (147) on the side near the partition plate (160). The water filling chamber (150) is fixedly installed with a piston cylinder (149). The piston cylinder (149) is slidably installed with a top rod (1491) fixed to the bottom end of the baffle plate (148). The side wall of the water pressure chamber (130) is fixedly installed with a water supply pipe (1492) fixed to the side wall end of the piston cylinder (149). The other end of the piston cylinder (149) is fixedly installed with a first drainage pipe (1493) near the partition plate (160). The side wall of the water pressure chamber (130) is fixedly installed with a second drainage pipe (1494) located on the side of the partition plate (160) at the upper right side. The automatic cleaning assembly (170) includes a rotating block (171) fixedly installed at the other end of the second rotating roller (146), a connecting rod (172) rotatably installed at the other end of the rotating block (171), an mounting plate (173) fixedly installed at the upper end of the partition (160), a connecting plate (174) rotatably installed on the side wall of the mounting plate (173) and the end of the connecting rod (172) rotatably installed, a half-sector gear (175) rotatably installed on one side of the connecting plate (174), a collecting plate (176) fixedly installed at one end of the half-sector gear (175) near the front end of the partition (160), and a toothed plate (177) in contact with the surface of the half-sector gear (175) fixedly installed on the side wall of the mounting plate (173).
2. A flood control device according to claim 1, characterized in that: The sand-clearing component (180) includes a first ratchet disc (181) fixedly installed at the other end of the rotating block (171). A second ratchet disc (182) is mounted on the inner wall bearing of the first ratchet disc (181). Multiple sets of protrusions (183) that contact the inner wall surface of the first ratchet disc (181) are rotatably installed on the outer circumference of the second ratchet disc (182). A second telescopic spring (184) fixed to the outer end of the second ratchet disc (182) is fixedly installed at the bottom end of the protrusions (183). A first bevel gear (185) extending outward from the outer side of the first ratchet disc (181) is fixedly installed at the other end of the second ratchet disc (182). A first transmission rod (186) is rotatably installed inside the cavity of the main body (100). A second bevel gear (187) that contacts the surface of the first bevel gear (185) is fixedly installed on the outer wall of the first transmission rod (186). A rotating disk (188) that is fixed to the end of the second bevel gear (187) is fixedly installed on the side wall of the main body (100) of the flood control device. A stroke block (189) is fixedly installed on the side wall of the rotating disk (188). A multi-blade plate (1891) is fixedly installed on the other end of the stroke block (189). A scraper (1892) that penetrates through and extends to the side wall of the baffle plate (148) is fixedly installed on the other end of the multi-blade plate (1891).
3. A flood control device according to claim 1, characterized in that: The main body (100) of the flood control device has two sets of symmetrically opened sliding grooves on its side wall, and the size of the sliding grooves is in contact with the edge of the side wall of the baffle plate (148).
4. A flood control device according to claim 1, characterized in that: The side wall of the pressure chamber (130) is provided with a circular hole at the end of the water supply pipe (1492), and the inner wall of the circular hole matches the outer wall of the water supply pipe (1492).
5. A flood control device according to claim 1, characterized in that: The side wall of the pressure chamber (130) is provided with a drain outlet at the end of the second drainage pipe (1494), and the diameter of the drain outlet matches the diameter of the second drainage pipe (1494).
6. A flood control device according to claim 1, characterized in that: The piston cylinder (149) has a piston plate that is slidably installed on its inner wall and fixed to the end of the push rod (1491), and a third telescopic spring that is fixed to the bottom end of the piston plate is fixed to the bottom end of the piston cylinder (149).
7. A flood control device according to claim 1, characterized in that: One-way valves are provided at the contact points between the side wall of the piston cylinder (149) and the water supply pipe (1492) and the first drainage pipe (1493).
8. A flood control device according to claim 1, characterized in that: The side wall of the mounting plate (173) is provided with a travel groove at the contact position with the surface of the connecting plate (174), and two sets of guide rods that penetrate the interior of the connecting plate (174) are fixedly installed inside the travel groove.
9. A flood control device according to claim 2, characterized in that: The end of the partition (160) is provided with a number of circular water-permeable holes, and the front end of the partition (160) is provided with a number of limiting grooves for the scraper (1892) to pass through.