Natural gas ethane recovery project whole plant flare system

By designing high-pressure, low-pressure, and ground-based flare systems, the problem of traditional flare systems being unable to adapt to the low temperature and large temperature difference of emitted gases in natural gas ethane recovery projects has been solved, achieving safe and environmentally friendly flare treatment and reducing emission pollution.

CN118224601BActive Publication Date: 2026-11-17CHANGQING ENGINEERING DESIGN CO LTD +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202211636984.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-19
Publication Date
2026-11-17
Estimated Expiration
2042-12-19

AI Technical Summary

Technical Problem

Traditional ambient or cryogenic venting systems are unsuitable for the low-temperature and large-temperature-difference venting requirements in natural gas ethane recovery projects, resulting in poor safety and environmental performance.

Method used

A whole-plant flare system for natural gas ethane recovery was designed, including high-pressure, low-pressure and ground flare systems. The high-pressure flare, low-pressure flare and ground flare systems are used to process high-pressure, low-pressure and low-temperature vented gases respectively. Gas separation and combustion are carried out by heating devices and components such as butterfly valves and figure-eight blind flanges.

Benefits of technology

This effectively reduced the environmental pollution caused by natural gas emissions during accidents, ensured safe production, and achieved safe and environmentally friendly venting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118224601B_ABST
    Figure CN118224601B_ABST
Patent Text Reader

Abstract

This invention discloses a plant-wide flare system for natural gas ethane recovery, comprising a high-pressure flare system, a low-pressure flare system, and a ground-based flare system. The plant-wide flare system for natural gas ethane recovery of this invention effectively reduces environmental pollution from natural gas emissions during accidents and ensures safe production by burning high-pressure flares, low-pressure flares, and cryogenic low-pressure flares separately through the high-pressure flares, low-pressure flares, and ground-based flares.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of natural gas purification technology, specifically relating to a whole-plant flare system for natural gas ethane recovery projects. Background Technology

[0002] The main function of the plant-wide flare system in the natural gas ethane recovery project is to combust the exhaust gases generated during the project and the combustible gases emitted in emergency situations, minimizing the harmful chemical substances produced during combustion and ultimately achieving safety and environmental protection goals. The natural gas ethane recovery project involves cryogenic refrigeration technology, resulting in low material flow temperatures and large temperature differences in the emitted gases. Traditional ambient or cryogenic flare systems are unsuitable for the flare requirements of this project. Summary of the Invention

[0003] The purpose of this invention is to provide a whole-plant flare system for natural gas ethane recovery projects, which can make the flare system at normal temperature or low temperature safe and environmentally friendly.

[0004] The technical solution adopted in this invention is a plant-wide flare system for natural gas ethane recovery, including a high-pressure flare system, a low-pressure flare system, and a ground flare system.

[0005] The invention is further characterized in that,

[0006] The high-pressure venting flare system includes a high-pressure venting flare, which is connected to a high-pressure venting separator. The high-pressure venting separator is connected to the plant's high-pressure venting main pipe. The plant's high-pressure venting main pipe is connected to one end of the high-pressure low-temperature venting main pipe, the high-pressure venting pipeline in the gas distribution and fuel gas area, and the high-pressure ambient temperature venting pipeline of the main unit.

[0007] The other end of the high-pressure cryogenic venting main is connected to the main unit's high-pressure cryogenic venting pipeline, which is connected to the ethane removal tower, ethane decarbonization and dehydration unit, cryogenic separation unit, demethanizer tower, and high-pressure refrigerant unit, respectively.

[0008] The other end of the high-pressure venting pipeline in the gas distribution and fuel gas area is connected to the high-pressure area of ​​the gas distribution area and the fuel gas area, respectively.

[0009] The other end of the main unit's high-pressure ambient temperature venting pipeline is connected to the pretreatment unit and the lean gas booster unit, respectively.

[0010] The high-pressure low-temperature venting main pipe is equipped with a built-in heating device.

[0011] The high-pressure cryogenic venting main pipe is connected to the plant's high-pressure venting main pipe via a tee a. The end of the tee a away from the high-pressure cryogenic venting main pipe and the plant's high-pressure venting main pipe is equipped with a cap a.

[0012] A butterfly valve a is installed between the tee a and the plant's high-pressure venting main; a figure-eight blind flange is installed inside the butterfly valve a.

[0013] A butterfly valve b is installed between the high-pressure ambient temperature venting pipeline and the plant's main high-pressure venting pipeline; a figure-eight blind flange is installed inside the butterfly valve b.

[0014] The low-pressure venting flare system includes a low-pressure venting flare, which is connected to a low-pressure venting separator. The low-pressure venting separator is connected to the plant's low-pressure venting main pipe. The plant's low-pressure venting main pipe is connected to one end of the tail gas main pipe, the main unit low-pressure venting pipeline, the low-pressure venting pipeline of the gas gathering and distribution area and fuel gas area, the low-pressure venting pipeline of the heating system, the low-pressure venting pipeline of the refrigerant storage and distribution area, the low-pressure venting pipeline of the loading and unloading area, the low-pressure venting pipeline of the stabilized light hydrocarbon tank and propane storage tank, and the low-pressure venting pipeline of the liquefied gas tank.

[0015] The other end of the exhaust manifold is connected to one end of the exhaust gas vent line of the ethane decarbonization unit in the main unit, and the other end of the exhaust gas vent line of the ethane decarbonization unit in the main unit is connected to the ethane decarbonization unit.

[0016] The other end of the low-pressure venting pipeline in the gas distribution and fuel gas area is connected to the low-pressure area of ​​the gas distribution and fuel gas area.

[0017] The other end of the low-pressure venting pipeline of the heating system is connected to the heating system.

[0018] The other end of the low-pressure vent pipeline in the refrigerant storage and distribution area is connected to the refrigerant storage and distribution area.

[0019] The other end of the low-pressure venting pipeline in the loading and unloading area is connected to the loading and unloading area;

[0020] The other end of the low-pressure venting pipeline for the stabilizing light hydrocarbon tank and the propane storage tank is connected to the stabilizing light hydrocarbon tank and the propane storage tank, respectively.

[0021] The other end of the low-pressure venting pipeline of the liquefied gas tank is connected to the liquefied gas tank.

[0022] A butterfly valve c is installed between the exhaust gas main pipe and the exhaust gas venting pipeline of the ethane decarbonization unit of the main unit; a figure-eight blind flange is installed inside the butterfly valve c.

[0023] The exhaust gas main pipe is connected to the plant's low-pressure vent main pipe via a tee (b). A cap (b) is installed at the end of the tee (b) furthest from the exhaust gas main pipe and the plant's low-pressure vent main pipe. A pneumatic ball valve is installed between the tee (b) and the plant's low-pressure vent main pipe.

[0024] The ground venting flare system includes a ground venting flare, which is connected to the plant's low-temperature and low-pressure venting main pipe. The plant's low-temperature and low-pressure venting main pipe is connected to one end of the centrifuge sealing gas low-temperature and low-pressure venting pipeline, the ethane storage tank venting pipeline, and the loading and unloading area low-temperature and low-pressure venting pipeline, respectively.

[0025] The other end of the centrifuge sealing gas low-temperature and low-pressure vent line is connected to the centrifuge sealing gas.

[0026] The other end of the vent pipeline for the ethane storage tank is connected to the ethane storage tank.

[0027] The low-temperature and low-pressure venting pipeline in the loading and unloading area is connected to the loading and unloading area.

[0028] A ball valve is installed between the plant's low-temperature and low-pressure venting main and the centrifuge sealing gas low-temperature and low-pressure venting pipeline.

[0029] The beneficial effects of this invention are:

[0030] The natural gas ethane recovery project plant-wide flare system provided by this invention effectively reduces the environmental pollution caused by natural gas emissions in the event of an accident and ensures safe production by burning high-pressure flares, low-pressure flares, and cryogenic low-pressure flares through high-pressure flares, low-pressure flares, and ground flares, respectively. Attached Figure Description

[0031] Figure 1 This is a schematic diagram of the flare system for the entire plant in the natural gas ethane recovery project.

[0032] The components include: 1. Main unit high-pressure cryogenic vent pipeline; 2. Cryogenic high-pressure vent main pipeline; 3. High-pressure vent pipeline for gas gathering and distribution and fuel gas area; 4. Main unit high-pressure ambient temperature vent pipeline; 5. Plant-wide high-pressure vent main pipeline; 6. Main unit ethane decarbonization unit tail gas vent pipeline; 7. Tail gas main pipeline; 8. Plant-wide low-pressure vent main pipeline; 9. Heating and temperature riser; 10. Low-pressure vent pipeline for gas gathering and distribution and fuel gas area; 11. Heating system. 12. Low-pressure venting pipeline in the refrigerant storage and distribution area; 13. Low-pressure venting pipeline in the loading and unloading area; 14. Low-pressure venting pipeline in the stabilized light hydrocarbon tank and propane storage tank; 15. Low-pressure venting pipeline in the liquefied gas tank; 16. Plant-wide low-temperature and low-pressure venting main pipeline; 17. Low-temperature and low-pressure venting pipeline for centrifuge sealing gas; 18. Ethane storage tank venting pipeline; 19. Low-temperature and low-pressure venting pipeline in the loading and unloading area; 20. High-pressure venting pipeline... 21. Low-pressure venting separator; 22. High-pressure venting flare; 23. Low-pressure venting flare; 24. Ground venting flare; 25. Head a; 26. Butterfly valve a; 27. Pneumatic ball valve; 28. Butterfly valve b; 29. ​​T-junction a; 30. Butterfly valve c; 31. T-junction b; 32. Head b; 33. Ethane removal tower; 34. Ethane decarbonization and dehydration unit; 35. Cryogenic separation unit; 36. Methanogen removal tower 37. High-pressure refrigerant unit; 38. Gas distribution area; 39. Fuel gas area; 40. Ethane decarbonization unit; 41. Heating system; 42. Refrigerant storage and distribution area; 43. Loading and unloading area; 44. Stabilized light hydrocarbon tank; 45. Propane storage tank; 46. Liquefied gas tank; 47. Centrifuge sealing gas; 48. Ethane storage tank; 49. Loading and unloading area; 50. Pretreatment unit; 51. Lean gas booster unit; 52. Ball valve. Detailed Implementation

[0033] The present invention will now be described in detail with reference to the accompanying drawings and specific embodiments.

[0034] Example 1

[0035] The structure of the whole-plant flare system for the natural gas ethane recovery project of this invention is as follows: Figure 1 As shown, it includes a high-pressure venting flare system, a low-pressure venting flare system, and a ground venting flare system.

[0036] The high-pressure venting flare system includes a high-pressure venting flare 22, which is connected to a high-pressure venting separator 20. The high-pressure venting separator 20 is connected to the plant's high-pressure venting main pipe 5. The plant's high-pressure venting main pipe 5 is connected to one end of the high-pressure low-temperature venting main pipe 2, the high-pressure venting pipeline 3 of the gas distribution and fuel gas area, and the high-pressure ambient temperature venting pipeline 4 of the main unit.

[0037] High-pressure venting gas enters the high-pressure venting separator 20 through the plant's high-pressure venting main pipe 5. After being separated by gravity in the high-pressure venting separator 20, it is discharged into the high-pressure venting flare 22 and then discharged after combustion in the high-pressure venting flare 22.

[0038] The other end of the high-pressure cryogenic venting main 2 is connected to the main unit high-pressure cryogenic venting pipeline 1. The main unit high-pressure cryogenic venting pipeline 1 is connected to the ethane stripper 33, the ethane decarbonization and dehydration unit 34, the cryogenic separation unit 35, the demethanizer 36, and the high-pressure refrigerant unit 37, respectively. The initial venting pressure of the ethane stripper 33 is 2-3 MPa.g, and the molecular weight is 32-34. The initial venting pressure of the ethane decarbonization and dehydration unit 34 is 2-3 MPa.g, and the molecular weight is 30-31. The initial venting pressure of the cryogenic separation unit 35 is 4-5 MPa.g, and the molecular weight is 17-18. The initial venting pressure of the demethanizer 36 is 2-3 MPa.g, and the molecular weight is 16-17. The initial venting pressure of the high-pressure refrigerant unit 37 is 3-4 MPa.g, and the molecular weight is 30-31.

[0039] The other end of the high-pressure venting pipeline 3 in the gas distribution and fuel gas area is connected to the high-pressure areas of the gas distribution area 38 and the fuel gas area 39, respectively.

[0040] The other end of the high-pressure ambient temperature venting pipeline 4 of the main unit is connected to the pretreatment device 50 and the lean gas boosting device 51 respectively; the initial venting pressure of the pretreatment device 50 is 4-5 MPa.g, and the molecular weight is 16-18; the initial high-pressure venting pressure of the lean gas boosting device 51 is 4-5 MPa.g, and the molecular weight is 16-17.

[0041] The low-pressure venting flare system includes a low-pressure venting flare 23, which is connected to a low-pressure venting separator 21. The low-pressure venting separator 21 is connected to a plant-wide low-pressure venting main pipe 8. The plant-wide low-pressure venting main pipe 8 is connected to one end of the tail gas main pipe 7, the main unit low-pressure venting pipeline 9, the low-pressure venting pipeline 10 of the gas distribution and fuel gas area, the low-pressure venting pipeline 11 of the heating system, the low-pressure venting pipeline 12 of the refrigerant storage and distribution area, the low-pressure venting pipeline 13 of the loading and unloading area, the low-pressure venting pipeline 14 of the stabilized light hydrocarbon tank and propane storage tank, and the low-pressure venting pipeline 15 of the liquefied gas tank.

[0042] The low-pressure venting gas enters the low-pressure venting separator 21 through the plant's low-pressure venting main pipe 8. After being separated by gravity in the low-pressure venting separator 21, it is discharged into the low-pressure venting separator 21 and then discharged after combustion in the low-pressure venting separator 21.

[0043] The other end of the exhaust manifold 7 is connected to one end of the exhaust gas venting line 6 of the main unit ethane decarbonization device, and the other end of the exhaust gas venting line 6 of the main unit ethane decarbonization device is connected to the ethane decarbonization device 40; the initial venting pressure of the exhaust gas venting line 6 of the ethane decarbonization device is 2-3 MPa.g, and the molecular weight is 29-30.

[0044] The other end of the low-pressure venting pipeline 10 for the gas distribution and fuel gas area is connected to the low-pressure areas of the gas distribution area 38 and the fuel gas area 39; the initial low-pressure venting pressure of the low-pressure area of ​​the fuel gas area 39 is 0.7-0.9 MPa.g, and the molecular weight is 17-18.

[0045] The other end of the low-pressure venting pipeline 11 of the heating system is connected to the heating system 41;

[0046] The other end of the low-pressure venting pipeline 12 in the refrigerant storage and distribution area is connected to the refrigerant storage and distribution area 42;

[0047] The other end of the low-pressure venting pipeline 13 in the loading and unloading area is connected to the loading and unloading area 43;

[0048] The other end of the low-pressure venting pipeline 14 for the stabilizing light hydrocarbon tank and propane storage tank is connected to the stabilizing light hydrocarbon tank 44 and the propane storage tank 45, respectively; the initial low-pressure venting pressure of the propane storage tank 45 is 1-3 MPa.g, and the molecular weight is 43-45; the initial low-pressure venting pressure of the stabilizing light hydrocarbon tank 44 is 0.5-0.7 MPa.g, and the molecular weight is 82-84.

[0049] The other end of the low-pressure venting line 15 of the liquefied gas tank is connected to the liquefied gas tank 46; the initial pressure of the low-pressure venting of the liquefied gas tank 46 is 1-2 MPa.g, and the molecular weight is 48-50.

[0050] The ground venting flare system includes a ground venting flare 24, which is connected to the plant’s low-temperature and low-pressure venting main 16. The plant’s low-temperature and low-pressure venting main 16 is connected to one end of the centrifuge sealing gas low-temperature and low-pressure venting pipeline 17, the ethane storage tank venting pipeline 18, and the loading and unloading area low-temperature and low-pressure venting pipeline 19, respectively.

[0051] The other end of the centrifuge sealing gas low-temperature and low-pressure venting pipeline 17 is connected to the centrifuge sealing gas 47.

[0052] The other end of the ethane storage tank vent line 18 is connected to the ethane storage tank 48;

[0053] The low-temperature and low-pressure venting pipeline 19 in the loading and unloading area is connected to the loading and unloading area 49.

[0054] Example 2

[0055] The structure of the whole-plant flare system for the natural gas ethane recovery project of this invention is as follows: Figure 1 As shown, it includes a high-pressure venting flare system, a low-pressure venting flare system, and a ground venting flare system.

[0056] The high-pressure venting flare system includes a high-pressure venting flare 22, which is connected to a high-pressure venting separator 20. The high-pressure venting separator 20 is connected to the plant's high-pressure venting main pipe 5. The plant's high-pressure venting main pipe 5 is connected to one end of the high-pressure low-temperature venting main pipe 2, the high-pressure venting pipeline 3 of the gas distribution and fuel gas area, and the high-pressure ambient temperature venting pipeline 4 of the main unit.

[0057] High-pressure venting gas enters the high-pressure venting separator 20 through the plant's high-pressure venting main pipe 5. After being separated by gravity in the high-pressure venting separator 20, it is discharged into the high-pressure venting flare 22 and then discharged after combustion in the high-pressure venting flare 22.

[0058] The other end of the high-pressure cryogenic venting main 2 is connected to the main unit high-pressure cryogenic venting pipeline 1. The main unit high-pressure cryogenic venting pipeline 1 is connected to the ethane stripper 33, the ethane decarbonization and dehydration unit 34, the cryogenic separation unit 35, the demethanizer 36, and the high-pressure refrigerant unit 37, respectively. The initial venting pressure of the ethane stripper 33 is 2-3 MPa.g, and the molecular weight is 32-34. The initial venting pressure of the ethane decarbonization and dehydration unit 34 is 2-3 MPa.g, and the molecular weight is 30-31. The initial venting pressure of the cryogenic separation unit 35 is 4-5 MPa.g, and the molecular weight is 17-18. The initial venting pressure of the demethanizer 36 is 2-3 MPa.g, and the molecular weight is 16-17. The initial venting pressure of the high-pressure refrigerant unit 37 is 3-4 MPa.g, and the molecular weight is 30-31.

[0059] The high-pressure low-temperature venting main 2 is equipped with a heating device 9; the high-pressure low-temperature venting air from the ethane stripper 33, ethane decarbonization and dehydration device 34, low-temperature separation device 35, demethanizer 36 and high-pressure refrigerant device 37 is heated by the heating device 9 and then enters the plant's high-pressure venting main 5.

[0060] The other end of the high-pressure venting pipeline 3 in the gas distribution and fuel gas area is connected to the high-pressure areas of the gas distribution area 38 and the fuel gas area 39, respectively.

[0061] The other end of the high-pressure ambient temperature venting pipeline 4 of the main unit is connected to the pretreatment device 50 and the lean gas boosting device 51 respectively; the initial venting pressure of the pretreatment device 50 is 4-5 MPa.g, and the molecular weight is 16-18; the initial high-pressure venting pressure of the lean gas boosting device 51 is 4-5 MPa.g, and the molecular weight is 16-17.

[0062] The low-pressure venting flare system includes a low-pressure venting flare 23, which is connected to a low-pressure venting separator 21. The low-pressure venting separator 21 is connected to a plant-wide low-pressure venting main pipe 8. The plant-wide low-pressure venting main pipe 8 is connected to one end of the tail gas main pipe 7, the main unit low-pressure venting pipeline 9, the low-pressure venting pipeline 10 of the gas distribution and fuel gas area, the low-pressure venting pipeline 11 of the heating system, the low-pressure venting pipeline 12 of the refrigerant storage and distribution area, the low-pressure venting pipeline 13 of the loading and unloading area, the low-pressure venting pipeline 14 of the stabilized light hydrocarbon tank and propane storage tank, and the low-pressure venting pipeline 15 of the liquefied gas tank.

[0063] The low-pressure venting gas enters the low-pressure venting separator 21 through the plant's low-pressure venting main pipe 8. After being separated by gravity in the low-pressure venting separator 21, it is discharged into the low-pressure venting separator 21 and then discharged after combustion in the low-pressure venting separator 21.

[0064] The other end of the exhaust manifold 7 is connected to one end of the exhaust gas venting line 6 of the main unit ethane decarbonization device, and the other end of the exhaust gas venting line 6 of the main unit ethane decarbonization device is connected to the ethane decarbonization device 40; the initial venting pressure of the exhaust gas venting line 6 of the ethane decarbonization device is 2-3 MPa.g, and the molecular weight is 29-30.

[0065] The other end of the low-pressure venting pipeline 10 for the gas distribution and fuel gas area is connected to the low-pressure areas of the gas distribution area 38 and the fuel gas area 39; the initial low-pressure venting pressure of the low-pressure area of ​​the fuel gas area 39 is 0.7-0.9 MPa.g, and the molecular weight is 17-18.

[0066] The other end of the low-pressure venting pipeline 11 of the heating system is connected to the heating system 41;

[0067] The other end of the low-pressure venting pipeline 12 in the refrigerant storage and distribution area is connected to the refrigerant storage and distribution area 42;

[0068] The other end of the low-pressure venting pipeline 13 in the loading and unloading area is connected to the loading and unloading area 43;

[0069] The other end of the low-pressure venting pipeline 14 for the stabilizing light hydrocarbon tank and propane storage tank is connected to the stabilizing light hydrocarbon tank 44 and the propane storage tank 45, respectively; the initial low-pressure venting pressure of the propane storage tank 45 is 1-3 MPa.g, and the molecular weight is 43-45; the initial low-pressure venting pressure of the stabilizing light hydrocarbon tank 44 is 0.5-0.7 MPa.g, and the molecular weight is 82-84.

[0070] The other end of the low-pressure venting line 15 of the liquefied gas tank is connected to the liquefied gas tank 46; the initial pressure of the low-pressure venting of the liquefied gas tank 46 is 1-2 MPa.g, and the molecular weight is 48-50.

[0071] The ground venting flare system includes a ground venting flare 24, which is connected to the plant’s low-temperature and low-pressure venting main 16. The plant’s low-temperature and low-pressure venting main 16 is connected to one end of the centrifuge sealing gas low-temperature and low-pressure venting pipeline 17, the ethane storage tank venting pipeline 18, and the loading and unloading area low-temperature and low-pressure venting pipeline 19, respectively.

[0072] The other end of the centrifuge sealing gas low-temperature and low-pressure venting pipeline 17 is connected to the centrifuge sealing gas 47.

[0073] The other end of the ethane storage tank vent line 18 is connected to the ethane storage tank 48;

[0074] The low-temperature and low-pressure venting pipeline 19 in the loading and unloading area is connected to the loading and unloading area 49.

[0075] Example 3

[0076] The structure of the whole-plant flare system for the natural gas ethane recovery project of this invention is as follows: Figure 1 As shown, it includes a high-pressure venting flare system, a low-pressure venting flare system, and a ground venting flare system.

[0077] The high-pressure venting flare system includes a high-pressure venting flare 22, which is connected to a high-pressure venting separator 20. The high-pressure venting separator 20 is connected to the plant's high-pressure venting main pipe 5. The plant's high-pressure venting main pipe 5 is connected to one end of the high-pressure low-temperature venting main pipe 2, the high-pressure venting pipeline 3 of the gas distribution and fuel gas area, and the high-pressure ambient temperature venting pipeline 4 of the main unit.

[0078] High-pressure venting gas enters the high-pressure venting separator 20 through the plant's high-pressure venting main pipe 5. After being separated by gravity in the high-pressure venting separator 20, it is discharged into the high-pressure venting flare 22 and then discharged after combustion in the high-pressure venting flare 22.

[0079] The other end of the high-pressure cryogenic venting main 2 is connected to the main unit high-pressure cryogenic venting pipeline 1. The main unit high-pressure cryogenic venting pipeline 1 is connected to the ethane stripper 33, the ethane decarbonization and dehydration unit 34, the cryogenic separation unit 35, the demethanizer 36, and the high-pressure refrigerant unit 37, respectively. The initial venting pressure of the ethane stripper 33 is 2-3 MPa.g, and the molecular weight is 32-34. The initial venting pressure of the ethane decarbonization and dehydration unit 34 is 2-3 MPa.g, and the molecular weight is 30-31. The initial venting pressure of the cryogenic separation unit 35 is 4-5 MPa.g, and the molecular weight is 17-18. The initial venting pressure of the demethanizer 36 is 2-3 MPa.g, and the molecular weight is 16-17. The initial venting pressure of the high-pressure refrigerant unit 37 is 3-4 MPa.g, and the molecular weight is 30-31.

[0080] The other end of the high-pressure venting pipeline 3 in the gas distribution and fuel gas area is connected to the high-pressure areas of the gas distribution area 38 and the fuel gas area 39, respectively.

[0081] The other end of the high-pressure ambient temperature venting pipeline 4 of the main unit is connected to the pretreatment device 50 and the lean gas boosting device 51 respectively; the initial venting pressure of the pretreatment device 50 is 4-5 MPa.g, and the molecular weight is 16-18; the initial high-pressure venting pressure of the lean gas boosting device 51 is 4-5 MPa.g, and the molecular weight is 16-17.

[0082] The high-pressure cryogenic venting main 2 is connected to the plant-wide high-pressure venting main 5 via a tee a29. The end of the tee a29 away from the high-pressure cryogenic venting main 2 and the plant-wide high-pressure venting main 5 is equipped with a cap a25.

[0083] A butterfly valve A26 is installed between the tee A29 and the plant's high-pressure venting main 5; a figure-eight blind flange is installed inside the butterfly valve A26.

[0084] The low-pressure venting flare system includes a low-pressure venting flare 23, which is connected to a low-pressure venting separator 21. The low-pressure venting separator 21 is connected to a plant-wide low-pressure venting main pipe 8. The plant-wide low-pressure venting main pipe 8 is connected to one end of the tail gas main pipe 7, the main unit low-pressure venting pipeline 9, the low-pressure venting pipeline 10 of the gas distribution and fuel gas area, the low-pressure venting pipeline 11 of the heating system, the low-pressure venting pipeline 12 of the refrigerant storage and distribution area, the low-pressure venting pipeline 13 of the loading and unloading area, the low-pressure venting pipeline 14 of the stabilized light hydrocarbon tank and propane storage tank, and the low-pressure venting pipeline 15 of the liquefied gas tank.

[0085] The low-pressure venting gas enters the low-pressure venting separator 21 through the plant's low-pressure venting main pipe 8. After being separated by gravity in the low-pressure venting separator 21, it is discharged into the low-pressure venting separator 21 and then discharged after combustion in the low-pressure venting separator 21.

[0086] The other end of the exhaust manifold 7 is connected to one end of the exhaust gas venting line 6 of the main unit ethane decarbonization device, and the other end of the exhaust gas venting line 6 of the main unit ethane decarbonization device is connected to the ethane decarbonization device 40; the initial venting pressure of the exhaust gas venting line 6 of the ethane decarbonization device is 2-3 MPa.g, and the molecular weight is 29-30.

[0087] The exhaust gas main pipe 7 is connected to the plant's low-pressure venting main pipe 8 via a tee b31. A head b32 is installed at the end of the tee b31 away from the exhaust gas main pipe 7 and the plant's low-pressure venting main pipe 8. A pneumatic ball valve 27 is installed between the tee b31 and the plant's low-pressure venting main pipe 8.

[0088] The other end of the low-pressure venting pipeline 10 for the gas distribution and fuel gas area is connected to the low-pressure areas of the gas distribution area 38 and the fuel gas area 39; the initial low-pressure venting pressure of the low-pressure area of ​​the fuel gas area 39 is 0.7-0.9 MPa.g, and the molecular weight is 17-18.

[0089] The other end of the low-pressure venting pipeline 11 of the heating system is connected to the heating system 41;

[0090] The other end of the low-pressure venting pipeline 12 in the refrigerant storage and distribution area is connected to the refrigerant storage and distribution area 42;

[0091] The other end of the low-pressure venting pipeline 13 in the loading and unloading area is connected to the loading and unloading area 43;

[0092] The other end of the low-pressure venting pipeline 14 for the stabilizing light hydrocarbon tank and propane storage tank is connected to the stabilizing light hydrocarbon tank 44 and the propane storage tank 45, respectively; the initial low-pressure venting pressure of the propane storage tank 45 is 1-3 MPa.g, and the molecular weight is 43-45; the initial low-pressure venting pressure of the stabilizing light hydrocarbon tank 44 is 0.5-0.7 MPa.g, and the molecular weight is 82-84.

[0093] The other end of the low-pressure venting line 15 of the liquefied gas tank is connected to the liquefied gas tank 46; the initial pressure of the low-pressure venting of the liquefied gas tank 46 is 1-2 MPa.g, and the molecular weight is 48-50.

[0094] The ground venting flare system includes a ground venting flare 24, which is connected to the plant’s low-temperature and low-pressure venting main 16. The plant’s low-temperature and low-pressure venting main 16 is connected to one end of the centrifuge sealing gas low-temperature and low-pressure venting pipeline 17, the ethane storage tank venting pipeline 18, and the loading and unloading area low-temperature and low-pressure venting pipeline 19, respectively.

[0095] The other end of the centrifuge sealing gas low-temperature and low-pressure venting pipeline 17 is connected to the centrifuge sealing gas 47.

[0096] The other end of the ethane storage tank vent line 18 is connected to the ethane storage tank 48;

[0097] The low-temperature and low-pressure venting pipeline 19 in the loading and unloading area is connected to the loading and unloading area 49.

[0098] Example 4

[0099] The structure of the whole-plant flare system for the natural gas ethane recovery project of this invention is as follows: Figure 1 As shown, it includes a high-pressure venting flare system, a low-pressure venting flare system, and a ground venting flare system.

[0100] The high-pressure venting flare system includes a high-pressure venting flare 22, which is connected to a high-pressure venting separator 20. The high-pressure venting separator 20 is connected to the plant's high-pressure venting main pipe 5. The plant's high-pressure venting main pipe 5 is connected to one end of the high-pressure low-temperature venting main pipe 2, the high-pressure venting pipeline 3 of the gas distribution and fuel gas area, and the high-pressure ambient temperature venting pipeline 4 of the main unit.

[0101] High-pressure venting gas enters the high-pressure venting separator 20 through the plant's high-pressure venting main pipe 5. After being separated by gravity in the high-pressure venting separator 20, it is discharged into the high-pressure venting flare 22 and then discharged after combustion in the high-pressure venting flare 22.

[0102] The other end of the high-pressure cryogenic venting main 2 is connected to the main unit high-pressure cryogenic venting pipeline 1. The main unit high-pressure cryogenic venting pipeline 1 is connected to the ethane stripper 33, the ethane decarbonization and dehydration unit 34, the cryogenic separation unit 35, the demethanizer 36, and the high-pressure refrigerant unit 37, respectively. The initial venting pressure of the ethane stripper 33 is 2-3 MPa.g, and the molecular weight is 32-34. The initial venting pressure of the ethane decarbonization and dehydration unit 34 is 2-3 MPa.g, and the molecular weight is 30-31. The initial venting pressure of the cryogenic separation unit 35 is 4-5 MPa.g, and the molecular weight is 17-18. The initial venting pressure of the demethanizer 36 is 2-3 MPa.g, and the molecular weight is 16-17. The initial venting pressure of the high-pressure refrigerant unit 37 is 3-4 MPa.g, and the molecular weight is 30-31.

[0103] The other end of the high-pressure venting pipeline 3 in the gas distribution and fuel gas area is connected to the high-pressure areas of the gas distribution area 38 and the fuel gas area 39, respectively.

[0104] The other end of the high-pressure ambient temperature venting pipeline 4 of the main unit is connected to the pretreatment device 50 and the lean gas boosting device 51 respectively; the initial venting pressure of the pretreatment device 50 is 4-5 MPa.g, and the molecular weight is 16-18; the initial high-pressure venting pressure of the lean gas boosting device 51 is 4-5 MPa.g, and the molecular weight is 16-17.

[0105] A butterfly valve b28 is installed between the high-pressure ambient temperature venting pipeline 4 and the plant's high-pressure venting main pipeline 5; a figure-eight blind flange is installed inside the butterfly valve b28.

[0106] The low-pressure venting flare system includes a low-pressure venting flare 23, which is connected to a low-pressure venting separator 21. The low-pressure venting separator 21 is connected to a plant-wide low-pressure venting main pipe 8. The plant-wide low-pressure venting main pipe 8 is connected to one end of the tail gas main pipe 7, the main unit low-pressure venting pipeline 9, the low-pressure venting pipeline 10 of the gas distribution and fuel gas area, the low-pressure venting pipeline 11 of the heating system, the low-pressure venting pipeline 12 of the refrigerant storage and distribution area, the low-pressure venting pipeline 13 of the loading and unloading area, the low-pressure venting pipeline 14 of the stabilized light hydrocarbon tank and propane storage tank, and the low-pressure venting pipeline 15 of the liquefied gas tank.

[0107] The low-pressure venting gas enters the low-pressure venting separator 21 through the plant's low-pressure venting main pipe 8. After being separated by gravity in the low-pressure venting separator 21, it is discharged into the low-pressure venting separator 21 and then discharged after combustion in the low-pressure venting separator 21.

[0108] The other end of the exhaust manifold 7 is connected to one end of the exhaust gas venting line 6 of the main unit ethane decarbonization device, and the other end of the exhaust gas venting line 6 of the main unit ethane decarbonization device is connected to the ethane decarbonization device 40; the initial venting pressure of the exhaust gas venting line 6 of the ethane decarbonization device is 2-3 MPa.g, and the molecular weight is 29-30.

[0109] The other end of the low-pressure venting pipeline 10 for the gas distribution and fuel gas area is connected to the low-pressure areas of the gas distribution area 38 and the fuel gas area 39; the initial low-pressure venting pressure of the low-pressure area of ​​the fuel gas area 39 is 0.7-0.9 MPa.g, and the molecular weight is 17-18.

[0110] The other end of the low-pressure venting pipeline 11 of the heating system is connected to the heating system 41;

[0111] The other end of the low-pressure venting pipeline 12 in the refrigerant storage and distribution area is connected to the refrigerant storage and distribution area 42;

[0112] The other end of the low-pressure venting pipeline 13 in the loading and unloading area is connected to the loading and unloading area 43;

[0113] The other end of the low-pressure venting pipeline 14 for the stabilizing light hydrocarbon tank and propane storage tank is connected to the stabilizing light hydrocarbon tank 44 and the propane storage tank 45, respectively; the initial low-pressure venting pressure of the propane storage tank 45 is 1-3 MPa.g, and the molecular weight is 43-45; the initial low-pressure venting pressure of the stabilizing light hydrocarbon tank 44 is 0.5-0.7 MPa.g, and the molecular weight is 82-84.

[0114] The other end of the low-pressure venting line 15 of the liquefied gas tank is connected to the liquefied gas tank 46; the initial pressure of the low-pressure venting of the liquefied gas tank 46 is 1-2 MPa.g, and the molecular weight is 48-50.

[0115] A butterfly valve C30 is installed between the exhaust gas main pipe 7 and the exhaust gas venting pipeline 6 of the main unit ethane decarbonization unit; a figure-eight blind flange is installed inside the butterfly valve C30.

[0116] The ground venting flare system includes a ground venting flare 24, which is connected to the plant’s low-temperature and low-pressure venting main 16. The plant’s low-temperature and low-pressure venting main 16 is connected to one end of the centrifuge sealing gas low-temperature and low-pressure venting pipeline 17, the ethane storage tank venting pipeline 18, and the loading and unloading area low-temperature and low-pressure venting pipeline 19, respectively.

[0117] The other end of the centrifuge sealing gas low-temperature and low-pressure venting pipeline 17 is connected to the centrifuge sealing gas 47, and the other end of the ethane storage tank venting pipeline 18 is connected to the ethane storage tank 48.

[0118] The low-temperature and low-pressure venting pipeline 19 in the loading and unloading area is connected to the loading and unloading area 49.

[0119] A ball valve 52 is installed between the plant’s low-temperature and low-pressure venting main pipe 16 and the centrifuge sealing gas low-temperature and low-pressure venting pipeline 17.

Claims

1. A plant-wide flare system for natural gas ethane recovery, characterized in that: This includes high-pressure venting flare systems, low-pressure venting flare systems, and ground-based venting flare systems. The high-pressure venting flare system includes a high-pressure venting flare (22), which is connected to a high-pressure venting separator (20). The high-pressure venting separator (20) is connected to a plant-wide high-pressure venting main pipe (5). The plant-wide high-pressure venting main pipe (5) is connected to one end of the high-pressure low-temperature venting main pipe (2), the high-pressure venting pipeline (3) of the gas distribution and fuel gas area, and the high-pressure ambient temperature venting pipeline (4) of the main unit. The other end of the high-pressure low-temperature venting main pipe (2) is connected to the main unit high-pressure low-temperature venting pipeline (1), which is connected to the ethane removal tower (33), the ethane decarbonization and dehydration device (34), the low-temperature separation device (35), the demethanizer tower (36), and the high-pressure refrigerant device (37), respectively. The other end of the high-pressure venting pipeline (3) of the gas distribution and fuel gas area is connected to the high-pressure area of ​​the gas distribution area (38) and the fuel gas area (39), respectively. The other end of the main unit's high-pressure ambient temperature venting pipeline (4) is connected to the pretreatment device (50) and the lean gas booster device (51), respectively. The high-pressure low-temperature venting main pipe (2) is equipped with a heating device (9). The high-pressure cryogenic venting main pipe (2) is connected to the plant-wide high-pressure venting main pipe (5) via a tee a (29). A cap a (25) is installed at the end of the tee a (29) away from the high-pressure cryogenic venting main pipe (2) and the plant-wide high-pressure venting main pipe (5). A butterfly valve a (26) is installed between the tee a (29) and the plant's high-pressure venting main pipe (5); a figure-eight blind flange is installed inside the butterfly valve a (26); A butterfly valve b (28) is installed between the main unit high-pressure ambient temperature venting pipeline (4) and the plant's high-pressure venting main pipeline (5); a figure-eight blind flange is installed inside the butterfly valve b (28); The low-pressure venting flare system includes a low-pressure venting flare (23), which is connected to a low-pressure venting separator (21). The low-pressure venting separator (21) is connected to a plant-wide low-pressure venting main pipe (8). The plant-wide low-pressure venting main pipe (8) is connected to one end of the tail gas main pipe (7), the main unit low-pressure venting pipeline, the gas distribution and fuel gas area low-pressure venting pipeline (10), the heating system low-pressure venting pipeline (11), the refrigerant storage and distribution area low-pressure venting pipeline (12), the loading and unloading area low-pressure venting pipeline (13), the stabilized light hydrocarbon tank and propane storage tank low-pressure venting pipeline (14), and the liquefied gas tank low-pressure venting pipeline (15). The other end of the exhaust gas main pipe (7) is connected to one end of the exhaust gas venting pipeline (6) of the main unit ethane decarbonization device, and the other end of the exhaust gas venting pipeline (6) of the main unit ethane decarbonization device is connected to the ethane decarbonization device (40). The other end of the low-pressure venting pipeline (10) of the gas distribution and fuel gas area is connected to the low-pressure area of ​​the gas distribution area (38) and the fuel gas area (39); The other end of the low-pressure venting pipeline (11) of the heating system is connected to the heating system (41); The other end of the low-pressure venting pipeline (12) of the refrigerant storage and distribution area is connected to the refrigerant storage and distribution area (42); The other end of the low-pressure venting pipeline (13) in the loading and unloading area is connected to the first loading and unloading area (43); The other end of the low-pressure venting pipeline (14) of the stabilized light hydrocarbon tank and propane storage tank is connected to the stabilized light hydrocarbon tank (44) and the propane storage tank (45) respectively. The other end of the low-pressure venting line (15) of the liquefied gas tank is connected to the liquefied gas tank (46); A butterfly valve c (30) is installed between the tail gas main pipe (7) and the tail gas venting pipeline (6) of the main unit ethane decarbonization unit; a figure-eight blind plate is installed inside the butterfly valve c (30); The exhaust gas main pipe (7) is connected to the plant's low-pressure vent main pipe (8) via a tee b (31). A cap b (32) is installed at the end of the tee b (31) away from the exhaust gas main pipe (7) and the plant's low-pressure vent main pipe (8). A pneumatic ball valve (27) is installed between the tee b (31) and the plant's low-pressure vent main pipe (8). The ground venting flare system includes a ground venting flare (24), which is connected to the plant's low-temperature and low-pressure venting main pipe (16). The plant's low-temperature and low-pressure venting main pipe (16) is connected to one end of the centrifuge sealing gas low-temperature and low-pressure venting pipeline (17), the ethane storage tank venting pipeline (18), and the loading and unloading area low-temperature and low-pressure venting pipeline (19). The other end of the centrifuge sealing gas low-temperature and low-pressure venting pipeline (17) is connected to the centrifuge sealing gas (47); The other end of the venting pipeline (18) of the ethane storage tank is connected to the ethane storage tank (48); The low-temperature and low-pressure venting pipeline (19) of the loading and unloading area is connected to the second loading and unloading area (49); A ball valve (52) is installed between the plant’s low-temperature and low-pressure venting main (16) and the centrifuge sealing gas low-temperature and low-pressure venting pipeline (17).

Citation Information

Patent Citations

  • Supporting ground flare system of methyl alcohol system olefin device

    CN204923012U

  • High low pressure flare gas system jointly retrieves

    CN206958937U

  • Pipeline integrated heating device for emptying pipeline airflow

    CN218034558U