Energy coordination optimization control method and system for virtual power plant
Through the energy coordination optimization control method of the virtual power plant, combined with electricity consumption and environmental prediction, the energy coordination control scheme is optimized, which solves the problem of poor stability of energy coordination control in the traditional method and improves the operating efficiency and stability of the energy system.
Patent Information
- Application Number
- CN202410515379.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-26
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-04-26
AI Technical Summary
Traditional power systems often rely on experience or fixed parameters in energy coordination control, resulting in poor stability and reliability of the energy system and difficulty in effectively responding to the impact of environmental factors.
Adopting the energy coordination optimization control method of the virtual power plant, by receiving energy coordination instructions, configuring the historical time zone distribution, activating the dual channels of power consumption prediction and the meter measurement module, generating the scheduled time zone power consumption, and combining with the operating environment prediction, activating the energy coordination control distribution Quasi-channel, using virtual power plant optimization algorithm to optimize the control scheme.
It achieves comprehensive dispatch and control of the energy system, improves the accuracy of power consumption prediction and system adaptability, reduces the risk of supply and demand imbalance, and improves energy utilization efficiency and system operation stability.
Smart Images

Figure CN118228887B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric energy storage systems, and in particular to an energy coordination and optimization control method and system for a virtual power plant. Background Art
[0002] With the continuous development of renewable energy and distributed energy, traditional power systems are facing many challenges. On the one hand, traditional power systems often have the problem of imbalance between energy supply and demand, that is, the power supply cannot meet the demand, or the excess power supply leads to energy waste, which not only affects the user's power experience, but also affects the stability and reliability of the energy system; on the other hand, the operation of the energy system is affected by environmental factors, such as weather, season, etc. These factors affect the generation, transmission and consumption of energy, thereby affecting the scheduling and control of the energy system. These factors need to be considered to achieve optimal control of the energy system. Summary of the invention
[0003] This application provides an energy coordination and optimization control method for a virtual power plant, aiming to solve the technical problem that traditional methods for energy coordination control are often based on experience or fixed parameters and lack precise regulation of energy coordination control parameters, resulting in poor stability and reliability of the energy system.
[0004] In view of the above problems, the present application provides an energy coordination and optimization control method and system for a virtual power plant.
[0005] The first aspect disclosed in the present application provides an energy coordination optimization control method for a virtual power plant, the method comprising: receiving an energy coordination instruction of a power plant, wherein the energy coordination instruction comprises a predetermined future time zone, and the power plant comprises a power generation side, a power transmission and distribution side, and a power consumption side of the power plant; configuring a first associated historical time zone distribution satisfying a time zone interval constraint and a second associated historical time zone distribution satisfying a time zone attribute association constraint according to the predetermined future time zone; activating a power consumption prediction dual channel and an electric meter measurement module, performing a power consumption prediction for the predetermined future time zone on the power consumption side of the power plant in combination with the first associated historical time zone distribution and the second associated historical time zone distribution, and generating a predetermined time zone power consumption; performing an operating environment prediction for the power plant according to the predetermined future time zone, and obtaining a predicted power plant environment distribution; activating a power plant energy coordination control alignment channel, performing energy control analysis on the power generation side and the power transmission and distribution side of the power plant in combination with the predetermined time zone power consumption and the predicted power plant environment distribution, and generating an initial power plant coordination control plan; optimizing the initial power plant coordination control plan according to a virtual power plant optimization algorithm, and generating a power plant energy coordination control plan.
[0006] Another aspect disclosed in the present application provides an energy coordination and optimization control system for a virtual power plant, the system being used for the energy coordination and optimization control method for the above-mentioned virtual power plant, the system comprising: a coordination instruction receiving module, the coordination instruction receiving module being used to receive energy coordination instructions of a power plant, wherein the energy coordination instructions include a predetermined future time zone, and the power plant includes a power generation side, a power transmission and distribution side, and a power consumption side of the power plant; a time zone distribution configuration module, the time zone distribution configuration module being used to configure, according to the predetermined future time zone, a first associated historical time zone distribution that satisfies a time zone interval constraint, and a second associated historical time zone distribution that satisfies a time zone attribute association constraint; an electricity consumption prediction module, the electricity consumption prediction module being used to activate an electricity consumption prediction dual channel and an electricity metering module, in combination with the first associated historical time zone distribution. The historical time zone distribution and the second associated historical time zone distribution perform the power consumption forecast of the predetermined future time zone on the power consumption side of the power plant to generate the predetermined time zone power consumption; an operating environment prediction module, the operating environment prediction module is used to predict the operating environment of the power plant according to the predetermined future time zone, and obtain the predicted power plant environment distribution; an energy control analysis module, the energy control analysis module is used to activate the power plant energy coordination control alignment channel, combine the predetermined time zone power consumption and the predicted power plant environment distribution to perform energy control analysis on the power generation side of the power plant and the power transmission and distribution side of the power plant, and generate an initial power plant coordination control plan; a control plan optimization module, the control plan optimization module is used to optimize the initial power plant coordination control plan according to the virtual power plant optimization algorithm to generate a power plant energy coordination control plan.
[0007] One or more technical solutions provided in this application have at least the following technical effects or advantages:
[0008] By comprehensively considering all aspects of the power plant, including the power generation side, the power transmission and distribution side, and the power consumption side of the power plant, comprehensive scheduling and control of energy is achieved, effectively solving the complexity problem in the energy system; by activating the power consumption prediction dual channel and the meter measurement module, combined with the historical time zone distribution to predict power consumption, it is possible to more accurately predict the power consumption in the future time zone, which will help the power plant to make more accurate energy scheduling arrangements in the future time zone and reduce the risk of imbalance between supply and demand; through the operation environment prediction, the predicted power plant environment distribution can be obtained, so as to consider the impact of environmental factors on the energy system, which will help the power plant to more comprehensively consider external environmental factors when formulating energy control plans, and improve the adaptability and stability of the system; by activating the power plant energy coordination control alignment channel, combined with the predetermined time zone power consumption and predicted power plant environment distribution, energy control analysis is performed on the power plant generation side and transmission and distribution side, an initial power plant coordination control plan is generated, and it is optimized through the virtual power plant optimization algorithm, which enables the power plant to more effectively utilize various energy resources and improve energy utilization efficiency and system operation effect. In summary, the energy coordination and optimization control method of the virtual power plant effectively solves the scheduling and control problems in the energy system, improves the operating efficiency and stability of the energy system, and provides effective technical support for energy supply and energy utilization.
[0009] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 A schematic flow chart of a method for energy coordination and optimization control of a virtual power plant is provided for an embodiment of the present application;
[0011] Figure 2 A schematic diagram of the structure of an energy coordination and optimization control system for a virtual power plant is provided for an embodiment of the present application.
[0012] Explanation of the reference numerals: coordination instruction receiving module 10 , time zone distribution configuration module 20 , power consumption prediction module 30 , operating environment prediction module 40 , energy control analysis module 50 , control scheme optimization module 60 . DETAILED DESCRIPTION
[0013] The embodiment of the present application provides an energy coordination and optimization control method for a virtual power plant, which solves the technical problem that traditional methods for energy coordination control are often based on experience or fixed parameters and lack precise regulation of energy coordination control parameters, resulting in poor stability and reliability of the energy system.
[0014] After introducing the basic principles of the present application, various non-limiting implementation methods of the present application will be specifically described below in conjunction with the drawings in the specification.
[0015] Embodiment 1
[0016] like Figure 1 As shown, an embodiment of the present application provides an energy coordination optimization control method for a virtual power plant, the method comprising:
[0017] Receiving an energy coordination instruction from a power plant, wherein the energy coordination instruction includes a predetermined future time zone, and the power plant includes a power generation side, a power transmission and distribution side, and a power consumption side of the power plant;
[0018] Receive energy coordination instructions from the power plant, where the energy coordination instructions include specific requirements for each component of the power plant, such as requiring the power generation side to provide a specific amount of electricity within a certain period of time, or requiring the transmission and distribution side to adjust the power transmission plan within a certain period of time to meet the demand, including specific scheduled future time zones.
[0019] The predetermined future time zone is a certain period in the future for energy adjustment, which can be in units of months, quarters or longer time spans. The length of the predetermined future time zone is set according to actual conditions and specific needs, such as the impact of weather forecasts, holidays and other factors on energy demand, to ensure that demand can be met and stable operation can be maintained in the future period.
[0020] A power plant consists of the power generation side, the transmission and distribution side, and the power consumption side. The power generation side is responsible for power generation, including various power generation equipment such as thermal power plants, wind farms, solar panels, etc.; the transmission and distribution side is responsible for the transmission and distribution of electricity, including substations, transmission lines, etc.; the power consumption side is responsible for the consumption of electricity, including factories, residences, commercial buildings, etc.
[0021] According to the predetermined future time zone, configuring a first associated historical time zone distribution satisfying a time zone interval constraint and a second associated historical time zone distribution satisfying a time zone attribute association constraint;
[0022] The time zone interval constraint means that the selected historical time zone has the same time span as the scheduled future time zone. For example, if the scheduled future time zone is one month long, the selected historical time zone should also be one month long. In view of this constraint, the first associated historical time zone distribution is configured so that the time span of the selected historical time zone data matches the time span of the scheduled future time zone. That is, a time period of the same length as the scheduled future time zone is selected from the historical data as the first associated historical time zone distribution.
[0023] The time zone attribute association constraint means that the selected historical time zone has attribute characteristics similar to those of the scheduled future time zone. For example, if the scheduled future time zone is a special period, such as the Chinese New Year period, during which the electricity consumption increases, the selected historical time zone also selects the corresponding special period. In view of this constraint, the second associated historical time zone distribution is configured so that the selected historical time zone data has attribute characteristics similar to those of the scheduled future time zone, that is, a special period that matches the attribute of the scheduled future time zone or a historical time zone with similar attribute characteristics is selected from the historical data as the second associated historical time zone distribution.
[0024] Activate the power consumption prediction dual channel and the electric meter measurement module, perform the power consumption prediction of the predetermined future time zone on the power consumption side of the power plant in combination with the first associated historical time zone distribution and the second associated historical time zone distribution, and generate the power consumption of the predetermined time zone;
[0025] The dual-channel electricity consumption prediction includes a first electricity consumption prediction channel and a second electricity consumption prediction channel. The prediction channel is obtained based on the training of the long short-term memory neural network. The first historical electricity consumption distribution and the scheduled future time zone are used as the input of the first electricity consumption prediction channel, and the first electricity consumption prediction result is output. The second historical electricity consumption distribution and the scheduled future time zone are used as the input of the second electricity consumption prediction channel, and the second electricity consumption prediction result is output. The first electricity consumption prediction result and the second electricity consumption prediction result are integrated to obtain the electricity consumption in the scheduled time zone. This prediction result is used as the input of energy coordination control in the subsequent steps to formulate and optimize the energy dispatch plan of the power plant. The specific method for obtaining the electricity consumption in the scheduled time zone is described in detail in the subsequent steps and is only briefly mentioned here.
[0026] Further, activating the power consumption forecast dual channel and the electric meter measurement module, performing the power consumption forecast of the predetermined future time zone on the power consumption side of the power plant in combination with the first associated historical time zone distribution and the second associated historical time zone distribution, and generating the power consumption of the predetermined time zone, includes:
[0027] Based on the electric meter measurement module, the electric consumption prediction dual channel is constructed, wherein the electric consumption prediction dual channel includes a first electric consumption prediction channel and a second electric consumption prediction channel;
[0028] According to the electric meter measurement module, reading the electric power consumption record of the electric power consumption side of the power plant in the first associated historical time zone distribution to obtain a first historical electric power consumption distribution;
[0029] According to the electric meter measurement module, reading the electric power consumption information of the electric power consumption side of the power plant in the second associated historical time zone distribution to obtain a second historical electric power consumption distribution;
[0030] Inputting the first historical power consumption distribution and the predetermined future time zone into the first power consumption prediction channel to generate a first power consumption prediction result;
[0031] generating a second power consumption forecast result according to the second historical power consumption distribution and the predetermined future time zone in combination with the second power consumption forecast channel;
[0032] Data fusion is performed based on the first power consumption forecast result and the second power consumption forecast result to generate the power consumption in the predetermined time zone.
[0033] Based on the electric meter measurement module, multiple first electricity consumption sample groups on the power plant power consumption side are loaded, and supervised learning is performed on the multiple first electricity consumption sample groups based on the long short-term memory neural network to generate the first electricity consumption prediction channel for predicting the first historical electricity consumption distribution; based on the electric meter measurement module, multiple second electricity consumption sample groups on the power plant power consumption side are loaded, and supervised learning is performed on the multiple second electricity consumption sample groups based on the long short-term memory neural network to generate the second electricity consumption prediction channel for predicting the second historical electricity consumption distribution.
[0034] The electric meter measurement module can be connected to the electric meter system on the power consumption side of the power plant to obtain power consumption data or historical power consumption records in real time. According to the time range of the first associated historical time zone distribution, the electric meter measurement module reads the power consumption records on the power consumption side of the power plant within the time range, and these records include each time interval in the first associated historical time zone distribution, such as hourly and daily power consumption data, and the corresponding time mark, to obtain the first historical power consumption distribution.
[0035] According to the time range of the second associated historical time zone distribution, the electricity consumption records of the power plant within the time range are read based on the electric meter metering module. These records also include the electricity consumption data of each time interval within the second associated historical time zone distribution, and the corresponding time identifier, to obtain the second historical electricity consumption distribution.
[0036] The first historical electricity consumption distribution obtained is used as input data, and the scheduled future time zone is used as the time constraint of the prediction time zone, and is input into the first electricity consumption prediction channel. The channel predicts the electricity consumption in the future time zone based on the features and patterns learned in the training process and the historical electricity consumption data. The prediction process satisfies the time zone interval constraint and generates a first electricity consumption prediction result, which is an estimate of the electricity consumption in the scheduled future time zone.
[0037] Similarly, the acquired second historical electricity consumption distribution is used as input data, and the scheduled future time zone is used as the time constraint of the prediction time zone, and is input into the second electricity consumption prediction channel. The channel predicts the electricity consumption in the future time zone based on the features and patterns learned in the training process and the historical electricity consumption data. The prediction process satisfies the time zone attribute association constraints and generates a second electricity consumption prediction result, which is an estimate of the electricity consumption in the scheduled future time zone.
[0038] The first electricity consumption forecast result and the second electricity consumption forecast result are fused. During the fusion process, different weights are assigned according to the specific situation and actual needs to reflect the importance of each electricity consumption forecast result. The two are weighted and summed according to the weights to obtain the comprehensive electricity consumption in the scheduled time zone, which is a more accurate prediction of the electricity consumption in the scheduled time zone.
[0039] Furthermore, based on the electric meter measurement module, the electric consumption prediction dual channel is constructed, including:
[0040] According to the electric meter measurement module, multiple first electric consumption sample groups of the electric power consumption side of the power plant are loaded, wherein each first electric consumption sample group includes a sample time zone, a sample electric consumption, and a first sample electric consumption distribution that satisfies the time zone interval constraint;
[0041] According to the electric meter measurement module, a plurality of second electric consumption sample groups of the electric power consumption side of the power plant are retrieved, wherein each second electric consumption sample group includes the sample time zone, the sample electric power consumption, and the second sample electric power consumption distribution satisfying the time zone attribute association constraint;
[0042] Performing supervised learning on the plurality of first power consumption sample groups according to a long short-term memory neural network, obtaining a first learning deviation coefficient each time a preset number of learnings are performed, and generating the first power consumption prediction channel when the first learning deviation coefficient is less than or equal to a learning deviation threshold;
[0043] Performing supervised learning on the plurality of second power consumption sample groups according to a long short-term memory neural network, obtaining a second learning deviation coefficient each time the preset number of learnings is performed, and generating the second power consumption prediction channel when the second learning deviation coefficient is less than or equal to the learning deviation threshold;
[0044] The first power consumption prediction channel and the second power consumption prediction channel are integrated to generate the power consumption prediction dual channel.
[0045] The electric meter system connected to the power plant power consumption side is connected to the electric meter metering module to obtain historical power consumption records. Multiple first power consumption sample groups are loaded from the electric meter metering module, wherein the sample time zone refers to the time zone range covered by the sample data, which is a preset time period, such as one hour, one day, etc. The sample power consumption is the actual power consumption data of the power plant power consumption side in the sample time zone, and the first sample power consumption distribution is the power consumption distribution that meets the time zone interval constraint, which can be the statistical data or probability distribution of power consumption.
[0046] Multiple second electricity consumption sample groups are loaded from the electricity metering module, wherein the sample time zone refers to the time zone range covered by the sample data, which is a preset time period, such as one hour, one day, etc. The sample electricity consumption is the actual electricity consumption data on the power plant side within the sample time zone, and the second sample electricity consumption distribution is the electricity consumption distribution that meets the time zone attribute association constraints, which can be the statistical data or probability distribution of electricity consumption.
[0047] For the time series prediction of electricity consumption, a long short-term memory (LSTM) neural network model is established. LSTM is a recurrent neural network variant suitable for processing and predicting time series data. Multiple first electricity consumption sample groups are used as training data. Each sample group contains a sample time zone and sample electricity consumption. These samples are used to train the LSTM model. The training parameters of the neural network are set, including the learning rate, loss function, etc., and the preset number of training times is determined.
[0048] Use the prepared training data to perform supervised learning on the LSTM model, that is, input the historical electricity consumption data into the model so that it can learn the time series relationship between the electricity consumption data. After each certain number of learnings, that is, each time the preset number of times is reached, the learning effect of the model is evaluated, and the first learning deviation coefficient is calculated. The learning deviation coefficient can be the value of the loss function. Check whether the first learning deviation coefficient is less than or equal to the preset learning deviation threshold. If it is less than or equal to, it indicates that the model has fully learned the patterns and rules of the data, and generates a first electricity consumption prediction channel for predicting electricity consumption in future time zones.
[0049] Taking multiple second electricity consumption sample groups as training data, supervised learning is performed on the LSTM model. After each certain number of learning, that is, each time the preset number of times is reached, the learning effect of the model is evaluated, and the second learning deviation coefficient is calculated to check whether the second learning deviation coefficient is less than or equal to the preset learning deviation threshold. If it is less than or equal to, it indicates that the model has fully learned the patterns and rules of the data, and generates a second electricity consumption prediction channel for predicting electricity consumption in future time zones.
[0050] Weights are assigned to the first power consumption prediction channel and the second power consumption prediction channel. The weights can be set according to their importance. Based on the weights, the prediction results of the first power consumption prediction channel and the second power consumption prediction channel are weightedly fused to generate the power consumption prediction dual channel. By integrating the first power consumption prediction channel and the second power consumption prediction channel, a more accurate power consumption prediction result can be obtained, thereby improving the reliability of the prediction.
[0051] Predicting the operating environment of the power plant according to the predetermined future time zone to obtain a predicted power plant environment distribution;
[0052] According to the scheduled future time zone, the operating environment of the power plant is predicted. The operating environment includes factors such as weather conditions, seasonal factors, holidays, etc. that affect the operation of the power plant. The predicted operating environment can be predicted in combination with historical data, weather forecasts, holiday arrangements and other information. After completing the operating environment prediction, the predicted power plant environmental distribution is obtained. This environmental distribution is an overview of various environmental factors in the future time zone, such as weather trends, seasonal changes, and possible special events in the future time zone.
[0053] Activate the power plant energy coordinated control registration channel, perform energy control analysis on the power generation side of the power plant and the power transmission and distribution side of the power plant in combination with the predetermined time zone power consumption and the predicted power plant environment distribution, and generate an initial power plant coordinated control plan;
[0054] Further, activating the power plant energy coordinated control registration channel, combining the power consumption in the predetermined time zone and the predicted power plant environment distribution to perform energy control analysis on the power generation side and the power transmission and distribution side of the power plant, and generating an initial power plant coordinated control plan, including:
[0055] The power plant energy coordinated control registration channel includes a power plant energy control record library, a registration feature recognition composite network and a registration weight sharing network, wherein the power plant energy control record library includes a plurality of power plant energy control records, each power plant energy control record includes a sample time zone power consumption, a sample power plant environment distribution, a sample power generation energy control decision and a sample transmission and distribution energy control decision, and the registration weight sharing network includes a predetermined power consumption registration weight coefficient and a predetermined environment registration weight coefficient;
[0056] Based on the power consumption in the predetermined time zone and the predicted power plant environment distribution, the power plant energy control record library is subjected to power consumption registration feature recognition and environment registration feature recognition according to the registration feature recognition composite network to generate a plurality of sample registration recognition results, wherein each sample registration recognition result includes a sample power consumption feature registration coefficient and a sample environment feature registration coefficient;
[0057] According to the registration weight sharing network, weighted calculations are performed on the multiple sample registration recognition results respectively to generate multiple sample registration feature coefficients;
[0058] An optimal sample registration feature coefficient is screened according to the multiple sample registration feature coefficients, and sample decision extraction is performed on the power plant energy control record library according to the optimal sample registration feature coefficient to obtain the initial power plant coordinated control plan.
[0059] The power plant energy control record library is a database that stores multiple power plant energy control records. Each power plant energy control record includes: sample time zone electricity consumption, which records the power plant's electricity consumption in a specific time zone; sample power plant environmental distribution, which records the environmental distribution of the power plant in a specific time zone, such as temperature, humidity, etc.; sample power generation energy control decisions, which records the energy control decisions of the power plant's power generation side in a specific time zone, such as which power generation method to choose, the amount of power generated, etc.; sample transmission and distribution energy control decisions, which records the energy control decisions of the power plant's transmission and distribution side in a specific time zone, including the scheduling of the transmission and distribution network.
[0060] The registration feature recognition composite network is used to identify and register the features in the power plant energy control records. This network consists of multiple sub-networks, each of which is responsible for identifying different features, such as power consumption, environmental distribution, etc.
[0061] The registration weight sharing network is used to share the weights of power plant energy control records according to the predetermined power consumption registration weight coefficient and the environmental registration weight coefficient, wherein the predetermined power consumption registration weight coefficient is used to adjust the weight of power consumption, and the predetermined environmental registration weight coefficient is used to adjust the weight of environmental distribution.
[0062] The registration feature recognition composite network analyzes the electricity consumption data in the power plant energy control record library and compares it with the electricity consumption in the predetermined time zone. Specifically, for each sample electricity consumption, its similarity with the electricity consumption in the predetermined time zone is calculated. The obtained similarity is the electricity consumption feature registration coefficient, which reflects the similarity between the sample time zone electricity consumption and the predetermined time zone electricity consumption. The higher the similarity, the greater the sample electricity consumption feature registration coefficient.
[0063] Similarly, the registration feature recognition composite network analyzes the environmental distribution data in the power plant energy control record library and compares it with the predicted power plant environmental distribution. Specifically, for each sample environmental distribution, its similarity with the predicted power plant environmental characteristics is calculated. The obtained similarity is the sample environmental feature registration coefficient, which reflects the degree of similarity between the sample environmental distribution and the predicted environmental distribution. The higher the similarity, the greater the sample environmental feature registration coefficient.
[0064] The sample electricity consumption feature registration coefficient and the sample environmental feature registration coefficient are integrated into the sample registration recognition result for subsequent energy coordination control analysis and decision making.
[0065] The registration weight sharing network includes a predetermined power registration weight coefficient and a predetermined environment registration weight coefficient. For each sample registration recognition result, a weighted calculation is performed using the predetermined weight coefficient in the registration weight sharing network, that is, the power feature registration coefficient and the environment feature registration coefficient are multiplied by the predetermined power registration weight coefficient and the predetermined environment registration weight coefficient, respectively, and the weighted results are added to obtain the sample registration feature coefficient. The multiple sample registration recognition results are traversed to obtain multiple sample registration feature coefficients.
[0066] The multiple sample registration feature coefficients are numerically compared, and the maximum value thereof is obtained as the optimal sample registration feature coefficient. The optimal sample registration feature coefficient is used to extract the corresponding sample decision from the power plant energy control record library. The sample decision includes the power generation energy control decision and the transmission and distribution energy control decision. These decisions are recorded in the power plant energy control record library and associated with each sample. The sample decision extracted from the power plant energy control record library is used as the initial power plant coordination control plan to provide specific decision-making guidance for the energy control of the power plant, so as to achieve effective energy coordination and optimization.
[0067] The initial power plant coordination control scheme is optimized according to the virtual power plant optimization algorithm to generate a power plant energy coordination control scheme.
[0068] Furthermore, the initial power plant coordinated control scheme is optimized according to the virtual power plant optimization algorithm to generate a power plant energy coordinated control scheme, including:
[0069] Based on the power plant, construct a virtual power plant model;
[0070] Based on the predicted power plant environment distribution, executing virtual control of the initial power plant coordinated control scheme according to the virtual power plant model to generate a first power plant virtual data set;
[0071] Inputting the first power plant virtual data set into an energy coordinated control evaluation model to generate a first coordinated control evaluation coefficient;
[0072] Determining whether the first coordinated control evaluation coefficient satisfies the coordinated control constraint;
[0073] If the first coordinated control evaluation coefficient satisfies the coordinated control constraint, the initial power plant coordinated control scheme is added to the power plant energy coordinated control scheme.
[0074] Determine the structure of the virtual power plant model, including the various aspects covered by the model and the relationship between them, including the physical composition of the power plant, energy flow, equipment characteristics, etc. Collect data related to the power plant, including the power generation capacity on the power generation side, the technical parameters of the power generation equipment, the transmission and distribution equipment information on the power transmission and distribution side, and the power demand on the power consumption side, etc. These data are used as parameters for establishing the virtual power plant model. Based on the collected data, a virtual power plant model is established through modeling software, which can accurately reflect the characteristics of the real power plant.
[0075] The predicted power plant environment distribution is mapped to the virtual power plant model so that the model can simulate the predicted environment. The initial power plant coordinated control scheme is applied to the virtual power plant model to perform virtual control, including adjusting the operating parameters on the power generation side and the transmission and distribution side to meet the predetermined power demand and taking into account the impact of environmental factors on the power plant operation. During the virtual control execution process, data on various aspects of the power plant are recorded, including power generation, transmission and distribution operating status, power consumption, etc. These data constitute the first power plant virtual data set.
[0076] An energy coordinated control evaluation model is designed, which includes an energy coordinated control evaluation function. The model can comprehensively consider the power plant operation data, environmental factors and other related factors to evaluate the effectiveness of the power plant coordinated control scheme. The first power plant virtual data set is taken as input, and the energy coordinated control evaluation function is used to evaluate the input virtual data set. Based on the calculation result of the evaluation function, a first coordinated control evaluation coefficient is generated. This evaluation coefficient can reflect the quality of the initial power plant coordinated control scheme.
[0077] Obtain coordination control constraints, which include requirements for energy supply, energy loss, environmental impact, etc., which are specified by relevant standards or business requirements and are a pre-set interval. Compare the first coordination control evaluation coefficient with the coordination control constraint condition to determine whether the evaluation coefficient is within an allowable range. If so, it is determined that the constraint is met; otherwise, it is determined that the constraint is not met.
[0078] If the first coordinated control evaluation coefficient satisfies the coordinated control constraint, that is, it meets the pre-set interval, then the initial power plant coordinated control scheme is added to the power plant energy coordinated control scheme, which means that the scheme is effective and meets the requirements and can be incorporated into the overall energy management system for actual power plant operation.
[0079] Furthermore, inputting the first power plant virtual data set into the energy coordinated control evaluation model to generate a first coordinated control evaluation coefficient includes:
[0080] Perform energy loss identification and evaluation based on the first power plant virtual data set to generate a first virtual energy loss evaluation coefficient;
[0081] Extracting a first virtual power supply according to the first power plant virtual data set, and calculating a first virtual energy supply evaluation coefficient in combination with the power consumption in the predetermined time zone;
[0082] Performing fault risk prediction according to the first power plant virtual data set to generate a first virtual fault risk coefficient;
[0083] Performing standardization processing according to the first virtual energy loss evaluation coefficient, the first virtual energy supply evaluation coefficient and the first virtual fault risk coefficient to generate a first standard energy loss evaluation coefficient, a first standard energy supply evaluation coefficient and a first standard fault risk coefficient;
[0084] The first standard energy loss evaluation coefficient, the first standard energy supply evaluation coefficient and the first standard fault risk coefficient are input into the energy coordination control evaluation model, and the first coordination control evaluation coefficient is output, wherein the energy coordination control evaluation model includes an energy coordination control evaluation function, and the energy coordination control evaluation function is:
[0085]
[0086] Among them, ECCY represents the coordinated control evaluation coefficient, PAW represents the supply evaluation gain coefficient, EPA represents the standard energy supply evaluation coefficient, PBW represents the energy loss gain coefficient, EPB represents the standard energy loss evaluation coefficient, PCW represents the failure risk gain coefficient, EPC represents the standard failure risk coefficient, PAW, PBW, and PCW are all positive numbers, and the sum of PAW, PBW, and PCW is 1.
[0087] Energy loss is identified for the first virtual data set. For example, based on the first power plant virtual data set, virtual power generation and virtual power consumption are extracted, the difference between the virtual power generation and virtual power consumption is calculated, and then the difference is divided by the virtual power generation to obtain the first virtual energy loss evaluation coefficient. This coefficient represents the degree of energy loss in the power plant. The lower the value, the higher the energy utilization efficiency.
[0088] The first virtual power supply is extracted from the first power plant virtual data set. This data represents the power supply expected by the power plant in the predetermined time zone. The extracted first virtual power supply is compared with the power consumption in the predetermined time zone, and the ratio of the first virtual power supply to the power consumption in the predetermined time zone is calculated to obtain the first virtual energy supply evaluation coefficient. This coefficient is a ratio used to evaluate the degree of match between the power supply of the power plant and the actual demand. The closer the value of this coefficient is to 1, the higher the degree of match between the power supply of the power plant and the demand; and the deviation of the value from 1 indicates that there is a difference between supply and demand.
[0089] Using relevant data in the first power plant virtual data set, such as equipment status, fault data, environmental conditions, etc., a fault prediction model is applied to predict fault risks. The fault prediction model is built based on machine learning and trained using historical fault data to identify potential fault modes or abnormal conditions. Based on the prediction results of the fault risk, a first virtual fault risk coefficient is generated. This coefficient is an indicator that measures the probability or degree of a possible fault in a power plant within a predetermined time zone, and is used to assess the degree of fault risk that the power plant may face within the predetermined time zone.
[0090] The first virtual energy loss evaluation coefficient, the first virtual energy supply evaluation coefficient and the first virtual fault risk coefficient are standardized so as to be compared and comprehensively evaluated under the same dimension. The standardization process includes calculating the standard deviation of each evaluation coefficient and calculating the average value of all evaluation coefficients. For each evaluation coefficient, the average value is subtracted from its original value and the difference is divided by the standard deviation to obtain the first standard energy loss evaluation coefficient, the first standard energy supply evaluation coefficient and the first standard fault risk coefficient, which respectively represent the standardized values of energy loss, energy supply and fault risk.
[0091] The energy coordination control evaluation model includes an energy coordination control evaluation function, and the energy coordination control evaluation function is as follows:
[0092]
[0093] Among them, PAW, PBW, and PCW are preset weights, which are set according to specific circumstances and actual needs, and respectively represent the importance of each evaluation coefficient, and their sum is 1. When calculating the coordinated control evaluation coefficient ECCY, each evaluation coefficient is weighted based on the weights PAW, PBW, and PCW, and the weighted sum of the weighted energy loss evaluation coefficient and the weighted fault risk coefficient is calculated. Then, the ratio of the weighted energy supply evaluation coefficient to the weighted sum is calculated. Finally, the natural logarithm function is used to take the logarithm of the comparison value to obtain the final coordinated control evaluation coefficient ECCY. In this way, the comprehensive performance of the coordinated control scheme of the power plant in terms of energy supply, energy loss, and fault risk can be evaluated.
[0094] The first standard energy loss evaluation coefficient, the first standard energy supply evaluation coefficient and the first standard fault risk coefficient are used as inputs and substituted into the energy coordination control evaluation function to perform the above calculation process to obtain the first coordination control evaluation coefficient.
[0095] Further, judging whether the first coordinated control evaluation coefficient satisfies the coordinated control constraint includes:
[0096] Extracting a lower limit coordinated control constraint value according to the coordinated control constraint, and calculating a control evaluation lower limit difference value in combination with the first coordinated control evaluation coefficient;
[0097] Determine whether the control evaluation lower limit difference is greater than a preset control evaluation lower limit difference;
[0098] If the control evaluation lower limit difference is less than / equal to the preset control evaluation lower limit difference, a first optimal mutation operator is activated, wherein the first optimal mutation operator includes a first mutation dimension threshold, a first variable step threshold and a first mutation capacity threshold;
[0099] Performing mutation adjustment on the initial power plant coordinated control scheme according to the first optimization mutation operator to generate a first power plant coordinated control mutation domain;
[0100] The first power plant coordinated control variation domain is iteratively optimized according to the virtual power plant model and the energy coordinated control evaluation model until the power plant energy coordinated control scheme that meets the coordinated control constraints is generated.
[0101] The coordinated control constraint is an interval. The lower limit coordinated control constraint value of the interval is extracted. The first coordinated control evaluation coefficient is compared with the extracted lower limit coordinated control constraint value, and the difference is calculated to obtain the control evaluation lower limit difference. This difference represents the degree of deviation between the current coordinated control evaluation coefficient and the constraint lower limit.
[0102] Determine a preset control evaluation lower limit difference, which is set based on actual conditions and specific computing power and is used to determine the control evaluation lower limit difference.
[0103] Compare the control evaluation lower limit difference with the preset control evaluation lower limit difference. If the control evaluation lower limit difference is less than or equal to the preset control evaluation lower limit difference, it means that the current solution is close to the optimization target and a smaller mutation can be used for optimization. In this case, the first optimal mutation operator is activated, wherein the first mutation dimension threshold indicates the dimensions on which the mutation operation is performed, and these dimensions can be different settings of the control parameters; the first mutation step threshold is the step range used during the mutation, for example, if the first mutation step threshold is 5%, the step sizes that can be used during the mutation include 1%, 2%, 3%, and 4%; the first mutation capacity threshold is the number threshold of the mutation schemes, which can control the number of schemes generated by the mutation operation and avoid generating too many unnecessary schemes.
[0104] According to the first optimization mutation operator, the initial power plant coordinated control scheme is mutated and adjusted, including, according to the first mutation dimension threshold, determining which parameters to mutate, these parameters include power generation energy control decision, transmission and distribution energy control decision, etc.; according to the first variable step threshold, determining the step range used in the mutation to ensure the effectiveness and efficiency of the mutation; according to the mutation dimension and step range, adjustments are made on the basis of the initial power plant coordinated control scheme to generate a series of mutation schemes, according to the first mutation capacity threshold, the number of mutation schemes is limited to avoid generating too many schemes, to ensure the effectiveness of the mutation, and finally generate the first power plant coordinated control mutation domain, which includes multiple mutation schemes, and the number of these mutation schemes meets the first mutation capacity threshold.
[0105] Using the virtual power plant model and the energy coordinated control evaluation model, the initial first power plant coordinated control plan is input as the starting point of the initial iteration. According to the current first power plant coordinated control plan, iterative optimization is performed in the variation domain. In each iteration, the generated new plan is evaluated by the energy coordinated control evaluation model to obtain the corresponding coordinated control evaluation coefficient. According to the evaluation results, the current plan is updated. During the iteration process, termination conditions are set, such as reaching the maximum number of iterations, convergence of the evaluation coefficient, etc. When the termination conditions are met, the iteration ends, and finally a power plant energy coordinated control plan that meets the coordinated control constraints is obtained. This plan has undergone an iterative optimization process and can improve energy utilization efficiency and power supply quality as much as possible while meeting the constraints.
[0106] Further, judging whether the control evaluation lower limit difference is greater than a preset control evaluation lower limit difference includes:
[0107] If the control evaluation lower limit difference is greater than the preset control evaluation lower limit difference, a second optimal mutation operator is activated, wherein the second optimal mutation operator includes a second mutation dimension threshold, a second variable asynchronous progress threshold, and a second mutation capacity threshold, and the second mutation dimension threshold is greater than the first mutation dimension threshold, the second variable asynchronous progress threshold is greater than the first variable asynchronous progress threshold, and the second mutation capacity threshold is greater than the first mutation capacity threshold;
[0108] Performing mutation adjustment on the initial power plant coordinated control scheme according to the second optimal mutation operator to generate a second power plant coordinated control variation domain;
[0109] The second power plant coordinated control variation domain is iteratively optimized according to the virtual power plant model and the energy coordinated control evaluation model until the power plant energy coordinated control scheme that meets the coordinated control constraints is obtained.
[0110] When the control evaluation lower limit difference is greater than the preset control evaluation lower limit difference, it means that the current solution is far away from the optimization goal, so a larger mutation is needed to try a wider search space. In this case, the second optimal mutation operator is activated. The second optimal mutation operator includes a second mutation dimension threshold, a second mutation step threshold and a second mutation capacity threshold. These thresholds are set larger than the first optimal mutation operator to facilitate a wider range of mutation searches.
[0111] The second optimal mutation operator is used to mutate the initial power plant coordinated control scheme. This mutation process will be more radical and cover a larger search space. After the mutation operation, the virtual power plant model and the energy coordinated control evaluation model are used again for iterative optimization. In each iteration, the coordinated control evaluation coefficient of the new scheme is evaluated. As in the previous steps, when the conditions are met, the iteration is terminated, and finally a power plant energy coordinated control scheme that meets the coordinated control constraints is obtained. This scheme covers a wider search space.
[0112] In summary, the energy coordination optimization control method of a virtual power plant provided by the embodiment of the present application has the following technical effects:
[0113] 1. By comprehensively considering all aspects of the power plant, including the power generation side, the power transmission and distribution side, and the power consumption side, the comprehensive dispatch and control of energy is achieved, effectively solving the complexity problem in the energy system;
[0114] 2. By activating the dual-channel power consumption forecast and the metering module, combined with the historical time zone distribution to forecast power consumption, it is possible to more accurately predict power consumption in future time zones, which helps power plants make more accurate energy scheduling arrangements in future time zones and reduce the risk of supply and demand imbalance;
[0115] 3. Through the operation environment prediction, the predicted power plant environment distribution can be obtained, so as to consider the impact of environmental factors on the energy system. This helps the power plant to consider external environmental factors more comprehensively when formulating energy control plans, thereby improving the adaptability and stability of the system;
[0116] 4. By activating the power plant energy coordination control registration channel, combined with the predetermined time zone power consumption and predicted power plant environmental distribution, energy control analysis is conducted on the power plant's generation side and transmission and distribution side, an initial power plant coordination control plan is generated, and it is optimized through the virtual power plant optimization algorithm. This enables the power plant to utilize various energy resources more effectively, improve energy utilization efficiency and system operation effects.
[0117] In summary, the energy coordination and optimization control method of the virtual power plant effectively solves the scheduling and control problems in the energy system, improves the operating efficiency and stability of the energy system, and provides effective technical support for energy supply and energy utilization.
[0118] Embodiment 2
[0119] Based on the same inventive concept as the energy coordination optimization control method of a virtual power plant in the aforementioned embodiment, Figure 2 As shown, the present application provides an energy coordination optimization control system for a virtual power plant, the system comprising:
[0120] A coordination instruction receiving module 10, wherein the coordination instruction receiving module 10 is used to receive an energy coordination instruction of a power plant, wherein the energy coordination instruction includes a predetermined future time zone, and the power plant includes a power generation side, a power transmission and distribution side, and a power consumption side of the power plant;
[0121] A time zone distribution configuration module 20, the time zone distribution configuration module 20 is used to configure a first associated historical time zone distribution that satisfies a time zone interval constraint and a second associated historical time zone distribution that satisfies a time zone attribute association constraint according to the predetermined future time zone;
[0122] The power consumption prediction module 30 is used to activate the power consumption prediction dual channel and the electric meter measurement module, and perform the power consumption prediction of the predetermined future time zone on the power consumption side of the power plant in combination with the first associated historical time zone distribution and the second associated historical time zone distribution to generate the power consumption of the predetermined time zone;
[0123] An operating environment prediction module 40, the operating environment prediction module 40 is used to predict the operating environment of the power plant according to the predetermined future time zone to obtain a predicted power plant environment distribution;
[0124] An energy control analysis module 50, the energy control analysis module 50 is used to activate the power plant energy coordination control registration channel, perform energy control analysis on the power generation side of the power plant and the power transmission and distribution side of the power plant in combination with the predetermined time zone power consumption and the predicted power plant environment distribution, and generate an initial power plant coordination control plan;
[0125] The control scheme optimization module 60 is used to optimize the initial power plant coordinated control scheme according to the virtual power plant optimization algorithm to generate a power plant energy coordinated control scheme.
[0126] Furthermore, the system further comprises:
[0127] A prediction dual-channel construction module, the prediction dual-channel construction module is used to construct the power consumption prediction dual-channel based on the electric meter measurement module, wherein the power consumption prediction dual-channel includes a first power consumption prediction channel and a second power consumption prediction channel;
[0128] An electricity consumption record reading module, the electricity consumption record reading module is used to read the electricity consumption record of the power plant power consumption side in the first associated historical time zone distribution according to the electric meter measurement module, and obtain a first historical electricity consumption distribution;
[0129] An electricity consumption information reading module, the electricity consumption information reading module is used to read the electricity consumption information of the power plant power consumption side in the second associated historical time zone distribution according to the electric meter measurement module, and obtain a second historical electricity consumption distribution;
[0130] a first power consumption prediction module, the first power consumption prediction module being used to input the first historical power consumption distribution and the predetermined future time zone into the first power consumption prediction channel to generate a first power consumption prediction result;
[0131] a second power consumption prediction module, the second power consumption prediction module being configured to generate a second power consumption prediction result according to the second historical power consumption distribution and the predetermined future time zone in combination with the second power consumption prediction channel;
[0132] A data fusion module is used to perform data fusion according to the first power consumption forecast result and the second power consumption forecast result to generate the power consumption in the predetermined time zone.
[0133] Furthermore, the system also includes a power consumption prediction dual-channel generation module to perform the following operation steps:
[0134] According to the electric meter measurement module, multiple first electric consumption sample groups of the electric power consumption side of the power plant are loaded, wherein each first electric consumption sample group includes a sample time zone, a sample electric consumption, and a first sample electric consumption distribution that satisfies the time zone interval constraint;
[0135] According to the electric meter measurement module, a plurality of second electric consumption sample groups of the electric power consumption side of the power plant are retrieved, wherein each second electric consumption sample group includes the sample time zone, the sample electric power consumption, and the second sample electric power consumption distribution satisfying the time zone attribute association constraint;
[0136] Performing supervised learning on the plurality of first power consumption sample groups according to a long short-term memory neural network, obtaining a first learning deviation coefficient each time a preset number of learnings are performed, and generating the first power consumption prediction channel when the first learning deviation coefficient is less than or equal to a learning deviation threshold;
[0137] Performing supervised learning on the plurality of second power consumption sample groups according to a long short-term memory neural network, obtaining a second learning deviation coefficient each time the preset number of learnings is performed, and generating the second power consumption prediction channel when the second learning deviation coefficient is less than or equal to the learning deviation threshold;
[0138] The first power consumption prediction channel and the second power consumption prediction channel are integrated to generate the power consumption prediction dual channel.
[0139] Furthermore, the system further includes a coordinated control scheme generating module to perform the following operation steps:
[0140] The power plant energy coordinated control registration channel includes a power plant energy control record library, a registration feature recognition composite network and a registration weight sharing network, wherein the power plant energy control record library includes a plurality of power plant energy control records, each power plant energy control record includes a sample time zone power consumption, a sample power plant environment distribution, a sample power generation energy control decision and a sample transmission and distribution energy control decision, and the registration weight sharing network includes a predetermined power consumption registration weight coefficient and a predetermined environment registration weight coefficient;
[0141] Based on the power consumption in the predetermined time zone and the predicted power plant environment distribution, the power plant energy control record library is subjected to power consumption registration feature recognition and environment registration feature recognition according to the registration feature recognition composite network to generate a plurality of sample registration recognition results, wherein each sample registration recognition result includes a sample power consumption feature registration coefficient and a sample environment feature registration coefficient;
[0142] According to the registration weight sharing network, weighted calculations are performed on the multiple sample registration recognition results respectively to generate multiple sample registration feature coefficients;
[0143] An optimal sample registration feature coefficient is screened according to the multiple sample registration feature coefficients, and sample decision extraction is performed on the power plant energy control record library according to the optimal sample registration feature coefficient to obtain the initial power plant coordinated control plan.
[0144] Furthermore, the system further includes a power plant energy coordination control scheme generation module to perform the following operation steps:
[0145] Based on the power plant, construct a virtual power plant model;
[0146] Based on the predicted power plant environment distribution, executing virtual control of the initial power plant coordinated control scheme according to the virtual power plant model to generate a first power plant virtual data set;
[0147] Inputting the first power plant virtual data set into an energy coordinated control evaluation model to generate a first coordinated control evaluation coefficient;
[0148] Determining whether the first coordinated control evaluation coefficient satisfies the coordinated control constraint;
[0149] If the first coordinated control evaluation coefficient satisfies the coordinated control constraint, the initial power plant coordinated control scheme is added to the power plant energy coordinated control scheme.
[0150] Furthermore, the system further includes a first coordinated control evaluation coefficient generating module to perform the following operation steps:
[0151] Perform energy loss identification and evaluation based on the first power plant virtual data set to generate a first virtual energy loss evaluation coefficient;
[0152] Extracting a first virtual power supply according to the first power plant virtual data set, and calculating a first virtual energy supply evaluation coefficient in combination with the power consumption in the predetermined time zone;
[0153] Performing fault risk prediction according to the first power plant virtual data set to generate a first virtual fault risk coefficient;
[0154] Performing standardization processing according to the first virtual energy loss evaluation coefficient, the first virtual energy supply evaluation coefficient and the first virtual fault risk coefficient to generate a first standard energy loss evaluation coefficient, a first standard energy supply evaluation coefficient and a first standard fault risk coefficient;
[0155] The first standard energy loss evaluation coefficient, the first standard energy supply evaluation coefficient and the first standard fault risk coefficient are input into the energy coordination control evaluation model, and the first coordination control evaluation coefficient is output, wherein the energy coordination control evaluation model includes an energy coordination control evaluation function, and the energy coordination control evaluation function is:
[0156]
[0157] Among them, ECCY represents the coordinated control evaluation coefficient, PAW represents the supply evaluation gain coefficient, EPA represents the standard energy supply evaluation coefficient, PBW represents the energy loss gain coefficient, EPB represents the standard energy loss evaluation coefficient, PCW represents the failure risk gain coefficient, EPC represents the standard failure risk coefficient, PAW, PBW, and PCW are all positive numbers, and the sum of PAW, PBW, and PCW is 1.
[0158] Furthermore, the system further includes a power plant energy coordination control scheme generation module to perform the following operation steps:
[0159] Extracting a lower limit coordinated control constraint value according to the coordinated control constraint, and calculating a control evaluation lower limit difference value in combination with the first coordinated control evaluation coefficient;
[0160] Determine whether the control evaluation lower limit difference is greater than a preset control evaluation lower limit difference;
[0161] If the control evaluation lower limit difference is less than / equal to the preset control evaluation lower limit difference, a first optimal mutation operator is activated, wherein the first optimal mutation operator includes a first mutation dimension threshold, a first variable step threshold and a first mutation capacity threshold;
[0162] Performing mutation adjustment on the initial power plant coordinated control scheme according to the first optimization mutation operator to generate a first power plant coordinated control mutation domain;
[0163] The first power plant coordinated control variation domain is iteratively optimized according to the virtual power plant model and the energy coordinated control evaluation model until the power plant energy coordinated control scheme that meets the coordinated control constraints is generated.
[0164] Furthermore, the system further includes an iterative optimization module to perform the following operation steps:
[0165] If the control evaluation lower limit difference is greater than the preset control evaluation lower limit difference, a second optimal mutation operator is activated, wherein the second optimal mutation operator includes a second mutation dimension threshold, a second variable asynchronous progress threshold, and a second mutation capacity threshold, and the second mutation dimension threshold is greater than the first mutation dimension threshold, the second variable asynchronous progress threshold is greater than the first variable asynchronous progress threshold, and the second mutation capacity threshold is greater than the first mutation capacity threshold;
[0166] Performing mutation adjustment on the initial power plant coordinated control scheme according to the second optimal mutation operator to generate a second power plant coordinated control variation domain;
[0167] The second power plant coordinated control variation domain is iteratively optimized according to the virtual power plant model and the energy coordinated control evaluation model until the power plant energy coordinated control scheme that meets the coordinated control constraints is obtained.
[0168] Through the above-mentioned detailed description of the energy coordination and optimization control method of a virtual power plant in this specification, those skilled in the art can clearly know the energy coordination and optimization control system of a virtual power plant in this embodiment. Since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description.
[0169] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A method for energy coordination and optimization control of a virtual power plant, characterized in that: The method comprises: Receiving an energy coordination instruction from a power plant, wherein the energy coordination instruction includes a predetermined future time zone, and the power plant includes a power generation side, a power transmission and distribution side, and a power consumption side of the power plant; According to the predetermined future time zone, configuring a first associated historical time zone distribution satisfying a time zone interval constraint and a second associated historical time zone distribution satisfying a time zone attribute association constraint; Activate the power consumption prediction dual channel and the electric meter measurement module, perform the power consumption prediction of the predetermined future time zone on the power consumption side of the power plant in combination with the first associated historical time zone distribution and the second associated historical time zone distribution, and generate the power consumption of the predetermined time zone; Predicting the operating environment of the power plant according to the predetermined future time zone to obtain a predicted power plant environment distribution; Activate the power plant energy coordinated control registration channel, perform energy control analysis on the power generation side and the power transmission and distribution side of the power plant in combination with the predetermined time zone power consumption and the predicted power plant environment distribution, and generate an initial power plant coordinated control plan; Optimizing the initial power plant coordinated control scheme according to a virtual power plant optimization algorithm to generate a power plant energy coordinated control scheme; The initial power plant coordination control scheme is optimized according to the virtual power plant optimization algorithm to generate a power plant energy coordination control scheme, including: Based on the power plant, construct a virtual power plant model; Based on the predicted power plant environment distribution, executing virtual control of the initial power plant coordinated control scheme according to the virtual power plant model to generate a first power plant virtual data set; Inputting the first power plant virtual data set into an energy coordinated control evaluation model to generate a first coordinated control evaluation coefficient; Determining whether the first coordinated control evaluation coefficient satisfies the coordinated control constraint; If the first coordinated control evaluation coefficient satisfies the coordinated control constraint, the initial power plant coordinated control scheme is added to the power plant energy coordinated control scheme.
2. The method according to claim 1, characterized in that Activating the power consumption forecast dual-channel and the electric meter measurement module, performing the power consumption forecast of the predetermined future time zone on the power consumption side of the power plant in combination with the first associated historical time zone distribution and the second associated historical time zone distribution, and generating the power consumption of the predetermined time zone, including: Based on the electric meter measurement module, the electric consumption prediction dual channel is constructed, wherein the electric consumption prediction dual channel includes a first electric consumption prediction channel and a second electric consumption prediction channel; According to the electric meter measurement module, reading the electric power consumption record of the electric power consumption side of the power plant in the first associated historical time zone distribution to obtain a first historical electric power consumption distribution; According to the electric meter measurement module, reading the electric power consumption information of the electric power consumption side of the power plant in the second associated historical time zone distribution to obtain a second historical electric power consumption distribution; Inputting the first historical power consumption distribution and the predetermined future time zone into the first power consumption prediction channel to generate a first power consumption prediction result; generating a second power consumption forecast result according to the second historical power consumption distribution and the predetermined future time zone in combination with the second power consumption forecast channel; Data fusion is performed based on the first power consumption forecast result and the second power consumption forecast result to generate the power consumption in the predetermined time zone.
3. The method according to claim 2, characterized in that Based on the electric meter measurement module, the electric consumption prediction dual channel is constructed, including: According to the electric meter measurement module, multiple first electric consumption sample groups of the electric power consumption side of the power plant are loaded, wherein each first electric consumption sample group includes a sample time zone, a sample electric consumption, and a first sample electric consumption distribution that satisfies the time zone interval constraint; According to the electric meter measurement module, a plurality of second electric consumption sample groups of the electric power consumption side of the power plant are retrieved, wherein each second electric consumption sample group includes the sample time zone, the sample electric power consumption, and the second sample electric power consumption distribution satisfying the time zone attribute association constraint; Performing supervised learning on the plurality of first power consumption sample groups according to a long short-term memory neural network, obtaining a first learning deviation coefficient each time a preset number of learnings are performed, and generating the first power consumption prediction channel when the first learning deviation coefficient is less than or equal to a learning deviation threshold; Performing supervised learning on the plurality of second power consumption sample groups according to a long short-term memory neural network, obtaining a second learning deviation coefficient each time the preset number of learnings is performed, and generating the second power consumption prediction channel when the second learning deviation coefficient is less than or equal to the learning deviation threshold; The first power consumption prediction channel and the second power consumption prediction channel are integrated to generate the power consumption prediction dual channel.
4. The method according to claim 1, characterized in that Activate the power plant energy coordinated control registration channel, perform energy control analysis on the power generation side and the power transmission and distribution side of the power plant in combination with the predetermined time zone power consumption and the predicted power plant environment distribution, and generate an initial power plant coordinated control plan, including: The power plant energy coordinated control registration channel includes a power plant energy control record library, a registration feature recognition composite network and a registration weight sharing network, wherein the power plant energy control record library includes a plurality of power plant energy control records, each power plant energy control record includes a sample time zone power consumption, a sample power plant environment distribution, a sample power generation energy control decision and a sample transmission and distribution energy control decision, and the registration weight sharing network includes a predetermined power consumption registration weight coefficient and a predetermined environment registration weight coefficient; Based on the power consumption in the predetermined time zone and the predicted power plant environment distribution, the power plant energy control record library is subjected to power consumption registration feature recognition and environment registration feature recognition according to the registration feature recognition composite network to generate a plurality of sample registration recognition results, wherein each sample registration recognition result includes a sample power consumption feature registration coefficient and a sample environment feature registration coefficient; According to the registration weight sharing network, weighted calculations are performed on the multiple sample registration recognition results respectively to generate multiple sample registration feature coefficients; An optimal sample registration feature coefficient is screened according to the multiple sample registration feature coefficients, and sample decision extraction is performed on the power plant energy control record library according to the optimal sample registration feature coefficient to obtain the initial power plant coordinated control plan.
5. The method according to claim 1, characterized in that Inputting the first power plant virtual data set into the energy coordinated control evaluation model to generate a first coordinated control evaluation coefficient includes: Perform energy loss identification and evaluation based on the first power plant virtual data set to generate a first virtual energy loss evaluation coefficient; Extracting a first virtual power supply according to the first power plant virtual data set, and calculating a first virtual energy supply evaluation coefficient in combination with the power consumption in the predetermined time zone; Performing fault risk prediction according to the first power plant virtual data set to generate a first virtual fault risk coefficient; Performing standardization processing according to the first virtual energy loss evaluation coefficient, the first virtual energy supply evaluation coefficient and the first virtual fault risk coefficient to generate a first standard energy loss evaluation coefficient, a first standard energy supply evaluation coefficient and a first standard fault risk coefficient; The first standard energy loss evaluation coefficient, the first standard energy supply evaluation coefficient and the first standard fault risk coefficient are input into the energy coordination control evaluation model, and the first coordination control evaluation coefficient is output, wherein the energy coordination control evaluation model includes an energy coordination control evaluation function, and the energy coordination control evaluation function is: ; Among them, ECCY represents the coordinated control evaluation coefficient, PAW represents the supply evaluation gain coefficient, EPA represents the standard energy supply evaluation coefficient, PBW represents the energy loss gain coefficient, EPB represents the standard energy loss evaluation coefficient, PCW represents the failure risk gain coefficient, EPC represents the standard failure risk coefficient, PAW, PBW, and PCW are all positive numbers, and the sum of PAW, PBW, and PCW is 1.
6. The method according to claim 1, characterized in that Determining whether the first coordinated control evaluation coefficient satisfies the coordinated control constraint includes: Extracting a lower limit coordinated control constraint value according to the coordinated control constraint, and calculating a control evaluation lower limit difference value in combination with the first coordinated control evaluation coefficient; Determine whether the control evaluation lower limit difference is greater than a preset control evaluation lower limit difference; If the control evaluation lower limit difference is less than / equal to the preset control evaluation lower limit difference, a first optimal mutation operator is activated, wherein the first optimal mutation operator includes a first mutation dimension threshold, a first variable step threshold and a first mutation capacity threshold; Performing mutation adjustment on the initial power plant coordinated control scheme according to the first optimization mutation operator to generate a first power plant coordinated control mutation domain; The first power plant coordinated control variation domain is iteratively optimized according to the virtual power plant model and the energy coordinated control evaluation model until the power plant energy coordinated control scheme that meets the coordinated control constraints is generated.
7. The method according to claim 6, characterized in that Determining whether the control evaluation lower limit difference is greater than a preset control evaluation lower limit difference includes: If the control evaluation lower limit difference is greater than the preset control evaluation lower limit difference, a second optimal mutation operator is activated, wherein the second optimal mutation operator includes a second mutation dimension threshold, a second variable asynchronous progress threshold, and a second mutation capacity threshold, and the second mutation dimension threshold is greater than the first mutation dimension threshold, the second variable asynchronous progress threshold is greater than the first variable asynchronous progress threshold, and the second mutation capacity threshold is greater than the first mutation capacity threshold; Performing mutation adjustment on the initial power plant coordinated control scheme according to the second optimal mutation operator to generate a second power plant coordinated control variation domain; The second power plant coordinated control variation domain is iteratively optimized according to the virtual power plant model and the energy coordinated control evaluation model until the power plant energy coordinated control scheme that meets the coordinated control constraints is obtained.
8. An energy coordination and optimization control system for a virtual power plant, characterized in that: A method for implementing energy coordination and optimization control of a virtual power plant according to any one of claims 1 to 7, comprising: A coordination instruction receiving module, the coordination instruction receiving module is used to receive an energy coordination instruction of a power plant, wherein the energy coordination instruction includes a predetermined future time zone, and the power plant includes a power generation side of the power plant, a power transmission and distribution side of the power plant, and a power consumption side of the power plant; A time zone distribution configuration module, the time zone distribution configuration module is used to configure a first associated historical time zone distribution that satisfies a time zone interval constraint and a second associated historical time zone distribution that satisfies a time zone attribute association constraint according to the predetermined future time zone; A power consumption prediction module, the power consumption prediction module is used to activate the power consumption prediction dual channel and the electric meter measurement module, and perform the power consumption prediction of the predetermined future time zone on the power consumption side of the power plant in combination with the first associated historical time zone distribution and the second associated historical time zone distribution to generate the power consumption of the predetermined time zone; An operating environment prediction module, the operating environment prediction module is used to predict the operating environment of the power plant according to the predetermined future time zone to obtain a predicted power plant environment distribution; An energy control analysis module, the energy control analysis module is used to activate the power plant energy coordination control registration channel, perform energy control analysis on the power generation side of the power plant and the power transmission and distribution side of the power plant in combination with the predetermined time zone power consumption and the predicted power plant environment distribution, and generate an initial power plant coordination control plan; A control scheme optimization module, wherein the control scheme optimization module is used to optimize the initial power plant coordinated control scheme according to a virtual power plant optimization algorithm to generate a power plant energy coordinated control scheme.
9. The energy coordination and optimization control system of a virtual power plant according to claim 8, characterized in that: The system comprises: A prediction dual-channel construction module, the prediction dual-channel construction module is used to construct the power consumption prediction dual-channel based on the electric meter measurement module, wherein the power consumption prediction dual-channel includes a first power consumption prediction channel and a second power consumption prediction channel; An electricity consumption record reading module, the electricity consumption record reading module is used to read the electricity consumption record of the power plant power consumption side in the first associated historical time zone distribution according to the electric meter measurement module, and obtain a first historical electricity consumption distribution; An electricity consumption information reading module, the electricity consumption information reading module is used to read the electricity consumption information of the power plant power consumption side in the second associated historical time zone distribution according to the electric meter measurement module, and obtain a second historical electricity consumption distribution; a first power consumption prediction module, the first power consumption prediction module being used to input the first historical power consumption distribution and the predetermined future time zone into the first power consumption prediction channel to generate a first power consumption prediction result; a second power consumption prediction module, the second power consumption prediction module being configured to generate a second power consumption prediction result according to the second historical power consumption distribution and the predetermined future time zone in combination with the second power consumption prediction channel; A data fusion module is used to perform data fusion according to the first power consumption forecast result and the second power consumption forecast result to generate the power consumption in the predetermined time zone.