A method and system for detecting stable operation of distribution network equipment

By building a topological structure and multi-layer perceptron network model, combined with monitoring data, the problem of low operating status detection efficiency and reliability of the distribution network in the existing technology is solved, and reliable judgment and efficient distribution network equipment stability are achieved. Test.

CN118249515BActive Publication Date: 2024-11-05GUANGXI POWER GRID CO LTD NANNING POWER SUPPLY BUREAU
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410477211.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-19
Publication Date
2024-11-05
Estimated Expiration
2044-04-19

AI Technical Summary

Technical Problem

In the prior art, the distribution network operating state detection method is based on a hierarchical analysis method, which has subjective influence and is low in efficiency and reliability, making it difficult to effectively judge the overall operating stability of distribution network equipment.

Method used

By building a topological structure and a multi-layer perceptron network model, combining historical and latest device monitoring data, topological features are extracted and multi-layer perceptron network model is trained to determine the stable operating status of distribution network equipment, and improve the reliability of detection results.

Benefits of technology

It realizes a reliable judgment on the overall operating stability of distribution network equipment, improves the efficiency and reliability of distribution network status detection, and provides operation and maintenance management personnel with reliable operating status reference.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118249515B_ABST
    Figure CN118249515B_ABST
Patent Text Reader

Abstract

The present application discloses a method and system for detecting the stable operation of distribution network equipment, which relates to power grid operation and maintenance technology, including: obtaining the topological structure of the distribution network part under the current power grid, and associating the distribution network equipment with the obtained topological structure; obtaining historical equipment monitoring data, associating the segmented monitoring data with the main extended topology in chronological order; and, according to the coverage equipment of each node of the main extended topology, determining the influence range of the associated distribution network equipment; for each sub-extended topology after data association, extracting sub-topological features; constructing a multi-layer perceptron network model; adding tags to the extracted topological features according to the alarm data in the historical equipment monitoring data, and training the multi-layer perceptron network model; determining the detection result of the stable operation of the distribution network equipment based on the trained multi-layer perceptron network model. The method of the present application can improve the reliability of the overall operation status detection of the distribution network, and provide the overall status reference of the distribution network equipment for the operation and maintenance management personnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of power grid operation and maintenance technology, and in particular to a method and system for detecting stable operation of distribution network equipment. Background Art

[0002] With the development of power grid technology, the number of distribution network operating equipment has continued to increase, and the operating environment has become more and more complex, which has put forward certain requirements on the reliability of distribution network operation. Therefore, it is necessary to detect the operating status of the distribution network.

[0003] In the prior art, the detection method for the operation status of the distribution network is mainly based on the hierarchical analysis method, and a number of experts are invited to build a detection index system for the operation status of the distribution network. However, the distribution network status detection method based on the hierarchical analysis method has subjective influences, and its efficiency and reliability are low. Summary of the invention

[0004] The embodiments of the present application provide a distribution network equipment stable operation detection method and system for determining the overall operation stability of the distribution network equipment based on monitoring data, thereby improving the reliability of the distribution network status detection results and providing an operation status reference for the distribution network equipment for operation and maintenance management personnel.

[0005] The present application embodiment provides a method for detecting stable operation of a distribution network device, including:

[0006] Acquire the topology of the distribution network part of the current power grid, and associate the distribution network equipment with the acquired topology to construct a main extended topology based on each node in the topology information, wherein the main node of the acquired topology includes the main equipment of the distribution network part;

[0007] Based on the constructed main extended topology, historical device monitoring data is obtained, and the segmented monitoring data is associated with the main extended topology in chronological order; and,

[0008] According to the main equipment and distribution network equipment covered by each node of the main extension topology, determine the influence range of the associated distribution network equipment, and for any main node, determine the sub-extension topology of the corresponding range, wherein the sub-extension topology is delineated based on the main extension topology, and any sub-extension topology contains a main node, and the ranges of adjacent sub-extension topologies can partially overlap;

[0009] For each sub-extended topology after data association, extract sub-topology features, and perform feature enhancement on sub-extended topologies with partial range overlap;

[0010] Constructing a multi-layer perceptron network model, wherein the number of input layer nodes of the multi-layer perceptron network model is set according to the number of the master nodes, the number of hidden layer nodes of the multi-layer perceptron network model is set according to the number of the distribution network devices, and establishing associations between corresponding hidden layer nodes based on the overlapping relationship between the determined sub-extended topologies;

[0011] Adding tags to the extracted topological features according to the alarm data in the historical equipment monitoring data, and training the multi-layer perceptron network model;

[0012] Corresponding topological features are extracted based on the sub-extended topology associated with the latest equipment monitoring data, and are input into the trained multi-layer perceptron network model to determine the detection result of the stable operation of the distribution network equipment based on the output of the trained multi-layer perceptron network model.

[0013] Optionally, associating the network distribution device with the acquired topology structure to construct a main extended topology based on each node in the topology structure information includes:

[0014] A secondary node is set for a distribution network device associated with any main node, and a connection relationship between the secondary node and any main node is configured according to the access relationship between the distribution network device and the main device loop. For distribution network devices directly connected between main devices, the corresponding secondary nodes are arranged between the main nodes. For distribution network devices connected to the secondary loop of the main device, the connection between the secondary node and the main node is established through a dotted line; and,

[0015] Based on the importance of any distribution network equipment, a weight relationship is configured for the edge between the corresponding secondary node and the main node to construct a main expansion topology.

[0016] Optionally, according to the main devices and network distribution devices covered by each node of the main extended topology, the influence scope of the associated network distribution devices is determined to include:

[0017] For any secondary node that has a connection relationship with the primary node, it is determined that the influence range of the associated distribution network device includes the primary node; and,

[0018] For any secondary node that has an indirect connection relationship with the primary node, it is determined that the influence scope of the associated distribution network device includes the corresponding secondary node link.

[0019] Optionally, associating the segmented monitoring data with the main extended topology in chronological order includes:

[0020] Assign monitoring parameters and monitoring status information of the segmented monitoring data to corresponding nodes;

[0021] For each sub-extended topology after data association, the sub-topology features extracted include:

[0022] Based on the monitoring status information, monitoring parameters and connection relationships in each sub-extended topology, topological features are extracted, wherein the extracted topological features include keyword features of the alarm and trend features of the monitoring parameters. The extracted keyword features are obtained by sequentially extracting and splicing keywords based on the monitoring status information within a segmented time, and time interval marks are added between adjacent keywords according to the time when the alarm occurs.

[0023] Optionally, also include:

[0024] Based on a pre-given keyword importance ranking, a corresponding weight is configured for an edge between a primary node and a secondary node, or an edge between a secondary node and a secondary node, wherein the configured weight is determined according to the keyword with the highest importance among the keywords;

[0025] Feature enhancements for sub-extended topologies with partial range overlap include:

[0026] For any secondary node with partial range overlap, all edges in the overlapping range are assigned the highest weight among the edges from primary node to secondary node or the edges from secondary node to secondary node in each topological feature in the overlapping range.

[0027] Optionally, building a multi-layer perceptron network model includes:

[0028] The number of input layer nodes of the multilayer perceptron network model is set to be the same as the number of master nodes;

[0029] Determining the number of hidden layers according to the number of overlaps of the sub-expanded topologies with partial range overlaps; and,

[0030] Setting the secondary nodes corresponding to the sub-expanded topologies without overlap as the primary hidden layer adjacent to the input layer, and setting the secondary nodes corresponding to the sub-expanded topologies with the largest number of overlapping layers as the final hidden layer away from the input layer;

[0031] The enhanced weights are used as the connection weights between input layer nodes and hidden layer nodes at all levels.

[0032] Optionally, adding tags to the extracted topological features according to the alarm data in the historical device monitoring data, and training the multi-layer perceptron network model includes:

[0033] In the historical data, according to the segmented time, alarm data with high keyword importance and alarm data with high occurrence frequency are selected, and combined according to a preset ratio to construct a training set, wherein the selection ratio of alarm data with high occurrence frequency is greater than that of alarm data with high keyword importance;

[0034] According to the constructed main expansion topology, the sub-expansion topologies with association relationships between the main nodes are jointly trained by the gradient descent method, wherein the following loss function is introduced in the training process:

[0035]

[0036]

[0037] Loss = α Loss1 + (1-α) Loss2

[0038] Among them, Loss1 represents the prediction accuracy loss, Loss2 represents the time adaptation loss, Loss represents the total loss, and p n represents the similarity between the predicted nth keyword and the actual alarm data of the corresponding time segment in the historical data, ε n represents the calculation weight of the nth keyword, N represents the maximum number of keywords extracted in the time segment, Δt n It represents the difference between the predicted time interval between the nth keyword and the n-1th keyword and the corresponding time interval mark, and α represents the loss weight ratio.

[0039] Optionally, the detection result of the stable operation of the distribution network equipment determined based on the output of the trained multi-layer perceptron network model includes:

[0040] Using a time window of fixed duration, wherein the most recent time of the time window of fixed duration is set to the current time, and the fixed duration is the duration of the time segment, so as to intercept the monitoring data of the time segment duration from the latest data;

[0041] Extract the latest sub-topology features and input them into the trained multi-layer perceptron network model to obtain prediction results; and,

[0042] The multi-layer perceptron network model is updated and trained using the latest monitoring data.

[0043] An embodiment of the present application also proposes a distribution network equipment stable operation detection system, the distribution network equipment stable operation detection system includes a processor and a memory, the memory stores a computer program, and when the computer program is executed by the processor, the steps of the distribution network equipment stable operation detection method as described above are implemented.

[0044] The method of the embodiment of the present application builds an extended topology structure based on the distribution network equipment, and trains the multi-layer perceptron network model in combination with monitoring data at the corresponding nodes. Through the optimized design of the multi-layer perceptron, it is particularly suitable for scenarios including a large number of distribution network equipment and a large number of nodes. The method of the embodiment of the present application can judge the overall operation stability system of the distribution network equipment according to the topology structure of the distribution network and the monitoring data, improve the reliability of the distribution network status detection results, and provide the operation status reference of the distribution network equipment for the operation and maintenance management personnel.

[0045] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present invention are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0047] Figure 1 The following is a basic flow chart of the method for detecting stable operation of distribution network equipment in this embodiment;

[0048] Figure 2 This is an example of the architecture of the multi-layer perceptron network model of this embodiment. DETAILED DESCRIPTION

[0049] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.

[0050] The present application embodiment proposes a method for detecting stable operation of a distribution network device, such as Figure 1 As shown, the following steps are included:

[0051] In step S101, the topological structure of the distribution network part of the current power grid is obtained, and the distribution network equipment is associated with the obtained topological structure, so as to construct a main extended topology based on each main node in the topological structure information, wherein the main node of the obtained topological structure includes the main equipment of the distribution network part. In some specific examples, the main equipment of the distribution network part includes, for example, distribution transformers, circuit breakers, etc., and the distribution network equipment may include, for example, disconnectors, voltage transformers, current transformers, switch cabinet monitoring equipment, etc. After the distribution network equipment is associated with the obtained topological structure, the constructed main extended topology includes more detailed information such as the main nodes (main equipment) and secondary nodes (auxiliary equipment) of the distribution network part.

[0052] In step S102, based on the constructed main extended topology, historical device monitoring data is obtained, and the segmented monitoring data is associated with the main extended topology in chronological order. In some specific examples, the monitoring data of a certain time period can be associated with the main extended topology, and the association method can be to assign the monitoring data within the segmented time of the monitoring data to the corresponding node.

[0053] In step S103, the influence range of the associated distribution network equipment is determined based on the main equipment and distribution network equipment covered by each node of the main extended topology, and a sub-extended topology of the corresponding range is determined for any main node, wherein the sub-extended topology is delineated based on the main extended topology, and any sub-extended topology contains a main node, and the ranges of adjacent sub-extended topologies can partially overlap. In some specific examples, step S103 can be swapped with step S102. In some examples, the coverage range of equipment such as voltage transformers and current transformers is the corresponding primary-side equipment, and the coverage range of the disconnector equipment includes multiple main equipment such as distribution network transformers and circuit breakers on the main circuit. Based on this, the main extended topology can be delineated into multiple sub-extended topologies.

[0054] In step S104, for each sub-extended topology after data association, sub-topology features are extracted, and for sub-extended topologies with partial range overlap, feature enhancement is performed. In the example of the present application, for each sub-extended topology associated with monitoring data, topological feature information can be extracted in combination with the monitoring data assigned to the sub-extended topology and the related primary and secondary nodes, and for distribution network equipment such as disconnector equipment that covers multiple primary nodes, feature enhancement can be further performed.

[0055] In step S105, a multilayer perceptron network model is constructed, wherein the number of input layer nodes of the multilayer perceptron network model is set according to the number of the main nodes, the number of hidden layer nodes of the multilayer perceptron network model is set according to the number of the distribution network devices, and associations are established between corresponding hidden layer nodes based on the overlapping relationship between the determined sub-extended topologies.

[0056] In step S106, the extracted topological features are marked according to the alarm data in the historical equipment monitoring data, and the multi-layer perceptron network model is trained. In a specific example, the monitoring data includes normal monitoring data, general alarm data, and important alarm data, etc., and various types of monitoring data can be combined into a training set to train the multi-layer perceptron network model. The multi-layer perceptron model selected in the embodiment of the present application is particularly suitable for the situation where the distribution network includes several main nodes and secondary (auxiliary nodes). In particular, because under normal circumstances, the monitoring data can only reflect a certain data of a certain device, and through the embodiment of the present application combined with the joint training of the multi-layer perceptron, the stability state of the entire distribution network can be determined.

[0057] In step S107, the corresponding topological features are extracted based on the sub-extended topology associated with the latest equipment monitoring data, and input into the trained multi-layer perceptron network model, so as to determine the detection result of the stable operation of the distribution network equipment based on the output of the trained multi-layer perceptron network model. After training, the multi-layer perceptron is used to output the reference of the overall operation status of the current distribution network to assist the operation and maintenance personnel to grasp the overall operation status of the distribution network.

[0058] The method of the embodiment of the present application builds an extended topology structure based on the distribution network equipment, and trains the multi-layer perceptron network model in combination with monitoring data at the corresponding nodes. Through the optimized design of the multi-layer perceptron, it is particularly suitable for scenarios including a large number of distribution network equipment and a large number of nodes. The method of the embodiment of the present application can judge the overall operation stability system of the distribution network equipment according to the topology structure of the distribution network and the monitoring data, improve the reliability of the distribution network status detection results, and provide the operation status reference of the distribution network equipment for the operation and maintenance management personnel.

[0059] In some embodiments, associating the network distribution device with the acquired topology structure to construct a main extended topology based on each node in the topology structure information includes:

[0060] A secondary node is set for the distribution network equipment associated with any main node, and the connection relationship between the secondary node and any main node is configured according to the access relationship between the distribution network equipment and the main equipment loop. For the distribution network equipment directly connected between the main equipment, the corresponding secondary nodes are arranged between the main nodes. For the distribution network equipment connected to the secondary loop of the main equipment, the connection between the secondary node and the main node is established through a dotted line. The relationship between the main equipment and the auxiliary equipment can be distinguished by direct connection and dotted line connection.

[0061] Based on the importance of any distribution network equipment, a weight relationship is configured for the edge between the corresponding secondary node and the main node to build a main extension topology. The specific weight relationship can be set according to the actual needs based on the topological structure of the distribution network. For example, if a serious alarm occurs on a certain device, it may cause the entire distribution network equipment to crash, and the weight of the device can be set to 1.

[0062] In some embodiments, according to the main devices and network distribution devices covered by each node of the main extended topology, determining the influence scope of the associated network distribution device includes:

[0063] For any secondary node that has a connection relationship with the primary node, it is determined that the influence range of the associated distribution network device includes the primary node; and,

[0064] For any secondary node that has an indirect connection relationship with the primary node, it is determined that the influence scope of the associated distribution network device includes the corresponding secondary node link.

[0065] In some embodiments, associating the segmented monitoring data with the main extended topology in chronological order includes assigning monitoring parameters and monitoring status information of the segmented monitoring data to corresponding nodes. For example, the relevant monitoring data and parameters within the segmented time can be directly filled into the corresponding primary node or secondary node.

[0066] For each sub-extended topology after data association, the sub-topology features extracted include:

[0067] Based on the monitoring status information, monitoring parameters and connection relationships in each sub-extended topology, topological features are extracted, wherein the extracted topological features include keyword features of the alarm and trend features of the monitoring parameters. The extracted keyword features are obtained by sequentially extracting and splicing keywords based on the monitoring status information within a segmented time, and time interval marks are added between adjacent keywords according to the time when the alarm occurs.

[0068] In some embodiments, the method of the embodiment of the present application further includes:

[0069] Based on the pre-given keyword importance classification, the edge between the primary node and the secondary node, or the edge between the secondary node and the secondary node is configured with a corresponding weight, wherein the configured weight is determined according to the keyword with the highest importance among the keywords. In a specific example, for the normal monitoring information, general alarm information, important alarm information, etc. contained in the monitoring data, the weight is further superimposed with the previous equipment importance, so as to determine the weight relationship of the connecting edge under the current keyword.

[0070] In some embodiments, feature enhancement for sub-extended topologies with partial range overlap includes: for any secondary node with partial range overlap, all edges in the overlapping range are assigned the highest weight of the edge between the primary node and the secondary node, or the edge between the secondary node and the secondary node in each topological feature within the overlapping range. In this way, the node association of the secondary node in the monitoring data, especially the alarm data, can be further associated and described, and the monitored alarm data can be diffused in a local range through the aforementioned weight superposition and weight enhancement, which can be used as the basis for the distribution network operation stability detection, and the reliability of the distribution network operation stability detection results can be effectively improved.

[0071] In some embodiments, constructing a multi-layer perceptron network model includes:

[0072] The number of input layer nodes of the multilayer perceptron network model is set to be the same as the number of the main nodes.

[0073] According to the number of overlaps of the sub-expanded topologies with partial range overlap, the number of hidden layers is determined; and the secondary nodes corresponding to the sub-expanded topologies without overlap are set as the primary hidden layers adjacent to the input layer, and the secondary nodes corresponding to the sub-expanded topologies with the largest number of overlaps are set as the final hidden layers away from the input layer. In the embodiment of the present application, a multi-layer perceptron network model is selected, such as Figure 2 As shown, by designing the number of input layer nodes and the distribution and number of hidden layer nodes, it is particularly suitable for the structural relationship of distribution network equipment, so that after training with the extracted topological features, the results close to the overall operating status of the actual distribution network can be predicted.

[0074] The enhanced weights are used as connection weights between input layer nodes and hidden layer nodes at all levels. In some examples, the weights of the edges after the aforementioned weight superposition and weight enhancement are directly used as weights between input layer nodes and hidden layer nodes at all levels, thereby reflecting the overall operation of the distribution network within the corresponding segment duration. The embodiment of the present application constructs a complex network model by adjusting the hierarchical structure of the multi-layer perceptron and the number of hidden units in each hidden layer to adapt to the extended topology of the distribution network, so that various types of information contained in the monitoring data can be learned.

[0075] In some embodiments, adding tags to the extracted topological features according to the alarm data in the historical device monitoring data, and training the multi-layer perceptron network model includes:

[0076] In the historical data, according to the segmented time, the alarm data with high keyword importance and the alarm data with high occurrence frequency are selected and combined according to a preset ratio to construct a training set, wherein the selection ratio of the alarm data with high occurrence frequency is greater than the alarm data with high keyword importance. In some examples, part of the normal monitoring data can also be added to the training set to form a batch execution training.

[0077] According to the constructed main extension topology, the sub-extension topologies with association relationships between the main nodes are jointly trained by the gradient descent method, wherein the following loss function is introduced in the training process:

[0078]

[0079]

[0080] Loss = α Loss1 + (1-α) Loss2

[0081] Among them, Loss1 represents the prediction accuracy loss, Loss2 represents the time adaptation loss, Loss represents the total loss, and p n represents the similarity between the predicted nth keyword and the actual alarm data of the corresponding time segment in the historical data, ε n represents the calculation weight of the nth keyword, N represents the maximum number of keywords extracted in the time segment, Δt n It represents the difference between the predicted time interval between the nth keyword and the n-1th keyword and the corresponding time interval mark, and α represents the loss weight ratio.

[0082] During the training process, a portion of samples is selected as a batch each time, and the gradient value is calculated as the overall gradient value. By adjusting the number of batches, both the efficiency of calculation and the accuracy of the value can be taken into account.

[0083] In some embodiments, determining the detection result of stable operation of the distribution network equipment based on the output of the trained multi-layer perceptron network model includes:

[0084] Using a time window of fixed duration, wherein the most recent time of the time window of fixed duration is set to the current time, and the fixed duration is the duration of the time segment, so as to intercept the monitoring data of the time segment duration from the latest data;

[0085] Extracting the latest sub-topology features and inputting them into the trained multi-layer perceptron network model to obtain prediction results; and updating and training the multi-layer perceptron network model using the latest monitoring data.

[0086] By setting a time window with a fixed duration and fixed position, the latest time-segmented monitoring data can be captured at any time in chronological order to perform predictions, thereby obtaining the current overall operating stability of the distribution network and providing effective status reference for operation and maintenance personnel.

[0087] An embodiment of the present application also proposes a distribution network equipment stable operation detection system, the distribution network equipment stable operation detection system includes a processor and a memory, the memory stores a computer program, and when the computer program is executed by the processor, the steps of the distribution network equipment stable operation detection method as described above are implemented.

[0088] In addition, although exemplary embodiments have been described herein, the scope includes any and all embodiments based on the present disclosure with equivalent elements, modifications, omissions, combinations (e.g., various embodiments intersecting schemes), adaptations or changes. It is not limited to the examples described in this specification or during the implementation of this application, and its examples will be interpreted as non-exclusive.

[0089] The above description is intended to be illustrative rather than restrictive. For example, the above examples (or one or more of them) can be used in combination with each other. For example, those of ordinary skill in the art may use other embodiments when reading the above description.

[0090] The above embodiments are merely exemplary embodiments of the present disclosure. Those skilled in the art may make various modifications or equivalent substitutions to the present invention within the essence and protection scope of the present disclosure, and such modifications or equivalent substitutions shall also be deemed to fall within the protection scope of the present invention.

Claims

1. A method for detecting stable operation of distribution network equipment, characterized in that: include: Acquire the topology of the distribution network part of the current power grid, and associate the distribution network equipment with the acquired topology to build a main extended topology based on each master node in the topology information, wherein the master node of the acquired topology includes the main equipment of the distribution network part; Based on the constructed main extended topology, historical device monitoring data is obtained, and the segmented monitoring data is associated with the main extended topology in chronological order; and, According to the main equipment and distribution network equipment covered by each node of the main extension topology, determine the influence range of the associated distribution network equipment, and for any main node, determine the sub-extension topology of the corresponding range, wherein the sub-extension topology is delineated based on the main extension topology, and any sub-extension topology contains a main node, and the ranges of adjacent sub-extension topologies can partially overlap; For each sub-extended topology after data association, extract sub-topology features, and perform feature enhancement on sub-extended topologies with partial range overlap; Constructing a multi-layer perceptron network model, wherein the number of input layer nodes of the multi-layer perceptron network model is set according to the number of the master nodes, the number of hidden layer nodes of the multi-layer perceptron network model is set according to the number of the distribution network devices, and establishing associations between corresponding hidden layer nodes based on the overlapping relationship between the determined sub-extended topologies; Adding tags to the extracted topological features according to the alarm data in the historical equipment monitoring data, and training the multi-layer perceptron network model; Corresponding topological features are extracted based on the sub-extended topology associated with the latest equipment monitoring data, and are input into the trained multi-layer perceptron network model to determine the detection result of the stable operation of the distribution network equipment based on the output of the trained multi-layer perceptron network model.

2. The method for detecting stable operation of distribution network equipment according to claim 1, characterized in that: Associating the network distribution device with the obtained topology structure to construct a main extended topology based on each node in the topology structure information includes: A secondary node is set for a distribution network device associated with any main node, and a connection relationship between the secondary node and any main node is configured according to the access relationship between the distribution network device and the main device loop. For distribution network devices directly connected between main devices, the corresponding secondary nodes are arranged between the main nodes. For distribution network devices connected to the secondary loop of the main device, the connection between the secondary node and the main node is established through a dotted line; and, Based on the importance of any distribution network equipment, a weight relationship is configured for the edge between the corresponding secondary node and the main node to construct a main expansion topology.

3. The method for detecting stable operation of distribution network equipment according to claim 2, characterized in that: According to the main devices and network distribution devices covered by each node of the main extended topology, determine the impact range of the associated network distribution devices, including: For any secondary node that has a connection relationship with the primary node, it is determined that the influence range of the associated distribution network device includes the primary node; and, For any secondary node that has an indirect connection relationship with the primary node, it is determined that the influence scope of the associated distribution network device includes the corresponding secondary node link.

4. The method for detecting stable operation of distribution network equipment according to claim 3, characterized in that: Associating the segmented monitoring data to the main extended topology in chronological order includes: Assign monitoring parameters and monitoring status information of the segmented monitoring data to corresponding nodes; For each sub-extended topology after data association, the sub-topology features extracted include: Based on the monitoring status information, monitoring parameters and connection relationships in each sub-extended topology, topological features are extracted, wherein the extracted topological features include keyword features of the alarm and trend features of the monitoring parameters. The extracted keyword features are obtained by sequentially extracting and splicing keywords based on the monitoring status information within a segmented time, and time interval marks are added between adjacent keywords according to the time when the alarm occurs.

5. The method for detecting stable operation of distribution network equipment according to claim 4, characterized in that: Also includes: Based on a pre-given keyword importance ranking, a corresponding weight is configured for an edge between a primary node and a secondary node, or an edge between a secondary node and a secondary node, wherein the configured weight is determined according to the keyword with the highest importance among the keywords; Feature enhancements for sub-extended topologies with partial range overlap include: For any secondary node with partial range overlap, all edges in the overlapping range are assigned the highest weight among the edges from primary node to secondary node or the edges from secondary node to secondary node in each topological feature in the overlapping range.

6. The method for detecting stable operation of distribution network equipment according to claim 5, characterized in that: Building a multi-layer perceptron network model includes: The number of input layer nodes of the multilayer perceptron network model is set to be the same as the number of master nodes; Determining the number of hidden layers according to the number of overlaps of the sub-expanded topologies with partial range overlaps; and, Setting the secondary nodes corresponding to the sub-expanded topologies without overlap as the primary hidden layer adjacent to the input layer, and setting the secondary nodes corresponding to the sub-expanded topologies with the largest number of overlapping layers as the final hidden layer away from the input layer; The enhanced weights are used as the connection weights between input layer nodes and hidden layer nodes at all levels.

7. The method for detecting stable operation of distribution network equipment according to claim 6, characterized in that: Adding tags to the extracted topological features according to the alarm data in the historical equipment monitoring data and training the multi-layer perceptron network model includes: In the historical data, according to the segmented time, alarm data with high keyword importance and alarm data with high occurrence frequency are selected, and combined according to a preset ratio to construct a training set, wherein the selection ratio of alarm data with high occurrence frequency is greater than that of alarm data with high keyword importance; According to the constructed main expansion topology, the sub-expansion topologies with association relationships between the main nodes are jointly trained by the gradient descent method, wherein the following loss function is introduced in the training process: Loss = α Loss1 + (1-α) Loss2 Among them, Loss1 represents the prediction accuracy loss, Loss2 represents the time adaptation loss, Loss represents the total loss, and p n represents the similarity between the predicted nth keyword and the actual alarm data of the corresponding time segment in the historical data, ε n represents the calculation weight of the nth keyword, N represents the maximum number of keywords extracted in the time segment, Δt n It represents the difference between the predicted time interval between the nth keyword and the n-1th keyword and the corresponding time interval mark, and α represents the loss weight ratio.

8. The method for detecting stable operation of distribution network equipment according to claim 7, characterized in that: The detection results of the stable operation of the distribution network equipment determined based on the output of the trained multi-layer perceptron network model include: Using a time window of fixed duration, wherein the latest time of the time window of fixed duration is set to the current time, and the fixed duration is the duration of the time segment, so as to intercept the monitoring data of the time segment duration from the latest data; Extract the latest sub-topology features and input them into the trained multi-layer perceptron network model to obtain prediction results; and, The multi-layer perceptron network model is updated and trained using the latest monitoring data.

9. A distribution network equipment stable operation detection system, characterized in that: The distribution network equipment stable operation detection system comprises a processor and a memory, wherein a computer program is stored in the memory, and when the computer program is executed by the processor, the steps of the distribution network equipment stable operation detection method as described in any one of claims 1 to 8 are implemented.

Citation Information

Cited By

  • Power distribution network operation and maintenance method, system and equipment based on multi-source data

    CN120297733A