ICF Target Micro-Assembly Robot Simulation System Based on MCD
By using MCD for micro-assembly simulation in the ICF target micro-assembly robot simulation system, the problem of low cavity target assembly accuracy is solved. Through the update of the simulation model and the optimization of the data transmission strategy, the assembly accuracy and efficiency are improved, and a stronger Mechatronics design and debugging.
Patent Information
- Application Number
- CN202410219734.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-02-28
AI Technical Summary
The assembly accuracy of cavity targets in the prior art is low, mainly due to inaccurate determination of assembly accuracy and data transmission effectiveness reflected by the average cavity target length, resulting in reduced simulation accuracy.
An ICF target micro-assembly robot simulation system based on MCD is used, including a simulation module, a communication module, a data storage module and a control module. By transmitting and storing simulation data, the standard update error amount, bit error rate and variance of the assembly time are calculated. Adjust caching strategies to improve assembly accuracy and efficiency.
It improves assembly accuracy and efficiency, reduces resource waste, enhances the reliability of mechatronics design, and improves design speed and quality.
Smart Images

Figure CN118260912B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of data processing, and in particular to an ICF target micro-assembly robot simulation system based on MCD. Background Art
[0002] As a key micro-structure for laser confinement nuclear fusion experiments, the manufacturing and assembly accuracy of the cavity target will have an important impact on whether the laser confinement nuclear fusion experiment can proceed smoothly. At present, the assembly methods of cavity targets include manual assembly and micro-assembly system assembly. Manual assembly is to assemble the target ball and other parts by manual operation. This assembly process is not efficient and cannot guarantee the accuracy of the cavity target. The micro-assembly system assembly uses a micro-manipulation robot for assembly. The micro-manipulation robot is a robot system that performs precision operations in a small space. It has become a hot spot in robot research at home and abroad in recent years.
[0003] Chinese Patent Publication No.: CN113391598B discloses a virtual assembly simulation method and system, and the specific steps of the method are as follows: S1, importing an assembly model; S2, generating a first assembly sequence according to the complete assembly model; S3, using virtual tooling, using a reference assembly sequence to perform visual operations on the component model, and generating a second assembly sequence; S4, optimizing and updating the second assembly sequence using an assembly process optimization algorithm, replacing the original reference assembly sequence with the updated second assembly sequence, and returning to step S3; or completing the assembly and ending the virtual assembly simulation. It can be seen that the virtual assembly simulation method and system have the following problems: the assembly accuracy is reduced due to inaccurate judgments on the accuracy of the assembly reflected by the average cavity target length and the effectiveness of the data transmission reflected by the bit error rate of the data. Summary of the invention
[0004] To this end, the present invention provides an ICF target micro-assembly robot simulation system based on MCD to overcome the problem in the prior art of reduced simulation accuracy due to inaccurate judgment of the accuracy of assembly reflected by the average cavity target length and the effectiveness of data transmission reflected by the bit error rate of the data.
[0005] To achieve the above-mentioned purpose, the present invention provides an ICF target micro-assembly robot simulation system based on MCD, comprising: a simulation module, used for simulating the assembly of the ICF target, comprising an MCD modeling unit for modeling a simulation model, a model updating unit connected to the MCD modeling unit for updating the simulation model, and a data acquisition unit respectively connected to the MCD modeling unit and the model updating unit for respectively acquiring simulation data, wherein the simulation data comprises operation data of the simulation model and correction data of the simulation model; a communication module, which is connected to the simulation module, for transmitting the simulation data; a data storage module, which is connected to the communication module, for respectively acquiring the simulation data; and a data storage unit, which is connected to the communication module, for respectively acquiring the simulation data. Simulation data and simulation control instructions are stored; a control module is respectively connected to the simulation module, the communication module and the data storage module, and is used to determine the standard update error amount of the simulation model according to the length of the cavity target completed by several simulation assemblies, or to determine the first cache strategy of the data storage module according to the bit error rate of the simulation data transmission process, and to determine the running memory share of the monitoring data upload process according to the bit error rate of the data transmission process and the variance of the simulation assembly time, and to re-determine the second cache strategy of the data storage module according to the average number of freezes in the simulation assembly process; wherein the first cache strategy and the second cache strategy have different cache times for the correction data of the simulation model.
[0006] Furthermore, the control module obtains the lengths of the cavity targets outputted by the simulation module during several simulation assembly processes, and calculates the average cavity target length according to the lengths of the cavity targets.
[0007] If the average cavity target length is greater than the preset first length, the control module determines that the assembly accuracy is lower than the allowable range, wherein:
[0008] If the average cavity target length is greater than a preset first length and less than or equal to a preset second length, the control module preliminarily determines that the validity of data transmission is lower than an allowable range, and calculates a bit error rate of the data transmission process;
[0009] If the average cavity target length is greater than the preset second length, the control module controls the simulation module to reconfigure the update standard error amount of the simulation model;
[0010] Wherein, the preset first length is smaller than the preset second length.
[0011] Further, the updated standard error of the reconfigured simulation model is determined by the difference between the average cavity target length and the preset second length.
[0012] Further, if the bit error rate of the data transmission process is greater than a preset first bit error rate, the control module secondly determines that the validity of the data transmission is lower than an allowable range, wherein:
[0013] If the bit error rate of the data transmission process is greater than the preset first bit error rate and less than or equal to the preset second bit error rate, the control module controls the data storage module to execute the first cache strategy;
[0014] The preset first bit error rate is smaller than the preset second bit error rate.
[0015] Furthermore, the first caching strategy is that the data storage module caches the correction data of the simulation model collected by the data acquisition unit with a first corresponding cache duration, wherein the first corresponding cache duration is determined by the difference between the bit error rate of the data transmission process and the preset first bit error rate.
[0016] Furthermore, when the bit error rate of the data transmission process is greater than the preset second bit error rate, the control module obtains the assembly time of several simulated assembly processes and calculates the variance of the simulated assembly time.
[0017] If the variance of the simulated assembly time is greater than a preset variance, the control module determines that the real-time performance of the control instruction transmission is lower than an allowable range, and determines the running memory usage of the monitoring data upload process.
[0018] Furthermore, the control module determines the running memory ratio of the monitoring data uploading process according to the difference between the variance of the simulated assembly time and the preset variance.
[0019] Furthermore, when the data storage module uses the first cache strategy to complete several simulated assembly processes within a unit monitoring cycle, the control module obtains the number of freezes in the several simulated assembly processes and calculates the average number of freezes in the simulated assembly processes.
[0020] If the average number of freezes in the simulated assembly process is greater than a preset number of freezes, the control module determines that the continuity of the assembly simulation is lower than an allowable range, and controls the data storage module to execute a second cache strategy.
[0021] Furthermore, the second caching strategy is that the data storage module caches the correction data of the simulation model collected by the data acquisition unit with a second corresponding cache duration, wherein the second corresponding cache duration is determined by the difference between the average number of freezes in the simulation assembly process and the preset number of freezes.
[0022] Furthermore, the bit error rate calculation formula of the data transmission process is:
[0023]
[0024] Among them, P is the bit error rate of the data transmission process, r1 is the number of bit errors in the simulation model operation data; r0 is the total number of bits in the simulation model operation data.
[0025] Compared with the prior art, the beneficial effect of the present invention is that the present invention adopts a unique mechatronics design solution, which integrates mechanical automation, electrical and software, performs three-dimensional modeling and simulation on the automation-related behavior concepts existing in mechatronics products, and uses virtual equipment and PLC for joint debugging, which brings more reliable debugging methods to mechatronics design. The use of MCD for micro-assembly simulation improves the design speed and quality, reduces the waste of production products and improves production efficiency. MCD can physically define and set parameters for the built model, and then verify the built model through the design of simulation sequence and motion simulation, thereby improving the efficiency of assembly processing, reducing the loss rate of resources, and improving assembly efficiency and assembly accuracy.
[0026] Furthermore, the system of the present invention determines the accuracy of assembly based on the average cavity target length. When the simulation model is used to simulate the assembly of the ICF target, the existence of the model error causes the end effector to collide with the spatial obstacle, which makes it impossible for the parts clamped or adsorbed by the robot to reach the specified position, resulting in a decrease in the accuracy of the assembly. By reducing the update standard error of the simulation model and increasing the update frequency of the simulation model, the probability of the end effector colliding with the spatial obstacle is reduced, thereby further improving the assembly efficiency and assembly accuracy of the micro-assembly robot simulation system.
[0027] Furthermore, the system described in the present invention determines the effectiveness of data transmission based on the bit error rate. When using the simulation model to simulate the assembly of the ICF target, the data storage module will cache the model data to be updated in advance to ensure the smoothness of the simulation model operation. However, the cache will lead to a reduction in data transmission memory, causing bit errors in data transmission, affecting the normal operation of the model. By reducing the cache time, the effectiveness of data transmission is improved, thereby further improving the assembly efficiency and assembly accuracy of the micro-assembly robot simulation system.
[0028] Furthermore, the system of the present invention determines the real-time performance of control data transmission based on the variance of the simulation assembly time. When the simulation model is used to simulate the assembly of the ICF target, the increase in the amount of monitoring data occupies the running memory, resulting in a lag in the transmission of the control data, which increases the difference in the time taken for the simulation assembly process. By reducing the running memory usage of the monitoring data upload process, the assembly efficiency and assembly accuracy of the micro-assembly robot simulation system are further improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 The overall structural block diagram of the ICF target micro-assembly robot simulation system based on MCD according to an embodiment of the present invention;
[0030] Figure 2 It is a specific structural block diagram of the simulation module of the MCD-based ICF target micro-assembly robot simulation system according to an embodiment of the present invention;
[0031] Figure 3 It is a partial structural schematic diagram of a simulation model of an ICF target micro-assembly robot simulation system based on MCD according to an embodiment of the present invention;
[0032] Figure 4 This is a connection structure block diagram of the simulation module and the communication module of the MCD-based ICF target micro-assembly robot simulation system according to an embodiment of the present invention. DETAILED DESCRIPTION
[0033] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0034] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.
[0035] See also Figure 1 As shown, they are respectively an overall structural block diagram of an ICF target micro-assembly robot simulation system based on MCD according to an embodiment of the present invention, a specific structural block diagram of a simulation module, a partial structural diagram of a simulation model, and a connection structural block diagram of a simulation module connected to a communication module. The ICF target micro-assembly robot simulation system based on MCD according to the present invention comprises:
[0036] A simulation module, used for simulating and assembling the ICF target, comprising an MCD modeling unit for modeling a simulation model, a model updating unit connected to the MCD modeling unit for updating the simulation model, and a data acquisition unit respectively connected to the MCD modeling unit and the model updating unit for respectively acquiring simulation data, wherein the simulation data comprises operation data of the simulation model and correction data of the simulation model;
[0037] A communication module, connected to the simulation module, for transmitting the simulation data;
[0038] A data storage module, connected to the communication module, for storing the simulation data and the simulation control instructions respectively;
[0039] A control module, which is respectively connected to the simulation module, the communication module and the data storage module, and is used to determine the minimum update error of the simulation model according to the length of the cavity target completed by several simulation assemblies, or to determine the first cache strategy of the data storage module according to the bit error rate of the data transmission process, and to determine the running memory ratio of the monitoring data upload process according to the bit error rate of the data transmission process and the variance of the simulation assembly time, and to re-determine the second cache strategy of the data storage module according to the average number of freezes in the simulation assembly process;
[0040] The first cache strategy and the second cache strategy have different cache durations for the correction data of the simulation model.
[0041] Specifically, the calculation formula for the running memory ratio of the monitoring data upload process is:
[0042]
[0043] Among them, R is the running memory ratio of the monitoring data upload process, r1 is the running memory of the monitoring data upload process, and r0 is the total running memory
[0044] Specifically, updating the simulation model includes adjusting the structure of the simulation model and adjusting the motion trajectory.
[0045] Specifically, the data acquisition unit includes a visual sensor disposed on the assembly table for acquiring the length of the cavity target outputted during the simulated assembly process.
[0046] The present invention adopts a unique mechatronics design solution (MCD), which integrates mechanical automation, electrical and software, performs three-dimensional modeling and simulation on automation-related behavior concepts existing in mechatronics products, and uses virtual equipment and PLC for joint debugging, which brings more reliable debugging methods to mechatronics design. Using MCD for micro-assembly simulation improves design speed and quality, reduces waste of production products and improves production efficiency. MCD can physically define and set parameters for the built model, and then verify the built model through the design of simulation sequence and motion simulation, thereby improving the efficiency of assembly processing, reducing the loss rate of resources, and improving assembly efficiency and assembly accuracy.
[0047] Specifically, the simulation model includes a first simulation assembly robot 1 for clamping the first half cavity and the diagnostic ring respectively, a second simulation assembly robot 2 fixed on the same horizontal plane as the first simulation assembly robot 1 for performing adsorption operations on the second half cavity and the target ball, and an assembly table 3 arranged between the first simulation assembly robot 1 and the second simulation assembly robot 2 for connecting the first half cavity, the second half cavity and the diagnostic ring.
[0048] Specifically, the process of simulating the assembly of the ICF target is as follows: the first simulation assembly robot clamps the diagnostic ring and places it on the assembly table, releases the diagnostic ring and clamps the first half cavity to the side of the diagnostic ring, and at the same time the second simulation assembly robot adsorbs the second half cavity to the other side of the diagnostic ring for alignment, the second simulation assembly robot assembles the second half cavity, and when the assembly is completed, it adsorbs the target ball and assembles it into the diagnostic ring, and when the assembly of the target ball is completed, the first simulation assembly robot assembles the first half cavity.
[0049] Specifically, the correction data of the simulation model includes historical operation data, freeze data, and modeling data required for re-modeling the simulation model.
[0050] Specifically, the jamming data includes the single jamming duration of the simulation model, the jamming time point of the simulation model, the jamming position and jamming structure of the simulation model.
[0051] Specifically, the modeling data required for remodeling the simulation model include physical data of the structure, dynamic data, sensor data, and working environment data.
[0052] Specifically, the data collection method for modeling data required for re-modeling the simulation model includes collecting the historical operation data of the simulation model stored in the data storage module through the data collection unit and obtaining various required modeling data of the simulation model from the cloud Internet channel.
[0053] Specifically, the running data of the simulation model includes the detection data of the visual sensor, the duration of the simulation assembly process, and the running memory data of the simulation model assembly process.
[0054] Specifically, the steps of building the first simulation assembly robot are:
[0055] (1) Draw a sketch. Create a sketch in the modeling environment and select a reference plane. Select the Draw Contour command to draw a trapezoidal contour with a height of h = 40 mm, a lower base radius of R = 14.2 mm, and an upper base radius of R = 6.5 mm.
[0056] (2) Section line rotation. Rotation is to select a curve as a section curve drawn in the sketch, and complete the rotation of the section curve by specifying a vector, a point, and an angle to complete the three-dimensional modeling. The robot base of the present invention is a sketch drawn by rotating 360° into a solid through a rotation instruction.
[0057] (3) Section line stretching. Draw sketches again on the upper and lower bottoms of the robot base, select the reference plane, stretch by drawing a circle, etc., and select Boolean operations in the command window. You can perform Boolean operations such as subtraction and merging, stretch the drawn graphics, and achieve the purpose of beautifying the base model locally.
[0058] (4) Array Features: Select a feature in the feature window, such as a stretched circle, and quickly create a specified 3D model by specifying vectors, spacing, quantity, span, etc.
[0059] (5) Robot assembly. In the assembly menu bar, connect the components by assembling components, select the required constraint relationships and assemble the components.
[0060] like Figure 2-4 As shown, the first simulation assembly robot assembly process of the present invention uses a method of assembling the three-dimensional model base, axis 1, axis 2, axis 3, axis 4, axis 5, axis 6, axis 7, axis 8 and the assembly end actuator fixture from bottom to top in sequence, and the three-dimensional models of each component are integrated into an assembly through constraint relationships, such as using concentric circle constraints or face-to-face contact alignment and other constraint relationships to assemble the three-dimensional models of each component. The second simulation assembly robot assembly is to assemble the three-dimensional model base, axis 1, axis 2, axis 3, axis 4, axis 5, axis 6, axis 7 and the assembly end actuator adsorption needle tube through constraint relationships.
[0061] Please continue reading Figure 1 As shown, the control module obtains the length of the cavity target output by the simulation module during several simulation assembly processes, and calculates the average cavity target length according to the length of the cavity target.
[0062] If the average cavity target length is greater than the preset first length, the control module determines that the assembly accuracy is lower than the allowable range, wherein:
[0063] If the average cavity target length is greater than a preset first length and less than or equal to a preset second length, the control module preliminarily determines that the validity of data transmission is lower than an allowable range, and calculates a bit error rate of the data transmission process;
[0064] If the average cavity target length is greater than the preset second length, the control module controls the simulation module to reconfigure the update standard error amount of the simulation model;
[0065] Wherein, the preset first length is smaller than the preset second length.
[0066] Specifically, the calculation formula of the average cavity target length is:
[0067]
[0068] Where L is the average cavity target length, l i is the length of the cavity target outputted by the ith simulation assembly process, n is the number of simulation assemblies, and n is a natural number greater than or equal to 1.
[0069] The updated standard error of the reconfigured simulation model is determined by the difference between the average cavity target length and the preset second length.
[0070] Specifically, the updated standard error is the error standard value of the model when the simulation model is corrected.
[0071] Specifically, the average cavity target length is recorded as L, the preset first length is recorded as L1, the preset second length is recorded as L2, the difference between the average cavity target length and the preset second length is recorded as △L, and the preset length difference is recorded as △L.
[0072] The process of determining the minimum update standard error of the simulation model according to the difference between the average cavity target length and the preset second length is:
[0073] If △L≤△L0, the control module determines the updated standard error Z using a preset second update coefficient α2;
[0074] If ΔL>ΔL0, the control module determines the updated standard error Z using a preset first update coefficient α1;
[0075] Among them, 0<α1<α2<1, the determined updated standard error Z'=Z×αq, αq is the preset qth update coefficient, and q=1,2.
[0076] The system of the present invention determines the accuracy of assembly based on the average cavity target length. When the simulation model is used to simulate the assembly of the ICF target, the end effector collides with the spatial obstacle due to the existence of the model error, and the parts clamped or adsorbed by the robot cannot reach the specified position, resulting in a decrease in the accuracy of the assembly. By reducing the update standard error of the simulation model and increasing the update frequency of the simulation model, the probability of the end effector colliding with the spatial obstacle is reduced, thereby further improving the assembly efficiency and assembly accuracy of the micro-assembly robot simulation system.
[0077] Please continue reading Figure 1As shown, if the bit error rate of the data transmission process is greater than the preset first bit error rate, the control module secondly determines that the validity of the data transmission is lower than the allowable range, wherein,
[0078] If the bit error rate of the data transmission process is greater than the preset first bit error rate and less than or equal to the preset second bit error rate, the control module controls the data storage module to execute the first cache strategy;
[0079] The preset first bit error rate is smaller than the preset second bit error rate.
[0080] Among them, the first caching strategy is that the data storage module caches the correction data of the simulation model collected by the data collection unit with a first corresponding cache duration, wherein the first corresponding cache duration is determined by the difference between the bit error rate of the data transmission process and the preset first bit error rate.
[0081] Specifically, the meaning of bit error is the difference between the signal received during data transmission and the digital signal sent by the transmitter.
[0082] Specifically, the bit error rate of the data transmission process is recorded as P, the preset first bit error rate is recorded as P1, the preset second bit error rate is recorded as P2, the difference between the bit error rate of the data transmission process and the preset first bit error rate is recorded as △P, △P=P-P1 is set, and the preset bit error rate difference is recorded as △P0;
[0083] The process of determining the first corresponding cache duration is as follows:
[0084] If ΔP≤ΔP0, the control module uses a preset first duration adjustment coefficient β1 to adjust the cache duration T of the collected data updated by the model of the data collection unit;
[0085] If ΔP>ΔP0, the control module uses a preset second time adjustment coefficient β2 to adjust the cache time T of the collected data updated by the model of the data collection unit;
[0086] Among them, 0<β1<β2<1, the adjusted first corresponding cache duration T′=T×(1-βb), βb is the preset bth duration adjustment coefficient, and b=1,2.
[0087] The system described in the present invention determines the effectiveness of data transmission based on the bit error rate. When using the simulation model to simulate the assembly of the ICF target, the data storage module will cache the model data to be updated in advance to ensure the smoothness of the simulation model operation. However, the cache will lead to a reduction in data transmission memory, causing bit errors in data transmission, affecting the normal operation of the model. By reducing the cache time, the effectiveness of data transmission is improved, further improving the assembly efficiency and assembly accuracy of the micro-assembly robot simulation system.
[0088] Please continue reading Figure 1 As shown, when the bit error rate of the data transmission process is greater than the preset second bit error rate, the control module obtains the assembly time of several simulated assembly processes and calculates the variance of the simulated assembly time.
[0089] If the variance of the simulated assembly time is greater than a preset variance, the control module determines that the real-time performance of the control instruction transmission is lower than an allowable range, and determines the running memory usage of the monitoring data upload process.
[0090] The control module determines the running memory ratio of the monitoring data uploading process according to the difference between the variance of the simulated assembly time and the preset variance.
[0091] Specifically, the variance of the simulated assembly time is obtained by calculating the average simulated assembly time after obtaining the assembly time of several simulated assembly processes, and the variance of the simulated assembly time is calculated based on the average simulated assembly time and the assembly time of the several simulated assembly processes. It can be understood that the calculation method of the variance of the simulated assembly time is a technical means commonly used by technical personnel in this field, which will not be elaborated here.
[0092] Specifically, the variance of the simulated assembly time is recorded as X, the preset variance is recorded as X0, the difference between the variance of the simulated assembly time and the preset variance is recorded as △X, △X=X-X0 is set, and the preset variance difference is recorded as △X0;
[0093] The process of determining the running memory ratio of the monitoring data upload process is as follows:
[0094] If △X≤△X0, the control module uses the preset second proportion adjustment coefficient δ2 to adjust the running memory proportion R of the monitoring data upload process;
[0095] If △X>△X0, the control module uses the preset first proportion adjustment coefficient δ1 to adjust the running memory proportion R of the monitoring data upload process;
[0096] Among them, 0<δ1<δ2<e-1, the adjusted running memory proportion of the monitoring data upload process R'=Rln(1+δg), δg is the preset g-th proportion adjustment coefficient, and g=1,2 is set.
[0097] The system described in the present invention determines the real-time transmission of control data according to the variance of the simulation assembly time. When the simulation model is used to simulate the assembly of the ICF target, the increase in the amount of monitoring data occupies the running memory, resulting in a lag in the transmission of the control data, which leads to an increase in the difference in the time used for the simulation assembly process. By reducing the running memory share of the monitoring data upload process, the assembly efficiency and assembly accuracy of the micro-assembly robot simulation system are further improved.
[0098] Please continue reading Figure 1 As shown, when the data storage module uses the first cache strategy to complete several simulated assembly processes within a unit monitoring cycle, the control module obtains the number of freezes in the several simulated assembly processes and calculates the average number of freezes in the simulated assembly processes.
[0099] If the average number of freezes in the simulated assembly process is greater than a preset number of freezes, the control module determines that the continuity of the assembly simulation is lower than an allowable range, and the control module controls the data storage module to execute a second cache strategy.
[0100] Specifically, the calculation formula for the average number of jams in the simulated assembly process is:
[0101]
[0102] Where C is the average number of freezes during the simulation assembly process, c j is the number of freezes in the jth simulated assembly process, m is the number of simulated assemblies, and m is a natural number greater than or equal to 1.
[0103] The second cache strategy is that the data storage module caches the correction data of the simulation model collected by the data collection unit with a second corresponding cache duration, wherein the second corresponding cache duration is determined by the difference between the average number of freezes in the simulation assembly process and the preset number of freezes.
[0104] Specifically, the average number of jams in the simulated assembly process is recorded as C, the preset number of jams is recorded as C0, the difference between the average number of jams in the simulated assembly process and the preset number of jams is recorded as △C, △C=C-C0 is set, and the difference between the preset number of jams is recorded as △C0;
[0105] The process of determining the second corresponding cache duration is as follows:
[0106] If ΔC≤ΔC0, the control module uses a preset third time adjustment coefficient β3 to adjust the first corresponding cache time T';
[0107] If ΔC>ΔC0, the control module uses a preset fourth time adjustment coefficient β4 to adjust the first corresponding cache time T';
[0108] Among them, 1<β3<β4, the adjusted second corresponding cache time length T″=T'×βf, βf is the preset fth time length adjustment coefficient, and f=3,4.
[0109] The bit error rate calculation formula of the data transmission process is:
[0110]
[0111] Among them, P is the bit error rate of the data transmission process, r1 is the number of bit errors in the simulation model operation data; r0 is the total number of codes in the simulation model operation data.
[0112] Example 1
[0113] In this embodiment 1, when the simulation model is used to simulate the assembly of the ICF target, when the length of the cavity target is greater than the preset first length and less than or equal to the preset second length, the bit error rate P of the data transmission process is detected to be 0.13, the preset first bit error rate P1 is 0.07, and the preset second bit error rate P2 is 0.15. The control module determines that the validity of the data transmission is lower than the allowable range, and calculates the difference between the bit error rate of the data transmission process and the preset first bit error rate △P=0.13-0.07=0.06, and the preset bit error rate difference △P0=0.05.
[0114] If ΔP>ΔP0, the control module uses the preset second time adjustment coefficient β2=0.15 to adjust the cache time T=3min of the collected data updated by the model of the data collection unit;
[0115] The adjusted first corresponding cache duration T′=3 min×(1-0.15)=2.55 min.
[0116] This embodiment 1 improves the effectiveness of data transmission while ensuring the smooth operation of the simulation model by adjusting the cache duration of the collected data for model update, and further improves the assembly efficiency and assembly accuracy of the micro-assembly robot simulation system.
[0117] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.
Claims
1. An ICF target micro-assembly robot simulation system based on MCD, characterized in that: include: A simulation module, used for simulating and assembling the ICF target, comprising an MCD modeling unit for modeling a simulation model, a model updating unit connected to the MCD modeling unit for updating the simulation model, and a data acquisition unit respectively connected to the MCD modeling unit and the model updating unit for respectively acquiring simulation data, wherein the simulation data comprises operation data of the simulation model and correction data of the simulation model; A communication module, connected to the simulation module, for transmitting the simulation data; A data storage module, connected to the communication module, for storing the simulation data and the simulation control instructions respectively; A control module, which is respectively connected to the simulation module, the communication module and the data storage module, and is used to determine the standard update error amount of the simulation model according to the length of the cavity target completed by several simulation assemblies, or to determine the first cache strategy of the data storage module according to the bit error rate of the simulation data transmission process, and to determine the running memory ratio of the monitoring data upload process according to the bit error rate of the data transmission process and the variance of the simulation assembly time, and to redetermine the second cache strategy of the data storage module according to the average number of freezes in the simulation assembly process; The first cache strategy and the second cache strategy have different cache durations for the correction data of the simulation model.
2. The MCD-based ICF target micro-assembly robot simulation system according to claim 1, characterized in that: The control module obtains the lengths of the cavity targets outputted by the simulation module during several simulation assembly processes, and calculates the average cavity target length according to the lengths of the cavity targets. If the average cavity target length is greater than the preset first length, the control module determines that the assembly accuracy is lower than the allowable range, wherein: If the average cavity target length is greater than a preset first length and less than or equal to a preset second length, the control module preliminarily determines that the validity of data transmission is lower than an allowable range, and calculates a bit error rate of the data transmission process; If the average cavity target length is greater than the preset second length, the control module controls the simulation module to reconfigure the update standard error amount of the simulation model; Wherein, the preset first length is smaller than the preset second length.
3. The MCD-based ICF target micro-assembly robot simulation system according to claim 2, characterized in that: The updated standard error of the reconfigured simulation model is determined by the difference between the average cavity target length and the preset second length.
4. The MCD-based ICF target micro-assembly robot simulation system according to claim 3 is characterized in that: If the bit error rate of the data transmission process is greater than the preset first bit error rate, the control module secondly determines that the validity of the data transmission is lower than the allowable range, wherein: If the bit error rate of the data transmission process is greater than the preset first bit error rate and less than or equal to the preset second bit error rate, the control module controls the data storage module to execute the first cache strategy; The preset first bit error rate is smaller than the preset second bit error rate.
5. The MCD-based ICF target micro-assembly robot simulation system according to claim 4, characterized in that: The first cache strategy is that the data storage module caches the correction data of the simulation model collected by the data collection unit with a first corresponding cache duration, wherein the first corresponding cache duration is determined by the difference between the bit error rate of the data transmission process and the preset first bit error rate.
6. The MCD-based ICF target micro-assembly robot simulation system according to claim 5, characterized in that: When the bit error rate of the data transmission process is greater than the preset second bit error rate, the control module obtains the assembly time of several simulated assembly processes and calculates the variance of the simulated assembly time. If the variance of the simulated assembly time is greater than a preset variance, the control module determines that the real-time performance of the control instruction transmission is lower than an allowable range, and determines the running memory usage of the monitoring data upload process.
7. The MCD-based ICF target micro-assembly robot simulation system according to claim 6, characterized in that: The control module determines the running memory ratio of the monitoring data uploading process according to the difference between the variance of the simulated assembly time and the preset variance.
8. The MCD-based ICF target micro-assembly robot simulation system according to claim 7, characterized in that: When the data storage module uses the first cache strategy to complete several simulated assembly processes within a unit monitoring cycle, the control module obtains the number of freezes in the several simulated assembly processes and calculates the average number of freezes in the simulated assembly processes. If the average number of freezes in the simulated assembly process is greater than a preset number of freezes, the control module determines that the continuity of the assembly simulation is lower than an allowable range, and controls the data storage module to execute a second cache strategy.
9. The MCD-based ICF target micro-assembly robot simulation system according to claim 8, characterized in that: The second cache strategy is that the data storage module caches the correction data of the simulation model collected by the data collection unit with a second corresponding cache duration, wherein the second corresponding cache duration is determined by the difference between the average number of freezes in the simulation assembly process and the preset number of freezes.
10. The MCD-based ICF target micro-assembly robot simulation system according to claim 9, characterized in that: The bit error rate calculation formula of the data transmission process is: Among them, P is the bit error rate of the data transmission process, r1 is the number of bit errors in the simulation model operation data; r0 is the total number of bits in the simulation model operation data.