A method and apparatus for rapid replacement of high voltage capacitors
By planning the area to be repaired in the high-voltage capacitor bank and allocating personnel and equipment, automated fixed-point transportation and replacement of high-voltage capacitors are achieved, solving the problem of difficult and time-consuming repair and replacement of high-voltage capacitor banks, improving replacement efficiency and saving labor costs.
Patent Information
- Application Number
- CN202410278416.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-12
- Publication Date
- 2025-10-21
- Estimated Expiration
- 2044-03-12
AI Technical Summary
The inspection and replacement of high-voltage capacitor banks is difficult, time-consuming, and labor-intensive, and existing equipment cannot efficiently complete multi-point replacement operations.
Plan an area for maintenance within the footprint of the high-voltage capacitor group, assign personnel for climbing, personnel for loading capacitors, and a liftable mobile cart. Through the cooperation of the main controller and the capacitor distribution device, the automated fixed-point transportation and replacement of high-voltage capacitors can be achieved.
The difficulty of repairing and replacing high-voltage capacitor banks is reduced, replacement efficiency is improved, and labor costs are saved.
Smart Images

Figure CN118270467B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of high-voltage capacitor maintenance, and in particular to a method and equipment for quickly replacing high-voltage capacitors. Background Art
[0002] During construction, high-voltage capacitor banks typically arrange multiple capacitor racks in an area, with multiple capacitor mounting layers installed on each rack. Each capacitor mounting layer houses multiple high-voltage capacitors, saving floor space. Existing high-voltage capacitor banks have narrow spaces between the capacitor racks, making it difficult to use lifting equipment. High-voltage capacitor replacement typically requires the collaboration of multiple maintenance personnel, who must move the capacitors during the replacement process. The large number of high-voltage capacitors in the entire high-voltage capacitor bank results in a heavy workload for maintenance and replacement, which is both time-consuming and labor-intensive. Summary of the Invention
[0003] The technical problem to be solved by the present invention is to provide a method and equipment for quickly replacing high-voltage capacitors, thereby reducing the difficulty of repairing and replacing high-voltage capacitor groups and improving the replacement efficiency of high-voltage capacitors.
[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is:
[0005] A method for quickly replacing a high-voltage capacitor comprises the following steps:
[0006] S1. Obtain and determine the deployment information of climbing personnel, capacitor loading personnel, and lifting and moving trolleys for each area to be repaired that contains a preset number of capacitor racks;
[0007] S2, determine whether the location information of the point to be replaced sent by the climbing personnel in the area to be repaired is received, if so, execute step S3, otherwise, determine again;
[0008] S3. Determine whether the trolley standby information sent by the capacitor loader in the area to be repaired after placing the high-voltage capacitor on the liftable movable trolley is received. If so, control the liftable movable trolley to transport the high-voltage capacitor to the location to be replaced. Otherwise, make another judgment.
[0009] In order to solve the above technical problems, another technical solution adopted by the present invention is:
[0010] A high-voltage capacitor rapid replacement device, comprising a main controller, a liftable mobile trolley, and a transport guide rail;
[0011] The liftable trolley is slidably arranged on the transport guide rail, and the transport guide rail is used to correspond one by one to both sides of the arrangement direction of all the capacitor racks in the area to be repaired;
[0012] The main controller is wirelessly connected to the liftable movable vehicle, and the main controller is used to execute the above-mentioned method for quickly replacing a high-voltage capacitor.
[0013] The beneficial effects of the present invention are: providing a method and equipment for quickly replacing high-voltage capacitors, planning an area to be repaired within the area occupied by the high-voltage capacitor group, and assigning climbing personnel, capacitor loading personnel and a liftable mobile cart to each area to be repaired during the repair and replacement operations. Relying on the cooperation between the climbing personnel, the main controller and the capacitor loading personnel, the high-voltage capacitors are transported to fixed points by the liftable mobile cart, assisting in the replacement operation of the high-voltage capacitors, and automating the handling process, which can effectively reduce the difficulty of repairing and replacing the high-voltage capacitor group, improve the efficiency of high-voltage capacitor replacement when facing multi-point high-voltage capacitor replacement operations, and save labor costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 A schematic diagram of the steps of a method for quickly replacing a high-voltage capacitor according to the present invention;
[0015] Figure 2 This is a schematic diagram of the installation of a high-voltage capacitor rapid replacement device in a high-voltage capacitor bank according to the present invention;
[0016] Figure 3 This is an enlarged schematic diagram of point A in the figure;
[0017] Figure 4 This is a side view of a high-voltage capacitor quick replacement device of the present invention after installation of a high-voltage capacitor bank.
[0018] Description of labels:
[0019] 1. Liftable mobile trolley; 2. Transport rails; 3. Capacitor rack; 4. High-voltage capacitor; 5. Loading platform; 6. Conveyor belt;
[0020] 11. Loading platform; 12. Lifting rail; 13. Moving base. DETAILED DESCRIPTION
[0021] To illustrate the technical content, achieved objectives and effects of the present invention in detail, the following description is given in conjunction with the embodiments and accompanying drawings.
[0022] Please refer to Figures 1 to 4 A method for quickly replacing a high-voltage capacitor comprises the following steps:
[0023] S1. Obtain and determine the deployment information 1 of the climbing personnel, capacitor loading personnel and the lifting and moving trolley for each area to be repaired that contains a preset number of capacitor racks 3;
[0024] S2, determine whether the location information of the point to be replaced sent by the climbing personnel in the area to be repaired is received, if so, execute step S3, otherwise, determine again;
[0025] S3. Determine whether the trolley standby information sent by the capacitor loader in the area to be repaired after placing the high-voltage capacitor 4 on the liftable movable trolley 1 is received. If so, control the liftable movable trolley 1 to transport the high-voltage capacitor 4 to the point to be replaced. Otherwise, make another judgment.
[0026] From the above description, it can be seen that the beneficial effects of the present invention are: planning the area to be repaired within the occupied area of the high-voltage capacitor group 4, and when carrying out the repair and replacement operations, assigning climbing personnel, capacitor loading personnel and a liftable mobile trolley 1 to each area to be repaired, relying on the cooperation between the climbing personnel, the main controller and the capacitor loading personnel, the high-voltage capacitor 4 is transported to a fixed point by the liftable mobile trolley 1 to assist in completing the replacement operation of the high-voltage capacitor 4, and the automated handling process can effectively reduce the difficulty of repair and replacement of the high-voltage capacitor group 4. When facing the replacement operation of high-voltage capacitors 4 at multiple points, the replacement efficiency of the high-voltage capacitor 4 is improved, saving labor costs.
[0027] Furthermore, the allocation information 1 for determining the climbing personnel, capacitor loading personnel and liftable mobile vehicle is specifically:
[0028] The numbering information of the capacitor racks 3 included in the area to be repaired and the numbering information of the liftable movable trolley 1 are sent to the climbing personnel and the capacitor loading personnel.
[0029] As can be seen from the above description, by sending the serial number information of the capacitor rack 3 and the liftable mobile trolley 1 online to the climbing personnel and capacitor loading personnel, automatic task allocation is achieved and the convenience of inspection and maintenance is improved.
[0030] Furthermore, the controlling of the liftable movable trolley 1 to transport the high-voltage capacitor 4 to the location to be replaced specifically includes:
[0031] According to the position information of the point to be replaced, the number information of the capacitor rack 3 to which the point to be replaced belongs and the layer number and horizontal position of the point to be replaced in the capacitor rack 3 are obtained;
[0032] According to the number information of the capacitor rack 3 and the correspondence between the horizontal position and the plane moving point of the liftable movable trolley 1, the plane moving point corresponding to the point to be replaced is obtained;
[0033] The liftable movable trolley 1 is controlled to move to the plane moving point corresponding to the point to be replaced, and the high-voltage capacitor 4 is lifted to a height corresponding to the number of layers.
[0034] As can be seen from the above description, the position of each high-voltage capacitor 4 on the capacitor rack 3 is accurately located through the numbering information, number of layers and horizontal orientation of the capacitor rack 3, and a corresponding relationship is established between the numbering information and horizontal orientation of the capacitor rack 3 and the plane moving point of the liftable movable trolley 1. After the climbers find the high-voltage capacitor 4 that needs to be replaced, the position of the feedback device is accurately fed back, so that the movable lifting trolley can accurately deliver the new high-voltage capacitor 4 to the corresponding plane moving point.
[0035] Furthermore, the control of the liftable movable trolley 1 to move to the plane moving point corresponding to the point to be replaced is specifically:
[0036] The liftable trolley 1 is controlled to slide on the transport guide rails 2 passing through all the capacitor racks 3 in the area to be repaired until it reaches the plane movement point.
[0037] From the above description, it can be seen that by laying the transport rails 2, the moving path of the liftable mobile cart 1 can be effectively restricted, and at the same time, it is convenient to customize the plane moving points on the transport rails 2 to achieve precise delivery.
[0038] Furthermore, the step of raising the high-voltage capacitor 4 to a height corresponding to the number of layers is as follows:
[0039] The lifting and moving trolley 1 is controlled to move the loading platform 11 carrying the high-voltage capacitor 4 upward on the lifting guide rail 12 until it reaches the height corresponding to the number of layers.
[0040] From the above description, it can be seen that the lifting guide rail 12 is used to lift the loading platform 11 carrying the high-voltage capacitor 4, and the lifting process is stable and the climbing height is easy to control.
[0041] Furthermore, if yes, executing step S3 also includes:
[0042] The capacitor distribution device is controlled to transport the high-voltage capacitor 4 to the area to be repaired corresponding to the point to be replaced.
[0043] From the above description, it can be seen that the capacitor distribution device is controlled to allocate high-voltage capacitors 4 to each area to be repaired, and cooperates with the operation process of the liftable movable vehicle 1 to improve the degree of automation of the replacement of the high-voltage capacitors 4 and improve the operation efficiency.
[0044] Furthermore, it also includes:
[0045] S4. Receive and determine whether the replacement completion information sent by the climber contains the new location information of the point to be replaced. If so, control the liftable movable vehicle 1 to move to the point to be replaced.
[0046] From the above description, it can be seen that after delivering the high-voltage capacitor 4 at a point to be replaced, it can be quickly moved to a new point to be replaced, and the replaced high-voltage capacitor 4 can be transported away, and then a new high-voltage capacitor 4 can be delivered, thereby realizing the connection operation between multiple point replacements and improving work efficiency.
[0047] Please refer to Figures 2 to 4 , a high-voltage capacitor rapid replacement device, including a main controller, a lifting and moving trolley 1 and a transport guide rail 2;
[0048] The liftable trolley 1 is slidably arranged on the transport rail 2, and the transport rail 2 is used to be laid one-to-one on both sides of the arrangement direction of all the capacitor racks 3 in the area to be repaired;
[0049] The main controller is wirelessly connected to the liftable movable vehicle 1, and the main controller is used to execute the above-mentioned method for quickly replacing a high-voltage capacitor.
[0050] From the above description, it can be seen that the beneficial effects of the present invention are: planning the area to be repaired within the occupied area of the high-voltage capacitor group 4, and when carrying out the repair and replacement operations, assigning climbing personnel, capacitor loading personnel and a liftable mobile trolley 1 to each area to be repaired, relying on the cooperation between the climbing personnel, the main controller and the capacitor loading personnel, the high-voltage capacitor 4 is transported to a fixed point by the liftable mobile trolley 1 to assist in completing the replacement operation of the high-voltage capacitor 4, and the automated handling process can effectively reduce the difficulty of repair and replacement of the high-voltage capacitor group 4. When facing the replacement operation of high-voltage capacitors 4 at multiple points, the replacement efficiency of the high-voltage capacitor 4 is improved, saving labor costs.
[0051] Further, it also includes a capacitor distribution device;
[0052] The capacitor distribution device is provided with distribution openings corresponding one to one with the transport guide rails 2 .
[0053] From the above description, it can be seen that the capacitor distribution device is controlled to allocate high-voltage capacitors 4 to each area to be repaired, and cooperates with the operation process of the liftable movable vehicle 1 to improve the degree of automation of the replacement of the high-voltage capacitors 4 and improve the operation efficiency.
[0054] Furthermore, the liftable mobile trolley 1 includes a movable base 13, a lifting guide rail 12 and a loading platform 11;
[0055] The movable base 13 is slidably disposed on the transport guide rail 2 , the lifting guide rail 12 is disposed on the movable base 13 , and the loading platform 11 is liftably disposed on the lifting guide rail 12 .
[0056] From the above description, it can be seen that by laying the transport rails 2, the moving path of the liftable mobile trolley 1 can be effectively restricted, and at the same time, it is convenient to customize the plane moving points on the transport rails 2 to achieve precise delivery; the lifting rails 12 are used to lift the loading platform 11 carrying the high-voltage capacitor 4, and the lifting process is stable and the climbing height is easy to control.
[0057] Please refer to Figures 1 to 3 , embodiment 1 of the present invention is:
[0058] A method for quickly replacing a high-voltage capacitor comprises the following steps:
[0059] S1. Obtain and determine the deployment information 1 of the climbing personnel, capacitor loading personnel and the lifting and moving trolley for each area to be repaired that contains a preset number of capacitor racks 3;
[0060] In this embodiment, the allocation information 1 of the climbing personnel, the capacitor loading personnel, and the liftable mobile vehicle is determined as follows:
[0061] The numbering information of the capacitor racks 3 included in the area to be repaired and the numbering information of the liftable mobile trolley 1 are sent to the climbing personnel and the capacitor loading personnel, and can be sent to the mobile devices of the climbing personnel and the capacitor loading personnel via SMS or the like.
[0062] In this embodiment, if Figure 2 As shown, most of the capacitor racks 3 of the high-voltage capacitor groups 4 are arranged in an array, so each column of capacitor racks 3 can be used as an area to be repaired. For other high-voltage capacitor groups 4 with irregular arrangements, they can be divided according to the actual number of personnel, etc.
[0063] S2, determine whether the location information of the point to be replaced sent by the climbing personnel in the area to be repaired is received, if so, execute step S3, otherwise, determine again;
[0064] In this embodiment, when replacing the high-voltage capacitor 4, the climber first uses the climbing equipment to approach the high-voltage capacitor 4 on the capacitor rack 3, and then looks for the high-voltage capacitor 4 that needs to be replaced; after finding it, the position information of the point to be replaced corresponding to the high-voltage capacitor 4 is sent.
[0065] In addition, while executing step S3, it also includes: controlling the capacitor distribution device to transport the high-voltage capacitor 4 to the maintenance area corresponding to the point to be replaced, that is, distributing a high-voltage capacitor 4 to the maintenance area that needs to be replaced, and cooperating with the subsequent loading and delivery process of the liftable trolley to realize automated transportation.
[0066] S3, determine whether the trolley standby message sent by the capacitor loader in the area to be repaired after placing the high-voltage capacitor 4 on the liftable movable trolley 1 is received. If so, control the liftable movable trolley 1 to transport the high-voltage capacitor 4 to the location to be replaced. Otherwise, determine again;
[0067] In this embodiment, controlling the elevating and movable trolley 1 to transport the high-voltage capacitor 4 to the location to be replaced specifically includes:
[0068] According to the position information of the point to be replaced, the number information of the capacitor rack 3 to which the point to be replaced belongs and the layer number and horizontal position of the point to be replaced in the capacitor rack 3 are obtained;
[0069] Based on the numbering information of the capacitor racks 3 and the corresponding relationship between their horizontal positions and the planar movement points of the liftable movable trolley 1, the planar movement point corresponding to the point to be replaced is determined. Specifically, the liftable movable trolley 1 is controlled to slide on the transport guide rails 2 passing through all capacitor racks 3 in the area to be repaired until it reaches the planar movement point. The liftable movable trolley 1 is then controlled to move to the planar movement point corresponding to the point to be replaced, raising the high-voltage capacitor 4 to the height corresponding to the number of layers. The specific implementation method is to control the loading platform 11 of the liftable movable trolley 1 carrying the high-voltage capacitor 4 to climb upward on the lifting guide rails 12 until it reaches the height corresponding to the number of layers.
[0070] Reference Figure 2 As shown, in the area to be repaired, each capacitor rack 3 is provided with number information for distinction; at the same time, high-voltage capacitors 4 are installed on the installation layers of different heights on the capacitor rack 3. Figure 2 There are three layers, each at a different height; and each layer also has four high-voltage capacitors 4, which are placed at four different horizontal positions. Combining the numbering information, the number of layers and the horizontal position, the installation point of each high-voltage capacitor 4 can be accurately located, thereby guiding the lifting trolley to move.
[0071] S4. Receive and determine whether the replacement completion information sent by the climber contains the location information of the new point to be replaced. If so, control the liftable mobile trolley 1 to move to the point to be replaced.
[0072] Please refer to Figures 2 to 4 , the second embodiment of the present invention is:
[0073] A high-voltage capacitor rapid replacement device includes a main controller, a liftable movable trolley 1, and a transport rail 2; the liftable movable trolley 1 is slidably set on the transport rail 2, and the transport rail 2 is used to correspond one-to-one with both sides of the arrangement direction of all capacitor racks 3 laid in the area to be repaired; the main controller is wirelessly connected to the liftable movable trolley 1, and the main controller is used to execute a high-voltage capacitor rapid replacement method according to embodiment one.
[0074] In this embodiment, if Figure 2 As shown, only one transmission track may be provided between two rows of capacitor racks 3, and the liftable movable trolleys 1 corresponding to the areas to be repaired on both sides may share the transmission track.
[0075] In this embodiment, a capacitor distribution device is also included; the capacitor distribution device is provided with distribution ports corresponding to the transport guide rails 2. Figure 2 As shown, the capacitor distribution device is mainly composed of a conveyor belt 6, which flows through each transport guide rail 2; at the same time, a loading platform 5 is set next to each transport guide rail 2 near the conveyor belt 6, so that capacitor loading personnel can load the high-voltage capacitor 4 onto the liftable movable trolley 1 at the loading platform 5.
[0076] In this embodiment, if Figure 3 and Figure 4 As shown, the liftable trolley 1 includes a movable base 13, a lifting guide rail 12 and a loading platform 11; the movable base 13 is slidably set on the transport guide rail 2, the lifting guide rail 12 is set on the movable base 13, and the loading platform 11 is liftably set on the lifting guide rail 12.
[0077] In summary, the present invention provides a method and equipment for quickly replacing high-voltage capacitors. The method plans an area to be repaired within the area occupied by the high-voltage capacitor group. When performing repair and replacement operations, climbing personnel, capacitor loading personnel, and a liftable mobile cart are assigned to each area to be repaired. Relying on the cooperation between the climbing personnel, the main controller, and the capacitor loading personnel, the high-voltage capacitors are transported to a fixed point by the liftable mobile cart to assist in completing the replacement operation of the high-voltage capacitors. The automated handling process can effectively reduce the difficulty of repairing and replacing the high-voltage capacitor group, improve the efficiency of high-voltage capacitor replacement when facing multi-point high-voltage capacitor replacement operations, and save labor costs.
[0078] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent transformations made using the contents of the present invention's description and drawings, or directly or indirectly applied in related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A method for quickly replacing a high-voltage capacitor, characterized in that: The steps include: S1. Obtain and determine the deployment information of climbing personnel, capacitor loading personnel, and lifting and moving trolleys for each area to be repaired that contains a preset number of capacitor racks; S2, determine whether the location information of the point to be replaced sent by the climbing personnel in the area to be repaired is received, if so, execute step S3, otherwise, determine again; S3, determining whether a trolley standby message is received from the capacitor loader in the area to be repaired after placing the high-voltage capacitor on the liftable movable trolley; if so, controlling the liftable movable trolley to transport the high-voltage capacitor to the location to be replaced; otherwise, determining again; The controlling of the liftable movable trolley to transport the high-voltage capacitor to the location to be replaced specifically includes: According to the position information of the point to be replaced, obtaining the number information of the capacitor rack to which the point to be replaced belongs and the layer number and horizontal position of the point to be replaced in the capacitor rack; According to the number information of the capacitor rack and the correspondence between the horizontal position and the plane moving point of the liftable movable trolley, the plane moving point corresponding to the point to be replaced is obtained; Controlling the liftable movable trolley to move to the plane moving point corresponding to the point to be replaced, and lifting the high-voltage capacitor to a height corresponding to the number of layers; Also includes: S4. Receive and determine whether the replacement completion information sent by the climber contains the new location information of the point to be replaced. If so, control the liftable movable trolley to move to the point to be replaced.
2. A method for rapid replacement of high-voltage capacitors according to claim 1, characterized in that: The specific information for determining the deployment of personnel for climbing, personnel for loading capacitors, and liftable mobile vehicles is as follows: The numbering information of the capacitor racks included in the area to be repaired and the numbering information of the liftable movable trolley are sent to the climbing personnel and the capacitor loading personnel.
3. The method for quickly replacing a high-voltage capacitor according to claim 1, wherein: The control of the liftable movable trolley to move to the plane moving point corresponding to the point to be replaced is specifically: The liftable trolley is controlled to slide on the transport guide rails passing through all the capacitor racks in the area to be repaired until it reaches the plane movement point.
4. The method for quickly replacing a high-voltage capacitor according to claim 1, characterized in that: The step of raising the high-voltage capacitor to a height corresponding to the number of layers is specifically: The lifting and moving trolley carrying the loading platform of the high-voltage capacitor is controlled to climb upward on the lifting guide rail until it reaches the height corresponding to the number of layers.
5. The method for quickly replacing a high-voltage capacitor according to claim 1, characterized in that: If so, executing step S3 also includes: The capacitor distribution device is controlled to transport the high-voltage capacitor to the area to be repaired corresponding to the point to be replaced.
6. A high-voltage capacitor rapid replacement device, characterized in that: Including main controller, lifting and moving trolley and transport rails; The liftable trolley is slidably arranged on the transport guide rail, and the transport guide rail is used to correspond one by one to both sides of the arrangement direction of all the capacitor racks in the area to be repaired; The main controller is wirelessly connected to the liftable movable vehicle, and the main controller is used to execute the high-voltage capacitor rapid replacement method according to any one of claims 1 to 5.
7. The high-voltage capacitor rapid replacement device according to claim 6, characterized in that: Also included is a capacitor distribution device; The capacitor distribution device is provided with distribution openings corresponding one to one with the transport guide rails.
8. The high-voltage capacitor rapid replacement device according to claim 6, characterized in that: The liftable trolley comprises a movable base, a lifting guide rail and a loading platform; The movable base is slidably arranged on the transport guide rail, the lifting guide rail is arranged on the movable base, and the loading platform is liftably arranged on the lifting guide rail.
Citation Information
Patent Citations
Large AGC hydraulic cylinder replacement method
CN107671124A
High-altitude maintenance device inside housing type rolling mill and use method
CN109176446A