Ultra-thin concrete fully assembled rail-top air duct system, unit section and construction method

Through the ultra-thin concrete fully assembled rail top air duct system, combined with the combination of special unit sections and intermediate unit sections, the ultra-thin reinforced concrete structure is used to solve the problems of low construction efficiency and poor durability of the existing rail top air duct, and achieve structural safety. , convenient transportation and improvement of economic benefits.

CN118273756BActive Publication Date: 2024-10-18CHINA RAILWAY DESIGN GRP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410710945.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2024-10-18
Estimated Expiration
2044-06-04

AI Technical Summary

Technical Problem

The existing rail top air duct has low construction efficiency and poor working environment. In addition, there are problems such as heavy component weight, poor durability and potential safety hazards in prefabricated construction.

Method used

An ultra-thin concrete fully assembled rail top air duct system is proposed. Through the combination of special unit sections at the center of the station, special unit sections at the station end and intermediate unit sections, an ultra-thin reinforced concrete structure is used, combined with specific unit section connection methods and construction sequences. , to realize the complete assembly of the station track air duct.

Benefits of technology

It achieves ultra-thin structure, light weight, safety and reliability, convenient transportation and hoisting, fast construction period and low cost, meets the requirements of structural safety and durability, and improves construction efficiency and economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118273756B_ABST
    Figure CN118273756B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of underground transportation engineering, and specifically relates to an ultra-thin concrete fully assembled rail-top air duct system, unit section and construction method. The rail-top air duct system includes a special unit section at the station center, a special unit section at the station end and an intermediate unit section; the intermediate unit section is composed of an outer hanging wall of the air duct, an inner hanging wall of the air duct and an air duct plate; the special unit section at the station center includes an inverted T-shaped hanging wall and two special unit sections adjacent to the left and right; the special unit section at the station end is composed of a mountain-shaped hanging wall, a station end hanging wall, a plug L-shaped hanging wall and a special air duct plate at the station end. The present invention comprehensively considers factors such as the number and position of openings on the rail-top air duct plate, the structural particularities of the station center and end parts, and the requirements for overhead wire suspension, and proposes the structural form of standard unit sections and special parts. The unit section division method is adopted, and after being prefabricated in the factory, it is assembled and installed on site to realize the fully assembled rail-top air duct of the station. The overall structure is safe and reliable, easy to transport and install, and has obvious economic benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of underground traffic engineering, and in particular relates to an ultra-thin concrete fully assembled rail top air duct system, a unit section and a construction method. Background Art

[0002] The conventional cast-in-place method of rail-top air ducts has problems such as low construction efficiency and poor working environment. The assembled rail-top air ducts can solve such problems and have the advantages of being green, environmentally friendly and low cost.

[0003] In 2022, the China Urban Rail Transit Association issued a notice on the "Action Plan for the Development of Green Urban Rail Transit in China's Urban Rail Transit", requiring the establishment and improvement of a system of standards, technologies and products for prefabricated construction of urban rails, strengthening the integrated design of prefabricated construction, and coordinating the production of components and parts, construction and installation of prefabricated construction.

[0004] In recent years, China has also made many attempts to use prefabricated rail-top air ducts. In terms of material selection, there is a method of using reinforced concrete structures and cast-in-place components of the same size. Although they are divided into unit sections, there are still inconveniences in transportation and installation due to the heavy weight of the components. There are also methods of assembling steel components and composite material panels, but the durability is relatively poor and there are safety hazards. In terms of assembly rate, due to the differences between the structure of the central mileage and the two ends of the station and the standard section structure, the combination of standard section assembly and cast-in-place in special parts is often used, which affects the integrity and aesthetics.

[0005] In view of the above situation, from the perspectives of structural safety, durability, convenient transportation and hoisting, and full assembly, an ultra-thin concrete fully assembled rail top air duct system and construction method are proposed, which has great practical significance. Summary of the invention

[0006] The purpose of the present invention is to propose an ultra-thin concrete fully assembled rail-top air duct system, unit section and construction method. On the one hand, taking into account the number and position of openings in the rail-top air duct plate, the structural particularities of the center and end parts of the station, and the requirements for the suspension of the contact network, a method for dividing the rail-top air duct into unit sections along the longitudinal direction of the station, standard unit sections and special unit section structural forms, and connection structures between components are proposed. On the other hand, a construction sequence and method for a fully assembled rail-top air duct are proposed. The present invention can realize the full assembly of the station track air duct, and has the advantages of ultra-thin and light structure, safe structure and reliable connection, convenient transportation and hoisting, fast construction period and low cost.

[0007] In order to solve the above technical problems, the present invention is implemented by the following technical solutions, which are as follows:

[0008] An ultra-thin concrete fully assembled rail-top air duct system, comprising a special unit section at the center of the station, a special unit section at the end of the station, and a plurality of intermediate unit sections arranged in sequence between the two, wherein the unit sections are connected in sequence from head to tail along the longitudinal direction of the station to form a whole;

[0009] The intermediate unit section is composed of an outer hanging wall of the air duct, an inner hanging wall of the air duct and an air duct plate;

[0010] The station center special unit section includes an inverted T-shaped hanging wall and two special unit sections adjacent to the left and right, and the composition of the special unit section is the same as that of the middle unit section;

[0011] The station-end special unit section is composed of a mountain-shaped hanging wall, a station-end hanging wall, a plug L-shaped hanging wall and a station-end special air duct plate.

[0012] In one technical solution, when the air duct is divided along the longitudinal unit, the special unit section at the center of the station and the special unit section at the end of the station are first determined, and then different types of air duct plates are selected for combination, and standard unit sections are arranged in sequence from the center of the station to both sides. Finally, a unit section of non-standard length is added between the standard unit section and the special unit section at the end of the station, and its length is related to the longitudinal length of the rail top air duct and the division of the air duct plate.

[0013] In one technical solution, the unit division and structural composition of the left and right lines of the rail top air duct can be mirrored at corresponding positions.

[0014] In one technical solution, the intermediate unit sections are divided into standard unit sections and non-standard unit sections. Specifically, the station is divided into standard unit sections, non-standard unit sections, special unit sections in the center of the station and special unit sections at the end of the station along the longitudinal direction. The length of the standard unit section can be 2m. Each unit section is composed of an outer suspended wall of the duct, an inner suspended wall of the duct and an air duct plate. The outer suspended wall is the suspended wall close to the platform side, and the lower part of the suspended wall is used to fix the shield door.

[0015] In one technical solution, the non-standard unit section differs from the standard unit section only in the length along the longitudinal direction of the station, and is the last filling and sealing unit divided as the unit section.

[0016] In one technical solution, the special unit section in the center of the station is an inverted T-shaped hanging wall and two special unit sections adjacent to the left and right. The outer hanging wall and inner hanging wall of the air duct of the adjacent special unit sections are the same length as the standard unit section. The only difference is that the longitudinal length of the air duct plate is slightly shorter than that of the standard unit section. This is due to the influence of the lower hanging plate of the inverted T-shaped hanging wall. The length of the air duct plate plus half of the size of the inverted T-shaped hanging wall is exactly equal to the standard unit length of 2m. The advantage of this is that it can ensure that the hanging wall is the same as the hanging wall of the standard unit section, reducing the types of molds for the production of prefabricated components. The hanging plate at the bottom of the inverted T-shaped hanging wall can be 400mm~500mm along the longitudinal length of the station. The inverted T-shaped hanging wall has the same net width as the two hanging walls along the cross-sectional direction of the station. Its vertical partition wall plays a partition role, which can realize the heat and smoke exhaust of the rail top air duct to the two ends of the station, meeting the functional requirements. The lower skin of the inverted T-shaped hanging wall is placed on the same hanging wall together with the adjacent air duct plate.

[0017] In one technical solution, the station-end special unit section is composed of the station-end special air duct plate, the mountain-shaped hanging wall, the station-end hanging wall and the L-shaped hanging wall at the end of the plug. The length of the station-end special unit section along the longitudinal direction of the station is related to the opening area requirement of the mountain-shaped hanging wall. The conventional cast-in-place method is to open a large hole on the side wall of the air duct. After the assembly method is adopted, three hanging columns and the bottom hidden beam are combined to form a reasonable force system to meet the structural safety requirements. The total area of ​​the two openings must meet the requirements of the wind-passing area. The length of the station-end special unit section can be calculated based on the opening area and the opening height. The total height of the L-shaped hanging wall at the end of the plug is the same as the net height of the mountain-shaped hanging wall and the station-end hanging wall. The purpose is to allow the L-shaped hanging wall at the end of the plug to dock with the special air duct plate at the station end at the same height. The thickness of the horizontal plate at the lower end of the L-shaped hanging wall at the end of the plug is the same as the height of the longitudinal beam of the air duct plate to avoid vertical misalignment between the two.

[0018] In one technical solution, the duct outer suspended wall, duct inner suspended wall, inverted T-shaped suspended wall, mountain-shaped suspended wall, station end suspended wall and plug L-shaped suspended wall are collectively referred to as suspended walls. The suspended walls are ultra-thin reinforced concrete structures. Shear grooves are provided between two adjacent suspended walls in the intermediate unit sections. After installation, grouting is performed in the shear grooves. The size of the shear grooves can be 2cm×2cm. The purpose is to provide transverse shear resistance at the joints of the suspended walls and increase the integrity of the duct unit sections along the longitudinal direction of the station.

[0019] In one technical solution, three hanging rods are embedded in the hanging wall, and the top of the hanging rods is threaded. After the hanging rods pass through the holes reserved in the station middle plate, they are fixed with steel pads and self-locking nuts. The diameter of the hanging rods and the length of the hanging rods inserted into the hanging wall must meet the load and calculation requirements. The hanging rods are generally about 6 cm higher than the middle plate upper surface. The thickness of the decoration layer in the public area of ​​the station is generally 15 cm, which can ensure that the decoration layer mortar fully covers the exposed nuts and rectangular steel pads with a certain thickness to ensure its durability.

[0020] In one technical solution, L-shaped steel plates are embedded in the middle and lower part of the hanging wall at the adjacent parts of the two hanging walls. Bolt holes are reserved on the L-shaped steel plates, which are fixed with bolts after installation to form a whole unit along the longitudinal direction.

[0021] In one technical solution, the air duct plate and the special air duct plate at the station end are collectively referred to as the rail top air duct plate. A V-shaped interface is set between two adjacent rail top air duct plates. After installation, polyethylene foam strips are first stuffed into the V-shaped interface and then grouting is carried out. The purpose is to facilitate the grouting implementation of the joint and improve the grouting connection quality at the joint.

[0022] In one technical solution, the rail-top air duct plate is composed of two longitudinal beams on both sides, two transverse beams in the middle and a thin plate, and is prefabricated at one time. Bolt holes for connecting the rail-top air duct plate and the suspended wall are reserved at the junction of the longitudinal and transverse beams. The thin plate is an ultra-thin reinforced concrete structure with a single row of bidirectional steel mesh arranged inside.

[0023] In one technical solution, the contact network hanging point within the longitudinal range of the rail-top air duct system is arranged on the crossbeam of the air duct plate. When the crossbeam of the air duct plate needs to hang the contact network, its size needs to be increased for load and installation, that is, the crossbeam at the contact network hanging point is increased in size, and the lower skin of the increased-size crossbeam needs to be consistent with another crossbeam, and the upper skin can be turned up to meet the load and installation requirements of the contact network. The spacing between the contact network hanging points needs to be appropriately adjusted according to the position of the crossbeam. The contact network is hung on the crossbeam, generating additional load, and the installation requires that the beam width meet certain width requirements, resulting in the crossbeam at the contact network being appropriately widened and raised compared to the place where the contact network is not hung. The method of making the lower skin of the crossbeam flush and appropriately turned up will, on the one hand, not cause lower limit intrusion and meet the driving limit requirements, and on the other hand, it can meet the load and installation requirements of the contact network.

[0024] In a technical solution, the rail-top air duct plate of the standard unit section is mainly divided into four types: A, B, C, and D according to the position and number of air holes, among which: the A-type rail-top air duct plate has no air holes, the B-type rail-top air duct plate has a middle air hole and half air holes on both sides, the C-type rail-top air duct plate has a middle air hole and half air holes on one side, and the D-type rail-top air duct plate has only half air holes on one side. Specifically: the number of air holes of the A-type air duct plate is 0, the number of air holes after the combination of two D-types is 1, the number of air holes after the combination of C-type and D-type is 2, the number of air holes after the combination of two C-types is 3, the number of air holes after the combination of C-type, B-type and D-type is 4, and the number of air holes after the combination of two D-types and two B-types is 5. The four types of A, B, C, and D can be assembled into six types of rail-top air duct plates with 0 to 5 air holes in each group after different combinations to meet the design requirements. Generally speaking, the two ends of the rail top duct are closer to the fan, and the heat or smoke exhaust effect is better than the middle effect. The reasonable approach is to increase the number of each group of air holes from 0 to 5 from the end to the middle. The duct plates of the standard unit section are mainly divided into four types: A, B, C, and D, which can minimize the types of duct plates and their prefabricated component mold models.

[0025] In one technical solution, the rail top air duct plate is composed of 0 to 5 air holes in each group of air holes from both ends to the middle. The air hole positions are appropriately fine-tuned based on the air duct plate division and the position of the vehicle top exhaust device so that the standard unit section adopts a uniform length modulus.

[0026] In one technical solution, the duct hanging wall and duct plate are prefabricated with ultra-thin reinforced concrete structure. The duct plate is 6 cm thick and the hanging wall is 9 cm thick. Considering the thickness requirement of the protective layer of the steel bars, a single row of bidirectional steel mesh is arranged. Compared with the upper and lower rows of cast-in-place steel bars, the number is reduced by half, and the thickness is reduced by more than half. The overall weight is reduced by more than half compared with the cast-in-place structure, which facilitates transportation and installation and meets the structural safety requirements.

[0027] In one technical solution, a channel steel support is provided between the lower part of the hanging wall in the air duct and the side wall of the station body or the middle plate of the station. The channel steel is welded through the embedded steel plates at both ends, and its purpose is to enhance the lateral stability of the air duct unit section. The standard section of the station adopts a straight brace (horizontal horizontal brace) method to support the main side wall of the station. The main side wall of the station shield shaft generally expands outward by about 1900mm. The shield shaft of the station adopts a 45° oblique brace method to support the lower skin of the station middle plate, and the support length is reduced by nearly half, which has the advantages of good force and material saving.

[0028] In a technical solution, channel steel supports may be arranged at intervals of one unit section.

[0029] In one technical solution, embedded parts such as steel plates and casings are reserved around the openings of the air duct plate and the contact network beam according to design requirements.

[0030] The second invention object of the present invention is to provide an ultra-thin concrete fully assembled rail-top air duct unit section, which is used to constitute the above-mentioned rail-top air duct system. The rail-top air duct unit section includes an outer hanging wall of the air duct, an inner hanging wall of the air duct, and a rail-top air duct plate assembled therebetween. Taking the middle unit section as an example, a shear groove is provided between two adjacent hanging walls, and a V-shaped interface is provided between two adjacent rail-top air duct plates. The hanging wall and the rail-top air duct plate are prefabricated with an ultra-thin reinforced concrete structure as a whole, wherein:

[0031] The rail top air duct plate is prefabricated at one time by two longitudinal beams on both sides, two cross beams in the middle and a thin plate, and bolt holes for connecting the air duct plate and the hanging wall are reserved at the junction of the longitudinal and cross beams;

[0032] Three hanging rods are embedded in the hanging wall. After the top of the hanging rod passes through the hole reserved in the middle plate of the station, it is fixed with a steel pad and a self-locking nut. L-shaped steel plates with bolt holes are also embedded on both sides of the lower and middle part of the hanging wall, so that each unit section forms a whole along the longitudinal direction.

[0033] The third invention object of the present invention is to provide a construction method for an ultra-thin concrete fully assembled rail-top air duct system, which is used to construct the rail-top air duct system described above. In order to achieve full assembly of the rail-top air duct of the station, combined with the division and structural characteristics of each unit section, when the rail-top air duct system is divided along the longitudinal unit, the special unit section at the center of the station and the special unit section at the end of the station are first determined, and then different types of air duct plates are selected for combination, and standard unit sections are arranged in sequence from the center of the station to both sides, and finally a non-standard unit section is added between the standard unit section and the special unit section at the end of the station, and its length is related to the longitudinal length of the rail-top air duct and the division of the air duct plate. The unit division and structural composition of the left and right lines of the rail-top air duct system are mirrored according to the corresponding positions.

[0034] In one technical solution, the construction method of the ultra-thin concrete fully assembled rail top air duct system includes the following process:

[0035] S1: Prefabricated components are transported to the station platform level according to component numbering;

[0036] S2: Taking the installation of the left track top air duct of the station as an example, first install the inverted T-shaped hanging wall of the special unit section in the center of the station, and use the lifting machine of the middle plate to make the hanging bars on the hanging wall pass through the reserved holes in the middle plate of the station, and fix them with steel pads and self-locking nuts;

[0037] S3: In the track area, assemble the two special unit sections on the left and right of the inverted T-shaped hanging wall in the center of the assembly station. In each special unit section, first connect the inner and outer hanging walls of the air duct with the air duct plate with bolts, and then hoist and install them in the same way as the inverted T-shaped hanging wall.

[0038] S4: Install standard unit sections, non-standard unit sections and special unit sections at the station end on both sides of the station in sequence. After installation, conduct a measurement and fine adjustment on the whole.

[0039] S5: Use bolts to fix the L-shaped embedded steel plates of two adjacent suspended walls;

[0040] S6: Welded connection channel steel support, support methods include horizontal bracing and diagonal bracing;

[0041] S7: Use CGM grouting material to grout the V-shaped interfaces between adjacent air duct panels, the gaps and shear grooves between adjacent hanging walls, the gaps between the hanging bars and the reserved holes in the middle plate, and the gaps between the hanging walls and the middle plate.

[0042] Combining all the above technical solutions, the advantages and positive effects of the present invention are as follows:

[0043] 1. The present invention provides an ultra-thin concrete fully assembled rail top air duct system, including a special unit section at the station center, a special unit section at the station end, and an intermediate unit section. The unit section division method is adopted, which achieves a 100% assembly rate compared with the method of combining prefabrication of standard sections with cast-in-place of special parts such as station ends.

[0044] 2. In the present invention, under the premise of meeting the structural safety, the ultra-thin reinforced concrete structure is used for the first time to construct the assembled rail-top air duct. Compared with other methods using the same size of cast-in-place components, the weight can be reduced by more than half. The overall structure is safe and reliable, easy to transport and install; compared with other methods using steel structures or composite materials, the durability is better.

[0045] 3. In the present invention, an ultra-thin reinforced concrete structure is used to construct the assembled rail-top air duct, which improves the current situation of poor working environment of the cast-in-place method, and the cost can be saved by more than half, and the construction period is only about 1 / 3 of that of the cast-in-place method.

[0046] 4. In the present invention, the air duct plates in the standard unit section are divided into four types of plates: A, B, C, and D. Through different combinations, the functional requirements of the air duct plate opening requirements can be met, the number of templates can be greatly reduced, and factory prefabrication is convenient.

[0047] 5. In the present invention, the air duct plate is prefabricated from longitudinal beams, transverse beams and thin plates at one time. Due to the arrangement of longitudinal beams and transverse beams, the air duct plate can be made into an ultra-thin reinforced concrete structure of only 6 cm thick, and can meet the requirements of structural safety. In addition, at the location where the contact network is suspended, due to the increase in load, the crossbeam needs to be widened and heightened. The method of flushing the lower skin and partially turning up the upper skin can meet the requirements of structural safety and normal installation of the contact network.

[0048] 6. In the present invention, the standard unit section is formed by connecting the outer and inner hanging walls and the duct plate with bolts. After the unit section is assembled in the track area, the pre-embedded hanging bars in the hanging wall pass through the reserved holes in the middle plate, and then the steel plate is used to fix the upper surface of the middle plate with bolts, which is convenient for transportation and construction. Shear grooves are set between adjacent hanging walls for post-grouting, L-shaped steel plates are embedded in the middle and lower parts of adjacent hanging walls for bolt fixing, horizontal braces are set in the middle and diagonal braces are set at the ends, and V-shaped interfaces are used for adjacent duct plates, so that the structural connection is safe and reliable and the construction is convenient.

[0049] 7. In the present invention, the special unit section in the center of the station adopts an inverted T-shaped hanging wall, which can realize the functional requirement of the middle partition of the rail top air duct on the one hand, and can be well connected with the adjacent unit sections on both sides on the other hand.

[0050] 8. In the present invention, the special unit section at the station end adopts a combination of a mountain-shaped hanging wall, an L-shaped hanging wall, a station-end plugging wall and an air duct plate. On the premise of ensuring structural safety, on the one hand, it can meet the functional requirements of end plugging and the wind flow area of ​​the air duct side wall, and on the other hand, it can be well connected with the adjacent unit sections, thereby realizing full assembly.

[0051] 9. In the present invention, according to the characteristics of the ultra-thin concrete fully assembled rail-top air duct system and unit sections, a matching construction sequence and method are provided to achieve the operability and convenience of the fully assembled system.

[0052] In addition, the following important aspects are also provided as auxiliary evidence of the inventiveness of the present invention:

[0053] 1. The technical solution of the present invention can realize the fully assembled construction of the rail-top air duct of any underground station. The technical principle of the solution is clear and the operation is simple. It can provide a reference for design and construction units. After transformation, this technical solution is expected to obtain very considerable economic benefits and value.

[0054] 2. At present, the country has not achieved a good combination of prefabricated component size selection, material selection and assembly rate. The present invention realizes the fully assembled construction of ultra-thin reinforced concrete structures for the first time. Whether from the perspective of structural safety, durability, convenient transportation and lifting, economic benefits, or from the perspective of full assembly, it fills the technical gaps in the industry at home and abroad.

[0055] 3. The present invention takes into account many advantages such as structural safety, durability, convenient construction, investment saving and beautiful appearance, and overcomes previous technical prejudices. BRIEF DESCRIPTION OF THE DRAWINGS

[0056] The accompanying drawings herein are incorporated in and constitute a part of the specification, illustrate embodiments consistent with the present disclosure, and together with the description, serve to explain the principles of the present disclosure;

[0057] Figure 1 It is a schematic diagram of the plane division of the rail top air duct unit section;

[0058] Figure 2 It is the cross-section diagram of the standard unit section;

[0059] Figure 3 It is the longitudinal section of the special unit section in the center of the station;

[0060] Figure 4 It is the structure diagram of the special unit section at the station end;

[0061] Figure 5 This is the structural diagram of the standard unit section air duct plate;

[0062] Figure 6 This is the node diagram of the connection between the hanger bar and the station middle plate;

[0063] Figure 7 This is the shear groove between the duct walls and the V-shaped interface diagram between the duct panels;

[0064] Figure 8 Pre-buried L-shaped steel plate diagram for the air duct wall;

[0065] Fig. 9 This is the channel steel support diagram.

[0066] In the figure: 1. External suspended wall of air duct; 2. Internal suspended wall of air duct; 3. Air duct plate; 4. Inverted T-shaped suspended wall; 5. Special air duct plate at the station end; 6. Mountain-shaped suspended wall; 7. Suspended wall at the station end; 8. L-shaped suspended wall with plug; 9. Suspended column; 10. Hidden beam; 11. Longitudinal beam; 12. Horizontal beam; 13. Thin plate; 14. Bolt hole; 15. Suspension bar; 16. Steel pad; 17. Bolt matching gasket; 18. Self-locking nut; 19. Shear groove; 20. V-shaped interface; 21. Polyethylene foam strip; 22. L-shaped steel plate; 23. Horizontal brace; 24. Diagonal brace; 25. Bolt. DETAILED DESCRIPTION

[0067] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present invention, so the present invention is not limited by the specific implementation disclosed below.

[0068] The present invention is further described in detail below in conjunction with specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention. Example 1

[0069] This embodiment provides an ultra-thin concrete fully assembled rail top air duct system, which is divided into standard unit sections, non-standard unit sections, station center special unit sections and station end special unit sections along the longitudinal direction in the station, specifically including:

[0070] The intermediate unit section is divided into standard unit section and non-standard unit section. The non-standard unit section is different from the standard unit section only in the longitudinal length of the station. It is the last filling and sealing unit divided as the unit section. The length of the standard unit section can be 2m. Each unit section consists of the outer hanging wall 1 of the air duct, the inner hanging wall 2 of the air duct and the air duct plate 3. Figure 2 As shown, the duct outer hanging wall 1 is the hanging wall near the platform side, and the lower part of the hanging wall is used to fix the shield door. The non-standard unit section is different from the standard unit section only in the longitudinal length of the station, and is the last filling sealing unit divided as the unit section.

[0071] The special unit section in the center of the station includes an inverted T-shaped hanging wall 4 and two special unit sections adjacent to the left and right. The composition of the special unit section is the same as that of the standard unit section in the middle unit section. The length of the outer and inner hanging walls of the air duct of the special unit section along the longitudinal direction of the station is the same as that of the standard unit section. The only difference is that the longitudinal length of the air duct plate is slightly shorter than that of the standard unit section. This is due to the influence of the lower hanging plate of the inverted T-shaped hanging wall. The length of the air duct plate plus half of the size of the inverted T-shaped hanging wall is exactly equal to the standard unit length of 2m. The advantage of this is that it can ensure that the hanging wall is the same as that of the standard unit section, reducing the types of molds for the production of prefabricated components. The hanging plate at the bottom of the inverted T-shaped hanging wall can be 400mm~500mm long along the longitudinal length of the station. On the one hand, it can meet the functional requirements of the middle partition of the rail top air duct, and on the other hand, it can be well connected with the adjacent unit sections on both sides. Figure 3 As shown. The inverted T-shaped suspended wall has the same net width as the two suspended walls along the cross section of the station. Its vertical partition wall plays a partitioning role, which can realize the heat and smoke exhaust from the track top air duct to both ends of the station, meeting the functional requirements. The lower skin of the inverted T-shaped suspended wall is placed on the same suspended wall together with the adjacent air duct board.

[0072] The station end special unit section is composed of a station end special air duct plate 5, a mountain-shaped hanging wall 6, a station end hanging wall 7 and a plug L-shaped hanging wall 8, such as Figure 4As shown. The length of the special unit section at the station end along the longitudinal direction of the station is related to the opening area requirement of the mountain-shaped suspended wall. The conventional cast-in-place method is to open a large hole on the side wall of the air duct. The present technical solution adopts an assembled method. Specifically: the mountain-shaped suspended wall is cast at one time by three hanging columns 9 and the hidden beam 10 at the bottom. Hanging bars are reserved on the hanging columns 9, which are fixed with bolts through the reserved holes in the middle plate. The load of the air duct plate is transmitted to the hanging columns through the hidden beams. The three hanging columns can effectively reduce the span of the lower hidden beam, making the force more uniform and reasonable. On the one hand, the hidden beam plays the role of the hole side beam after the hole is opened, and on the other hand, it bears the load transmitted from the air duct plate and transmits it to the hidden column, thereby forming a reasonable force system to meet the structural safety requirements. The total area of ​​the two openings must meet the requirements of the wind-passing area. The length of the special unit section at the station end can be calculated based on the opening area and the opening height. Compare again Figure 4 In (d), (e) and (f), the total height L1 of the L-shaped wall with plug is the same as the net height L1 of the mountain-shaped wall and the station-end wall. The purpose is to make the L-shaped wall with plug connect with the special air duct plate at the station end at the same height. The thickness of the horizontal plate at the lower end of the L-shaped wall with plug is the same as the height of the longitudinal beam of the air duct plate to avoid vertical misalignment between the two.

[0073] In this embodiment, the ultra-thin concrete fully assembled rail-top air duct system is divided into the left-line rail-top air duct and the right-line rail-top air duct in the station. Taking the left-line rail-top air duct as an example, it includes a special unit section at the center of the station, a number of intermediate unit sections arranged in sequence on both sides with the special unit section at the center of the station as the center, and a special unit section at the end of the station. Each unit section is connected along the longitudinal end to form a whole. The rail-top air duct system comprehensively considers the number and position of openings on the rail-top air duct plate, the structural characteristics of the center and end of the station, and the requirements for the suspension of the contact network, and proposes the structural form of standard unit sections and special parts. The unit section division method is adopted, and the combination is assembled and installed on site after being prefabricated in the factory to realize the fully assembled rail-top air duct of the station. The standard unit section is assembled by two hanging walls and air duct plates. The unit section is fixed by the hanging bars embedded in the hanging wall and passing through the reserved holes in the middle plate. The assembly joints are grouted with CGM grouting material, and various connection reinforcement measures are added between the components. The suspended walls and air duct panels are made of ultra-thin reinforced concrete components, which are more than half lighter than cast-in-place ones. The overall structure is safe and reliable, easy to transport and install, and has obvious economic benefits.

[0074] Furthermore, in this embodiment, it is also possible to consider factors such as the number and position of openings on the rail-top air duct plate, the structural characteristics of the station center and end parts, and the requirements for contact network suspension, and divide the station rail-top air duct into unit sections along the longitudinal direction, and divide them into special unit sections in the station center, standard unit sections, special unit sections at the station end, and non-standard unit sections in sequence.

[0075] Furthermore, in this embodiment, it can also be considered that the air duct plates in the standard unit section are mainly divided into four types: A, B, C, and D according to the position and number of air holes, wherein: the A-type rail top air duct plate has no air holes, the B-type rail top air duct plate has a middle air hole and half air holes on both sides, the C-type rail top air duct plate has a middle air hole and half air holes on one side, and the D-type rail top air duct plate has only half air holes on one side. After different combinations, six types of air holes can be assembled, each with 0 to 5 air holes, to meet the design requirements, such as Figure 5 As shown. Generally speaking, the two ends of the rail top air duct are closer to the fan, and the heat or smoke exhaust effect is better than the middle effect. The common and reasonable practice is that the number of air holes in each group increases from 0 to 5 from the end to the middle. The number of air holes in the A-type air duct plate is 0, the number of air holes after the combination of two D-types is 1, the number of air holes after the combination of C-type and D-type is 2, the number of air holes after the combination of two C-types is 3, the number of air holes after the combination of C-type, B-type and D-type is 4, and the number of air holes after the combination of two D-types and two B-types is 5. The air duct plates of the standard unit section are mainly divided into four types: A, B, C, and D, which can minimize the types of air duct plates and their mold models.

[0076] Furthermore, in this embodiment, it can also be considered that the air duct plate structure is composed of two longitudinal beams 11 on both sides, two transverse beams 12 in the middle and a thin plate 13, which are prefabricated at one time, and bolt holes 14 are reserved at the junction of the longitudinal and transverse beams to connect the air duct plate and the air duct hanging wall.

[0077] Furthermore, in this embodiment, it can also be considered that the contact network hanging point within the longitudinal range of the rail top air duct system is set on the air duct plate crossbeam, such as Figure 5 As shown in (a), when the crossbeam of the air duct plate needs to hang the contact network, the load and installation need to increase its size, that is, the crossbeam at the contact network hanging point is enlarged, and the lower skin of the enlarged crossbeam needs to be consistent with the other crossbeam, and the upper skin can be turned up, such as Figure 5 As shown in (e) in the figure, in order to meet the load and installation requirements of the contact network, the spacing between the contact network hanging points needs to be appropriately adjusted according to the position of the beam. The contact network is suspended on the beam, which generates additional loads, and the installation requires that the beam width meet certain width requirements, resulting in the beam at the contact network being appropriately widened and raised compared to the place where the contact network is not suspended. The method of making the bottom skin of the beam flush and appropriately flipping up is adopted. On the one hand, it will not cause intrusion below and meet the driving limit requirements. On the other hand, it can meet the load and installation requirements of the contact network.

[0078] Furthermore, in this embodiment, it can also be considered that the duct hanging wall and duct plate are prefabricated with ultra-thin reinforced concrete structure. The duct plate is 6 cm thick and the hanging wall is 9 cm thick, which is more than half the thickness of cast-in-place. The overall weight is more than half the weight of cast-in-place, which is convenient for transportation and installation. Considering the thickness requirement of the protective layer of the steel bar, a single row of bidirectional steel mesh is arranged, which is half the thickness of the upper and lower rows of cast-in-place steel bars, meeting the structural safety requirements.

[0079] Furthermore, in this embodiment, it can also be considered that three hanging rods 15 are pre-buried in the outer hanging wall and the inner hanging wall of the air duct of each unit section, and the top of the hanging rod 15 is threaded. After the hanging rod passes through the holes reserved in the station middle plate, it is fixed with a steel pad 16, a bolt matching gasket 17 and a self-locking nut 18, and the top of the hanging rod is 60mm higher than the structural surface. Figure 6 and Figure 8 As shown in (a) in the figure. The diameter of the hanger bar and the length of the hanger bar inserted into the wall must meet the load and calculation requirements. The hanger bar is generally about 6 cm higher than the middle plate upper surface. The thickness of the decoration layer in the public area of ​​the station is generally 15 cm, which can ensure that the decoration layer mortar has a certain thickness to fully cover the exposed nuts and rectangular steel pads, etc., to ensure its durability.

[0080] Furthermore, in this embodiment, it can also be considered that a shear-resistant groove 19 is provided between two adjacent hanging walls in the middle unit section, and grouting is performed after installation. Figure 7 As shown in the figure, the plane size of the shear groove can be 2cm×2cm, and the height is the same as the suspended wall. It is set in the middle of the side wall of the suspended wall. The purpose of setting the shear groove is to provide the lateral shear resistance at the joint of the suspended wall and increase the integrity of the air duct unit sections along the longitudinal direction of the station. Figure 7 As shown in (a), after the air duct is installed, the shear groove 19 is grouted with CGM high-strength grouting material. After the grouting material is cured, it can be well bonded to the adjacent hanging wall and has the ability to resist the mutual displacement of adjacent unit nodes along the cross-sectional direction.

[0081] Furthermore, in this embodiment, it is also possible to consider that a V-shaped interface 20 is provided between adjacent air duct plates, and grouting is performed after installation, such as Figure 7 As shown, a V-shaped interface is set between adjacent air duct plates, and a polyethylene foam strip 21 is inserted before grouting. The purpose of setting the V-shaped interface is to facilitate the grouting of the joint and improve the grouting connection quality at the joint. Figure 7 As shown in (b), the V-shaped interface is actually formed by the adjacent air duct plates being beveled. The total width of the upper part of the V-shaped interface is 3-6 cm. After the air duct plate is installed, the polyethylene foam strip 21 is first inserted, and then the CGM high-strength grouting material is used for grouting. The foam strip plays a role in preventing the grout from leaking. After the grouting material is cured, it can be well bonded with the adjacent air duct thin plates, thereby increasing the integrity of the air duct plate.

[0082] Furthermore, in this embodiment, it can also be considered that a V-shaped interface 20 is provided between the inverted T-shaped hanging wall 4 and the air duct plate, and grouting is performed after installation.

[0083] Furthermore, in this embodiment, it can also be considered that L-shaped steel plates 22 are pre-buried at the adjacent parts of the two walls near the middle and lower parts of the hanging wall, and bolt holes are reserved in the steel plates. After installation, bolts are fixed to form a whole unit section along the longitudinal direction, such as Figure 8 shown.

[0084] Furthermore, in this embodiment, it is also possible to consider adding channel steel supports between the lower part of the inner wall of the rail top air duct and the side wall of the station body or the middle plate of the station, and welding them through the embedded steel plates at both ends. The purpose is to enhance the lateral stability of the air duct unit section. The channel steel supports can be set every other unit section. The horizontal brace 23 is used to horizontally support the side wall of the station body within the standard section of the station. Fig. 9 The main side wall of the station shield shaft is generally expanded about 1900mm, and 24 45° diagonal braces are used to support the lower skin of the station middle plate, such as Fig. 9 As shown in (b), the support length is reduced by nearly half, which has the advantages of good force resistance and material saving.

[0085] Furthermore, in this embodiment, it can also be considered that embedded parts such as steel plates and sleeves are reserved around the openings of the air duct plate and the contact network beam according to design requirements. Example 2

[0086] An ultra-thin concrete fully assembled rail-top air duct unit section is used to constitute the rail-top air duct system described in the above-mentioned embodiment 1. The rail-top air duct unit section includes an outer duct hanging wall, an inner duct hanging wall and a rail-top air duct plate assembled therebetween. In this embodiment, taking the middle unit section as an example, a shear-resistant groove is arranged between two adjacent pieces of the hanging wall, and a V-shaped interface is arranged between two adjacent pieces of the rail-top air duct plates. The hanging wall and the rail-top air duct plate are prefabricated as a whole with ultra-thin reinforced concrete structure. Taking the standard unit section in embodiment 1 as an example, the rail-top air duct plate is prefabricated at one time with two longitudinal beams on both sides, two transverse beams in the middle and a thin plate. Bolt holes for connecting the air duct plate and the hanging wall are reserved at the junction of the longitudinal and transverse beams; three hanging rods are embedded in the hanging wall, and the top of the hanging rod is fixed with a steel pad and a self-locking nut after passing through the hole reserved in the station middle plate. L-shaped steel plates with bolt holes are also embedded on both sides of the hanging wall near the middle and lower parts, so that each unit section forms a whole along the longitudinal direction. Example 3

[0087] This embodiment provides a construction sequence and method for the ultra-thin concrete fully assembled rail top air duct system in the above-mentioned embodiment 1, which specifically includes the following steps:

[0088] S1: Prefabricated components are transported to the station platform level according to component numbering;

[0089] S2: Taking the installation of the left track top air duct of the station as an example, first install the inverted T-shaped hanging wall of the special unit section in the center of the station, and use the lifting machine of the middle plate to make the hanging rods on the hanging wall pass through the reserved holes in the middle plate of the station and fix them with self-locking nuts;

[0090] S3: Next, assemble the left and right sections of the inverted T-shaped hanging wall in the center of the track area. First, connect the inner and outer hanging walls of the duct with the duct plate with bolts, and then hoist and install them in the same way as the inverted T-shaped hanging wall.

[0091] S4: Next, standard unit sections, non-standard unit sections, and special unit sections at the station end are installed on both sides of the station in turn. After the installation is completed, the whole unit is measured and fine-tuned once;

[0092] S5: Next, use bolts to fix the L-shaped embedded steel plates of the two adjacent suspended walls;

[0093] S6: Next, weld and connect the channel steel supports, including the horizontal braces and diagonal braces;

[0094] S7: Finally, use CGM grouting material to grout the V-shaped interface of the duct plate, the gaps and shear grooves between adjacent duct walls, the gaps between the hanger bars and the reserved holes in the middle plate, and the gaps between the hanger wall and the middle plate.

[0095] The above is only a preferred embodiment of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. An ultra-thin concrete fully assembled rail top air duct system, characterized by: It includes a special unit section at the center of the station, a special unit section at the end of the station, and several intermediate unit sections arranged in sequence between the two. Each unit section is connected in sequence along the longitudinal direction of the station to form a whole; The intermediate unit section is composed of an outer hanging wall of the air duct, an inner hanging wall of the air duct and an air duct plate; The special unit section at the center of the station includes an inverted T-shaped hanging wall and two special unit sections adjacent to the left and right. The composition of the special unit section is the same as that of the middle unit section; The station-end special unit section consists of a mountain-shaped hanging wall, a station-end hanging wall, a plug L-shaped hanging wall and a station-end special air duct plate; The intermediate unit sections are divided into standard unit sections and non-standard unit sections. The length of the non-standard unit sections along the longitudinal direction of the station is different from that of the standard unit sections. The length of the air duct outer hanging wall and the air duct inner hanging wall of the special unit sections along the longitudinal direction of the station are the same as those of the standard unit sections. The length of the air duct plate of the special unit sections along the longitudinal direction of the station is shorter than that of the air duct plate of the standard unit sections. The duct outer hanging wall, duct inner hanging wall, inverted T-shaped hanging wall, mountain-shaped hanging wall, station end hanging wall and plug L-shaped hanging wall are collectively referred to as hanging walls. The hanging walls are ultra-thin reinforced concrete structures. Shear grooves are provided between two adjacent hanging walls in the intermediate unit section. After installation, grouting is performed in the shear grooves. The air duct plates and the special air duct plates at the station end are collectively referred to as rail top air duct plates. A V-shaped interface is set between two adjacent rail top air duct plates. After installation, polyethylene foam strips are first stuffed into the V-shaped interface and then grouting is performed.

2. The ultra-thin concrete fully assembled rail top air duct system according to claim 1, characterized in that: Three hanging rods are embedded in the hanging wall. The top of the hanging rods is threaded. After the hanging rods pass through the holes reserved in the middle plate of the station, they are fixed with steel pads and self-locking nuts. L-shaped steel plates are embedded in the middle and lower parts of the hanging wall at the adjacent parts of the two hanging walls. Bolt holes are reserved on the L-shaped steel plates. After installation, they are fixed with bolts to form a whole along the longitudinal direction.

3. The ultra-thin concrete fully assembled rail top air duct system according to claim 2, characterized in that: The rail top air duct plate is prefabricated at one time by two longitudinal beams on both sides, two transverse beams in the middle and a thin plate. Bolt holes for connecting the rail top air duct plate and the hanging wall are reserved at the junction of the longitudinal beams and the transverse beams. The thin plate is an ultra-thin reinforced concrete structure with a single row of bidirectional steel mesh arranged inside.

4. The ultra-thin concrete fully assembled rail top air duct system according to claim 3, characterized in that: The rail top air duct plates of the standard unit section are divided into four types: A, B, C, and D according to the position and number of air holes, among which: type A rail top air duct plates have no air holes, type B rail top air duct plates have one air hole in the middle and half air holes on each side, type C rail top air duct plates have one air hole in the middle and half air holes on one side, and type D rail top air duct plates have half air holes only on one side. The four types can be assembled into six types of rail top air duct plates with 0 to 5 air holes in each group after different combinations. Each group of air holes on the rail top air duct plates from both ends to the middle consists of 0 to 5 air holes.

5. The ultra-thin concrete fully assembled rail top air duct system according to claim 1, characterized in that: A channel steel support is provided between the lower part of the suspended wall in the air duct and the side wall of the station body or the middle plate of the station. The channel steel is welded through the embedded steel plates at both ends. The channel steel is supported to the side wall of the station body by a straight support method within the standard section of the station, and to the lower part of the middle plate of the station by a 45° oblique support method within the shield shaft of the station.

6. An ultra-thin concrete fully assembled rail top air duct unit section, used to constitute the ultra-thin concrete fully assembled rail top air duct system according to any one of claims 1 to 5, the rail top air duct unit section comprising an air duct outer hanging wall, an air duct inner hanging wall, and a rail top air duct plate assembled therebetween, characterized in that: A shear groove is provided between two adjacent pieces of the hanging wall, and a V-shaped interface is provided between two adjacent pieces of the track top air duct plate. The hanging wall and the track top air duct plate are prefabricated with ultra-thin reinforced concrete structure, wherein: The rail top air duct plate is prefabricated at one time by two longitudinal beams on both sides, two cross beams in the middle and a thin plate. Bolt holes for connecting the rail top air duct plate and the hanging wall are reserved at the junction of the longitudinal beams and the cross beams. Three hanging rods are embedded in the hanging wall. After the top of the hanging rod passes through the hole reserved in the middle plate of the station, it is fixed with a steel pad and a self-locking nut. L-shaped steel plates with bolt holes are also embedded on both sides of the lower and middle part of the hanging wall, so that each unit section forms a whole along the longitudinal direction.

7. A construction method for an ultra-thin concrete fully assembled rail-top air duct system, for constructing the ultra-thin concrete fully assembled rail-top air duct system according to any one of claims 2 to 5, characterized in that: When dividing the rail-top air duct system in the station along the longitudinal unit, first determine the special unit section at the station center and the special unit section at the station end. Then select different types of rail-top air duct panels for combination, and arrange standard unit sections in sequence from the station center to both sides. Finally, add a non-standard unit section between the standard unit section and the special unit section at the station end. The length of the non-standard unit section is related to the longitudinal length of the rail-top air duct system and the division of the rail-top air duct panels. The unit division and structural composition of the left and right lines of the rail-top air duct system are mirrored according to the corresponding positions. The construction method includes the following processes: S1: Prefabricate components in the factory, number them, and transport them to the platform level of the station; S2: Taking the installation of the left-line rail-top air duct at the station as an example, first install the inverted T-shaped hanging wall of the special unit section in the center of the station. Use the lifting machine of the middle plate to make the hanging rods on the hanging wall pass through the reserved holes in the station middle plate and fix them with steel pads and self-locking nuts. S3: In the track area, assemble the two adjacent special unit sections on the left and right of the inverted T-shaped hanging wall in the center of the station. In each special unit section, first connect the inner hanging wall of the air duct, the outer hanging wall of the air duct and the air duct plate with bolts, and then hoist and install them in the same way as the inverted T-shaped hanging wall; S4: Install standard unit sections, non-standard unit sections and station-end special unit sections on both sides of the station in sequence. After installation, perform a measurement and fine-tuning on the entire unit. S5: Use bolts to fix the embedded L-shaped steel plates of two adjacent suspended walls; S6: Welded connection channel steel support, support methods include horizontal bracing and diagonal bracing; S7: Use CGM grouting material to grout the V-shaped interfaces between adjacent duct panels, the gaps and shear grooves between adjacent suspended walls, the gaps between the hanging bars and the reserved holes in the middle plate, and the gaps between the suspended walls and the middle plate.

Citation Information

Patent Citations

  • Fabricated structure suitable for newly-built or rebuilt rail top air duct of subway station

    CN114908799A

  • Subway station rail top air duct fabricated structure and construction method thereof