A stone throwing and filling device for breakwater construction

By designing a stone throwing and filling device for breakwater construction, using movable pulleys and shock-absorbing components, the problems of traditional stone throwing and filling construction costs, low efficiency and difficulty in safety management have been solved, achieving efficient and low-cost stone throwing and filling, and reducing costs. The influence of environmental factors.

CN118292391BActive Publication Date: 2024-10-18CCCC SHANGHAI DREDGING CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410728183.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-06
Publication Date
2024-10-18
Estimated Expiration
2044-06-06

AI Technical Summary

Technical Problem

The traditional stone filling construction technology has high costs, low efficiency, is greatly affected by environmental factors, and is difficult to manage safely. Especially under land boundary conditions, the construction is complex and costly.

Method used

A stone throwing and filling device for breakwater construction is designed, including a base plate, a protective seat, an ejection track, a pitch mechanism, an empty sandwich side plate and a movable pulley. By controlling the pitch angle of the ejection track and the acceleration cable of the movable pulley, efficient ejection of stones is achieved. Reduce the load on the drive motor, save energy consumption, and buffer the vibration of the protective seat through the shock-absorbing component.

Benefits of technology

It achieves high efficiency and low cost of stone throwing and filling, reduces dependence on environmental factors, reduces construction difficulty and equipment load, and improves construction safety and energy efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118292391B_ABST
    Figure CN118292391B_ABST
Patent Text Reader

Abstract

The invention discloses a stone throwing device for breakwater construction, which belongs to the technical field of engineering construction machinery. The invention comprises a bottom plate, a protective seat is slidably mounted on the bottom plate, an ejection track is mounted in the protective seat, a pitch mechanism is arranged between the ejection track and the protective seat, the pitch mechanism is used to adjust the angle between the ejection track and the horizontal plane, an ejection platform is slidably mounted on the ejection track, empty interlayer side plates are arranged on both sides of the ejection track, an ejection mechanism is mounted on each of the empty interlayer side plates, and both ejection mechanisms are connected to the ejection platform, a shock absorbing assembly is also mounted in the protective seat, and the shock absorbing assembly performs buffering and shock absorption on the protective seat, breakwater stones are transmitted to the ejection platform through a transmission device, and the elevation angle of the ejection track is first adjusted according to the throwing distance, the smaller the angle between the ejection track and the horizontal plane, the farther the breakwater stones are thrown, and the larger the angle between the ejection track and the horizontal plane, the closer the breakwater stones are thrown.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of engineering construction machinery, in particular to a stone throwing and filling device for breakwater construction. Background Art

[0002] As the main component material of the breakwater, stone can effectively block waves, enhance the durability and anti-scouring ability of the breakwater, and reduce the impact of waves on the port. The stone filling construction of the breakwater generally includes bagged gravel, bottom protection stone, foot protection stone, embankment core stone, cushion stone and other filling construction. Usually, the "net bag throwing method" and "backhoe throwing method" are adopted. Both construction techniques are based on the construction scope and ship type. The positioning grid is arranged, and the DGPS positioning position in the construction coordinate system is calculated. The positioning ship enters the construction area and is stationed parallel to the axis of the embankment. The DGPS guides the positioning ship to stir the cable for initial stationing. The two DGPS mobile stations respectively measure the construction coordinates of the bow and stern, and adjust the ship position to the designated position. Before throwing the stone, the volume of each grid of the current section is calculated according to the bottom elevation and slope, and then the net bag / excavator is used for throwing. The above traditional stone throwing construction technology has the following shortcomings:

[0003] (1) High construction cost: The traditional stone throwing technology requires the use of a positioning ship and a stone ship for combined construction. The "backhoe throwing method" also requires the use of a special excavator, so a lot of equipment is invested and the construction cost is high.

[0004] (2) Low construction efficiency: Traditional stone casting technology has certain requirements on tide level and water flow rate, and usually requires waiting for the tide to work, which results in short effective construction time and low construction efficiency.

[0005] (3) Affected by environmental factors: Construction vessels are easily affected by natural environmental factors such as wind, waves, and tides during operation, resulting in reduced filling accuracy or even inability to operate.

[0006] (4) Difficulty in safety management: The traditional "net bag throwing method" and "backhoe throwing method" require a lot of equipment and are both water operations, which places high demands on on-site management personnel and construction operators. There are many risk points in the construction, and safety management is difficult.

[0007] In addition, because some areas adjacent to the shore need to be formed into land, a part of the inner sand and gravel filter structure construction location needs to be constructed on water as the last construction process. However, under the condition that the land boundary has been formed, it is difficult for water equipment to enter and exit the enclosure. In previous projects, some large-scale water construction equipment was often left in closed waters. After the construction was completed, the ship was transported out by a ship lift, or some large-scale assembly equipment from some inland rivers was used for construction. The construction process was relatively complicated and the construction cost was high. Summary of the invention

[0008] The object of the present invention is to provide a stone dumping device for breakwater construction to solve the problems raised in the above-mentioned background technology.

[0009] In order to solve the above technical problems, the present invention provides the following technical solutions: a stone throwing device for breakwater construction, comprising a bottom plate, a protective seat is slidably installed on the bottom plate, an ejection track is installed in the protective seat, a pitch mechanism is arranged between the ejection track and the protective seat, the pitch mechanism is used to adjust the angle between the ejection track and the horizontal plane, an ejection platform is slidably arranged on the ejection track, empty interlayer side panels are arranged on both sides of the ejection track, an ejection mechanism is installed on each of the empty interlayer side panels, and the two ejection mechanisms are connected to the ejection platform, a shock absorbing assembly is also installed in the protective seat, and the shock absorbing assembly buffers and damps the protective seat, the breakwater stones to be thrown are transmitted to the ejection platform through a conveying device, and the elevation angle of the ejection track is first adjusted according to the throwing distance, the smaller the angle between the ejection track and the horizontal plane, the farther the breakwater stones are thrown, and the larger the angle between the ejection track and the horizontal plane, the closer the breakwater stones are thrown.

[0010] Furthermore, a transverse pillar is provided at one end of the protective seat, and a support plate is provided at the other end of the protective seat. The bottom of the ejection track is rotatably connected to the transverse pillar, and the end of the ejection track away from the transverse pillar is placed on the support plate. Four through slots are opened at the bottom of the protective seat, and racks are provided at positions corresponding to the four through slots on the bottom plate, and the length of the rack is smaller than the length of the through slots.

[0011] Furthermore, the pitch mechanism includes a lifting motor, a spiral sleeve, a screw and an adapter. The lifting motor is rotatably installed on the protective seat through a bracket. The spiral sleeve is coaxially connected to the motor shaft of the lifting motor. The adapter is rotatably connected to the bottom of the ejection track. The screw and the adapter are fixedly installed. The screw and the spiral sleeve are threadedly matched. The adapter is rotatably connected to the support plate. The transfer position height of the adapter and the support plate is higher than the transfer position height of the ejection track and the cross support. The control system controls the lifting motor to work, and the lifting motor drives the spiral sleeve to rotate. Since the screw cannot rotate with the spiral sleeve, the screw The rotating sleeve can only move in and out during its rotation. When the spiral sleeve rotates the screw rod out, the adapter applies an oblique upward thrust to the pallet, and the upward component of the thrust lifts the pallet upward, driving the ejection track to tilt upward, thereby achieving the effect of lifting the ejection track; on the contrary, when the spiral sleeve retracts the screw rod, the adapter applies an oblique downward pulling force to the pallet, and the upward component of the pulling force pulls the pallet downward, driving the ejection track to lower. The operator controls the lifting motor through the control system to drive the spiral sleeve to rotate a certain number of turns, and uses the telescopic movement between the screw rod and the spiral sleeve to achieve the pitch control of the ejection track.

[0012] Furthermore, each of the empty interlayer side panels is provided with three ejection chutes, which are provided in parallel, and the lengths of the three ejection chutes are shortened from top to bottom. A positioning electromagnet is provided at the end of the ejection chute, and each of the ejection mechanisms includes a first pulley, a second pulley and a third pulley, and the first pulley, the second pulley and the third pulley are all composed of a pulley carrier and a movable pulley, the movable pulley is rotatably installed in the pulley carrier, and the pulley carrier is slidably installed in the ejection chute, the first pulley, the second pulley and the third pulley are installed from bottom to top, and the ejection platform is connected to the third pulley.

[0013] Furthermore, contact switches are provided at both ends of each ejection chute, and the contact switches are connected to the control system through a circuit. After the two contact switches in the ejection chute where the first pulley is located are touched, the contact switches send a trigger signal to the control system. The control system receives the trigger signal and controls the electromagnet in the first retractable roller and the electromagnet in the clutch disk close to the first retractable roller to be powered off, and controls the electromagnet in the second retractable roller and the electromagnet in the clutch disk close to the second retractable roller to be powered on.

[0014] After the two contact switches in the ejection chute where the second pulley is located are touched, the contact switch sends a trigger signal to the control system, and the control system receives the trigger signal and controls the electromagnet in the second retractable roller and the electromagnet in the clutch disk close to the second retractable roller to be powered off, and controls the electromagnet in the third retractable roller and the electromagnet in the clutch disk close to the third retractable roller to be powered on;

[0015] After the two contact switches in the ejection chute where the third pulley is located are touched, the contact switch sends a trigger signal to the control system. The control system is in the ejection stage, the three contact switches close to the cross support side are in the power-off state, and the three contact switches close to the pallet side are in the power-on state.

[0016] Furthermore, each group of the ejection mechanism comprises a driving motor and a winding carrier, the winding carrier is installed on an empty interlayer side panel, the driving motor is located below the winding carrier, a driving shaft is arranged on the motor shaft of the driving motor, and the driving shaft is rotatably arranged in the winding carrier, and a third winding roller, a second winding roller and a first winding roller are rotatably installed in the winding carrier from top to bottom, and the first winding roller, the second winding roller and the third winding roller are arranged in an empty sleeve with the driving shaft, and the first winding roller, the second winding roller and the third winding roller are all composed of a large winding wheel and a small winding wheel, and the large winding wheel is fixedly connected to the small winding wheel, and the large winding wheel is located above the small winding wheel. When the stone is transmitted to the ejection platform through the conveying device and the pitch angle adjustment of the ejection track is completed, before the stone throwing device ejects the stone, the return cables connected to the first pulley are all wound on the small winding wheel of the first winding roller, and the return cables connected to the second pulley are all wound The return cables wound on the small winding wheel of the second winding roller and connected to the third pulley are all wound on the small winding wheel of the first winding roller, and the large winding wheels of the three winding rollers all release the acceleration cables, so the three pulleys are all located on the side of the catapult platform close to the cross pillar, that is, the end of the catapult platform close to the cross pillar. The operator manually controls the throwing and filling device to enter the catapult stage. The operator starts the control system through the controller to start operation. The control system energizes the drive motor and drives the drive shaft to rotate. The drive shaft drives all the clutch discs to rotate. Since the separation spring supports the clutch disc, the clutch disc cannot drive the winding roller to rotate. After the control system turns on the drive motor, the electromagnet in the first winding roller and the electromagnet in the clutch disc close to the first winding roller are further energized, and the clutch disc and the first winding roller are adsorbed and pressed tightly, and the large winding wheel quickly winds up the acceleration cable, and the acceleration cable pulls the first pulley to slide in the catapult chute;

[0017] Because one end of the acceleration cable of the second pulley is connected to the first pulley, the first pulley will slide through an acceleration cable to pull the second pulley during the sliding process, and because one end of the acceleration cable of the third pulley is connected to the first pulley, the second pulley will slide through an acceleration cable to pull the third pulley during the sliding process, and the third pulley drives the ejection platform to move. Therefore, when the first pulley starts to move, the second pulley and the third pulley are also moving at the same time, and the moving speed gradually decreases.

[0018] Because the traction required to eject the breakwater stones is provided by the third pulley, the third pulley is a movable pulley, and the second pulley needs to provide traction for the breakwater stones when moving;

[0019] The second pulley is also a movable pulley, so the first pulley needs to provide traction for the second pulley when it moves, that is, the first pulley provides traction for the breakwater stones when it moves;

[0020] The first pulley is still a movable pulley. When the large winding wheel quickly winds up the acceleration cable of the first pulley, the acceleration cable only needs to provide traction for the first pulley when it moves. Therefore, the driving motor only needs to provide traction for the original breakwater stones at this time. Therefore, the work required for the third pulley to drive the breakwater stones to move is gradually weakened by the passive pulley.

[0021] Furthermore, each group of the ejection mechanism also includes three return cables, three acceleration cables, three front guide wheels and three rear guide wheels. The three front guide wheels are installed at one end of the empty interlayer side plate close to the support plate, and the three rear guide wheels are installed at one end of the empty interlayer side plate close to the cross pillar. The three return cables are respectively connected to one end of the pulley carrier on the first pulley, the second pulley and the third pulley, and then pass around the three rear guide wheels respectively. The other ends of the three return cables are sequentially wound around the small winding wheels of the first winding roller, the second winding roller and the third winding roller. Since the large winding wheel and the small winding wheel rotate at the same time, the large winding wheel pulls the acceleration cable to move while the small winding wheel releases the return cable. The release length of the return cable is half of the acceleration cable. The first pulley touches the contact point after moving to the end of the ejection chute. The switch and the control system detect a signal that the first pulley has moved to the end. The control system first controls the clutch disk and the electromagnet in the large winding wheel in the first winding roller to be powered off and separated, so that the large winding wheel in the first winding roller stops rotating to prevent the acceleration cable from being broken. After the clutch disk and the electromagnet in the large winding wheel in the first winding roller are powered off, the control system uses the positioning electromagnet to generate magnetic attraction to attract the first pulley, so that the first pulley cannot continue to move to prevent the first pulley from sliding back. After the positioning electromagnet is energized, the control system energizes the electromagnet in the clutch disk close to the second winding roller, and energizes the electromagnet in the large winding wheel in the second winding roller. The clutch disk and the second winding roller are attracted and drive the second winding roller to rotate. The large winding wheel in the second winding roller pulls the second pulley to move quickly through the acceleration cable.

[0022] Furthermore, one end of one of the accelerating cables is fixedly connected to one side of the empty interlayer side plate close to the support plate, then passes around the first pulley and a front guide wheel, and finally is wound around the large winding wheel of the first winding roller. One end of the second accelerating cable is connected to the pulley carrier of the first pulley, then passes around the second pulley and a front guide wheel, and finally is wound around the large winding wheel of the second winding roller. One end of the third accelerating cable is connected to the pulley carrier of the second pulley, then passes around the third pulley and a front guide wheel, and finally is wound around the large winding wheel of the third winding roller. When the second pulley moves to the end of the ejection chute and touches the contact switch, the control system detects that the second pulley moves to When the signal of the end is received, the control system first controls the clutch disc and the electromagnet in the large winding wheel in the second winding roller to cut off the power and separate, so that the large winding wheel in the second winding roller stops rotating. After the clutch disc and the electromagnet in the large winding wheel in the second winding roller are cut off, the control system uses the positioning electromagnet to generate magnetic attraction to attract the second pulley to prevent the second pulley from sliding back. After the positioning electromagnet is energized, the control system energizes the electromagnet in the clutch disc close to the third winding roller, and the electromagnet in the large winding wheel in the third winding roller is energized. The clutch disc and the third winding roller are attracted and drive the third winding roller to rotate. The large winding wheel in the third winding roller pulls the third pulley to move rapidly by the acceleration cable, and the third pulley is pulled to move rapidly.

[0023] Until the third pulley also moves to the end of the ejection chute and touches the contact switch, the control system detects the signal that the third pulley has moved to the end, and the control system first controls the clutch disc and the electromagnet in the large winding wheel in the third winding roller to cut off the power and separate, so that the large winding wheel in the third winding roller stops rotating. After the clutch disc and the electromagnet in the large winding wheel in the third winding roller are powered off, the control system uses the positioning electromagnet to generate magnetic attraction to suck the third pulley to prevent the third pulley from sliding back. The ejection platform stops moving, and the breakwater stones are ejected forward by inertia, thereby realizing the ejection of the breakwater stones. Through step-by-step buffering and acceleration, the load of the drive motor is reduced to prevent the drive motor from being overloaded and burned. The labor-saving characteristics of the movable pulley are utilized, and the breakwater stones can be ejected using only the motor. Compared with the electromagnetic ejection method with high power consumption, it has the effect of saving energy.

[0024] Furthermore, a cross-shaped slide groove is provided on the driving shaft at positions corresponding to the third take-up roller, the second take-up roller and the first take-up roller, and a clutch disk is slidably installed in each of the cross-shaped slide grooves, and the three clutch disks are close to the large winding wheel, and a high friction coefficient material is provided at the position where each clutch disk and the large winding wheel are close to each other, and an electromagnet is provided in each clutch disk and each large winding wheel, and all the electromagnets are connected to a control system through a circuit, and a spring hole is also provided in the driving shaft corresponding to each cross-shaped slide groove, and a separation spring is installed in each of the spring holes, and the separation spring is in contact with the clutch disk. After the ejection is completed, the return cables on the small winding wheels in the three take-up rollers have all been released, the three acceleration cables are wound up, and the three contact switches close to one side of the cross pillar are switched. The control system controls the on and off of the three electromagnets through the same control method as the ejection process, and retracts the first pulley, the second pulley and the third pulley in turn, so that the ejection platform is reset and waits for the next ejection operation.

[0025] Furthermore, a return spring is arranged between the two gaps between each through groove and the rack, and the shock absorbing assembly includes four speed increase boxes and four metal damping plates. The input end of each speed increase box is connected to an input gear, and the output end of each speed increase box is connected to an output gear. The four input gears are respectively meshed with four racks, and each output gear is provided with a magnet. The four metal damping plates are arranged close to the output gears. During the ejection process of the breakwater stones, the collision between the pulley carrier and the ejection platform and the ejection track causes the vibration of the protective seat, especially along the direction of the stone ejection. The impact force caused by inertia causes the protective seat to displace. When the protective seat is displaced, the input gear rolls along the surface of the rack. After being accelerated by the speed increase box, the output gear rotates at a high speed. The high-speed movement of the magnet causes electromagnetic eddy currents to form in the metal damping plate, and then the high-speed rotation of the output gear is weakened by the induced magnetic field, thereby further achieving the purpose of reducing the displacement of the protective seat and damping the shock of the protective seat.

[0026] Compared with the prior art, the beneficial effects achieved by the present invention are:

[0027] The connection between the clutch disc and the retracting and releasing roller is controlled by an electromagnet, and the three sets of movable pulleys are controlled separately. The labor-saving characteristic of the movable pulley is utilized to gradually weaken the work required for moving the breakwater stones. The load of the drive motor is reduced through step-by-step buffering acceleration to prevent the drive motor from being overloaded and burned. The breakwater stones can be ejected using only the motor, which saves energy compared to the electromagnetic ejection method with high power consumption. The displacement of the protective seat caused by the inertial impact force is converted into high-speed rotation of the output gear. The high-speed movement of the magnet causes electromagnetic eddy currents to form in the metal damping plate, and then the high-speed rotation of the output gear is weakened by the induced magnetic field, thereby further achieving the purpose of reducing the displacement of the protective seat and reducing the shock of the protective seat. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0029] Figure 1 The overall appearance structure of the dumping device of the present invention is shown in FIG. Figure 1 ;

[0030] Figure 2 The overall appearance structure of the dumping device of the present invention is shown in FIG. Figure 2 ;

[0031] Figure 3 It is a structural schematic diagram of the protective seat part of the dumping device of the present invention;

[0032] Figure 4 It is a schematic diagram of the structure of the ejection track in the ejection device of the present invention;

[0033] Figure 5 It is a schematic diagram of the structure of the hollow sandwich side plate of the dumping device of the present invention;

[0034] Figure 6 It is a schematic diagram of the structure inside the winding carrier in the throwing and filling device of the present invention;

[0035] Figure 7 The structure of the driving shaft part of the dumping device of the present invention is shown in FIG. Figure 1 ;

[0036] Figure 8 The structure of the driving shaft part of the dumping device of the present invention is shown in FIG. Figure 2 ;

[0037] Fig. 9 It is a schematic diagram of the ejection principle of the ejection filling device of the present invention;

[0038] In the figure: 1. bottom plate; 201. protective seat; 202. cross support; 203. support plate; 3. rack; 4. speed increaser; 501. input gear; 502. output gear; 503. metal damping plate; 6. lifting motor; 701. spiral sleeve; 702. screw; 703. adapter; 8. ejection platform; 9. ejection track; 10. empty interlayer side plate; 111. movable pulley; 112. pulley carrier; 121. first pulley; 122. second pulley; 123. third pulley; 131. front guide wheel; 132. rear guide wheel; 141. return cable; 142. acceleration cable; 15. drive motor; 16. drive shaft; 17. winding carrier; 181. large winding wheel; 182. small winding wheel; 19. clutch plate; 20. separation spring. DETAILED DESCRIPTION

[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] See also Figure 1-Figure 9 The present invention provides a technical solution: a stone dumping device for breakwater construction, comprising a bottom plate 1, a protective seat 201 is slidably mounted on the bottom plate 1, a launch track 9 is installed in the protective seat 201, a pitch mechanism is arranged between the launch track 9 and the protective seat 201, the pitch mechanism is used to adjust the angle between the launch track 9 and the horizontal plane, a launch platform 8 is slidably arranged on the launch track 9, empty sandwich side panels 10 are arranged on both sides of the launch track 9, and each empty sandwich side panel 10 is installed There is an ejection mechanism, and both ejection mechanisms are connected to the ejection platform 8. A shock-absorbing assembly is also installed in the protective seat 201. The shock-absorbing assembly buffers and reduces shock to the protective seat 201. The breakwater stones that need to be thrown are transmitted to the ejection platform 8 through the conveying device. The elevation angle of the ejection track 9 is adjusted according to the throwing distance. The smaller the angle between the ejection track 9 and the horizontal plane, the farther the breakwater stones are thrown, and the larger the angle between the ejection track 9 and the horizontal plane, the closer the breakwater stones are thrown.

[0041] A transverse pillar 202 is provided at one end of the protection seat 201, and a support plate 203 is provided at the other end of the protection seat 201. The bottom of the ejection track 9 is rotatably connected to the transverse pillar 202, and the end of the ejection track 9 away from the transverse pillar 202 is placed on the support plate 203. The pitch mechanism includes a lifting motor 6, a spiral sleeve 701, a screw 702 and an adapter 703. The lifting motor 6 is rotatably installed on the protection seat 201 through a bracket, the spiral sleeve 701 is coaxially connected to the motor shaft of the lifting motor 6, the adapter 703 is rotatably connected to the bottom of the ejection track 9, the screw 702 is fixedly installed with the adapter 703, the screw 702 and the spiral sleeve 701 are threadedly matched, the adapter 703 is rotatably connected to the support plate 203, the transfer position height of the adapter 703 and the support plate 203 is higher than the transfer position height of the ejection track 9 and the transverse pillar 202, and the control system controls the lifting motor 6 to work. The lifting motor 6 drives the spiral sleeve 701 to rotate. Since the screw rod 702 cannot rotate with the spiral sleeve 701, it can only move in and out during the rotation of the spiral sleeve 701. When the spiral sleeve 701 unscrews the screw rod 702, the adapter 703 applies an oblique upward thrust to the support plate 203, and the upward component of the thrust pushes the support plate 203 upward, driving the ejection track 9 to tilt upward, thereby achieving the effect of lifting the ejection track; on the contrary, when the spiral sleeve 701 retracts the screw rod 702, the adapter 703 applies an oblique downward pulling force to the support plate 203, and the upward component of the pulling force pulls the support plate 203 downward, driving the ejection track 9 to lower. The operator controls the lifting motor 6 through the control system to drive the spiral sleeve 701 to rotate a certain number of circles, and utilizes the telescopic movement between the screw rod 702 and the spiral sleeve 701 to achieve the pitch control of the ejection track 9.

[0042] Three ejection chutes are provided on each empty interlayer side panel 10. The three ejection chutes are provided in parallel. The lengths of the three ejection chutes are shortened from top to bottom. Positioning electromagnets are provided at the ends of the ejection chutes. Contact switches are provided at both ends of each ejection chute. The contact switches are connected to the control system through circuits. After the two contact switches in the ejection chute where the first pulley 121 is located are touched, the contact switches send a trigger signal to the control system. The control system receives the trigger signal and controls the electromagnet in the first retractable roller and the electromagnet in the clutch disk 19 close to the first retractable roller to be powered off, and controls the electromagnet in the second retractable roller and the electromagnet in the clutch disk 19 close to the second retractable roller to be powered on.

[0043] After the two contact switches in the ejection chute where the second pulley 122 is located are touched, the contact switch sends a trigger signal to the control system, and the control system receives the trigger signal to control the electromagnet in the second retractable roller and the electromagnet in the clutch disk 19 close to the second retractable roller to cut off the power, and controls the electromagnet in the third retractable roller and the electromagnet in the clutch disk 19 close to the third retractable roller to be energized;

[0044] After the two contact switches in the ejection chute where the third pulley 123 is located are touched, the contact switch sends a trigger signal to the control system, and the control system receives the trigger signal and controls the electromagnet in the third retracting roller and the electromagnet in the clutch disk 19 near the third retracting roller to cut off the power. In the ejection stage, the three contact switches near the side of the cross pillar 202 are in the power-off state, and the three contact switches near the side of the support plate 203 are in the power-on state. Each ejection mechanism includes a first pulley 121, a second pulley 122 and a third pulley 123. The first pulley 121, the second pulley 122 and the third pulley 123 The pulleys 123 are composed of a pulley carrier 112 and a movable pulley 111. The movable pulley 111 is rotatably installed in the pulley carrier 112. The pulley carrier 112 is slidably installed in the ejection chute. The first pulley 121, the second pulley 122 and the third pulley 123 are installed from bottom to top. The ejection platform 8 is connected to the third pulley 123. When the stone is transmitted to the ejection platform 8 through the transmission device and the pitch angle adjustment of the ejection track 9 is completed, before the stone throwing device ejects the stone, the return cable 142 connected to the first pulley 121 is all wound up on the small winding wheel 1 of the first winding roller. 82, the return cable 142 connected to the second pulley 122 is all wound on the small winding wheel 182 of the second winding roller, and the return cable 143 connected to the third pulley 121 is all wound on the small winding wheel 182 of the first winding roller, and the large winding wheels 181 of the three winding rollers all release the acceleration cable 142, so the three pulleys are all located on the side of the ejection platform 8 close to the horizontal support 202, that is, the end of the ejection platform 8 close to the horizontal support 202. The operator manually controls the ejection device to enter the ejection stage, and the operator starts the control system through the controller to start running, and the control The control system energizes the drive motor 15 and drives the drive shaft 16 to rotate. The drive shaft 16 drives all the clutch discs 19 to rotate. Since the separation spring 20 presses against the clutch disc 19, the clutch disc 19 cannot drive the retracting roller to rotate. After the control system turns on the drive motor 15, the electromagnet in the first retracting roller and the electromagnet in the clutch disc 19 close to the first retracting roller are further energized. The clutch disc 19 and the first retracting roller are tightly attached. The large reel 181 quickly reels the acceleration cable 142. The acceleration cable 142 pulls the first pulley 121 to slide in the ejection chute.

[0045] Because one end of the acceleration cable 142 of the second pulley 122 is connected to the first pulley 121, the first pulley 121 will pull the second pulley 122 to slide through the acceleration cable 142 during the sliding process. Because one end of the acceleration cable 142 of the third pulley 123 is connected to the first pulley 121, the second pulley 122 will pull the third pulley 123 to slide through the acceleration cable 142 during the sliding process. The third pulley 123 drives the ejection platform 8 to move. Therefore, when the first pulley 121 starts to move, the second pulley 122 and the third pulley 123 are also moving at the same time, and the moving speed gradually decreases.

[0046] Because the traction force required for ejecting the breakwater stones is provided by the third pulley 123, the third pulley 123 is a movable pulley, and the second pulley 122 needs to provide the breakwater stones when moving. traction;

[0047] The second pulley 122 is also a movable pulley, so when the first pulley 121 moves, it is necessary to provide the second pulley 122 with a movable pulley. The traction force of the first pulley 121 is to provide the breakwater stones with a certain traction force when moving. traction;

[0048] The first pulley 121 is still a movable pulley. When the large winding wheel 181 quickly winds up the acceleration cable 142 of the first pulley 121, the acceleration cable 142 only needs to provide the first pulley 121 with a stable state when moving. The traction force of the breakwater stones is required to be provided by the drive motor 15. The traction force is sufficient, so the work required for the third pulley 123 to drive the breakwater stones to move is gradually weakened by the passive pulley.

[0049] A cross-shaped slide groove is provided on the driving shaft 16 at the positions corresponding to the third retracting roller, the second retracting roller and the first retracting roller. A clutch disc 19 is slidably installed in each cross-shaped slide groove. The three clutch discs 19 are close to the large reel 181. A high friction coefficient material is provided at the position where each clutch disc 19 and the large reel 181 are close to each other. An electromagnet is provided in each clutch disc 19 and each large reel 181. All the electromagnets are connected to a control system through a circuit. The slide groove is also provided with a spring hole, and a separation spring 20 is installed in each spring hole, and the separation spring 20 is in contact with the clutch disk 19. Each set of ejection mechanisms includes a drive motor 15 and a winding carrier 17. The winding carrier 17 is installed on the empty interlayer side plate 10. The drive motor 15 is located below the winding carrier 17. A drive shaft 16 is arranged on the motor shaft of the drive motor 15. The drive shaft 16 is rotatably arranged in the winding carrier 17. The third retracting roller, the second retracting roller, and the third retracting roller are rotatably installed in the winding carrier 17 from top to bottom. The first retractable roller, the second retractable roller and the third retractable roller are arranged in an empty sleeve with the drive shaft 16. The first retractable roller, the second retractable roller and the third retractable roller are each composed of a large reel 181 and a small reel 182. The large reel 181 is fixedly connected to the small reel 182. The large reel 181 is located above the small reel 182. Each ejection mechanism also includes three return cables 141, three acceleration cables 142, three front guide wheels 131 and three rear guide wheels 132. The three front guide wheels 131 and the three rear guide wheels 132 are arranged in an empty sleeve with the drive shaft 16. The wheel 131 is installed at one end of the empty interlayer side panel 10 close to the support plate 203, and the three rear guide wheels 132 are installed at one end of the empty interlayer side panel 10 close to the cross pillar 202. The three return cables 141 are respectively connected to one end of the pulley carrier 112 on the first pulley 121, the second pulley 122 and the third pulley 123, and then pass around the three rear guide wheels 132 respectively. The other ends of the three return cables 141 are sequentially wound around the small winding wheel 182 of the first winding roller, the second winding roller and the third winding roller.

[0050] Since the large reel 181 and the small reel 182 rotate at the same time, the large reel 181 pulls the acceleration cable 142 to move while the small reel 182 releases the return cable 141. The release length of the return cable 141 is half of the acceleration cable 142. After the first pulley 121 moves to the end of the ejection chute, it touches the contact switch. The control system detects the signal that the first pulley 121 has moved to the end. The control system first controls the clutch disk 19 to disconnect the electromagnet in the large reel 181 in the first reel roller, so that the large reel 181 in the first reel roller stops rotating to prevent the acceleration cable 142 from being broken. After the clutch disc 19 and the electromagnet in the large winding wheel in the first winding roller are powered off, the control system uses the positioning electromagnet to generate magnetic attraction to attract the first pulley 121, so that the first pulley 121 cannot continue to move, and prevents the first pulley 121 from sliding back. After the positioning electromagnet is powered on, the control system energizes the electromagnet in the clutch disc 19 close to the second winding roller, and energizes the electromagnet in the large winding wheel 181 in the second winding roller. The clutch disc 19 and the second winding roller are attracted and drive the second winding roller to rotate. The large winding wheel 181 in the second winding roller pulls the second pulley 122 to move quickly through the acceleration cable 142.

[0051] One end of an accelerating cable 142 is fixedly connected to one side of the empty interlayer side plate 10 close to the supporting plate 203, then passes around the first pulley 121 and a front guide wheel 131, and is finally wound around the large winding wheel 181 of the first winding roller. One end of the second accelerating cable 142 is connected to the pulley carrier 112 of the first pulley 121, then passes around the second pulley 122 and a front guide wheel 131, and is finally wound around the large winding wheel 181 of the second winding roller. One end of the third accelerating cable 142 is connected to the pulley carrier 112 of the second pulley 122, then passes around the third pulley 123 and a front guide wheel 131, and is finally wound around the large winding wheel 181 of the third winding roller. When the second pulley 122 moves to the end of the ejection chute After the first gear is in the clutch, the electromagnet in the large winding wheel 181 in the second winding roller is powered on and separated, so that the large winding wheel 181 in the second winding roller stops rotating. After the clutch disc 19 and the electromagnet in the large winding wheel in the second winding roller are powered off, the control system uses the positioning electromagnet to generate magnetic attraction to attract the second pulley 122 to prevent the second pulley 122 from sliding back. After the positioning electromagnet is powered on, the control system energizes the electromagnet in the clutch disc 19 close to the third winding roller, and the electromagnet in the large winding wheel 181 in the third winding roller is powered on. The clutch disc 19 and the third winding roller are attracted and drive the third winding roller to rotate. Wheel 81 pulls the third pulley 123 to move quickly through the acceleration cable 142, and the third pulley 123 is pulled to move quickly until the third pulley 123 also moves to the end of the ejection chute and touches the contact switch. The control system detects the signal that the third pulley 123 moves to the end, and the control system first controls the clutch disk 19 and the electromagnet in the large winding wheel 181 in the third winding roller to cut off the power and separate, so that the large winding wheel 181 in the third winding roller stops rotating. After the clutch disk 19 and the electromagnet in the large winding wheel in the third winding roller are powered off, the control system uses the positioning electromagnet to generate magnetic attraction to attract the third pulley 123 to prevent the third pulley 123 from sliding back. The ejection platform 8 stops moving, and the breakwater stones are ejected forward by inertia, realizing the breakwater stone The ejection of the block is accelerated by buffering step by step, which reduces the load of the driving motor 15 and prevents the driving motor 15 from being overloaded and burned. The labor-saving characteristic of the movable pulley is utilized, and only the motor can be used to eject the breakwater stones. Compared with the electromagnetic ejection method with high power consumption, it has the effect of saving energy. After the ejection is completed, the return cable 141 on the small winding wheel 182 in the three winding rollers has been fully released, and the three accelerating cables 142 are wound up. The three contact switches on the side of the cross support 202 are switched to the power-on state, and the three contact switches on the side of the support plate 203 are switched to the power-off state. The positioning electromagnet of the adsorption pulley is powered off, and the three adsorptions on the pulleys are released. The driving motor 15 drives the driving shaft 16 to reverse, so that the electromagnet in the clutch disk 19 near the first winding roller is powered on.The electromagnet in the large reel in the first reel is energized, the clutch disc and the first reel are attracted again and drive the first reel to rotate, the small reel 182 in the first reel pulls the first pulley 121 to move quickly through the return cable 141, so that the first pulley 121 returns to the initial position, the pulley carrier 112 contacts the contact switch, and the control system controls the power on and off of the three groups of electromagnets through the same control method as the ejection process, and retracts the first pulley 121, the second pulley 122 and the third pulley 123 in turn, so that the ejection platform 8 is reset and waits for the next ejection operation.

[0052] Four through slots are provided at the bottom of the protective seat 201, and racks 3 are provided at positions corresponding to the four through slots on the bottom plate 1. The length of the rack 3 is less than the length of the through slot, and a return spring is provided between the two gaps between each through slot and the rack 3. The shock absorbing assembly includes four speed increase boxes 4 and four metal damping plates 503. The input end of each speed increase box 4 is connected to an input gear 501, and the output end of each speed increase box 4 is connected to an output gear 502. The four input gears 501 are respectively meshed with the four racks 3, and each output gear 502 is provided with a magnet. The four metal damping plates 503 are all arranged close to the output gear 502, and the breakwater stones are ejected. During the process, the collision between the pulley carrier 112 and the ejection platform 8 and the ejection track 9 causes the vibration of the protective seat 201, especially along the direction of the stone ejection. The impact force caused by inertia causes the protective seat 201 to be displaced. When the protective seat 201 is displaced, the input gear 501 rolls along the surface of the rack 3. After being accelerated by the speed increaser 4, the output gear 502 rotates at a high speed. The high-speed movement of the magnet forms an electromagnetic eddy current in the metal damping plate 503, and then weakens the high-speed rotation of the output gear 502 through the induced magnetic field, thereby further achieving the purpose of reducing the displacement of the protective seat 201 and reducing the shock of the protective seat 201.

[0053] The working principle of the present invention is as follows: the breakwater stones to be thrown are transmitted to the ejection platform 8 through the transmission device, and the elevation angle of the ejection track 9 is adjusted according to the throwing distance. The smaller the angle between the ejection track 9 and the horizontal plane, the farther the breakwater stones are thrown, and the larger the angle between the ejection track 9 and the horizontal plane, the closer the breakwater stones are thrown. The control system controls the lifting motor 6 to work, and the lifting motor 6 drives the spiral sleeve 701 to rotate. Since the screw 702 cannot rotate with the spiral sleeve 701, it can only move in and out during the rotation of the spiral sleeve 701. When the spiral sleeve 701 rotates the screw 702 out, the adapter 703 An oblique upward thrust is applied to the support plate 203, and the upward component of the thrust pushes the support plate 203 upward, driving the ejection track 9 to tilt upward, thereby achieving the effect of lifting the ejection track; on the contrary, when the spiral sleeve 701 retracts the screw rod 702, the adapter 703 applies an oblique downward pulling force to the support plate 203, and the upward component of the pulling force pulls the support plate 203 downward, driving the ejection track 9 to lower. The operator controls the lifting motor 6 through the control system to drive the spiral sleeve 701 to rotate a certain number of circles, and uses the telescopic movement between the screw rod 702 and the spiral sleeve 701 to achieve the pitch control of the ejection track 9.

[0054] After the two contact switches in the ejection chute where the first pulley 121 is located are touched, the contact switch sends a trigger signal to the control system. The control system receives the trigger signal and controls the electromagnet in the first retractable roller and the electromagnet in the clutch disk 19 close to the first retractable roller to be powered off, and controls the electromagnet in the second retractable roller and the electromagnet in the clutch disk 19 close to the second retractable roller to be powered on; after the two contact switches in the ejection chute where the second pulley 122 is located are touched, the contact switch sends a trigger signal to the control system. The control system receives the trigger signal and controls the electromagnet in the second retractable roller and the electromagnet in the clutch disk 19 close to the second retractable roller to be powered off, and controls the electromagnet in the third retractable roller and the electromagnet in the clutch disk 19 close to the third retractable roller to be powered on;

[0055] After the two contact switches in the ejection slot where the third pulley 123 is located are touched, the contact switch sends a trigger signal to the control system. The control system receives the trigger signal and controls the electromagnet in the third retracting roller and the electromagnet in the clutch disk 19 near the third retracting roller to cut off the power. In the ejection stage, the three contact switches near the side of the cross pillar 202 are in the power-off state, and the three contact switches near the side of the support plate 203 are in the power-on state.

[0056] When the stone is transmitted to the ejection platform 8 through the conveying device and the pitch angle adjustment of the ejection track 9 is completed, before the stone throwing device ejects the stone, the return cable 142 connected to the first pulley 121 is all wound up on the small winding wheel 182 of the first winding roller, the return cable 142 connected to the second pulley 122 is all wound up on the small winding wheel 182 of the second winding roller, and the return cable 143 connected to the third pulley 121 is all wound up on the small winding wheel 182 of the first winding roller, and the large winding wheels 181 of the three winding rollers all release the acceleration cable 142, so the three pulleys are all located on the side of the ejection platform 8 close to the cross pillar 202, that is, the ejection platform 8 At one end near the horizontal support 202, the operator manually controls the throwing and filling device to enter the ejection stage. The operator starts the control system through the controller to start operation. The control system energizes the drive motor and drives the drive shaft to rotate. The drive shaft drives all the clutch disks to rotate. Since the separation spring supports the clutch disk, the clutch disk cannot drive the retracting roller to rotate. After the control system turns on the drive motor 15, the electromagnet in the first retracting roller and the electromagnet in the clutch disk 19 near the first retracting roller are further energized. The clutch disk and the first retracting roller are adsorbed and pressed tightly, and the large reel quickly reels the acceleration cable. The acceleration cable pulls the first pulley to slide in the ejection chute.

[0057] Because one end of the acceleration cable 142 of the second pulley 122 is connected to the first pulley 121, the first pulley 121 will pull the second pulley 122 to slide through the acceleration cable 142 during the sliding process. Because one end of the acceleration cable 142 of the third pulley 123 is connected to the first pulley 121, the second pulley 122 will pull the third pulley 123 to slide through the acceleration cable 142 during the sliding process. The third pulley 123 drives the ejection platform 8 to move. Therefore, when the first pulley 121 starts to move, the second pulley 122 and the third pulley 123 are also moving at the same time, and the moving speed gradually decreases.

[0058] Because the traction force required for ejecting the breakwater stones is provided by the third pulley 123, the third pulley 123 is a movable pulley, and the second pulley 122 needs to provide the breakwater stones when moving. traction;

[0059] The second pulley 122 is also a movable pulley, so when the first pulley 121 moves, it is necessary to provide the second pulley 122 with a movable pulley. The traction force of the first pulley 121 is to provide the breakwater stones with a certain traction force when moving. traction;

[0060] The first pulley 121 is still a movable pulley. When the large winding wheel 181 quickly winds up the acceleration cable 142 of the first pulley 121, the acceleration cable 142 only needs to provide the first pulley 121 with a stable state when moving. The traction force of the breakwater stones is required to be provided by the drive motor 15. The traction force is sufficient, so the work required for the third pulley 123 to drive the breakwater stones to move is gradually weakened by the passive pulley.

[0061] Since the large take-up wheel 181 and the small take-up wheel 182 rotate at the same time, the large take-up wheel 181 pulls the acceleration cable 142 to move while the small take-up wheel 182 releases the return cable 141. The release length of the return cable 141 is half of the acceleration cable 142. After the first pulley moves to the end of the ejection chute, it touches the contact switch. The control system detects the signal that the first pulley 121 has moved to the end. The control system first controls the clutch disk and the electromagnet in the large take-up wheel in the first take-up roller to cut off the power and separate, so that the large take-up wheel 181 in the first take-up roller stops rotating to prevent the acceleration cable 142 from being pulled off. After the electromagnet in the large winding wheel in the first winding roller is powered off, the control system uses the positioning electromagnet to generate magnetic attraction to attract the first pulley, so that the first pulley cannot move further, and prevents the first pulley 121 from sliding back. After the positioning electromagnet is powered on, the control system energizes the electromagnet in the clutch disk close to the second winding roller, and energizes the electromagnet in the large winding wheel in the second winding roller. The clutch disk and the second winding roller are attracted and drive the second winding roller to rotate, and the large winding wheel in the second winding roller pulls the second pulley to move quickly by the acceleration cable.

[0062] When the second pulley moves to the end of the ejection chute and touches the contact switch, the control system detects the signal that the second pulley 122 moves to the end, and the control system first controls the clutch disc 19 and the electromagnet in the large winding wheel 181 in the second winding roller to cut off the power and separate, so that the large winding wheel 181 in the second winding roller stops rotating. After the clutch disc 19 and the electromagnet in the large winding wheel in the second winding roller are powered off, the control system uses the positioning electromagnet to generate magnetic attraction to attract the second pulley 122 to prevent the second pulley 122 from sliding back. After the positioning electromagnet is energized, the control system controls the electromagnet in the clutch disc 19 close to the third winding roller to be energized, and the electromagnet in the large winding wheel 181 in the third winding roller is energized. The clutch disc 19 and the third winding roller are attracted and drive the third winding roller to rotate. The large winding wheel 181 in the third winding roller pulls the third pulley 123 to move quickly through the acceleration cable 142, and the third pulley is pulled to move quickly;

[0063] Until the third pulley 123 also moves to the end of the ejection chute and touches the contact switch, the control system detects the signal that the third pulley 123 moves to the end, the control system first controls the clutch disc 19 and the electromagnet in the large winding wheel 181 in the third winding roller to be powered off and separated, so that the large winding wheel 181 in the third winding roller stops rotating. After the clutch disc 19 and the electromagnet in the large winding wheel in the third winding roller are powered off, the control system uses the positioning electromagnet to generate magnetic attraction to attract the third pulley 123 to prevent the third pulley 123 from sliding back, and the ejection platform 8 stops moving. The breakwater stones are ejected forward by inertia to realize the ejection of the breakwater stones. Through step-by-step buffering acceleration, the load of the drive motor is reduced to prevent the drive motor from being overloaded and burned. The labor-saving characteristics of the movable pulley are utilized, and the breakwater stones can be ejected only by the motor. Compared with the electromagnetic ejection method with high power consumption, it has the effect of saving energy. The cables 141 have all been released, and the three accelerating cables 142 are wound up. The three contact switches near the side of the cross support 202 are switched to the energized state, and the three contact switches near the side of the support plate 203 are switched to the de-energized state. The positioning electromagnet of the adsorption pulley is de-energized, and the three pulleys are released from adsorption. The driving motor drives the driving shaft to reverse, so that the electromagnet in the clutch disk 19 near the first retracting roller is energized, and the electromagnet in the large reel in the first retracting roller is energized. The clutch disk and the first retracting roller are attracted again and drive the first retracting roller to rotate. The small reel 182 in the first retracting roller pulls the first pulley 121 to move quickly through the return cable 141, so that the first pulley 121 returns to the initial position, and the pulley carrier 112 contacts the contact switch. The control system controls the on and off status of the three groups of electromagnets through the same control method as the ejection process, and retracts the first pulley, the second pulley and the third pulley in turn, so that the ejection platform 8 is reset and waits for the next ejection operation.

[0064] During the ejection process of the breakwater stones, the pulley carrier 112 and the ejection platform 8 collide with the ejection track 9, causing the vibration of the protective seat 201, especially along the direction of the stone ejection. The impact force caused by inertia causes the protective seat 201 to displace. When the protective seat 201 is displaced, the input gear 501 rolls along the surface of the rack 3. After being accelerated by the speed increaser 4, the output gear 502 rotates at a high speed. The high-speed movement of the magnet causes electromagnetic eddy currents to form in the metal damping plate 503, and then the high-speed rotation of the output gear 502 is weakened by the induced magnetic field, thereby further achieving the purpose of reducing the displacement of the protective seat 201 and reducing the shock of the protective seat 201.

[0065] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0066] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A stone dumping device for breakwater construction, characterized in that: The invention comprises a bottom plate (1), a protective seat (201) being slidably mounted on the bottom plate (1), an ejection track (9) being mounted inside the protective seat (201), a pitch mechanism being arranged between the ejection track (9) and the protective seat (201), the pitch mechanism being used to adjust the angle between the ejection track (9) and a horizontal plane, an ejection platform (8) being slidably mounted on the ejection track (9), empty interlayer side plates (10) being arranged on both sides of the ejection track (9), an ejection mechanism being mounted on each of the empty interlayer side plates (10), the two ejection mechanisms being connected to the ejection platform (8), and a shock absorbing component being further mounted inside the protective seat (201), the shock absorbing component performing buffering and shock reduction on the protective seat (201); Each of the ejection mechanisms comprises a first pulley (121), a second pulley (122) and a third pulley (123); the ejection platform (8) is connected to the third pulley (123); each group of the ejection mechanisms comprises a drive motor (15) and a winding carrier (17); a drive shaft (16) is arranged on the motor shaft of the drive motor (15); the drive shaft (16) is rotatably arranged in the winding carrier (17); a third retracting roller, a second retracting roller and a first retracting roller are rotatably installed in the winding carrier (17) from top to bottom; the first retracting roller, the second retracting roller and the third retracting roller are all connected by a large winding roller. The ejection mechanism is composed of a first pulley (181) and a small reel (182), each group of the ejection mechanism also includes three return cables (141), three acceleration cables (142), three front guide wheels (131) and three rear guide wheels (132), the three return cables (141) are respectively connected to one end of the pulley carrier (112) on the first pulley (121), the second pulley (122) and the third pulley (123), a cross-shaped slide groove is opened at the position corresponding to the third reel roller, the second reel roller and the first reel roller on the drive shaft (16), and a clutch disc (19) is slidably installed in each of the cross-shaped slide grooves; A transverse support (202) is disposed at one end of the protection seat (201), and a support plate (203) is disposed at the other end of the protection seat (201); the bottom of the ejection track (9) is rotatably connected to the transverse support (202), and one end of the ejection track (9) away from the transverse support (202) is placed on the support plate (203); four through slots are formed at the bottom of the protection seat (201), and racks (3) are disposed at positions corresponding to the four through slots on the bottom plate (1), and the length of the racks (3) is less than the length of the through slots; A return spring is arranged between two gaps between each through slot and the rack (3); the shock absorbing assembly comprises four speed increasing boxes (4) and four metal damping plates (503); the input end of each speed increasing box (4) is connected to an input gear (501); the output end of each speed increasing box (4) is connected to an output gear (502); the four input gears (501) are respectively meshed with four racks (3); each output gear (502) is provided with a magnet; and the four metal damping plates (503) are arranged close to the output gear (502); The pitch mechanism comprises a lifting motor (6), a spiral sleeve (701), a screw rod (702) and an adapter (703); the lifting motor (6) is rotatably mounted on the protective seat (201) via a bracket; the spiral sleeve (701) is coaxially connected to the motor shaft of the lifting motor (6); the adapter (703) is rotatably connected to the bottom of the ejection track (9); the screw rod (702) and the adapter (703) are fixedly mounted; the screw rod (702) and the spiral sleeve (701) are threadedly matched; the adapter (703) is rotatably connected to the support plate (203); and the height of the transfer position between the adapter (703) and the support plate (203) is higher than the height of the transfer position between the ejection track (9) and the cross support (202); Three ejection chutes are provided on each of the empty interlayer side panels (10), the three ejection chutes are provided in parallel, and the lengths of the three ejection chutes are shortened from top to bottom; the first pulley (121), the second pulley (122) and the third pulley (123) are all composed of a pulley carrier (112) and a movable pulley (111); the movable pulley (111) is rotatably mounted in the pulley carrier (112), the pulley carrier (112) is slidably mounted in the ejection chutes, and the first pulley (121), the second pulley (122) and the third pulley (123) are installed from bottom to top; The three clutch discs (19) are all close to the large winding wheel (181), and a high friction coefficient material is provided at a position where each clutch disc (19) and the large winding wheel (181) are close to each other. An electromagnet is provided in each clutch disc (19) and each large winding wheel (181), and all the electromagnets are connected to a control system through a circuit. A spring hole is also provided in the drive shaft (16) corresponding to each cross-shaped slide groove, and a separation spring (20) is installed in each spring hole, and the separation spring (20) is in contact with the clutch disc (19).

2. The stone dumping device for breakwater construction according to claim 1, characterized in that: The winding carrier (17) is mounted on the empty interlayer side plate (10), the driving motor (15) is located below the winding carrier (17), the first winding roller, the second winding roller and the third winding roller are arranged in an empty sleeve with the driving shaft (16), the large winding wheel (181) is fixedly connected to the small winding wheel (182), and the large winding wheel (181) is located above the small winding wheel (182).

3. The stone dumping device for breakwater construction according to claim 2, characterized in that: The three front guide wheels (131) are installed at one end of the empty interlayer side plate (10) close to the support plate (203), the three rear guide wheels (132) are installed at one end of the empty interlayer side plate (10) close to the cross support (202), the three return cables (141) respectively pass around the three rear guide wheels (132), and the other ends of the three return cables (141) are sequentially wound around the small reeling wheels (182) of the first reeling roller, the second reeling roller and the third reeling roller.

4. The stone dumping device for breakwater construction according to claim 3 is characterized in that: One end of an accelerating cable (142) is fixedly connected to a side of the empty interlayer side plate (10) close to the support plate (203), then passes around the first pulley (121) and a front guide wheel (131), and finally is wound around the large winding wheel (181) of the first winding roller; One end of the second accelerating cable (142) is connected to the pulley carrier (112) of the first pulley (121), then passes around the second pulley (122) and a front guide wheel (131), and finally is wound around the large winding wheel (181) of the second winding roller; One end of the third accelerating cable (142) is connected to the pulley carrier (112) of the second pulley (122), then passes around the third pulley (123) and a front guide wheel (131), and finally is wound around the large winding wheel (181) of the third winding roller.

5. The stone dumping device for breakwater construction according to claim 1, characterized in that: Contact switches are arranged at both ends of each ejection chute, and the contact switches are connected to a control system through a circuit.

Citation Information

Patent Citations

  • Active maglev electromagnetic catapult

    CN103057722A

  • Carrier-based aircraft catapulting device for aircraft carrier

    CN113697123A