A method for drilling and completing a well in a coal mine with thick bedrock formation
The intelligent one-drill completion scheme designed through geological exploration and modeling software, combined with real-time monitoring and intervention of intelligent drilling equipment, solves the efficiency and safety issues of completion of thick bedrock formations in coal mines, and achieves efficient coal seam resource mining.
Patent Information
- Application Number
- CN202410733632.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-07
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-06-07
AI Technical Summary
In the process of coal mine development, how to formulate and implement a one-drill completion plan for thick bedrock strata in coal mines, improve completion operation efficiency, and reduce costs and underground operation risks.
Collect data through geological exploration, use modeling software to design a drilling and completion plan, and import it into intelligent drilling equipment to monitor and intervene in the drilling process in real time, complete completion and production operations, and monitor the process flow to generate early warning information .
It effectively improves the efficiency of well completion operations, reduces time and costs, and reduces underground construction risks.
Smart Images

Figure CN118309368B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mining, and in particular to an intelligent well construction method for drilling and completing a thick bedrock stratum in a coal mine. Background Art
[0002] One-drill completion is a drilling technology used in oil and gas field development or coal mine development. It refers to the use of only one drill pipe or tubing string to complete the entire completion process during the completion operation of an oil and gas well or a coal mine well. Traditional completion methods usually require multiple runs of the drill pipe or tubing string, while one-drill completion technology uses reasonable design and optimized processes to complete the installation and fixation of wellbore isolation, tubing, casing, and packers and other equipment in a single operation. The application of one-drill completion technology can greatly reduce the time and cost of completion operations, improve operational efficiency, and reduce the risks brought about by underground operations. Therefore, how to formulate a one-drill completion plan for thick bedrock formations in coal mines and to efficiently implement the one-drill completion plan is a key and difficult issue in the current coal mine development process. Summary of the invention
[0003] In order to solve the above problems, the purpose of the present invention is to provide an intelligent well construction method for drilling and completing a thick bedrock formation in a coal mine.
[0004] The purpose of the present invention can be achieved by the following technical solution: A method for drilling and completing a well in a thick bedrock formation of a coal mine, comprising the following steps:
[0005] Step S1: Select a coal mine area for geological exploration, and then collect corresponding geological data;
[0006] Step S2: Based on the collected geological data, a drilling and completion plan for thick bedrock formations is designed through modeling software;
[0007] Step S3: importing the designed drilling and completion plan into the intelligent drilling equipment, and starting the intelligent drilling equipment to perform drilling operations;
[0008] Step S4: arranging formation information monitoring equipment to collect formation data in real time during the drilling operation, and performing intelligent intervention on the intelligent drilling equipment based on the formation data;
[0009] Step S5: When the intelligent drilling equipment reaches the preset target location, it performs completion operations, and after the completion operations are successfully completed, it performs production operations to exploit the coal seam resources at the target location;
[0010] Step S6: Monitor the process flow of the production operation, locate abnormal process flow and generate corresponding warning information.
[0011] Furthermore, the process of selecting a coal mining area for geological exploration and collecting relevant geological data includes:
[0012] Select a coal mine area, and select the corresponding number of geological exploration equipment according to the area of the coal mine area. The area of the coal mine area is S 区域 , obtain the equipment working area of the geological exploration equipment and record it as S 工作 , according to S 区域 and S 工作 Obtain the number of geological exploration equipment required in the coal mining area, record this number as S, and S = S 区域 / S 工作 , S is an integer greater than 0;
[0013] Set the working period of each geological exploration equipment, and then start the equipment adjustment of each geological exploration equipment during the working period, and then obtain the equipment parameters corresponding to the geological exploration equipment. The equipment parameters are used to adjust the stable placement of the geological exploration equipment. Set the equipment parameters for the corresponding geological exploration equipment, and then collect the geological data of each geological exploration equipment in the corresponding coal mine area. The geological data includes geological type, drillable depth, geological looseness and geological stability.
[0014] Furthermore, based on the collected geological data, the process of designing a drilling and completion plan for thick bedrock formations through modeling software includes:
[0015] Select modeling software and determine whether the modeling environment is in a safe environment. The modeling software is pre-set with firewall logs and security regular expressions. The firewall log is used to determine whether the current modeling software records intrusion information. The security regular expression is used to determine whether several modeling configuration items included in the modeling software are in a correct configuration state;
[0016] When there is no intrusion information in the modeling software, and all modeling configuration items corresponding to the modeling software are in a correctly configured state, it is determined that the modeling environment of the modeling software is in a safe environment; otherwise, it is determined that the modeling software is not in a safe environment;
[0017] When the modeling software is in a safe environment, the geological data is input into the modeling software, and the modeling software uses the geological type, drillable depth, geological porosity and geological stability in the geological data as program evaluation items, and then designs a one-drilling completion plan for thick bedrock formations. When the modeling software is not in a safe environment, the modeling software is scanned and repaired for vulnerabilities, and then the modeling environment is converted to a safe environment.
[0018] Furthermore, the process of importing the designed drilling and completion plan into the intelligent drilling equipment and starting the intelligent drilling equipment to perform drilling operations includes:
[0019] Selecting an intelligent drilling device that meets the corresponding drill bit selection of the geological type in a drilling and completion plan, obtaining the device communication protocol of the intelligent drilling device and the software communication protocol of the modeling software, and determining whether the device communication protocol and the software communication protocol are in the same network communication format;
[0020] If yes, then the well completion plan designed by the modeling software is imported into the intelligent drilling equipment. The well completion plan includes the specified completion time, completion depth, drilling speed, drilling equipment control parameters and drilling start time. The intelligent drilling equipment performs drilling operations according to the well completion plan.
[0021] If not, the device communication protocol and the software communication protocol are uniformly converted into a preset third-party communication protocol, a drilling and completion plan is imported into the intelligent drilling equipment according to the third-party communication protocol, and then the intelligent drilling equipment is started to perform drilling operations;
[0022] The drilling operation includes drilling path planning, drilling azimuth correction and drilling obstacle avoidance. After completing the drilling path planning, drilling azimuth correction and drilling obstacle avoidance, the final drilling path of the intelligent drilling equipment is constructed.
[0023] Furthermore, the process of collecting formation data in real time during the drilling operation by arranging formation information monitoring equipment includes:
[0024] When the intelligent drilling equipment performs drilling operations in the current coal mine area through a drilling and completion plan, a formation information monitoring device is arranged on the intelligent drilling equipment, and the data reporting frequency of the formation information monitoring device is set, which is recorded as f 上报 , f 上报 The unit is: N times / meter, N is an integer greater than 0, the formation position of the formation information monitoring equipment before the drilling operation begins is marked as L1, and the formation position corresponding to the completion depth of the intelligent drilling equipment is marked as L2, where the units of L1 and L2 are meters, and then the data reporting frequency f is obtained. 上报 The number of settings is recorded as X, X = |L2-L1| / f 上报 , and then the formation information monitoring equipment performs X*N real-time reporting operations, and all data information collected by the formation information monitoring equipment every 5 times is marked as formation data. The formation data includes formation stress change data, formation tension change data and formation shear force change data.
[0025] Furthermore, the process of intelligent intervention of intelligent drilling equipment based on formation data includes:
[0026] The formation stress change data, the formation tension change data and the formation shear force change data are respectively composed of the real-time stress data, the real-time tension data and the real-time shear force data of a plurality of formation positions. The plurality of formation positions are sequentially numbered from top to bottom and recorded as i, i=1, 2, 3, ..., m, where m is an integer greater than 0, and the real-time stress data, real-time tension data and real-time shear force data corresponding to the formation position numbered i are respectively marked as YL[i], ZL[i] and JQL[i];
[0027] Using several stratum positions as abscissas, using YL[i], ZL[i] and JQL[i] corresponding to several stratum positions as ordinates, respectively, to construct stress trend curves, tension trend curves and shear force trend curves of several real-time stress data, several real-time tension data and several real-time shear force data that change with stratum positions;
[0028] Set standard stress trend curve, standard tension trend curve and standard shear force trend curve;
[0029] The stress trend curve, the tension trend curve and the shear force trend curve are respectively compared with the corresponding standard stress trend curve, the standard tension trend curve and the standard shear force trend curve, so as to obtain the corresponding abnormal stress curve segment, abnormal tension curve segment and abnormal shear force curve segment;
[0030] The formation positions corresponding to the abnormal stress curve segments, the abnormal tension curve segments and the abnormal shear force curve segments are marked as intervention points of the intelligent drilling equipment. At several marked intervention points, the intelligent intervention of the intelligent equipment includes setting equipment stress adjustment parameters, equipment tension adjustment parameters and equipment shear force adjustment parameters, and then correcting the abnormal stress curve segments by the equipment stress adjustment parameters, correcting the abnormal tension curve segments by the equipment tension adjustment parameters, and correcting the abnormal shear force curve segments by the equipment shear force adjustment parameters.
[0031] Furthermore, when the intelligent drilling equipment reaches the target location, the completion operation is performed, and after the completion operation is completed, the production operation is performed to exploit the coal seam resources at the target location. The process includes:
[0032] Acquire the completion depth recorded in a drilling completion plan imported by the intelligent drilling equipment, and use the underground area corresponding to the completion depth as the preset target position of the intelligent drilling equipment. When the intelligent drilling equipment reaches the target position, the intelligent drilling equipment performs the completion operation;
[0033] The construction personnel in the surface area put the completion device and the completion-related components required by the completion device into the underground area. The completion device arranges the completion-related components in the wellbore area and the bottom area of the well in the current underground area according to the preset completion construction manual. After the completion operation is completed, the completion device is recovered to the surface area, and the construction area in the surface area performs a functional integrity check on the completion device. If the functional integrity check is qualified, the completion device is put into storage. If the functional integrity check is unqualified, the equipment maintenance personnel are arranged to perform maintenance operations on the completion device until the functional integrity check of the completion device is qualified, and then the maintenance operation is stopped and the storage operation is performed;
[0034] When the well completion operation is completed, a coal mine construction well is generated in the coal mine area, a coal mining robot is deployed in the coal mine construction well, the construction parameters of the coal mining robot are set, and the coal mining robot then performs production operations to mine the coal seam resources at the target location through production operations.
[0035] Furthermore, the process of monitoring the process flow of production operations, locating abnormal process flows and generating corresponding warning information includes:
[0036] Obtain several process flows included in the production operation, set process specification information corresponding to several process flows for process flow monitoring. If the process flow does not conform to the corresponding process specification information, the corresponding process flow is identified as an abnormal process flow, and an early warning information corresponding to the abnormal process flow is generated. If the process flow completely conforms to the corresponding process specification information, no operation is performed.
[0037] The content of the early warning information is: there is an abnormality in the current process flow. All process operation records corresponding to the current abnormal process flow are summarized, and the corresponding process log is generated after data encryption. The process log is sent to the administrator. The administrator decrypts the process log and hands it over to a production team composed of several production operators for data analysis, and then formulates and executes the corresponding operation plan to convert the abnormal process flow into normal.
[0038] Compared with the prior art, the beneficial effects of the present invention are as follows: by conducting geological exploration of the coal mine area to collect corresponding geological data, and based on the collected geological data, the corresponding one-drilling and completion plan is designed by the modeling software and imported into the intelligent drilling equipment, the intelligent drilling equipment is started to perform drilling operations, and the formation data during the drilling operation is collected in real time, and the intelligent drilling equipment is intelligently intervened based on the formation data. When the intelligent drilling equipment arrives at the preset target position, the completion operation and production operation are performed, and then the coal seam resources at the target position are mined, the process flow of the production operation is monitored, abnormal process flow is located and corresponding early warning information is generated, and finally the purpose of one-drilling and completion is achieved, the operation efficiency of the completion operation is effectively improved, the time cost of completion is reduced, and the risks of underground construction are reduced to a certain extent by monitoring the process flow of the production operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 It is a flow chart of the present invention. DETAILED DESCRIPTION
[0040] like Figure 1 As shown, a method for drilling and completing a well in a thick bedrock formation in a coal mine comprises the following steps:
[0041] Step S1: Select a coal mine area for geological exploration, and then collect corresponding geological data;
[0042] Step S2: Based on the collected geological data, a drilling and completion plan for thick bedrock formations is designed through modeling software;
[0043] Step S3: importing the designed drilling and completion plan into the intelligent drilling equipment, and starting the intelligent drilling equipment to perform drilling operations;
[0044] Step S4: arranging formation information monitoring equipment to collect formation data in real time during the drilling operation, and performing intelligent intervention on the intelligent drilling equipment based on the formation data;
[0045] Step S5: When the intelligent drilling equipment reaches the preset target location, it performs completion operations, and after the completion operations are successfully completed, it performs production operations to exploit the coal seam resources at the target location;
[0046] Step S6: Monitor the process flow of the production operation, locate abnormal process flow and generate corresponding warning information.
[0047] It should be further explained that, in the specific implementation process, the process of selecting a coal mining area for geological exploration and then collecting corresponding geological data includes:
[0048] Select a coal mine area, and select the corresponding number of geological exploration equipment according to the area of the coal mine area. The area of the coal mine area is S 区域 , obtain the equipment working area of the geological exploration equipment, and record the equipment working area as S 工作 ;
[0049] Then according to S 区域 and S 工作 Obtain the number of geological exploration equipment required in the coal mining area, record this number as S, then S = S 区域 / S 工作 , where S is an integer greater than 0. When the calculated value of S is a decimal, the value of S is rounded up;
[0050] A working period is set for each geological exploration equipment, and then equipment adjustment of each geological exploration equipment is started during the working period. The equipment adjustment is performed based on the judgment of the surface flatness, and the surface flatness of each geological exploration equipment in the corresponding coal mine area is obtained. A surface flatness-equipment parameter comparison table is preset, and the surface flatness-equipment parameter comparison table records the equipment parameters corresponding to the geological exploration equipment under each surface flatness. The equipment parameters are used to adjust the stable placement of the geological exploration equipment, and the equipment parameters are set for the corresponding geological exploration equipment. Then, when the equipment parameter setting is completed and the geological exploration equipment is stable, each geological exploration equipment collects corresponding geological data in the corresponding coal mine area, and the geological data includes geological type, drillable depth, geological looseness and geological stability.
[0051] It should be further explained that in the specific implementation process, based on the collected geological data, the process of designing a drilling and completion plan for thick bedrock formations through modeling software includes:
[0052] Selecting modeling software, and determining whether the modeling environment of the modeling software is in a safe environment, wherein the modeling software is pre-set with a firewall log and a security regular expression, wherein the firewall log is used to determine whether the current modeling software records intrusion information, and the security regular expression is used to determine whether several modeling configuration items included in the modeling software are in a correctly configured state;
[0053] The firewall log predefines a series of security keywords, each security keyword is associated with a corresponding security log item, and a number of log items included in the firewall log and the keywords corresponding to the log items are obtained. If the keyword belongs to any one of the series of security keywords, the log item corresponding to the keyword is marked as a security log item, otherwise, the log item corresponding to the keyword is marked as an illegal log item. If the illegal log items exceed the upper limit of the illegal number set for the firewall log, it is determined that the current modeling software records intrusion information, otherwise, it is determined that there is no intrusion information;
[0054] Obtain regular expressions corresponding to several modeling configuration items of the modeling software, and compare the regular expression of each modeling configuration item with the corresponding security regular expression of each modeling configuration item. If the regular expression is consistent with the security regular expression, the corresponding modeling configuration item is in a correctly configured state; if the comparison is inconsistent, the corresponding modeling configuration item is not in a correctly configured state;
[0055] When there is no intrusion information in the modeling software, and all modeling configuration items corresponding to the modeling software are in a correctly configured state, it is determined that the modeling environment of the modeling software is in a secure environment, otherwise the modeling software is not in a secure environment;
[0056] When the modeling software is in a safe environment, the geological data is input into the modeling software, and the modeling software uses the geological type, drillable depth, geological looseness and geological stability in the geological data as program evaluation items, and then designs a one-drill completion plan for thick bedrock formations;
[0057] When the modeling software is not in a secure environment, vulnerability scanning and vulnerability repair are performed on the modeling software. Through vulnerability scanning, several vulnerability points in the modeling environment of the modeling software and the vulnerability details information corresponding to the vulnerability points are located. Vulnerabilities are repaired according to the vulnerability details information of several vulnerability points, and patch files for the corresponding vulnerability points are generated. The corresponding vulnerability points are then repaired by several patch files and the modeling environment is converted into a secure environment.
[0058] It should be further explained that, in the specific implementation process, the process of importing the designed drilling and completion plan into the intelligent drilling equipment and starting the intelligent drilling equipment to perform drilling operations includes:
[0059] Selecting an intelligent drilling device that meets the corresponding drill bit selection of the geological type recorded in a drilling and completion plan, obtaining the device communication protocol of the intelligent drilling device, obtaining the software communication protocol of the modeling software, and determining whether the device communication protocol and the software communication protocol are in the same network communication format that can directly communicate;
[0060] If yes, then a drilling and completion plan designed by the modeling software is imported into the intelligent drilling equipment, wherein the drilling and completion plan includes a specified completion time, completion depth, drilling speed, drilling equipment control parameters and drilling start time, and the intelligent drilling equipment performs drilling operations according to the drilling and completion plan;
[0061] The drilling equipment control parameters include a number of drilling azimuth coordinates, drill bit rotation speed and drilling excavation azimuth, wherein the drilling excavation azimuth is based on the vertical line of the intelligent drilling equipment itself, and the drilling excavation azimuth includes the positive left excavation azimuth, the positive right excavation azimuth, the oblique left excavation azimuth and the oblique right excavation azimuth;
[0062] If not, the device communication protocol and the software communication protocol are uniformly converted into a preset third-party communication protocol, a drilling and completion plan is imported into the intelligent drilling equipment according to the third-party communication protocol, and then the intelligent drilling equipment is started to perform drilling operations;
[0063] The drilling operation includes drilling path planning, drilling azimuth correction and drilling obstacle avoidance;
[0064] The intelligent drilling equipment is started according to the drilling start time recorded in a drilling completion plan, and the drilling path is planned according to a number of drilling azimuth coordinates in the control parameters of the drilling equipment, and then the drilling path corresponding to the intelligent drilling equipment is constructed by summarizing the several drilling azimuth coordinates;
[0065] The intelligent drilling equipment is driven according to the drilling path, the drill bit rotation speed in the drilling equipment control parameters, and the drilling speed in a drilling completion plan. During the driving process of the intelligent drilling equipment, it is determined whether the positive left excavation direction, the positive right excavation direction, the oblique left excavation direction, and the oblique right excavation direction of the drilling excavation direction in the intelligent drilling equipment are within the respective preset allowable deviation ranges of the direction. If so, no operation is performed. If not, the direction correction parameters corresponding to the current intelligent drilling equipment are generated through drilling direction correction, and each drilling excavation direction is corrected to the corresponding allowable deviation range of the direction by the direction correction parameters.
[0066] The content of the drilling obstacle avoidance is: locating a number of obstacle points that the intelligent drilling equipment passes through when traveling along the drilling path. The obstacle at each obstacle point is defined as rock or other solid geological structure that cannot be destroyed by the intelligent drilling equipment at the current drill bit rotation speed. When the intelligent drilling equipment encounters an obstacle at the obstacle point, the drill bit rotation speed of the intelligent drilling equipment is first increased to destroy the obstacle. If the obstacle cannot be destroyed, the drilling path of the intelligent drilling equipment is changed to avoid the obstacle, and the final drilling path generated after the drilling obstacle avoidance is completed is constructed.
[0067] It should be further explained that, in the specific implementation process, the process of collecting formation data in real time during the drilling operation by arranging formation information monitoring equipment includes:
[0068] When the intelligent drilling equipment performs drilling operations in the current coal mine area through a drilling and completion plan, a formation information monitoring device is arranged on the intelligent drilling equipment, and the data reporting frequency of the formation information monitoring device is set, and the data reporting frequency is recorded as f 上报 ;
[0069] The data reporting frequency f 上报The unit is: N times / meter, where N is an integer greater than 0, the formation position of the formation information monitoring equipment before the start of the drilling operation is marked as L1, and the formation position corresponding to the completion depth reached by the intelligent drilling equipment is marked as L2, where the units of L1 and L2 are meters;
[0070] Then obtain the data reporting frequency f 上报 The number of settings is X, then X=|L2-L1| / f 上报 , and then the formation information monitoring device performs X*N real-time reporting operations, marking all data information collected by the formation information monitoring device every 5 times as formation data;
[0071] The formation data includes formation stress change data, formation tension change data and formation shear force change data.
[0072] It should be further explained that, in the specific implementation process, the process of intelligent intervention of intelligent drilling equipment based on formation data includes:
[0073] The formation stress change data is composed of real-time stress data of several formation positions, the formation tension change data is composed of real-time tension data of several formation positions, and the formation shear force change data is composed of real-time shear force data of several formation positions;
[0074] A number of stratum positions are sequentially numbered from top to bottom, and the number is recorded as i, where i=1, 2, 3, ..., m, where m is an integer greater than 0, and the real-time stress data corresponding to the stratum position numbered i is marked as YL[i], the real-time tension data corresponding to the stratum position numbered i is marked as ZL[i], and the real-time shear force data corresponding to the stratum position numbered i is marked as JQL[i];
[0075] Using several formation positions as abscissas, using YL[i], ZL[i] and JQL[i] corresponding to several formation positions as ordinates, respectively, to construct several stress trend curves of real-time stress data changing with formation positions, to construct several tension trend curves of real-time tension data changing with formation positions, and to construct several shear force trend curves of real-time shear force data changing with formation positions;
[0076] Set standard stress trend curve, standard tension trend curve and standard shear force trend curve;
[0077] The stress trend curve is compared with the standard stress trend curve, and the curve segment portion of the stress trend curve that is higher than the standard stress trend curve is marked as an abnormal stress curve segment. Similarly, the tension trend curve is compared with the standard tension trend curve, and the curve segment portion of the tension trend curve that is higher than the standard tension trend curve is marked as an abnormal tension curve segment. The shear force trend curve is compared with the standard shear force trend curve, and the curve segment portion of the shear force trend curve that is higher than the standard shear force trend curve is marked as an abnormal shear force curve segment.
[0078] The formation positions corresponding to the abnormal stress curve segments, the abnormal tension curve segments and the abnormal shear force curve segments are marked as intervention points of the intelligent drilling equipment. At the marked intervention points, the intelligent intervention of the intelligent equipment includes setting equipment stress adjustment parameters, equipment tension adjustment parameters and equipment shear force adjustment parameters;
[0079] Then, the abnormal stress curve segment is corrected by the equipment stress adjustment parameter, the abnormal tension curve segment is corrected by the equipment tension adjustment parameter, and the abnormal shear force curve segment is corrected by the equipment shear force adjustment parameter.
[0080] It should be further explained that, in the specific implementation process, when the intelligent drilling equipment reaches the preset target position, the completion operation is performed, and after the completion operation is successfully completed, the production operation is performed, and then the process of mining the coal seam resources at the target position includes:
[0081] Acquire the completion depth recorded in a drilling completion plan imported by the intelligent drilling equipment, and use the underground area corresponding to the completion depth as the preset target position of the intelligent drilling equipment. When the intelligent drilling equipment reaches the target position, the intelligent drilling equipment performs the completion operation;
[0082] The completion operation includes: construction personnel in the surface area place the completion device and the completion-related components required by the completion device into the underground area, and the completion device arranges the completion-related components in the wellbore area and the bottom area of the well in the current underground area according to the preset completion construction manual;
[0083] It should be noted that completion-related devices include but are not limited to tubing, casing and packers;
[0084] When the completion operation is completed, the completion device is recovered to the ground area, and the construction area in the ground area conducts a functional integrity check on the completion device. If the functional integrity check is qualified, the completion device is put into storage. If the functional integrity check is unqualified, the equipment maintenance personnel are arranged to perform maintenance operations on the completion device until the functional integrity check of the completion device is qualified, and then the maintenance operation is stopped and the storage operation is carried out;
[0085] When the well completion operation is completed, a coal mine construction well is generated in the coal mine area, a coal mining robot is deployed in the coal mine construction well, the construction parameters of the coal mining robot are set, and the coal mining robot then performs production operations to mine the coal seam resources at the target location through production operations.
[0086] It should be further explained that, in the specific implementation process, the process of monitoring the process flow of production operations, locating abnormal process flows and generating corresponding warning information includes:
[0087] Obtain several process flows included in the production operation, set process specification information corresponding to several process flows for process flow monitoring. If the process flow does not conform to the corresponding process specification information, the corresponding process flow is identified as an abnormal process flow, and an early warning information corresponding to the abnormal process flow is generated. If the process flow completely conforms to the corresponding process specification information, no operation is performed.
[0088] The content of the early warning information is: there is an abnormality in the current process flow. All process operation records corresponding to the current abnormal process flow are summarized, and the corresponding process log is generated after data encryption. The process log is sent to the administrator. The administrator decrypts the process log and hands it over to a production team composed of several production operators for data analysis, and then formulates and executes the corresponding operation plan to convert the abnormal process flow into normal.
[0089] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.
Claims
1. An intelligent well construction method for drilling and completing a well in a thick bedrock formation of a coal mine, characterized in that: The following steps are involved: Step S1: Select a coal mine area for geological exploration, and then collect corresponding geological data; Step S2: Based on the collected geological data, a drilling and completion plan for thick bedrock formations is designed through modeling software; Step S3: importing the designed drilling and completion plan into the intelligent drilling equipment, and starting the intelligent drilling equipment to perform drilling operations; Selecting an intelligent drilling device that meets the corresponding drill bit selection of the geological type recorded in a drilling and completion plan, obtaining the device communication protocol of the intelligent drilling device, obtaining the software communication protocol of the modeling software, and determining whether the device communication protocol and the software communication protocol are in the same network communication format that can directly communicate; If yes, then the well completion plan designed by the modeling software is imported into the intelligent drilling equipment. The well completion plan includes the specified completion time, completion depth, drilling speed, drilling equipment control parameters and drilling start time. The intelligent drilling equipment performs drilling operations according to the well completion plan. The control parameters of the drilling equipment include several drilling azimuth coordinates, drill bit rotation speed and drilling excavation azimuth. The drilling excavation azimuth is based on the vertical line of the intelligent drilling equipment itself. The drilling excavation azimuth includes the positive left excavation azimuth, the positive right excavation azimuth, the oblique left excavation azimuth and the oblique right excavation azimuth. If not, the device communication protocol and the software communication protocol are uniformly converted into a preset third-party communication protocol, a drilling and completion plan is imported into the intelligent drilling equipment according to the third-party communication protocol, and then the intelligent drilling equipment is started to perform drilling operations; Drilling operations include drilling path planning, drilling azimuth correction, and drilling obstacle avoidance; The intelligent drilling equipment is started according to the drilling start time recorded in a drilling completion plan, and the drilling path is planned according to a number of drilling azimuth coordinates in the control parameters of the drilling equipment, and then the drilling path corresponding to the intelligent drilling equipment is constructed by summarizing the several drilling azimuth coordinates; The intelligent drilling equipment is driven according to the drilling path, the drill bit rotation speed in the drilling equipment control parameters, and the drilling speed in a drilling completion plan. During the driving process of the intelligent drilling equipment, it is determined whether the positive left excavation direction, the positive right excavation direction, the oblique left excavation direction, and the oblique right excavation direction of the drilling excavation direction in the intelligent drilling equipment are within the respective preset allowable deviation ranges of the direction. If so, no operation is performed. If not, the direction correction parameters corresponding to the current intelligent drilling equipment are generated through drilling direction correction, and each drilling excavation direction is corrected to the corresponding allowable deviation range of the direction by the direction correction parameters. The content of drilling obstacle avoidance is: locate several obstacle points that the intelligent drilling equipment passes through when traveling along the drilling path. The obstacle of each obstacle point is defined as rock or other solid geological structure that cannot be destroyed by the intelligent drilling equipment at the current drill bit rotation speed. When the intelligent drilling equipment encounters an obstacle at the obstacle point, first increase the drill bit rotation speed of the intelligent drilling equipment to destroy the obstacle. If it cannot be destroyed, change the drilling path of the intelligent drilling equipment to avoid the obstacle, and construct the final drilling path generated after the drilling obstacle avoidance is completed; Step S4: arranging formation information monitoring equipment to collect formation data in real time during the drilling operation, and performing intelligent intervention on the intelligent drilling equipment based on the formation data; Step S5: When the intelligent drilling equipment reaches the preset target location, it performs completion operations, and after the completion operations are successfully completed, it performs production operations to exploit the coal seam resources at the target location; Step S6: Monitor the process flow of the production operation, locate abnormal process flow and generate corresponding warning information.
2. The method for drilling and completing a well in a thick bedrock formation in a coal mine according to claim 1, characterized in that: The process of selecting a coal mining area for geological exploration and collecting relevant geological data includes: Select a coal mine area, and select the corresponding number of geological exploration equipment according to the area of the coal mine area. The area of the coal mine area is S 区域 , obtain the equipment working area of the geological exploration equipment, whose area is recorded as S 工作 , according to S 区域 and S 工作 Obtain the number of geological exploration equipment required in the coal mining area, record this number as S, and S = S 区域 / S 工作 , S is an integer greater than 0; Set the working period of each geological exploration equipment, and then start the equipment adjustment of each geological exploration equipment during the working period, and then obtain the equipment parameters corresponding to the geological exploration equipment. The equipment parameters are used to adjust the stable placement of the geological exploration equipment. Set the equipment parameters for the corresponding geological exploration equipment, and then collect the geological data of each geological exploration equipment in the corresponding coal mine area. The geological data includes geological type, drillable depth, geological looseness and geological stability.
3. The method for drilling and completing a well in a thick bedrock formation in a coal mine according to claim 2, characterized in that: Based on the acquired geological data, the process of designing a well completion plan for thick bedrock formations through modeling software includes: Select modeling software and determine whether the modeling environment is in a safe environment. The modeling software is pre-set with firewall logs and security regular expressions. The firewall log is used to determine whether the current modeling software records intrusion information. The security regular expression is used to determine whether several modeling configuration items included in the modeling software are in a correct configuration state; When there is no intrusion information in the modeling software, and all modeling configuration items corresponding to the modeling software are in a correctly configured state, it is determined that the modeling environment of the modeling software is in a safe environment; otherwise, it is determined that the modeling software is not in a safe environment; When the modeling software is in a safe environment, the geological data is input into the modeling software, and the modeling software uses the geological type, drillable depth, geological porosity and geological stability in the geological data as program evaluation items, and then designs a one-drilling completion plan for thick bedrock formations. When the modeling software is not in a safe environment, the modeling software is scanned and repaired for vulnerabilities, and then the modeling environment is converted to a safe environment.
4. The method for drilling and completing a well in a thick bedrock formation in a coal mine according to claim 3, characterized in that: The process of collecting formation data in real time during drilling operations by arranging formation information monitoring equipment includes: When the intelligent drilling equipment performs drilling operations in the current coal mine area through a drilling and completion plan, a formation information monitoring device is arranged on the intelligent drilling equipment, and the data reporting frequency of the formation information monitoring device is set, which is recorded as f 上报 , f 上报 The unit is: N times / meter, N is an integer greater than 0, the formation position of the formation information monitoring equipment before the drilling operation begins is marked as L1, and the formation position corresponding to the completion depth of the intelligent drilling equipment is marked as L2, where the units of L1 and L2 are meters, and then the data reporting frequency f is obtained. 上报 The number of settings is recorded as X, X = |L2-L1| / f 上报 , and then the formation information monitoring equipment performs X*N real-time reporting operations, and all data information collected by the formation information monitoring equipment every 5 times is marked as formation data. The formation data includes formation stress change data, formation tension change data and formation shear force change data.
5. The method for drilling and completing a well in a thick bedrock formation in a coal mine according to claim 4, characterized in that: The process of intelligent intervention of intelligent drilling equipment based on formation data includes: The formation stress change data, the formation tension change data and the formation shear force change data are respectively composed of the real-time stress data, the real-time tension data and the real-time shear force data of a plurality of formation positions. The plurality of formation positions are sequentially numbered from top to bottom and recorded as i, i=1, 2, 3, ..., m, where m is an integer greater than 0, and the real-time stress data, real-time tension data and real-time shear force data corresponding to the formation position numbered i are respectively marked as YL[i], ZL[i] and JQL[i]; Using several stratum positions as abscissas, using YL[i], ZL[i] and JQL[i] corresponding to several stratum positions as ordinates, respectively, to construct stress trend curves, tension trend curves and shear force trend curves of several real-time stress data, several real-time tension data and several real-time shear force data that change with stratum positions; Set standard stress trend curve, standard tension trend curve and standard shear force trend curve; The stress trend curve, the tension trend curve and the shear force trend curve are respectively compared with the corresponding standard stress trend curve, the standard tension trend curve and the standard shear force trend curve, so as to obtain the corresponding abnormal stress curve segment, abnormal tension curve segment and abnormal shear force curve segment; The formation positions corresponding to the abnormal stress curve segments, the abnormal tension curve segments and the abnormal shear force curve segments are marked as intervention points of the intelligent drilling equipment. At several marked intervention points, the intelligent intervention of the intelligent equipment includes setting equipment stress adjustment parameters, equipment tension adjustment parameters and equipment shear force adjustment parameters, and then correcting the abnormal stress curve segments by the equipment stress adjustment parameters, correcting the abnormal tension curve segments by the equipment tension adjustment parameters, and correcting the abnormal shear force curve segments by the equipment shear force adjustment parameters.
6. The method for drilling and completing a well in a thick bedrock formation in a coal mine according to claim 5, characterized in that: When the intelligent drilling equipment reaches the target location, it performs completion operations, and after the completion operations, it performs production operations to exploit the coal seam resources at the target location. The process includes: Acquire the completion depth recorded in a drilling completion plan imported by the intelligent drilling equipment, and use the underground area corresponding to the completion depth as the preset target position of the intelligent drilling equipment. When the intelligent drilling equipment reaches the target position, the intelligent drilling equipment performs the completion operation; The construction personnel in the ground area put the completion device and the completion related components required by the completion device into the drilling area. The completion device arranges the completion related components in the wellbore area and the bottom area of the current drilling area according to the preset completion construction manual. When the completion operation is completed, the completion device is recovered to the ground area, and the construction area in the ground area performs a functional integrity check on the completion device. If the functional integrity check is qualified, the completion device is put into storage. If the functional integrity check is unqualified, the equipment maintenance personnel are arranged to perform maintenance operations on the completion device until the functional integrity check of the completion device is qualified, and then the maintenance operation is stopped and the storage operation is performed; When the well completion operation is completed, a coal mine construction well is generated in the coal mine area, a coal mining robot is deployed in the coal mine construction well, the construction parameters of the coal mining robot are set, and the coal mining robot then performs production operations to mine the coal seam resources at the target location through production operations.
7. The method for drilling and completing a well in a thick bedrock formation in a coal mine according to claim 6, characterized in that: The process of monitoring the production process flow, locating abnormal process flow and generating corresponding warning information includes: Obtain several process flows included in the production operation, set process specification information corresponding to several process flows for process flow monitoring. If the process flow does not conform to the corresponding process specification information, the corresponding process flow is identified as an abnormal process flow, and an early warning information corresponding to the abnormal process flow is generated. If the process flow completely conforms to the corresponding process specification information, no operation is performed. The content of the early warning information is: there is an abnormality in the current process flow. All process operation records corresponding to the current abnormal process flow are summarized, and the corresponding process log is generated after data encryption. The process log is sent to the administrator. The administrator decrypts the process log and hands it over to a production team composed of several production operators for data analysis, and then formulates and executes the corresponding operation plan to convert the abnormal process flow into normal.
Citation Information
Patent Citations
Drilling method for petroleum geological exploration
CN112796746A
Methods and systems for improved drilling operations using real-time and historical drilling data
WO2014066981A1