Method, device, electronic equipment and system for charging and swapping of electric logistics vehicles
By optimizing the control model and objective function, the problem of charging and discharging time scheduling of electric logistics vehicles in the "integrated charging and swapping" logistics center was solved, achieving cost reduction and energy efficiency improvement.
Patent Information
- Application Number
- CN202410722525.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-05
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-06-05
AI Technical Summary
The existing technology lacks a charging and swapping scheduling method for "integrated charging and swapping" logistics centers, and cannot effectively schedule the charging and discharging times of different electric logistics vehicles in different logistics centers.
Provide a charging and swapping scheduling method that optimizes and determines the charging and swapping plan for each electric logistics vehicle by obtaining a pre-built optimization control model, including an objective function and objective constraints. The objective function considers charging price, charging speed, and battery swapping. Cost, delay cost and other factors, constraints include battery state of charge, time, charging capacity, etc., to ensure the rationalization of the charging and swapping plan of electric logistics vehicles.
It achieves effective scheduling of the charging and discharging times of different electric logistics vehicles in different logistics centers, reduces charging costs, improves energy utilization efficiency, and balances power supply and demand.
Smart Images

Figure CN118313627B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of electric vehicle power supply, and in particular to a charging and swapping scheduling method, device, electronic equipment and system for electric logistics vehicles. Background Art
[0002] With the rapid development of e-commerce, freight transportation has increased significantly in the past decade. Traditional charging facilities can no longer meet the growing demand for freight transportation. The development of battery technology has also promoted the application of battery swapping technology, improving the convenience and endurance of electric logistics vehicles. The "charging and swapping integrated" logistics center integrates traditional logistics centers, charging piles and battery swapping equipment, allowing electric logistics vehicles to choose different charging methods as needed, thereby improving the flexibility and convenience of charging. In addition, the optimization of charging time for electric logistics vehicles is crucial to maintaining the load balance of the power system and improving energy utilization efficiency. Reasonable arrangement of charging time can reduce grid shock, balance power supply and demand, reduce user charging costs, and improve energy utilization.
[0003] At present, there is still a lack of charging and swapping scheduling methods for "integrated charging and swapping" logistics centers, and it is impossible to effectively schedule the charging and discharging times of different electric logistics vehicles in different logistics centers. Summary of the invention
[0004] The present invention provides a charging and swapping scheduling method, device, electronic equipment and system for electric logistics vehicles to solve the problem that there is currently a lack of charging and swapping scheduling methods for "charging and swapping integrated" logistics centers, and the charging time and discharging time of different electric logistics vehicles in different logistics centers cannot be effectively scheduled.
[0005] In a first aspect, the present invention provides a charging and swapping scheduling method for a logistics system, wherein the logistics system includes a plurality of electric logistics vehicles, a plurality of logistics centers, and an information interaction system, and the charging and swapping scheduling method is applied to the information interaction system, and is characterized in that the charging and swapping scheduling method includes:
[0006] Acquire a pre-built optimization control model, wherein the optimization control model includes target constraints and an objective function;
[0007] Under the target constraint conditions, the target function is optimized, and a charging and battery replacement plan for each of the electric logistics vehicles is determined based on the optimization result;
[0008] Wherein, the objective function is:
[0009]
[0010] In the objective function, i and jRespectively represent the serial numbers of electric logistics vehicles and logistics centers, I and J Represent the collection of electric logistics vehicles and logistics centers respectively, Indicates the sequence number of the time period. Represents a collection of time periods, Indicates i Electric logistics vehicles j Logistics center The charging and battery replacement behavior in a time period, with a value of 1 for charging and a value of 0 for battery replacement. , and Respectively represent i Electric logistics vehicles j The charging price, charging speed and charging time of each logistics center and Indicates i The battery replacement cost and delay cost of an electric logistics vehicle, and Respectively represent i Electric logistics vehicles arrived at j Expected and actual time for each logistics center;
[0011] The output of the objective function is the optimized .
[0012] In some of the embodiments, the target constraints include a first constraint on the battery state of charge of the electric logistics vehicle, a second constraint on time, a third constraint on the charging capacity of the logistics center, and a fourth constraint on each variable in the objective function.
[0013] In some embodiments, the first constraint includes:
[0014] In some of the embodiments, the target constraints include a first constraint on the battery state of charge of the electric logistics vehicle, a second constraint on time, a third constraint on the charging capacity of the logistics center, and a fourth constraint on each variable in the objective function.
[0015] In some embodiments, the first constraint includes:
[0016]
[0017]
[0018]
[0019] in, and Respectively represent i Electric logistics vehicles leave and arrive at j The battery charge status of each logistics center and Respectively represent i The upper and lower limits of the battery state of charge of an electric logistics vehicle, o and d Respectively represent i The origin and destination of electric logistics vehicles, Indicates i Electric logistics vehicles arrived at j +1 logistics center battery charge status, Indicates j logistics center and j +1 distance to a logistics center, and Respectively represent i Energy consumption rate and battery capacity of an electric logistics vehicle.
[0020] In some embodiments, the second constraint includes:
[0021]
[0022]
[0023] in, Indicates i Electric logistics vehicles leave j The time of logistics center, , and Respectively represent i Electric logistics vehicles j The battery replacement time, waiting time, loading and unloading time of each logistics center, Indicates i Electric logistics vehicles arrived at j +1 logistics center time, Indicates j logistics center and j +1 distance to a logistics center, Indicates i The driving speed of an electric logistics vehicle, o Indicates i The starting point of the electric logistics vehicle.
[0024] In some embodiments, the third constraint condition includes:
[0025]
[0026]
[0027]
[0028]
[0029] in, M Indicates variable parameters and , z Represents variable parameters and , Represents a collection of time periods, Indicates i Electric logistics vehicles Whether it reaches the j logistics center, the value is 1 for yes and 0 for no. Indicates i Electric logistics vehicles Is it in the first j The value is 1 for yes and 0 for no. Indicates The preset time node within a time period, Indicates i Electric logistics vehicles j The battery replacement time of each logistics center, Indicates i Electric logistics vehicles Whether it reaches the j The value is 1 for yes and 0 for no. Indicates j The charging capacity of each logistics center, Indicates the proportion of electric logistics vehicles that need battery replacement.
[0030] In some embodiments, the fourth constraint condition includes:
[0031]
[0032] in, and Respectively represent i Electric logistics vehicles j The battery replacement time and waiting time of each logistics center, Indicates i Electric logistics vehicles leave j The time of logistics center, Represents a positive real number.
[0033] In a second aspect, the present invention provides a charging and swapping scheduling device for a logistics system, wherein the logistics system includes a plurality of electric logistics vehicles, a plurality of logistics centers, and an information interaction system, wherein the charging and swapping scheduling device is applied to the information interaction system, and the charging and swapping scheduling device includes:
[0034] A model acquisition module, used to acquire a pre-built optimization control model, wherein the optimization control model includes target constraints and an objective function;
[0035] An optimization control module, used to optimize the objective function under the objective constraint condition, and determine the charging and battery replacement time of each of the electric logistics vehicles based on the optimization result;
[0036] Wherein, the objective function is:
[0037]
[0038] In the objective function, i and j Respectively represent the serial numbers of electric logistics vehicles and logistics centers, I and J Represent the collection of electric logistics vehicles and logistics centers respectively, Indicates the sequence number of the time period. Represents a collection of time periods, Indicates i Electric logistics vehicles j Logistics center The charging and battery replacement behavior in a time period, with a value of 1 for charging and a value of 0 for battery replacement. , and Respectively represent i Electric logistics vehicles j The charging price, charging speed and charging time of each logistics center and Indicates i The battery replacement cost and delay cost of an electric logistics vehicle, and Respectively represent i Electric logistics vehicles arrived at j Expected and actual time for each logistics center;
[0039] The output of the objective function is the optimized .
[0040] In a third aspect, the present invention provides an electronic device, comprising a memory and a processor, wherein the memory stores a computer program, and the processor is configured to run the computer program to execute the charging and swapping scheduling method for the logistics system described in the first aspect.
[0041] In a fourth aspect, the present invention provides an information interaction system for a logistics system, wherein the logistics system includes a plurality of electric logistics vehicles and a plurality of logistics centers, and the information interaction system is configured to execute the charging and swapping scheduling method for the logistics system described in the first aspect to determine the charging and swapping plan for each of the electric logistics vehicles.
[0042] In a fifth aspect, the present invention provides a logistics system, which includes a number of electric logistics vehicles, a number of logistics centers and an information interaction system, and the information interaction system is configured to execute the charging and swapping scheduling method for the logistics system described in the first aspect.
[0043] Compared with the related technology, the present invention provides a charging and swapping scheduling method for the "charging and swapping integrated" logistics center, which can effectively schedule the charging time and discharging time of different electric logistics vehicles in different logistics centers, solving the problem that there is currently a lack of charging and swapping scheduling methods for the "charging and swapping integrated" logistics centers, and it is impossible to effectively schedule the charging time and discharging time of different electric logistics vehicles in different logistics centers.
[0044] Details of one or more embodiments of the present application are set forth in the following drawings and description to make other features, objects, and advantages of the present application more readily apparent. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 is a structural diagram of a logistics system in an embodiment of the present invention;
[0046] Figure 2 is a flow chart of a charging and swapping scheduling method for a logistics system in an embodiment of the present invention;
[0047] Figure 3 It is a structural diagram of the charging and swapping scheduling device of the logistics system in an embodiment of the present invention. DETAILED DESCRIPTION
[0048] In order to more clearly understand the purpose, technical solutions and advantages of the present application, the present application is described and illustrated below in conjunction with the accompanying drawings and embodiments.
[0049] Unless otherwise defined, the technical terms or scientific terms involved in this application shall have the general meaning understood by people with general skills in the technical field to which this application belongs. The words "one", "a", "the", "these" and the like in this application do not indicate a quantitative limitation, and they may be singular or plural. The terms "include", "comprise", "have" and any variants thereof involved in this application are intended to cover non-exclusive inclusions; for example, a process, method and system, product or device comprising a series of steps or modules (units) is not limited to the listed steps or modules (units), but may include unlisted steps or modules (units), or may include other steps or modules (units) inherent to these processes, methods, products or devices. The words "connect", "connected", "coupled" and the like involved in this application are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. The "multiple" involved in this application refers to two or more. "And / or" describes the association relationship of associated objects, indicating that there may be three relationships, for example, "A and / or B" may mean: A exists alone, A and B exist at the same time, and B exists alone. Generally, the character " / " indicates that the objects associated with each other are in an "or" relationship. The terms "first", "second", "third", etc. in this application are only used to distinguish similar objects and do not represent a specific ordering of the objects.
[0050] In an embodiment of the present invention, a charging and swapping scheduling method for a logistics system is provided.
[0051] Figure 1 is a structural diagram of the logistics system in the embodiment of the present invention, referring to Figure 1 ,The logistics system includes several electric logistics vehicles, several logistics centers and an ,information interaction system, and the charging and swapping scheduling method is applied to the ,information interaction system.
[0052] Figure 2 is a flow chart of a charging and swapping scheduling method for a logistics system in an embodiment of the present invention. Figure 2 As shown, the process includes step S110 and step S120.
[0053] Step S110, obtaining a pre-built optimization control model, where the optimization control model includes target constraints and an objective function.
[0054] Step S120, optimizing the objective function under the target constraint condition, and determining the charging and battery replacement plan for each electric logistics vehicle based on the optimization result.
[0055] Among them, the objective function is:
[0056]
[0057] In the objective function, i and j Respectively represent the serial numbers of electric logistics vehicles and logistics centers, I and J Represent the collection of electric logistics vehicles and logistics centers respectively, Indicates the sequence number of the time period. Represents a collection of time periods, Indicates i Electric logistics vehicles j Logistics center The charging and battery replacement behavior in a time period, with a value of 1 for charging and a value of 0 for battery replacement. , and Respectively represent i Electric logistics vehicles j The charging price, charging speed and charging time of each logistics center and Indicates i The battery replacement cost and delay cost of an electric logistics vehicle, and Respectively represent i Electric logistics vehicles arrived at j The expected time and actual time of a logistics center. In the process of cargo transportation, there is an agreed delivery time, which is the expected time for the electric logistics vehicle to arrive at the logistics center. If the vehicle does not arrive according to the agreed delivery time, a delay will occur, resulting in delay costs.
[0058] The output of the objective function is the optimized By optimizing the objective function, we can obtain the corresponding electric logistics vehicles, logistics centers and time periods. The value of .
[0059] The charging and swapping scheme of electric logistics vehicles includes information such as the charging and swapping time and location of the electric logistics vehicles. It can be specifically expressed as:
[0060]
[0061] Among them, each element is the output of the objective function. For example, It means that the first electric logistics vehicle changes its battery in the first time period of the first logistics center. Indicates that the first electric logistics vehicle m Logistics center n Charging in a certain time period, Indicates The electric logistics vehicles were charged in the first time period at the first logistics center. Indicates Electric logistics vehicles m Logistics center n Charge in a certain period of time.
[0062] The above objective function calculates the total cost of charging and swapping of all electric logistics vehicles. By optimizing the objective function, a charging and swapping solution with the lowest total cost can be obtained. Therefore, the present invention provides a charging and swapping scheduling method for an "integrated charging and swapping" logistics center, which can effectively schedule the charging time and discharge time of different electric logistics vehicles in different logistics centers, solving the problem that there is currently a lack of charging and swapping scheduling methods for "integrated charging and swapping" logistics centers, and it is impossible to effectively schedule the charging time and discharge time of different electric logistics vehicles in different logistics centers.
[0063] In order to obtain a more reasonable charging and swapping solution or one that meets specific conditions, it is necessary to introduce target constraints and optimize the objective function while meeting the target constraints.
[0064] In some of the embodiments, the target constraints include a first constraint on the battery state of charge of the electric logistics vehicle, a second constraint on time, a third constraint on the charging capacity of the logistics center, and a fourth constraint on each variable in the objective function.
[0065] The first constraint condition includes:
[0066]
[0067]
[0068]
[0069] in, and Respectively represent i Electric logistics vehicles leave and arrive at j The battery charge status of each logistics center and Respectively represent i The upper and lower limits of the battery state of charge of an electric logistics vehicle, o and d Respectively represent i The origin and destination of electric logistics vehicles, Indicates i Electric logistics vehicles arrived at j +1 logistics center battery charge status, Indicatesj logistics center and j +1 distance to a logistics center, and Respectively represent i Energy consumption rate and battery capacity of an electric logistics vehicle.
[0070] In the first constraint, the first constraint and the second constraint ensure that the battery charge state of the electric logistics vehicle must always remain within the constraint range. The first constraint is to ensure battery health and extend battery life; the third constraint is the change process constraint of the battery state of charge of the electric logistics vehicle in the logistics center; the fourth constraint is the discharge process constraint of the electric logistics vehicle.
[0071] The second constraint includes:
[0072]
[0073]
[0074] in, Indicates i Electric logistics vehicles leave j The time of logistics center, , and Respectively represent i Electric logistics vehicles j The battery replacement time, waiting time, loading and unloading time of each logistics center, Indicates i Electric logistics vehicles arrived at j +1 logistics center time, Indicates j logistics center and j +1 distance to a logistics center, Indicates i The driving speed of an electric logistics vehicle, o Indicates i The origin of the electric logistics vehicle. Among them, the loading and unloading time refers to the time in the process of logistics transportation when the vehicle arrives at the logistics center and needs to unload the goods on the vehicle and load the goods to be transported to the next station.
[0075] In the second constraint condition, the first constraint is the time change process constraint of the electric logistics vehicle in the logistics center; the second constraint is the loading and unloading time constraint of the electric logistics vehicle in the logistics center; the third constraint is the time change process constraint of the electric logistics vehicle from the previous logistics center to the next logistics center.
[0076] The third constraint includes:
[0077]
[0078]
[0079]
[0080]
[0081] in, M Represents variable parameters and , z Represents variable parameters and , Represents a collection of time periods, Indicates i Electric logistics vehicles Whether it reaches the j logistics center, the value is 1 for yes and 0 for no. Indicates i Electric logistics vehicles Is it in the first j The value is 1 for yes and 0 for no. Indicates The preset time node within a time period, Indicates i Electric logistics vehicles j The battery replacement time of each logistics center, Indicates i Electric logistics vehicles Whether it reaches the j The value is 1 for yes and 0 for no. Indicates j The charging capacity of each logistics center, Indicates the proportion of electric logistics vehicles that need battery replacement.
[0082] In the third constraint, the first constraint is the time constraint for the electric logistics vehicle to arrive at the logistics center. When the electric logistics vehicle arrives at the logistics center before the preset time node, it is considered that the electric logistics vehicle has arrived at the logistics center within the corresponding time period; the second constraint is the charging time constraint for the electric logistics vehicle at the logistics center; the third constraint means that if and only if and If both are 1, then is 1, that is, the electric logistics vehicle arrives at the logistics center and charges and replaces the battery; the fourth constraint is used to constrain the cumulative number of electric logistics vehicles charged and replaced by the logistics center within the corresponding time period to not exceed the charging station capacity of the logistics center; the fifth constraint is used to constrain the number of electric logistics vehicles that replace the battery to not exceed the specified ratio.
[0083] The fourth constraint condition includes:
[0084]
[0085] in, and Respectively represent i Electric logistics vehicles j The battery replacement time and waiting time of each logistics center, Indicates i Electric logistics vehicles leave j The time of logistics center, Represents a collection of time periods, Represents a positive real number.
[0086] It should be noted that, through the variables in the objective function and the objective constraints, it can be seen that in the calculation process of the optimization control model, relevant information about the electric logistics vehicles and logistics centers is needed.
[0087] Specifically, it includes the starting location, driving speed and battery capacity of the electric logistics vehicle, the battery charge state of the electric logistics vehicle from the starting location, the battery charge state of the electric logistics vehicle when it arrives at the destination, the expected time for the electric logistics vehicle to arrive at the logistics center, the battery charge state of the electric logistics vehicle when it arrives at the logistics center, the time when the electric logistics vehicle arrives at the logistics center, the battery charge state of the electric logistics vehicle when it leaves the logistics center, the time when the electric logistics vehicle leaves the logistics center, the charging time of the electric logistics vehicle at the logistics center, the waiting time of the electric logistics vehicle at the logistics center, the charging speed of the electric logistics vehicle at the logistics center, the distance from the previous logistics center to the next logistics center, and the energy consumption rate of the electric logistics vehicle. In addition, the charging station capacity of the logistics center and the proportion of electric logistics vehicles that are replaced by batteries.
[0088] Therefore, before the information interaction system executes the charging and swapping scheduling method provided by the present invention, it will obtain the above information.
[0089] In an embodiment of the present invention, a charging and swapping scheduling device for a logistics system is also provided. The logistics system includes a number of electric logistics vehicles, a number of logistics centers and an information interaction system, and the charging and swapping scheduling device is applied to the information interaction system. The device is used to implement the above-mentioned embodiments and preferred implementation modes, and those that have been explained will not be repeated. The terms "module", "unit", "sub-unit", etc. used below can implement a combination of software and / or hardware for predetermined functions. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceived.
[0090] Figure 3 is a structural diagram of a charging and swapping scheduling device for a logistics system in an embodiment of the present invention. Figure 3 , the charging and swapping scheduling device includes:
[0091] A model acquisition module is used to acquire a pre-built optimization control model, where the optimization control model includes target constraints and an objective function;
[0092] The optimization control module is used to optimize the objective function under the target constraint conditions and determine the charging and battery replacement time of each electric logistics vehicle based on the optimization results;
[0093] Among them, the objective function is:
[0094]
[0095] In the objective function, i and j Respectively represent the serial numbers of electric logistics vehicles and logistics centers, I and J Represent the collection of electric logistics vehicles and logistics centers respectively, Indicates the sequence number of the time period. Represents a collection of time periods, Indicates i Electric logistics vehicles j Logistics center The charging and battery replacement behavior in a time period, with a value of 1 for charging and a value of 0 for battery replacement. , and Respectively represent i Electric logistics vehicles j The charging price, charging speed and charging time of each logistics center and Indicates i The battery replacement cost and delay cost of an electric logistics vehicle, and Respectively represent iElectric logistics vehicles arrived at j Expected and actual time for each logistics center;
[0096] The output of the objective function is the optimized .
[0097] The above-mentioned charging and swapping scheduling device can obtain the charging and swapping scheme with the lowest total charging and swapping cost by optimizing the objective function. Therefore, the present invention provides a charging and swapping scheduling device for an "integrated charging and swapping" logistics center, which can effectively schedule the charging time and discharging time of different electric logistics vehicles in different logistics centers, solving the problem that there is currently a lack of charging and swapping scheduling methods for "integrated charging and swapping" logistics centers, and it is impossible to effectively schedule the charging time and discharging time of different electric logistics vehicles in different logistics centers.
[0098] It should be noted that the above modules can be functional modules or program modules, and can be implemented by software or hardware. For modules implemented by hardware, the above modules can be located in the same processor; or the above modules can be located in different processors in any combination.
[0099] The present invention also provides an electronic device, including a memory and a processor, wherein a computer program is stored in the memory, and the processor is configured to run the computer program to execute the charging and swapping scheduling method for the logistics system provided by the present invention.
[0100] The present invention also provides an information interaction system for a logistics system, the logistics system includes a number of electric logistics vehicles and a number of logistics centers, and the information interaction system is configured to execute the charging and swapping scheduling method for the logistics system provided by the present invention to determine the charging and swapping plan for each electric logistics vehicle.
[0101] The present invention also provides a logistics system, which includes a number of electric logistics vehicles, a number of logistics centers and an information interaction system. The information interaction system is configured to execute the charging and swapping scheduling method for the logistics system provided by the present invention.
[0102] It should be understood that the specific embodiments described herein are only used to explain the application, rather than to limit it. Based on the embodiments provided in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the protection scope of this application.
[0103] Obviously, the drawings are only some examples or embodiments of the present application. For ordinary technicians in the field, the present application can also be applied to other similar situations based on these drawings without creative work. In addition, it is understandable that although the work done in this development process may be complicated and lengthy, for ordinary technicians in the field, certain changes in design, manufacturing or production based on the technical content disclosed in this application are only conventional technical means and should not be regarded as insufficient content disclosed in this application.
Claims
1. A charging and swapping scheduling method for a logistics system, wherein the logistics system includes a plurality of electric logistics vehicles, a plurality of logistics centers, and an information interaction system, and the charging and swapping scheduling method is applied to the information interaction system, characterized in that: The charging and swapping scheduling method comprises: Acquire a pre-built optimization control model, wherein the optimization control model includes target constraints and an objective function; Under the target constraint conditions, the target function is optimized, and a charging and battery replacement plan for each of the electric logistics vehicles is determined based on the optimization results; Wherein, the objective function is: , In the objective function, i and j Respectively represent the serial numbers of electric logistics vehicles and logistics centers, I and J Represent the collection of electric logistics vehicles and logistics centers respectively, Indicates the sequence number of the time period. Represents a collection of time periods, Indicates i Electric logistics vehicles j Logistics center The charging and battery replacement behavior in a time period, with a value of 1 for charging and a value of 0 for battery replacement. , and Respectively represent i Electric logistics vehicles j The charging price, charging speed and charging time of each logistics center and Indicates i The battery replacement cost and delay cost of an electric logistics vehicle, and Respectively represent i Electric logistics vehicles arrived at j Expected and actual time for each logistics center; The output of the objective function is a charging and swapping solution with the lowest total charging and swapping cost; The expected time for the electric logistics vehicle to arrive at the logistics center is the agreed delivery time during the transportation of the goods; The target constraints include a first constraint on the battery state of charge of the electric logistics vehicle, a second constraint on time, a third constraint on the charging capacity of the logistics center, and a fourth constraint on each variable in the target function; The first constraint condition includes: , , , in, and Respectively represent i Electric logistics vehicles leave and arrive at j The battery charge status of each logistics center and Respectively represent i The upper and lower limits of the battery state of charge of an electric logistics vehicle, o and d Respectively represent i The origin and destination of electric logistics vehicles, Indicates i Electric logistics vehicles arrived at j +1 logistics center battery charge status, Indicates j logistics center and j +1 distance to a logistics center, and Respectively represent i Energy consumption rate and battery capacity of electric logistics vehicles; The second constraint condition includes: , , in, Indicates i Electric logistics vehicles leave j The time of logistics center, , and Respectively represent i Electric logistics vehicles j The battery replacement time, waiting time, loading and unloading time of each logistics center, Indicates i Electric logistics vehicles arrived at j +1 logistics center time, Indicates j logistics center and j +1 distance to a logistics center, Indicates i The driving speed of an electric logistics vehicle, o Indicates i The origin of electric logistics vehicles; The third constraint condition includes: , , , , in, M Indicates variable parameters and , z Indicates variable parameters and , Represents a collection of time periods, Indicates i Electric logistics vehicles Whether it reaches the j logistics center, the value is 1 for yes and 0 for no. Indicates i Electric logistics vehicles Is it in the first j The value is 1 for yes and 0 for no. Indicates The preset time node within a time period, Indicates i Electric logistics vehicles j The battery replacement time of each logistics center, Indicates i Electric logistics vehicles Whether it reaches the j The value is 1 for yes and 0 for no. Indicates j The charging capacity of each logistics center, Indicates the proportion of electric logistics vehicles that need battery replacement; The fourth constraint condition includes: , in, and Respectively represent i Electric logistics vehicles j The battery replacement time and waiting time of each logistics center, Indicates i Electric logistics vehicles leave j The time of logistics center, Represents a positive real number.
2. A charging and swapping scheduling device for a logistics system, the logistics system comprising a plurality of electric logistics vehicles, a plurality of logistics centers and an information interaction system, the charging and swapping scheduling device being applied to the information interaction system, characterized in that: The charging and swapping scheduling device comprises: A model acquisition module, used to acquire a pre-built optimization control model, wherein the optimization control model includes target constraints and an objective function; An optimization control module, used to optimize the objective function under the objective constraint condition, and determine the charging and battery replacement time of each of the electric logistics vehicles based on the optimization result; Wherein, the objective function is: , In the objective function, i and j Respectively represent the serial numbers of electric logistics vehicles and logistics centers, I and J Respectively represent the collection of electric logistics vehicles and logistics centers, Indicates the sequence number of the time period. Represents a collection of time periods, Indicates i Electric logistics vehicles j Logistics center The charging and battery replacement behavior in a time period, with a value of 1 for charging and a value of 0 for battery replacement. , and Respectively represent i Electric logistics vehicles j The charging price, charging speed and charging time of each logistics center and Indicates i The battery replacement cost and delay cost of an electric logistics vehicle, and Respectively represent i Electric logistics vehicles arrived at j Expected and actual time for each logistics center; The output of the objective function is a charging and swapping solution with the lowest total charging and swapping cost; The expected time for the electric logistics vehicle to arrive at the logistics center is the agreed delivery time during the transportation of the goods; The target constraints include a first constraint on the battery state of charge of the electric logistics vehicle, a second constraint on time, a third constraint on the charging capacity of the logistics center, and a fourth constraint on each variable in the target function; The first constraint condition includes: , , , in, and Respectively represent i Electric logistics vehicles leave and arrive at j The battery charge status of each logistics center and Respectively represent i The upper and lower limits of the battery state of charge of an electric logistics vehicle, o and d Respectively represent i The origin and destination of electric logistics vehicles, Indicates i Electric logistics vehicles arrived at j +1 logistics center battery charge status, Indicates j logistics center and j +1 distance to a logistics center, and Respectively represent i Energy consumption rate and battery capacity of electric logistics vehicles; The second constraint condition includes: , , in, Indicates i Electric logistics vehicles leave j The time of logistics center, , and Respectively represent i Electric logistics vehicles j The battery replacement time, waiting time, loading and unloading time of each logistics center, Indicates i Electric logistics vehicles arrived at j +1 logistics center time, Indicates j logistics center and j +1 distance to a logistics center, Indicates i The driving speed of an electric logistics vehicle, o Indicates i The origin of electric logistics vehicles; The third constraint condition includes: , , , , in, M Represents variable parameters and , z Indicates variable parameters and , Represents a collection of time periods, Indicates i Electric logistics vehicles Whether it reaches the j logistics center, the value is 1 for yes and 0 for no. Indicates i Electric logistics vehicles Is it in the first j The value is 1 for yes and 0 for no. Indicates The preset time node within a time period, Indicates i Electric logistics vehicles j The battery replacement time of each logistics center, Indicates i Electric logistics vehicles Whether it reaches the j The value is 1 for yes and 0 for no. Indicates j The charging capacity of each logistics center, Indicates the proportion of electric logistics vehicles that need battery replacement; The fourth constraint condition includes: , in, and Respectively represent i Electric logistics vehicles j The battery replacement time and waiting time of each logistics center, Indicates i Electric logistics vehicles leave j The time of logistics center, Represents a positive real number.
3. An electronic device comprising a memory and a processor, characterized in that: A computer program is stored in the memory, and the processor is configured to run the computer program to execute the charging and swapping scheduling method for the logistics system according to claim 1.
4. An information interaction system of a logistics system, the logistics system comprising a plurality of electric logistics vehicles and a plurality of logistics centers, characterized in that: The information interaction system is configured to execute the charging and swapping scheduling method for the logistics system described in claim 1 to determine the charging and swapping plan for each of the electric logistics vehicles.
5. A logistics system, comprising a plurality of electric logistics vehicles, a plurality of logistics centers and an information interaction system, characterized in that: The information interaction system is configured to execute the charging and swapping scheduling method for the logistics system according to claim 1.
