A risk monitoring and assessment method for smart construction sites

By acquiring and analyzing construction site information, calculating risk level thresholds, and monitoring the construction site environment and construction parameters in real time, the problem of ineffective risk monitoring in smart construction sites is solved, and construction safety and monitoring accuracy are improved.

CN118313670BActive Publication Date: 2024-10-11NANJING TECH UNIV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410734456.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2024-10-11
Estimated Expiration
2044-06-07

AI Technical Summary

Technical Problem

Existing smart construction sites cannot effectively monitor risks during the construction process, resulting in potential safety hazards.

Method used

By acquiring and analyzing construction site information, risk level thresholds are calculated, risk judgments are made based on these thresholds, and instructions are monitored and issued in real time to improve construction safety.

Benefits of technology

It improves the accuracy of construction site risk monitoring, reduces safety hazards during the construction process, and ensures the rationality of the construction site environment and construction parameters.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118313670B_ABST
    Figure CN118313670B_ABST
Patent Text Reader

Abstract

The present invention provides a smart construction site risk monitoring and assessment method, which relates to the technical field of construction site risk monitoring, and is specifically as follows: receiving construction site information, and transmitting the received construction site information to an information analysis module; analyzing the construction site information to obtain environmental data and construction site data, transmitting the environmental data and construction site data to a data calculation module for calculation to obtain construction site risk reference data and environmental risk reference data, receiving the construction site risk reference data to perform risk level classification to obtain a construction site risk level threshold, the information analysis module receives the environmental risk reference data to perform risk level classification to obtain an environmental risk level threshold; transmitting the differentiated risk level threshold to a risk judgment module, and performing risk judgment through the risk level threshold; the present invention obtains and analyzes the construction site information during the construction process of the construction site, and obtains the construction site information in real time to judge the safety of the construction site.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of construction site risk monitoring, and in particular to a smart construction site risk monitoring and assessment method. Background Art

[0002] A smart construction site refers to the use of information technology to establish an information ecosystem for construction projects that is interconnected, collaborative, intelligently produced, and scientifically managed. This data is then combined with engineering information collected through the Internet of Things for data mining and analysis in a virtual reality environment to provide process trend forecasts and expert plans, and to achieve visual and intelligent management of engineering construction, so as to improve the level of information technology in engineering management and gradually achieve green and ecological construction.

[0003] During the construction process of existing smart construction sites, the environmental information on the construction site and the solidification speed of the building have a significant impact on the construction progress and construction safety. During the construction process of the construction site, it is impossible to remotely obtain and analyze the construction information generated during the construction process, and to monitor the risks during the construction process of the construction site, which leads to certain safety hazards during the construction process of the construction site. Therefore, there is a lack of a risk monitoring and assessment method for smart construction sites to solve the above problems. Summary of the invention

[0004] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a smart construction site risk monitoring and assessment method, which can acquire site information during the construction process of the site, analyze the site environment information and the site construction information based on the site information, obtain the site construction parameters and the site environment parameters, calculate and obtain the risk level threshold based on the site construction parameters and the site environment parameters, and make risk judgments based on the risk level threshold to solve the problem that the existing risk monitoring cannot be carried out during the construction process of the site, resulting in certain safety hazards during the construction process of the site.

[0005] In order to achieve the above object, the present invention is implemented through the following technical solution: a smart construction site risk monitoring and assessment method, the method comprising the following steps:

[0006] Step S1: receiving construction site information, and transmitting the received construction site information to an information analysis module. The information analysis module analyzes the construction site information to obtain environmental data and construction site data, and transmits the environmental data and construction site data to a data calculation module.

[0007] Step S2: The data calculation module calculates and obtains the construction site risk reference data and the environmental risk reference data based on the environmental data and the construction site data. The information analysis module receives the construction site risk reference data to classify the risk levels and obtains the construction site risk level threshold. The information analysis module receives the environmental risk reference data to classify the risk levels and obtains the environmental risk level threshold.

[0008] Step S3: The differentiated risk level threshold is transmitted to the risk judgment module, and the risk judgment module performs risk judgment based on the risk level threshold;

[0009] Step S4: The construction site information monitoring module acquires the construction site information, and calculates the real-time construction site risk parameters and real-time environmental risk parameters through the data calculation module;

[0010] Step S5: The risk judgment module judges the real-time risk level based on the real-time construction site risk parameters and the real-time environmental risk parameters, and transmits the real-time risk level to the instruction issuing module, which issues different instructions based on the risk level.

[0011] Furthermore, in step S1, the construction site information includes construction site environment information and construction site construction information, and the construction site environment information includes temperature value, humidity value, dust concentration value and working wind speed value;

[0012] The construction site information includes wall solidification information, work progress information, and mud and sand mixing information;

[0013] The construction site environment information and construction site construction information are transmitted to the information analysis module.

[0014] Furthermore, in step S1, the information analysis module receives the construction site information and performs analysis as follows:

[0015] Obtain the wall solidification information of the corresponding time period according to the multiple temperature average values ​​and the multiple humidity average values ​​after the arrangement is completed, and obtain the wall solidification hardness value after a set of temperature average values ​​and humidity average values ​​are placed according to the wall solidification information; thereby obtaining multiple wall solidification hardness values;

[0016] Generate a temperature reference curve and a humidity reference curve in a plane rectangular coordinate system according to multiple temperature average values ​​and multiple humidity average values, generate a solidification hardness reference curve through multiple wall solidification hardness values, select the temperature average value and humidity average value corresponding to the highest point of the solidification hardness reference curve, define the temperature average value at this position as the standard temperature value, define the humidity average value at this position as the standard humidity value, and transmit the obtained temperature average value, humidity average value, wall solidification hardness value, standard temperature value and standard humidity value to a data calculation module;

[0017] The information analysis module obtains the corresponding work progress value in the work progress information based on the average dust concentration value and the average working wind speed value, generates a work progress curve in the plane rectangular coordinate system according to the obtained work progress, obtains the highest point of the work progress curve according to the rising and falling conditions, defines the work progress value corresponding to the highest point as the optimal progress value, obtains the average dust concentration value and the average working wind speed value corresponding to the optimal progress value, defines the corresponding average dust concentration value as the optimal dust value, defines the corresponding average working wind speed value as the optimal wind speed value, and transmits the optimal dust value and the optimal wind speed value to the data calculation module.

[0018] Furthermore, the sediment information in the construction site information is analyzed, and the sediment ratio when the sediment is mixed is obtained through the sediment mixing information to obtain the sediment ratio value. The analysis is performed based on the sediment ratio value. The specific analysis is as follows:

[0019] When the sediment is mixed, the proportion of the sediment ratio is changed, and after being mixed with water, it solidifies to form a plurality of sediment detection blocks, and each sediment ratio is recorded to obtain a plurality of sediment ratio values;

[0020] Impacting multiple sediment detection blocks, acquiring the impact force when each sediment detection block is broken, and obtaining multiple impact force values;

[0021] Arrange multiple impact force values ​​in ascending order to obtain the maximum impact force value, and define the sediment ratio value corresponding to the maximum impact force value as the standard sediment ratio value;

[0022] The standard sediment ratio value is transmitted to the server, and when the sediment is mixed, the sediment is mixed according to the mixing ratio of the standard sediment ratio value;

[0023] The standard temperature value, standard humidity value, optimal dust value and optimal wind speed value are defined as environmental data, the wall solidification hardness value and the standard mud-sand ratio value are defined as site data, and the site data and environmental data are transmitted to the data calculation module.

[0024] Furthermore, the data calculation module receives the best dust value and the best wind speed value to obtain the progress reference value, and sets the progress reference value as: JDCKz;

[0025] The data calculation module receives the standard temperature value and the standard humidity value and combines the progress reference value to obtain the risk level reference value, and sets the risk level reference value to: FXCKz;

[0026] The risk level reference value is transmitted to the information analysis module, and the information analysis module classifies the risk levels based on the obtained risk level reference value. The specific risk level classification is as follows:

[0027] If the risk level reference value obtained is in the interval [3×FXCKz / 4,5×FXCKz / 4), it is the first environmental risk level threshold;

[0028] If the risk level reference value obtained is in the range of [FXCKz / 2,3×FXCKz / 4) and [5×FXCKz / 4,5×FXCKz / 4), it is the second environmental risk level threshold;

[0029] If the risk level reference value obtained is in the interval of (0, FXCKz / 2) or [5×FXCKz / 4, ∞), it is the third environmental risk level threshold;

[0030] The data calculation module receives the standard temperature value, the standard humidity value, the wall solidification hardness value, the temperature average value and the humidity average value to obtain the wall solidification reference value; the wall solidification reference value is set to: QTNGCKz;

[0031] The obtained wall solidification reference value is transmitted to the information analysis module, and the information analysis module divides the risk level based on the wall solidification reference value. The specific division is as follows:

[0032] If the wall solidification reference value is within the interval of (3×QTNGCKz / 4,QTNGCKz], it is the first construction site risk level threshold;

[0033] If the wall solidification reference value is in the interval of (2×QTNGCKz / 4,3×QTNGCKz / 4], it is the second construction site risk level threshold;

[0034] If the wall solidification reference value is in the interval of (QTNGCKz / 4,2×QTNGCKz / 4], it is the third construction site risk level threshold;

[0035] The divided first environment risk level threshold, the second environment risk level threshold, the third environment risk level threshold, the first construction site risk level threshold, the second construction site risk level threshold and the third construction site risk level threshold are uniformly defined as risk level thresholds; and the risk level thresholds are transmitted to the risk judgment module.

[0036] Further, the risk judgment module receives a first environmental risk level threshold value among the risk level threshold values, and judges that in this environment, it is suitable for the construction site workers to work, and the workers are highly efficient;

[0037] The risk judgment module receives the second environmental risk level threshold in the risk level threshold, and judges that under this environment, the working environment of the construction site workers is normal and the workers' efficiency is qualified;

[0038] The risk judgment module receives the third environmental risk level threshold in the risk level threshold, and judges that it is not suitable for the construction site workers to work in this environment, and the workers have low efficiency;

[0039] The risk judgment module receives the first construction site risk level threshold in the risk level threshold, and judges that in this environment, the wall solidification speed is fast, and it is suitable to continue the wall work after the work is completed and cooled for one day;

[0040] The risk judgment module receives the second construction site risk level threshold in the risk level threshold, and judges that in this environment, the wall solidification speed is general, and after the work is completed and cooled for one day, the wall needs to be supported and fixed before work can be performed on the wall; the risk judgment module receives the third construction site risk level threshold in the risk level threshold, and judges that in this environment, the wall solidification speed is slow, and after the work is completed and cooled for one day, work cannot be performed on the wall.

[0041] Beneficial effects of the present invention: The present invention acquires construction site information during construction, analyzes construction site environment information and construction site information based on the construction site information, obtains construction site parameters and construction site environment parameters, calculates and obtains risk level thresholds based on the construction site parameters and construction site environment parameters, makes risk judgments based on the risk level thresholds, and judges the safety of construction site by acquiring construction site information in real time;

[0042] The present invention performs risk judgment on multiple risk level thresholds obtained through a risk judgment module. When obtaining real-time risk parameters calculated from construction site information, effective judgment is performed based on the risk interval in which the real-time risk parameters are located, thereby improving the accuracy of construction site risk monitoring.

[0043] Advantages of additional aspects of the present invention will be given in part in the description of the following specific embodiments, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:

[0045] Figure 1 A principle block diagram of a smart construction site risk monitoring and assessment method of the present invention;

[0046] Figure 2 A method step diagram of a smart construction site risk monitoring and assessment method of the present invention. DETAILED DESCRIPTION

[0047] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0048] It should be noted that the terms used herein are for describing specific embodiments only and are not intended to be limiting of exemplary embodiments according to the present invention.

[0049] In the absence of conflict, the embodiments of the present invention and the features of the embodiments may be combined with each other.

[0050] Example 1, please refer to Figure 1 and Figure 2 As shown, a smart construction site risk monitoring and assessment method; the monitoring and assessment method includes a construction site information acquisition module, an information analysis module, a risk judgment module, an instruction issuing module, a data calculation module and a construction site information monitoring module, which are respectively connected to the server data;

[0051] The specific scheme is as follows: the construction site information acquisition module receives the construction site information and transmits the received construction site information to the information analysis module;

[0052] The construction site information includes the construction site environment information and the construction site construction information. The construction site environment information includes the temperature value, humidity value, dust concentration value and working wind speed value;

[0053] The construction site information includes wall solidification information, work progress information, and mud and sand mixing information;

[0054] The construction site environment information and construction site construction information are transmitted to the information analysis module.

[0055] The information analysis module analyzes the construction site information to obtain environmental data and construction site data, and transmits the environmental data and construction site data to the data calculation module;

[0056] The information analysis module receives the construction site environment information and performs analysis as follows:

[0057] Obtain the construction site environment information and construction site information in the same time period in the four seasons of the year, define the same time period as T time period, and define the four season time periods as T1, T2, T3, and T4 respectively;

[0058] Respectively obtain the daily average values ​​of the temperature value, the daily average value of the humidity value, the daily average value of the dust concentration value, and the daily average value of the working wind speed value in the construction site environment information during the time periods T1, T2, T3, and T4, and obtain multiple temperature average values, multiple humidity average values, multiple dust concentration average values, and multiple working wind speed average values;

[0059] Arrange the obtained average temperature values ​​in ascending order, and arrange the average humidity values, average dust concentration values, and average working wind speed values ​​corresponding to the average temperature values ​​accordingly;

[0060] The information analysis module receives the construction site information and analyzes it as follows:

[0061] Obtain the wall solidification information of the corresponding time period according to the multiple temperature average values ​​and the multiple humidity average values ​​after the arrangement is completed, and obtain the wall solidification hardness value after a set of temperature average values ​​and humidity average values ​​are placed according to the wall solidification information; thereby obtaining multiple wall solidification hardness values;

[0062] A temperature reference curve and a humidity reference curve are generated in a plane rectangular coordinate system according to multiple temperature average values ​​and multiple humidity average values, a solidification hardness reference curve is generated according to multiple wall solidification hardness values, the temperature average value and humidity average value corresponding to the highest point of the solidification hardness reference curve are selected, the temperature average value at this position is defined as the standard temperature value, the humidity average value at this position is defined as the standard humidity value, and the obtained temperature average value, humidity average value, wall solidification hardness value, standard temperature value and standard humidity value are transmitted to a data calculation module.

[0063] The information analysis module obtains the corresponding work progress value in the work progress information based on the average dust concentration value and the average working wind speed value, generates a work progress curve in the plane rectangular coordinate system according to the obtained work progress, obtains the highest point of the work progress curve according to the rising and falling conditions, defines the work progress value corresponding to the highest point as the optimal progress value, obtains the average dust concentration value and the average working wind speed value corresponding to the optimal progress value, defines the corresponding average dust concentration value as the optimal dust value, defines the corresponding average working wind speed value as the optimal wind speed value, and transmits the optimal dust value and the optimal wind speed value to the data calculation module.

[0064] It should be noted that the work progress is expressed in the form of percentage or thousandths. If 1% of the work is completed, it will be represented by the number 1.

[0065] The sediment ratio during sediment mixing is obtained through sediment mixing information, and the sediment ratio value is obtained. The analysis is based on the sediment ratio value. The specific analysis is as follows:

[0066] When the sediment is mixed, the proportion of the sediment ratio is changed, and after being mixed with water, it solidifies to form a plurality of sediment detection blocks, and each sediment ratio is recorded to obtain a plurality of sediment ratio values;

[0067] Impacting multiple sediment detection blocks, acquiring the impact force when each sediment detection block is broken, and obtaining multiple impact force values;

[0068] Arrange multiple impact force values ​​in ascending order to obtain the maximum impact force value, and define the sediment ratio value corresponding to the maximum impact force value as the standard sediment ratio value;

[0069] The standard sediment ratio value is transmitted to the server, and when the sediment is mixed, the sediment is mixed according to the mixing ratio of the standard sediment ratio value.

[0070] Among them, the standard temperature value, standard humidity value, optimal dust value and optimal wind speed value are defined as environmental data, and the wall solidification hardness value and standard mud and sand ratio value are defined as construction site data.

[0071] The data calculation module calculates and obtains the construction site risk reference data and the environmental risk reference data based on the environmental data and the construction site data. The information analysis module receives the construction site risk reference data to classify the risk levels and obtains the construction site risk level threshold. The information analysis module receives the environmental risk reference data to classify the risk levels and obtains the environmental risk level threshold.

[0072] The data calculation module receives the best dust value and the best wind speed value to obtain the progress reference value, and sets the progress reference value to: JDCKz; the best dust value to: ZJFCz; the best wind speed value to: ZJFSz;

[0073] Please refer to the following formula for details:

[0074] JDCKz=(ZJFSz×K) / ZJFCz;

[0075] It should be noted that K is a balance coefficient, which is used to balance the numerical value of the progress reference value;

[0076] The data calculation module receives the standard temperature value and the standard humidity value and combines the progress reference value to obtain the risk level reference value. The risk level reference value is set to: FXCKz; the standard temperature value is: BZWDz; the standard humidity value is: BZSDz;

[0077] Please refer to the following formula for specific calculation:

[0078] FXCKz=Ka×BZWDz×JDCKz / BZSDz;

[0079] It should be noted that Ka is a balance coefficient, which is used to balance the value of the risk level reference value;

[0080] The risk level reference value is transmitted to the information analysis module, and the information analysis module classifies the risk levels based on the obtained risk level reference value. The specific risk level classification is as follows:

[0081] If the risk level reference value obtained is in the interval [3×FXCKz / 4,5×FXCKz / 4), it is the first environmental risk level threshold;

[0082] If the risk level reference value obtained is in the range of [FXCKz / 2,3×FXCKz / 4) and [5×FXCKz / 4,5×FXCKz / 4), it is the second environmental risk level threshold;

[0083] If the risk level reference value obtained is in the interval of (0, FXCKz / 2) or [5×FXCKz / 4, ∞), it is the third environmental risk level threshold;

[0084] The data calculation module receives the standard temperature value, the standard humidity value, the wall solidification hardness value, the temperature average value and the humidity average value to obtain the wall solidification reference value;

[0085] Set the wall solidification reference value to: QTNGCKz; the wall solidification hardness value to: QTNGYDz; the temperature average value to: WDPJz; the humidity average value to: SDPJz;

[0086] To obtain the reference value of wall solidification, please refer to the following steps:

[0087] ;

[0088] It should be noted that Ks is the balance coefficient, which is used to balance the value range of the wall solidification reference value;

[0089] The obtained wall solidification reference value is transmitted to the information analysis module, and the information analysis module divides the risk level based on the wall solidification reference value. The specific division is as follows:

[0090] If the wall solidification reference value is within the interval of (3×QTNGCKz / 4,QTNGCKz], it is the first construction site risk level threshold;

[0091] If the wall solidification reference value is in the interval of (2×QTNGCKz / 4,3×QTNGCKz / 4], it is the second construction site risk level threshold;

[0092] If the wall solidification reference value is in the interval of (QTNGCKz / 4,2×QTNGCKz / 4], it is the third construction site risk level threshold;

[0093] The divided first environment risk level threshold, the second environment risk level threshold, the third environment risk level threshold, the first construction site risk level threshold, the second construction site risk level threshold and the third construction site risk level threshold are uniformly defined as risk level thresholds; and the risk level thresholds are transmitted to the risk judgment module.

[0094] The differentiated risk level threshold is transmitted to the risk judgment module, and the risk judgment module makes risk judgment based on the risk level threshold;

[0095] The risk judgment module receives a first environmental risk level threshold value in the risk level threshold values, and judges that the environment is suitable for the construction site staff to work and the staff efficiency is high;

[0096] The risk judgment module receives the second environmental risk level threshold in the risk level threshold, and judges that under this environment, the working environment of the construction site workers is normal and the workers' efficiency is qualified;

[0097] The risk judgment module receives the third environmental risk level threshold in the risk level threshold, and judges that it is not suitable for the construction site workers to work in this environment, and the workers have low efficiency;

[0098] It should be noted that: qualified work efficiency refers to obtaining the workload of the staff in the environments of the first environmental risk level threshold, the second environmental risk level threshold and the third environmental risk level threshold within the T time period, obtaining the workload of n people doing the same job, the number of people is not less than 100, and obtaining the average work value according to the working time and the remaining workload, and obtaining different work average values ​​for different environmental risk levels, and obtaining the work average value under the environment of the first environmental risk level threshold is greater than the work average value under the environment of the second environmental risk level threshold, and the work average value under the environment of the second environmental risk level threshold is greater than the work average value under the environment of the third environmental risk level threshold; therefore, it is judged at the first environmental risk level threshold that the environment is suitable for the construction site staff to work and the staff efficiency is high; at the second environmental risk level threshold, it is judged that the working environment of the construction site staff is normal and the staff efficiency is qualified; at the third environmental risk level threshold, it is judged that the environment is not suitable for the construction site staff to work and the staff efficiency is poor;

[0099] The risk judgment module receives the first construction site risk level threshold in the risk level threshold, and judges that in this environment, the wall solidification speed is fast, and it is suitable to continue the wall work after the work is completed and cooled for one day;

[0100] The risk judgment module receives the second construction site risk level threshold in the risk level threshold, and judges that in this environment, the wall solidification speed is average, and after the work is completed and cooled for one day, the wall needs to be supported and fixed before working on the wall;

[0101] The risk judgment module receives the third construction site risk level threshold in the risk level threshold, and judges that in this environment, the wall solidification speed is slow, and the wall cannot be worked on after the work is completed and cooled for one day;

[0102] The construction site information monitoring module acquires the construction site information and calculates the real-time construction site risk parameters and real-time environmental risk parameters through the data calculation module;

[0103] The data calculation module obtains environmental data and construction site data from the construction site information;

[0104] The risk judgment module judges the real-time risk level based on the real-time construction site risk parameters and the real-time environmental risk parameters, and transmits the real-time risk level to the instruction issuing module. The instruction issuing module issues different instructions based on the risk level.

[0105] Embodiment 2, when the present invention detects risks on a construction site, the specific steps are as follows:

[0106] Step S1: receiving construction site information, and transmitting the received construction site information to an information analysis module. The information analysis module analyzes the construction site information to obtain environmental data and construction site data, and transmits the environmental data and construction site data to a data calculation module.

[0107] The construction site information includes the construction site environment information and the construction site construction information. The construction site environment information includes the temperature value, humidity value, dust concentration value and working wind speed value;

[0108] The construction site information includes wall solidification information, work progress information, and mud and sand mixing information;

[0109] The information analysis module receives the construction site environment information for analysis. The specific steps are as follows:

[0110] Step S11: Acquire the construction site environment information and construction site construction information of the same time period in four seasons of the year, define the same time period as time period T, and define the four season time periods as T1, T2, T3, and T4 respectively;

[0111] Step S12: respectively obtaining the daily average values ​​of the temperature value, the daily average value of the humidity value, the daily average value of the dust concentration value, and the daily average value of the working wind speed value in the construction site environment information in the time periods T1, T2, T3, and T4, and obtaining multiple temperature average values, multiple humidity average values, multiple dust concentration average values, and multiple working wind speed average values;

[0112] Step S13: Arrange the acquired temperature average values ​​in ascending order, and arrange the humidity average values, dust concentration average values, and working wind speed average values ​​corresponding to the temperature average values ​​in a corresponding manner;

[0113] The information analysis module receives the construction site information for analysis. The specific steps are as follows:

[0114] Step 11: Obtain the wall solidification information of the corresponding time period according to the multiple temperature average values ​​and the multiple humidity average values ​​after the arrangement is completed;

[0115] Step 12: obtaining the wall solidification hardness value after the wall is placed under a set of average temperature values ​​and average humidity values ​​according to the wall solidification information; thereby obtaining a plurality of wall solidification hardness values;

[0116] Step 13: Generate a temperature reference curve graph and a humidity reference curve graph in a plane rectangular coordinate system according to the multiple temperature average values ​​and the multiple humidity average values;

[0117] Step 14: Generate a solidification hardness reference curve through multiple wall solidification hardness values, select the temperature average value and humidity average value corresponding to the highest point of the solidification hardness reference curve, define the temperature average value at this position as the standard temperature value, and define the humidity average value at this position as the standard humidity value;

[0118] Step 15: The obtained average temperature value, average humidity value, wall solidification hardness value, standard temperature value and standard humidity value are transmitted to the data calculation module.

[0119] The information analysis module obtains the corresponding work progress value in the work progress information based on the average dust concentration and the average working wind speed;

[0120] According to the obtained work progress, a work progress curve is generated in a plane rectangular coordinate system, and the highest point of the work progress curve is obtained according to the rising and falling conditions of the work progress curve, and the work progress value corresponding to the highest point is defined as the optimal progress value;

[0121] The average dust concentration value and the average working wind speed value corresponding to the optimal progress value are obtained, the corresponding average dust concentration value is defined as the optimal dust value, the corresponding average working wind speed value is defined as the optimal wind speed value, and the optimal dust value and the optimal wind speed value are transmitted to the data calculation module.

[0122] The sediment ratio during sediment mixing is obtained through sediment mixing information, and the sediment ratio value is obtained. The analysis is performed based on the sediment ratio value. The specific analysis steps are as follows:

[0123] Step S111: when mixing the sediment, the sediment ratio is changed, and after being mixed with water, it solidifies to form a plurality of sediment detection blocks, and each sediment ratio is recorded to obtain a plurality of sediment ratio values;

[0124] Step S112: impacting a plurality of sediment detection blocks, acquiring the impact force when each sediment detection block is broken, and obtaining a plurality of impact force values;

[0125] Step S113: Arrange the multiple impact force values ​​in ascending order, obtain the maximum impact force value, and define the sediment ratio value corresponding to the maximum impact force value as the standard sediment ratio value;

[0126] Step S114: The standard sediment ratio value is transmitted to the server, and when the sediment is mixed, the sediment is mixed according to the mixing ratio of the standard sediment ratio value.

[0127] Step S2: The data calculation module calculates and obtains the construction site risk reference data and the environmental risk reference data based on the environmental data and the construction site data. The information analysis module receives the construction site risk reference data to classify the risk levels and obtains the construction site risk level threshold. The information analysis module receives the environmental risk reference data to classify the risk levels and obtains the environmental risk level threshold.

[0128] The data calculation module receives the optimal dust value and the optimal wind speed value to obtain the progress reference value;

[0129] The data calculation module receives the standard temperature value and the standard humidity value and combines the progress reference value to obtain the risk level reference value;

[0130] The risk level reference value is transmitted to the information analysis module, and the information analysis module divides the risk level based on the acquired risk level reference value to obtain a first environmental risk level threshold, a second environmental risk level threshold, and a third environmental risk level threshold;

[0131] The data calculation module receives the standard temperature value, the standard humidity value, the wall solidification hardness value, the temperature average value and the humidity average value to obtain the wall solidification reference value;

[0132] The obtained wall solidification reference value is transmitted to the information analysis module, and the information analysis module divides the risk level based on the wall solidification reference value to obtain a first construction site risk level threshold, a second construction site risk level threshold, and a third construction site risk level threshold;

[0133] The divided first environment risk level threshold, the second environment risk level threshold, the third environment risk level threshold, the first construction site risk level threshold, the second construction site risk level threshold and the third construction site risk level threshold are uniformly defined as risk level thresholds; and the risk level thresholds are transmitted to the risk judgment module.

[0134] Step S3: The differentiated risk level threshold is transmitted to the risk judgment module, and the risk judgment module performs risk judgment based on the risk level threshold;

[0135] Step S4: The construction site information monitoring module acquires the construction site information, and calculates the real-time construction site risk parameters and real-time environmental risk parameters through the data calculation module;

[0136] Step S5: The risk judgment module judges the real-time risk level based on the real-time construction site risk parameters and the real-time environmental risk parameters, and transmits the real-time risk level to the instruction issuing module, which issues different instructions based on the risk level.

[0137] It should be understood by those skilled in the art that the embodiments of the present invention may be provided as methods, systems or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media containing computer-usable program codes. Among them, the storage medium may be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (Static Random Access Memory, referred to as SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, referred to as EEPROM), erasable programmable read-only memory (Erasable Programmable Read Only Memory, referred to as EPROM), programmable read-only memory (Programmable Red-Only Memory, referred to as PROM), read-only memory (Read-Only Memory, referred to as ROM), magnetic memory, flash memory, magnetic disk or optical disk.

[0138] The above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.

Claims

1. A risk monitoring and assessment method for smart construction sites, It is characterized in that The method comprises the following steps: Step S1: receiving construction site information, and transmitting the received construction site information to an information analysis module. The information analysis module analyzes the construction site information to obtain environmental data and construction site data, and transmits the environmental data and construction site data to a data calculation module. Step S2: The data calculation module calculates and obtains the construction site risk reference data and the environmental risk reference data based on the environmental data and the construction site data. The information analysis module receives the construction site risk reference data to classify the risk levels and obtains the construction site risk level threshold. The information analysis module receives the environmental risk reference data to classify the risk levels and obtains the environmental risk level threshold. Step S3: The differentiated risk level threshold is transmitted to the risk judgment module, and the risk judgment module performs risk judgment based on the risk level threshold; Step S4: The construction site information monitoring module acquires the construction site information, and calculates the real-time construction site risk parameters and real-time environmental risk parameters through the data calculation module; Step S5: The risk judgment module judges the real-time risk level based on the real-time construction site risk parameters and the real-time environmental risk parameters, and transmits the real-time risk level to the instruction issuing module, and the instruction issuing module issues different instructions based on the risk level; In step S1, the construction site information includes construction site environment information and construction site construction information, and the construction site environment information includes temperature value, humidity value, dust concentration value and working wind speed value; The construction site information includes wall solidification information, work progress information, and mud and sand mixing information; Transmitting the construction site environment information and construction site construction information to the information analysis module; The information analysis module receives the construction site information and performs analysis as follows: Obtain the wall solidification information of the corresponding time period according to the multiple temperature average values ​​and the multiple humidity average values ​​after the arrangement is completed, and obtain the wall solidification hardness value after a set of temperature average values ​​and humidity average values ​​are placed according to the wall solidification information; thereby obtaining multiple wall solidification hardness values; Generate a temperature reference curve and a humidity reference curve in a plane rectangular coordinate system according to multiple temperature average values ​​and multiple humidity average values, generate a solidification hardness reference curve through multiple wall solidification hardness values, select the temperature average value and humidity average value corresponding to the highest point of the solidification hardness reference curve, define the temperature average value at this position as the standard temperature value, define the humidity average value at this position as the standard humidity value, and transmit the obtained temperature average value, humidity average value, wall solidification hardness value, standard temperature value and standard humidity value to a data calculation module; The information analysis module obtains the corresponding work progress value in the work progress information based on the average dust concentration value and the average working wind speed value, generates a work progress curve in a plane rectangular coordinate system according to the obtained work progress, obtains the highest point of the work progress curve according to the rising and falling conditions, defines the work progress value corresponding to the highest point as the optimal progress value, obtains the average dust concentration value and the average working wind speed value corresponding to the optimal progress value, defines the corresponding average dust concentration value as the optimal dust value, defines the corresponding average working wind speed value as the optimal wind speed value, and transmits the optimal dust value and the optimal wind speed value to the data calculation module; The sediment information in the construction site information is analyzed, and the sediment ratio when the sediment is mixed is obtained through the sediment mixing information to obtain the sediment ratio value. The analysis is based on the sediment ratio value. The specific analysis is as follows: Obtain the standard sediment ratio value; The standard sediment ratio value is transmitted to the server, and when the sediment is mixed, the sediment is mixed according to the mixing ratio of the standard sediment ratio value; The standard temperature value, standard humidity value, optimal dust value and optimal wind speed value are defined as environmental data, the wall solidification hardness value and the standard sediment ratio value are defined as construction site data, and the construction site data and environmental data are transmitted to the data calculation module; The data calculation module receives the best dust value and the best wind speed value to obtain the progress reference value, and sets the progress reference value to be: JDCKz; The data calculation module receives the standard temperature value and the standard humidity value and combines the progress reference value to obtain the risk level reference value, and sets the risk level reference value to: FXCKz; The risk level reference value is transmitted to the information analysis module, and the information analysis module classifies the risk level based on the acquired risk level reference value; The data calculation module receives the standard temperature value, the standard humidity value, the wall solidification hardness value, the temperature average value and the humidity average value to obtain the wall solidification reference value; the wall solidification reference value is set to: QTNGCKz; The obtained wall solidification reference value is transmitted to the information analysis module, and the information analysis module divides the risk level based on the wall solidification reference value; The divided first environment risk level threshold, the second environment risk level threshold, the third environment risk level threshold, the first construction site risk level threshold, the second construction site risk level threshold and the third construction site risk level threshold are uniformly defined as risk level thresholds; and the risk level thresholds are transmitted to the risk judgment module.

2. According to claim 1, a smart construction site risk monitoring and assessment method, It is characterized in that The risk judgment module receives a first environmental risk level threshold value among the risk level threshold values, and judges that the environment is suitable for the construction site workers to work and the workers are highly efficient; The risk judgment module receives the second environmental risk level threshold in the risk level threshold, and judges that under this environment, the working environment of the construction site workers is normal and the workers' efficiency is qualified; The risk judgment module receives the third environmental risk level threshold in the risk level threshold, and judges that it is not suitable for the construction site workers to work in this environment, and the workers have low efficiency; The risk judgment module receives the first construction site risk level threshold in the risk level threshold, and judges that in this environment, the wall solidification speed is fast, and it is suitable to continue the wall work after the work is completed and cooled for one day; The risk judgment module receives the second construction site risk level threshold in the risk level thresholds, and judges that in this environment, after the work is completed and cooled for one day, the wall needs to be supported and fixed, and work needs to be performed on the wall; the risk judgment module receives the third construction site risk level threshold in the risk level thresholds, and judges that in this environment, the wall solidification speed is slow, and work cannot be performed on the wall after the work is completed and cooled for one day.

3. According to claim 1, a smart construction site risk monitoring and assessment method, It is characterized in that The risk levels are classified as follows: If the risk level reference value obtained is in the interval [3×FXCKz / 4,5×FXCKz / 4), it is the first environmental risk level threshold; If the risk level reference value obtained is in the range of [FXCKz / 2,3×FXCKz / 4) and [5×FXCKz / 4,5×FXCKz / 4), it is the second environmental risk level threshold; If the risk level reference value obtained is in the interval of (0, FXCKz / 2) or [5×FXCKz / 4, ∞), it is the third environmental risk level threshold; If the wall solidification reference value is within the interval of (3×QTNGCKz / 4,QTNGCKz], it is the first construction site risk level threshold; If the wall solidification reference value is in the interval of (2×QTNGCKz / 4,3×QTNGCKz / 4], it is the second construction site risk level threshold; If the wall solidification reference value is within the interval of (QTNGCKz / 4, 2×QTNGCKz / 4], it is the third construction site risk level threshold.

4. According to claim 1, a smart construction site risk monitoring and assessment method, It is characterized in that The specific method for obtaining the standard sediment ratio is as follows: When the sediment is mixed, the proportion of the sediment ratio is changed, and after being mixed with water, it solidifies to form a plurality of sediment detection blocks, and each sediment ratio is recorded to obtain a plurality of sediment ratio values; Impacting multiple sediment detection blocks, acquiring the impact force when each sediment detection block is broken, and obtaining multiple impact force values; Arrange multiple impact force values ​​in ascending order to obtain the maximum impact force value, and define the sediment ratio value corresponding to the maximum impact force value as the standard sediment ratio value.

Citation Information

Cited By

  • Construction risk situation monitoring method and system based on deep neural network

    CN120069548A