Power control method, device, equipment, storage medium and program product

The power control method and device facilitate large-scale regulation of energy storage power stations by integrating power supply and demand data to manage power transfer relationships, addressing the lack of effective control methods for multiple energy storage devices.

CN118316082BActive Publication Date: 2024-12-13CSG POWER GENERATION (GUANGDONG) ENERGY STORAGE TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410726941.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-06
Publication Date
2024-12-13
Estimated Expiration
2044-06-06

AI Technical Summary

Technical Problem

Existing technologies lack effective methods for large-scale control of multiple energy storage devices, making it difficult to manage and coordinate the operation of distributed power sources, and there is a lack of large-scale control methods for multiple energy storage devices.

Method used

A power control method and device that integrates power supply data, virtual resource data, and demand data to determine power transfer relationships, generating order information for energy storage devices and distribution network systems, enabling large-scale regulation.

Benefits of technology

Enables effective large-scale control of multiple energy storage power stations by coordinating power transfer between energy storage devices and distribution networks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118316082B_ABST
    Figure CN118316082B_ABST
Patent Text Reader

Abstract

The present application relates to a method, device, equipment, storage medium and program product for power control. The method includes: receiving a first power control request sent by an energy storage management terminal and a second power control request sent by a power grid management terminal, the first power control request including power supply data of multiple energy storage devices and first virtual resource data required for power transfer corresponding to each energy storage device, and the second power control request including power demand data of multiple distribution network systems; determining power control strategy data based on power supply data, power demand data and first virtual resource data, the power control strategy data including multiple power transfer relationships; generating multiple order information for power transfer based on multiple power transfer relationships; and sending multiple order information to the energy storage management terminal and the power grid management terminal. This method can realize large-scale control of multiple energy storage power stations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of power electronics technology, and in particular to a power control method, device, equipment, storage medium and program product. Background Art

[0002] With the adjustment of industrial structure and the implementation of energy conservation and emission reduction, the power grid has gradually eliminated backward production capacity and shut down old thermal power units. Electrochemical energy storage has become the first choice for alternative power sources due to its mature technology and short construction period. The construction of energy storage power stations can make up for the power supply shortage after the retirement of thermal power units.

[0003] In related technologies, centralized management of energy storage resources can achieve peak load shaving and time shifting of electric energy, solve the problem of local consumption and grid connection of distributed power sources, and improve the operational safety of the power grid. However, due to the small capacity of a single energy storage power station, it is difficult to form effective control resources, and there is currently a lack of large-scale control methods for multiple energy storage devices. Summary of the invention

[0004] Based on this, it is necessary to provide a power control method, device, equipment, storage medium and program product that can achieve large-scale control of multiple energy storage power stations in response to the above technical problems.

[0005] In a first aspect, the present application provides a method for controlling power consumption. The method comprises:

[0006] Receive a first power control request sent by the energy storage management terminal and a second power control request sent by the power grid management terminal, wherein the first power control request includes power supply data of multiple energy storage devices and first virtual resource data required for power transfer corresponding to each energy storage device, and the second power control request includes power demand data of multiple distribution network systems;

[0007] Determine power control strategy data according to the power supply data, the power demand data and the first virtual resource data, wherein the power control strategy data includes a plurality of power transfer relationships, each of which is used to indicate an energy storage device corresponding to a starting end of power transfer and a distribution network system corresponding to a destination end of power transfer;

[0008] Generating a plurality of order information of the power transfer according to the plurality of power transfer relationships;

[0009] The multiple order information is sent to the energy storage management terminal and the power grid management terminal.

[0010] In one embodiment, determining the power control strategy data according to the power supply data, the power demand data and the first virtual resource data includes:

[0011] Acquire preset power dispatch rule data, where the power dispatch rule data is used to indicate a mapping relationship between the power supply data and the first virtual resource data and the power demand data respectively;

[0012] According to the power dispatch rule data, the power supply data, the power demand data and the first virtual resource data, a plurality of the energy storage devices and a plurality of the distribution network systems are matched to determine the plurality of power transfer relationships;

[0013] The multiple power transfer relationships are aggregated to generate the power control strategy data.

[0014] In one embodiment, the power control strategy data also includes a resource transfer amount corresponding to each power transfer relationship; after sending the plurality of order information to the energy storage management terminal and the power grid management terminal, the method further includes:

[0015] Determine the first virtual resource data corresponding to each power transfer relationship according to the energy storage device corresponding to the starting end of the power transfer indicated by each power transfer relationship;

[0016] According to the resource transfer amount corresponding to each power transfer relationship and the first virtual resource data corresponding to each power transfer relationship, the second virtual resource data corresponding to each energy storage device is determined, and the second virtual resource data is used to characterize the total virtual resource amount interacted by the energy storage device during the power transfer process.

[0017] In one of the embodiments, after receiving the first power control request sent by the energy storage management terminal and the second power control request sent by the power grid management terminal, the method further includes:

[0018] Verifying the power control authority of the multiple energy storage devices and the multiple distribution network systems;

[0019] The power supply data and the first virtual resource data of the energy storage device that does not have the power control authority, and the power demand data of the distribution network system that does not have the power control authority are discarded.

[0020] In one embodiment, the verifying the power control authority of the multiple energy storage devices and the multiple distribution network systems includes:

[0021] Respectively obtain contract information of power control types corresponding to the multiple energy storage devices and the multiple distribution network systems;

[0022] According to the contract information, the power control authority of the multiple energy storage devices and the multiple distribution network systems is verified respectively.

[0023] In one embodiment, the order information also includes power transmission credential information, and the power transmission credential information is used to verify the energy storage device corresponding to the starting end of the power transfer and the distribution network system corresponding to the destination end of the power transfer when the power is transferred.

[0024] In a second aspect, the present application also provides a power control device. The device comprises:

[0025] A receiving module receives a first power control request sent by an energy storage management terminal and a second power control request sent by a power grid management terminal, wherein the first power control request includes power supply data of multiple energy storage devices and first virtual resource data required for power transfer corresponding to each energy storage device, and the second power control request includes power demand data of multiple distribution network systems;

[0026] a processing module, configured to determine power control strategy data according to the power supply data, the power demand data and the first virtual resource data, wherein the power control strategy data includes a plurality of power transfer relationships, each of which is used to indicate an energy storage device corresponding to a starting end of the power transfer and a distribution network system corresponding to a destination end of the power transfer; and to generate a plurality of order information for power transfer according to the plurality of power transfer relationships;

[0027] The sending module is used to send the multiple order information to the energy storage management terminal and the power grid management terminal.

[0028] In one of the embodiments, the processing module is also used to obtain preset power dispatch rule data, and the power dispatch rule data is used to indicate the mapping relationship between the power supply data and the first virtual resource data and the power demand data respectively; according to the power dispatch rule data, the power supply data, the power demand data and the first virtual resource data, a plurality of the energy storage devices and a plurality of the distribution network systems are matched to determine the plurality of power transfer relationships; and the plurality of power transfer relationships are summarized to generate the power control strategy data.

[0029] In one embodiment, the processing module is also used to determine the first virtual resource data corresponding to each power transfer relationship based on the energy storage device corresponding to the starting end of the power transfer indicated by each power transfer relationship; determine the second virtual resource data corresponding to each energy storage device based on the resource transfer amount corresponding to each power transfer relationship and the first virtual resource data corresponding to each power transfer relationship, wherein the second virtual resource data is used to characterize the total virtual resource amount interacted by the energy storage device during the power transfer process.

[0030] In one of the embodiments, the processing module is also used to verify the power control authority of the multiple energy storage devices and the multiple distribution network systems; discard the power supply data and the first virtual resource data of the energy storage devices that do not have the power control authority, and the power demand data of the distribution network systems that do not have the power control authority.

[0031] In one of the embodiments, the processing module is also used to respectively obtain contract information of corresponding power control types of the multiple energy storage devices and the multiple distribution network systems; and verify the power control authority of the multiple energy storage devices and the multiple distribution network systems respectively according to the contract information.

[0032] In one embodiment, the order information also includes power transmission credential information, and the power transmission credential information is used to verify the energy storage device corresponding to the starting end of the power transfer and the distribution network system corresponding to the destination end of the power transfer when the power is transferred.

[0033] In a third aspect, the present application further provides a computer device, wherein the computer device comprises a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the power control method of the first aspect is implemented.

[0034] In a fourth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the power control method of the first aspect is implemented.

[0035] In a fifth aspect, the present application further provides a computer program product, which includes a computer program, and when the computer program is executed by a processor, the power control method of the first aspect is implemented.

[0036] The above-mentioned power control method, device, equipment, storage medium and program product first receive a first power control request sent by the energy storage management terminal and a second power control request sent by the power grid management terminal, wherein the first power control request includes power supply data of multiple energy storage devices and the first virtual resource data required for power transfer corresponding to each energy storage device, and the second power control request includes power demand data of multiple distribution network systems. Secondly, according to the power supply data, the power demand data and the first virtual resource data, the power control strategy data is determined, and the power control strategy data includes multiple power transfer relationships, each of which is used to indicate the energy storage device corresponding to the starting end of the power transfer and the distribution network system corresponding to the destination end of the power transfer. Thirdly, according to the multiple power transfer relationships, multiple order information for power transfer is generated. Finally, multiple order information is sent to the energy storage management terminal and the power grid management terminal. By matching the power supply data, the power demand data and the first virtual resource data required for power transfer, order information corresponding to multiple power transfer relationships between the energy storage device and the distribution network system is generated, so that the energy storage device and the distribution network system are transferred based on the order information, and then multiple energy storage power stations can be effectively regulated on a large scale. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] FIG1 is an application environment diagram of a power control method provided in an embodiment of the present application;

[0038] Figure 2 A schematic diagram of the structure of a power control system provided in an embodiment of the present application;

[0039] Figure 3 A schematic diagram of a flow chart of a power control method provided in an embodiment of the present application;

[0040] Figure 4 A schematic diagram of another power control method provided in an embodiment of the present application;

[0041] Figure 5 A schematic diagram of a flow chart of another power control method provided in an embodiment of the present application;

[0042] Figure 6 A structural block diagram of a power control device provided in an embodiment of the present application;

[0043] FIG. 7 is a diagram of the internal structure of a computer device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0044] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0045] The power control method provided in the embodiment of the present application can be applied in the application environment shown in FIG1 . Among them, the energy storage management terminal 101 and the power grid management terminal 102 both communicate with the server 103 through the network. The data storage system can store the data that the server 103 needs to process. The data storage system can be integrated on the server 103, or it can be placed on the cloud or other network servers.

[0046] When power regulation is required, first, the energy storage management terminal 101 sends a first power regulation request to the server 103, and the power grid management terminal 102 sends a second power regulation request to the server 103. The first power regulation request includes power supply data of multiple energy storage devices and the first virtual resource data required for power transfer corresponding to each energy storage device, and the second power regulation request includes power demand data of multiple distribution network systems. Secondly, the server 103 determines the power regulation strategy data based on the power supply data, the power demand data and the first virtual resource data. The power regulation strategy data includes multiple power transfer relationships, and each power transfer relationship is used to indicate the energy storage device corresponding to the starting end of the power transfer and the distribution network system corresponding to the destination end of the power transfer. Thirdly, the server 103 generates multiple order information for power transfer based on the multiple power transfer relationships. Finally, the server 103 sends multiple order information to the energy storage management terminal and the power grid management terminal.

[0047] The energy storage management terminal 101 and the power grid management terminal 102 may be, but are not limited to, various personal computers, laptops, smart phones, tablet computers, IoT devices and portable wearable devices. IoT devices may be smart speakers, smart TVs, smart air conditioners, smart car-mounted devices, etc. Portable wearable devices may be smart watches, smart bracelets, head-mounted devices, etc. The server 103 may be implemented as an independent server or a server cluster consisting of multiple servers.

[0048] Figure 2 This is a schematic diagram of the structure of a power control system provided in an embodiment of the present application. Figure 2 As shown, the power control system includes: an energy storage management terminal 101, a power grid management terminal 102, a server 103, an energy storage device 104 and a power grid system 105.

[0049] Among them, the energy storage management terminal 101 is used to collect information about the energy storage device 104, and the power grid management terminal 102 is used to collect information about the power grid system 105. A cloud energy storage service system platform is set up on the server 103. The cloud energy storage system interacts with the energy storage management terminal 101 and the power grid management terminal 102 to build a valuable information transmission channel between the distributed energy storage device 104 and the power grid system 105 to achieve flexible scheduling of energy storage. Under the power control strategy, the distributed energy storage device 104 and the power grid system 105 realize the power transfer between each subject through the cloud platform.

[0050] In some embodiments, data monitoring interfaces such as voltage transformers, current sensors, and temperature and humidity sensors are installed inside the energy storage device 104, and a battery management module of the energy storage device 104 is constructed to obtain various parameters of each battery module in the energy storage device 104 and monitor the battery condition and operating status of the energy storage device.

[0051] In some embodiments, the energy storage management terminal 101 collects the power supply data of the energy storage device 104 and the first virtual resource data required for power transfer and uploads them to the cloud in real time through a first power control request, so as to perform joint scheduling under the scheduling of the server according to the power status of the energy storage device 104. Correspondingly, the power grid management terminal 102 collects the power demand data of the distribution network system and reports it to the server 103 through a second power control request.

[0052] In some embodiments, the server 103 constructs a cloud energy storage integrated management platform with the help of technologies such as big data, cloud computing, and the Internet of Things. The cloud energy storage integrated management platform can achieve comprehensive cloud energy storage services and optimal configuration of electric energy after obtaining the power supply data of the energy storage device and the first virtual resource data required for power transfer through the energy storage management terminal 101, and obtaining the power demand data of the distribution network system through the power grid management terminal 102.

[0053] In one embodiment, Figure 3 As shown, a power control method is provided, and the method is applied to the server in FIG. 1 as an example for description, including S201-S204:

[0054] S201. Receive a first power control request sent by an energy storage management terminal and a second power control request sent by a power grid management terminal.

[0055] The first power control request includes power supply data of multiple energy storage devices and first virtual resource data required for power transfer corresponding to each energy storage device, and the second power control request includes power demand data of multiple distribution network systems.

[0056] It should be understood that the power transfer involved in the embodiment of the present application can be the power transmission between the energy storage device and the distribution network system during load peaks and valleys. The above power supply data refers to the power that the energy storage device can provide, and the above power demand data refers to the power required by the distribution network system. The first virtual resource data refers to the amount of virtual resources gained per unit of power through resource transfer during load peaks and valleys.

[0057] In some embodiments, each energy storage device may correspond to an energy storage management terminal, and accordingly, each energy storage management terminal may collect the operation data of the corresponding energy storage device, thereby determining the power supply data and the first virtual resource data of the corresponding energy storage device. Similarly, each distribution network system may correspond to a power network management terminal, and accordingly, each power network management terminal may collect the operation data of the corresponding distribution network system, thereby determining the power demand data of the corresponding distribution network system.

[0058] In other embodiments, multiple energy storage devices may correspond to the same energy storage management terminal, and accordingly, the energy storage management terminal may aggregate the operating data of multiple energy storage devices, thereby respectively determining the power supply data and the first virtual resource data of each energy storage device. Similarly, multiple distribution network systems may correspond to one power network management terminal, and accordingly, the power network management terminal may aggregate the operating data of multiple distribution network systems, thereby respectively determining the power demand data of each distribution network system.

[0059] The energy storage device mentioned above may be various energy storage power stations, such as an electrochemical energy storage power station.

[0060] It should be understood that the embodiments of the present application do not impose any restrictions on when the energy storage management terminal sends the first power control request and when the power grid management terminal sends the second power control request. In some embodiments, the first power control request and the second power control request can be sent to the server in real time. In other embodiments, a fixed-point power control cycle can be set, and the first power control request and the second power control request are sent to the server at a set time point before the start of each power control cycle. Exemplarily, the power control cycle can be set to a day, and the first power control request and the second power control request can be sent to the server at 10 o'clock in the evening of the previous day.

[0061] In other embodiments, after receiving the first power control request sent by the energy storage management terminal and the second power control request sent by the power grid management terminal, the server can verify the power control authority of multiple energy storage devices and multiple distribution network systems. If it is verified that the power control authority is not possessed, the server can discard the power supply data and the first virtual resource data of the energy storage device that does not have the power control authority, and the power demand data of the distribution network system that does not have the power control authority. If it is verified that the power control authority is possessed, the server continues to perform power control based on the first power control request and the second power control request.

[0062] It should be understood that the embodiments of the present application do not limit how to verify the power control authority. In some embodiments, the server can obtain the contract information of the corresponding power control types of multiple energy storage devices and multiple distribution network systems respectively. Subsequently, the server verifies the power control authority of multiple energy storage devices and multiple distribution network systems respectively according to the contract information.

[0063] Exemplarily, the energy storage service provider formulation platform on the server can formulate operating rules, including the rights, power control rules, service processes, rules and regulations that the energy storage device and the distribution network system have in the energy storage service provider formulation platform. Subsequently, if the energy storage device and the distribution network system need to perform power control, a contract request can be sent to the server to generate corresponding contract information. When performing power control, the server determines the power control authority of multiple energy storage devices and multiple distribution network systems by verifying the contract information. For energy storage devices and distribution network systems with power control authority, power control can be performed. For energy storage devices and distribution network systems that do not have power control authority, the power control queue can be removed, and the power supply data and first virtual resource data of the energy storage device that does not have power control authority, as well as the power demand data of the distribution network system that does not have power control authority, are discarded.

[0064] In some embodiments, after receiving the first power control request and the second power control request, the server may further integrate and publish the power supply data, power demand data and the first virtual resource data therein according to time periods.

[0065] S202: Determine power control strategy data according to power supply data, power demand data and first virtual resource data.

[0066] The power control strategy data includes a plurality of power transfer relationships, each of which is used to indicate the energy storage device corresponding to the starting end of the power transfer and the distribution network system corresponding to the destination end of the power transfer.

[0067] In this step, after receiving the first power control request and the second power control request, the server may also determine power control strategy data according to the power supply data, the power demand data and the first virtual resource data.

[0068] It should be understood that the embodiments of the present application do not limit how to determine the power control strategy data based on the power supply data, the power demand data and the first virtual resource data. In some embodiments, the server may first obtain preset power dispatch rule data, and the power dispatch rule data is used to indicate the mapping relationship between the power supply data and the first virtual resource data and the power demand data, respectively. Subsequently, the server may match multiple energy storage devices and multiple distribution network systems according to the power dispatch rule data, the power supply data, the power demand data and the first virtual resource data, and determine multiple power transfer relationships. Finally, the server may summarize multiple power transfer relationships to generate power control strategy data.

[0069] The above-mentioned preset power dispatch rule data may be pre-set to determine the mapping relationship between the power supply data and the first virtual resource data and the power demand data respectively.

[0070] Exemplarily, using the preset power dispatch rule data, the first virtual resource data of each energy storage device can be centrally bid in combination with the power supply data and power demand data. Based on the mapping relationship indicated by the power dispatch rule data, it can be determined whether there is a distribution network system that matches the energy storage device. If so, the energy storage device bids successfully, and then a power transfer relationship between the successfully matched energy storage device and the distribution network system can be generated. By combining multiple power transfer relationships, the final power control strategy data can be formed, and the power control strategy data can be the final dispatch result.

[0071] S203. Generate multiple order information of electricity transfer according to multiple electricity transfer relationships.

[0072] In this step, after the server determines the power regulation strategy data according to the power supply data, the power demand data and the first virtual resource data, it can generate multiple order information of power transfer according to multiple power transfer relationships.

[0073] In some embodiments, the power control strategy data also includes the resource transfer amount corresponding to each power transfer relationship; accordingly, the above order information includes not only the corresponding power transfer relationship, but also the resource transfer amount corresponding to the power transfer relationship.

[0074] S204: Send multiple order information to the energy storage management terminal and the power grid management terminal.

[0075] In the present application, after the server generates multiple order information for electric energy transfer, the multiple order information can be sent to the energy storage management terminal and the power grid management terminal.

[0076] In some embodiments, if multiple energy storage devices can correspond to one energy storage management terminal, and multiple distribution network systems correspond to one grid management terminal, multiple order information can be directly sent to the energy storage management terminal and the grid management terminal. If each energy storage device corresponds to one energy storage management terminal, and each distribution network system corresponds to one grid management terminal, the order information can be sent to the energy storage management terminal corresponding to the energy storage device for the power transfer involved in the order, and the grid management terminal corresponding to the distribution network system for the power transfer involved in the order.

[0077] In some embodiments, the order information also includes power transmission credential information, which is used to verify the energy storage device corresponding to the starting end of the power transfer and the distribution network system corresponding to the destination end of the power transfer when the power is transferred.

[0078] For example, before executing the power transfer corresponding to the order information, the power transfer certificate information can be used to verify whether the energy storage device and distribution network system for the power transfer are determined. If correct, the power transfer will continue and the power delivery will be completed. If incorrect, the information power transfer will be stopped.

[0079] In some embodiments, after sending multiple order information to the energy storage management terminal and the power grid management terminal to transfer electricity, the server can also determine the first virtual resource data corresponding to each electricity transfer relationship based on the energy storage device corresponding to the starting end of the electricity transfer indicated by each electricity transfer relationship. Subsequently, the server can determine the second virtual resource data corresponding to each energy storage device based on the resource transfer amount corresponding to each electricity transfer relationship and the first virtual resource data corresponding to each electricity transfer relationship.

[0080] The second virtual resource data is used to represent the total amount of virtual resources interacted by the energy storage device during the power transfer process.

[0081] Exemplarily, after the power transfer is completed, the amount of resource transfer transferred by the order information corresponding to each power transfer relationship can be determined. In addition, since the first virtual resource data required for the power transfer is proposed by the energy storage device, the first virtual resource data corresponding to each power transfer relationship can be determined by querying the energy storage device corresponding to the starting end of the power transfer indicated by each power transfer relationship. Subsequently, the server can multiply the first virtual resource data corresponding to each power transfer relationship by the amount of resource transfer transferred by each power transfer relationship to obtain the amount of virtual resources generated by each power transfer. The amount of virtual resources generated by each power transfer is summarized to obtain the second virtual resource data. That is, the server realizes a settlement that benefits all parties.

[0082] The power control method provided in the embodiment of the present application first receives a first power control request sent by an energy storage management terminal and a second power control request sent by a power grid management terminal. The first power control request includes power supply data of multiple energy storage devices and first virtual resource data required for power transfer corresponding to each energy storage device, and the second power control request includes power demand data of multiple distribution network systems. Secondly, according to the power supply data, the power demand data and the first virtual resource data, the power control strategy data is determined. The power control strategy data includes multiple power transfer relationships, and each power transfer relationship is used to indicate the energy storage device corresponding to the starting end of the power transfer and the distribution network system corresponding to the destination end of the power transfer. Thirdly, according to the multiple power transfer relationships, multiple order information for power transfer is generated. Finally, multiple order information is sent to the energy storage management terminal and the power grid management terminal. By matching the power supply data, the power demand data and the first virtual resource data required for power transfer, order information corresponding to multiple power transfer relationships between the energy storage device and the distribution network system is generated, so that the energy storage device and the distribution network system are transferred based on the order information, and then multiple energy storage power stations can be effectively regulated on a large scale.

[0083] The following describes how to determine the power control strategy data. Figure 4 A flow chart of another power control method provided in an embodiment of the present application is shown as follows: Figure 4 As shown, the power control method includes S301-S306:

[0084] S301. Receive a first power control request sent by an energy storage management terminal and a second power control request sent by a power grid management terminal.

[0085] The first power control request includes power supply data of multiple energy storage devices and first virtual resource data required for power transfer corresponding to each energy storage device, and the second power control request includes power demand data of multiple distribution network systems;

[0086] S302, obtaining preset power dispatch rule data, where the power dispatch rule data is used to indicate a mapping relationship between power supply data and first virtual resource data and power demand data respectively;

[0087] S303, matching multiple energy storage devices and multiple distribution network systems according to the power dispatch rule data, the power supply data, the power demand data and the first virtual resource data, and determining multiple power transfer relationships;

[0088] S304: Summarize multiple power transfer relationships and generate power control strategy data.

[0089] S305, generating multiple order information of power transfer according to multiple power transfer relationships;

[0090] S306. Send multiple order information to the energy storage management terminal and the power grid management terminal.

[0091] The following explains how to perform resource settlement after electricity transfer. Figure 5 A flow chart of another power control method provided in the embodiment of the present application is shown as follows: Figure 5 As shown, the power control method includes S401-S406:

[0092] S401. Receive a first power control request sent by an energy storage management terminal and a second power control request sent by a power grid management terminal.

[0093] The first power control request includes power supply data of multiple energy storage devices and first virtual resource data required for power transfer corresponding to each energy storage device, and the second power control request includes power demand data of multiple distribution network systems.

[0094] S402: Determine power control strategy data according to power supply data, power demand data and first virtual resource data.

[0095] The power control strategy data includes a plurality of power transfer relationships, each of which is used to indicate the energy storage device corresponding to the starting end of the power transfer and the distribution network system corresponding to the destination end of the power transfer.

[0096] S403: Generate multiple order information of electricity transfer according to multiple electricity transfer relationships.

[0097] S404: Send multiple order information to the energy storage management terminal and the power grid management terminal.

[0098] S405, determining first virtual resource data corresponding to each power transfer relationship according to the energy storage device corresponding to the starting end of the power transfer indicated by each power transfer relationship;

[0099] S406. Determine the second virtual resource data corresponding to each energy storage device according to the resource transfer amount corresponding to each power transfer relationship and the first virtual resource data corresponding to each power transfer relationship, wherein the second virtual resource data is used to characterize the total virtual resource amount interacted by the energy storage device during the power transfer process.

[0100] The power control method provided in the embodiment of the present application first receives a first power control request sent by an energy storage management terminal and a second power control request sent by a power grid management terminal. The first power control request includes power supply data of multiple energy storage devices and first virtual resource data required for power transfer corresponding to each energy storage device, and the second power control request includes power demand data of multiple distribution network systems. Secondly, according to the power supply data, the power demand data and the first virtual resource data, the power control strategy data is determined. The power control strategy data includes multiple power transfer relationships, and each power transfer relationship is used to indicate the energy storage device corresponding to the starting end of the power transfer and the distribution network system corresponding to the destination end of the power transfer. Thirdly, according to the multiple power transfer relationships, multiple order information for power transfer is generated. Finally, multiple order information is sent to the energy storage management terminal and the power grid management terminal. By matching the power supply data, the power demand data and the first virtual resource data required for power transfer, order information corresponding to multiple power transfer relationships between the energy storage device and the distribution network system is generated, so that the energy storage device and the distribution network system are transferred based on the order information, and then multiple energy storage power stations can be effectively regulated on a large scale.

[0101] It should be understood that, although the steps in the flowcharts involved in the above embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above embodiments may include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0102] Based on the same inventive concept, the embodiment of the present application also provides a power control device for implementing the power control method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more power control device embodiments provided below can refer to the limitations of the power control method above, and will not be repeated here.

[0103] In one embodiment, Figure 6 As shown, a power control device 500 is provided, including: a receiving module 501, a processing module 502 and a sending module 503, wherein:

[0104] The receiving module 501 receives a first power control request sent by the energy storage management terminal and a second power control request sent by the power grid management terminal, wherein the first power control request includes power supply data of multiple energy storage devices and first virtual resource data required for power transfer corresponding to each energy storage device, and the second power control request includes power demand data of multiple distribution network systems.

[0105] Processing module 502 is used to determine power control strategy data based on power supply data, power demand data and first virtual resource data, where the power control strategy data includes multiple power transfer relationships, each of which is used to indicate the energy storage device corresponding to the starting end of the power transfer and the distribution network system corresponding to the destination end of the power transfer; based on the multiple power transfer relationships, multiple order information for power transfer is generated.

[0106] The sending module 503 is used to send multiple order information to the energy storage management terminal and the power grid management terminal.

[0107] In one of the embodiments, the processing module 502 is also used to obtain preset power dispatch rule data, the power dispatch rule data is used to indicate the mapping relationship between the power supply data and the first virtual resource data and the power demand data respectively; according to the power dispatch rule data, the power supply data, the power demand data and the first virtual resource data, multiple energy storage devices and multiple distribution network systems are matched to determine multiple power transfer relationships; and the multiple power transfer relationships are summarized to generate power control strategy data.

[0108] In one embodiment, the processing module 502 is also used to determine the first virtual resource data corresponding to each power transfer relationship based on the energy storage device corresponding to the starting end of the power transfer indicated by each power transfer relationship; determine the second virtual resource data corresponding to each energy storage device based on the resource transfer amount corresponding to each power transfer relationship and the first virtual resource data corresponding to each power transfer relationship, and the second virtual resource data is used to characterize the total virtual resource amount interacted by the energy storage device during the power transfer process.

[0109] In one of the embodiments, the processing module 502 is also used to verify the power control authority of multiple energy storage devices and multiple distribution network systems; discard the power supply data and the first virtual resource data of the energy storage device that does not have the power control authority, and the power demand data of the distribution network system that does not have the power control authority.

[0110] In one embodiment, the processing module 502 is further used to obtain contract information of corresponding power control types of multiple energy storage devices and multiple distribution network systems respectively; and verify the power control permissions of multiple energy storage devices and multiple distribution network systems respectively according to the contract information.

[0111] In one of the embodiments, the order information also includes power transmission certificate information, which is used to verify the energy storage device corresponding to the starting end of the power transfer and the distribution network system corresponding to the destination end of the power transfer when the power is transferred.

[0112] Each module in the above power control device can be implemented in whole or in part by software, hardware or a combination thereof. Each module can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute the operations corresponding to each module.

[0113] In one embodiment, a computer device is provided, which may be a server, and its internal structure diagram may be shown in FIG7. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. The processor, the memory and the input / output interface are connected via a system bus, and the communication interface is connected to the system bus via the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a power control method is implemented.

[0114] Those skilled in the art will understand that the structure shown in FIG. 7 is merely a block diagram of a partial structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than shown in the figure, or combine certain components, or have a different arrangement of components.

[0115] In one embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the above-mentioned power control method when executing the computer program.

[0116] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the above-mentioned power control method is implemented.

[0117] In one embodiment, a computer program product is provided, including a computer program, and when the computer program is executed by a processor, the power control method described above is implemented.

[0118] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant laws, regulations and standards of relevant countries and regions.

[0119] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.

[0120] The technical features of the above embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0121] The above embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A power control method, characterized in that: The method comprises: Receive a first power control request sent by the energy storage management terminal and a second power control request sent by the power grid management terminal, wherein the first power control request includes power supply data of multiple energy storage devices and first virtual resource data required for power transfer corresponding to each energy storage device, and the second power control request includes power demand data of multiple distribution network systems, and the first virtual resource data is used to characterize the amount of virtual resources benefited per unit of power when load peak-valley resource transfer is performed; Determine power control strategy data according to the power supply data, the power demand data and the first virtual resource data, wherein the power control strategy data includes a plurality of power transfer relationships, each of which is used to indicate an energy storage device corresponding to a starting end of power transfer and a distribution network system corresponding to a destination end of power transfer; Generating a plurality of order information of the power transfer according to the plurality of power transfer relationships; Sending the plurality of order information to the energy storage management terminal and the power grid management terminal; The step of determining the power control strategy data according to the power supply data, the power demand data and the first virtual resource data includes: Acquire preset power dispatch rule data, where the power dispatch rule data is used to indicate a mapping relationship between the power supply data and the first virtual resource data and the power demand data respectively; According to the power dispatch rule data, the power supply data, the power demand data and the first virtual resource data, a plurality of the energy storage devices and a plurality of the distribution network systems are matched to determine the plurality of power transfer relationships; The multiple power transfer relationships are aggregated to generate the power control strategy data.

2. The method according to claim 1, characterized in that The power control strategy data also includes the resource transfer amount corresponding to each power transfer relationship; After sending the plurality of order information to the energy storage management terminal and the power grid management terminal, the method further includes: Determine the first virtual resource data corresponding to each power transfer relationship according to the energy storage device corresponding to the starting end of the power transfer indicated by each power transfer relationship; According to the resource transfer amount corresponding to each power transfer relationship and the first virtual resource data corresponding to each power transfer relationship, the second virtual resource data corresponding to each energy storage device is determined, and the second virtual resource data is used to characterize the total virtual resource amount interacted by the energy storage device during the power transfer process.

3. The method according to claim 1, characterized in that After receiving the first power control request sent by the energy storage management terminal and the second power control request sent by the power grid management terminal, the method further includes: Verifying the power control authority of the multiple energy storage devices and the multiple distribution network systems; The power supply data and the first virtual resource data of the energy storage device that does not have the power control authority, and the power demand data of the distribution network system that does not have the power control authority are discarded.

4. The method according to claim 3, characterized in that The verifying the power control authority of the multiple energy storage devices and the multiple distribution network systems includes: Respectively obtain contract information of power control types corresponding to the multiple energy storage devices and the multiple distribution network systems; According to the contract information, the power control authority of the multiple energy storage devices and the multiple distribution network systems is verified respectively.

5. The method according to any one of claims 1 to 3, characterized in that: The order information also includes power transmission credential information, which is used to verify the energy storage device corresponding to the starting end of the power transfer and the distribution network system corresponding to the destination end of the power transfer when the power is transferred.

6. A power control device, characterized in that: The device comprises: A receiving module receives a first power control request sent by an energy storage management terminal and a second power control request sent by a power grid management terminal, wherein the first power control request includes power supply data of multiple energy storage devices and first virtual resource data required for power transfer corresponding to each energy storage device, and the second power control request includes power demand data of multiple distribution network systems, and the first virtual resource data is used to characterize the amount of virtual resources gained per unit of power when load peak-valley resource transfer is performed; a processing module, configured to determine power control strategy data according to the power supply data, the power demand data and the first virtual resource data, wherein the power control strategy data includes a plurality of power transfer relationships, each of which is used to indicate an energy storage device corresponding to a starting end of the power transfer and a distribution network system corresponding to a destination end of the power transfer; and to generate a plurality of order information for power transfer according to the plurality of power transfer relationships; A sending module, used for sending the plurality of order information to the energy storage management terminal and the power grid management terminal; Among them, the processing module is also used to obtain preset power dispatch rule data, the power dispatch rule data is used to indicate the mapping relationship between the power supply data and the first virtual resource data and the power demand data respectively; according to the power dispatch rule data, the power supply data, the power demand data and the first virtual resource data, multiple energy storage devices and multiple distribution network systems are matched to determine multiple power transfer relationships; and multiple power transfer relationships are summarized to generate power control strategy data.

7. The device according to claim 6, characterized in that The processing module is further used to determine the first virtual resource data corresponding to each power transfer relationship according to the energy storage device corresponding to the starting end of the power transfer indicated by each power transfer relationship; According to the resource transfer amount corresponding to each power transfer relationship and the first virtual resource data corresponding to each power transfer relationship, the second virtual resource data corresponding to each energy storage device is determined, and the second virtual resource data is used to characterize the total virtual resource amount interacted by the energy storage device during the power transfer process.

8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 5 are implemented.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 5 are implemented.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 5 are implemented.

Citation Information

Patent Citations

  • Electric power resource configuration method and system based on demand response

    CN106058851A

  • Virtual power plant scheduling method and device based on carbon-electricity market

    CN117318123A