A production equipment for ultra-high strength prestressed concrete pipe piles

The use of high-pressure defoaming technology to remove air bubbles in concrete pipe pile production equipment solves the problem of air bubbles affecting prestressing and compactness during the pouring process, achieves higher compactness and sealing, and ensures product quality and mold ejection efficiency.

CN118322335BActive Publication Date: 2024-10-15ZHEJIANG XIONGYU CONCRETE COMPONENTS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410422666.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-09
Publication Date
2024-10-15
Estimated Expiration
2044-04-09

Smart Images

  • Figure CN118322335B_ABST
    Figure CN118322335B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of concrete pipe pile production, and discloses a production device for ultra-high strength prestressed concrete pipe piles, including a fixing mechanism, wherein the fixing mechanism also includes a containing plate one, and a support frame is fixedly connected to the side wall of the telescopic containing plate one. The present invention utilizes the characteristic that the high pressure generated above diffuses to all sides, and a feed control plate is arranged at the bottom of the equipment. The force generated by the high pressure forces the feed control plate to move downward. After the feed control plate moves down a certain distance, the concrete inside the enclosed space will enter the molding groove between the molding plate two and the molding plate one through the through hole of the molding plate one, wherein the control spring controls the index of the top pressure of the feed control plate during this process, and the feed control plate will move downward only after the top pressure reaches the specified index, thereby ensuring the stability of the high pressure in the enclosed space.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of concrete pipe pile production equipment, in particular to production equipment for ultra-high strength prestressed concrete pipe piles. Background Art

[0002] The production process of concrete pipe piles usually includes the following main steps: Preparation: First, you need to prepare the required raw materials, including cement, sand, gravel, etc., as well as the molds and mechanical equipment required for production; Mixing raw materials: Put cement, sand, gravel and other raw materials into a mixer in a certain proportion to ensure the uniformity and quality of the concrete; Casting and molding: Pour the mixed concrete into the pre-prepared tubular mold. Usually, a rotary mold or a rolling mold is used to ensure that the concrete fully fills the mold and the surface is flat; Curing treatment: The concrete pipe piles need to be cured after casting and molding. Usually, they are left in the mold for a period of time to allow the concrete to fully solidify and obtain a certain strength; Demolding and trimming: After the concrete pipe piles reach a certain strength, the mold can be removed, and then the pipe piles can be trimmed and the edges and corners trimmed to ensure that they meet the design requirements.

[0003] When performing the above-mentioned pouring and forming, the pouring method mostly adopts pouring cement from top to bottom. However, during the filling process of this type of pouring method, a small amount of air will be mixed in the concrete due to the gaps added by the concrete, and there will be a small amount of bubbles inside. After the cement solidifies, the bubbles will be directly in the pipe pile. Removing the bubbles by vibration or stirring may cause heavier materials such as gravel to sink to the bottom, affecting the prestress of the concrete pipe pile. In view of the above problems, the following solutions are proposed. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a production device for ultra-high strength prestressed concrete pipe piles, including a fixing mechanism, the fixing mechanism also includes a accommodating plate 1, a support frame is fixedly connected to the side wall of the telescopic accommodating plate 1, and a power motor is fixedly connected to the top of the telescopic support frame;

[0005] The shaping mechanism comprises a push rod slidably connected to the inner wall of the through hole on the support frame, a gear rod is fixedly connected to the side wall of the telescopic push rod, and a piston plate is fixedly connected to the bottom of the telescopic gear rod;

[0006] The control mechanism comprises a fixing plate 1 fixedly connected to the bottom of the containing plate 1, a pressurized air bag is fixedly connected to the top of the fixing plate 1, and an air outlet square tube is connected through the side wall of the pressurized air bag.

[0007] Preferably, the fixing mechanism also includes a accommodating plate 2 slidably connected to one side wall of the accommodating plate, a combination groove is opened at the side wall of the accommodating plate 2, a telescopic air bag is fixedly connected to the inner wall of the combination groove, and a sliding groove is opened at the side wall of the accommodating plate 2. By utilizing the characteristics of high-pressure defoaming, after the equipment is assembled, the concrete to be processed is poured into the barreled space formed by the accommodating plate 1 and the accommodating plate 2, and the power supply of the power motor is turned on. The power motor drives the push rod to move downward through the internal gear. At this time, a closed space is formed between the piston plate and the barreled space, and as the push rod is continuously pressed downward, the closed space is transformed into a high-pressure space. By applying high pressure, the bubbles in the concrete can be quickly compressed and released, and the bubbles can be discharged from the concrete, thereby ensuring that the concrete in the closed space reduces the formation of pores before entering the molding stage, thereby improving the compactness of the concrete.

[0008] Preferably, the fixing mechanism also includes a sliding rod slidably connected to the inner wall of the sliding groove, a plurality of limiting rails are fixedly connected to the side wall of the sliding rod, a limiting block is slidably connected to the inner walls of the plurality of limiting rails, a return spring is fixedly connected to the side wall of the limiting block, one end of the return spring away from the limiting block is fixedly connected to the inner wall of the limiting rail, an obstructing diagonal rod is fixedly connected to the top of the limiting block, and a force block is fixedly connected to the side wall of the accommodating plate.

[0009] Preferably, the molding mechanism also includes a cleaning ring fixedly connected to the outer wall of the piston plate, a molding plate one is placed on the top of the fixed plate one, a molding plate two is slidably connected to the side wall of the molding plate one, and a connecting rod is slidably connected to the inner wall of the molding plate one.

[0010] Preferably, the molding mechanism also includes a sliding groove opened on one side wall of the molding plate, a sliding bracket is slidably connected to the inner wall of the sliding groove, a compression spring is fixedly connected to the bottom of the sliding bracket, and one end of the compression spring away from the sliding bracket is fixedly connected to the bottom of the sliding groove.

[0011] Preferably, the molding mechanism also includes a pressure bracket fixedly connected to the side wall of the sliding bracket, a push spring fixedly connected to the side wall of the pressure bracket, a damper fixedly connected to the inner wall of the push spring, and a blocking plate fixedly connected to the end of the push spring away from the pressure bracket. After the pressure airbag is pressurized, the internal air will enter the telescopic airbag through the air outlet square tube, causing the telescopic airbag to expand and block the connection seam between the containing plate one and the containing plate two, thereby preventing the internal high-pressure environment from causing moisture in the concrete to flow out through the connection seam, thereby improving the sealing of the equipment while ensuring the internal concrete moisture content and product quality.

[0012] Preferably, the control mechanism also includes a fixed plate 2 fixedly connected to the bottom of the containing plate 2, a control spring fixedly connected to the top of the fixed plate 2, an end of the control spring away from the fixed plate 2 fixedly connected to a feed control plate, the inner wall of the feed control plate is slidably connected to the outer wall of the molding plate 1, and a pushing cylinder is fixedly connected to the bottom of the feed control plate. Utilizing the characteristic that the high pressure generated above diffuses to all around, a feed control plate is arranged at the bottom of the equipment, and the force generated by the high pressure forces the feed control plate to move downward. After the feed control plate moves down a certain distance, it will present a state as shown in the figure, and the concrete inside the confined space will enter the molding groove between the molding plate 2 and the molding plate 1 through the through hole of the molding plate 1. During this process, the control spring controls the index of the top pressure of the feed control plate. Only after the top pressure reaches the specified index will the feed control plate move downward to ensure the stability of the high pressure in the confined space, and by changing the feeding method, it is ensured that in the process of concrete entering the inner wall of the molding plate 1 from the inner wall of the containing plate 1, no air will be mixed in the concrete, thereby affecting the product's resistance to prestressed strength.

[0013] Preferably, the control mechanism also includes a support block fixedly connected to the bottom of the fixed plate 1, and the side wall of the support block is fixedly connected to the equipment base. After the piston plate moves down to the specified position, the piston plate will contact the top of the pressure bracket and push the pressure bracket down. After the pressure bracket moves down to the specified height, the blocking plate will be pushed by the pushing spring to block the hole on the side of the molding plate 1. In this process, the blocking plate will cut off the connection between the internal and external spaces to ensure that the subsequent product demolding will not be stuck due to the position of the feed port, affecting the demolding efficiency. In addition, after the feed control plate moves down to the specified position, the feed control plate will push the pushing cylinder, driving the sliding rod to move downward, so that the obstruction diagonal rod loses its restriction on the force block, forcing the accommodating plate 2 to be disconnected from the accommodating plate 1, and the remaining molding plate 1 and molding plate 2 can facilitate the subsequent drying, demolding and other processes of the equipment.

[0014] The present invention has the following beneficial effects:

[0015] (1) The present invention utilizes the characteristics of high-pressure degassing. After the equipment is assembled, the concrete to be processed is poured into the barrel space formed by the first and second containing plates, and the power of the power motor is turned on. The power motor drives the push rod to move downward through the internal gear. At this time, a closed space is formed between the piston plate and the barrel space. As the push rod continues to press downward, the closed space is transformed into a high-pressure space. By applying high pressure, the bubbles in the concrete can be quickly compressed and released, and the bubbles can be discharged from the concrete, thereby ensuring that the concrete in the closed space reduces the formation of pores before entering the molding stage, thereby improving the compactness of the concrete.

[0016] (2) The present invention utilizes the characteristic that the high pressure generated above diffuses to the surroundings, and a feed control plate is arranged at the bottom of the equipment. The force generated by the high pressure forces the feed control plate to move downward. After the feed control plate moves down a certain distance, it will present the following Figure 6 In the state shown, the concrete inside the confined space will enter the molding groove between the molding plate 2 and the molding plate 1 through the through hole of the molding plate 1, wherein the control spring controls the index of the top pressure of the feed control plate during this process. The feed control plate will move down only after the top pressure reaches the specified index, thereby ensuring the stability of the high pressure in the confined space. By changing the feeding method, it is ensured that in the process of the concrete entering the inner wall of the containing plate 1 from the inner wall of the molding plate 1, no air will be mixed in the concrete, thereby affecting the product's resistance to prestressed strength.

[0017] (3) The present invention utilizes the force generated by the downward movement of the feed control plate and provides a pressurized airbag at the bottom of the feed control plate. After the pressurized airbag is pressurized, the internal air will enter the telescopic airbag through the air outlet square tube, causing the telescopic airbag to expand and block the connection seam between the containing plate 1 and the containing plate 2, thereby preventing the internal high-pressure environment from causing moisture in the concrete to flow out through the connection seam. While improving the sealing performance of the equipment, the internal concrete moisture content and product quality are guaranteed.

[0018] (4) In the present invention, after the piston plate moves down to the specified position, the piston plate will contact the top of the pressure bracket and push the pressure bracket down. After the pressure bracket moves down to the specified height, the blocking plate will be pushed by the pushing spring to block the hole on the side of the molding plate. In this process, the blocking plate will cut off the connection between the internal and external spaces to ensure that when the subsequent product is demolded, it will not be stuck at the feed port position, affecting the demolding efficiency. In addition, after the feed control plate moves down to the specified position, the feed control plate will push the pushing cylinder to drive the sliding rod to move downward, so that the obstruction diagonal rod loses its restriction on the force block, forcing the two containing plates to be disconnected from the one containing plate. The remaining molding plate one and molding plate two can facilitate the subsequent drying, demolding and other processes of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0020] Figure 1 It is an exploded schematic diagram of the overall structural assembly of the present invention;

[0021] Figure 2 It is a schematic diagram of the overall structure of the present invention;

[0022] Figure 3It is a schematic diagram of the fixing mechanism of the present invention;

[0023] Figure 4 For the present invention Figure 3 A magnified view of middle;

[0024] Figure 5 It is a schematic diagram of the shaping mechanism of the present invention;

[0025] Figure 6 For the present invention Figure 5 Enlarged view of middle B;

[0026] Figure 7 It is a cross-sectional schematic diagram of the control mechanism of the present invention;

[0027] Figure 8 For the present invention Figure 7 Enlarged view of C in the middle.

[0028] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0029] In the figure: 1. fixing mechanism; 101. containing plate 1; 102. supporting frame; 103. power motor; 104. containing plate 2; 105. combination slot; 106. telescopic airbag; 107. sliding slot; 108. limiting track; 109. limiting block; 110. return spring; 111. obstructing inclined rod; 112. force bearing block; 113. sliding rod; 2. shaping mechanism; 201. pushing rod; 202. gear rod; 203. piston plate; 204. cleaning ring; 205 , molding plate one; 206, molding plate two; 207, connecting rod; 208, sliding groove; 209, sliding bracket; 210, pressure spring; 211, pressure bracket; 212, pushing spring; 213, blocking plate; 3, control mechanism; 301, fixed plate one; 302, fixed plate two; 303, control spring; 304, feed control plate; 305, pressure air bag; 306, air outlet square tube; 307, pushing cylinder; 308, support block; 309, equipment base. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] For example, see Figure 1 - Figure 3The present invention is a production device for ultra-high strength prestressed concrete pipe piles, comprising a fixing mechanism 1, the fixing mechanism 1 also comprising a receiving plate 101, a support frame 102 is fixedly connected to the side wall of the telescopic receiving plate 101, and a power motor 103 is fixedly connected to the top of the telescopic support frame 102;

[0032] The shaping mechanism 2 includes a push rod 201 slidably connected to the inner wall of the through hole on the support frame 102, a gear rod 202 is fixedly connected to the side wall of the telescopic push rod 201, and a piston plate 203 is fixedly connected to the bottom of the telescopic gear rod 202;

[0033] The control mechanism 3 comprises a fixing plate 301 fixedly connected to the bottom of the containing plate 101, a pressurized air bag 305 is fixedly connected to the top of the fixing plate 301, and an air outlet square tube 306 is connected through the side wall of the pressurized air bag 305.

[0034] The fixing mechanism 1 also includes a second containing plate 104 slidably connected to the side wall of the first containing plate 101, a combination groove 105 is opened on the side wall of the second containing plate 104, a telescopic air bag 106 is fixedly connected to the inner wall of the combination groove 105, and a sliding groove 107 is opened on the side wall of the second containing plate 104. By utilizing the characteristics of high-pressure defoaming, after the equipment is assembled, the concrete to be processed is poured into the barreled space formed by the first containing plate 101 and the second containing plate 104, and the power supply of the power motor 103 is turned on, and the power motor 103 drives the push rod 201 to move downward through the internal gear. At this time, a closed space is formed between the piston plate 203 and the barreled space, and as the push rod 201 is continuously pressed downward, the closed space is transformed into a high-pressure space. By applying high pressure, the bubbles in the concrete can be quickly compressed and released, and the bubbles can be discharged from the concrete, thereby ensuring that the concrete in the closed space reduces the formation of pores before entering the molding stage and improves the compactness of the concrete.

[0035] The fixing mechanism 1 also includes a sliding rod 113 slidably connected to the inner wall of the sliding groove 107, a plurality of limiting rails 108 are fixedly connected to the side wall of the sliding rod 113, a plurality of limiting blocks 109 are slidably connected to the inner walls of the limiting rails 108, a return spring 110 is fixedly connected to the side wall of the limiting block 109, one end of the return spring 110 away from the limiting block 109 is fixedly connected to the inner wall of the limiting rail 108, an obstructing inclined rod 111 is fixedly connected to the top of the limiting block 109, and a force block 112 is fixedly connected to the side wall of the accommodating plate 101.

[0036] For example 2, please refer to Figure 4 - Figure 8The present invention is a production equipment for ultra-high strength prestressed concrete pipe piles. On the basis of Example 1, the molding mechanism 2 also includes a cleaning ring 204 fixedly connected to the outer wall of the piston plate 203, a molding plate 205 is placed on the top of the fixed plate 301, a molding plate 206 is slidably connected to the side wall of the molding plate 205, and a connecting rod 207 is slidably connected to the inner wall of the molding plate 205.

[0037] The molding mechanism 2 also includes a sliding groove 208 opened on the side wall of the molding plate 205, and a sliding bracket 209 is slidably connected to the inner wall of the sliding groove 208. The bottom of the sliding bracket 209 is fixedly connected to a compression spring 210, and the end of the compression spring 210 away from the sliding bracket 209 is fixedly connected to the bottom of the sliding groove 208.

[0038] The molding mechanism 2 also includes a pressure bracket 211 fixedly connected to the side wall of the sliding bracket 209, a push spring 212 fixedly connected to the side wall of the pressure bracket 211, a damper fixedly connected to the inner wall of the push spring 212, and a blocking plate 213 fixedly connected to the end of the push spring 212 away from the pressure bracket 211. After the pressure airbag 305 is pressurized, the internal air will enter the telescopic airbag 106 through the air outlet square tube 306, causing the telescopic airbag 106 to expand and block the connection seam between the containing plate 101 and the containing plate 2 104, so as to prevent the internal high-pressure environment from causing the moisture in the concrete to flow out through the connection seam, thereby improving the sealing of the equipment and ensuring the internal concrete moisture content and product quality.

[0039] The control mechanism 3 also includes a fixing plate 302 fixedly connected to the bottom of the accommodating plate 104, a control spring 303 is fixedly connected to the top of the fixing plate 302, an end of the control spring 303 away from the fixing plate 302 is fixedly connected to a feed control plate 304, an inner wall of the feed control plate 304 is slidably connected to an outer wall of the molding plate 205, a pushing cylinder 307 is fixedly connected to the bottom of the feed control plate 304, and a feed control plate 304 is arranged at the bottom of the device by utilizing the characteristic that the high pressure generated above diffuses to the surroundings, the force generated by the high pressure forces the feed control plate 304 to move downward, and after the feed control plate 304 moves down to a certain distance, it will present the following Figure 6 In the state shown, the concrete inside the enclosed space will enter the molding groove between the molding plate 206 and the molding plate 1 205 through the through hole of the molding plate 1 205, wherein the control spring 303 controls the index of the top pressure of the feed control plate 304 during this process. Only after the top pressure reaches the specified index will the feed control plate 304 move downward to ensure the stability of the high pressure in the enclosed space, and by changing the feeding method, it is ensured that in the process of the concrete entering the inner wall of the molding plate 1 205 from the inner wall of the containing plate 101, no air will be mixed in the concrete to affect the product's resistance to prestressed strength.

[0040] The control mechanism 3 also includes a support block 308 fixedly connected to the bottom of the fixed plate 301, and a device base 309 is fixedly connected to the side wall of the support block 308. After the piston plate 203 moves down to a specified position, the piston plate 203 will contact the top of the pressure bracket 211 and push the pressure bracket 211 to move down. After the pressure bracket 211 moves down to a specified height, the blocking plate 213 is pushed by the push spring 212 to block the hole on the side of the molding plate 205. In this process, the blocking plate 213 will cut off the inner The connection with the external space ensures that when the subsequent product is demoulded, there will be no jamming at the feed port position, which will affect the demoulding efficiency. In addition, after the feed control plate 304 moves down to the specified position, the feed control plate 304 will push the pushing cylinder 307, driving the sliding rod 113 to move downward, so that the obstruction inclined rod 111 loses the restriction on the force block 112, forcing the accommodating plate 2 104 to be disconnected from the accommodating plate 1 101, and the remaining molding plate 1 205 and molding plate 2 206 can facilitate the subsequent drying, demoulding and other processes of the equipment.

[0041] A specific application of this embodiment is: after the equipment is assembled, the concrete to be processed is poured into the annular space formed by the containing plate 101, the containing plate 104, the molding plate 105, and the molding plate 206, and the power supply of the power motor 103 is turned on. The power motor 103 drives the push rod 201 to move downward through the internal gear. At this time, a closed space is formed between the piston plate 203 and the barreled space, and as the push rod 201 continues to press downward, the closed space is transformed into a high-pressure space. By applying high pressure, the bubbles in the concrete can be quickly compressed and released, and the bubbles can be discharged from the concrete. Utilizing the characteristic that the high pressure generated above diffuses to the surroundings, a feed control plate 304 is provided at the bottom of the equipment. The force generated by the high pressure forces the feed control plate 304 to move downward. After the feed control plate 304 moves down a certain distance, it will present the following Figure 6In the state shown, the concrete inside the enclosed space will enter the molding groove between the molding plate 206 and the molding plate 1 205 through the through hole of the molding plate 1 205, wherein the control spring 303 controls the index of the top pressure of the feed control plate 304 during this process, and the feed control plate 304 will move down only after the top pressure reaches the specified index, thereby ensuring the stability of the high pressure in the enclosed space, and by changing the feeding method, ensuring that the concrete enters the inner wall of the molding plate 1 205 from the inner wall of the containing plate 101, after the pressurized airbag 305 is pressurized, the internal air will enter the telescopic airbag 106 through the air outlet square tube 306, causing the telescopic airbag 106 to expand, blocking the connection seam between the containing plate 101 and the containing plate 2 104, thereby preventing the internal high-pressure environment from causing the moisture in the concrete to flow out through the connection seam, thereby improving the sealing performance of the equipment while ensuring the internal concrete moisture content ratio and To ensure product quality, after the piston plate 203 moves down to the specified position, the piston plate 203 will contact the top of the pressure bracket 211 and push the pressure bracket 211 down. After the pressure bracket 211 moves down to the specified height, the blocking plate 213 is pushed by the pushing spring 212 to block the holes on the side of the molding plate 205. In this process, the blocking plate 213 will cut off the connection between the internal and external spaces to ensure that when the subsequent products are demolded, there will be no jamming at the feed port position, which will affect the demolding efficiency. In addition, after the feed control plate 304 moves down to the specified position, the feed control plate 304 will push the pushing cylinder 307, driving the sliding rod 113 to move downward, so that the obstruction diagonal rod 111 loses the restriction on the force block 112, forcing the accommodating plate 2 104 to be disconnected from the accommodating plate 1 101, and the remaining molding plate 1 205 and molding plate 2 206 can facilitate the subsequent drying, demolding and other processes of the equipment.

[0042] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A production device for ultra-high strength prestressed concrete pipe piles, comprising a fixing mechanism (1), wherein the fixing mechanism (1) further comprises a receiving plate (101), a support frame (102) is fixedly connected to the side wall of the telescopic receiving plate (101), and a power motor (103) is fixedly connected to the top of the telescopic support frame (102), characterized in that: Also includes: A shaping mechanism (2), the telescopic shaping mechanism (2) comprising a push rod (201) slidably connected to the inner wall of the through hole on the support frame (102), a gear rod (202) fixedly connected to the side wall of the telescopic push rod (201), and a piston plate (203) fixedly connected to the bottom of the telescopic gear rod (202); A control mechanism (3), the control mechanism (3) comprising a fixing plate (301) fixedly connected to the bottom of the containing plate (101), a pressurized air bag (305) fixedly connected to the top of the fixing plate (301), and an air outlet square tube (306) penetratingly connected to the side wall of the pressurized air bag (305); The fixing mechanism (1) further comprises a second containing plate (104) slidably connected to the side wall of the first containing plate (101), a combination groove (105) being provided on the side wall of the second containing plate (104), a telescopic airbag (106) being fixedly connected to the inner wall of the combination groove (105), and a sliding groove (107) being provided on the side wall of the second containing plate (104); The molding mechanism (2) further comprises a cleaning ring (204) fixedly connected to the outer wall of the piston plate (203); a molding plate 1 (205) is placed on the top of the fixed plate 1 (301); a molding plate 2 (206) is slidably connected to the side wall of the molding plate 1 (205); a connecting rod (207) is slidably connected to the inner wall of the molding plate 1 (205); and the side walls of the molding plate 1 (205) and the molding plate 2 (206) are both provided with square through holes; The control mechanism (3) further comprises a second fixing plate (302) fixedly connected to the bottom of the second containing plate (104); a control spring (303) is fixedly connected to the top of the second fixing plate (302); an end of the control spring (303) away from the second fixing plate (302) is fixedly connected to a feed control plate (304); an inner wall of the feed control plate (304) is slidably connected to an outer wall of the first molding plate (205); and a pushing cylinder (307) is fixedly connected to the bottom of the feed control plate (304); The concrete to be processed is poured into the annular space formed by the containing plate 1 (101), the containing plate 2 (104), the molding plate 1 (205), and the molding plate 2 (206). The power motor (103) drives the push rod (201) to move downward through the internal gear. At this time, a closed space is formed between the piston plate (203) and the barrel space. The closed space is transformed into a high-pressure space. By applying high pressure, the feed control plate (304) is forced to move downward along the inner wall of the annular space, and the square through hole on the side of the feeding control plate (304) and the molding plate 1 (205) overlap, so that the concrete can enter the plastic space formed by the molding plate 1 (205) and the molding plate 2 (206) through the square through hole.

2. The production equipment of a super high strength prestressed concrete pipe pile according to claim 1 is characterized in that: The fixing mechanism (1) further comprises a sliding rod (113) slidably connected to the inner wall of the sliding groove (107); a plurality of limiting rails (108) are fixedly connected to the side wall of the sliding rod (113); a plurality of limiting rails (108) are slidably connected to the inner walls of the limiting rails (108); a return spring (110) is fixedly connected to the side wall of the limiting block (109); an end of the return spring (110) away from the limiting block (109) is fixedly connected to the inner wall of the limiting rail (108); a blocking inclined rod (111) is fixedly connected to the top of the limiting block (109); and a force bearing block (112) is fixedly connected to the side wall of the accommodating plate (101).

3. The production equipment of a super high strength prestressed concrete pipe pile according to claim 2 is characterized in that: The molding mechanism (2) further comprises a sliding groove (208) provided on a side wall of the molding plate (205); a sliding bracket (209) is slidably connected to the inner wall of the sliding groove (208); a compression spring (210) is fixedly connected to the bottom of the sliding bracket (209); and one end of the compression spring (210) away from the sliding bracket (209) is fixedly connected to the bottom of the sliding groove (208).

4. The production equipment of ultra-high strength prestressed concrete pipe piles according to claim 3 is characterized by: The shaping mechanism (2) further comprises a pressure bracket (211) fixedly connected to the side wall of the sliding bracket (209), a push spring (212) fixedly connected to the side wall of the pressure bracket (211), a damper fixedly connected to the inner wall of the push spring (212), and a blocking plate (213) fixedly connected to one end of the push spring (212) away from the pressure bracket (211).

5. The production equipment of ultra-high strength prestressed concrete pipe piles according to claim 4 is characterized in that: The control mechanism (3) further comprises a support block (308) fixedly connected to the bottom of the first fixed plate (301), and a device base (309) is fixedly connected to the side wall of the support block (308).