A tunnel soft rock large deformation monitoring anchor

By designing a tunnel soft rock large deformation monitoring anchor with an anchor assembly and a pressure element with a movable body and a resistance body, the existing technology solves the problem of being unable to monitor the internal deformation of the tunnel surrounding rock and poor anchoring effect, and achieves real-time monitoring and Improve the effect of anchoring force.

CN118327648BActive Publication Date: 2024-10-11SINOHYDRO BUREAU 1 CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410749911.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-12
Publication Date
2024-10-11
Estimated Expiration
2044-06-12

Smart Images

  • Figure CN118327648B_ABST
    Figure CN118327648B_ABST
Patent Text Reader

Abstract

The present invention discloses a large deformation monitoring anchor rod for soft rock in a tunnel, which relates to the field of underground engineering for tunnel construction, and includes an anchor rod assembly and a measuring device. The anchor rod assembly includes a pressure-yielding device, a hollow anchor rod and an anchor head. The two ends of the pressure-yielding device are detachably connected to the hollow anchor rod and the anchor head respectively. The pressure-yielding device includes a sleeve and a movable body and a resistance body located in the sleeve. The movable body is slidably connected to the sleeve, and the resistance body is clamped with the sleeve. The movable body abuts against the resistance body to provide working resistance of the anchor rod assembly. The measuring device includes a pressure element, a data line and a host. The pressure element is located in the resistance body. The present invention sets a plurality of resistance bodies to improve the anchoring effect of the anchor rod assembly. At the same time, when the pressure element is under pressure, the pressure signal will be transmitted to the external host, so as to monitor the deformation of the soft rock and the tension of the anchor rod in real time, effectively judge the pressure-yielding condition of the anchor rod, and improve the safety of tunnel support.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of underground engineering for tunnel construction, and in particular to a tunnel soft rock large deformation monitoring anchor rod. Background Art

[0002] Tunnel weak large deformation means that before tunnel excavation, the rock mass is in a three-way high confining pressure environment, which is mutually constrained and in a stable equilibrium state. After tunnel excavation, stress is redistributed twice, and the tangential stress near the tunnel wall increases while the radial stress decreases (approaches zero). At this time, the rock mass environment of the tunnel wall changes from a high confining pressure state to a low confining pressure state. The confining pressure is in a plastic state in a large range of the stress increase area. When the support structure is not enough to resist the deformation of the surrounding rock, a significant plastic state is produced. The greater the local stress, the greater the plastic radius of the surrounding rock will be after tunnel excavation. This deformation is a significant plastic deformation produced under high ground stress conditions. There are two main characteristics:

[0003] 1. The deformation is large. Generally, the deformation of soft rock tunnels can reach more than 10 cm, while the deformation of squeezing soft rock tunnels can reach more than 30 cm, or even more than 100 cm. It is often manifested as cracking of initial support sprayed concrete, distortion of steel frames, deformation intrusion, and even cracking of the secondary lining.

[0004] 2. Deformation lasts for a long time. Since the weak surrounding rock has high rheology and low strength, the stress redistribution after excavation lasts for a long time, resulting in a long deformation convergence time. The shortest time is tens of days, hundreds of days, and the longest time is several years.

[0005] For problems with large deformation, yielding anchor rods are usually used for anchoring. The anchor rods adapt to the large deformation of the rock and soil in the stratum to achieve the yielding effect. The deformed geological body will release the harmful deformation appropriately during anchoring, maintain the anchoring effect, ensure the reliability of anchoring, and provide protection for the safety of the project. However, the existing yielding anchor rods cannot monitor the deformation of the surrounding rock inside the tunnel, and cannot effectively judge the yielding condition of the anchor rods.

[0006] As for the problem of long-lasting deformation, it is necessary to carry out long-term and continuous monitoring of the weak surrounding rock of the tunnel after excavation. At present, the monitoring of surrounding rock pressure between surrounding rock and initial support is mainly carried out by pre-buried soil pressure box method. This method is expensive, complex to install, and has great interference to construction, so it is difficult to apply it in large quantities in tunnel engineering.

[0007] The Chinese patent with the authorization announcement number CN111878169B discloses a rock anchor and working method that can measure the internal deformation of the tunnel surrounding rock. The scheme reflects the deformation inside the rock through the resistance change of the resistive displacement monitoring element. However, the scheme lacks the pressure-releasing effect and cannot provide effective working resistance. The deformed geological body cannot appropriately release the harmful deformation during anchoring, and the anchoring effect is poor.

[0008] Therefore, there is an urgent need for an anchor structure that effectively combines the yielding anchor and the measuring device, which can monitor the internal deformation and yielding amount of the surrounding rock while ensuring the yielding effect. Summary of the invention

[0009] The purpose of the present invention is to provide a tunnel soft rock large deformation monitoring anchor rod to solve the problems existing in the background technology.

[0010] The objective of the present invention is achieved through the following technical solutions:

[0011] A tunnel soft rock large deformation monitoring anchor rod comprises an anchor rod assembly and a measuring device, wherein the anchor rod assembly comprises a pressure-releasing device, a hollow anchor rod and an anchor head, and two ends of the pressure-releasing device are detachably connected to the hollow anchor rod and the anchor head respectively.

[0012] The pressure-releasing device comprises a sleeve, a movable body and a resistance body located in the sleeve, the movable body is slidably connected to the sleeve, the resistance body is clamped with the sleeve, and the movable body abuts against the resistance body to provide working resistance of the anchor rod assembly; one end of the movable body is connected to the anchor head, and the other end of the movable body is connected to the hollow anchor rod, a connecting piece is provided between the movable body and the hollow anchor rod, a hollow tube is provided in the hollow anchor rod, and the connecting piece is connected to the hollow tube;

[0013] The measuring device comprises a pressure element, a data line and a host, wherein the pressure element is located in the resistance body, and the data line passes through the connecting piece and the hollow tube and extends out of the drilled hole.

[0014] Further, the movable body includes a first middle part and a first sliding part, the first sliding part array is on the outside of the first middle part, the length of the first sliding part is greater than the length of the sleeve, one end of the first middle part is provided with a first internal threaded opening, the anchor head is threadedly connected to the movable body through the first internal threaded opening, the other end of the first middle part is provided with an abutment part, and the outer size of the first middle part is adapted to the inner size of the sleeve.

[0015] Furthermore, a sliding groove is provided in the sleeve at a position corresponding to the first sliding part, the size of the sliding groove is adapted to the size of the first sliding part, a step groove is provided at one end of the sliding groove close to the hollow anchor rod, and a clamping groove arranged along the circumferential direction of the sleeve is provided at the position of the step groove, and the clamping groove is connected to the step groove.

[0016] Further, the resistance body is located on one side of the abutment portion, the resistance body includes two groups of resistance sheets of the same specifications, the pressure element is located between the two resistance sheets, the resistance sheet includes a second middle portion and a second sliding portion, the second sliding portion array is on the outside of the second middle portion, the position of the second sliding portion corresponds to the position of the step groove, the size of the second sliding portion is matched with the size of the step groove, the size of the second sliding portion is matched with the clamping groove, and the resistance body is clamped with the sleeve through the second sliding portion and the clamping groove.

[0017] Furthermore, the connecting piece includes a sealing plate, a sealing head, a plug and a second internal threaded port, the outer diameter of the sealing plate is the same as the outer diameter of the sleeve, the position array of the plug corresponding to the step groove is on the sealing plate, the size of the plug is adapted to the gap after the step groove is inserted into the first sliding part, the size of the plug is adapted to the inner diameter of the sleeve, the sealing plate is provided with an opening at the position corresponding to the first sliding part, and the hollow tube is threadedly connected to the connecting piece through the second internal threaded port.

[0018] Furthermore, the plug is a hollow structure, a connecting cavity is provided in the sealing plate, the connecting cavity is respectively connected to the plug and the second internal threaded port, one end of the data cable is connected to the pressure element, and the other end of the data cable passes through the stepped groove, the plug, the connecting cavity and the hollow tube and is connected to the host.

[0019] Furthermore, a grouting branch pipe is provided at one end of the hollow anchor rod close to the connecting piece, and the grouting branch pipe is fixed to the first sliding part. The first sliding part is a hollow structure, and one end of the first sliding part close to the first internal threaded opening is connected to the first middle part. The anchor head is a hollow structure, and the anchor head is connected to the first middle part. Sealing plugs are provided at both ends of the hollow anchor rod, and the sealing plug is located between the hollow anchor rod and the hollow tube. The end of the sealing plug close to the connecting piece abuts against the connecting piece, and a grouting hole is provided on the outer side of one end of the hollow tube extending out of the drilled hole, and a grouting hole is provided on the outer side of the anchor head.

[0020] Furthermore, a tray is provided at one end of the hollow anchor rod outside the drilled hole, a nut is provided on the outer side of the tray, the nut is threadably matched with the hollow anchor rod, and the main machine is fixed on the tray.

[0021] Furthermore, the resistance sheet is made of steel wire mesh or iron plate.

[0022] The beneficial effects of the present invention are:

[0023] 1) The abutment portion of the movable body is located at the front end of the resistance body. When the movable body moves, it abuts against the resistance body, and the working resistance is applied through the resistance body to improve the anchoring force of the anchor assembly.

[0024] 2) When the pressure element is under pressure, it will transmit the pressure signal to the external host through the data line. The host can monitor the deformation of soft rock in real time and effectively judge the pressure relief of anchor rods, so that the staff can take timely measures and improve the safety of tunnel support.

[0025] 3) Setting up multiple pressure elements can monitor the stress condition of each resistance body separately, and at the same time comprehensively analyze the deformation of the tunnel through multiple pressure elements to improve the monitoring effect.

[0026] 4) Multiple pressure-releasing devices can be flexibly set to adapt to anchor rods of different lengths and improve the pressure-releasing effect. At the same time, by setting pressure-releasing devices at different positions in the borehole, the deformation of the borehole at different positions can be monitored. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 A cross-sectional view of a tunnel soft rock large deformation monitoring anchor rod according to the present invention;

[0028] Figure 2 for Figure 1 The enlarged schematic diagram of point A in the middle;

[0029] Figure 3 It is a structural diagram of the movable body in the present invention;

[0030] Figure 4 It is a schematic diagram of the pressure-releasing device in the present invention close to one end of the anchor head;

[0031] Figure 5 It is a schematic diagram of the sleeve close to one end of the hollow anchor rod in the present invention;

[0032] Figure 6 is a cross-sectional view of the sleeve in the present invention;

[0033] Figure 7 is a top view of the sleeve in the present invention;

[0034] Figure 8 is a side view of the connecting member of the present invention;

[0035] Fig. 9 It is a front view of the connecting member in the present invention;

[0036] Fig.10 It is a side view of the resistance body in the present invention;

[0037] Fig.11 It is a front view of the resistance body in the present invention;

[0038] Fig.12 is a schematic diagram of a hollow anchor rod in the present invention;

[0039] Fig.13is a schematic diagram of an anchor head in the present invention;

[0040] Fig.14 It is a schematic diagram of Example 2 of the present invention;

[0041] In the figure, 1-hollow anchor rod, 11-grouting branch pipe, 12-sealing plug, 13-grouting hole, 2-anchor head, 21-grouting hole, 3-pressure release device, 31-sleeve, 311-slide groove, 312-step groove, 313-clamping groove, 32-movable body, 321-first sliding part, 322-first middle part, 323-first internal threaded mouth, 324-abutting part, 33-resistance body, 331-second middle part, 332-second sliding part, 4-measuring device, 41-pressure element, 42-data line, 43-host, 5-connecting piece, 51-sealing plate, 52-plug, 53-sealing head, 54-second internal threaded mouth, 55-connecting cavity, 56-opening, 6-hollow pipe, 7-tray, 8-nut, 9-tunnel soft rock, 10-drilling hole. DETAILED DESCRIPTION

[0042] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0043] Example 1

[0044] like Figure 1-13 As shown, a tunnel soft rock large deformation monitoring anchor includes an anchor assembly and a measuring device 4. The anchor assembly includes a pressure-releasing device 3, a hollow anchor 1 and an anchor head 2. The two ends of the pressure-releasing device 3 are detachably connected to the hollow anchor 1 and the anchor head 2, respectively.

[0045] The pressure-releasing device 3 includes a sleeve 31 and a movable body 32 and a resistance body 33 located in the sleeve 31, wherein the movable body 32 is slidably connected to the sleeve 31, and the resistance body 33 is clamped with the sleeve 31, and the movable body 32 abuts against the resistance body 33 to provide working resistance for the anchor assembly; one end of the movable body 32 is connected to the anchor head 2, and the other end of the movable body 32 is connected to the hollow anchor 1, a connecting piece 5 is provided between the movable body 32 and the hollow anchor 1, a hollow tube 6 is provided in the hollow anchor 1, and the connecting piece 5 is connected to the hollow tube 6;

[0046] The measuring device 4 includes a pressure element 41 , a data line 42 and a host 43 . The pressure element 41 is located inside the resistance body 33 , and the data line 42 passes through the connecting piece 5 and the hollow tube 6 and extends out of the borehole 10 .

[0047] Through the above technical solution, a borehole 10 is drilled in advance on the soft rock 9 of the tunnel, and then the pressure element 41 is installed in the pressure-releasing device 3, and the data line 42 is connected and then extended from the hollow tube 6 to connect with the external host 43, and then the anchor head 2, the pressure-releasing device 3 and the hollow anchor rod 1 are connected in sequence, and the anchor head 2, the movable body 32 and the hollow anchor rod 1 are a whole. Then the anchor rod assembly is placed in the drilled hole 10, and it can be known that the aperture of the drilled hole 10 is adapted to the outer diameter of the sleeve 31.

[0048] After the anchor assembly is placed in the borehole 10, the tray 7 and nut 8 are installed to fix the anchor assembly, and then grouting is performed through the grouting hole 13. After solidification, the sleeve 31 is fixed to the borehole 10 as a whole, and the anchor head 2 and the hollow anchor 1 are fixed to the borehole 10 as a whole. When the soft rock 9 of the tunnel is deformed, the sleeve 31 and the movable body 32 will be relatively displaced. At this time, the hollow anchor 1 drives the movable body 32 to move toward the opening of the borehole 10, and the sleeve 31 is relatively immobile.

[0049] Since the abutment portion 324 of the movable body 32 is located at the front end of the resistance body 33, when the movable body 32 moves, it will abut against the resistance body 33, and the resistance body 33 will apply working resistance to improve the anchoring force of the anchor assembly. At the same time, when the movable body 32 abuts against the resistance body 33, the internal pressure element 41 will be compressed and the pressure signal will be transmitted to the external host 43 through the data line 42. The deformation of the soft rock 9 in the tunnel can be monitored in real time through the host 43, and the pressure release of the anchor assembly can be effectively judged, which is convenient for the staff to make timely processing and improve the safety of tunnel support.

[0050] like Figure 1-Figure 4 As shown, the movable body 32 includes a first middle portion 322 and a first sliding portion 321. The length of the first sliding portion 321 is greater than the length of the sleeve 31. Figure 5-Figure 7 As shown, a slide groove 311 is provided in the sleeve 31 at a position corresponding to the first sliding portion 321 , the first sliding portion 321 is fully matched with the slide groove 311 , and the first middle portion 322 is matched with the inner diameter of the sleeve 31 .

[0051] Therefore, when the movable body 32 is inserted into the sleeve 31, at one end of the anchor head 2, the first sliding portion 321 and the first intermediate portion 322 tightly fit together to seal the inside of the sleeve 31. In order to improve the sealing effect, a sealing ring can be added to the outer contour of the movable body 32.

[0052] Continue as Figure 5-Figure 7As shown, a step groove 312 is provided at one end of the slide groove 311 close to the hollow anchor rod 1. The function of the step groove 312 is to facilitate the insertion of the resistance body 33 along the step groove 312 and limit it through the step groove 312. The step groove 312 gradually expands from the inside to the outside of the sleeve 31, and each step groove 312 is provided with a section of clamping groove 313 arranged along the circumference of the sleeve 31. The width of the clamping groove 313 is the same as the width of each level of the step groove 312, and is also the same as the thickness of the resistance body 33.

[0053] At the same time Figure 5-Figure 11 As shown, the resistance sheet includes a second middle portion 331 and a second sliding portion 332, the pressure element 41 is located between the two second middle portions 331, the second sliding portion 332 is arrayed on the outside of the second middle portion 331, the position of the second sliding portion 332 corresponds to the position of the step groove 312, the size of the second sliding portion 332 is adapted to the size of the step groove 312, and the size of the second sliding portion 332 is adapted to the snap-in groove 313, so the resistance body 33 is inserted into the step groove through the second sliding portion 332, and then rotated in a certain direction so that the second sliding portion extends into the snap-in groove 313, and is snap-fitted and fixed to the sleeve 31 through the second sliding portion 332 and the snap-in groove 313.

[0054] At the same time Figure 2-Figure 11 As shown, the size of the second sliding portion 332 of the smallest resistance body 33 is adapted to the deepest level of the step groove 312, so the smallest resistance body 33 is inserted into the deepest part of the step groove 312 through the second sliding portion 332, and will not continue to slide along the slide groove 311 after being limited by the step groove 312.

[0055] After the resistance body 33 is rotated by a certain angle, the second sliding part 332 will rotate along the clamping groove 313, so that the resistance body 33 and the sleeve 31 are clamped, and then multiple resistance bodies 33 are placed in sequence, and the second sliding part 332 of each resistance body 33 gradually becomes larger and matches the stepped groove 312. After the resistance bodies 33 are all clamped, the positions of the slide groove 311 and the stepped groove 312 are vacated, which facilitates the insertion of the first sliding part 321 into the slide groove 311 at the other end. The placement of multiple resistance bodies 33 is completed by the stepped groove 312 and the clamping groove 313, which improves the resistance to the movable body 32, and the flexible arrangement can adapt to tunnels with different deformation amounts.

[0056] like Figure 1 , Figure 10-12As shown, the pressure element 41 is installed between the two resistance sheets, which is convenient for real-time monitoring of the pressure condition of the resistance body 33. When the frontmost resistance body 33 is abutted by the abutment portion 324 of the movable body 32, the force condition begins to be recorded. When the tunnel is deformed greatly, the abutment portion 324 will push out the closest resistance body 33, causing the resistance body 33 to deform until the movable body 32 abuts against the next resistance body 33. At this time, the pressure element 41 of the resistance body 33 continues to record the pressure condition. The pressure relief effect is improved by using multiple resistance bodies 33, and the multiple pressure elements 41 can monitor the force condition of each resistance body 33 respectively, and a comprehensive analysis is performed by using multiple pressure elements 41.

[0057] like Figure 1-Figure 3 , Figure 8-Figure 12 As shown, after the resistance body 33 is arranged, the plug 52 of the connector 5 is inserted into the gap to fix and seal, and the sealing head 53 is also inserted into the sleeve 31 to complete the sealing. At this time, the sealing plate 51 abuts against the end surface of the sleeve 31 to ensure that the parts in the sleeve 31 will not be disturbed by the subsequent grouting. Then the hollow tube 6 is threadedly connected with the second internal threaded port 54, and the data line 42 in the sleeve 31 is gathered and passed through the gap between the stepped groove 312 and the first sliding part 321, and then penetrates the plug 52, the connecting cavity 55, the hollow tube 6, and then extends out of the borehole 10 to connect with the host 43.

[0058] Then as Figure 3 and Fig.12 As shown, the hollow tube 6 is inserted into the hollow anchor rod 1, and then the grouting branch pipe 11 is also inserted into the first sliding part 321, and the grouting branch pipe 11 is fixedly connected to the first sliding part 321 by welding or other methods to improve the overall connection strength between the movable body 32 and the hollow anchor rod 1. At the same time, the sealing plugs 12 are respectively fixed to the two ends of the hollow anchor rod 1 to prevent subsequent grout leakage.

[0059] Then as Figure 3-Figure 4 , Fig.13 As shown, the anchor head 2 is connected to the movable body 32 through the first internal threaded opening 323. Since the first middle part 322 is a hollow structure, it is connected to the first sliding part 321. The slurry enters the hollow anchor rod 1 from the grouting hole 13, then flows along the grouting branch pipe 11, the first sliding part 321, the first middle part 322, the anchor head 2, and finally flows out from the slurry outlet hole 21. At this time, the slurry is located in the borehole 10. The slurry is poured out from the bottom of the borehole 10 to improve the grouting effect and ensure the overall connection strength between the anchor rod assembly and the borehole 10. At the same time, it can be known that since the first middle part 322 is a hollow structure, a slurry stopper is provided at one end of the abutment part 324 to prevent the slurry from being retained from one end of the abutment part 324.

[0060] Example 2

[0061] On the basis of Example 1, refer to Fig.14As shown, the difference between this embodiment and embodiment 1 is that two adjacent pressure relief devices 3 are connected by a hollow anchor rod 1, one end of the hollow anchor rod 1 is connected to the left movable body 32 as a whole through a grouting branch pipe 11, and the other end of the hollow anchor rod 1 is connected to the right movable body 32 through a thread. Then continue as Fig.14 As shown, since the first middle part 322 is a hollow structure, the hollow tube 6 located between the two pressure-releasing devices 3 is connected to the connector 5 on the left at one end, and the other end extends into the first middle part 322 on the right. The data line 42 in the left movable body 32 enters the second sleeve 31 through the hollow tube 6 and is connected to the data line 42 in the second sleeve 31. It can be known that at this time, a circular slurry stopper is provided at one end of the first middle part 322 on the right side close to the abutment part 324 to prevent the slurry from flowing into the sleeve 31 from one end of the abutment part 324.

[0062] Flexible arrangement of multiple pressure-releasing devices 3 can adapt to anchor rods of different lengths and improve the pressure-releasing effect. Meanwhile, by arranging the pressure-releasing devices 3 at different positions in the borehole 10 , the deformation of the borehole 10 at different positions can be monitored.

[0063] The above is only a preferred embodiment of the present invention. It should be understood that the present invention is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the concept described herein through the above teachings or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art do not depart from the spirit and scope of the present invention, and should be within the scope of protection of the claims attached to the present invention.

Claims

1. A tunnel soft rock large deformation monitoring anchor, characterized by: It comprises an anchor rod assembly and a measuring device (4), wherein the anchor rod assembly comprises a pressure-releasing device (3), a hollow anchor rod (1) and an anchor head (2), and two ends of the pressure-releasing device (3) are respectively detachably connected to the hollow anchor rod (1) and the anchor head (2); The pressure-releasing device (3) comprises a sleeve (31), and a movable body (32) and a resistance body (33) located in the sleeve (31); the movable body (32) is slidably connected to the sleeve (31); the resistance body (33) is snap-fitted to the sleeve (31); the movable body (32) and the resistance body (33) abut against each other to provide working resistance for the anchor rod assembly; one end of the movable body (32) is connected to the anchor head (2); the other end of the movable body (32) is connected to the hollow anchor rod (1); a connecting piece (5) is provided between the movable body (32) and the hollow anchor rod (1); a hollow tube (6) is provided in the hollow anchor rod (1); the connecting piece (5) is connected to the hollow tube (6); The measuring device (4) comprises a pressure element (41), a data line (42) and a host (43), wherein the pressure element (41) is located inside the resistance body (33), and the data line (42) passes through the connecting piece (5) and the hollow tube (6) and extends out of the borehole (10); The movable body (32) comprises a first middle portion (322) and a first sliding portion (321), the first sliding portion (321) being arranged on the outer side of the first middle portion (322), the length of the first sliding portion (321) being greater than the length of the sleeve (31), one end of the first middle portion (322) being provided with a first internal thread opening (323), the anchor head (2) being threadedly connected to the movable body (32) via the first internal thread opening (323), the other end of the first middle portion (322) being provided with an abutting portion (324), the outer dimensions of the first middle portion (322) being adapted to the inner dimensions of the sleeve (31); A slide groove (311) is provided in the sleeve (31) at a position corresponding to the first sliding portion (321), the size of the slide groove (311) is adapted to the size of the first sliding portion (321), a step groove (312) is provided at one end of the slide groove (311) close to the hollow anchor rod (1), a clamping groove (313) is provided at the position of the step groove (312) and is arranged along the circumferential direction of the sleeve (31), and the clamping groove (313) is communicated with the step groove (312); The resistance body (33) is located on one side of the abutting portion (324), the resistance body (33) comprises two groups of resistance sheets of the same specification, the pressure element (41) is located between the two resistance sheets, the resistance sheet comprises a second middle portion (331) and a second sliding portion (332), the second sliding portion (332) is arrayed on the outside of the second middle portion (331), the position of the second sliding portion (332) corresponds to the position of the stepped groove (312), the size of the second sliding portion (332) matches the size of the stepped groove (312), the size of the second sliding portion (332) matches the size of the clamping groove (313), and the resistance body (33) is clamped with the sleeve (31) via the second sliding portion (332) and the clamping groove (313).

2. The tunnel soft rock large deformation monitoring anchor rod according to claim 1, characterized in that: The connecting member (5) comprises a sealing plate (51), a sealing head (53), a plug (52) and a second internal threaded opening (54); the outer diameter of the sealing plate (51) is the same as the outer diameter of the sleeve (31); the plug (52) is arranged on the sealing plate (51) at a position corresponding to the step groove (312); the size of the plug (52) is adapted to the gap after the step groove (312) is inserted into the first sliding portion (321); the size of the plug (52) is adapted to the inner diameter of the sleeve (31); an opening (56) is provided on the sealing plate (51) at a position corresponding to the first sliding portion (321); and the hollow tube (6) is threadedly connected to the connecting member (5) through the second internal threaded opening (54).

3. The tunnel soft rock large deformation monitoring anchor rod according to claim 2 is characterized by: The plug (52) is a hollow structure. A connecting cavity (55) is provided in the sealing plate (51). The connecting cavity (55) is connected to the plug (52) and the second internal threaded port (54) respectively. One end of the data line (42) is connected to the pressure element (41). The other end of the data line (42) passes through the stepped groove (312), the plug (52), the connecting cavity (55) and the hollow tube (6) and is connected to the host (43).

4. The tunnel soft rock large deformation monitoring anchor rod according to claim 1, characterized in that: A grouting branch pipe (11) is provided at one end of the hollow anchor rod (1) close to the connecting piece (5), and the grouting branch pipe (11) is fixed to the first sliding part (321). The first sliding part (321) is a hollow structure. One end of the first sliding part (321) close to the first internal thread opening (323) is connected to the first middle part (322). The anchor head (2) is a hollow structure. The anchor head (2) is connected to the first middle part (322). Sealing plugs (12) are provided at both ends of the hollow anchor rod (1). The sealing plugs (12) are located between the hollow anchor rod (1) and the hollow tube (6). One end of the sealing plug (12) close to the connecting piece (5) abuts against the connecting piece (5). A grouting hole (13) is provided on the outer side of one end of the hollow tube (6) extending out of the drilled hole (10), and a grouting hole (21) is provided on the outer side of the anchor head (2).

5. The tunnel soft rock large deformation monitoring anchor rod according to claim 1, characterized in that: A tray (7) is provided at one end of the hollow anchor rod (1) outside the drill hole (10), a nut (8) is provided on the outside of the tray (7), the nut (8) is threadably matched with the hollow anchor rod (1), and the main machine (43) is fixed on the tray (7).

6. The tunnel soft rock large deformation monitoring anchor rod according to claim 1, characterized in that: The resistance sheet is made of steel wire mesh or iron plate.

Citation Information

Patent Citations

  • A rock anchor bolt for measuring internal deformation of tunnel surrounding rock and its working method

    CN111878169B

  • Tension-compression coupled yielding energy-absorbing grouting anchor rod for large deformation of surrounding rock and working method thereof

    CN109723480A

  • Large deformation tunnel yielding anchor rod capable of measuring surrounding rock pressure

    CN110195608A

  • Resistance -increasing lets and presses large deformation stock

    CN208718710U

  • Large-deformation resistance-increased Anti-shearing anchor cable, and construction method and working method thereof

    WO2022105599A1