A method and system for evaluating reliability of power transmission lines under wind and ice conditions
By acquiring and analyzing meteorological data, evaluating the wind and ice combined wind speed and load of the transmission line, combined with the finite element model, the problem of ignoring the wind and ice combined probability and climate change in the existing technology is solved, and the accuracy of the reliability evaluation of the transmission line is improved. and early warning capabilities.
Patent Information
- Application Number
- CN202410455872.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-16
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-04-16
AI Technical Summary
The prior art ignores wind-ice combined probability and climate change when evaluating the wind-ice loads faced by transmission lines, resulting in inaccurate structural reliability assessment and increasing the risk of failure.
By obtaining meteorological data, dividing periods, fitting the wind speed distribution function of the dangerous months of ice covering, calculating wind and ice combined wind speed and load, and evaluating the failure probability of the transmission line in combination with the finite element model to provide reliability assessment.
Accurate assessment of wind and ice loads is achieved, and early warning of wind and ice loads faced by transmission lines is improved, which is suitable for areas where wind and ice joint action records are lacking.
Smart Images

Figure CN118332800B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of transmission line disaster assessment, and in particular relates to a method and system for assessing the reliability of a transmission line under combined wind and ice conditions. Background Art
[0002] As an important infrastructure, transmission lines are always facing the combined threat of wind and ice disasters, and there is a risk of causing huge economic losses. Transmission line icing refers to the phenomenon that ice forms on the surface of wires, insulators, towers and other components on transmission lines in winter or cold conditions. The weight of ice will increase the line load and increase the windproof area of transmission lines. The combined effect of wind and ice loads will lead to safety hazards such as line breakage and tower toppling. At present, the key to the design of transmission line icing is to count the wind speed values during icing, but wind speed statistics during icing are rare. Therefore, for areas with a wide lack of wind-ice joint records, national standards recommend different wind speed reduction calculation methods.
[0003] The method recommended by the standards of various countries is often to use the extreme value of icing and the reduced value of the design wind speed to verify the wind-ice load of the transmission line. However, this method ignores the problem of the wind-ice joint probability, that is, it does not consider the reduced value of the design wind speed and the joint probability of icing. Therefore, ignoring this joint probability will lead to inaccurate reliability assessment of the structure when wind-ice load acts.
[0004] In addition, existing studies have ignored the impact of climate change on the selection of wind-ice loads, further increasing the risk of failure of transmission lines when facing wind-ice loads. Summary of the invention
[0005] In order to overcome the shortcomings of the above-mentioned prior art, the present invention provides a method and system for evaluating the reliability of power transmission lines under combined wind and ice conditions, which take into account the correlation between icing and wind speed during icing to the greatest extent, provide early warning of the wind-ice loads faced by the transmission lines during their service period, fully evaluate the reliability level of the transmission tower line system in different periods, and provide a reference for wind-ice verification of transmission lines.
[0006] To achieve the above objectives, one or more embodiments of the present invention provide the following technical solutions:
[0007] A first aspect of the present invention provides a method for evaluating the reliability of a power transmission line under combined wind and ice conditions.
[0008] A method for evaluating the reliability of a power transmission line under wind and ice conditions comprises the following steps:
[0009] Obtain meteorological data of the area where the transmission tower line system is located, divide the meteorological data into multiple time periods, and obtain the monthly average wind speed and monthly average temperature data sets corresponding to each time period;
[0010] Based on the average monthly temperature, determine the ice-dangerous months in each period;
[0011] The probability density distribution function of the monthly average wind speed corresponding to the ice-hazard month is fitted, and combined with the set return period, the wind-ice combined wind speed under the given return period is calculated;
[0012] According to the extreme ice thickness of the set return period and the obtained wind-ice combined wind speed, the wind-ice load acting on the transmission tower, transmission line and insulator of the transmission tower-line system is calculated respectively;
[0013] Apply wind-ice load to the pre-established finite element model of the transmission line, calculate and obtain multiple discrete failure probability points, select the failure probability points for fitting, and obtain the failure probability curve;
[0014] Combining the failure probability curve with the probability density distribution function of the monthly average wind speed, the total failure probability of the transmission line is obtained. Based on the total failure probability of the transmission line, the reliability assessment of the transmission line is completed.
[0015] A second aspect of the present invention provides a wind-ice combined transmission line reliability assessment system.
[0016] A wind-ice combined transmission line reliability assessment system, comprising:
[0017] The data preprocessing module is configured to: obtain meteorological data of the area where the transmission tower line system is located, divide the meteorological data into multiple time periods, and obtain the monthly average wind speed and monthly average temperature data sets corresponding to each time period;
[0018] The icing-dangerous month selection module is configured to: determine the icing-dangerous month in each period based on the monthly average temperature;
[0019] The wind-ice combined wind speed calculation module is configured to: fit the probability density distribution function of the monthly average wind speed corresponding to the ice-hazard month, and calculate the wind-ice combined wind speed under the given return period in combination with the set return period;
[0020] The wind-ice load calculation module is configured to: calculate the wind-ice loads acting on the transmission tower, the transmission line and the insulator of the transmission tower line system respectively according to the extreme ice thickness of the set return period and the obtained wind-ice combined wind speed;
[0021] The failure probability curve calculation module is configured to: apply wind-ice load to a pre-established transmission line finite element model, calculate a plurality of discrete failure probability points, select the failure probability points for fitting, and obtain a failure probability curve;
[0022] The reliability assessment module is configured to: combine the failure probability curve and the probability density distribution function of the monthly average wind speed to obtain the total failure probability of the transmission line, and complete the reliability assessment of the transmission line based on the total failure probability of the transmission line.
[0023] A third aspect of the present invention provides a computer-readable storage medium having a program stored thereon, which, when executed by a processor, implements the steps in the method for evaluating reliability of a power transmission line under wind-ice combined conditions as described in the first aspect of the present invention.
[0024] The fourth aspect of the present invention provides an electronic device, including a memory, a processor, and a program stored in the memory and executable on the processor, wherein when the processor executes the program, the steps in the method for evaluating the reliability of a power transmission line under combined wind and ice conditions as described in the first aspect of the present invention are implemented.
[0025] One or more of the above technical solutions have the following beneficial effects:
[0026] The present invention provides a method and system for evaluating the reliability of power transmission lines under wind and ice conditions.
[0027] (1) The present invention provides a method and system for evaluating the reliability of power transmission lines under wind and ice combined effects. The method collects the weather station data in the area where the transmission line is located, and calculates the key meteorological parameters for the present and future periods based on historical data and time series prediction models. Subsequently, the proposed wind-ice combined effect calculation method is used to conduct research on the disaster intensity in various historical periods. Finally, the wind-ice disaster distribution is combined with the failure probability of the transmission line to conduct reliability evaluation of the transmission line in different historical periods. The present invention establishes a meteorological condition early warning model, which can predict the changing laws of meteorological parameters in the future period based on the mining of the changing trends of the main meteorological parameters in the historical data, and can provide early warning of the wind-ice loads that the transmission line will face during its service period in the future period, conduct reliability evaluation of the transmission line in the future period, and provide a reference for wind-ice verification of the transmission line.
[0028] (2) The wind-ice combined action calculation method proposed in the present invention takes into account the correlation between icing and wind speed during icing to the greatest extent, and provides a basis for wind-ice verification of transmission lines in areas where there is a lack of wind-ice combined action records.
[0029] (3) The present invention can quickly calculate the wind-ice loads faced by the transmission line in different historical periods based on the meteorological data of the location of the transmission line, and fully evaluate the reliability level of the transmission tower line system in different historical periods, providing a basis for the wind-ice verification of the transmission line under the environment of major climate changes.
[0030] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0032] Figure 1 This is an overall flow chart of Embodiment 1 of the present invention.
[0033] Figure 2(a) shows the measured distribution of the daily maximum wind speed in a certain area over the past 70 years.
[0034] Figure 2(b) is a distribution diagram of the measured daily average temperature in a certain area over the past 70 years.
[0035] Figure 3 This is a graph showing the change in the loss function of the early warning model with the number of iterations.
[0036] Figure 4 It is the historical data and forecast data of monthly average temperature.
[0037] Figure 5 It is the historical and predicted data of the monthly average value of the maximum daily wind speed.
[0038] Figure 6 Select schematic diagram for dangerous months.
[0039] Figure 7 This is the distribution function diagram of average wind speed in different historical periods.
[0040] Figure 8 It is the design value of wind speed under the combined effect of wind and ice in different historical periods.
[0041] Fig. 9 This is the finite element model established based on the case project.
[0042] Fig.10 is the failure probability of the case transmission line under a given load.
[0043] Fig.11 is the total failure probability of the transmission line in different historical periods.
[0044] Fig.12 It is the reliability index of the transmission line in different historical periods. DETAILED DESCRIPTION
[0045] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0046] It should be noted that the terms used herein are for describing specific embodiments only and are not intended to be limiting of exemplary embodiments according to the present invention.
[0047] In the absence of conflict, the embodiments of the present invention and the features of the embodiments may be combined with each other.
[0048] The overall idea proposed by the present invention is:
[0049] The present invention takes into account the correlation between icing and wind speed during icing to the greatest extent, can quickly calculate the wind-ice load faced by the transmission line at different times, and fully evaluate the reliability level of the transmission tower line system at different times:
[0050] (1) Based on historical meteorological data, a meteorological condition warning model is established and warning data is derived by using the decomposition-prediction-reconstruction method to predict meteorological data for a period of time in the future;
[0051] (2) For areas lacking wind-ice records, a method for calculating the combined wind-ice effect based on the monthly average of the monthly mean temperature and the daily maximum wind speed is proposed;
[0052] (3) After combining historical data with warning data, the data are divided into different historical periods. The wind-ice combined action calculation method is used to calculate the wind-ice loads in different historical periods, and the impact of climate change on the wind-ice loads faced by transmission lines is clarified.
[0053] (4) A finite element model of the transmission line is established based on the design data, and the failure probability of the transmission line under a given load intensity is calculated. The reliability of the transmission line in different historical periods is evaluated by combining the load probability density distribution function.
[0054] Embodiment 1
[0055] This embodiment discloses a method for evaluating the reliability of a power transmission line under the combined effects of wind and ice.
[0056] As Figure 1 As shown, a method for evaluating the reliability of a power transmission line under wind and ice conditions comprises the following steps:
[0057] Obtain meteorological data of the area where the transmission tower line system is located, divide the meteorological data into multiple time periods, and obtain the monthly average wind speed and monthly average temperature data sets corresponding to each time period;
[0058] Based on the average monthly temperature, determine the ice-dangerous months in each period;
[0059] The probability density distribution function of the monthly average wind speed corresponding to the ice-hazard month is fitted, and combined with the set return period, the wind-ice combined wind speed under the given return period is calculated;
[0060] According to the extreme ice thickness of the set return period and the obtained wind-ice combined wind speed, the wind-ice load acting on the transmission tower, transmission line and insulator of the transmission tower-line system is calculated respectively;
[0061] Apply wind-ice load to the pre-established finite element model of the transmission line, calculate and obtain multiple discrete failure probability points, select the failure probability points for fitting, and obtain the failure probability curve;
[0062] Combining the failure probability curve with the probability density distribution function of the monthly average wind speed, the total failure probability of the transmission line is obtained. Based on the total failure probability of the transmission line, the reliability assessment of the transmission line is completed.
[0063] Furthermore, the method of this embodiment includes:
[0064] Obtain the design data of the transmission tower line system that needs to be evaluated, including the design parameters of the ground wire, transmission tower and various accessories. At the same time, collect the meteorological station data in the area where the transmission tower line system is located;
[0065] The meteorological condition warning model is established by using the method of decomposition (reasonable decomposition algorithm) - prediction (reasonable prediction model) - reconstruction (recombining the sequence);
[0066] The monthly average temperature and the monthly average daily maximum wind speed were calculated based on the weather station data, and the early warning model was used to obtain the time series of future meteorological conditions;
[0067] The meteorological data are divided into different historical periods, and the wind-ice combined action calculation method is used to calculate the wind-ice loads in different historical periods, specifically:
[0068] A calculation method for the combined wind-ice effect based on the monthly average of the monthly mean temperature and the daily maximum wind speed is proposed, including:
[0069] Select dangerous months with icing, calculate the monthly average of the maximum daily wind speed in dangerous months (referred to as monthly average wind speed), fit the probability density distribution function of the monthly average wind speed, calculate the wind-ice combined wind speed under a given return period, design the extreme icing thickness of the return period and combine it with the wind-ice combined wind speed, and calculate the wind-ice load faced by the transmission line;
[0070] A finite element model of the transmission line is established based on the design data, and wind-ice loads are applied to the pre-established finite element model of the transmission line; the failure probability of the transmission line under a given load intensity is calculated; and the reliability of the transmission line in different historical periods is evaluated.
[0071] Furthermore, Figure 1 As shown, the technical solution of this embodiment is implemented with reference to the following contents:
[0072] Step 1: Meteorological data collection and early warning model establishment
[0073] (1) Obtain the design data of the transmission tower line system to be evaluated, including the design parameters of the ground wire, transmission tower and various accessories. At the same time, collect the meteorological station data in the area where the transmission tower line system is located;
[0074] (2) The average wind speed and monthly average temperature from 1951 to 2020 were calculated using the daily meteorological data obtained;
[0075] (3) Using variational mode decomposition (VMD) to decompose the historical data series into multiple subsequences with obvious regularity;
[0076] (4) With the help of the time series prediction capability of the bidirectional long short-term memory network (BiLSTM), the series of main meteorological parameters in the next 20 years is predicted; BiLSTM is an improvement on the unidirectional LSTM. BiLSTM consists of a forward LSTM and a backward LSTM. The loss function of the model changes with the number of iterations as shown in the figure below: Figure 3 shown.
[0077] Data input and parameter update can be done using the following formula:
[0078]
[0079] In the formula, x t is the input sample, is the output value of the forward LSTM, is the output value of the backward LSTM layer, y t is the output value of BiLSTM, is the weight matrix from the forward LSTM layer to the output layer, is the weight matrix from the backward LSTM layer to the output layer, b y is the bias matrix of the output layer.
[0080] (5) The predicted values of each subsequence are superimposed to form a meteorological parameter prediction sequence.
[0081] Step 2: Combined wind-ice load calculation method
[0082] (6) Divide the meteorological data into different historical periods and establish the average wind speed and monthly average temperature data sets for different historical periods;
[0083] (7) Determine the dangerous months. It is generally believed that the probability of ice cover is greater when the monthly average temperature is between -5℃ and 5℃;
[0084] (8) Fit the average wind speed distribution function of dangerous months using the following models and select the model with the best fitting effect:
[0085]
[0086] Among them, a1 and c1 are shape parameters, a2, b1, c2 are scale parameters, and a3, b2, c3 are position parameters.
[0087] (9) Calculate the wind-ice combined wind speed under a given return period using the following formula:
[0088]
[0089] Where R represents the return period, pdf is the probability density distribution function of wind speed, and v i Indicates the design wind speed for the return period.
[0090] (10) Based on the extreme ice thickness and wind-ice combined wind speed, calculate the wind-ice load acting on the transmission tower line system, and calculate the wind load based on the windward area, etc., F(t), F c (t) and F i (t) are the wind-ice loads acting on the transmission tower, transmission line and insulator, respectively, and the calculation formula is as follows:
[0091]
[0092] Wherein, τ is the air density correction coefficient; ρ is 1225kg / m3; V m represents the simulated wind speed sequence; θ represents the angle with the vertical tower line direction; C xt1 and C xt2 are the resistance coefficients of the transmission tower in the X and Y directions respectively; C i is the resistance coefficient of ice-covered transmission line; C xi is the resistance coefficient of the insulator, generally set to 1.20; S i It is the projected area of the insulator along its axial direction.
[0093] Step 3: Reliability analysis of transmission tower line system
[0094] (11) Establish a finite element model of the transmission tower line system based on the selected actual project;
[0095] (12) Determine the failure criteria of different components of the transmission line, and assume that the failure of any component will lead to the failure of the entire transmission tower line system. Calculate multiple sets of wind speed-structure response data based on the finite element model, and arrange the structural responses from small to large according to the wind speed. When the response exceeds the component failure criterion, it is considered that the structure has failed. Take the number of failures as the base number, calculate the discrete failure probability points in turn, select the convex part of the failure probability points, and use the cubic spline interpolation method to fit to obtain a smooth failure probability curve;
[0096] (13) Calculate the structural reliability. The structural reliability can be expressed by the total failure probability of the transmission line. The total failure probability of the transmission line is calculated based on the probability density distribution function of the failure probability of the transmission line under a given load intensity and the average wind speed. The calculation formula is as follows:
[0097] P f =∫0 +∞ F R (v)·pdf(v)dv
[0098] Where pdf(v) is the probability density distribution function of the average wind speed, F R (v) is the failure probability of the transmission line at a given wind speed.
[0099] (14) The reliability index β of the calculated structure is related to the total failure probability of the transmission line as follows:
[0100] P f =1-Φ(β)
[0101] Where Φ is the standard normal distribution.
[0102] (15) Analyze the wind-ice combined wind speed in different historical periods and discuss the impact of climate change on load selection; draw a β bar graph of the reliability index corresponding to the transmission tower line system in different historical periods and analyze the impact of climate change on the structural reliability level.
[0103] (16) The recommended verification method for the transmission tower-line system under wind-ice load is:
[0104] For areas where the design wind speed is gradually decreasing, all historical data are used to determine the wind-ice combined wind speed. For areas where the design wind speed is gradually increasing, the data of the past 20-30 years are used to determine the wind-ice combined wind speed. At the same time, models such as BiLSTM are used to predict data for the next 10-20 years to provide future warnings for transmission lines to further prevent possible failures.
[0105] Implementation Cases:
[0106] This embodiment selects a 500kV transmission line in a certain province as a supporting project for implementing the reliability assessment method of the transmission line under the combined effects of wind and ice.
[0107] Step 1: Meteorological data collection and early warning model establishment.
[0108] First, the design data of the transmission tower line system to be evaluated is obtained, including the design parameters of the ground wire, transmission tower and various accessories. At the same time, the meteorological station data in the area where the transmission tower line system is located is collected, as shown in Figure 2; then, the average wind speed and monthly average temperature from 1951 to 2020 are calculated through the daily meteorological data obtained; the variational mode decomposition (VMD) method is used to decompose the historical data sequence into multiple subsequences with obvious regularity; with the help of the time series prediction ability of the bidirectional long short-term memory network (Bidirectional Long Short-Term Memory, BiLSTM), the sequence of main meteorological parameters in the next 20 years is predicted.
[0109] The loss function of the model is specified as mean square error (MSE). After optimization, the number of neurons in the LSTM layer is specified as 64, which means that there are 64 LSTM units at this level. Figure 3 The loss value change curve during model training and model verification is given as the number of iterations increases. The final loss value of the model is 1.5, which has a reliable accuracy.
[0110] The average wind speed and monthly average temperature series for the next 20 years are predicted, such as Figure 4 , Figure 5 The monthly average temperature has well continued the changing trend and fluctuation characteristics of historical data, showing a trend of gradually rising temperature amid fluctuations.
[0111] Step 2: Wind-ice load calculation method.
[0112] The meteorological data are divided into different historical periods, and the average wind speed and monthly average temperature data sets of different historical periods are established; the dangerous months are determined. It is generally believed that the probability of ice cover is greater when the monthly average temperature is between -5℃ and 5℃, such as Figure 6 As shown; Fit the average wind speed distribution function of dangerous months in different historical periods, and select the model with better fitting effect, such as Figure 7 shown.
[0113] Calculate the combined wind-ice speed for a given return period, such as Figure 8 Then the wind-ice combined load acting on the transmission tower line system is calculated.
[0114] Step 3: Reliability analysis of transmission tower line system.
[0115] According to the actual project selected, a finite element model of the transmission tower line system is established, such as Fig. 9 As shown in the figure, the failure criteria of different components of the transmission line are determined, and it is considered that the failure of any component will lead to the failure of the entire transmission tower line system. Discrete failure probability points are calculated based on the data points calculated by the finite element model, and the convex part of the failure probability point is selected. The cubic spline interpolation method is used for fitting to obtain a smooth failure probability curve, as shown in the figure. Fig.10 shown.
[0116] Structural reliability can be expressed by the total failure probability. In order to facilitate designers and researchers to intuitively understand the structural reliability level, the total failure probability of the structure is calculated and the results are listed in Fig.11 middle.
[0117] Using the relationship between the reliability index β and the failure probability (as shown in Equation 9), the reliability index β of the structure is calculated. Fig.12 As shown in the figure, a β bar graph of the reliability index for different historical periods is drawn.
[0118] The reliability of the case transmission line was evaluated using this method, and the wind-ice loads that the case project will face in the next 20 years were learned through the established early warning model. At the same time, the proposed wind-ice combined load calculation method can provide more reliable accompanying wind speeds during icing. Finally, by delineating different historical periods, the impact of climate change on the reliability of the transmission tower line system under wind-ice loads was demonstrated.
[0119] Embodiment 2
[0120] This embodiment discloses a wind-ice combined transmission line reliability assessment system.
[0121] A wind-ice combined transmission line reliability assessment system, comprising:
[0122] The data preprocessing module is configured to: obtain meteorological data of the area where the transmission tower line system is located, divide the meteorological data into multiple time periods, and obtain the monthly average wind speed and monthly average temperature data sets corresponding to each time period;
[0123] The icing-dangerous month selection module is configured to: determine the icing-dangerous month in each period based on the monthly average temperature;
[0124] The wind-ice combined wind speed calculation module is configured to: fit the probability density distribution function of the monthly average wind speed corresponding to the ice-hazard month, and calculate the wind-ice combined wind speed under the given return period in combination with the set return period;
[0125] The wind-ice load calculation module is configured to: calculate the wind-ice loads acting on the transmission tower, the transmission line and the insulator of the transmission tower line system respectively according to the extreme ice thickness of the set return period and the obtained wind-ice combined wind speed;
[0126] The failure probability curve calculation module is configured to: apply wind-ice load to a pre-established transmission line finite element model, calculate a plurality of discrete failure probability points, select the failure probability points for fitting, and obtain a failure probability curve;
[0127] The reliability assessment module is configured to: combine the failure probability curve and the probability density distribution function of the monthly average wind speed to obtain the total failure probability of the transmission line, and complete the reliability assessment of the transmission line based on the total failure probability of the transmission line.
[0128] Embodiment 3
[0129] The purpose of this embodiment is to provide a computer-readable storage medium.
[0130] A computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps in the method for evaluating the reliability of a power transmission line under wind-ice combined conditions as described in Example 1 of the present disclosure.
[0131] Embodiment 4
[0132] The purpose of this embodiment is to provide an electronic device.
[0133] An electronic device includes a memory, a processor, and a program stored in the memory and executable on the processor. When the processor executes the program, the steps in the method for evaluating the reliability of a power transmission line under wind and ice combined conditions as described in Example 1 of the present disclosure are implemented.
[0134] The steps involved in the apparatuses of the above embodiments 2, 3 and 4 correspond to the method embodiment 1, and the specific implementation methods can refer to the relevant description part of embodiment 1. The term "computer-readable storage medium" should be understood as a single medium or multiple media including one or more instruction sets; it should also be understood to include any medium that can store, encode or carry an instruction set for execution by a processor and enable the processor to execute any method in the present invention.
[0135] Those skilled in the art should understand that the modules or steps of the present invention described above can be implemented by a general-purpose computer device, or alternatively, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. The present invention is not limited to any specific combination of hardware and software.
[0136] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.
Claims
1. A method for evaluating the reliability of a power transmission line under wind and ice conditions, characterized in that: The following steps are involved: Obtain meteorological data of the area where the transmission tower line system is located, divide the meteorological data into multiple time periods, and obtain the monthly average wind speed and monthly average temperature data sets corresponding to each time period; Based on the average monthly temperature, determine the ice-dangerous months in each period; The probability density distribution function of the monthly average wind speed corresponding to the ice-hazard month is fitted, and combined with the set return period, the wind-ice combined wind speed under the given return period is calculated; According to the extreme ice thickness of the set return period and the obtained wind-ice combined wind speed, the wind-ice load acting on the transmission tower, transmission line and insulator of the transmission tower-line system is calculated respectively; Apply wind-ice load to the pre-established finite element model of the transmission line, calculate and obtain multiple discrete failure probability points, select the failure probability points for fitting, and obtain the failure probability curve; Combining the failure probability curve with the probability density distribution function of the monthly average wind speed, the total failure probability of the transmission line is obtained. Based on the total failure probability of the transmission line, the reliability assessment of the transmission line is completed. The wind-ice combined wind speed under the given return period is calculated as: Where R represents the return period; pdf is the probability density distribution function of the monthly average wind speed; v i represents the combined wind-ice wind speed at a given return period, i.e., the design wind speed; The specific calculation formula of the wind-ice load is: Among them, F(t), F c (t) and F i (t) are the wind-ice loads acting on the transmission tower, transmission line and insulator respectively; τ is the air density correction factor; ρ is 1225kg / m3; V m represents the sequence of wind speed changes over time; θ represents the angle with the vertical tower line direction; C xt1 and C xt2 are the resistance coefficients of the transmission tower in the X and Y directions respectively; C i is the resistance coefficient of ice-covered transmission line; C xi is the resistance coefficient of the insulator; S i It is the projected area of the insulator along its axial direction.
2. The reliability assessment method for power transmission lines under wind and ice combined conditions according to claim 1, characterized in that: The meteorological data is divided into historical meteorological data and future meteorological data according to time. The future meteorological data is predicted based on the historical meteorological data using a pre-trained meteorological condition warning model. The meteorological data specifically includes the monthly average wind speed and the monthly average temperature.
3. The reliability assessment method for power transmission lines under wind and ice combined conditions according to claim 1, characterized in that: Months with average monthly temperatures between -5℃ and 5℃ are regarded as dangerous months for icing.
4. The reliability assessment method for power transmission lines under wind and ice combined conditions according to claim 1, characterized in that: Based on the selected transmission tower-line system, a finite element model of the transmission tower-line system is established; Determine the failure criteria of different components of the transmission line, and assume that the failure of any one component will lead to the failure of the entire transmission tower line system; Based on the finite element model, multiple discrete failure probability points are calculated; The convex part of the failure probability point is selected and fitted to obtain the failure probability curve.
5. The reliability assessment method for power transmission lines under wind and ice combined conditions according to claim 1, characterized in that: The total failure probability of the transmission line is expressed as: Where pdf(v) is the probability density distribution function of the monthly average wind speed; F R (v) is the failure probability of the transmission line at a given wind speed; Calculate the reliability index β. The relationship between β and the total failure probability of the transmission line is: P f =1-Φ(β) Among them, Φ is the standard normal distribution; The reliability of the transmission line is evaluated based on the reliability index β.
6. A wind-ice combined transmission line reliability assessment system, characterized by: include: The data preprocessing module is configured to: obtain meteorological data of the area where the transmission tower line system is located, divide the meteorological data into multiple time periods, and obtain the monthly average wind speed and monthly average temperature data sets corresponding to each time period; The icing-dangerous month selection module is configured to: determine the icing-dangerous month in each period based on the monthly average temperature; The wind-ice combined wind speed calculation module is configured to: fit the probability density distribution function of the monthly average wind speed corresponding to the ice-hazard month, and calculate the wind-ice combined wind speed under the given return period in combination with the set return period; The wind-ice load calculation module is configured to: calculate the wind-ice loads acting on the transmission tower, the transmission line and the insulator of the transmission tower line system respectively according to the extreme ice thickness of the set return period and the obtained wind-ice combined wind speed; The failure probability curve calculation module is configured to: apply wind-ice load to a pre-established transmission line finite element model, calculate a plurality of discrete failure probability points, select the failure probability points for fitting, and obtain a failure probability curve; The reliability assessment module is configured to: combine the failure probability curve and the probability density distribution function of the monthly average wind speed to obtain the total failure probability of the transmission line, and complete the reliability assessment of the transmission line based on the total failure probability of the transmission line; The wind-ice combined wind speed under the given return period is calculated as: Where R represents the return period; pdf is the probability density distribution function of the monthly average wind speed; v i represents the combined wind-ice wind speed at a given return period, i.e., the design wind speed; The specific calculation formula of the wind-ice load is: Among them, F(t), F c (t) and F i (t) are the wind-ice loads acting on the transmission tower, transmission line and insulator respectively; τ is the air density correction factor; ρ is 1225kg / m3; V m represents the sequence of wind speed changes over time; θ represents the angle with the vertical tower line direction; C xt1 and C xt2 are the resistance coefficients of the transmission tower in the X and Y directions respectively; C i is the resistance coefficient of ice-covered transmission line; C xi is the resistance coefficient of the insulator; S i It is the projected area of the insulator along its axial direction.
7. A computer-readable storage medium having a program stored thereon, characterized in that: When the program is executed by a processor, the steps in the method for evaluating reliability of a power transmission line under wind and ice combined conditions as described in any one of claims 1 to 5 are implemented.
8. An electronic device comprising a memory, a processor, and a program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the steps in the method for evaluating the reliability of a power transmission line under wind and ice combined conditions as described in any one of claims 1 to 5 are implemented.