A precipitation extrapolation forecast method
Through the X-band radar nowcasting method based on precipitation life cycle discrimination, combined with X-band rain measurement radar and numerical atmospheric model, the precipitation life cycle is identified and grid-specific coefficients are assigned, which solves the problem of low precipitation forecast accuracy in the existing technology and achieves Provides higher forecast accuracy and disaster early warning support.
Patent Information
- Application Number
- CN202410501069.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-16
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2043-08-16
AI Technical Summary
Existing precipitation forecasting technologies, especially methods based on numerical atmospheric models, have low accuracy in predicting short-term heavy precipitation and cannot meet the prevention needs of disasters such as urban waterlogging and flash floods. Moreover, traditional radar nowcasting methods cannot effectively distinguish between different precipitation life cycles. , resulting in insufficient forecast accuracy.
The X-band radar nowcasting method based on precipitation life cycle discrimination is adopted, radar data is obtained through X-band rain measurement radar, and the TREC algorithm is used to estimate the advection of the precipitation field and the WRF model simulates the wind field and humidity field to identify the water vapor channel, and determines the precipitation grid by grid. life cycle, and assign specific coefficients to the forecast grid to improve the accuracy of extrapolated forecasts.
It effectively improves the accuracy of short-term heavy precipitation forecasts, enhances the ability to identify different precipitation life cycles, improves the reliability and accuracy of forecasts, and supports nowcasting and early warning of disaster-causing heavy rains.
Smart Images

Figure CN118348538B_ABST
Abstract
Description
Technical Field
[0001] This invention application is a divisional application of an invention patent application with the application date of August 16, 2023, application number: 202311033930.2, and name: An X-band radar nowcasting method based on precipitation life cycle discrimination.
[0002] The present invention is applicable to the technical field of precipitation forecasting, and proposes an X-band radar nowcasting method based on precipitation life cycle discrimination, which is mainly used by meteorological and water conservancy departments to carry out precipitation forecast rainfall estimation, mountain torrent forecast and warning, and the like. Background Art
[0003] In recent years, my country's precipitation forecasting technology has developed by leaps and bounds, from early statistical forecasting methods to numerical model forecasting methods, and then to extrapolation forecasting methods based on satellite remote sensing data. A large number of scholars have conducted research on these forecasting technologies and applied them to actual precipitation forecasting, playing an irreplaceable role in natural disaster prevention.
[0004] Currently, the most common commercial applications are radar-based nowcasting and numerical forecasting based on numerical atmospheric models.
[0005] Short-term heavy precipitation is often caused by severe convective weather, which is a key factor in inducing natural disasters such as urban waterlogging, mountain torrents, landslides, and mud-rock flows, posing a serious threat to people's lives and property. Since short-term heavy precipitation is a nonlinear process, its generation, evolution, and extinction mechanism is very complex. The accuracy of numerical precipitation forecasts based on numerical atmospheric models is lower than that of radar-based nowcasting. The accuracy of short-term heavy rainfall forecasts and warnings under traditional nowcasting technology still cannot meet the defense needs of rainstorms, floods, geological disasters, and other disasters.
[0006] Therefore, it is urgent to conduct research on precipitation nowcasting methods and improve the accuracy of heavy precipitation forecasts.
[0007] Radar precipitation nowcasting techniques mainly include the single centroid method, cross-correlation method and optical flow method. Its extrapolation forecasting method is merely a regular analysis of historical observation data. However, precipitation at different times, in different regions and at different scales has different life cycles and predictability. The smaller the scale of precipitation, the shorter its life cycle and the worse its predictability.
[0008] During the forecasting process, precipitation in different life cycles needs to be treated differently.
[0009] Therefore, determining the precipitation life cycle before forecasting can effectively improve the accuracy of precipitation forecasting. This application proposes an X-band radar nowcasting method based on precipitation life cycle discrimination, aiming to assign precipitation specific coefficients to different precipitation life cycles and improve the accuracy of extrapolated forecasting. Summary of the invention
[0010] The present invention proposes an X-band radar nowcasting method based on precipitation life cycle discrimination. The technical problem solved by the present invention is to fully consider the influence of precipitation life cycle on the predicted precipitation, introduce a numerical atmospheric model to judge the precipitation life cycle, assign a precipitation specific coefficient to the forecast grid based on the precipitation life cycle, and combine the advantages of X-band rain measuring radar in detecting the spatial distribution of rainfall to improve the accuracy of extrapolated forecasting.
[0011] In order to solve the above-mentioned technical problems, the present invention adopts the following solutions:
[0012] An X-band radar nowcasting method based on precipitation life cycle discrimination comprises the following steps:
[0013] Step 1: Data processing;
[0014] The radar data of the initial field detection area is obtained through the X-band rainfall radar, and the radar data is quality controlled and gridded, and the grid numbers are assigned. k = 1, 2, …, n ;
[0015] Step 2: Motion field estimation;
[0016] The TREC algorithm is used to estimate the advection of the precipitation field, determine the moving position of the precipitation echo during the forecast period, and determine the precipitation area.
[0017] Step 3, determine the precipitation life cycle;
[0018] The WRF model is used to simulate wind and humidity fields, identify water vapor channels, and determine the precipitation life cycle on a grid-by-grid basis;
[0019] Step 4: Determine the precipitation coefficient;
[0020] Step 5: Precipitation extrapolation forecast;
[0021] According to the determined precipitation life cycle, the precipitation coefficient is assigned to the analysis field grid and the forecast rainfall is calculated.
[0022] Furthermore, in step 1, radar data of the detection area is obtained, quality control and grid processing are performed on the radar data, and grid numbers are assigned.
[0023] k = 1, 2, …, n ;
[0024] The radar image of the detection area is obtained by scanning the intensity field through the X-band rain measuring radar. Nine elevation angles are scanned every 6 minutes. The minimum elevation angle of the radar is 0.5° and the maximum detection radius of the intensity field is 140 kilometers.
[0025] Since radar image data often contain clutter and bright band false echoes, the median filtering method is used to denoise the radar image.
[0026] Median filtering eliminates isolated noise points by selecting the median value of each pixel in a neighborhood of the pixel to be processed to replace the pixel to be processed.
[0027] The complete process of median filtering algorithm to remove noise is:
[0028] First, arrange the pixel values in a neighborhood of the pixel to be processed into a sequence in the order of small to large or large to small. The value in the middle of the sequence is the median value required in the experiment.
[0029] Secondly, this value is used to replace the pixel value to be processed, making the pixel value of the neighborhood closer to the true value, thus avoiding the influence of false echoes and ground clutter to a large extent.
[0030] The specific implementation process of median filtering is:
[0031] First, define a length L is the window, and the length of this window L In most cases it is an odd number, because when L When is an even number, the median filter recognition effect is poor, so L Must be equal to 2N+1 , N is a positive integer. The signal samples in the window are [ X ( i - N ) ,…,X ( i ), …,X ( i + N )], X ( i ) is the signal sample value at the center of the window, then the output formula of the median filter is as follows: In the formula N= , Z Represents a set of integers.
[0032] The median filter is also called a sliding filter. The median filter algorithm of an image is an optimization of the average filter algorithm. It can use a window in the image to perform an approximate sliding operation to filter and delete the high-frequency part of the image, making the image smoother and achieving the purpose of denoising.
[0033] Furthermore, in step 2, the advection estimation of the precipitation field is performed by using the TREC algorithm to determine the moving position of the precipitation echo within the forecast period;
[0034] TREC algorithm introduces the concept of correlation coefficient in statistics to identify and track echoes. It mainly aims to find the correlation between sub-units and achieve the optimal match between units. The linear change process of two units is the radar echo in t-1 Time tot The motion trajectory at each moment is used to determine the motion vector of the precipitation field through the motion change process.
[0035] The specific steps are as follows:
[0036] S21, based on the gridding process in step 1, exploring the reflectivity factor value or precipitation intensity of each cell point;
[0037] S22. Calculate based on reflectivity factor or precipitation intensity Moment and The correlation coefficient of all grid cells at the moment is as follows. The grid cell with the largest correlation coefficient is considered to have an echo area in Displacement trend within the time period;
[0038] S23, based on displacement change and unit time , analyze and solve the echo motion vector of the precipitation field u, v ;
[0039] S24, based on echo motion vector u and v , the semi-Lagrangian algorithm is used to realize precipitation forecast for a period of time in the future.
[0040] In the formula, R represents the correlation coefficient; Z 1 express t 1 Radar reflectivity factor at time ; Z 2 express t 2 Radar reflectivity factor at time ; `Z 1 express t 1 The mean value of the radar reflectivity factor of the grid cell at time , ` Z 2 express t 2 The mean value of radar reflectivity factor of grid cells at time instant; N It is expressed as the number of sub-region grid points, k is the grid code, k = 1, 2, …, n.
[0041] Furthermore, in step 3, the water vapor channel is identified by simulating the wind field and humidity field through the WRF model, and the precipitation life cycle is determined grid by grid;
[0042] In the simulation process, the optimal physical parameterization combination is selected according to the actual environmental conditions, and a three-layer grid nesting scheme is selected in combination with a reasonable spatial scale to perform spatial analysis on the above variables in the detection area.
[0043] Generally speaking, the resolution of the three-layer grid increases gradually from the outside to the inside, and the grid becomes smaller gradually. In order to more clearly judge the direction of the water vapor channel, the simulation results of the bottom three layers of grids are generally selected for variable analysis.
[0044] The method for determining the precipitation life cycle includes the following steps:
[0045] S31. Simulating precipitation using the WRF model (PREC) , wind speed (V) , relative humidity (RH) , water vapor flux (SNTVQ) The key variables that affect the water vapor channel are used to obtain the atmospheric precipitable water in the detection area. (PWV);
[0046] S32. Determine the atmospheric precipitable water in the analysis field grid by grid. PWV) .
[0047] In the formula, VQ is the atmospheric water vapor flux in kgm -2 m -1 .
[0048] In the formula, TVQ is the water vapor flux of the entire atmosphere, in units of kgm -2 s -1 ; V h is the horizontal wind speed in ms -1 ;
[0049] In the formula, PWV is the atmospheric precipitable water in mm ; is the atmospheric density in kgm -3 ; r is the atmospheric water vapor mixing ratio, in kgkg -1 : z and z top They are the height of the atmosphere and the top atmosphere from the surface of the earth, in meters; R d is the gas constant of air, 287JK -1 kg -1 ; T is the temperature in K ;P is the air pressure, in pa .
[0050] S33. Establishing the atmospheric precipitable water PWV The actual precipitation Rt The relationship between T .
[0051] Precipitable Water PWV It only represents the potential for precipitation, which is different from the actual precipitation. Its value is greater than the actual precipitation. Rt , so there is an atmospheric precipitable water PWV The critical value PWV r , used to define whether there is precipitation in the local area.
[0052] By analyzing the atmospheric precipitable water PWV The simulated value and the actual precipitation observed at the rain gauge station show that the atmospheric precipitable water PWV The actual precipitation Rt There is an obvious positive correlation, and the atmospheric precipitable water PWV When the atmospheric precipitation is greater than 50 mm, precipitation occurs. Therefore, the criterion for determining whether there is precipitation is the atmospheric precipitation amount. PWV Is it greater than 50mm? PWV r =50mm.
[0053] (1) When PWV t > PWV r The actual precipitation Rt > 0 , there is precipitation process, T≠0;
[0054] (2) When PWV t < PWV r The actual precipitation Rt < 0 , there is no precipitation process, T=0。
[0055] Furthermore, the step 4 determines the precipitation coefficient; according to the determined precipitation life cycle, the precipitation coefficient is assigned to the analysis field grid for calculating the forecast rainfall of the analysis field grid.
[0056] After the precipitation field is extrapolated according to the advection method, if the analysis field grid PWV t > PWV r , indicating that there is a precipitation process in the analysis field, that is, R t+1≠0,T≠0 .
[0057] Where PWV r =50mm, T represents the precipitation life cycle.
[0058] (1) When the initial field grid R t ≠0 hour, R t+1 ≠0 , precipitation forecast can be understood as the forecast process from "there is precipitation in the initial field" to "there is precipitation in the analysis field", precipitation coefficient The calculation formula for the next moment forecast precipitation, precipitation coefficient and forecast precipitation is as follows: In the formula, PWV t+1 represents the atmospheric precipitable water in the analysis field grid; PWV t represents the atmospheric precipitable water of the initial field grid; is the precipitation coefficient; R t represents the initial field precipitation; R t+1 It represents the forecast precipitation of the analysis field; k Indicates the grid number; t Indicates time.
[0059] (2) When the initial field grid R t =0 hour, R t+1 ≠0, Precipitation forecast can be understood as the forecast process from "no precipitation in the initial field" to "precipitation in the analysis field". Under the condition that there is no precipitation in the initial field and precipitation in the analysis field, the actual precipitation R t+1 equal t+1 Atmospheric precipitable water and precipitation coefficient at the moment The product of . The value of atmospheric precipitable water PWV The actual precipitation R In the hourly precipitation simulation and monitoring, it was found that the atmospheric precipitable water PWV The actual precipitation R There is a certain proportional relationship, and this proportional relationship is related to the season: from March to May, the atmospheric precipitation PWV Actual precipitation R 5 times; from June to October, the atmospheric precipitation PWV Actual precipitation RFrom November to February of the following year, the actual precipitation is less, and there is no significant relationship between the atmospheric precipitable water and the actual precipitation.
[0060] In the formula, represents the precipitation coefficient; PWV t+1 represents the atmospheric precipitable water in the analysis field grid; represents the actual precipitation in the analysis field; k Indicates the grid number; t Indicates time.
[0061] (3) After the precipitation field is extrapolated according to advection, if the grid of the analysis field PWV t < PWV r , indicating that there is no actual precipitation in the analysis field, that is, R t+1 =0,T=0 At this time, regardless of whether there is precipitation in the initial field, the actual precipitation in the analysis field R t+1 Must be 0.
[0062] Furthermore, the step 5 is to extrapolate the precipitation forecast.
[0063] By establishing the relationship between atmospheric precipitable water and actual precipitation, the precipitation life cycle is determined, and the four precipitation change processes from "precipitation in the initial field" to "precipitation in the analysis field", "no precipitation in the initial field" to "precipitation in the analysis field", "precipitation in the initial field" to "no precipitation in the analysis field", and "precipitation in the initial field" to "no precipitation in the analysis field" are analyzed to determine the precipitation coefficient and predict the actual precipitation in the analysis field. R t , combined with the judgment of precipitation area in step 2, a complete precipitation forecast process is realized, which can effectively improve the accuracy of extrapolation forecast.
[0064] In the formula, PWV t+1 represents the atmospheric precipitable water in the analysis field grid; PWV t represents the atmospheric precipitable water of the initial field grid; is the precipitation coefficient; R t represents the initial field precipitation; R t+1 It represents the forecast precipitation of the analysis field; k Indicates the grid number; t Indicates time;
[0065] represents the precipitation coefficient; PWV t+1represents the atmospheric precipitable water in the analysis field grid; represents the actual precipitation in the analysis field; k Indicates the grid number; t Indicates time.
[0066] The X-band radar nowcasting method based on precipitation life cycle discrimination of the present invention has the following beneficial effects:
[0067] (1) The present invention takes into account the impact of the precipitation life cycle on the predicted precipitation, introduces a numerical atmospheric model to determine the precipitation life cycle, and assigns different coefficients to the precipitation life cycle of the grid; combined with the advantages of X-band rain radar in detecting the spatial distribution of rainfall, the accuracy of extrapolated forecasting is improved.
[0068] (2) The present invention introduces a numerical atmospheric model to determine the source and channel of water vapor, injects physical process analysis into the traditional extrapolation forecasting method based on law analysis, fully considers the physical concepts of rainfall formation and development, and can effectively improve the accuracy of extrapolation forecasting, providing strong support for the near-term forecast and warning of disastrous rainstorms. BRIEF DESCRIPTION OF THE DRAWINGS
[0069] Figure 1 : A flow chart of an X-band radar nowcasting method based on precipitation life cycle discrimination in the present invention. DETAILED DESCRIPTION
[0070] The invention discloses an X-band radar nowcasting method based on precipitation life cycle discrimination. The technical problem solved by the invention is to fully consider the influence of precipitation life cycle on the predicted precipitation, introduce a numerical atmospheric model to judge the precipitation life cycle, assign a specific coefficient of precipitation to the forecast grid based on the precipitation life cycle, and improve the accuracy of extrapolated forecasting by combining the advantages of X-band rain measuring radar in detecting spatial distribution of rainfall.
[0071] In order to solve the above-mentioned technical problems, the present invention adopts the following solutions:
[0072] An X-band radar nowcasting method based on precipitation life cycle discrimination comprises the following steps:
[0073] Step 1: Data processing;
[0074] The radar data of the initial field detection area is obtained through the X-band rainfall radar, and the radar data is quality controlled and gridded, and the grid numbers are assigned. k = 1, 2, …, n ;
[0075] Step 2: Motion field estimation;
[0076] The TREC algorithm is used to estimate the advection of the precipitation field, determine the moving position of the precipitation echo during the forecast period, and determine the precipitation area.
[0077] Step 3, determine the precipitation life cycle;
[0078] The WRF model is used to simulate wind and humidity fields to identify water vapor channels and determine the precipitation life cycle grid by grid.
[0079] Step 4: Determine the precipitation coefficient;
[0080] Step 5: Precipitation extrapolation forecast;
[0081] According to the determined precipitation life cycle, the precipitation coefficient is assigned to the analysis field grid and the forecast precipitation is calculated.
[0082] Furthermore, in step 1, radar data of the detection area is obtained, quality control and grid processing are performed on the radar data, and grid numbers are assigned. k = 1, 2, …, n ;
[0083] The radar image of the detection area is obtained by scanning the intensity field with an X-band rain radar. The radar scans 9 elevation angles every 6 minutes. The lowest elevation angle of the radar is 0.5°, and the maximum detection radius of the intensity field is 140 kilometers. Since radar image data often contain false echoes such as clutter and bright bands, the median filtering method is used to denoise the radar image.
[0084] Median filtering eliminates isolated noise points by selecting the median value of each pixel in a neighborhood of the pixel to be processed to replace the pixel to be processed. The complete median filtering algorithm removes noise in the following process: first, the pixel values in a neighborhood of the pixel to be processed are arranged in a sequence from small to large or from large to small. The value in the middle of the sequence is the median value required in the experiment. Secondly, this value is used to replace the pixel value to be processed, so that the pixel value of the neighborhood is closer to the true value, which largely avoids the influence of false echoes and ground clutter.
[0085] The specific implementation process of median filtering is as follows: First, a length L is the window, and the length of this window L In most cases it is an odd number, because when L When is an even number, the median filter recognition effect is poor, so L Must be equal to 2N+1 , N is a positive integer. The signal samples in the window are [ X ( i - N ) ,…,X ( i ), …,X ( i + N )], X ( i ) is the signal sample value at the center of the window, then the output formula of the median filter is as follows:
[0086] In the formula N= , Z Represents a set of integers. The median filter is also called a sliding filter. The median filter algorithm of an image is an optimization of the average filter algorithm. It can use a window in the image to perform an approximate sliding operation, filter out the high-frequency part of the image, make the image smoother, and achieve the purpose of denoising.
[0087] Furthermore, in step 2, the advection estimation of the precipitation field is performed by using the TREC algorithm to determine the moving position of the precipitation echo within the forecast period;
[0088] TREC algorithm introduces the concept of correlation coefficient in statistics to identify and track echoes. It mainly aims to find the correlation between sub-units and achieve the optimal match between units. The linear change process of two units is the radar echo in t-1 Time to t The motion trajectory at each moment is used to determine the motion vector of the precipitation field through the motion change process.
[0089] The specific steps are as follows:
[0090] S21, based on the gridding process in step 1, exploring the reflectivity factor value or precipitation intensity of each cell point;
[0091] S22. Calculate based on reflectivity factor or precipitation intensity Moment and The correlation coefficient of all grid cells at the moment is as follows. The grid cell with the largest correlation coefficient is considered to have an echo area in Displacement trend within the time period;
[0092] S23, based on displacement change and unit time , analyze and solve the echo motion vector of the precipitation field u, v ;
[0093] S24, based on echo motion vector u and v , the semi-Lagrangian algorithm is used to realize precipitation forecast for a period of time in the future.
[0094] In the formula, R represents the correlation coefficient; Z 1 express t 1 Radar reflectivity factor at time ; Z 2 express t 2 Radar reflectivity factor at time ; `Z1 express t 1 The mean value of the radar reflectivity factor of the grid cell at time , ` Z 2 express t 2 The mean value of radar reflectivity factor of grid cells at time instant; N It is represented by the number of sub-region grid points, k is the grid number, k = 1, 2, …, n.
[0095] Furthermore, in step 3, the water vapor channel is identified by simulating the wind field and humidity field through the WRF model, and the precipitation life cycle is determined grid by grid;
[0096] In the simulation process, the optimal physical parameterization combination is selected according to the actual environmental conditions, and a three-layer grid nesting scheme is selected in combination with a reasonable spatial scale to perform spatial analysis on the above variables in the detection area.
[0097] Generally speaking, the resolution of the three-layer grid increases gradually from the outside to the inside, and the grid becomes smaller gradually. In order to more clearly judge the direction of the water vapor channel, the simulation results of the bottom three layers of grids are generally selected for variable analysis.
[0098] The method for determining the precipitation life cycle includes the following steps:
[0099] S31. Simulating precipitation using the WRF model (PREC) , wind speed (V) , relative humidity (RH) , water vapor flux (SNTVQ) The key variables that affect the water vapor channel are used to obtain the atmospheric precipitable water in the detection area. (PWV);
[0100] S32. Determine the atmospheric precipitable water in the analysis field grid by grid. PWV) .
[0101] In the formula, VQ is the atmospheric water vapor flux in kgm -2 m -1 .
[0102] In the formula, TVQ is the water vapor flux of the entire atmosphere, in units of kgm -2 s -1 ; V h is the horizontal wind speed in ms -1 .
[0103] In the formula, PWV is the atmospheric precipitable water in mm ; is the atmospheric density in kgm -3 ; r is the atmospheric water vapor mixing ratio, in kgkg -1 : z and z top They are the height of the atmosphere and the top atmosphere from the surface of the earth, in meters; R d is the gas constant of air, 287JK -1 kg -1 ; T is the temperature in K ; P is the air pressure, in pa .
[0104] S33. Establishing the atmospheric precipitable water PWV The actual precipitation Rt The relationship between T .
[0105] Precipitable Water PWV It only represents the potential for precipitation, which is different from the actual precipitation. Its value is greater than the actual precipitation. Rt , so there is an atmospheric precipitable water PWV The critical value PWV r , used to define whether there is precipitation in the local area.
[0106] By analyzing the atmospheric precipitable water PWV The simulated value and the actual precipitation observed at the rain gauge station show that the atmospheric precipitable water PWV The actual precipitation Rt There is an obvious positive correlation, and the atmospheric precipitable water PWV When the atmospheric precipitation is greater than 50 mm, precipitation occurs. Therefore, the criterion for determining whether there is precipitation is the atmospheric precipitation amount. PWV Is it greater than 50mm? PWV r =50mm.
[0107] (1) When PWV t > PWV r The actual precipitation Rt > 0 , there is precipitation process, T≠0;
[0108] (2) When PWV t < PWV r The actual precipitation Rt < 0 , there is no precipitation process, T=0。
[0109] Furthermore, the step 4 determines the precipitation coefficient; according to the determined precipitation life cycle, a specific coefficient of the precipitation forecast of the analysis field grid is assigned to calculate the forecast rainfall of the analysis field grid.
[0110] After the precipitation field is extrapolated according to the advection method, if the analysis field grid PWV t > PWV r , indicating that there is a precipitation process in the analysis field, that is, R t+1 ≠0,T≠0 .
[0111] Where PWV r =50mm, T represents the precipitation life cycle.
[0112] (1) When the initial field grid R t ≠0 hour, R t+1 ≠0 , precipitation forecast can be understood as the forecast process from "there is precipitation in the initial field" to "there is precipitation in the analysis field", precipitation coefficient The calculation formula for the next moment forecast precipitation, precipitation coefficient and forecast precipitation is as follows: In the formula, PWV t+1 represents the atmospheric precipitable water in the analysis field grid; PWV t represents the atmospheric precipitable water of the initial field grid; is the precipitation coefficient; R t represents the initial field precipitation; R t+1 It represents the forecast precipitation of the analysis field; k Indicates the grid number; t Indicates time.
[0113] (2) When the initial field grid R t =0 hour, R t+1 ≠0,Precipitation forecast can be understood as the forecast process from "no precipitation in the initial field" to "precipitation in the analysis field". Under the condition that there is no precipitation in the initial field and precipitation in the analysis field, the actual precipitation R t+1 equal t+1 Atmospheric precipitable water and precipitation coefficient at the moment The product of . The value of atmospheric precipitable water PWV The actual precipitation R In the hourly precipitation simulation and monitoring, it was found that the atmospheric precipitable water PWV The actual precipitation R There is a certain proportional relationship, and this proportional relationship is related to the season: from March to May, the atmospheric precipitation PWV Actual precipitation R 5 times; from June to October, the atmospheric precipitation PWV Actual precipitation R From November to February of the following year, the actual precipitation is less, and there is no significant relationship between the atmospheric precipitable water and the actual precipitation.
[0114] In the formula, represents the precipitation coefficient; PWV t+1 represents the atmospheric precipitable water in the analysis field grid; represents the actual precipitation in the analysis field; k Indicates the grid number; t Indicates time.
[0115] (3) After the precipitation field is extrapolated according to advection, if the grid of the analysis field PWV t < PWV r , indicating that there is no actual precipitation in the analysis field, that is, R t+1 =0,T=0 At this time, regardless of whether there is precipitation in the initial field, the actual precipitation in the analysis field R t+1 Must be 0.
[0116] Furthermore, the step 5 includes extrapolating the precipitation forecast.
[0117] By establishing the relationship between atmospheric precipitable water and actual precipitation, the precipitation life cycle is determined, and the four precipitation change processes from "precipitation in the initial field" to "precipitation in the analysis field", "no precipitation in the initial field" to "precipitation in the analysis field", "precipitation in the initial field" to "no precipitation in the analysis field", and "precipitation in the initial field" to "no precipitation in the analysis field" are analyzed to determine the precipitation coefficient and predict the actual precipitation in the analysis field. R t, combined with the judgment of precipitation area in step 2, a complete precipitation forecast process is realized, which can effectively improve the accuracy of extrapolation forecast.
[0118] In the formula, PWV t+1 represents the atmospheric precipitable water in the analysis field grid; PWV t represents the atmospheric precipitable water of the initial field grid; is the precipitation coefficient; R t represents the initial field precipitation; R t+1 It represents the forecast precipitation of the analysis field; k Indicates the grid number; t Indicates time;
[0119] represents the coefficient; PWV t+1 represents the atmospheric precipitable water in the analysis field grid; represents the actual precipitation in the analysis field; k Indicates the grid number; t Indicates time.
[0120] The X-band radar nowcasting method based on precipitation life cycle discrimination of the present invention has the following beneficial effects:
[0121] (1) The present invention takes into account the impact of the precipitation life cycle on the predicted precipitation, introduces a numerical atmospheric model to determine the precipitation life cycle, and assigns a specific precipitation coefficient to the forecast grid based on the precipitation life cycle; combined with the advantages of X-band rain radar in detecting the spatial distribution of rainfall, the accuracy of extrapolated forecasting is improved.
[0122] (2) The present invention introduces a numerical atmospheric model to determine the source and channel of water vapor, injects physical process analysis into the traditional extrapolation forecasting method based on law analysis, fully considers the physical concepts of rainfall formation and development, and can effectively improve the accuracy of extrapolation forecasting, providing strong support for the near-term forecast and warning of disastrous rainstorms.
[0123] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A precipitation extrapolation forecasting method, comprising the following steps: Step 1: Data processing; The radar data of the initial field detection area is obtained through the X-band rainfall radar, and the radar data is quality controlled and gridded, and the grid numbers are assigned. k=1,2,…,n ; Step 2: Motion field estimation; The TREC algorithm is used to estimate the advection of the precipitation field, determine the moving position of the precipitation echo within the forecast period, and determine the precipitation area; Step 3, determine the precipitation life cycle; The wind field and humidity field are simulated by the WRF model, the water vapor channel is identified, and the precipitation life cycle is determined grid by grid; the method for determining the precipitation life cycle in step 3 includes the following steps: S31. Simulating precipitation using the WRF model (PREC) , wind speed (V) , relative humidity (RH) , water vapor flux (SNTVQ) The key variables that affect the water vapor channel are used to obtain the atmospheric precipitable water in the detection area. (PWV); S32. Determine the atmospheric precipitable water in the analysis field grid by grid. PWV ; In the formula, VQ is the atmospheric water vapor flux in kgm -2 m -1 ; In the formula, TVQ is the water vapor flux of the entire atmosphere, in units of kgm -2 s -1 ;v h is the horizontal wind speed in ms -1 ; In the formula, PWV is the atmospheric precipitable water in mm ; is the atmospheric density in kgm -3 ; r is the atmospheric water vapor mixing ratio, in kgkg -1 : z and z top They are the height of the atmosphere and the top atmosphere from the surface of the earth, in meters; R d is the gas constant of air, 287JK -1 kg -1 ; T is the temperature in K ; P is the air pressure, in pa ; S33. Precipitable water content PWV The actual precipitation R t The relationship between T ; S33 Atmospheric Precipitable Water PWV The actual precipitation R t The relationship between T; By analyzing the atmospheric precipitable water PWV The simulated value and the actual precipitation observed at the rain gauge station show that the atmospheric precipitable water PWV The actual precipitation R t There is an obvious positive correlation, and the atmospheric precipitable water PWV When the atmospheric precipitation is greater than 50 mm, precipitation occurs. Therefore, the criterion for determining whether there is precipitation is the atmospheric precipitation amount. PWV Is it greater than 50 mm, that is, the atmospheric precipitation PWV The critical value PWV r =50mm; (1) When PWV t > PWV r The actual precipitation R t >0 , there is precipitation process, T≠0; (2) When PWV t < PWV r The actual precipitation R t <0 , there is no precipitation process, T=0; Step 4: Determine the precipitation coefficient; The step 4 assigns a precipitation coefficient to the analysis field grid and calculates the forecast precipitation of the analysis field grid; After the precipitation field is extrapolated according to the advection method, if the analysis field grid PWV t > PWV r , indicating that there is a precipitation process in the analysis field, that is, R t+1 ≠0,T≠0 ; Where PWV r =50mm, T represents the precipitation life cycle (1) When the initial field grid R t ≠0 hour, R t+1 ≠0 , precipitation forecast can be understood as the forecast process from "there is precipitation in the initial field" to "there is precipitation in the analysis field", precipitation coefficient The calculation formula for the next moment forecast precipitation, precipitation coefficient and forecast precipitation is as follows: In the formula, PWV t+1 represents the atmospheric precipitable water in the analysis field grid; PWV t represents the atmospheric precipitable water of the initial field grid; represents the precipitation coefficient; R t represents the initial field precipitation; R t+1 It represents the forecast precipitation of the analysis field; k Indicates the grid number; t Indicates time; (2) When the initial field grid R t =0 hour, R t+1 ≠0, Precipitation forecast is understood as the forecast process from "no precipitation in the initial field" to "precipitation in the analysis field". Under the condition that there is no precipitation in the initial field and precipitation in the analysis field, the actual precipitation R t+1 equal t+1 Atmospheric precipitable water and precipitation coefficient at the moment The product of The value of atmospheric precipitable water PWV The actual precipitation R Based on the relationship between the hourly precipitation simulation and monitoring, it was found that the atmospheric precipitable water PWV The actual precipitation R There is a certain proportional relationship, and this proportional relationship is related to the season: from March to May, the atmospheric precipitation PWV Actual precipitation R 5 times; from June to October, the atmospheric precipitation PWV Actual precipitation R From November to February of the following year, the actual precipitation is less, and there is no significant relationship between atmospheric precipitable water and actual precipitation. In the formula, represents the precipitation coefficient; PWV t+1 represents the atmospheric precipitable water in the analysis field grid; represents the actual precipitation in the analysis field; k Indicates the grid number; t Indicates time; (3) After the precipitation field is extrapolated according to advection, if the grid of the analysis field PWV t < PWV r , indicating that there is no actual precipitation in the analysis field, that is, R t+1 =0,T=0 ; At this time, regardless of whether there is precipitation in the initial field, the actual precipitation in the analysis field R t+1 Must be 0; Step 5: Precipitation extrapolation forecast; The step 5 is precipitation extrapolation forecast; By establishing the relationship between atmospheric precipitable water and actual precipitation, the precipitation life cycle is determined, and the four precipitation change processes from "precipitation in the initial field" to "precipitation in the analysis field", "no precipitation in the initial field" to "precipitation in the analysis field", "precipitation in the initial field" to "no precipitation in the analysis field", and "precipitation in the initial field" to "no precipitation in the analysis field" are analyzed to determine the precipitation coefficient and predict the actual precipitation in the analysis field. R t , combined with the judgment of the precipitation area in step 2, a complete precipitation forecast process is realized, which can effectively improve the accuracy of extrapolation forecast; In the formula, PWV t+1 represents the atmospheric precipitable water in the analysis field grid; PWV t represents the atmospheric precipitable water of the initial field grid; is the precipitation coefficient; R t represents the initial field precipitation; R t+1 It represents the forecast precipitation of the analysis field; k Indicates the grid number; t Indicates time; represents the precipitation coefficient; PWV t+1 represents the atmospheric precipitable water in the analysis field grid; represents the actual precipitation in the analysis field; k Indicates the grid number; t Indicates time.
2. A precipitation extrapolation forecasting method according to claim 1, characterized in that: The step 1 obtains a radar image of the detection area by scanning the intensity field through an X-band rain measuring radar, and scans 9 elevation angles every 6 minutes. The lowest elevation angle of the radar is 0.5°, and the maximum detection radius of the intensity field is 140 kilometers. Since the radar image data contains clutter and bright band false echoes, the median filtering method is used to denoise the radar image.
3. A precipitation extrapolation forecasting method according to claim 1, characterized in that: The step 2 uses the TREC algorithm to estimate the advection of the precipitation field and determine the moving position of the precipitation echo within the forecast period; the specific method is as follows: S21, based on the network processing in step 1, exploring the reflectivity factor value or precipitation intensity of each cell point; S22. Calculate based on reflectivity factor or precipitation intensity Moment and The correlation coefficient of all grid cells at the moment, the grid cell with the largest correlation coefficient is considered to have the echo area in Displacement trend within the time period; S23, based on displacement change and unit time , analyze and solve the echo motion vector of the precipitation field u,v ; S24, based on echo motion vector u and v , using the semi-Lagrangian algorithm to achieve precipitation forecast for a period of time in the future; In the formula, R represents the correlation coefficient; Z 1 express t 1 Radar reflectivity factor at time ; Z 2 express t 2 Radar reflectivity factor at time ; express t 1 The mean value of the radar reflectivity factor of the grid cell at time , express t 2 The mean value of radar reflectivity factor of grid cells at time instant; N It is represented by the number of sub-region grid points; k is the grid number, k=1,2,…,n.
