PCB material box inbound and outbound management system and management method
By analyzing historical outbound records and correlations in the PCB material box outbound management system, the pickup path of AGV trolley is solved, and the problem of complex and time-consuming paths of intelligent AGV trolleys are improved when picking up goods between multiple shelves is improved. efficiency.
Patent Information
- Application Number
- CN202410539359.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-30
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-04-30
AI Technical Summary
In the existing PCB material box outbound management system, the path of the intelligent AGV trolley when picking up goods between multiple shelves is complex and time-consuming, resulting in limited outbound efficiency. Existing optimization methods such as path planning algorithm optimization and increasing the number of AGVs exist. limitation.
A PCB material box inlet and outbound management system was designed, including material box identification module, warehouse status monitoring module, analysis module, period analysis module, first screening module, second screening module, first route planning module and second route planning module and The second route planning module optimizes the pickup path of AGV trolleys and dynamically adjusts the inbound and outbound routes by analyzing historical outbound records, correlation and outbound peak periods.
It effectively reduces the moving distance and time of AGV trolleys, improves outbound efficiency, and optimizes the handling efficiency of AGV trolleys, adapts to complex shelf layouts and variable pickup needs.
Smart Images

Figure CN118350744B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of material box management, and in particular to a PCB material box inbound and outbound storage management system and a management method. Background Art
[0002] In the existing PCB material box outbound management system, the intelligent AGV car plays a key role. It can automatically go to the designated shelf according to the preset instructions and accurately take out the required PCB material box, which greatly improves the outbound efficiency. However, in actual applications, since the material boxes of PCB boards of different specifications are usually stored on different shelves, the intelligent AGV car needs to go to multiple shelves to pick up goods when outbound. Especially when the distance between the shelves is far, the movement path of the AGV car will become complicated and time-consuming, which seriously restricts the improvement of outbound efficiency.
[0003] At present, although some technologies have been used to try to solve this problem, such as optimizing the path planning algorithm of AGVs and increasing the number of AGVs, these methods still have certain limitations. For example, although the optimization of the path planning algorithm can reduce the moving distance of AGVs to a certain extent, its effect is not significant when the shelf layout is complex or the demand for picking is changeable. Although increasing the number of AGVs can improve the outbound capacity, it will also bring problems such as rising costs and increased management difficulty. Summary of the invention
[0004] In order to improve the efficiency of PCB material box outbound delivery and optimize the planning of inbound and outbound delivery capabilities, the present application provides a PBC material box inbound and outbound delivery management system and management method.
[0005] The above first invention objective of the present application is achieved through the following technical solutions:
[0006] The present invention provides a PBC material box storage and outbound management system, comprising:
[0007] A material box identification module is used to identify the product information of multiple material boxes carried by the AGV intelligent vehicle to be stored in the warehouse to obtain information of multiple products to be stored in the warehouse;
[0008] The warehouse status monitoring module is used to obtain the storage location list in the current warehouse in real time. The storage location list contains the location information of each location, including the cabinet where the location is located, the location coordinates, the location status, and the product information in the warehouse;
[0009] An analysis module is used to analyze the correlation between different product information according to the historical outbound records of the AGV smart car in the database, and obtain a set of combined product information elements according to the correlation and the correlation benchmark value, each of which has product information of two boxes, and each of which corresponds to an outbound timestamp set, and the historical outbound records contain product information of multiple boxes carried by the AGV smart car, as well as outbound timestamps;
[0010] The period analysis module is used to analyze and obtain the peak period of shipment of each combination product information element according to the combination product information element and the corresponding shipment timestamp set.
[0011] In the PCB material box storage and outbound management system of the present invention, preferably, it also includes:
[0012] A first screening module, configured to screen the combination product information set according to the plurality of product information to be stored to obtain primary combination product information elements;
[0013] The second screening module is used to screen out the combination product information elements to be planned from the primary combination product information elements according to the current time and the peak period of shipment corresponding to each primary combination product information element.
[0014] In the PCB material box storage and outbound management system of the present invention, preferably, it also includes:
[0015] A first route planning module, used for allocating first allocation bins corresponding to each material box in the information element of the combined product to be planned according to a first preset rule;
[0016] The second route planning module is used to allocate second allocation locations corresponding to each material box in the elements of the primary combination product information element except the combination product information element to be planned according to a second preset rule.
[0017] In a preferred example, the present application can be further configured as follows: the first route planning module includes:
[0018] The first query unit is used to query whether there is a warehouse where the product information in the warehouse is the same as the product information of a material box in the information element of the combined product to be planned as the identification warehouse;
[0019] The second query unit is used to query whether there is a first accessible storage location with the same cabinet as the storage location of the identified storage location, the same storage location horizontal coordinate, and a storage location status of none.
[0020] A first allocation unit, configured to use the first accessible bin as a first allocation bin for another container if an accessible bin exists;
[0021] A first random allocation unit is used to select any bin whose bin status is "None" as a first allocation bin for another container if there is no identified bin;
[0022] The third query unit is used to query whether there is a second accessible storage location that is in the same cabinet as the storage location of the identified storage location, has a different storage location horizontal coordinate, and has a storage location status of None if there is no accessible storage location;
[0023] A second allocation unit is used to use the second accessible bin as a first allocation bin for another container if the second accessible bin exists;
[0024] The second random allocation unit is used to select any bin whose bin status is "None" as the first allocation bin for another container if there is no second accessible bin.
[0025] In a preferred example, the present application can be further configured as follows: the second route planning module includes:
[0026] The random allocation unit is used to select any bin whose bin status is "none" as the second allocation bin for each bin in the primary combination product information element except the combination product information element to be planned.
[0027] In a preferred example, the present application can be further configured as follows: a barcode or a QR code is provided on the material box, and the material box identification module performs identification by scanning the barcode or the QR code on the material box.
[0028] In a preferred example, the present application can be further configured as follows: the warehouse status monitoring module identifies the barcode or QR code on the material box through an identifier arranged in the warehouse to obtain the warehouse information of the warehouse in real time.
[0029] The above second invention objective of the present application is achieved through the following technical solutions:
[0030] A PCB material box storage and outbound management method, based on the PCB material box storage and outbound system as described above, comprises the following steps:
[0031] Identify product information of multiple material boxes carried by the AGV intelligent vehicle to be stored to obtain information of multiple products to be stored;
[0032] Obtain the storage location list in the current warehouse in real time. The storage location list contains the location information of each location, including the cabinet where the location is located, location coordinates, location status, and product information in the warehouse;
[0033] Analyze the correlation between different product information according to the historical outbound records of the AGV smart car in the database, and obtain a set of combined product information elements according to the correlation and the correlation benchmark value, each of which has product information of two boxes, and each of which corresponds to an outbound timestamp set. The historical outbound records contain product information of multiple boxes carried by the AGV smart car, as well as outbound timestamps;
[0034] According to the combined product information elements and the corresponding outbound timestamp sets, the outbound peak period of each combined product information element is analyzed and obtained;
[0035] Filtering the combination product information set according to the plurality of product information to be stored to obtain primary combination product information elements;
[0036] Filter out the combination product information elements to be planned from the primary combination product information elements according to the current time and the peak period of shipment corresponding to each primary combination product information element;
[0037] Allocate a first allocation bin corresponding to each material box in the information element of the combined product to be planned according to a first preset rule;
[0038] The second allocation bin corresponding to each material box in the elements of the primary combination product information element except the combination product information element to be planned is allocated according to the second preset rule.
[0039] In a preferred example, the present application can be further configured as follows: allocating first allocation bins corresponding to each material box in the information element of the combined product to be planned according to a first preset rule, including:
[0040] Check whether there is a warehouse with the same product information as the product information of a material box in the information element of the combined product to be planned as the identification warehouse;
[0041] If there is an identified bin, check whether there is a first accessible bin with the same cabinet, the same bin horizontal coordinate and bin status as the identified bin;
[0042] If there is an accessible storage location, the first accessible storage location is used as the first allocation storage location of another container;
[0043] If there is no identified bin, any bin with bin status of None is selected as the first allocation bin for another container;
[0044] If there is no available storage location, check whether there is a second available storage location that is in the same cabinet as the storage location of the identified storage location, has a different storage location horizontal coordinate, and has a storage location status of None;
[0045] If there is a second accessible bin, use the second accessible bin as the first allocation bin for another container;
[0046] If there is no second accessible storage bin, any storage bin with a storage bin status of None is selected as the first allocation bin for another container.
[0047] In summary, the present application includes at least one of the following beneficial technical effects:
[0048] 1. This method realizes intelligent optimization and dynamic adjustment of the AGV picking path by comprehensively considering factors such as shelf layout, PCB material box specifications, and outbound demand, thereby effectively reducing the moving distance and time of the AGV and improving outbound efficiency;
[0049] 2. According to the PCB boards of different products in the same outbound trip of the AGV smart car, analyze the correlation of PCB boards of different specifications in different time periods. When the AGV smart car is transporting into the warehouse, according to the product information of the PCB boards carried by the AGV smart car, combined with the current empty storage location in the current warehouse, and combined with the time period, the storage location of the specifications of the PCB boards carried by the AGV smart car is allocated, and the warehouse route planning strategy is formulated to optimize the transportation efficiency of the AGV car. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] Figure 1 This is a schematic diagram of the connection of various modules of the PCB material box inbound and outbound management system in one embodiment of the present application;
[0051] Figure 2 It is a flow chart for implementing a method for managing the storage and outbound delivery of PCB material boxes in one embodiment of the present application;
[0052] Figure 3 It is a flowchart for implementing S7 in the PCB material box warehousing and outbound management method in one embodiment of the present application. DETAILED DESCRIPTION
[0053] The following is a description of exemplary embodiments of the present application in conjunction with the accompanying drawings, including various details of the embodiments of the present application to facilitate understanding, which should be considered as merely exemplary. Therefore, it should be recognized by those of ordinary skill in the art that various changes and modifications can be made to the embodiments described herein without departing from the scope and spirit of the present application. Similarly, for the sake of clarity and conciseness, the description of well-known functions and structures is omitted in the following description.
[0054] It should be noted that the terms "first", "second", etc. in the present invention are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present disclosure described herein can be implemented in an order other than those illustrated or described herein. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present disclosure.
[0055] In addition, the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article, unless otherwise specified, generally means that the associated objects before and after are in an "or" relationship.
[0056] Figure 1 FIG. 1 is a schematic diagram showing the connection of various modules of the PCB material box storage and outbound management system according to the first embodiment of the present application. Figure 1 As shown, the PCB material box inbound and outbound management system includes: a material box identification module, a warehouse status monitoring module, an analysis module, a period analysis module, a first screening module, a second screening module, a first route planning module and a second route planning module.
[0057] The warehouse has multiple storage cabinets. The AGV smart car carries several material boxes and automatically navigates to the corresponding storage cabinet to enter and exit the corresponding storage cabinet. The warehouse status monitoring module of the management system includes an identifier set in each storage cabinet, which scans and identifies the barcode or QR code on the outer wall of the material box to obtain the storage information of the storage cabinet. The storage information includes the cabinet where the storage cabinet is located, the storage coordinates, the storage status, and the product information in the warehouse; wherein, the cabinet where the storage cabinet is located is pre-associated and bound with the identifier in the storage cabinet, the storage coordinates include the storage horizontal coordinate and the storage vertical coordinate, the storage status includes "yes" and "no", and the product information in the warehouse includes the product name, product model and product size, wherein the product information can be set by the management personnel, for example, it can also include the purpose, which is not specifically limited here. After the PCB board is packed, the packing personnel write the corresponding product information into the barcode or QR code.
[0058] The management system has an underlying database that stores historical outbound records of the AGV smart car. The historical outbound records contain product information of multiple material boxes carried by the AGV smart car during one outbound trip, as well as the outbound timestamp.
[0059] Among them, the analysis module is used to analyze the correlation between different product information based on the historical outbound records of the AGV smart car in the database, and obtain a set of combined product information elements based on the correlation and the correlation benchmark value. Each combined product information element has product information of two boxes, and each combined product information element corresponds to an outbound timestamp set. Specifically, the system pre-sets an association benchmark value. For example, the correlation is 50%, which means that the number of historical outbound records of product information of box A and product information of box B at the same time accounts for 50% of the number of historical outbound records of product information of box A or product information of box B; the association benchmark value can be set to 60%.
[0060] The material box identification module is used to identify the product information of multiple material boxes carried by the AGV smart car to be stored in the warehouse to obtain multiple product information to be stored in the warehouse; similarly, the material box identification module can be multiple barcode scanners installed on the AGV smart car, which scan the barcode or QR code on the material box to identify the product information of the material box and transmit it to the system as multiple product information to be stored in the warehouse.
[0061] The period analysis module is used to analyze and obtain the peak period of shipment of each combination product information element according to the combination product information element and the corresponding shipment timestamp set.
[0062] Specifically, the months can be used as an interval. For example, among the shipment timestamps corresponding to a certain combination product information element, 30% of the shipment timestamps are distributed in February, 15% of the shipment timestamps are distributed in March, 10% of the shipment timestamps are distributed in April, 8% of the shipment timestamps are distributed in May, 33% of the shipment timestamps are distributed in June, and 4% of the shipment timestamps are distributed in July. The months with the highest proportions are taken as the shipment peak periods, and February and June are the shipment peak periods of the combination product information element.
[0063] It is understandable that one can also use ten days, one quarter, etc. as an interval, depending on the actual warehousing and production scale, without making specific limitations.
[0064] The first screening module is used to screen the combination product information set according to multiple product information to be stored to obtain a primary combination product information element; specifically, if in the combination product information set, two product information in the combination product information element are respectively the same as one product information to be stored, that is, there are exactly two product information to be stored in the multiple product information to be stored that coincide with two product information in a certain combination product information element, then the combination product information element is used as the primary combination product information element.
[0065] The second screening module is used to screen out the combination product information elements to be planned from the primary combination product information elements according to the current time and the peak period of shipment corresponding to each primary combination product information element.
[0066] Specifically, if the current time is in the previous interval of the peak period of shipment corresponding to the primary combination product information element, the primary combination product information element is used as the combination product information element to be planned, otherwise it is not used as the combination product information element to be planned.
[0067] The first route planning module is used to allocate the first allocation bin corresponding to each material box in the information element of the combined product to be planned according to the first preset rule.
[0068] The first route planning module includes a first query unit, a second query unit, a first allocation unit, a first random allocation unit, a third query unit, a second allocation unit and a second random allocation unit, wherein the first query unit is used to query whether there is a warehouse location whose product information is the same as the product information of a material box in the information element of the combined product to be planned as an identification warehouse location; the second query unit is used to query whether there is a first accessible warehouse location that is in the same cabinet as the warehouse location of the identified warehouse location, has the same warehouse horizontal coordinate and has a warehouse status of none if there is an accessible warehouse location; the first allocation unit is used to use the first accessible warehouse location as the first allocation warehouse location for another material box if there is an accessible warehouse location.
[0069] For example, there are product A information and product B information in the information element of the combined product to be planned. The first query unit queries that there are bins containing product A information stored in the bins, then marks the bins containing product A information stored in the bins as identification bins. The second query unit queries, based on the bin information of the identification bins, whether there is a first accessible bin with a bin status of "none" and the same cabinet and bin horizontal coordinate as the identification bin. If so, any first accessible bin will be used as the first allocated bin for the bins containing product B information on the AGV smart cart.
[0070] The first random allocation unit is used to select any bin whose status is None as the first allocation bin for another material box if there is no identified bin; continuing with the previous example, if it does not exist, select any bin whose status is None as the first allocation bin for the material box containing product B information on the AGV smart car, which can be achieved by using a random selection algorithm.
[0071] The third query unit is used to query whether there is a second accessible storage location that is located in the same cabinet as the storage location of the identified storage location, has a different storage location horizontal coordinate, and has a storage location status of none if there is no accessible storage location.
[0072] The second allocation unit is used for using the second accessible storage location as the first allocation location of another material box if there is a second accessible storage location.
[0073] Continuing with the above example, the third query unit further queries the second accessible storage location based on the fact that there is an identified storage location but no accessible storage location. The second accessible storage location is a storage location located in the same storage cabinet as the identified storage location, so the time for picking up material boxes when leaving the warehouse can also be reduced.
[0074] The second random allocation unit is used to select any bin whose bin status is "None" as the first allocation bin for another container if there is no second accessible bin.
[0075] The second route planning module is used to allocate second allocation locations corresponding to each material box in the elements of the primary combination product information element except the combination product information element to be planned according to a second preset rule.
[0076] Specifically, the second route planning module includes a random allocation unit, which is used to select any bin whose bin status is None as the second allocation bin for each container in the elements of the primary combination product information element except the combination product information element to be planned.
[0077] In summary, this application analyzes the correlation of PCB boards of different specifications in different time periods according to the PCB boards of different products in the same outbound trip of the AGV smart car. When the AGV smart car is transporting into the warehouse, the storage location of the PCB boards carried by the AGV smart car is allocated according to the product information of the PCB boards carried by the AGV smart car, combined with the current vacant storage location in the current warehouse, and combined with the time period, and the warehouse entry route planning strategy is formulated to optimize the transportation efficiency of the AGV car; and the warehouse entry route planning and outbound trip schedule of the AGV smart car can be dynamically adjusted to achieve efficient PCB board transportation and storage.
[0078] Reference Figure 2 The present application also provides a PCB material box storage and outbound management method, based on the PCB material box storage and outbound management system, the management method includes the following steps:
[0079] S1. Identify product information of multiple material boxes carried by the AGV intelligent vehicle to be stored in the warehouse to obtain information of multiple products to be stored in the warehouse.
[0080] S2. Obtain the storage location list in the current warehouse in real time.
[0081] Among them, the storage location list contains the location information of each location, and the location information includes the cabinet where the location is located, the location coordinates, the location status, and the product information in the warehouse.
[0082] S3. Analyze the correlation between different product information based on the historical outbound records of the AGV smart car in the database, and obtain a combined product information element set based on the correlation and correlation benchmark value.
[0083] Among them, each combined product information element has product information of two material boxes, and each combined product information element corresponds to a delivery timestamp set. The historical delivery record contains product information of multiple material boxes carried by the AGV smart car, as well as the delivery timestamp.
[0084] S4. Analyze and obtain the peak period of shipment of each combination product information element according to the combination product information element and the corresponding shipment timestamp set.
[0085] S5. Filter the combination product information set according to the information of multiple products to be stored to obtain primary combination product information elements.
[0086] S6. Filter out the combination product information elements to be planned from the primary combination product information elements according to the current time and the peak delivery period corresponding to each primary combination product information element.
[0087] S7. Allocate a first allocation location corresponding to each material box in the information element of the combined product to be planned according to a first preset rule.
[0088] S8. Allocate second allocation locations corresponding to each material box in the elements of the primary combination product information element except the combination product information element to be planned according to a second preset rule.
[0089] Reference Figure 3 , where S7 includes:
[0090] S71. Check whether there is a warehouse with product information in the warehouse that is the same as the product information of a material box in the combined product information element to be planned as the identification warehouse.
[0091] S72. If there is an identified bin, check whether there is a first accessible bin that is located in the same cabinet as the identified bin, has the same bin horizontal coordinate, and has a bin status of None.
[0092] S73. If there is an accessible storage location, use the first accessible storage location as the first allocation storage location for another material box.
[0093] S74. If there is no identified bin, select any bin whose bin status is None as the first allocation bin for another material box.
[0094] S75. If there is no accessible storage location, check whether there is a second accessible storage location that is in the same cabinet as the identified storage location, has a different storage location horizontal coordinate, and has a storage location status of None.
[0095] S76: If there is a second accessible storage location, use the second accessible storage location as the first allocation storage location for another material box.
[0096] S77. If there is no second accessible storage bin, select any storage bin whose storage bin status is None as the first allocation bin for another material box.
[0097] The specific definition of the PCB material box storage and outbound management method can be found in the above definition of the PCB material box storage and outbound management system, which will not be repeated here. Each step of the above PCB material box storage and outbound management method can be fully or partially implemented by software, hardware and their combination.
[0098] Various implementations of the systems and techniques described herein can be realized in digital electronic circuit systems, integrated circuit systems, dedicated ASICs (application specific integrated circuits), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0099] These computer programs (also referred to as programs, software, software applications, or code) include machine instructions for programmable processors and can be implemented using high-level procedural and / or object-oriented programming languages, and / or assembly / machine languages. As used herein, the terms "machine-readable medium" and "computer-readable medium" refer to any computer program product, device, and / or means (e.g., disk, optical disk, memory, programmable logic device (PLD)) for providing machine instructions and / or data to a programmable processor, including a machine-readable medium that receives machine instructions as a machine-readable signal. The term "machine-readable signal" refers to any signal for providing machine instructions and / or data to a programmable processor.
[0100] To provide interaction with a user, the systems and techniques described herein can be implemented on a computer having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user can provide input to the computer. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).
[0101] The systems and techniques described herein may be implemented in a computing system that includes back-end components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes front-end components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such back-end components, middleware components, or front-end components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), and the Internet.
[0102] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in this application can be executed in parallel, sequentially or in different orders, as long as the expected results of the technical solution disclosed in this application can be achieved, and this document is not limited here.
[0103] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of this application should be included in the protection scope of this application.
Claims
1. PCB material box storage and outbound management system, characterized by: include: A material box identification module is used to identify the product information of multiple material boxes carried by the AGV intelligent vehicle to be stored in the warehouse to obtain information of multiple products to be stored in the warehouse; The warehouse status monitoring module is used to obtain the storage location list in the current warehouse in real time. The storage location list contains the location information of each location, including the cabinet where the location is located, the location coordinates, the location status, and the product information in the warehouse; An analysis module is used to analyze the correlation between different product information according to the historical outbound records of the AGV smart car in the database, and obtain a set of combined product information elements according to the correlation and the correlation benchmark value, each of which has product information of two boxes, and each of which corresponds to an outbound timestamp set, and the historical outbound records contain product information of multiple boxes carried by the AGV smart car, as well as outbound timestamps; The period analysis module is used to analyze and obtain the peak period of shipment of each combination product information element according to the combination product information element and the corresponding shipment timestamp set; The PCB material box inbound and outbound management system also includes: A first route planning module, used for allocating first allocation bins corresponding to each material box in the information element of the combined product to be planned according to a first preset rule; A second route planning module is used to allocate second allocation locations corresponding to each material box in the elements of the primary combination product information element except the combination product information element to be planned according to a second preset rule; Among them, the first route planning module includes: The first query unit is used to query whether there is a warehouse where the product information in the warehouse is the same as the product information of a material box in the information element of the combined product to be planned as the identification warehouse; The second query unit is used to query whether there is a first accessible storage location with the same cabinet as the storage location of the identified storage location, the same storage location horizontal coordinate, and a storage location status of none. A first allocation unit, configured to use the first accessible bin as a first allocation bin for another container if an accessible bin exists; A first random allocation unit is used to select any bin whose bin status is "None" as a first allocation bin for another container if there is no identified bin; The third query unit is used to query whether there is a second accessible storage location that is located in the same cabinet as the storage location of the identified storage location, has a different storage location horizontal coordinate, and has a storage location status of None if there is no accessible storage location; A second allocation unit is used to use the second accessible bin as a first allocation bin for another container if the second accessible bin exists; The second random allocation unit is used to select any bin whose bin status is "None" as the first allocation bin for another container if there is no second accessible bin.
2. The PCB material box storage and outbound management system according to claim 1, characterized in that: The PCB material box inbound and outbound management system also includes: A first screening module, configured to screen the combination product information set according to the plurality of product information to be stored to obtain primary combination product information elements; The second screening module is used to screen out the combination product information elements to be planned from the primary combination product information elements according to the current time and the peak period of shipment corresponding to each primary combination product information element.
3. The PCB material box storage and outbound management system according to claim 1, characterized in that: The second route planning module includes: The random allocation unit is used to select any bin whose bin status is "none" as the second allocation bin for each bin in the primary combination product information element except the combination product information element to be planned.
4. The PCB material box storage and outbound management system according to claim 1, characterized in that: The material box is provided with a bar code or a two-dimensional code, and the material box identification module performs identification by scanning the bar code or the two-dimensional code on the material box.
5. The PCB material box storage and outbound management system according to claim 4, characterized in that: The warehouse status monitoring module identifies the barcode or QR code on the material box through an identifier arranged in the warehouse to obtain the warehouse information of the warehouse in real time.
6. A PCB material box storage and outbound management method, characterized in that: Based on the PCB material box storage and outbound system according to any one of claims 1 to 5, the management method includes: Identify product information of multiple material boxes carried by the AGV intelligent vehicle to be stored to obtain information of multiple products to be stored; Obtain the storage location list in the current warehouse in real time. The storage location list contains the location information of each location, including the cabinet where the location is located, location coordinates, location status, and product information in the warehouse; Analyze the correlation between different product information according to the historical outbound records of the AGV smart car in the database, and obtain a set of combined product information elements according to the correlation and the correlation benchmark value, each of which has product information of two boxes, and each of which corresponds to an outbound timestamp set. The historical outbound records contain product information of multiple boxes carried by the AGV smart car, as well as outbound timestamps; According to the combined product information elements and the corresponding outbound timestamp sets, the outbound peak period of each combined product information element is analyzed and obtained; Filtering the combination product information set according to the plurality of product information to be stored to obtain primary combination product information elements; Filter out the combination product information elements to be planned from the primary combination product information elements according to the current time and the peak period of shipment corresponding to each primary combination product information element; Allocate a first allocation bin corresponding to each material box in the information element of the combined product to be planned according to a first preset rule; Allocate the second allocation bin corresponding to each material box in the elements other than the combination product information element to be planned in the primary combination product information element according to the second preset rule; The first allocation bin corresponding to each material box in the information element of the combined product to be planned is allocated according to the first preset rule, including: Check whether there is a warehouse with the same product information as the product information of a material box in the combined product information element to be planned as the identification warehouse; If there is an identified bin, check whether there is a first accessible bin with the same cabinet, the same bin horizontal coordinate and bin status as the identified bin; If there is an accessible storage location, the first accessible storage location is used as the first allocation storage location of another container; If there is no identified bin, any bin with bin status of None is selected as the first allocation bin for another container; If there is no available storage location, check whether there is a second available storage location that is in the same cabinet as the storage location of the identified storage location, has a different storage location horizontal coordinate, and has a storage location status of None; If there is a second accessible bin, use the second accessible bin as the first allocation bin for another container; If there is no second accessible storage bin, any storage bin with a storage bin status of None is selected as the first allocation bin for another container.
Citation Information
Patent Citations
Goods allocation optimization system based on combination of product multidimensional elements and method thereof
CN104021426A
Three-dimensional network terminal warehousing service system based on big data
CN111738662A
Intelligent management system for workbins
CN115392840A
Logistics warehouse management system and method
CN115423411A
Warehouse management method based on ERP (Enterprise Resource Planning) system and related equipment
CN115907605A