A three-way elbow forming and processing integrated equipment
By designing a three-way elbow forming and processing integrated equipment that integrates feeding, limiting, cutting and forming functions, the problems of complex operation and low efficiency of existing equipment are solved, and the automated processing and forming of pipelines is realized, and the removal and collection of elbows are facilitated.
Patent Information
- Application Number
- CN202410539173.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-30
- Publication Date
- 2025-04-15
- Estimated Expiration
- 2044-04-30
AI Technical Summary
The existing three-way elbow forming processing equipment is difficult to achieve the cutting, limiting, processing and forming of pipelines on a single device, resulting in complex operation and low efficiency, and the surface of the elbow after forming is large and difficult to remove.
A three-way elbow molding and processing integrated equipment is designed, integrating feeding components, limiting components, cutting and vacuuming components and forming components. The automatic feeding, limiting, cutting and forming of the pipeline is achieved through cylinder drive and electric telescopic rods, and the moisture on the surface of the elbow is blown dry through the blowing components.
It realizes automated processing and forming of pipelines, simplifies operating procedures, improves work efficiency, reduces the risk of manual operation, and facilitates the removal and collection of elbows.
Smart Images

Figure CN118357733B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of three-way elbows, and in particular to three-way elbow forming and processing integrated equipment. Background Art
[0002] The tee elbow is mainly used to change the direction of the pipe and the liquid flow. It is used at the branch pipe of the main pipeline. The tee elbow can be classified according to the pipe diameter. It is generally made of carbon steel, cast steel, alloy steel, stainless steel, copper, aluminum alloy, plastic, argon asphalt, PVC and other materials. The existing tee elbow can be made of welding, stamping, casting, etc.
[0003] At present, when forming a tee elbow, it is necessary to first cut the pipe into pipes of equal length on one device, and then transfer the pipe to other equipment for stamping and forming. It is difficult for a single device to realize processing and forming at the same time. The pipe needs to be repeatedly limited, which is troublesome to operate. Moreover, when the pipe is cut, it is difficult to automatically load the pipe, which affects the work efficiency. At the same time, after forming, the surface of the elbow will have more moisture and will be located in the mold groove, which is inconvenient for the staff to take and use. Summary of the invention
[0004] The purpose of the present invention is to solve the shortcomings of the prior art and to propose a three-way elbow forming and processing integrated equipment.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A three-way elbow forming and processing integrated equipment comprises a frame body, a feeding rack is fixedly installed on the inner walls on both sides of the frame body, a fixing plate is fixedly installed on the top of the frame body, a processing table located on one side of the feeding rack is arranged below the fixing plate, a mold groove is arranged on the processing table, a collecting box is arranged below the processing table, a filter is arranged in the collecting box, a vacuum cleaner located above the processing table is arranged in the frame body, an air blast hopper located above the processing table is arranged in the frame body, a feeding assembly is arranged in the frame body, a top material assembly connected with the feeding assembly is arranged in the frame body, a limiting assembly connected with the feeding assembly is arranged on the frame body, a cutting and dust collection assembly is arranged on the frame body, a forming assembly is arranged on the frame body, and symmetrically distributed air blast assemblies are arranged on the frame body.
[0007] Preferably, the loading assembly includes a lifting plate arranged between two loading racks, two groups of symmetrically arranged loading inclined blocks are fixedly installed on the top of the lifting plate, two symmetrically distributed rollers are arranged at the bottom of the lifting plate, and a lifting frame slidably connected to the bottom of the frame is arranged at the bottom of the lifting plate, both of the two rollers are in contact with the top of the lifting frame, and a cylinder fixedly connected to the bottom of the frame is arranged on the side of the lifting frame away from the processing table, and the telescopic end of the cylinder is fixedly connected to the lifting frame.
[0008] Preferably, the ejecting assembly includes an input rod fixedly mounted on the bottom of the lifting plate, a first output cylinder is fixedly mounted on the inner bottom of the frame, the input rod passes through the top of the first output cylinder and extends into the first output cylinder, one end of the first input rod located in the first output cylinder is fixedly mounted with a first output plug slidably connected to the inner wall of the first output cylinder, a spring is fixedly connected between the first output plug and the inner top of the first output cylinder, a third input tube connected to the interior of the first output cylinder is provided on the first output cylinder, and one end of the third input tube connected to the first output cylinder is located below the first output plug.
[0009] Preferably, a third output cylinder is fixedly installed at the bottom of the processing table, a third output plug slidably connected to the inner wall of the third output cylinder is arranged inside the third output cylinder, a connecting rod is fixedly installed on the top of the third output plug, one end of the connecting rod passes through the bottom of the processing table and extends into the mold groove, a lifting block is fixedly installed on the end of the connecting rod located in the mold groove, an end of the third input tube away from the first output cylinder is connected to the third output cylinder, and an end of the third input tube connected to the third output cylinder is located below the third output plug.
[0010] Preferably, the limit assembly includes a rotating shaft that passes through an inner wall of one side of a frame, an inner ring of a one-way bearing is fixedly mounted on one end of the rotating shaft located in the frame, a gear is fixedly mounted on the outer ring of the one-way bearing, a rack is fixedly mounted on the side of the lifting frame away from the cylinder, a circular plate is fixedly mounted on one end of the rotating shaft located outside the frame, a first connecting rod is arranged on a side wall of the circular plate close to the frame, a first connecting track is arranged on an outer wall of one side of the frame, two first electric telescopic rods are fixedly mounted on the bottom of the fixed plate, the telescopic ends of the two first electric telescopic rods are fixedly mounted with the same pressure block, and the first connecting rod and the first connecting track are both located in the circuit of the two first electric telescopic rods.
[0011] Preferably, the cutting and dust collection assembly includes a second connecting rod arranged on a side wall of the circular plate close to the frame, a second connecting track is arranged on one side wall of the frame, two second electric telescopic rods are fixedly installed on the bottom of the fixed plate, the telescopic ends of the two second electric telescopic rods are fixedly connected to a driving power supply, the output shafts of the two driving power supplies are fixedly connected to cutting blades, the processing table is located between the two cutting blades, and the second connecting rod and the second connecting track are both located in the circuit of the two second electric telescopic rods, the two second driving power supplies and the vacuum cleaner.
[0012] Preferably, the forming assembly includes a third connecting rod arranged on a side wall of the circular plate close to the frame, a third connecting track is arranged on one side wall of the frame, mounting brackets are fixedly installed on both side outer walls of the frame, third electric telescopic rods are fixedly installed on two side walls of the mounting brackets close to the frame, and flushing pipes slidably connected to the two side outer walls of the frame are penetrated, the telescopic ends of the two third electric telescopic rods are respectively fixedly connected to the two flushing pipes, and the two flushing pipes are provided with water inlet pipes, and the third connecting track of the third connecting rod industry is located in the circuit of the two third electric telescopic rods.
[0013] Preferably, the blowing assembly includes an output rod fixedly mounted on a side of the lifting frame close to the cylinder, a second output cylinder fixedly connected to the bottom of the frame body is provided on the side of the lifting frame close to the cylinder, one end of the output rod extends into the second output cylinder, a second output plug slidably connected to the inner wall of the second output cylinder is fixedly mounted on the end of the output rod located in the second output cylinder, a first input pipe and a second input pipe connected to the interior of the second output cylinder are provided on the second output cylinder, the ends of the first input pipe and the second input pipe connected to the second output cylinder are both located on the side of the output rod away from the output rod, the end of the first input pipe away from the second output cylinder is connected to the blowing bucket, and a one-way valve is provided in the first input pipe and the second input pipe.
[0014] Beneficial effects of the present invention:
[0015] By setting up the feeding assembly, after starting the cylinder, the pipes can be moved one by one to the processing table for processing. The operation is simple and convenient, and there is no need for manual feeding. The safety is stronger and the work efficiency is improved.
[0016] By setting a limit assembly, the pipeline can be automatically limited after it moves to the processing table, thereby avoiding the deviation of the pipeline during subsequent processing and forming. There is no need to repeat the limit, saving time.
[0017] By setting up a cutting and dust suction component and a forming component, the pipe can be automatically cut after the limiting component completes the limiting of the pipe, so that the pipe can be processed into a preset length. At the same time, after the pipe is cut, the pipe is automatically flushed and formed, integrating processing and forming in one. By setting up a collection box, debris and water in the processing and forming process can be collected.
[0018] By setting up the ejecting component and the blowing component, the elbow can be automatically ejected from the mold groove after the elbow is formed. At the same time, the elbow can be automatically blown after forming to blow away some moisture on the surface of the elbow, making it easier for staff to take and collect it.
[0019] After the cylinder is started, the present invention can not only automatically load the pipeline, but also complete the limiting, processing and forming of the pipeline in succession. The operation is simple and convenient, that is, processing and forming are integrated, which improves the work efficiency. Moreover, after forming, the elbow can be pushed out of the mold groove and the elbow can be blown, which is convenient for the staff to take and collect the elbow. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 A three-dimensional structural schematic diagram of a three-way elbow forming and processing integrated equipment proposed by the present invention;
[0021] Figure 2 This is a three-dimensional structural schematic diagram of one side of a three-way elbow forming and processing integrated equipment proposed by the present invention;
[0022] Figure 3 This is a three-dimensional structural schematic diagram of the other side of the three-way elbow forming and processing integrated equipment proposed by the present invention;
[0023] Figure 4 It is a schematic diagram of the planar structure inside the frame of the present invention;
[0024] Figure 5 It is a schematic diagram of the planar structure inside the first output cylinder of the present invention;
[0025] Figure 6 A position distribution diagram of the first connection rod, the second connection rod, the third connection rod, the first connection track, the second connection track and the third connection track of the present invention;
[0026] Figure 7 It is a schematic diagram of the planar structure inside the second output cylinder of the present invention.
[0027] In the figure: 1 frame, 2 lifting frame, 3 loading frame, 4 fixing plate, 5 third electric telescopic rod, 6 mounting frame, 7 air blast, 8 flushing pipe, 9 first input pipe, 10 collecting box, 11 first connection track, 12 round plate, 13 pressing block, 14 processing table, 15 water inlet pipe, 16 loading inclined block, 17 lifting plate, 18 first connection rod, 19 second input pipe, 20 first output tube, 21 input rod, 22 cylinder, 23 second output tube, 24 driving power supply, 25 cutting blade, 2 6 second electric telescopic rod, 27 first electric telescopic rod, 28 second connection rod, 29 vacuum cleaner, 30 filter, 31 rack, 32 gear, 33 shaft, 34 one-way bearing, 35 third output cylinder, 36 lifting block, 37 mold groove, 38 connecting rod, 39 third output plug, 40 third input pipe, 41 roller, 42 first output plug, 43 spring, 44 second connection track, 45 third connection track, 46 third connection rod, 47 output rod, 48 second output plug. DETAILED DESCRIPTION
[0028] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0029] Reference Figure 1-Figure 7 , a three-way elbow forming and processing integrated equipment, including a frame 1, a loading rack 3 is fixedly installed on the inner walls of both sides of the frame 1, a fixing plate 4 is fixedly installed on the top of the frame 1, a processing table 14 located on one side of the loading rack 3 is arranged below the fixing plate 4, a mold groove 37 is arranged on the processing table 14, a collecting box 10 is arranged below the processing table 14, a filter screen 30 is arranged in the collecting box 10, a dust collector 29 located above the processing table 14 is arranged in the frame 1, an air blower 7 located above the processing table 14 is arranged in the frame 1, and a loading assembly is arranged in the frame 1;
[0030] The loading assembly includes a lifting plate 17 arranged between two loading racks 3, two groups of symmetrically arranged loading inclined blocks 16 are fixedly installed on the top of the lifting plate 17, two symmetrically distributed rollers 41 are arranged at the bottom of the lifting plate 17, a lifting frame 2 slidably connected to the bottom of the frame 1 is arranged at the bottom of the lifting plate 17, the two rollers 41 are in contact with the top of the lifting frame 2, and a cylinder 22 fixedly connected to the bottom of the frame 1 is arranged on the side of the lifting frame 2 away from the processing table 14, and the telescopic end of the cylinder 22 is fixedly connected to the lifting frame 2;
[0031] The frame 1 is provided with a feeding assembly connected to the feeding assembly, and the feeding assembly includes an input rod 21 fixedly mounted on the bottom of the lifting plate 17, and a first output cylinder 20 is fixedly mounted on the inner bottom of the frame 1, and the input rod 21 passes through the top of the first output cylinder 20 and extends into the first output cylinder 20, and one end of the first input rod 21 located in the first output cylinder 20 is fixedly mounted with a first output plug 42 slidably connected to the inner wall of the first output cylinder 20, and a spring 43 is fixedly connected between the first output plug 42 and the inner top of the first output cylinder 20, and a third input pipe 40 connected to the interior of the first output cylinder 20 is provided on the first output cylinder 20, and the third input pipe 40 is connected to the first output cylinder 20. One end of the output tube 20 connected is located below the first output plug 42, a third output tube 35 is fixedly installed at the bottom of the processing table 14, a third output plug 39 is provided in the third output tube 35 and is slidably connected to the inner wall thereof, a connecting rod 38 is fixedly installed on the top of the third output plug 39, one end of the connecting rod 38 passes through the bottom of the processing table 14 and extends into the mold groove 37, a lifting block 36 is fixedly installed on one end of the connecting rod 38 located in the mold groove 37, an end of the third input tube 40 away from the first output tube 20 is connected to the third output tube 35, and one end of the third input tube 40 connected to the third output tube 35 is located below the third output plug 39;
[0032] The frame 1 is provided with a limit assembly connected with the feeding assembly, and the limit assembly includes a rotating shaft 33 which is arranged on the inner wall of one side of the frame 1, and an inner ring of a one-way bearing 34 is fixedly installed on one end of the rotating shaft 33 located in the frame 1, and a gear 32 is fixedly installed on the outer ring of the one-way bearing 34, and a rack 31 is fixedly installed on the side of the jacking frame 2 away from the cylinder 22, and a circular plate 12 is fixedly installed on one end of the rotating shaft 33 located outside the frame 1, and a first connecting rod 18 is arranged on a side wall of the circular plate 12 close to the frame 1, and a first connecting track 11 is arranged on an outer wall of one side of the frame 1, and two first electric telescopic rods 27 are fixedly installed on the bottom of the fixed plate 4, and the telescopic ends of the two first electric telescopic rods 27 are fixedly installed with the same pressing block 13, and the first connecting rod 18 and the first connecting track 11 are both located in the circuit of the two first electric telescopic rods 27;
[0033] The frame 1 is provided with a cutting dust collection assembly, which includes a second connection rod 28 arranged on a side wall of the circular plate 12 close to the frame 1, a second connection track 44 is arranged on a side wall of the frame 1, two second electric telescopic rods 26 are fixedly installed at the bottom of the fixed plate 4, the telescopic ends of the two second electric telescopic rods 26 are fixedly connected to the driving power supply 24, the output shafts of the two driving power supplies 24 are fixedly connected to the cutting blades 25, the processing table 14 is located between the two cutting blades 25, and the second connection rod 28 and the second connection track 44 are both located in the circuit of the two second electric telescopic rods 26, the two second driving power supplies 24 and the dust collector 29;
[0034] The frame 1 is provided with a forming assembly, which includes a third connection rod 46 arranged on a side wall of the circular plate 12 close to the frame 1, a third connection track 45 is arranged on one side wall of the frame 1, mounting brackets 6 are fixedly installed on both side outer walls of the frame 1, and third electric telescopic rods 5 are fixedly installed on two mounting brackets 6 close to one side wall of the frame 1, and flushing pipes 8 slidably connected to the two side outer walls of the frame 1 are penetrated, and the telescopic ends of the two third electric telescopic rods 5 are respectively fixedly connected to the two flushing pipes 8, and the two flushing pipes 8 are provided with water inlet pipes 15, and the third connection rod 46 and the third connection track 45 are both located in the circuit of the two third electric telescopic rods 5;
[0035] A symmetrically distributed air blowing assembly is arranged inside the frame 1, and the air blowing assembly includes an output rod 47 fixedly mounted on the side of the lifting frame 2 close to the cylinder 22, a second output tube 23 fixedly connected to the bottom of the frame 1 is arranged on the side of the lifting frame 2 close to the cylinder 22, one end of the output rod 47 extends into the second output tube 23, and a second output plug 48 slidably connected to the inner wall of the second output tube 23 is fixedly mounted on one end of the output rod 47 located in the second output tube 23, and a first input pipe 9 and a second input pipe 19 connected to the interior of the second output tube 23 are arranged on the second output tube 23, and the ends of the first input pipe 9 and the second input pipe 19 connected to the second output tube 23 are both located on the side of the output rod 47 away from the output rod 47, and the end of the first input pipe 9 away from the second output tube 23 is connected to the air blowing bucket 7, and a one-way valve is arranged in the first input pipe 9 and the second input pipe 19.
[0036] When the present invention is used, a plurality of pipes are placed on the loading rack 3, and the cylinder 22 is started to lift the jacking rack 2 (attached Figure 4 state) first moves to the right and then moves to the left to return to the initial position (the initial position is attached Figure 4 State), during the rightward movement of the lifting frame 2, since the roller 41 contacts the top of the lifting frame 2 and a slope is provided on the lifting frame 2, the lifting frame 2 will first move the roller 41, the lifting plate 17 and the two sets of loading inclined blocks 16 upward, thereby lifting the pipes on the loading frame 3. When the lifting plate 17 is at the highest position, multiple pipes will slide along the inclined surface of the loading frame 3 to the previous station, so that one of the pipes will slide into the processing table 14 and be located above the mold groove 37. During the upward movement of the lifting plate 17, the input rod 21 and the first output plug 42 will be driven to move upward, so that the spring 43 is compressed, and part of the oil in the third output cylinder 35 below the third output plug 39 and in the third input pipe 40 is sucked into the first output cylinder 20, so that the third output plug 39, the connecting rod 38 and the lifting block 36 move downward for subsequent molding;
[0037] Subsequently, as the jacking frame 2 continues to move to the right, the rack 31 and the gear 32 begin to mesh with each other and cause the gear 32 to rotate counterclockwise for one circle. At this time, the inner ring and the outer ring of the one-way bearing 34 are locked with each other, so that the shaft 33, the circular plate 12, the first connecting rod 18, the second connecting rod 28 and the third connecting rod 46 rotate counterclockwise accordingly (see FIG. 2 ). Figure 6 During the counterclockwise rotation of the first connecting rod 18, the second connecting rod 28 and the third connecting rod 46, the first connecting rod 18 first contacts the first connecting track 11, the circuit of the first electric telescopic rod 27 is first connected to the circuit, and the pressing block 13 moves downward to press and fix one of the pipes on the processing table 14, and then the second connecting rod 28 contacts the second connecting track 44 (at this time, the first connecting rod 18 is still in contact with the first connecting track 11), and the circuits of the second electric telescopic rod 26, the driving power supply 24 and the vacuum cleaner 29 are connected, so that the cutting blade 25 rotates and moves downward to cut the two end parts of the pipe. By setting the vacuum cleaner 29, the debris and dust generated during cutting can be sucked and collected;
[0038] Then the second connection rod 28 is separated from the second connection track 44 and no longer contacts each other, the third connection rod 46 contacts the third connection track 45 (at this time the first connection rod 18 is still in contact with the first connection track 11), the cutting blade 25 no longer rotates and returns to the initial position, the third electric telescopic rod 5 is turned on and started to make the two flushing pipes 8 approach each other and finally connect with the cut pipe, the pressurized water is introduced into the flushing pipes 8 through the water inlet pipe 15, and the punching water in the flushing pipes 8 on both sides punches the pipes at the same time, then the third connection rod 46 and the third connection track 45 no longer contact each other, After the punching is completed, the flushing pipes 8 on both sides are moved toward each other and returned to the initial position by the third electric telescopic rod 5. Finally, the first connection rod 18 is no longer in contact with the first connection track 11. The first electric telescopic rod 27 makes the pressing block 13 move upward and no longer fixes the pipeline. By setting the collection box 10, the debris generated during cutting and the punching water can be collected, and the debris can be filtered by the filter 30. During the rightward movement of the jacking frame 2, the output rod 47 and the second output plug 48 are also driven to move rightward, so that the external air is sucked into the second output cylinder 23 through the second input pipe 19;
[0039] After the stamping of the pipeline is completed, the lifting frame 2 moves to the left and returns to the initial position. During this process, the lifting frame 2 causes the output rod 47 and the second output plug 48 to move to the left, so that the air sucked into the second output cylinder 23 is pressed into the air blower 7 through the first input pipe 9 and sprayed to the stamped pipeline, so that part of the moisture on the pipeline can be blown away for collection. The movement of the lifting frame 2 causes the rack 31 to move to the left, thereby causing the gear 32 to rotate clockwise for one circle, but at this time the inner and outer rings of the one-way bearing 34 are idling, and the shaft 33 does not rotate, thereby causing The first connection rod 18, the second connection rod 28 and the third connection rod 46 on the circular plate 12 will not rotate. When the lifting frame 2 moves to the left and returns to the initial position, the pressure generated by the compression of the spring 43 can make the lifting plate 17 and the roller 41 move downward, and then the first output plug 42 moves downward, and the oil in the first output cylinder 20 is pressed into the third output cylinder 35, so that the third output plug 39, the connecting rod 38 and the lifting block 36 move upward to lift the formed pipe so that the staff can take it, and so on.
[0040] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A three-way elbow forming and processing integrated equipment, comprising a frame (1), characterized in that: A loading rack (3) is fixedly mounted on both inner walls of the frame (1), a fixing plate (4) is fixedly mounted on the top of the frame (1), a processing table (14) is arranged below the fixing plate (4) and is located on one side of the loading rack (3), a mold groove (37) is arranged on the processing table (14), a collecting box (10) is arranged below the processing table (14), a filter screen (30) is arranged in the collecting box (10), and a filter screen (30) is arranged in the processing table (14) in the frame (1). ), the frame (1) is provided with an air blower (7) located above the processing table (14), the frame (1) is provided with a feeding assembly, the frame (1) is provided with a lifting assembly connected to the feeding assembly, the frame (1) is provided with a limit assembly connected to the feeding assembly, the frame (1) is provided with a cutting and dust collecting assembly, the frame (1) is provided with a forming assembly, and the frame (1) is provided with symmetrically distributed air blower assemblies; The loading assembly comprises a lifting plate (17) arranged between two loading racks (3), two groups of symmetrically arranged loading inclined blocks (16) are fixedly installed on the top of the lifting plate (17), two symmetrically distributed rollers (41) are arranged at the bottom of the lifting plate (17), a lifting frame (2) slidably connected to the bottom of the frame (1) is arranged at the bottom of the lifting plate (17), the two rollers (41) are in contact with the top of the lifting frame (2), and a cylinder (22) fixedly connected to the bottom of the frame (1) is arranged on the side of the lifting frame (2) away from the processing table (14), and the telescopic end of the cylinder (22) is fixedly connected to the lifting frame (2); The ejecting assembly comprises an input rod (21) fixedly mounted on the bottom of the lifting plate (17); a first output cylinder (20) is fixedly mounted on the inner bottom of the frame (1); the input rod (21) passes through the top of the first output cylinder (20) and extends into the first output cylinder (20); a first output plug (42) slidably connected to the inner wall of the first output cylinder (20) is fixedly mounted on one end of the input rod (21) located in the first output cylinder (20); a spring (43) is fixedly connected between the first output plug (42) and the inner top of the first output cylinder (20); a third input pipe (40) is arranged on the first output cylinder (20) and is connected to the interior thereof; an end of the third input pipe (40) connected to the first output cylinder (20) is located below the first output plug (42); A third output cylinder (35) is fixedly mounted on the bottom of the processing table (14), a third output plug (39) is arranged in the third output cylinder (35) and is slidably connected to the inner wall thereof, a connecting rod (38) is fixedly mounted on the top of the third output plug (39), one end of the connecting rod (38) passes through the bottom of the processing table (14) and extends into the mold groove (37), a lifting block (36) is fixedly mounted on the end of the connecting rod (38) located in the mold groove (37), an end of the third input pipe (40) away from the first output cylinder (20) is connected to the third output cylinder (35), and an end of the third input pipe (40) connected to the third output cylinder (35) is located below the third output plug (39); The limit assembly comprises a rotating shaft (33) which is arranged through an inner wall of one side of a frame (1); an inner ring of a one-way bearing (34) is fixedly mounted on one end of the rotating shaft (33) located in the frame (1); a gear (32) is fixedly mounted on the outer ring of the one-way bearing (34); a rack (31) is fixedly mounted on the side of the lifting frame (2) away from the cylinder (22); a circular plate (12) is fixedly mounted on one end of the rotating shaft (33) located outside the frame (1); a first connection rod (18) is arranged on a side wall of the circular plate (12) close to the frame (1); a first connection track (11) is arranged on an outer wall of one side of the frame (1); two first electric telescopic rods (27) are fixedly mounted on the bottom of the fixed plate (4); the telescopic ends of the two first electric telescopic rods (27) are fixedly mounted with the same pressing block (13); and the first connection rod (18) and the first connection track (11) are both located in the circuits of the two first electric telescopic rods (27).
2. The three-way elbow forming and processing integrated equipment according to claim 1 is characterized in that: The cutting and dust collection assembly comprises a second connection rod (28) arranged on a side wall of the circular plate (12) close to the frame (1); a second connection track (44) is arranged on a side wall of the frame (1); two second electric telescopic rods (26) are fixedly mounted on the bottom of the fixed plate (4); the telescopic ends of the two second electric telescopic rods (26) are fixedly connected to a driving power source (24); the output shafts of the two driving power sources (24) are fixedly connected to a cutting blade (25); the processing table (14) is located between the two cutting blades (25); and the second connection rod (28) and the second connection track (44) are both located in a circuit of the two second electric telescopic rods (26), the two second driving power sources (24) and the dust collector (29).
3. The three-way elbow forming and processing integrated equipment according to claim 1 is characterized in that: The molding assembly comprises a third connection rod (46) arranged on a side wall of the circular plate (12) close to the frame (1); a third connection track (45) is arranged on one side wall of the frame (1); mounting frames (6) are fixedly mounted on both side outer walls of the frame (1); third electric telescopic rods (5) are fixedly mounted on both side walls of the mounting frames (6) close to the frame (1); flushing pipes (8) slidably connected thereto are penetrated through both side outer walls of the frame (1); the telescopic ends of the two third electric telescopic rods (5) are respectively fixedly connected to the two flushing pipes (8); the two flushing pipes (8) are provided with water inlet pipes (15); and the third connection rod (46) and the third connection track (45) are both located in the circuits of the two third electric telescopic rods (5).
4. The three-way elbow forming and processing integrated equipment according to claim 1 is characterized in that: The air blowing assembly comprises an output rod (47) fixedly mounted on a side of the lifting frame (2) close to the cylinder (22); a second output cylinder (23) fixedly connected to the bottom of the frame (1) is arranged on the side of the lifting frame (2) close to the cylinder (22); one end of the output rod (47) extends into the second output cylinder (23); a second output plug (48) slidably connected to the inner wall of the second output cylinder (23) is fixedly mounted on the end of the output rod (47) located in the second output cylinder (23); a first input pipe (9) and a second input pipe (19) connected to the interior of the second output cylinder (23); the ends of the first input pipe (9) and the second input pipe (19) connected to the second output cylinder (23) are both located on a side of the output rod (47) away from the output rod (47); the ends of the first input pipe (9) away from the second output cylinder (23) are connected to the air blowing scoop (7); and one-way valves are arranged in the first input pipe (9) and the second input pipe (19).
Citation Information
Patent Citations
Extrusion molding mechanism for ultrahigh molecular weight polyethylene composite pipe
CN112721088A
Energy-saving stepping cooling bed equipment
CN203409236U
Positioning and conveying structure of full-automatic pipe cutting machine
CN220698358U