A method for installing an implicit rigid-connected column base structure

Through the installation method of the implicit rigidly connected column foot structure, the problem of the protruding structure of the steel structure column foot affecting the appearance of the building is solved, the concealed design and structural stability of the column foot area are realized, and the aesthetics and safety of the building are improved. and simplifies the installation process.

CN118375222BActive Publication Date: 2024-10-22SHANGHAI JIEYI CONSTR TECH CO LTD

Patent Information

Application Number
CN202410813719.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-10-22
Estimated Expiration
2044-06-24

AI Technical Summary

Technical Problem

The existing steel structure column base structure has protruding structures, which affects the appearance of the building, and may be demolished without authorization during later decoration, causing structural safety hazards.

Method used

The installation method of the implicit rigid-joined column foot structure is adopted, by welding the shoe beams and anchor bars to the lower surface of the column foot plate, and pre-embedding the column foot plate in the building structure, and the column body and column foot plate are coordinated by the studs and ear plates. Achieve vertical installation and avoid exposed structures in the column base area.

Benefits of technology

It improves the aesthetics of the column foot area, ensures the stability and safety of the building structure, simplifies the installation and adjustment of the column body, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118375222B_ABST
    Figure CN118375222B_ABST
Patent Text Reader

Abstract

The present invention discloses an installation method of an implicit rigid column base structure, which relates to the field of construction, and includes the following steps: pre-treating a column base plate; pre-treating a column body; pre-embedding a column base plate; inserting a first nut and a first gasket on each stud, and roughly adjusting all the first nuts to be in the same horizontal plane; hoisting the column body; fine-tuning all the first nuts so that the column body is perpendicular to the column base plate and the bottom of the column body contacts the upper surface of the column base plate; welding the bottom of the column body to the upper surface of the column base plate; cutting and removing the ear plate and the stud. The present invention places the boot beam under the column base plate, and the entire column base plate is no longer pre-welded with the column body, but the column base plate is pre-cast on the building structure as an embedded part. Accordingly, the boot beam and anchor bars will be cast inside the building and no longer exposed. Naturally, there is no need to cast a protruding structure at the column base, thus realizing an implicit rigid column base, making the column structure of the building more beautiful.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of construction, and in particular to an installation method of an implicit rigid-connected column base structure. Background Art

[0002] Compared with traditional buildings with long construction periods, serious environmental pollution, and shortage of construction workers, the construction method of prefabricated components manufactured in factories and assembled on site adopted by prefabricated buildings has many advantages such as shortening construction period, improving construction efficiency, and reducing construction costs. It is being increasingly widely used in the construction industry.

[0003] As the most typical structural form of prefabricated buildings, steel structures are widely used. The most of them should belong to light industrial plants, followed by heavy high-rise and super high-rise public buildings, but there are fewer residential applications. One of the main reasons is that the appearance requirements of steel structure buildings and residential buildings do not match, and there is an obvious sense of disharmony; among them, the column foot structure of the steel structure is one of the appearance disharmony. In the prior art, the column foot in low-rise buildings usually adopts exposed rigid column foot. Only anchor bolts need to be embedded in the foundation construction. The rest of the column foot plate and boot beam (stiffening plate) are all processed and pre-welded together with the bottom of the column body, and then leveling and bolt connection work is carried out on site when the column body is installed. Since the column foot plate is usually larger than the column, and there are protrusions such as boot beams (stiffening plates) on the upper part of the column foot plate, the column foot area needs to be covered with concrete after the column body is connected. This will inevitably lead to a protruding structure at the foot of the finished column, which will cause a large appearance problem for the building. On the other hand, it has been found in practice that some owners arbitrarily smashed the protruding part for the sake of beauty in the later decoration, causing a large structural safety hazard. Summary of the invention

[0004] The technical problem to be solved by the present invention is that the column base structure of the steel structure in the prior art has a protruding structure, which affects the appearance of the building. The present invention provides an installation method for an implicit rigid column base structure, which eliminates the protruding structure in the column base area without affecting the strength of the building.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: an installation method of an implicit rigid column base structure, wherein the implicit rigid column base structure comprises a column body, a column base plate, a boot beam and an anchor bar, the bottom of the column body is welded to the upper surface of the column base plate, the boot beam is welded to the lower surface of the column base plate, and the anchor bar is welded to the lower surface of the column base plate; the boot beam comprises a plurality of plates welded into a tic-tac-toe shape; one end of the anchor bar is welded to the lower surface of the column base plate, and the other end is used to anchor the building structure and is bent toward the center direction of the column base plate;

[0006] The installation method of the implicit rigid-connected column foot structure comprises the following steps:

[0007] Step 1: Pre-treat the column base plate: First, weld the shoe beam and anchor bars to the lower surface of the column base plate, and then vertically weld multiple studs to the upper surface of the column base plate;

[0008] Step 2: Pre-treating the column body: welding a plurality of ear plates around the column body, the ear plates are in a horizontal posture, the number of the ear plates is consistent with the number of the studs, the positions of the ear plates and the studs correspond one to one, and the ear plates are provided with first perforations matching the studs;

[0009] Step 3: Pre-embed the column base plate. After the building is poured, the upper surface of the column base plate is exposed to the outside, and the lower surface of the column base plate is poured inside the building structure;

[0010] Step 4: Insert a first nut and a first washer on each stud, and roughly adjust all the first nuts to be on the same horizontal plane;

[0011] Step 5: Lift the column body so that the ear plate is aligned with the stud; after the column body falls, the stud is inserted into the first perforation of the ear plate;

[0012] Step 6: Fine-tune all the first nuts so that the column body is perpendicular to the column base plate and the bottom of the column body is in contact with the upper surface of the column base plate;

[0013] Step 7: Weld the bottom of the column body to the upper surface of the column base plate;

[0014] Step 8: Cut and remove the ear plates and studs;

[0015] In step 5, a guide is used to guide the column body to fall accurately, and the guide includes a bottom plate, a positioning column, a positioning shaft and a guide rod; a second through hole is provided on the bottom plate, the positioning column is vertically fixed on the bottom plate, and a square hole along the length direction of the positioning column is provided inside the positioning column. In step 4, the bottom plate is sleeved on the stud by using the second through hole, and the bottom plate is located under the first nut;

[0016] The cross section of the positioning shaft is square and matches the square hole. The guide rod is fixed on the positioning shaft. When the positioning shaft is vertically inserted into the square hole of the positioning column, the guide rod is in a vertical state and is located directly above the stud.

[0017] In step 5, when the column body is suspended just above the column base plate, the positioning shaft is inserted into the square hole of the positioning column, and the guide rod is inserted into the first through hole of the ear plate.

[0018] The function of the shoe beam is to prevent local buckling failure of the column base plate and to improve the out-of-plane local stability of the column base plate. It is an important component of the column base structure and cannot be cancelled. In order to avoid the shoe beam affecting the appearance in the column base area, the present invention places the shoe beam under the column base plate, and the entire column base plate is no longer pre-welded to the column body. Instead, the column base plate is pre-cast on the building structure as an embedded part. Accordingly, the shoe beam and anchor bars will be cast inside the building and will no longer be exposed. Naturally, there is no need to cast a protruding structure at the column base, thereby realizing an implicit rigid-connected column base.

[0019] However, it should be noted that the pre-buried anchor bolts in the traditional technical solution can not only be used to install the column body, but also to adjust the column body to ensure that the column body is vertical. The technical solution of the present invention directly pre-buries the column base plate, which will cause the column body to be unable to adjust its posture during installation. In order to overcome this installation problem, the present invention provides an installation method for an implicit rigid column base structure.

[0020] Furthermore, in step 6: after the fine-tuning is completed, a second gasket and a second nut are put on each stud, and then the second nut is tightened. The second nut and the first nut jointly fasten the ear plate, so that the column body is more stable during the welding process, thereby ensuring the welding quality.

[0021] Furthermore, in step 1, the specific welding method of the anchor bar is: a hole is set on the lower surface of the column base plate, the upper end of the anchor bar is inserted into the hole and is plug-welded with the column base plate.

[0022] Furthermore, in step 7, the bottom of the column body and the upper surface of the column base plate are welded using a groove penetration welding process.

[0023] During the installation of the column body, the multiple studs in step 5 need to be plugged into the first through-holes of the multiple ear plates, and it is difficult to plug the multiple column holes into each other at the same time. In order to facilitate on-site installation, the present invention uses a guide in step 5 to guide the column body to fall accurately, and the guide includes a bottom plate, a positioning column, a positioning shaft and a guide rod. The bottom plate is provided with a second through-hole, the positioning column is vertically fixed on the bottom plate, and a square hole along the length direction of the positioning column is provided inside the positioning column. In step 4, the bottom plate is sleeved on the studs using the second through-hole, and the bottom plate is located under the first nut.

[0024] The cross section of the positioning shaft is square and matches the square hole. The guide rod is fixed on the positioning shaft. When the positioning shaft is vertically inserted into the square hole of the positioning column, the guide rod is in a vertical state and is located directly above the stud.

[0025] In step 5, when the column body is suspended just above the column base plate, the positioning shaft is inserted into the square hole of the positioning column, and the guide rod is inserted into the first through hole of the ear plate.

[0026] Furthermore, a trapezoidal opening is provided at the top of the square hole of the positioning column, and a trapezoidal boss is provided in the middle of the positioning shaft, and the trapezoidal boss can be inserted into the trapezoidal opening; the trapezoidal boss and the trapezoidal opening are used to realize the vertical positioning of the positioning shaft.

[0027] Furthermore, a hexagonal sleeve is provided on the upper surface of the base plate, and the hexagonal sleeve is aligned with the first nut; the hexagonal sleeve is used as a wrench. When the first nut needs to be fine-tuned in step 6, the worker directly lifts the base plate of the guide to allow the hexagonal sleeve to be inserted into the first nut, and then the first nut can be rotated by rotating the base plate, which is more convenient.

[0028] Beneficial effects:

[0029] (1) The implicit rigid-jointed column base structure of the present invention places the shoe beam under the column base plate, and the entire column base plate is no longer pre-welded to the column body. Instead, the column base plate is cast in advance on the building structure as an embedded part. Accordingly, the shoe beam and anchor bars are cast inside the building and are no longer exposed. Naturally, there is no need to cast a protruding structure at the column base, thus realizing the implicit rigid-jointed column base and making the column structure of the building more beautiful.

[0030] (2) The implicit rigid-jointed column base structure installation method of the present invention realizes the installation and adjustment of the column body through the cooperation of the studs and the ear plates, ensuring that the column body and the column base plate are perpendicular, thereby guaranteeing the quality of the building.

[0031] (3) The implicit rigid-jointed column base structure installation method of the present invention utilizes the guide rod in the guide to ensure that the first through hole of the ear plate is aligned with the stud, guides the column body to move downward quickly, and accurately realizes the insertion of the first through hole and the stud, thereby improving the installation efficiency of the column body.

[0032] (4) The implicit rigid-jointed column foot structure installation method of the present invention configures a hexagonal sleeve on the bottom plate of the guide, which is convenient for workers to directly use the bottom plate to fine-tune the first nut in a narrow space, making the installation of the column body more convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a structural diagram of the implicit rigid-connected column base in Example 1.

[0034] Figure 2 This is a schematic diagram of the pretreatment of the column base plate in Example 1 (part 1).

[0035] Figure 3 This is a schematic diagram of the pretreatment of the column base plate in Example 1 (part 2).

[0036] Figure 4 This is a diagram of the installation process of the implicit rigid column base in Example 1 (part 1).

[0037] Figure 5 This is the installation process diagram of the implicit rigid column base in Example 1 (part 2).

[0038] Figure 6 This is the installation process diagram of the implicit rigid column base in Example 1 (part 3).

[0039] Figure 7 It is a stereoscopic diagram of the guide in Example 2.

[0040] Figure 8 This is a cross-sectional view of the guide in Example 2.

[0041] Fig. 9 This is a diagram of the installation process of the implicit rigid column base in Example 2 (part 1).

[0042] Fig.10 This is the installation process diagram of the implicit rigid column base in Example 2 (part 2).

[0043] Fig.11 This is the installation process diagram of the implicit rigid column base in Example 2 (part 3).

[0044] Fig.12 This is the installation process diagram of the implicit rigid column base in Example 2 (part 4).

[0045] Among them: 100, column body; 200, column base plate; 300, boot beam; 400, anchor bar; 500, stud; 510, first nut; 520, first gasket; 530, second nut; 540, second gasket; 600, ear plate; 610, first through hole; 700, guide; 710, base plate; 711, second through hole; 712, hexagonal sleeve; 720, positioning column; 721, square hole; 722, trapezoidal mouth; 730, positioning shaft; 731, trapezoidal boss; 740, guide rod. DETAILED DESCRIPTION

[0046] The present invention is further described in detail below in conjunction with specific implementation modes. Example 1

[0047] like Figure 1 As shown, the implicit rigid column base structure of this embodiment includes a column body 100, a column base plate 200, a shoe beam 300 and an anchor bar 400; the bottom of the column body 100 is welded to the upper surface of the column base plate 200, the shoe beam 300 is welded to the lower surface of the column base plate 200, and the anchor bar 400 is welded to the lower surface of the column base plate 200; the structure of the shoe beam 300 is as shown in FIG. Figure 2 As shown, it includes a plurality of plates welded into a crisscross shape; one end of the anchor bar 400 is welded to the lower surface of the column base plate 200, and the other end is used to anchor the building structure and is bent toward the center direction of the column base plate 200.

[0048] The function of the boot beam 300 is to prevent the column base plate 200 from local buckling failure and improve the out-of-plane local stability of the column base plate 200. It is an important component of the column base structure and cannot be cancelled. In order to avoid the boot beam 300 affecting the appearance in the column base area, the present embodiment places the boot beam 300 under the column base plate 200, and the entire column base plate 200 is no longer pre-welded with the column body 100, but the column base plate 200 is pre-cast on the building structure as an embedded part. Correspondingly, the boot beam 300 and the anchor bar 400 will be cast inside the building and no longer exposed. Naturally, there is no need to cast a protruding structure at the column base, thereby realizing an implicit rigid-connected column base. The finished column base structure is as follows Figure 1 As shown, there is only the column body 100 above the column base plate 200 without any other structure.

[0049] The installation method of the implicit rigid column base structure of this embodiment includes the following steps:

[0050] Step 1: Pre-treat the column base plate 200: Figure 2 and Figure 3 As shown, firstly, the shoe beam 300 and the anchor bar 400 are welded to the lower surface of the column base plate 200, and then a plurality of studs 500 are vertically welded to the upper surface of the column base plate 200; wherein, the specific welding method of the anchor bar 400 is: a hole is set on the lower surface of the column base plate 200, the upper end of the anchor bar 400 is inserted into the hole and is plug-welded with the column base plate 200 by penetration;

[0051] Step 2: Pre-treat the column 100: Figure 4 As shown, a plurality of ear plates 600 are welded around the column body 100, the ear plates 600 are in a horizontal posture, all the ear plates 600 are located in the same horizontal plane, the number of the ear plates 600 is consistent with the number of the studs 500, the positions of the ear plates 600 and the studs 500 correspond one to one, and the ear plates 600 are provided with first through holes 610 matching the studs 500;

[0052] Step 3: pre-embed the column base plate 200. After the building is cast, the upper surface of the column base plate 200 and the studs 500 are exposed to the outside, and the lower surface of the column base plate 200, the shoe beam 300 and the anchor bar 400 are cast inside the building structure;

[0053] Step 4: Figure 4 As shown, a first nut 510 and a first washer 520 are inserted into each stud 500, and all the first nuts 510 are roughly adjusted to be substantially in the same horizontal plane;

[0054] Step 5: Figure 4 As shown, the column body 100 is hoisted, the column body 100 is suspended just above the column base plate 200, and the ear plate 600 is aligned with the stud 500; then Figure 5 As shown, the column body 100 falls, and the stud 500 is inserted into the first through hole 610 of the ear plate 600;

[0055] Step 6: Fine-tune all the first nuts 510 so that the column body 100 is perpendicular to the column base plate 200 and the bottom of the column body 100 is in contact with the upper surface of the column base plate 200; Figure 6 As shown, after the fine adjustment is completed, the second gasket 540 and the second nut 530 are put on each stud 500, and then the second nut 530 is tightened. The second nut 530 and the first nut 510 jointly tighten the ear plate 600, so that the column body 100 is more stable during the welding process, and the welding quality is guaranteed; the role of the second nut 530 is only to ensure the temporary tightening of the ear plate 600 in the installation state, so the second nut 530 is often tightened manually with limited force; in order to ensure the tightening effect of the ear plate 600, two second nuts 530 can be used on each stud 500 to prevent the second nut 530 from loosening during the installation process;

[0056] Step 7: Weld the bottom of the column body 100 to the upper surface of the column base plate 200, and the bottom of the column body 100 and the upper surface of the column base plate 200 are welded by groove penetration welding process;

[0057] Step 8: Cut and remove the ear plate 600 and the stud 500. At this point, the upper surface of the column base plate 200 no longer has any other components except the column body 100, thus realizing an implicit rigid column base structure. Example 2

[0058] In step 5 of embodiment 1, the four studs 500 and the first through holes 610 of the four ear plates 600 need to be plugged in, and it is difficult to plug multiple column holes in parallel. In order to facilitate on-site installation, this embodiment provides another installation method of the implicit rigid column foot structure, which requires the use of Figure 7 and Figure 8 The guide 700 shown in the figure comprises a bottom plate 710, a positioning column 720, a positioning shaft 730 and a guide rod 740; a second through hole 711 is provided on the bottom plate 710, the positioning column 720 is vertically fixed on the bottom plate 710, and a square hole 721 is provided inside the positioning column 720 along its length direction; the cross section of the positioning shaft 730 is square and matches the square hole 721, and the guide rod 740 is fixed on the positioning shaft 730. When the positioning shaft 730 is vertically fixed to the bottom plate 710, the second through hole 711 is provided on the bottom plate 710, and the positioning column 720 is vertically fixed to the bottom plate 710. A square hole 721 is provided inside the positioning column 720 along its length direction; the cross section of the positioning shaft 730 is square and matches the square hole 721, and the guide rod 740 is fixed on the positioning shaft 730. After being directly inserted into the square hole 721 of the positioning column 720, the guide rod 740 is in a vertical state and is located directly above the stud 500; a trapezoidal opening 722 is provided at the top of the square hole 721 of the positioning column 720, and a trapezoidal boss 731 is provided in the middle of the positioning shaft 730, and the trapezoidal boss 731 can be inserted into the trapezoidal opening 722; a hexagonal sleeve 712 is provided on the upper surface of the base plate 710, and the hexagonal sleeve 712 is aligned with the first nut 510; the hexagonal sleeve 712 is used as a wrench.

[0059] The installation method of the implicit rigid column base structure of this embodiment includes the following steps:

[0060] Step 1: Pre-treat the column base plate 200: Figure 2 and Figure 3 As shown, firstly, the shoe beam 300 and the anchor bar 400 are welded to the lower surface of the column base plate 200, and then a plurality of studs 500 are vertically welded to the upper surface of the column base plate 200; wherein, the specific welding method of the anchor bar 400 is: a hole is set on the lower surface of the column base plate 200, the upper end of the anchor bar 400 is inserted into the hole and is plug-welded with the column base plate 200 by penetration;

[0061] Step 2: Pre-treat the column 100: Figure 4 As shown, a plurality of ear plates 600 are welded around the column body 100, the ear plates 600 are in a horizontal posture, all the ear plates 600 are located in the same horizontal plane, the number of the ear plates 600 is consistent with the number of the studs 500, the positions of the ear plates 600 and the studs 500 correspond one to one, and the ear plates 600 are provided with first through holes 610 matching the studs 500;

[0062] Step 3: pre-embed the column base plate 200. After the building is cast, the upper surface of the column base plate 200 and the studs 500 are exposed to the outside, and the lower surface of the column base plate 200, the shoe beam 300 and the anchor bar 400 are cast inside the building structure;

[0063] Step 4: Fig. 9 As shown, the bottom plate 710 is sleeved on the stud 500 by using the second through hole 711, and then a first nut 510 is sleeved on each stud 500 and a first gasket 520 is sleeved, and all the first nuts 510 are roughly adjusted to be substantially in the same horizontal plane; the bottom plate 710 is located below the first nuts 510;

[0064] Step 5: Fig. 9 As shown, the column body 100 is hoisted, the column body 100 is suspended just above the column base plate 200, and the ear plate 600 is aligned with the stud 500; then Fig.10 As shown, the positioning shaft 730 is inserted into the square hole 721 of the positioning column 720, and the guide rod 740 is inserted into the first through hole 610 of the ear plate 600. At this time, the guide rod 740 is in a vertical state and is located directly above the stud 500; at this point, the suspended column body 100 is limited in the horizontal direction; then, as shown in Fig.11 As shown, the column body 100 falls, and all the studs 500 are smoothly inserted into the first through holes 610 of the corresponding ear plates 600; after the column body 100 falls into place, as shown in FIG. Fig.12 As shown, pull out the positioning shaft 730 and the guide rod 740;

[0065] Step 6: Fig.12The bottom plate 710 shown is lifted upward so that the hexagonal sleeve 712 is inserted into the first nut 510. At this time, the bottom plate 710 can be used as a wrench to rotate the first nut 510; the bottom plate 710 is used to fine-tune all the first nuts 510 so that the column body 100 is perpendicular to the column base plate 200 and the bottom of the column body 100 is in contact with the upper surface of the column base plate 200; after the fine-tuning is completed, a second gasket 540 and two second nuts 530 are put on each stud 500, and then the second nuts 530 are tightened. The second nuts 530 and the first nuts 510 are used to tighten the ear plate 600 together, so that the column body 100 is more stable during the welding process, and the welding quality is guaranteed;

[0066] Step 7: Weld the bottom of the column body 100 to the upper surface of the column base plate 200, and the bottom of the column body 100 and the upper surface of the column base plate 200 are welded by groove penetration welding process;

[0067] Step 8: Cut and remove the ear plate 600 and the stud 500. At this point, the upper surface of the column base plate 200 no longer has any other components except the column body 100, thus realizing an implicit rigid column base structure.

[0068] In this embodiment, the guide 700 will not be cut and damaged, and is a reusable component.

[0069] Although the embodiments of the present invention are described in the specification, these embodiments are only for reference and should not limit the protection scope of the present invention. Various omissions, substitutions and changes within the scope of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for installing an implicit rigid column base structure, characterized in that: The implicit rigid column base structure comprises a column body, a column base plate, a shoe beam and an anchor bar, wherein the bottom of the column body is welded to the upper surface of the column base plate, the shoe beam is welded to the lower surface of the column base plate, and the anchor bar is welded to the lower surface of the column base plate; the shoe beam comprises a plurality of plates welded into a tic-tac-toe shape; one end of the anchor bar is welded to the lower surface of the column base plate, and the other end is used to anchor the building structure and is bent toward the center direction of the column base plate; The installation method of the implicit rigid-connected column foot structure comprises the following steps: Step 1: Pre-treat the column base plate: First, weld the shoe beam and anchor bars to the lower surface of the column base plate, and then vertically weld multiple studs to the upper surface of the column base plate; Step 2: Pre-treating the column body: welding a plurality of ear plates around the column body, the ear plates are in a horizontal posture, the number of the ear plates is consistent with the number of the studs, the positions of the ear plates and the studs correspond one to one, and the ear plates are provided with first perforations matching the studs; Step 3: Pre-embed the column base plate. After the building is poured, the upper surface of the column base plate is exposed to the outside, and the lower surface of the column base plate is poured inside the building structure; Step 4: Insert a first nut and a first washer on each stud, and roughly adjust all the first nuts to be on the same horizontal plane; Step 5: Lift the column body so that the ear plate is aligned with the stud; after the column body falls, the stud is inserted into the first perforation of the ear plate; Step 6: Fine-tune all the first nuts so that the column body is perpendicular to the column base plate and the bottom of the column body is in contact with the upper surface of the column base plate; Step 7: Weld the bottom of the column body to the upper surface of the column base plate; Step 8: Cut and remove the ear plates and studs; In step 5, a guide is used to guide the column body to fall accurately, and the guide includes a bottom plate, a positioning column, a positioning shaft and a guide rod; a second through hole is provided on the bottom plate, the positioning column is vertically fixed on the bottom plate, and a square hole along the length direction of the positioning column is provided inside the positioning column. In step 4, the bottom plate is sleeved on the stud by using the second through hole, and the bottom plate is located under the first nut; The cross section of the positioning shaft is square and matches the square hole. The guide rod is fixed on the positioning shaft. When the positioning shaft is vertically inserted into the square hole of the positioning column, the guide rod is in a vertical state and is located directly above the stud. In step 5, when the column body is suspended just above the column base plate, the positioning shaft is inserted into the square hole of the positioning column, and the guide rod is inserted into the first through hole of the ear plate.

2. The installation method of the implicit rigid column base structure according to claim 1 is characterized in that: In step 6: after the fine adjustment is completed, a second washer and a second nut are put on each stud, and then the second nut is tightened.

3. The installation method of the implicit rigid column base structure according to claim 1 is characterized in that: In step 1, the specific welding method of the anchor bar is: a hole is set on the lower surface of the column base plate, the upper end of the anchor bar is inserted into the hole and is plug-welded with the column base plate.

4. The installation method of the implicit rigid column base structure according to claim 1 is characterized in that: In step 7, the bottom of the column body and the upper surface of the column base plate are welded using a groove penetration welding process.

5. The installation method of the implicit rigid column base structure according to claim 1 is characterized in that: A trapezoidal opening is arranged at the top of the square hole of the positioning column, and a trapezoidal boss is arranged at the middle of the positioning shaft.

6. The installation method of the implicit rigid column base structure according to claim 5 is characterized in that: A hexagonal sleeve is arranged on the upper surface of the bottom plate, and the hexagonal sleeve is aligned with the first nut.

Citation Information

Patent Citations

  • Whole body embedded type rigid pedestal and construction method thereof

    CN104963354A

  • Embedded steel pipe column base joint

    CN214883823U

  • Anchor bar combined semi-embedded type steel column base structure

    CN217352580U

Cited By

  • A bottom-mounted PEC column base structure and its construction method

    CN123064250A