Monitoring method of ship-pipe connection posture during floating installation of submerged tube
By arranging monitoring points and equipment on the immersed pipes and integrated ships, the connection status of the ship pipes is monitored in real time, which solves the stability and safety problems caused by rocking motion during the floating installation process and improves the reliability and accuracy of the construction.
Patent Information
- Application Number
- CN202410789623.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-06-19
AI Technical Summary
During the floating installation process of the immersed tube tunnel, factors such as waves caused the rocking motion of the integrated ship and the immersed tube, which affected the stability and safety of the ship-tube connection. The existing technology lacked effective monitoring means.
By arranging characteristic points on the immersed pipe and integrated ship, and installing accelerometers and inclinometers, the displacement and rotation of the ship-pipe connection can be monitored in real time. If out-of-synchronization is found, an alarm will be triggered to ensure the stability and safety of the ship-pipe connection.
Real-time monitoring of the ship-pipe connection posture during the floating installation of the immersed pipe is achieved, ensuring the stability and safety of the connection and improving the reliability and accuracy of the construction.
Smart Images

Figure CN118376206B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of immersed tube tunnel construction, and in particular relates to a method for monitoring the ship-tube connection posture during the floating installation of an immersed tube. Background Art
[0002] At present, in the construction of immersed tube tunnels, an innovative integrated vessel is used to float and install the immersed tube segments. Figure 1 As shown, the immersed tube 2 is first connected to the bottom of the integrated ship 1 by using transverse positioning cables, longitudinal positioning cables and piers, and then the integrated ship 1 sails to float the immersed tube 2 above the area to be installed, and then the sinking cables are used to sink the immersed tube 2 onto the bed of the area to be installed. During this period, the position of the integrated ship 1 is adjusted by using the ship-moving cables, and the immersed tube 2 is positioned by using the GPS equipment on the measuring tower of the immersed tube 2, so that the immersed tube 2 can be accurately sunk and docked.
[0003] However, during the process of floating and installing the immersed tube 2 on the integrated ship 1, both the integrated ship 1 and the immersed tube 2 will be affected by factors such as waves, and various swaying movements will occur, which will affect the stability and safety of the connection between the integrated ship 1 and the immersed tube 2, and further affect the reliability, safety and construction accuracy of the floating installation of the immersed tube 2; but the existing technology rarely pays substantial attention to and effectively monitors the ship-tube connection. In view of this, it is necessary to monitor the ship-tube connection posture during the floating installation of the immersed tube 2. Summary of the invention
[0004] In view of the deficiencies in the related art, the present invention provides a method for monitoring the ship-pipe connection posture during the floating installation of a submerged tube, aiming to monitor the ship-pipe connection posture during the floating installation of a submerged tube in real time to ensure the stability and safety of the ship-pipe connection.
[0005] The present invention provides a method for monitoring the connection posture of a ship and a pipe during floating and installation of a submerged pipe, which is used for real-time monitoring the connection posture of an integrated ship and a submerged pipe during floating and installation of the submerged pipe, and comprises the following steps:
[0006] The deployment of monitoring point groups includes:
[0007] First characteristic points are arranged on the outer walls at both ends of the left and right lanes of the immersed tube in the length direction, and second characteristic points are arranged on the decks at both ends of the left and right sides of the integrated ship in the length direction, respectively. The four second characteristic points correspond to the four first characteristic points one by one to form four first monitoring point groups;
[0008] The third characteristic points are arranged on the outer walls in the middle of the length direction of the left and right lanes of the immersed tube, and on the side walls at both ends and the middle of the length direction of the middle corridor of the immersed tube. The fourth characteristic points are arranged on the deck in the middle of the length direction of the left and right sides of the integrated ship, on the deck in the middle of the bow and stern of the integrated ship, and on the deck in the center of the hull. The five fourth characteristic points correspond to the five third characteristic points one by one to form five second monitoring point groups.
[0009] Monitoring equipment is installed, an accelerometer is installed at each first characteristic point and the second characteristic point to measure the heave, sway and pitch data at each first characteristic point and the second characteristic point in real time; an inclinometer is installed at each third characteristic point and the fourth characteristic point to measure the pitch and roll data at each third characteristic point and the fourth characteristic point in real time;
[0010] The ship-pipe connection posture monitoring is carried out during the floating and installation of the immersed tube. The measurement data of all accelerometers are read and displayed in real time to determine whether the displacement changes of the first characteristic point and the second characteristic point in each first monitoring point group are synchronized; the measurement data of all inclinometers are read and displayed in real time to determine whether the rotation trends of the third characteristic point and the fourth characteristic point in each second monitoring point group are synchronized; if all are synchronized, the floating or installation of the immersed tube will continue; if any one is not synchronized, the floating or installation of the immersed tube will be suspended, and an abnormal alarm will be triggered to prompt manual intervention to investigate the cause.
[0011] In some of the embodiments, after the monitoring equipment installation step is completed, a monitoring equipment benchmarking step is also included; the monitoring equipment benchmarking step is performed after the integrated ship is connected to the immersed tube and is in a static state, specifically, the measurement data of all accelerometers and all inclinometers are read simultaneously to benchmark the two accelerometers of each first monitoring point group and the two inclinometers of each second monitoring point group.
[0012] In some of the embodiments, in the ship pipe connection posture monitoring step, the measurement data of the accelerometer is used to analyze whether the motion cycles of the first feature point and the second feature point in the first monitoring point group are consistent, whether the phases are consistent, and whether the amplitude difference is less than the preset deviation requirement, to determine whether the displacement changes of the first feature point and the second feature point in the first monitoring point group are synchronized; the measurement data of the inclinometer is used to analyze whether the motion cycles of the third feature point and the fourth feature point in the second monitoring point group are consistent, whether the phases are consistent, and whether the amplitude difference is less than the preset deviation requirement, to determine whether the rotation trends of the third feature point and the fourth feature point in the second monitoring point group are synchronized.
[0013] In some of the embodiments, when the motion periods of the first characteristic point and the second characteristic point in any first monitoring point group are inconsistent, the phases are inconsistent, or the amplitude difference exceeds the preset deviation requirement, or the motion periods of the third characteristic point and the fourth characteristic point in any second monitoring point group are inconsistent, the phases are inconsistent, or the amplitude difference exceeds the preset deviation requirement, an abnormal alarm is triggered and manual intervention is performed to investigate the cause; the investigation direction includes but is not limited to the cable force of each cable, the sealing of the ballast water tank in the immersed tube, the sealing of the sealing door at the end of the immersed tube, and the configuration of the ballast water volume of the integrated ship.
[0014] In some of the embodiments, the accelerometer is an ultra-low frequency magnetoelectric vibration acceleration sensor, and its minimum vibration measurement frequency is 0.05 Hz.
[0015] In some of the embodiments, an ultra-low frequency magnetoelectric vibration acceleration sensor is used to measure the acceleration of the first characteristic point and the second characteristic point in the three directions of x, y, and z, and the longitudinal, lateral, and heave data of the first characteristic point and the second characteristic point are obtained after acceleration filtering and integration.
[0016] In some of the embodiments, a gyroscope is installed on the deck at the center of the integrated ship hull; during the floating and installation process of the submerged tube, the gyroscope is used to monitor the bow roll of the integrated ship in real time.
[0017] In some of the embodiments, when using a gyroscope to monitor the bow roll of the integrated ship in real time, the measurement data of the gyroscope is read in real time, and a guidance method is adopted in conjunction with the GPS equipment on the immersed tube measurement tower, and the Kalman filter is used to compensate for the drift of the gyroscope, thereby obtaining the bow roll data of the integrated ship.
[0018] Based on the above technical scheme, the method for monitoring the ship-pipe connection posture during the floating installation of the submerged tube in the embodiment of the present invention can perform real-time monitoring of the ship-pipe connection posture during the floating installation of the submerged tube, so as to ensure the stability and safety of the ship-pipe connection, ensure that the integrated ship and the submerged tube achieve the expected common motion characteristics, and thereby ensure the reliability, safety and construction accuracy of the submerged tube during the floating installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0020] Figure 1 This is a schematic diagram of using an integrated vessel for immersed tube installation;
[0021] Figure 2 It is a flow chart of the method for monitoring the ship-pipe connection posture during the floating installation of the submerged tube of the present invention;
[0022] Figure 3It is a schematic diagram of the overall layout of the monitoring equipment on the integrated ship and the immersed tube in the present invention;
[0023] Figure 4 This is a schematic diagram of the layout of the integrated onboard monitoring equipment in the present invention;
[0024] Figure 5 It is a schematic diagram of the arrangement of the monitoring equipment on the immersed tube in the present invention;
[0025] Figure 6 Schematic diagram of the coordinate system of the integrated ship motion;
[0026] Figure 7 This is a simplified schematic diagram of the split motion of the ship tube;
[0027] Figure 8-Figure 10 They are respectively exemplary diagrams of monitoring conditions of ship pipe heave, ship pipe sway and ship pipe longitudinal swing at a first monitoring point group when the present invention is used to monitor the ship pipe connection posture during submerged pipe floating;
[0028] Figure 11-Figure 12 They are respectively exemplary diagrams of monitoring conditions of the pitch and roll of the ship tube at a second monitoring point group when the present invention is used to monitor the connection posture of the ship tube during floating of the submerged tube.
[0029] In the figure: 1. integrated ship; 2. submerged tube; 3. accelerometer; 4. inclinometer; 5. gyroscope. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0031] In the description of the present invention, it should be understood that the terms "center", "lateral", "longitudinal", "up", "down", "top", "bottom", "inside", "outside", "left", "right", "front", "back", "vertical", "horizontal", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0032] The terms "first", "second", etc. are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first", "second", etc. may explicitly or implicitly include one or more of the features.
[0033] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0034] refer to Figure 1-Figure 12 As shown, the present invention provides a method for monitoring the connection posture of a ship and a pipe during floating and installation of a submerged tube, which is used for real-time monitoring the connection posture of an integrated ship 1 and a submerged tube 2 during floating and installation of the submerged tube 2.
[0035] It is understandable to those skilled in the art that when the integrated vessel 1 is used for floating installation of the immersed tube 2, various swaying motions occur due to the influence of various complex factors such as wind, waves, current and speed in different waterways, which can be summarized as six degrees of freedom of movement: heave, sway, sway, pitch, roll and bow; the motion characteristics are mainly based on reciprocating simple harmonic motion. It should be noted that when the connection between the ship and the tube is monitored in real time, the integrated vessel 1 itself and the immersed tube 2 itself are regarded as rigid bodies, and neither of them undergoes self-structural deformation. In this way, the spatial motion form of the split movement of the ship and the tube can be simplified to two plane motions with a certain distance between them, such as Figure 7 shown.
[0036] A method for monitoring the ship-pipe connection posture during submerged tube floating installation includes steps for arranging a monitoring point group, installing monitoring equipment, monitoring the ship-pipe connection posture, etc.
[0037] The steps for setting up the monitoring point group include:
[0038] 1) First characteristic points are arranged on the outer walls at both ends of the left lane in the immersed tube 2 in the length direction and on the outer walls at both ends of the right lane in the length direction, that is, the four first characteristic points correspond to the four corner points of the immersed tube 2 respectively, and the four first characteristic points are arranged at the same height position, such as in the middle of the overall height of the immersed tube 2; second characteristic points are arranged on the deck at both ends of the left side of the integrated ship 1 in the length direction and on the deck at both ends of the right side in the length direction, respectively, and the four second characteristic points correspond to the four first characteristic points one by one to form four first monitoring point groups; further explained, with the width direction of the immersed tube 2 as the horizontal direction, the length direction as the longitudinal direction, and the height direction as the vertical direction, the first characteristic points and the second characteristic points in each first monitoring point group will have a height difference in the vertical direction, but can be aligned in the horizontal direction.
[0039] 2) Third characteristic points are arranged on the outer wall in the middle of the length direction of the left lane in the immersed tube 2, the outer wall in the middle of the length direction of the right lane, and the side walls at both ends and the middle of the length direction of the corridor in the immersed tube 2, that is, the five third characteristic points correspond to the end points and intersection positions of the horizontal and vertical central axes of the immersed tube 2, respectively, and the five third characteristic points are arranged at the same height position, such as in the middle of the overall height of the immersed tube 2; fourth characteristic points are arranged on the deck in the middle of the length direction of the left side of the integrated ship 1, the deck in the middle of the length direction of the right side, the deck in the middle of the bow of the integrated ship 1, the deck in the middle of the stern of the integrated ship 1, and the deck in the center of the hull of the integrated ship 1, and the five fourth characteristic points correspond to the five third characteristic points one by one to form five second monitoring point groups; it is further explained that the third characteristic point and the fourth characteristic point in each second monitoring point group will have a height difference in the vertical direction, but can be aligned in the horizontal direction.
[0040] The specific steps of installing the monitoring equipment are as follows: an accelerometer 3 is installed at the first characteristic point and the second characteristic point in each first monitoring point group to measure the heave, sway and pitch data at the first characteristic point and the second characteristic point in each first monitoring point group in real time, so as to know the displacement change of the integrated ship 1 and the immersed tube 2; an inclinometer 4 is installed at the third characteristic point and the fourth characteristic point in each second monitoring point group to measure the pitch and roll data at each third characteristic point and the fourth characteristic point in real time, so as to know the rotation trend of the integrated ship 1 and the immersed tube 2. The accelerometer 3 and the inclinometer 4 have high acquisition accuracy, fast signal response and strong anti-interference ability.
[0041] The ship-tube connection posture monitoring is carried out during the floating and installation process of the immersed tube 2. The measurement data of all accelerometers 3 are read and displayed in real time to determine whether the displacement changes of the first characteristic point and the second characteristic point in each first monitoring point group are synchronized; the measurement data of all inclinometers 4 are read and displayed in real time to determine whether the rotation trends of the third characteristic point and the fourth characteristic point in each second monitoring point group are synchronized; thereby realizing the whole process digital technology and real-time visual monitoring of the connection between the integrated ship 1 and the immersed tube 2. If the monitoring results of each first monitoring point group and the second monitoring point group are synchronized, it means that the connection between the integrated ship 1 and the immersed tube 2 is good during the floating and installation process of the immersed tube 2, and the expected ship-tube common motion characteristics can be achieved, which meets the theoretical research and design expectations, and the floating or installation of the immersed tube 2 is continued; if the monitoring results of any first monitoring point group or the second monitoring point group are not synchronized, it means that there is an abnormality in the connection between the integrated ship 1 and the immersed tube 2, and the floating or installation of the immersed tube 2 is suspended, and an abnormal alarm is triggered to prompt manual intervention for cause investigation.
[0042] The above-mentioned schematic embodiment, through the setting of the first monitoring point group and the second monitoring point group, the application of the accelerometer 3 and the inclinometer 4, can monitor the displacement changes and rotation trends of the integrated ship 1 and the immersed tube 2 in real time, and then realize real-time monitoring of the ship-tube connection posture during the floating installation of the immersed tube 2, thereby ensuring the stability and safety of the ship-tube connection during the floating installation of the immersed tube 2, ensuring that the integrated ship 1 and the immersed tube 2 achieve the expected common motion characteristics, and then ensuring the reliability, safety and construction accuracy of the immersed tube 2 during the floating installation.
[0043] refer to Figure 1-Figure 5 As shown, in some embodiments, after the monitoring equipment installation step is completed, a monitoring equipment calibration step is also included. The monitoring equipment calibration step is performed after the integrated ship 1 is connected to the immersed tube 2 and is in a stationary state, specifically: the measurement data of all accelerometers 3 are read at the same time to calibrate the two accelerometers 3 of each first monitoring point group, that is, the heave, sway and pitch data of the first characteristic point and the second characteristic point in each first monitoring point group are calibrated for consistency of the initial state; the measurement data of all inclinometers 4 are read at the same time to calibrate the two inclinometers 4 of each second monitoring point group, that is, the pitch and roll data of the third characteristic point and the fourth characteristic point in each second monitoring point group are calibrated for consistency of the initial state. This illustrative embodiment realizes the initialization calibration of the connection posture of the integrated ship 1 and the immersed tube 2 through the monitoring equipment calibration step, which is conducive to improving the monitoring accuracy and reliability during the subsequent ship-tube connection posture monitoring.
[0044] refer to Figure 1-Figure 12 As shown, in some embodiments, in the ship pipe connection posture monitoring step, the measurement data of the accelerometer 3 is used to analyze whether the motion cycles of the first characteristic point and the second characteristic point in the first monitoring point group are consistent, whether the phases are consistent, and whether the amplitude difference is less than the preset deviation requirement, to determine whether the displacement changes of the first characteristic point and the second characteristic point in the first monitoring point group are synchronized; for example, the monitoring conditions of the ship pipe heave, ship pipe sway, and ship pipe longitudinal swing at a first monitoring point group are respectively as follows: Figure 8-Figure 10As shown, the red line in the figure represents the integrated ship 1, and the blue line represents the immersed tube 2. It can be seen from the figure that the first characteristic point and the second characteristic point in the first monitoring point group have consistent motion cycles, consistent phases, and small amplitude differences (less than the preset deviation requirements) in the three degrees of freedom of heave, sway, and pitch. Therefore, it can be judged that the displacement changes of the first characteristic point located on the immersed tube 2 and the second characteristic point located on the integrated ship 1 in the first monitoring point group are synchronized; thus, by combining the monitoring results of all the first monitoring point groups, it can be judged whether the displacement changes of the integrated ship 1 and the immersed tube 2 are synchronized. In the ship-tube connection posture monitoring step, the measurement data of the inclinometer 4 is used to analyze whether the motion cycles of the third characteristic point and the fourth characteristic point in the second monitoring point group are consistent, whether the phases are consistent, and whether the amplitude difference is less than the preset deviation requirements, to judge whether the rotation trends of the third characteristic point and the fourth characteristic point in the second monitoring point group are synchronized; for example, the monitoring conditions of the ship tube pitch and ship tube roll at a second monitoring point group are respectively as follows: Figure 11-Figure 12 As shown in the figure, the red line represents the integrated ship 1 and the blue line represents the immersed tube 2. It can be seen from the figure that the third characteristic point and the fourth characteristic point in the second monitoring point group have consistent motion cycles and phases in the two degrees of freedom of pitch and roll, and the amplitude difference is small (less than the preset deviation requirement). Therefore, it can be judged that the rotation trends of the third characteristic point located on the immersed tube 2 and the fourth characteristic point located on the integrated ship 1 in the second monitoring point group are synchronized; therefore, by combining the monitoring results of all the second monitoring point groups, it can be judged whether the rotation trends of the integrated ship 1 and the immersed tube 2 are synchronized. This exemplary embodiment realizes the analysis and judgment of whether the ship tubes are synchronously displaced and rotated.
[0045] In some embodiments, when the motion cycle of the first characteristic point and the second characteristic point in any first monitoring point group is inconsistent, the phase is inconsistent, or the amplitude difference exceeds the preset deviation requirement, or the motion cycle of the third characteristic point and the fourth characteristic point in any second monitoring point group is inconsistent, the phase is inconsistent, or the amplitude difference exceeds the preset deviation requirement, the ship is stopped to suspend the floating or installation of the immersed tube 2, and an abnormal alarm is triggered to manually intervene to investigate the cause. The investigation direction includes but is not limited to the cable force of each cable, the sealing of the ballast water tank in the immersed tube 2, the sealing of the end sealing door of the immersed tube 2, the configuration of the ballast water volume of the integrated ship 1, etc.; according to the specific reasons, the technicians in this field can take measures such as adjusting the corresponding cable force, regulating the water tank valve, plugging the end sealing door, and allocating the ballast water volume to correct the deviation.
[0046] Supplementary explanation of the influence of the cable force of each cable on the movement posture of the immersed tube 2: when the immersed tube 2 is floating, the sinking cable has a greater influence on the movement posture of the immersed tube 2, and the cable force of the sinking cable should make the immersed tube 2 reliably crimped on the pier at the bottom of the integrated ship 1, ensuring that the immersed tube 2 and the integrated ship 1 are tightly crimped, which is beneficial to improving the stability and safety of the ship-tube connection when the immersed tube 2 is floating; when the immersed tube 2 is sunk and installed in the area to be installed, the transverse positioning cable and the longitudinal positioning cable have a greater influence on the movement posture of the immersed tube 2, and the cable force of the longitudinal positioning cable and the transverse positioning cable is obviously correlated with the movement amplitude of the immersed tube 2. The cable force of the longitudinal positioning cable can be controlled to more than 30 tons and the cable force of the transverse positioning cable can be controlled to more than 60 tons, so as to effectively control the movement amplitude of the immersed tube 2, and then fully control the ship-tube connection posture when the immersed tube 2 is installed.
[0047] When the integrated ship 1 is used for the floating installation of the immersed tube 2 in water, the motion state is mainly reflected in the low-frequency motion characteristics due to the large volume of the integrated ship 1 and the immersed tube 2; especially during the installation of the immersed tube 2, due to the support of various cables, the motion frequency reaches the range of ultra-low frequency (<0.1Hz) vibration. However, most of the commonly used accelerometers 3 cannot cover the ultra-low frequency test requirements, and their measurement accuracy and reliability cannot be guaranteed. In some embodiments, the accelerometer 3 is an ultra-low frequency magnetoelectric vibration acceleration sensor, and its minimum vibration measurement frequency is 0.05Hz; the sensor adopts passive closed-loop servo technology to obtain good ultra-low frequency characteristics; the sensor is provided with four gears of acceleration, small speed, medium speed and large speed, which can not only provide the acceleration and speed parameters of the measuring point, but also provide different frequency bands and different filtering steepness, thereby realizing the ultra-low frequency test function of 0.05Hz, thereby meeting the needs of ultra-low frequency motion posture monitoring during the floating installation of the immersed tube 2, and improving the monitoring accuracy and reliability.
[0048] Combination Figure 6 As shown, in some embodiments, an ultra-low frequency magnetoelectric vibration acceleration sensor is used to measure the acceleration of the first characteristic point and the second characteristic point in the three directions of x, y, and z. After acceleration filtering and integration, the longitudinal surge, transverse surge, and heave data of the first characteristic point and the second characteristic point are obtained, and then the displacement of the integrated ship 1 and the submerged tube 2 can be obtained.
[0049] refer to Figure 1-Figure 4As shown, in some embodiments, a gyroscope 5 is also installed on the deck at the center of the hull of the integrated ship 1. During the floating and installation process of the immersed tube 2, the gyroscope 5 is used to monitor the bow roll of the integrated ship 1 in real time as a supplementary monitoring of the ship-tube connection during the floating and installation of the immersed tube; it should be noted that due to the setting of the aforementioned accelerometer 3 and inclinometer 4, the monitoring of the five degrees of freedom of the integrated ship 1 and the immersed tube 2, namely, the relative motion between the integrated ship 1 and the immersed tube 2 can be determined, so it is not necessary to set the gyroscope 5 in the immersed tube 2, and only the gyroscope 5 is set on the integrated ship 1 to monitor the overall bow roll freedom, which reduces the monitoring cost and difficulty. Further, if the bow roll data of the integrated ship 1 meets the preset requirements, the floating or installation of the immersed tube 2 will continue; if the bow roll data of the integrated ship 1 exceeds the preset requirements, the floating or installation of the immersed tube 2 will be suspended, and an abnormal alarm will be triggered to prompt manual intervention for cause investigation. The directions for investigation include but are not limited to the cable force of each cable, the configuration of the ballast water volume of the integrated ship 1, the steering conditions, etc.; technical personnel in this field can take corresponding measures such as adjusting the corresponding cable force, allocating the ballast water volume, compensating for the rudder effect, etc. to correct the deviation according to the specific reasons.
[0050] refer to Figure 1-Figure 4 As shown, in some embodiments, since the gyroscope 5 has a time drift limitation in principle, when the gyroscope 5 is used to monitor the bow roll of the integrated ship 1 in real time, the measurement data of the gyroscope 5 is read in real time, and the guidance method of the GPS device on the measuring tower of the immersed tube 2 is adopted, and the Kalman filter is used to compensate for the drift of the gyroscope 5, so as to obtain the bow roll data of the integrated ship.
[0051] To further explain, we first need to introduce a system of discrete control processes, which can be described by a linear stochastic differential equation: X(k)=AX(k-1)+BU(k)+W(k);
[0052] Add the measured value of the system: Z(k)=HX(k)+V(k);
[0053] In the above two equations, X(k) is the system state at time k, and U(k) is the control quantity of the system at time k. A and B are system parameters. For multi-model systems, they are matrices. Z(k) is the measurement value at time k, and H is the parameter of the measurement system. For multi-measurement systems, H is a matrix.
[0054] First, we need to use the system process model to predict the next state of the system. Assuming the current system state is k, according to the system model, we can predict the current state based on the previous state of the system:
[0055] X(k|k-1)=AX(k-1|k-1)+BU(k)…………(1);
[0056] In formula (1), X(k|k-1) is the result predicted by the previous state, X(k-1|k-1) is the optimal result of the previous state, U(k) is the control amount of the current state, and P represents the covariance;
[0057] P(k|k-1)=AP(k-1|k-1) A'+Q……… (2);
[0058] In formula (2), P(k|k-1) is the covariance corresponding to X(k|k-1), P(k-1|k-1) is the covariance corresponding to X(k-1|k-1), A' represents the transposed matrix of A, and Q is the covariance of the system process. Formulas (1) and (2) are the first two of the five formulas of the Kalman filter, which are the predictions of the system;
[0059] Then collect the measured values of the current state. Combining the predicted value and the measured value, we can get the optimal estimate X(k|k) of the current state (k):
[0060] X(k|k)= X(k|k-1)+Kg(k) (Z(k)-HX(k|k-1)) ……… (3);
[0061] Where Kg is the Kalman gain:
[0062] Kg(k)= P(k|k-1) H' / (HP(k|k-1) H'+ R) ......... (4);
[0063] The optimal estimated value X(k|k) in state k is obtained. However, in order to keep the Kalman filter running until the system process ends, the covariance of X(k|k) in state k must be updated:
[0064] P(k|k)=(I-Kg(k) H)P(k|k-1)……… (5);
[0065] Where I is a matrix of 1. For a single model and single measurement, I=1. When the system enters the k+1 state, P(k|k) is P(k-1|k-1) in equation (2). In this way, the algorithm can perform autoregressive operations.
[0066] The basic description of the principle of the Kalman filter is as above, and equations (1), (2), (3), (4) and (5) are its five basic formulas. According to these five formulas, the drift compensation of the gyroscope 5 can be easily completed with the help of computer programming.
[0067] To sum up, the method for monitoring the ship-pipe connection posture during the floating installation of the submerged tube of the present invention can perform real-time monitoring of the ship-pipe connection posture during the floating installation of the submerged tube 2, so as to ensure the stability and safety of the ship-pipe connection, ensure that the integrated ship 1 and the submerged tube 2 achieve the expected common motion characteristics, and thus ensure the reliability, safety and construction accuracy of the submerged tube 2 during the floating installation.
[0068] Finally, it should be noted that: the various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0069] The above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the present invention can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the present invention, which should be included in the scope of the technical solution for protection of the present invention.
Claims
1. A method for monitoring the connection posture of a ship and a pipe during floating and installation of a submerged pipe, which is used to monitor the connection posture of an integrated ship and a submerged pipe in real time during floating and installation of a submerged pipe, and is characterized in that: The following steps are involved: The deployment of monitoring point groups includes: First characteristic points are arranged on the outer walls of the immersed tube at both ends of the left and right lanes in the length direction, and second characteristic points are arranged on the decks at both ends of the left and right sides of the integrated ship in the length direction, and the four second characteristic points correspond to the four first characteristic points one by one to form four first monitoring point groups; The third characteristic points are arranged on the outer walls in the middle of the length direction of the left and right lanes of the immersed tube and on the side walls at both ends and the middle of the length direction of the middle corridor of the immersed tube, and the fourth characteristic points are arranged on the deck in the middle of the length direction of the left and right sides of the integrated ship, on the deck in the middle of the bow and stern of the integrated ship, and on the deck at the center of the hull. The five fourth characteristic points correspond to the five third characteristic points one by one to form five second monitoring point groups; Monitoring equipment is installed, an accelerometer is installed at each of the first characteristic point and the second characteristic point to measure the heave, sway and pitch data at each of the first characteristic point and the second characteristic point in real time; an inclinometer is installed at each of the third characteristic point and the fourth characteristic point to measure the pitch and roll data at each of the third characteristic point and the fourth characteristic point in real time; The ship-pipe connection posture monitoring is carried out during the floating and installation process of the immersed tube. The measurement data of all the accelerometers are read and displayed in real time. The measurement data of the accelerometers are used to analyze whether the motion cycles of the first characteristic point and the second characteristic point in each of the first monitoring point groups are consistent, whether the phases are consistent, and whether the amplitude difference is less than the preset deviation requirement, so as to determine whether the displacement changes of the first characteristic point and the second characteristic point in each of the first monitoring point groups are synchronized; the measurement data of all the inclinometers are read and displayed in real time. The measurement data of the inclinometers are used to analyze whether the motion cycles of the third characteristic point and the fourth characteristic point in each of the second monitoring point groups are consistent, whether the phases are consistent, and whether the amplitude difference is less than the preset deviation requirement, so as to determine whether the rotation trends of the third characteristic point and the fourth characteristic point in each of the second monitoring point groups are synchronized; if all are synchronized, the floating or installation of the immersed tube is continued; if any one is not synchronized, the floating or installation of the immersed tube is suspended, and an abnormal alarm is triggered to prompt manual intervention for cause investigation.
2. The method for monitoring the connection posture of a ship and a pipe during floating installation of a submerged pipe according to claim 1 is characterized in that: After the monitoring equipment installation step is completed, it also includes a monitoring equipment benchmarking step; the monitoring equipment benchmarking step is carried out after the integrated ship is connected to the immersed tube and is in a static state, specifically, the measurement data of all the accelerometers and all the inclinometers are read at the same time to benchmark the two accelerometers of each of the first monitoring point groups and the two inclinometers of each of the second monitoring point groups.
3. The method for monitoring the connection posture of a ship and a pipe during floating installation of a submerged tube according to claim 1 is characterized in that: When the motion periods of the first characteristic point and the second characteristic point in any of the first monitoring point groups are inconsistent, the phases are inconsistent, or the amplitude difference exceeds the preset deviation requirement, or the motion periods of the third characteristic point and the fourth characteristic point in any of the second monitoring point groups are inconsistent, the phases are inconsistent, or the amplitude difference exceeds the preset deviation requirement, an abnormal alarm is triggered and manual intervention is required to investigate the cause; the investigation direction includes but is not limited to the cable force of each cable, the sealing of the ballast water tank in the immersed tube, the sealing of the sealing door at the end of the immersed tube, and the configuration of the ballast water volume of the integrated ship.
4. The method for monitoring the connection posture of a ship and a pipe during floating installation of a submerged pipe according to claim 1 is characterized in that: The accelerometer is an ultra-low frequency magnetoelectric vibration acceleration sensor, and its minimum vibration measurement frequency is 0.05 Hz.
5. The method for monitoring the connection posture of a ship and a pipe during floating installation of a submerged pipe according to claim 4 is characterized in that: The ultra-low frequency magnetoelectric vibration acceleration sensor is used to measure the acceleration of the first characteristic point and the second characteristic point in the three directions of x, y and z, and the longitudinal surge, lateral surge and heave data of the first characteristic point and the second characteristic point are obtained after acceleration filtering and integration.
6. The method for monitoring the connection posture of a ship and a pipe during floating installation of a submerged pipe according to claim 1 is characterized in that: A gyroscope is also installed on the deck at the center of the integrated ship's hull; during the floating and installation process of the submerged tube, the gyroscope is used to monitor the bow rolling of the integrated ship in real time.
7. The method for monitoring the connection posture of a ship and a pipe during floating installation of a submerged pipe according to claim 6, characterized in that: When the gyroscope is used to monitor the bow roll of the integrated ship in real time, the measurement data of the gyroscope is read in real time, and the guidance method of the GPS device on the immersed tube measurement tower is adopted, and the Kalman filter is used to compensate the drift of the gyroscope, so as to obtain the bow roll data of the integrated ship.
Citation Information
Patent Citations
Large-sized underwater hoisting structure position posture real-time measuring device
CN102866384A
Leveling frame device of riprap leveling ship
CN110777797A