A wind resistance test device and test method for dock gantry crane
By using a hydraulic jack and a load cell to apply specified thrust in the terminal gantry wind resistance test device, combined with the lifting and adjusting floor frame and connecting components, the problems of low accuracy and safety hazards in the existing test solution are solved, and an efficient and accurate test is achieved wind resistance test.
Patent Information
- Application Number
- CN202410806093.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-06-21
AI Technical Summary
The existing wharf gantry crane wind resistance test scheme has low accuracy and cannot accurately control the traction force. Moreover, the performance error of the steel wire rope causes uneven force on both sides of the sea and land, which poses safety risks and affects the accuracy of the test results and the safety of the operators.
A terminal gantry crane wind resistance test device is designed, which includes a lifting platform and a pressure test device. It applies a specified thrust through a hydraulic jack and a load cell, and combines the lifting adjustment floor frame and connecting components to achieve efficient and accurate resistance to the pier gantry crane. Wind test.
It realizes efficient and rapid wind resistance testing of dock door cranes under different levels of wind force, ensuring the accuracy of test results and operational safety, and reducing the risk of accidents.
Smart Images

Figure CN118376399B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of performance testing of dock operating equipment, and in particular to a wind resistance testing device and a testing method for a dock gantry crane. Background Art
[0002] The gantry crane is a common lifting equipment in ports. On the gantry-shaped base running along the ground track, a rotatable lifting boom is set. It has four coordinated mechanisms for lifting, rotating, luffing and running. Railway trains or other vehicles can pass under the gantry seat, and can be used for vehicle and ship loading and unloading and transshipment and direct pickup operations. It has the advantages of beautiful appearance, safe and reliable operation, advanced performance, convenient maintenance and durability.
[0003] In actual use, gusts, strong winds, and typhoons often pose a serious threat to the stability and safety of cranes, which may cause the crane to overturn or damage the cargo, or even cause casualties. Therefore, it is of great practical significance to test the tension of gantry cranes under windproof conditions. Through the test of windproof tension of gantry cranes, the stability and safety of gantry cranes in strong winds can be evaluated, providing operators with a safer working environment and reducing the risk of accidents.
[0004] At present, the wind resistance test scheme for gantry cranes is to select a loader as the traction equipment, use a wire rope to connect the sea and land sides, and use the traction force of the loader to simulate the actual wind load on the gantry crane; however, the accuracy of this test scheme is not high, and the magnitude of the traction force cannot be accurately controlled; at the same time, due to the performance error of the wire rope, it is easy to cause uneven force on both sides of the sea and land, which does not meet the actual working conditions of the wind load; from a safety perspective, due to the influence of the breaking tension of the wire rope, there is a certain danger for on-site operators. Therefore, it is necessary to develop a special equipment and supporting test method for gantry crane wind resistance testing in response to the above problems. Summary of the invention
[0005] The purpose of the present invention is to provide a wind resistance testing device for a dock gantry crane that solves the above-mentioned technical problems.
[0006] Another object of the present invention is to provide a testing method implemented by using the above-mentioned dock gantry crane wind resistance testing device.
[0007] To this end, the technical solution of the present invention is as follows:
[0008] A wind resistance test device for a dock gantry crane comprises a pressure test device arranged on a lifting platform and two sets of connection components; wherein the lifting platform comprises a mounting seat, which is arranged on a lifting and adjusting ground frame; two push rod penetration holes are symmetrically provided on the end walls at both ends in the length direction of the mounting seat; the pressure test device comprises a movable push rod, a hydraulic jack, a weighing sensor and a fixed push rod which are coaxially arranged in sequence in the horizontal direction; the movable push rod comprises a movable rod and a movable push plate; one end of the movable rod is penetrated in the push rod penetration hole of the end wall at one end of the mounting seat, and a fixed plate is vertically fixed on the end surface of the other end; the movable push plate is arranged at parallel intervals on the adjacent side of the fixed plate, and the two are fixedly connected by a plurality of bolts; the hydraulic jack is arranged in such a way that its hydraulic push rod faces the movable push rod, and its cylinder is fixed on the mounting seat In the mounting seat, the front end of the hydraulic push rod is inserted into the opening on the movable push plate, and is limited between the fixed plate and the movable push plate by a limiting ring arranged on the end wall of the front end of the hydraulic push rod, so that the movable push rod is driven to reciprocate in the mounting seat by the hydraulic push rod; one end of the fixed push rod is inserted into the push rod insertion hole of the end wall of the other end of the mounting seat, and the other end is fixed in the mounting seat; the detection end of the weighing sensor and the other end opposite to the detection end are respectively abutted and fixed on the end surface of the bottom end of the cylinder of the hydraulic jack and the end surface of the other end of the fixed push rod; two sets of connecting components are respectively arranged on the end wall of the walking end of the gantry crane at the outer rod ends of the movable push rod and the fixed push rod in the test state, so that the rod end of the movable push rod and the rod end of the fixed push rod are respectively abutted on the two sets of connecting components to apply a specified thrust to the gantry crane.
[0009] Furthermore, the liftable and adjustable frame body is composed of four lifting and adjusting mechanisms assembled on the support frame; the support frame includes four vertically arranged support tubes, so that the four lifting and adjusting mechanisms are respectively arranged in the four support tubes; the four support tubes are symmetrically arranged on both sides of the mounting seat in the length direction of the mounting seat, and are directly or indirectly fixed on both sides of the mounting seat; the lifting and adjusting mechanism includes a ball screw, which is composed of a screw vertically inserted in the support tube and a screw nut assembled on the screw, an annular boss is provided on the inner wall of the support tube, and the connecting flange at the top of the screw nut is pressed and fixed on the annular boss, so that the support tube is synchronously lifted and lowered in the vertical direction with the screw nut; an adjusting handwheel is fixed on the top of the screw, and the bottom end is rotatably arranged on a wheel frame with casters.
[0010] Furthermore, at least one connecting beam is provided between every two adjacent supporting tubes.
[0011] Furthermore, a connecting beam is arranged on the bottom side of every two supporting tubes located on the two end sides in the length direction of the supporting frame, and a track positioning plate is arranged on the bottom surface of each connecting beam and directly below the mounting seat; the track positioning plate is arranged vertically, and two protrusions are symmetrically arranged on its bottom surface along the width direction of the supporting frame, and the width between the two protrusions is adapted to the width of the two track grooves on the walking track of the dock gantry crane, so that the lifting platform can realize the centering setting of the mounting seat and the dock gantry crane by respectively embedding the two protrusions on the track positioning plates on the front and rear ends of the lifting platform in the two track grooves.
[0012] Furthermore, on the inner wall on the opposite side of the mounting seat corresponding to the reciprocating movement space of the movable push rod, two guide rails are symmetrically fixed, and the track grooves of the two guide rails are horizontally opened along the moving direction of the movable push rod and are arranged opposite to each other, so that the fixed plate and the movable push plate of the movable push rod are embedded in the track grooves of the two guide rails and can reciprocate in the horizontal direction in the track grooves.
[0013] Furthermore, both ends of the cylinder of the hydraulic jack are fixed in the mounting seat through at least two arc-shaped mounting seats; and the fixed push rod is fixed in the mounting seat through at least two arc-shaped mounting seats.
[0014] Furthermore, each set of gantry crane connection components is composed of a top seat and a buffer shield; wherein, the buffer shield is an inverted U-shaped frame that is sleeved on the outside of the buffer column and is fixed on the end wall of the gantry crane's walking end, so that the buffer column is arranged in the buffer shield and the front end of the buffer column is exposed to the outside of the buffer shield; the top seat is a rigid shell with an opening on one side, which is sleeved on the outside of the buffer shield through the open end, and a gap is left between the inner wall on the side opposite to the open end and the buffer column; the top seat is fixed to the buffer shield by bolts.
[0015] Furthermore, at least two pairs of interconnected connecting screw holes are correspondingly opened on the top surfaces of the top seat and the buffer shield, so that the two can be connected and fixed as a whole through bolts that are respectively penetrated and threaded into each pair of connecting screw holes in the sleeve state; the bolts are composed of a threaded rod and an annular handle fixed on the top of the threaded rod.
[0016] A method for testing wind resistance of a dock gantry crane implemented by the above-mentioned wind resistance testing device for the dock gantry crane comprises the following steps:
[0017] S1. A dock gantry crane wind resistance test device is respectively arranged at the sea-side walking end and the land-side walking end of the gantry crane to be tested; wherein, the lifting platform of the dock gantry crane wind resistance test device located at the sea-side walking end is fixed on the sea-side gantry crane walking track, and the rod end of its fixed top rod is butted against the end wall of the sea-side walking end of the adjacent side gantry crane through a set of connecting components; the lifting platform of the dock gantry crane wind resistance test device located at the land-side walking end is fixed on the land-side gantry crane walking track, and the rod end of its fixed top rod is butted against the end wall of the land-side walking end of the adjacent side gantry crane through a set of connecting components;
[0018] S2. Determine the test thrust that the hydraulic jack needs to apply during the test according to the model of the door crane to be tested and the wind test requirements;
[0019] S3. Keep the land-side walking end and the sea-side walking end of the gantry crane to be tested in a stationary and movable state, and the land-side walking end and the sea-side walking end of the gantry crane on the adjacent side in a stationary and immovable state; control the synchronous extension and extension of the two hydraulic jacks, and use the two driving movable push rods to abut against the land-side walking end and the sea-side walking end of the gantry crane to be tested through the connecting assembly, and then apply the test thrust to the gantry crane to be tested; use the weighing sensor to monitor in real time whether the test thrust applied by the two hydraulic jacks to the gantry crane to be tested is the same as the wind load corresponding to the test wind force; according to the test requirements, the test thrust is applied in sequence from small to large, and wait for 1min~3min after each test thrust reaches the test value; during the waiting process, observe whether the gantry crane to be tested has obvious slippage relative to the gantry crane running track: 1) If the gantry crane to be tested has obvious slippage, the gantry crane to be tested cannot meet the resistance to the wind load corresponding to the test thrust; 2) If the gantry crane to be tested does not have obvious slippage, the gantry crane to be tested can meet the resistance to the wind load corresponding to the test thrust.
[0020] Furthermore, the test thrust that the hydraulic jack needs to apply during the test F The calculation formula is:
[0021] P w = C × K h × q ×A w ,
[0022] F = 1 / 2 P w ,
[0023] In the above two formulas, P w It is the wind load acting on the port loading and unloading machinery or cargo, in Newton (N); C is the wind load shape coefficient of the windward structure; K his the wind pressure height variation coefficient; q is the wind pressure, which is determined according to the wind speed and the calculation formula is q = 0.613× v 2 ; A w is the windward area along the track; F It is the test thrust that should be applied by the jack in the wind resistance test device of a single dock gantry crane.
[0024] Compared with the prior art, the wind resistance test device for the dock gantry crane is designed based on the structural characteristics of the dock gantry crane. Its lifting platform can quickly and accurately position the pressure test mechanism at the designated test position. Its pressure test mechanism can apply different test thrusts according to the set value, and the value can be monitored in real time, so that the wind resistance test of the gantry crane for different levels of wind can be completed at one time. Its connecting component can realize the docking of the pressure test device with the gantry crane under the premise of protecting the buffer column at the walking end of the gantry crane, so that the test steps are simple and easy to control; furthermore, the wind resistance test method used in conjunction with the wind resistance test device for the dock gantry crane can realize efficient and rapid wind resistance test of the dock gantry crane and obtain accurate test results. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the split structure of the lifting platform and two sets of connecting components of the wind resistance testing device for the dock gantry crane of the present invention;
[0026] Figure 2 It is a perspective structural schematic diagram of a mounting seat of a wind resistance test device for a dock gantry crane according to the present invention, in which a pressure test device is built in;
[0027] Figure 3 It is a schematic diagram of a top view of the structure in which a pressure test device is built into a mounting seat of a wind resistance test device for a dock gantry crane according to the present invention, and the pressure test device is connected with an external device;
[0028] Figure 4 It is a structural schematic diagram of the cooperation between a single lifting adjustment mechanism and a support tube in the lifting platform of the wind resistance testing device for the dock gantry crane of the present invention;
[0029] Figure 5 It is a schematic diagram of the assembly of the guide rail and the movable top rod of the wind resistance testing device of the dock gantry crane of the present invention;
[0030] Figure 6 A flow chart of a wind resistance test method implemented by the wind resistance test device for a dock gantry crane of the present invention;
[0031] Figure 7 It is a top view of the arrangement between the dock gantry crane wind resistance testing device and the dock gantry crane in the dock gantry crane wind resistance testing method of the present invention. DETAILED DESCRIPTION
[0032] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but the following embodiments are by no means intended to limit the present invention in any way. Example 1
[0033] See also Figure 1 The wind resistance test device for the wharf gantry crane includes a pressure test device arranged on a lifting platform 1, and two sets of gantry crane connection components.
[0034] See also Figure 1 and Figure 2 The lifting platform 1 includes four lifting adjustment mechanisms mounted on a support frame, and a mounting seat 103 for setting a pressure test device, and the mounting seat 103 is height-adjustable by the four lifting adjustment mechanisms.
[0035] The support frame includes four vertically arranged support tubes 101; the four support tubes 101 are symmetrically arranged on both sides of the mounting seat 103 in the length direction of the mounting seat 103, and are directly or indirectly fixed on both sides of the mounting seat 103; the mounting seat 103 is a cubic strip box body with an opening at the top; wherein, two push rod penetration holes are centrally opened on the end panels at both ends in the length direction of the box body, and the inner cavity of the box body is separated from one end to the other end by two partitions arranged at intervals along the length direction, so that the inner cavity of the box body is divided into a hydraulic activity cavity, a sensor installation cavity and a fixed push rod installation cavity in sequence. In this embodiment, the upper part of each support tube 101 is connected and fixed to the side wall of the mounting seat 103 through a horizontally arranged short connecting beam, the upper parts of the two support tubes 101 located on the same side of the mounting seat 103 are fixedly connected by a horizontally arranged long connecting beam 104, and the lower parts of every two support tubes 101 are fixedly connected by a horizontally arranged long connecting beam 104.
[0036] As a preferred technical solution of this embodiment, two track positioning plates 106 are centrally and symmetrically arranged on the bottom surface of the long connecting beam 104 located at both ends of the length direction of the support frame; the track positioning plate 106 is a vertically arranged inverted trapezoidal plate, and two protrusions are symmetrically arranged on its bottom surface along the width direction of the support frame, and the width between the two protrusions is adapted to the width of the two track grooves on the walking track of the terminal gantry crane, so that the lifting platform 1 can embed the two protrusions of the track positioning plates 106 at the front and rear ends into the two track grooves to ensure the alignment of the mounting seat 103 with the sea side gantry crane or the land side gantry crane.
[0037] The four lifting adjustment mechanisms are respectively arranged in the four support tubes 101, so that the height of the support frame from the ground can be adjusted by using the four lifting adjustment mechanisms; at the same time, the support frame can be adjusted by using the four lifting adjustment mechanisms, so that the support frame can meet the requirement of adjusting the mounting seat 103 on the lifting platform to a horizontal state on a sloped ground or an uneven ground.
[0038] See also Figure 4 The lifting and lowering adjustment mechanism includes a ball screw, a limit plate 1023, an adjustment hand wheel 1024, a wheel frame 1026 and a caster 1027; wherein,
[0039] The lead screw 1022 of the ball screw is centrally and vertically inserted into the support tube 101; the adjusting hand wheel 1024 is sleeved and fixed on the top of the lead screw 1022 to facilitate manual rotation of the lead screw 1022; the limit plate 1023 is sleeved on the upper side of the lead screw 1022 and is spaced below the adjusting hand wheel 1024, and the limit plate 1023 is rotatably connected to the lead screw 1022 through a rotating bearing; when the limit plate 1023 is pressed on the top of the support tube 101, it indicates that the lifting platform 1 has been adjusted to the highest limit;
[0040] An annular boss 1011 matching with the screw nut 1021 is provided on the inner wall of the support cylinder 101, and a plurality of screw holes are evenly distributed in the circumferential direction on the annular boss; a connecting flange is provided at the top of the screw nut 1021 of the ball screw, which is pressed on the annular boss and connected and fixed to the annular boss by a plurality of bolts evenly distributed in the circumferential direction, so that the support cylinder 101 can reciprocate in the vertical direction with the screw nut 1021;
[0041] The caster 1027 is installed on the wheel frame 1026, and a bearing seat 1025 is installed on the top of the wheel frame 1026, so that the bottom end of the screw 1022 is rotatably connected to the wheel frame 1026 through a rotating bearing arranged in the bearing seat 1025, so as to facilitate the movement of the lifting platform 1; the wheel frame 1026 is also provided with a brake mechanism for limiting the rotation of the caster 1027, so that during the pressure test, the position of the lifting platform 1 is not affected by the rolling of the caster 1027 and is not offset.
[0042] See also Figure 2 and Figure 3 The pressure testing device is centrally arranged in the mounting seat 103, and includes a movable push rod 6, a hydraulic jack 4, a weighing sensor 5 and a fixed push rod 7 which are coaxially arranged in sequence; in the present embodiment, the hydraulic jack 4 preferably adopts a 200t hydraulic jack, and is equipped with a hydraulic pump station assembly SQF-5310, and the weighing sensor 5 preferably adopts a Mettler Toledo weighing sensor IND320L, and is equipped with a digital display screen which can display the force value in real time.
[0043] The movable push rod 6 and the hydraulic jack 4 are arranged in the hydraulic movable chamber; the movable push rod 6 includes a movable rod 601 and a movable push plate 602; one end of the movable rod 601 is penetrated from the push rod penetration hole opened on the end wall of one end of the mounting seat 103 to the outside of the mounting seat 103, and a rectangular fixing plate is vertically fixed on the end surface of the other end; the movable push plate 602 is a plate body identical to the fixed plate, which is arranged parallel to the fixed plate and has a through hole in the center of the plate body; the movable push plate 602 and the fixed plate are connected and fixed as a whole by bolts and matching nuts 603 penetrated at the four top corners of the two.
[0044] The hydraulic jack 4 is arranged in such a way that its hydraulic push rod faces the movable push rod 6, and the two ends of its cylinder are fixed in the hydraulic movable chamber by two arc-shaped mounting seats 107; the push rod at one end of the hydraulic jack 4 is passed through the central through hole of the movable push plate 602, and a limiting sleeve 401 is sleeved and fixed on the outer wall of the push rod end, and the outer diameter of the limiting sleeve 401 is larger than the aperture of the central through hole of the movable push plate 602, so that the push rod at this end of the hydraulic jack 4 can directly push the movable rod 601 to move to the outside of the mounting seat 103, or pull the movable rod 601 back into the mounting seat 103 through the limiting cooperation of the limiting sleeve 401 at the push rod end and the movable push plate 602.
[0045] The fixed push rod 7 is a fixed rod body arranged in the fixed push rod mounting cavity, one end of which is passed through the push rod penetration hole on the other end side of the mounting seat 103 to the outside of the mounting seat 103, and the other end of which is passed through the opening hole of the partition between the sensor mounting cavity and the fixed push rod mounting cavity; preferably, the fixed push rod 7 is fixed in the mounting seat 103 through at least two arc-shaped mounting seats 107.
[0046] The weighing sensor 5 is arranged in the sensor installation cavity, and the detection end and the other end opposite to the detection end are respectively abutted against the bottom end of the cylinder of the hydraulic jack and the other end of the fixed push rod 7; specifically, on the hydraulic jack 4, a cylindrical connecting column is provided at the center of the bottom end of the cylinder opposite to the hydraulic push rod, one end of the connecting column is welded and fixed at the center of the bottom end of the cylinder, and the other end is passed through the opening of the partition between the hydraulic active cavity and the sensor installation cavity, and abuts against the detection end of the weighing sensor 5; the other end of the weighing sensor 5 opposite to the detection end is fixed to the other end face of the fixed push rod 7 by screws.
[0047] As a preferred technical solution of this embodiment, see Figure 5Two guide rails 105 are symmetrically fixed on the side walls of the hydraulic chamber on the opposite sides corresponding to the movable space of the movable push rod 6. The track grooves of the two guide rails 105 are arranged opposite to each other and are opened along the moving direction of the movable push rod 6. The shape and size of the track grooves are adapted to the shape and size of the fixed plate (or the movable push plate 602), so that the fixed plate and the movable push plate 602 of the movable push rod 6 are embedded in the track grooves of the two guide rails 105, providing a guiding effect for the reciprocating movement of the movable push rod 6.
[0048] See also Figure 1 The two sets of door machine connection components are placed on both sides of the lifting platform 1 when in use, and can be stored on the connecting beam below the mounting seat 103 on the lifting platform 1 after use; specifically, each set of connection components consists of a top seat 2 and a buffer shield 3; wherein the buffer shield 3 is pre-fixed on the outside of the buffer column 1002 of the walking end 1001 of the door machine 10, and does not need to be removed after testing; the top seat 2 can be detachably assembled on the buffer shield 3.
[0049] The buffer shield 3 is a rigid shield body, which is specifically an inverted U-shaped frame composed of a horizontally arranged top plate and vertical plates symmetrically fixed on both sides of the top plate. It is sleeved on the outside of the buffer column 1002 and welded and fixed to the outer wall of the walking end 1001 to prevent the buffer column 1002 from being damaged by falling objects from high altitude above the gantry machine 10 and collisions with external equipment and vehicles on both sides; the width of the buffer shield 3 in the axial direction of the buffer column 1002 is smaller than the length of the buffer column 1002, so that the end of the buffer column 1002 can extend to the outside of the buffer shield 3 to avoid affecting the buffer column 1002 in the horizontal direction. Anti-direct collision function.
[0050] The top seat 2 is a rigid shell with an opening on one side. The shape and size of the inner cavity of the shell are respectively adapted to the shape and size of the buffer shield 3, so that the top seat 2 is sleeved on the outside of the buffer shield 3, and a gap is left between the inner wall on the side opposite to the opening end and the buffer column, that is, the inner wall of the top seat 2 does not contact the buffer column 1002; the other side of the top seat 2 is fixed to the rod end of the movable rod 601 located on the outside of the mounting seat 103 on the movable top rod 6, specifically, the rod end of the movable rod 601 is centered and vertically fixed on the other side wall of the top seat 2;
[0051] Two top seat screw holes 201 are symmetrically provided on the top surface of the top seat 2, and two shield screw holes 301 are symmetrically provided on the top surface of the buffer shield 3, so that when the top seat 2 is sleeved on the outside of the buffer shield 3, the two screw holes thereon are respectively connected with the two screw holes on the buffer shield 3, so that the two are connected and fixed as a whole by bolts 202 that are respectively penetrated and threadedly connected in each of the two connected screw holes; wherein the bolts 202 are specifically composed of a threaded rod and a ring-shaped handle fixed on the top of the threaded rod.
[0052] The design of the connection assembly can protect the buffer column 1002 on the end side of the walking end 1001 of the door machine 10, while also achieving rapid and stable docking between the pressure testing device on the lifting platform 1 and the door machine 10. Example 2
[0053] See also Figure 6 and Figure 7 , a dock gantry crane wind resistance testing method implemented by the dock gantry crane wind resistance testing device based on Example 1, the method is suitable for weather conditions with wind force ≤ level 4.
[0054] The specific implementation steps of the wind resistance test method for the wharf gantry crane are as follows:
[0055] S1. Since the gantry crane includes two walking ends located at the sea side and the land side respectively, before the gantry crane wind resistance test is performed, it is necessary to respectively set a terminal gantry crane wind resistance test device at the sea side walking end and the land side walking end of the gantry crane 10 to be tested;
[0056] Taking the sea side as an example, the specific steps for setting up the wind resistance test device for each dock gantry crane are as follows:
[0057] S101, installing the connection assembly: welding and fixing the buffer shield 3 on the end wall of the sea-side walking end 1001 of the door machine 10 to be tested and the adjacent side door machine 12, and making the buffer column 1002 centered in the buffer shield 3; sleeve the top seat 2 on the outside of the buffer shield 3, and fix it on the buffer shield 3 by two bolts 202;
[0058] S102, move the lifting platform 1 onto the running track 11, and insert the bottom protrusion of the track positioning plate 106 into the two track grooves of the running track 11, so that the center line of the pressure testing device in the lifting platform 1 is located on the center connection line of the two door cranes 10;
[0059] S103, adjusting the hand wheels of the lifting and lowering adjustment mechanisms on the lifting platform 1, so that the pressure testing device is set in a horizontal state, and at the same time, the movable push rod 6 is set in the center of the connecting assembly on the same side, and the fixed push rod 7 abuts against the center of the end wall of the connecting assembly on the same side;
[0060] S104, using the same method as steps S101 to S103, completing the connection of another terminal gantry crane wind resistance test device at the land-side walking end of the gantry crane;
[0061] S105, connecting the hydraulic jacks 4 of the two wharf gantry crane wind resistance test devices to the on-site hydraulic pump station 8 through hydraulic pipelines, so that the movable push rod 6 is pushed by the hydraulic jack 4 to abut against the connecting component on the same side; connecting the weighing sensors 5 of the two wharf gantry crane wind resistance test devices to the on-site digital display screen 9 through data transmission lines, so as to monitor the thrust jointly applied by the two hydraulic jacks 4 in real time;
[0062] S2. Determine the test thrust that the hydraulic jack 4 needs to apply during the test according to the model of the door crane to be tested and the wind test requirements. F ;
[0063] Specifically, the calculation formula of the test thrust is:
[0064] P w = C × K h × q ×A w ,
[0065] F = 1 / 2 P w ,
[0066] In the above two formulas, P w It is the wind load acting on the port loading and unloading machinery or cargo, in Newton (N); C is the wind load shape coefficient of the windward structure; K h is the wind pressure height variation coefficient; q is the wind pressure, which is determined according to the wind speed and the calculation formula is q = 0.613× v 2 ; A w is the windward area along the track; F It is the test thrust that should be applied by the jack in the wind resistance test device of a single dock gantry crane.
[0067] S3, keep the land side walking end and the sea side walking end of the door crane 10 to be tested in a stationary movable state, and the land side walking end and the sea side walking end of the adjacent side door crane 12 in a stationary immovable state, so as to ensure that under the test thrust, only the door crane 10 to be tested can be pushed, and the adjacent side door crane 12 cannot move from the beginning to the end; the hydraulic pump station controls the synchronous extension and extension of the two hydraulic jacks 4, and uses the weighing sensor 5 to monitor whether the test thrust applied by the two hydraulic jacks 4 to the door crane 10 to be tested is the same as the wind load corresponding to the test wind force. According to the test requirements, the test thrust is applied in sequence from small to large, and wait for 1min~3min after each test thrust reaches the test value. During the waiting process, observe whether the door crane 10 to be tested has obvious slippage relative to the door crane running track 11:
[0068] (1) If the door crane 10 to be tested slips significantly, the door crane 10 to be tested cannot meet the requirements of resisting the wind load corresponding to the test thrust;
[0069] (2) If the door crane 10 to be tested does not slip significantly, the door crane 10 to be tested can meet the requirements of resisting the wind load corresponding to the test thrust.
[0070] In order to further demonstrate the practicability of the wind resistance test device and test method for the wharf gantry crane of the present application, the applicant conducted a wind resistance performance test on the existing 25T gantry crane and 40T gantry crane at its wharf.
[0071] According to the calculation book of the gantry crane, the windward area of the 25T gantry crane along the track direction A w = rotating part + non-rotating part = 321.21m 2 , 40T gantry crane windward area along the track direction A w =241.82+137.73=379.55m 2 ; According to the calculation regulations of wind load on port machinery, the wind load shape system C The value is 1.08, the wind pressure height variation coefficient K h The value is taken as 1.25; furthermore, the above method is used to calculate the simulated wind load numerical comparison table shown in Table 1 below.
[0072] Table 1:
[0073]
[0074] Based on the wind load simulation values corresponding to different wind force levels shown in Table 1, the wind resistance performance of the 25T gantry crane and the 40T gantry crane of the pier was tested using the wind resistance test device of the present application. The test results show that the 25T gantry crane can withstand a maximum wind force of 12, and the 40T gantry crane can withstand a maximum wind force of 12, which is the same as the results of the two models of gantry cranes in daily applications.
Claims
1. A wind resistance test device for a dock gantry crane, characterized in that: The invention comprises a pressure testing device arranged on a lifting platform (1) and two sets of connection components; wherein the lifting platform (1) comprises a mounting seat (103) which is arranged on a lifting and adjusting frame; two push rod insertion holes are symmetrically provided on the end walls at both ends in the length direction of the mounting seat (103); the pressure testing device comprises a movable push rod (6), a hydraulic jack (4), a weighing sensor (5) and a fixed push rod (7) which are coaxially arranged in sequence in the horizontal direction; the movable push rod (6) comprises a movable rod (601) and a movable push plate (602); one end of the movable rod (601) is inserted into the push rod insertion hole of the end wall at one end of the mounting seat (103), and a fixed plate is vertically fixed on the end surface of the other end; the movable push plate (602) is arranged in parallel and spaced apart on the fixed frame. The fixed plate is adjacent to the fixed plate, and the two are fixedly connected by a plurality of bolts; the hydraulic jack (4) is arranged in a manner that its hydraulic push rod faces the movable push rod (6), and its cylinder is fixed in the mounting seat (103); the front end of the hydraulic push rod is inserted into the opening on the movable push plate (602), and is limited between the fixed plate and the movable push plate (602) by a limiting sleeve (401) provided on the front end wall of the hydraulic push rod, so that the movable push rod (6) is driven by the hydraulic push rod to reciprocate in the mounting seat (103); one end of the fixed push rod (7) is inserted into the push rod insertion hole of the other end wall of the mounting seat (103), and the other end is fixed in the mounting seat (103); the detection end of the weighing sensor (5) and the other end opposite to the detection end are respectively abutted and fixed on the hydraulic jack; The bottom end surface of the cylinder of the jack and the other end surface of the fixed push rod (7); two sets of connection components are respectively arranged on the end wall of the gantry crane walking end located at the outer rod ends of the movable push rod (6) and the fixed push rod (7) in the test state, so that the rod ends of the movable push rod (6) and the fixed push rod (7) are respectively abutted on the two sets of connection components to apply a specified thrust to the gantry crane; the lifting and adjusting frame body is four lifting and adjusting mechanisms (102) assembled on the support frame; a connecting beam is respectively arranged on the bottom side of each two support cylinders (101) located at the two end sides in the length direction of the support frame, and a track positioning plate (106) is arranged on the bottom surface of each connecting beam and directly below the mounting seat (103); the track positioning plate (106) is vertically arranged, and its bottom Two protrusions are symmetrically arranged along the width direction of the support frame on the surface, and the width between the two protrusions is adapted to the width of the two track grooves on the running track of the dock gantry crane, so that the lifting platform (1) can be respectively embedded in the two track grooves by the two protrusions on the front and rear end side track positioning plates (106) thereof, so as to realize the centering setting of the mounting seat (103) and the dock gantry crane; casters (1027) are arranged at the bottom of the lifting adjustment mechanism (102); each set of gantry crane connection components is composed of a top seat (2) and a buffer shield (3); wherein the buffer shield (3) is an inverted U-shaped frame sleeved on the outside of the buffer column and fixed on the end wall of the gantry crane running end, so that the buffer column is arranged in the buffer shield (3), and the front end of the buffer column is exposed to the outside of the buffer shield (3);The top seat (2) is a rigid shell with an opening on one side, and is sleeved on the outside of the buffer shield (3) through the open end, and a gap is left between the inner wall on the side opposite to the open end and the buffer column; the top seat (2) is fixed to the buffer shield (3) by bolt connection. ; 2. The wind resistance test device for a dock gantry crane according to claim 1 is characterized in that: The support frame comprises four vertically arranged support tubes (101), so that four lifting adjustment mechanisms (102) are respectively arranged in the four support tubes (101); the four support tubes (101) are symmetrically arranged on both sides of the mounting seat (103) in the length direction of the mounting seat (103), and are directly or indirectly fixed to both sides of the mounting seat (103); the lifting adjustment mechanism comprises a ball screw, which is composed of a screw (1022) vertically inserted in the support tube (101) and a screw (1022) assembled on the screw (102 2), an annular boss (1011) is provided on the inner wall of the support tube (101), a connecting flange at the top end of the lead screw nut (1021) is press-fitted and fixed on the annular boss (1011), so that the support tube (101) is synchronously lifted and lowered in the vertical direction along with the lead screw nut (1021); an adjusting hand wheel (1024) is fixed at the top end of the lead screw (1022), and the bottom end is rotatably arranged on a wheel frame (1026) equipped with a caster (1027).
3. The wind resistance test device for the dock gantry crane according to claim 2 is characterized in that: At least one connecting beam is provided between every two adjacent support tubes (101).
4. The wind resistance test device for a dock gantry crane according to claim 2 is characterized in that: Two guide rails (105) are symmetrically fixed on the inner wall of the mounting seat (103) on the opposite side corresponding to the reciprocating space of the movable push rod (6). The track grooves of the two guide rails (105) are horizontally opened along the moving direction of the movable push rod (6) and are arranged opposite to each other, so that the fixed plate and the movable push plate (602) of the movable push rod (6) are embedded in the track grooves of the two guide rails (105) and can reciprocate in the horizontal direction in the track grooves.
5. The wind resistance testing device for a dock gantry crane according to claim 1 is characterized in that: Both ends of the cylinder of the hydraulic jack (4) are fixed in the mounting seat (103) via at least two arc-shaped mounting seats (107); and the fixed push rod (7) is fixed in the mounting seat (103) via at least two arc-shaped mounting seats (107).
6. The wind resistance testing device for a dock gantry crane according to claim 1 is characterized in that: At least two pairs of interpenetrating connection screw holes are correspondingly provided on the top surfaces of the top seat (2) and the buffer shield (3), so that the two can be connected and fixed as a whole in a sleeved state by bolts (202) respectively inserted through and threadedly connected in each pair of connection screw holes; the bolts (202) are composed of a threaded rod and an annular handle fixed on the top end of the threaded rod.
7. A method for testing wind resistance of a dock gantry crane implemented by the wind resistance testing device for the dock gantry crane according to any one of claims 1 to 6, characterized in that: Here are the steps: S1. A dock gantry crane wind resistance test device is respectively arranged at the sea-side walking end and the land-side walking end of the gantry crane to be tested; wherein, the lifting platform of the dock gantry crane wind resistance test device located at the sea-side walking end is fixed on the sea-side gantry crane walking track, and the rod end of its fixed top rod is butted against the end wall of the sea-side walking end of the adjacent side gantry crane through a set of connecting components; the lifting platform of the dock gantry crane wind resistance test device located at the land-side walking end is fixed on the land-side gantry crane walking track, and the rod end of its fixed top rod is butted against the end wall of the land-side walking end of the adjacent side gantry crane through a set of connecting components; S2. Determine the test thrust that the hydraulic jack needs to apply during the test according to the model of the door crane to be tested and the wind test requirements; S3. Keep the land-side walking end and the sea-side walking end of the gantry crane to be tested in a stationary and movable state, and the land-side walking end and the sea-side walking end of the gantry crane on the adjacent side in a stationary and immovable state; control the synchronous extension and extension of the two hydraulic jacks, and use the two driving movable push rods to abut against the land-side walking end and the sea-side walking end of the gantry crane to be tested through the connecting assembly, and then apply the test thrust to the gantry crane to be tested; use the weighing sensor to monitor in real time whether the test thrust applied by the two hydraulic jacks to the gantry crane to be tested is the same as the wind load corresponding to the test wind force; according to the test requirements, the test thrust is applied in sequence from small to large, and wait for 1min~3min after each test thrust reaches the test value; during the waiting process, observe whether the gantry crane to be tested has obvious slippage relative to the gantry crane running track: 1) If the gantry crane to be tested has obvious slippage, the gantry crane to be tested cannot meet the resistance to the wind load corresponding to the test thrust; 2) If the gantry crane to be tested does not have obvious slippage, the gantry crane to be tested can meet the resistance to the wind load corresponding to the test thrust.
8. The wind resistance test method for a dock gantry crane according to claim 7, characterized in that: The test thrust that the hydraulic jack needs to apply during the test F The calculation formula is: P w = C × K h × q ×A w , F = 1 / 2 P w , In the above two formulas, P w The wind load acting on port loading and unloading machinery or cargo, in N; C is the wind load shape coefficient of the windward structure; K h is the wind pressure height variation coefficient; q is the wind pressure, which is determined according to the wind speed and the calculation formula is q = 0.613× v 2 ; A w is the windward area along the track; F It is the test thrust that should be applied by the jack in the wind resistance test device of a single dock gantry crane.
Citation Information
Patent Citations
Indoor test detector for wind-resistant anti-slip brake of port crane
CN102620923A
Comprehensive laboratory examination device for anti-wind brake product of crane
CN105236271A
Test device and test method for wind-resistant and anti-skid performance of crane
CN109085006A
Port crane anti-gust capability detection device and detection method thereof
CN110371855A
Verification device for crane monitoring system
CN111470428A
