A method for coordinated topological reconstruction of distribution network and drainage network to cope with rainstorm waterlogging disasters
By constructing a power-drainage network coupling model and a multi-scenario optimization method, the distribution network and drainage network are collaboratively reconstructed, which solves the problem of failure to effectively coordinate network topology reconstruction in the existing technology and improves disaster prevention in response to heavy rain and waterlogging disasters. Disaster reduction capabilities and emergency response efficiency.
Patent Information
- Application Number
- CN202410776088.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-17
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-06-17
AI Technical Summary
Existing technologies fail to effectively coordinate the topology reconstruction of distribution networks and drainage networks in response to heavy rain and waterlogging disasters, and ignore the mutual influence and emergency linkage between different networks, resulting in urban power grids, drainage networks, and transportation networks facing heavy rains. Insufficient disaster prevention and mitigation capabilities in times of danger.
Construct a power-drainage network coupling model based on pressure and unsteady flow hydrodynamic partial differential constraints, and establish the equivalent linear complex algebraic equation of the drainage network's nonlinear hydrodynamic partial differential equation in the frequency domain to derive the power-drainage composite safety The regional multi-hyperplane formula is used, and the multi-scenario stochastic optimization method of Monte Carlo simulation is used for rolling optimization solution to realize the collaborative reconstruction of the distribution network and drainage network.
It has improved the disaster prevention and reduction capabilities of the urban power grid, drainage network and transportation network under heavy rain conditions, optimized the collaborative planning of drainage and waterlogging prevention and urban water systems, road traffic and power facilities, and improved the efficiency of emergency power supply and drainage.
Smart Images

Figure CN118396333B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of emergency resource planning, and in particular relates to a method for collaboratively reconstructing the topology of a distribution network and a drainage network in response to a rainstorm waterlogging disaster. Background Art
[0002] The urban drainage network includes canals, rainwater storage tanks, electric-driven drainage pump stations, electric sluice gates, rainwater collection wells and other drainage ancillary facilities. It is an infrastructure network for rainwater collection, transportation, treatment and discharge. In recent years, with the rapid development of electrified transportation, the installed capacity of electric-driven drainage pump stations has increased day by day, and the connection between urban power distribution networks and drainage networks and transportation networks has become increasingly close. However, in heavy rainfall weather, the enhanced coupling relationship between multiple networks has also brought new challenges and risks to the emergency management of infrastructure networks. Due to the high intensity of extreme rainfall and poor drainage, the water level in the urban area continued to rise. The floods overflowed, causing many bridges to be washed away and many roads to be blocked by water. In this case, the mileage and travel time of mobile emergency vehicles such as mobile emergency power supply vehicles and emergency drainage vehicles increased significantly. As a result, the mobile emergency vehicles were unable to arrive at the disaster site in time, greatly reducing their efficiency in emergency power supply and emergency drainage for key network nodes. In addition, the power grid, drainage network and transportation network in the city can reduce the adverse effects of rainstorm disasters to a certain extent through coupling, coordination and mutual assistance. The power distribution system reconfigures the network topology by closing or opening remote-controlled switches and temporarily supplying power from mobile emergency power supply vehicles to restore power supply to the drainage system pumps and gates.
[0003] At present, in terms of improving the power supply recovery capacity of the distribution system, domestic and foreign scholars have carried out corresponding research from the perspectives of component reinforcement and strengthening, network planning and topology reconstruction. Among them, dynamic topology reconstruction of the power grid is the most important means to restore the power supply of important power loads or reduce power loads. However, existing research only stays at the level of power grid reconstruction, and does not involve the coordinated reconstruction of the topology of the distribution network and the drainage network. It ignores the mutual influence and emergency linkage between different networks, which greatly weakens the ability of urban power grids, drainage networks and transportation networks to cope with rainstorm hazards. In addition, when analyzing the dynamic characteristics of the drainage network, its hydraulic characteristics need to be expressed by hyperbolic hydrodynamic partial differential equations, while nonlinear hydrodynamic partial differential equations are difficult to be directly applied to optimization calculations. To solve this problem, most scholars usually use finite difference methods to achieve approximate discrete processing of hydrodynamic partial differential equations in two dimensions of time and space. However, high-precision differential discretization requires the selection of appropriate differential formats and smaller differential steps, which leads to a sharp increase in the number of constraints and variables in the original optimization model. Therefore, an efficient solution method for emergency linkage decision optimization is urgently needed to coordinate the dispatch of distribution network and drainage network topology reconstruction, so as to enhance the disaster prevention and mitigation capabilities of urban power grid, drainage network and transportation network in response to heavy rains, and realize the coordinated planning of drainage and flood control, urban water system, road traffic and power facilities under the characteristics of urban multi-network coupling. Summary of the invention
[0004] The purpose of the embodiment of the present invention is to provide a method for coordinated reconstruction of the topology of a distribution network and a drainage network in response to rainstorm waterlogging disasters, so as to achieve coordinated reconstruction of the network topology of the distribution network and the drainage network.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is a method for coordinating the topology reconstruction of the distribution network and the drainage network to cope with the flood disaster caused by heavy rain, comprising the following steps:
[0006] Step S1, constructing a power-drainage network coupling model based on partial differential constraints of pressurized and unpressurized unsteady flow dynamics to characterize the dynamic interactive evolution process of power grid outage, rainwater overflow and road waterlogging under heavy rain disasters;
[0007] Step S2, establishing an equivalent linear complex algebraic equation of the nonlinear hydrodynamic partial differential equation of the drainage network in the frequency domain;
[0008] Step S3, deriving a multi-hyperplane formula for the power-drainage composite safety region, characterizing the feasible operation boundary of the electric pump-sluice group under complex power and rainwater injection conditions;
[0009] Step S4: Considering the uncertainty of rainfall in rainstorm weather, multi-scenario stochastic optimization based on Monte Carlo simulation is adopted to solve the emergency dispatch decision plan at the current moment through rolling optimization.
[0010] Furthermore, step S1 includes constructing a drainage network model based on partial differential constraints of pressurized and unpressurized non-steady flow water dynamics and constructing a coordinated control model of distribution network reconstruction and drainage network flow direction topology transformation; wherein, constructing a drainage network model based on partial differential constraints of pressurized and unpressurized non-steady flow water dynamics is specifically as follows:
[0011] When the rainfall is small, the water level in the drainage channel is low and does not reach the top of the channel. At this time, the water flow in the channel is regarded as a pressure-free non-steady flow; assuming that the bottom elevation of the drainage network channel is zero, and assuming that the channel or pipe cross-section is a rectangular shape that does not change, we have:
[0012] ;
[0013] ;
[0014] ;
[0015] ;
[0016] In the formula, for Time Channel Cross-sectional area of water flow; For time, is the axial coordinate along the channel; For pipes Confluence flow; is the water depth of the canal; is the cross-sectional area of the conduit, It means that the pipeline is in a state of pressurized non-steady flow. It means that the pipe is in a state of unpressurized non-steady flow; For pipes The hydraulic gradient is the change in the horizontal height of the water flow in the conduit; For pipes The channel bottom slope; Represents the acceleration due to gravity, with a value of 9.81 m / s 2 ; , are Manning coefficient and hydraulic radius respectively; , They are time set and channel set respectively; is the width of the channel;
[0017] When heavy rain falls, a large amount of rainwater will flow into the canal, causing the water level in the canal to reach the top of the canal. At this time, the canal water flow will be in a pressurized non-constant flow state:
[0018] ;
[0019] ;
[0020] In the formula, Indicates the height of the rectangular conduit; is the assumed virtual narrow slit width; It indicates the pressure flow wave velocity;
[0021] The initial conditions and boundary conditions of the drainage network model with partial differential constraints for unsteady and unsteady flow are as follows:
[0022] ;
[0023] ;
[0024] In the formula , For pipes At the initial moment The water depth and flow rate, The upper limit of the flow rate; is the lower limit of flow rate; is the length of the river;
[0025] Road water depth The calculation formula is:
[0026] ;
[0027] ;
[0028] In the formula, For road surface and rainwater collection wells The traffic exchange volume is When the rainwater is collected from the rainwater collection well Overflow to the road, when When ; express Time Road rainfall; Indicates the road catchment area; for Time Drainage Truck Drain into rainwater collection well The amount of water; Indicates the assembly of emergency drainage vehicles; represents a road set; for The amount of rainwater lost at any given moment due to evaporation and infiltration.
[0029] Furthermore, the process of constructing the coordinated control model of distribution network reconstruction and drainage network flow direction topology transformation is specifically as follows:
[0030] The distribution network reconstruction must meet the node power balance and line capacity constraints. At the same time, the node load reduction should be limited to the allowable range:
[0031] ;
[0032] ;
[0033] ;
[0034] In the formula, , They are used to inject mobile emergency power supply and distributed power supply into grid nodes respectively. The active power, , They are used to inject mobile emergency power supply and distributed power supply into grid nodes respectively. Reactive power; , They are Timeline Active and reactive currents flowing through; , They are Timeline Active and reactive currents flowing through; , They are Time grid node Active power demand and reactive power demand of the pumping station; , They are Time grid node Active power demand and reactive power demand of the sluice gate; , They are Time grid node Other active and reactive loads except pump and gate loads; , They are Time grid node The reduction of active load and reactive load, is a set of power grid nodes;
[0035] The distribution network reconstruction constraints should also satisfy the distribution network radial network constraints:
[0036] ;
[0037] ;
[0038] ;
[0039] ;
[0040] ;
[0041] In the formula, and express Timeline Connectivity state variable, if the line Closed, then , , if the line If disconnected, , ; is a 0-1 state variable, where Representation Node Is a node If not, then ; is a 0-1 state variable, where Representation Node Is a node If not, then ; To express Timeline A 0-1 variable for the switch state change, where Indicates that the circuit breaker is closed. Indicates that the line switch is disconnected; It is a collection of power grid branches;
[0042] The relationship between the drainage flow and power of the drainage pump station in the drainage network and the operating power limit of the drainage pump station are as follows:
[0043] ;
[0044] ;
[0045] ;
[0046] In the formula, for Time drainage pump station Active power consumed; for Time drainage pump station The extraction flow rate; is the water density; For drainage pumping station drainage efficiency; For drainage pumping station of water head; for Time drainage pump station Reactive power consumed; For drainage pumping station Power factor; , Separate drainage pump station The upper and lower limits of operating power; express Time drainage pump station A binary variable for the start / stop state; It represents a collection of drainage pumping stations;
[0047] During the operation of the drainage pump station, if the power supply of the power grid is lower than the minimum power limit To avoid damage to the drainage pump station, the drainage pump station will automatically shut down, as follows:
[0048] ;
[0049] In the formula, is any positive number; For drainage pumping station The extraction flow rate;
[0050] The calculation formula for active power and reactive power consumed by the opening and closing of the sluice gate in the drainage pump station is as follows:
[0051] ;
[0052] ;
[0053] In the formula, , They are Water gate at all times Active and reactive power consumed; Indicates sluice gate A binary variable in the on state. Always open the floodgates ,have , and when Keep the floodgates closed at all times ,have ; Indicates sluice gate Active power of a single start and stop; For sluice gate Power factor; Assemble for the sluice gate;
[0054] When the sluice gate is closed, the flow rate of the pipe is zero. When the sluice gate is opened, the flow rate of the pipe should not exceed the maximum flow rate of the sluice gate:
[0055] ;
[0056] In the formula, is a 0-1 variable indicating the operation status of the pipeline, where 0 indicates the closed state and 1 indicates the pipeline is in a closed state. In a connected state; For sluice gate Maximum water flow rate; To express A 0-1 variable indicating the flow state of the pipe at the moment, where Indicates water flow from Flow to Node , if not, then ;
[0057] In addition, frequent changes in the opening and closing status of the sluice gate will lead to unstable hydrodynamic characteristics of the pipeline. It is necessary to ensure that the opening and closing time interval and the number of opening and closing times allowed by the sluice gate within the scheduling cycle are within a reasonable range, as shown below:
[0058] ;
[0059] ;
[0060] ;
[0061] ;
[0062] In the formula, Indicates sluice gate A binary variable in the closed state, when Always open the floodgates ,have , and when Keep the floodgates closed at all times ,have ; , They are the minimum opening time and minimum closing time of the electric water gate respectively; Indicates the maximum number of times the sluice gate is allowed to be opened and closed within the scheduling cycle; Indicates the length of the scheduling time domain, Set the opening time intervals for all sluice gates; The set of closing time intervals for all sluice gates; express and Moment elements of the collection; is a set of positive integers;
[0063] When a blockage occurs in a pipe in the urban drainage network, rainwater will overflow at both ends of the pipe. At this time, the nodes at the beginning and end of the pipe should be regarded as fault nodes:
[0064] ;
[0065] ;
[0066] ;
[0067] ;
[0068] At the same time, considering the difficulty of repairing underground drainage network pipe faults in rainstorm weather, pipe fault repair is not considered here, so after the pipe fault occurs, the fault will always exist during the scheduling cycle:
[0069] ;
[0070] ;
[0071] In the formula, express Time channel node 0-1 variable for the fault status, express Time channel node A 0-1 variable of the fault status, where 0 indicates that the node is a non-faulty node and 1 indicates that the node is a faulty node; express Time Channel A 0-1 variable for the fault state, where 0 means the conduit is in a non-fault state and 1 means the conduit is in a fault state;
[0072] If a failure occurs in a connected pipe, the sluice gate at the location will be closed to isolate the failure:
[0073] ;
[0074] ;
[0075] The sluice gate located on the faulty channel cannot be used for drainage network flow topology reconstruction:
[0076] ;
[0077] The connectivity of the drainage network is affected by the opening and closing status of the sluice gates:
[0078] ;
[0079] ;
[0080] ;
[0081] In order to avoid poor drainage and prevent water flow from impacting the wall of different-diameter pipes, the topological reconstruction of the drainage network flow direction should also ensure that the total cross-sectional area of the connecting pipes at the outlet of a single pipe is not less than the total cross-sectional area of the connecting pipes at the inlet of the pipe:
[0082] ;
[0083] ;
[0084] In the formula, To express A 0-1 variable indicating the flow state of the pipe at the moment, where Indicates water flow from Flow to Node , if not, then ; For The node is the outlet node of the pipeline Cross-sectional area; For The node is the inlet node of the pipeline Cross-sectional area; Indicates export and The collection of pipes and conduits connected to the node; For entrance and A collection of pipes and conduits connected to a node.
[0085] Furthermore, the step S2 is specifically as follows:
[0086] The unpressurized unsteady flow drainage model in step S1 is preprocessed by linear approximation to obtain:
[0087] ;
[0088] ;
[0089] ;
[0090] In the formula, represents the water velocity per unit cross section, , is a complex frequency domain variable; and Respectively represent matrices The characteristic value of express Time Channel The change in flow rate, express Time Channel The amount of change in water depth; is the width of the channel; is the determinant of the matrix. To facilitate the expression of the formula, take the matrix It is an intermediate variable and has no specific meaning; , They are Time Drainage Network Changes in water depth and flow rate, , , is the process variable;
[0091] The equation for the relationship between the water depth at the outlet node of the pipe and the flow rate change at the inlet and outlet under heavy rain weather is as follows:
[0092] ;
[0093] ;
[0094] In the formula, express Time Channel The change of water depth at the outlet node; express Time Channel The traffic change of the inlet node, where Indicates pipe Water flow delay coefficient, Express Round down; express Time Channel The traffic change at the egress node; express Time Channel The change of water depth at the outlet node; Indicates pipe The length of the pipe, Indicates the time change.
[0095] Furthermore, the step S3 is specifically as follows:
[0096] To describe the changes of node voltage amplitude and water depth with the changes of net power injection and net rainwater injection, the safety area of the power-drainage network is established:
[0097] ;
[0098] ;
[0099] In the formula, The upper limit of water depth is The difference in water depth at that time; is the upper limit of voltage amplitude and The difference in voltage amplitude at each moment; represents the vectors related to the control variables of the drainage network and the distribution network; represents the component constant; The constant coefficient matrix representing the current drainage network topology, A constant coefficient matrix representing the current distribution network topology; Indicates that the conduit inlet is The flow rate change at each moment; , Indicates that the rainwater storage tank is Changes in water storage and discharge flow at each moment; express Change in water flow at the outlet at each moment; Indicates that the drainage pump station The change in displacement at each moment; , Indicates the change in active power and reactive power of the distribution network; is the transpose;
[0100] If the drainage network node Depth of water or Node The node voltage amplitude When the upper limit is reached, the corresponding or is equal to zero;
[0101] When the voltage amplitude at a node in the distribution network or the water level at a node in the drainage network reaches the upper limit, the control variable will reach the critical operating point:
[0102] ;
[0103] In the formula, the superscript “ " indicates an adjacent value, so The variables in the formula "correspond to the critical working points of the distribution network and the drainage network respectively. , , , , , , They correspond to the flow at the inlet of the pipe, the amount of water stored in the rainwater storage tank, the discharge flow of the rainwater storage tank, the water flow at the outlet, the discharge of the drainage pump station, the upper limit of the active power of the distribution network, and the upper limit of the reactive power of the distribution network;
[0104] The above equation is equivalent to the following hyperplane equation:
[0105] ;
[0106] ;
[0107] ;
[0108] In the formula, is the element parameter matrix, where The constant coefficient matrix representing the modified drainage network topology, The constant coefficient matrix representing the modified distribution network topology. The larger the matrix coefficient value, the greater the impact of the change in rainwater / power injection on the water depth and voltage magnitude. and represents a unit vector;
[0109] The lower limits of water depth and voltage amplitude are derived, and finally the composite safety area of the power-drainage network is obtained as shown in the following formula, where and represents the constant coefficient matrix, which is related to the critical operating point and corresponds to the lower limit of water depth and voltage amplitude:
[0110] .
[0111] Furthermore, the step S4 specifically includes constructing an objective function and establishing operation constraints for emergency drainage and power supply guarantee of the power distribution system; wherein the scheduling objective function is:
[0112] Current moment The amount of power grid load reduction, road surface water depth, and the next moment Until the end of the scheduling The sum of power load reduction and road water depth is minimum:
[0113] ;
[0114] In the formula, is the weight factor; To represent the distribution network node The weight coefficient of the upper load priority, Indicates a rainstorm scene The probability of occurrence, and ; Indicates the total number of scenes; Scheduling end time, express Time Road Depth of water on the road surface, for Time grid node The amount of active load reduction.
[0115] Furthermore, the emergency drainage and power supply guarantee operation constraints of the power distribution system include: pressure / non-pressure non-constant flow dynamic constraints of the drainage network, flow direction topology reconstruction constraints of the drainage network, flow balance constraints of the drainage network nodes, water level balance constraints of the drainage network nodes, dispatching operation constraints of mobile emergency vehicles and DG operation constraints; among which:
[0116] The flow balance constraint of the drainage network node is:
[0117] ;
[0118] The water level balance constraint of the drainage network node is:
[0119] ;
[0120] The dispatching and operation constraints of mobile emergency vehicles are:
[0121] ;
[0122] ;
[0123] ;
[0124] ;
[0125] The operating constraints are:
[0126] ;
[0127] ;
[0128] In the formula, express Time Channel Export flow; Indicates pipe Inlet flow; Indicates that water flows into the node A collection of pipes and conduits; Indicates the water flow out of the node A collection of pipes and conduits; express Time Drainage Truck Enqueue Node Traffic volume; and Represents rainwater storage tank exist The amount of water stored and the discharge flow at each moment; For Node Drainage pump station exist Displacement at the time; for Time Channel Water level at the outlet; for Time Channel Water level at the inlet; express Time Drainage Network Node water level; represents the vehicle travel time on non-flooded roads; Indicates that the vehicle is Time Road Travel time; Indicates the road Length; For the road The design speed of vehicles when there is no water on the road surface; and Road The median value of the road surface water depth threshold and the elastic attenuation coefficient during the interruption; Indicates mobile emergency vehicle From the parking garage Arrival Node Journey time; To indicate the road Is it a path? 0-1 variables, Indicates the road Belong to the path ; Indicates mobile emergency vehicle In the parking garage A 0-1 variable for the deployment status, Indicates deployment to this node; is a 0-1 variable, Indicates mobile emergency vehicle exist From the parking garage Passing the path Arrival Node ; and represent the road set and the flooded road set respectively; From the parking garage Arrival Node A collection of paths; Indicates a parking garage collection; Indicates the set of distribution network nodes to which the emergency power supply vehicle can be connected; Indicates the set of nodes that the emergency drainage vehicle can access; and They represent the collection of emergency drainage vehicles and emergency power supply vehicles respectively; and Respectively Maximum and minimum output power; and They are Downward and upward climbing power constraints; express gather.
[0129] Furthermore, it also includes:
[0130] Step S5, an equivalent linear method is proposed for the nonlinear formula in the model obtained in S1 to improve the solution speed, and finally realize the emergency linkage operation of the coordinated reconstruction of the distribution network and the drainage network topology.
[0131] Furthermore, the equivalent linearity in step S5 specifically refers to converting the rainwater inflow and overflow functions of the rainwater collection well obtained in step S1 into linear constraints:
[0132] ;
[0133] ;
[0134] ;
[0135] ;
[0136] In the formula, and are continuous variables; is a 0-1 variable, Indicates rainwater collection well exist The depth of the water at that moment, Indicates The depth of the rainwater collection well.
[0137] The beneficial effects of the present invention are:
[0138] 1. A city power-drainage network coupling model based on static safety domain analysis is proposed. The present invention characterizes the feasible operating boundary of the electric pump-sluice group under complex power and rainwater injection conditions through the multi-hyperplane formula of the power-drainage composite safety region. On this basis, a power-drainage network coupling model with partial differential constraints of pressurized / unpressurized non-steady flow dynamics is proposed to characterize the dynamic interactive evolution process of power grid blackouts, rainwater overflow and road waterlogging under heavy rain disasters.
[0139] 2. A method for collaborative topological reconstruction of urban distribution networks and drainage networks taking into account multiple types of mobile emergency resources is proposed. The present invention coordinates the dispatching of pump gate clusters and distributed emergency drainage vehicles to reconstruct the optimal drainage path and water flow direction of the drainage network, realizes the redistribution of drainage power loads at fault nodes of the distribution system to improve the resilience of power grid operation, and optimizes the integration of mobile emergency power supply vehicles and distributed power generation resources to realize fault recovery reconstruction of the distribution system to ensure uninterrupted power supply to key drainage facilities.
[0140] 3. The hyperbolic hydrodynamic partial differential equivalent linear equation of the drainage network based on Laplace transform is established. The present invention performs linear approximation preprocessing on the Saint-Venant partial differential equation based on Taylor expansion technology, and then derives the linear algebraic relationship equation between the water depth at the outlet node of the drainage network pipe channel and the flow rate at the inlet and outlet under heavy rain weather through Laplace transform, effectively overcoming the heavy computational burden brought by the traditional finite difference approximation method to deal with the constraints of the hydrodynamic partial differential equation. BRIEF DESCRIPTION OF THE DRAWINGS
[0141] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0142] Figure 1 It is a flow chart of a method for collaboratively reconstructing the topology of an urban distribution network and a drainage network according to an embodiment of the present invention.
[0143] Figure 2a It is the test system diagram of the power distribution-drainage-traffic network test system. Figure 2b This is the topology reconstruction failure recovery result diagram.
[0144] Figure 3 1 is a flow diagram of pipes and canals at different times in methods 1 to 3 under a rainstorm disaster in an embodiment of the present invention, wherein (a) is a flow diagram of pipes and canals (3, 2), and (b) is a flow diagram of pipes and canals (3, 8). DETAILED DESCRIPTION
[0145] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0146] like Figure 1As shown, the embodiment of the present invention considers the impact of traffic delays or even paralysis caused by heavy rain and flood disasters on the traffic capacity of mobile emergency power supply vehicles and emergency drainage vehicles, and constructs a power-drainage network coupling model based on the partial differential constraints of pressure / non-pressure non-steady flow hydrodynamics to characterize the dynamic interactive evolution process of power grid blackouts, rainwater overflow and road waterlogging under heavy rain disasters. Secondly, the equivalent linear complex algebraic equation of the nonlinear hydrodynamic partial differential equation of the drainage network is established in the frequency domain through Laplace transform to achieve high-quality solution of hyperbolic nonlinear equations. Then, the multi-hyperplane formula of the power-drainage composite safety area is further derived to characterize the feasible operating boundary of the electric pump-sluice group under complex power and rainwater injection conditions. Finally, considering the uncertainty of rainfall in heavy rain weather, a rolling optimization model of the urban emergency linkage decision-making plan based on the Monte Carlo simulation method is constructed, and considering the optimization solution speed of the model, an equivalent linear method is further proposed for the nonlinear formula in the model to realize the emergency linkage operation of the coordinated reconstruction of the urban distribution network and drainage network topology. The details are as follows:
[0147] 1. Construct a power-drainage network coupling model and topology transformation coordinated regulation model under heavy rain weather based on the partial differential constraints of pressurized / unpressurized non-steady flow dynamics.
[0148] (1) Constructing a drainage network model based on pressurized / unpressurized unsteady flow hydrodynamic constraints
[0149] The distribution network model mainly includes a network topology model and a power flow calculation model. The network topology model calculates the optimal network radial topology by changing the working state of the remote switch. The power flow calculation then calculates the power and voltage distribution of the distribution network nodes through the given topology structure and node branch parameters. The embodiment of the present invention will use the linearized Disflow power flow model to describe the dynamic power flow during the reconstruction of the radial distribution network.
[0150] The distribution of drainage network is complicated. The opening and closing of sluice gates and the start and stop of pump stations may cause the flow and water level in the drainage network pipes to change. When the rainfall is small, the water level in the drainage pipes is low and does not reach the top of the pipes. At this time, the water flow in the pipes can be regarded as a pressureless non-steady flow. The Saint-Venant equation is used to describe the changes of hydraulic elements such as pipe water level and flow along the pipe or channel direction. Assuming that the bottom elevation of the drainage network pipe is zero, and assuming that the cross-section of the channel or pipe is a rectangular shape with constant shape, we have:
[0151] (1)
[0152] (2)
[0153] (3)
[0154] (4)
[0155] In the formula, for Time Channel The cross-sectional area of water flow; For time, is the axial coordinate along the channel; For pipes Confluence flow; For pipes water depth; is the cross-sectional area of the conduit, It means that the pipeline is in a state of pressurized non-steady flow. It means that the pipe is in a non-pressured non-steady flow state; For pipes The hydraulic gradient is the change in the horizontal height of the water flow in the conduit; For pipes The channel bottom slope; Represents the acceleration due to gravity, with a value of 9.81 m / s 2 ; , are Manning coefficient and hydraulic radius respectively; , They are time set and channel set respectively; is the channel width.
[0156] When heavy rain falls in rainstorms, a large amount of rainwater flows into the canal, causing the water level in the canal to reach the top of the canal. At this time, the canal water flow will be in a state of pressurized non-constant flow. For the hydrodynamic calculation of canal pressurized flow, the embodiment of the present invention uses the Preissmann narrow slit method to make the water level in the canal pressurized non-constant flow state equivalent to the water level in the non-pressurized non-constant flow, and further uses the Saint-Venant equations to describe it:
[0157] (5)
[0158] (6)
[0159] In the formula, Indicates the height of the rectangular conduit; The assumed virtual slit width; Indicates the pressure flow wave velocity.
[0160] The initial conditions and boundary conditions of the partial differential equation of the drainage network hydrodynamics are as follows:
[0161] (7)
[0162] (8)
[0163] In the formula , For pipes At the initial moment The water depth and flow rate, The upper limit of the flow rate; is the lower limit of flow rate; is the length of the river.
[0164] Assuming that all rainwater collection wells are open during heavy rain, rainwater can flow into the underground drainage network or overflow onto the road surface of the traffic network through the wells. Formula (9) shows the rainwater inflow and overflow of the rainwater collection well:
[0165] (9)
[0166] In the formula, For road surface and rainwater collection wells The traffic exchange volume is When the rainwater is collected from the rainwater collection well Overflow to the road, when When ; , Represents rainwater collection wells Radius and depth; is the terrain elevation; , They represent the weir flow coefficient and orifice outflow coefficient respectively; Indicates rainwater collection well exist The depth of the water at the moment; for Time Road Depth of water on the road surface; represents a road set; Indicates connecting pipes and roads Rainwater collection wells on the road surface; It is the height from the bottom of the rainwater collection well to the water surface.
[0167] The depth of road water accumulation needs to be calculated by comprehensively considering the rainfall, drainage of underground drainage network, emergency drainage by emergency drainage vehicles, and rainwater loss caused by evaporation and infiltration during rainfall. The water exchange between different roads is not considered here, and the final road water accumulation depth is obtained. The calculation formula is:
[0168] (10)
[0169] (11)
[0170] In the formula, express Time Road rainfall; Indicates the road catchment area; for Time Drainage Truck Drain into rainwater collection well The amount of water; Indicates the assembly of emergency drainage vehicles; represents a road set; for The amount of rainwater lost at any given moment due to evaporation and infiltration.
[0171] (2) Constructing a coordinated control model for distribution network reconstruction and drainage network flow topology transformation
[0172] The distribution network reconstruction needs to meet the node power balance and line capacity constraints, as shown in equations (12) and (13). At the same time, the node load reduction should be limited to the allowable range, as shown in equation (14),
[0173] (12)
[0174] (13)
[0175] (14)
[0176] In the formula, , They are used to inject mobile emergency power supply and distributed power supply into grid nodes respectively. The active power, , They are used to inject mobile emergency power supply and distributed power supply into grid nodes respectively. Reactive power; , They are Timeline Active and reactive currents flowing through; , They are Timeline Active and reactive currents flowing through; , They are Time grid node Active power demand and reactive power demand of the pumping station; , They are Time grid node Active power demand and reactive power demand of the sluice gate; , They are Time grid node Other active and reactive loads except pump and gate loads; , They are Time grid node Active load reduction and reactive load reduction; It is a collection of power grid branches; is a collection of power grid nodes.
[0177] The distribution network reconstruction constraint should also satisfy the distribution network radial network constraint, as shown in equations (15)-(19):
[0178] (15)
[0179] (16)
[0180] (17)
[0181] (18)
[0182] (19)
[0183] In the formula, and express Timeline Connectivity state variable, if the line Closed, then , If the line If disconnected, ; is a 0-1 state variable, where Representation Node Is a node If not, then ; To express Timeline A 0-1 variable for the switch state change, where Indicates that the circuit breaker is closed. Indicates that the line switch is open.
[0184] Referring to the reconstruction of the distribution network, the drainage network can be abstracted into a connected graph through the basic principles of graph theory, in which sluice gates, drainage pumping stations, pipe-channel intersections, rainwater collection wells and rainwater storage tanks can be regarded as nodes, and pipes can be regarded as branches, corresponding to the edges in the connected graph. Among them, the relationship between the drainage pumping flow and power and the operating power limit of the drainage pumping station are as follows:
[0185] (20)
[0186] (twenty one)
[0187] (twenty two)
[0188] In the formula, for Time drainage pump station Active power consumed; for Time drainage pump station The extraction flow rate; is the water density; For drainage pumping station drainage efficiency; For drainage pumping station of water head; for Time drainage pump station Reactive power consumed; For drainage pumping station Power factor; , Separate drainage pump station The upper and lower limits of operating power; express Time drainage pump station A binary variable for the start / stop state; Represents a collection of drainage pumping stations.
[0189] During the operation of the drainage pump station, if the power supply of the power grid is lower than the minimum power limit To avoid damage to the drainage pump station, the drainage pump station will automatically shut down, as follows:
[0190] (twenty three)
[0191] In the formula, Any positive number.
[0192] The calculation formula for active power and reactive power consumed by the opening and closing of the sluice gate in the drainage pump station is as follows:
[0193] (twenty four)
[0194] (25)
[0195] In the formula, , They are Water gate at all times Active and reactive power consumed; Indicates sluice gate A binary variable in the on state. Always open the floodgates ,have , and when Keep the floodgates closed at all times ,have ; Indicates sluice gate Active power of a single start and stop; For sluice gate Power factor; Gather for the sluice gate.
[0196] The opening and closing of the sluice gate will directly affect the flow rate of the canal. When the sluice gate is closed, the flow rate of the canal is zero. When the sluice gate is opened, the flow rate of the canal should not exceed the maximum flow rate of the sluice gate:
[0197] (26)
[0198] In the formula, is a 0-1 variable indicating the operation status of the pipeline, where 0 indicates the closed state and 1 indicates the pipeline is in a closed state. In a connected state; For sluice gate Maximum water flow rate; To express A 0-1 variable indicating the flow state of the pipe at the moment, where Indicates water flow from Flow to Node , if not, then .
[0199] In addition, frequent changes in the opening and closing status of the sluice gate will lead to unstable hydrodynamic characteristics of the pipeline. It is necessary to ensure that the opening and closing time interval and the number of opening and closing times allowed by the sluice gate within the scheduling cycle are within a reasonable range, as shown below:
[0200] (27)
[0201] (28)
[0202] (29)
[0203] (30)
[0204] In the formula, Indicates sluice gate A binary variable in the closed state, when Always open the floodgates ,have , and when Keep the floodgates closed at all times ,have ; , They are the minimum opening time and minimum closing time of the electric water gate respectively; Indicates the maximum number of times the sluice gate is allowed to be opened and closed within the scheduling cycle; Indicates the length of the scheduling time domain. Set the opening time intervals for all sluice gates; The set of closing time intervals for all sluice gates; express and Moment elements of the collection; is a set of positive integers.
[0205] When a blockage occurs in the urban drainage network, rainwater overflow will occur at both ends of the faulty pipeline. At this time, the nodes at the beginning and end of the pipeline should be regarded as faulty nodes, as shown in equations (31)-(34). At the same time, considering the difficulty of repairing underground drainage network pipelines in rainstorm weather, pipeline fault repair is not considered here. Therefore, after the pipeline fault occurs, the fault will always exist during the scheduling cycle, as shown in equations (35) and (36):
[0206] (31)
[0207] (32)
[0208] (33)
[0209] (34)
[0210] (35)
[0211] (36)
[0212] In the formula, express Time channel node 0-1 variable for the fault status, express Time channel node A 0-1 variable of the fault status, where 0 indicates that the node is a non-faulty node and 1 indicates that the node is a faulty node; express Time Channel A 0-1 variable for the fault status, where 0 means the conduit is in a non-faulty state and 1 means the conduit is in a faulty state.
[0213] In addition, if a connected pipeline fails, the sluice gate at its location will be closed to isolate the fault, as shown in equations (37) and (38). Equation (39) indicates that the sluice gate located on the faulty pipeline cannot be used to reconstruct the drainage network flow topology:
[0214] (37)
[0215] (38)
[0216] (39)
[0217] The connectivity of drainage network pipes is affected by the opening and closing status of the sluice gates, as shown in equations (40)-(42). In addition, in order to avoid poor drainage and prevent water flow from impacting the walls of pipes with different diameters, the topological reconstruction of the drainage network flow direction should also ensure that the total cross-sectional area of the connecting pipes at the outlet of a single pipe is not less than the total cross-sectional area of the connecting pipes at the inlet of the pipe, as shown in equations (43) and (44):
[0218] (40)
[0219] (41)
[0220] (42)
[0221] (43)
[0222] (44)
[0223] In the formula, To express A 0-1 variable indicating the flow state of the pipe at the moment, where Indicates water flow from Flow to Node , if not, then ; For The node is the outlet node of the pipeline Cross-sectional area; For The node is the inlet node of the pipeline Cross-sectional area; Indicates export and The collection of pipes and conduits connected to the node; Entrance and A collection of pipes and conduits connected to a node.
[0224] 2. Based on Laplace transform, the equivalent linear complex algebraic equation of the nonlinear hydrodynamic partial differential equation of the drainage network is established in the frequency domain.
[0225] The Saint-Venant equations can describe the spatiotemporal dynamic changes of water level and flow in the canal. However, the equations are hyperbolic nonlinear partial differential equations and cannot be directly used for topological reconstruction and optimization of distribution network and drainage network. Therefore, this embodiment uses Taylor expansion technology to perform linear approximation preprocessing on the Saint-Venant equations shown in equations (1) and (2), and let Time Drainage Network The changes in water depth and flow rate are and ,but The water depth and flow rate at a given moment can be expressed as and Based on Taylor expansion, equations (1) and (2) and The functional relationship between them can be written as,
[0226] (45)
[0227] In the formula represents a higher-order remainder. Indicates flow rate, Indicates water depth.
[0228] Ignoring the higher-order remainder of Taylor expansion, equation (1) can be linearized into (46):
[0229] (46)
[0230] The partial differential equation (2) consists of four terms. Each term of the partial differential equation (2) is linearized. The first term of equation (2) can be directly linearized. It can be Taylor expanded to:
[0231] (47)
[0232] make and , then there is,
[0233] (48)
[0234] In the formula, It represents the water velocity per unit cross section.
[0235] For equation (48), find The partial derivative of is:
[0236] (49)
[0237] because ,and ,therefore about The partial derivative of is expressed as:
[0238] (50)
[0239] Since the cross section of the conduit is assumed to be a rectangular shape with constant shape, , , combine it with (50) and substitute it into (49), then we have:
[0240] (51)
[0241] Similarly, by linearizing the third and fourth terms of equation (2), the partial differential equation (2) can be finally linearized into the following linear partial differential equation: , , , , and , is the process variable, where ; , then:
[0242] (52)
[0243] (53)
[0244] (54)
[0245] (55)
[0246] In the formula, represents the water velocity per unit cross section, .
[0247] However, equations (52)-(55) are still difficult to be directly used for the optimal reconstruction of the drainage network flow direction topology. Then, the Laplace transform analysis method of the circuit is used to transform the time domain linear partial differential equations (52)-(55) into complex frequency domain equations (56) and (57) through Laplace transform to simplify the optimization solution process:
[0248] (56)
[0249] (57)
[0250] In the formula, is a complex frequency domain variable; and Respectively represent matrices The characteristic value of express Time Channel The change in flow rate, express Time Channel The amount of change in water depth; is the width of the channel; is the determinant of the matrix. For the convenience of formula expression, take the matrix It is an intermediate variable and has no specific meaning.
[0251] The flow and water level conditions at the inlet and outlet boundaries of the pipe are and , then the analytical solutions of equations (56) and (57) are:
[0252] (58)
[0253] During the drainage process, the flow in the canal is mainly achieved by controlling the pumping flow of the drainage pump gate at the inlet and outlet nodes of the canal. The initial boundary condition of the drainage network canal should be the inlet node of the canal. and exit nodes Flow rate change and Therefore, the water level at the inlet node of the canal can be derived by matrix transformation: and the exit node water level and the transfer matrix of flow changes And the relationship equation is:
[0254] (59)
[0255] Furthermore, the pump section uses the integral delay zero technique to approximate the transfer matrix , the matrix will be transferred It is approximately an approximate matrix composed of the superposition of low-frequency terms and high-frequency terms. :
[0256] (60)
[0257] (61)
[0258] In the formula, represents the time delay coefficient of water flow in pipes and canals; is the backwater area; , , and represents the high frequency terms of the transfer matrix. , It is an intermediate variable in the derivation of the formula and has no practical meaning. Since the focus is on the change of water level in the canal under rainy weather, the high-frequency part of the transmission matrix is ignored here. Then (59) can be expressed as:
[0259] (62)
[0260] Then, by applying the inverse Laplace transform, the time domain relationship between the change in water depth at the outlet node of the canal and the change in flow at the inlet and outlet nodes of the canal can be obtained as follows:
[0261] (63)
[0262] In the formula, express Time Channel The change of water depth at the outlet node; express Time Channel The traffic change of the inlet node, where Indicates pipe Water flow delay coefficient; express Time Channel The traffic change at the egress node; express Time Channel The change in water depth at the outlet node, Indicates the time change.
[0263] The velocity of the pressure wave of water flow inside the pipe is much greater than the velocity of the gravity wave of water flow, so the time delay coefficient of water flow in the pipe under heavy rain is approximated as:
[0264] (64)
[0265] In the formula, Indicates pipe Length of pipeline; Indicates the pressure flow wave velocity.
[0266] Assumptions , the relationship equation between the water depth at the outlet node of the pipe and the flow rate change at the inlet and outlet under heavy rain weather can be established as follows:
[0267] (65)
[0268] (66)
[0269] In the formula, Express Round down.
[0270] 3. Derive the multi-hyperplane formula of the power-drainage composite safety area to characterize the feasible operation boundary of the electric pump-sluice group under complex power and rainwater injection conditions.
[0271] In order to describe the changes of node voltage amplitude and water depth with the changes of net power injection and net rainwater injection, equations (67) and (68) are established to evaluate the safety area of the power-drainage network.
[0272] (67)
[0273] (68)
[0274] In the formula, The upper limit of water depth is The difference in water depth at that time; is the upper limit of voltage amplitude and The difference in voltage amplitude at each moment; represents the vectors related to the control variables of the drainage network and the distribution network; represents the component constant; The constant coefficient matrix representing the current drainage network topology, A constant coefficient matrix representing the current distribution network topology; Indicates that the conduit inlet is The flow rate change at each moment; , Indicates that the rainwater storage tank is Changes in water storage and discharge flow at each moment; express Change in water flow at the outlet at each moment; Indicates that the drainage pump station The change in displacement at each moment; , Indicates the change in active power and reactive power of the distribution network.
[0275] If the drainage network node Depth of water or Node The node voltage amplitude When the upper limit is reached, the corresponding or is equal to zero. In addition, when the voltage amplitude of a node in the distribution network or the water level of a node in the drainage network reaches the upper limit, the control variable will reach the critical operating point. Therefore, (67) and (68) can be written as:
[0276] (69)
[0277] In the formula, the superscript of physical quantity is represents adjacent values, so it contains The formula variables correspond to the critical working points of the distribution network and the drainage network respectively. , , , , , , They correspond to the flow at the canal inlet, the amount of water stored in the rainwater storage tank, the discharge flow of the rainwater storage tank, the water flow at the outlet, the discharge of the drainage pump station, the upper limit of the active power of the distribution network, and the upper limit of the reactive power of the distribution network. Then, equation (69) can be equivalently normalized into the following hyperplane equation:
[0278] (70)
[0279] (71)
[0280] (72)
[0281] In the formula, is the element parameter matrix, where The constant coefficient matrix representing the modified drainage network topology, The constant coefficient matrix representing the modified distribution network topology. The larger the matrix coefficient value, the greater the impact of the change in rainwater / power injection on the water depth and voltage magnitude. and represents a unit vector.
[0282] Similarly, the lower limits of water depth and voltage amplitude are derived according to the process shown in equations (67)-(72), and finally the composite safety area of the power-drainage network is obtained, as shown in equation (73), where and represents the constant coefficient matrix, which is related to the critical operating point and corresponds to the lower limit of water depth and voltage amplitude:
[0283] (73)
[0284] 4. Considering the uncertainty of rainfall in heavy rain weather, multi-scenario stochastic optimization based on Monte Carlo simulation is adopted to solve the emergency dispatch decision plan at the current moment through rolling optimization.
[0285] (1) Objective function
[0286] Taking into account the uncertainty of rainfall in heavy rain weather, this patent adopts multi-scenario stochastic optimization based on Monte Carlo simulation to perform rolling optimization solutions for the current emergency dispatch decision plans of key facility components of each mobile emergency resource, distribution network and drainage network, and future dispatch decision plans that include rainfall randomness.
[0287] The scheduling objective function is the current time The amount of power grid load reduction, road surface water depth, and the next moment Until the end of the scheduling The sum of power load reduction and road water depth is minimum:
[0288] (74)
[0289] In the formula, is the weight factor; To represent the distribution network node The weight coefficient of the upper load priority, Indicates a rainstorm scene The probability of occurrence, and ; Indicates the total number of scenes; The scheduling end time. Since there are multiple different decisions to achieve the optimal tax-inclusive goal during the optimization solution, it is necessary to calculate and select the emergency scheduling decision plan with the largest safety area through formula (73) to cope with the upcoming rainstorm disaster.
[0290] (2) Constraints on emergency drainage and power supply guarantee in urban power distribution systems
[0291] The pressure / unpressure non-steady flow hydrodynamic constraints of the drainage network are shown in equations (1)-(11), the flow direction topology reconstruction constraints of the drainage network are shown in equations (12)-(44), the flow balance constraints of the drainage network nodes are shown in equation (75), the water level balance constraints of the drainage network nodes are shown in equation (76), the dispatching and operation constraints of the mobile emergency vehicle are shown in equations (77)-(80), and the DG operation constraints are shown in equations (81)-(82):
[0292] (75)
[0293] (76)
[0294] (77)
[0295] (78)
[0296] (79)
[0297] (80)
[0298] (81)
[0299] (82)
[0300] In the formula, express Time Channel Export flow; Indicates pipe Inlet flow; Indicates that water flows into the node A collection of pipes and conduits; Indicates the water flow out of the node A collection of pipes and conduits; express Time Drainage Truck Enqueue Node Traffic volume; and Represents rainwater storage tank exist The amount of water stored and the discharge flow at each moment; For Node Drainage pump station exist Displacement at the time; for Time Channel Water level at the outlet; for Time Channel Water level at the inlet; express Time Drainage Network Node water level; represents the vehicle travel time on non-flooded roads; Indicates that the vehicle is Time Road Travel time; Indicates the road Length; For the road The design speed of vehicles when there is no water on the road surface; and Road The median value of the road surface water depth threshold and the elastic attenuation coefficient during the interruption; Indicates mobile emergency vehicle From the parking garage Arrival Node Journey time; To indicate the road Is it a path? 0-1 variables, Indicates the road Belong to the path ; Indicates mobile emergency vehicle In the parking garage A 0-1 variable for the deployment status, Indicates deployment to this node; is a 0-1 variable, Indicates mobile emergency vehicle exist From the parking garage Passing the path Arrival Node ; and represent the road set and the flooded road set respectively; From the parking garage Arrival Node A set of paths; Indicates a parking garage collection; Indicates the set of distribution network nodes to which the emergency power supply vehicle can be connected; Indicates the set of nodes that the emergency drainage vehicle can access; and They represent the collection of emergency drainage vehicles and emergency power supply vehicles respectively; and Respectively Maximum and minimum output power; and They are Downward and upward climbing power constraints; express gather.
[0301] 5. An equivalent linearization method for nonlinear dual-variable radial topology constraints of power grid reconstruction and the collection well flow calculation formula is proposed.
[0302] The decision-making optimization problem of coordinated reconstruction of power-water networks under heavy rain disasters is a MINLP problem involving a large number of 0-1 variables. Constraint (9) is a nonlinear constraint and cannot be directly solved by existing commercial solvers. It is necessary to use effective linear approximation methods to linearize the nonlinear constraints. For the discontinuous piecewise linear function (9), firstly, the pipe and channel water depth The feasible domain is divided into Section The left and right endpoints of the segment are set to and , then the discontinuous piecewise linear function (9) can be transformed into the following linear constraint:
[0303] (84)
[0304] (85)
[0305] (86)
[0306] (87)
[0307] In the formula, and are continuous variables; is a 0-1 variable; Indicates rainwater collection well exist The depth of the water at the moment; Indicates The depth of the rainwater collection well.
[0308] In summary, the decision optimization of coordinated reconstruction of power-water network under heavy rain disaster can be transformed into MILP problem. This embodiment uses Jupyter Notebook platform for programming, and uses Python language to call commercial mathematical optimization software Gurobi9.5.1 to solve the emergency linkage optimization decision model.
[0309] The modified IEEE 33-node distribution network, 37-node drainage network and 21-node transportation network are used as follows: Figure 2a The urban area power distribution-drainage-traffic network test system shown in the figure. Assume that the distribution network lines 8-9 and pipes 25-31 fail. Figure 2b The figure shows the topology reconstruction result under the proposed method. The superiority of the proposed emergency linkage decision-making method is verified by three comparative methods: 1) Method 1 is the urban distribution network and drainage network topology collaborative reconstruction method proposed in the embodiment of the present invention; 2) Method 2 is the distribution network and drainage network emergency decision-making method without considering the drainage network flow topology reconstruction; 3) Method 3 only uses the distribution network reconstruction method to restore the power supply of the pump station group, without considering the drainage vehicle and drainage network topology reconstruction.
[0310] Figure 3 The figure shows the canal flow at different times in methods 1-3 under heavy rain disasters. Table 1 shows the comparison of optimization results of different performance indicators of methods 1-3 under heavy rain disasters. Figure 3 It can be seen that the flow in canal (3, 2) of method 1 is the smallest, while the rainwater flow in canals (3, 8) and (8, 7) of method 1 increases significantly. This is mainly because methods 2 and 3 do not consider the reconstruction of the drainage network flow topology. The rainwater flow in canal (3, 4) will all flow into canal (3, 2). This shows that method 1 can effectively adjust the drainage network flow topology according to the distribution network fault situation to speed up drainage and support grid reconstruction.
[0311] Table 1 shows the comparison of optimization results of different performance indicators of methods 1-3 under heavy rain disasters. From the analysis of Table 1, it can be seen that considering the coordinated reconstruction of the drainage network flow topology and the distribution network topology can effectively reduce the reduction of key loads of the distribution network and the flooding depth of the traffic network roads. The load reduction rate of important nodes of the distribution system is reduced from 41.40% to 23.93%, and the average flooding depth of the traffic network roads is reduced by more than 68mm, which verifies the superiority of the proposed method.
[0312] Table 1 Comparison of optimization results of different performance indicators of methods 1-3 under heavy rain disasters
[0313]
[0314] Each embodiment in this specification is described in a related manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0315] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention are included in the protection scope of the present invention.
Claims
1. A method for coordinating topological reconstruction of distribution network and drainage network to cope with rainstorm waterlogging disasters, characterized in that: The following steps are involved: Step S1, constructing a power-drainage network coupling model based on partial differential constraints of pressurized and unpressurized unsteady flow dynamics to characterize the dynamic interactive evolution process of power grid outage, rainwater overflow and road waterlogging under heavy rain disasters; Step S2, establishing an equivalent linear complex algebraic equation of the nonlinear hydrodynamic partial differential equation of the drainage network in the frequency domain; Step S3, deriving a multi-hyperplane formula for the power-drainage composite safety region, characterizing the feasible operation boundary of the electric pump-sluice group under complex power and rainwater injection conditions; Step S4: Considering the uncertainty of rainfall in rainstorm weather, multi-scenario stochastic optimization based on Monte Carlo simulation is adopted to solve the emergency dispatch decision plan at the current moment through rolling optimization; The step S1 includes constructing a drainage network model based on the partial differential constraints of pressurized and unpressurized non-steady flow water dynamics and constructing a coordinated control model of distribution network reconstruction and drainage network flow direction topology transformation; wherein, constructing a drainage network model based on the partial differential constraints of pressurized and unpressurized non-steady flow water dynamics is specifically as follows: The water level in the drainage channel has not reached the top of the channel. At this time, the water flow in the channel is regarded as a pressure-free non-steady flow; assuming that the bottom elevation of the drainage network channel is zero, and assuming that the channel or pipe cross-section is a rectangular shape with constant shape, we have: ; ; ; ; In the formula, for Time Channel Cross-sectional area of water flow; For the moment, is the axial coordinate along the channel; For pipes Confluence flow; For pipes water depth; is the cross-sectional area of the conduit, It means that the pipeline is in a state of pressurized non-steady flow. It means that the pipe is in a state of unpressurized non-steady flow; For pipes The hydraulic gradient is the change in the horizontal height of the water flow in the conduit; For pipes The channel bottom slope; Represents the acceleration due to gravity, with a value of 9.81 m / s 2 ; , are Manning coefficient and hydraulic radius respectively; , They are time set and channel set respectively; is the width of the pipe; When rainwater pours into the canal during heavy rain, causing the water level in the canal to reach the top of the canal, the canal water flow will be in a pressurized non-constant flow state: ; ; In the formula, Indicates the height of the rectangular conduit; is the assumed virtual narrow slit width; It indicates the pressure flow wave velocity; The initial conditions and boundary conditions of the drainage network model with partial differential constraints for unsteady and unsteady flow are as follows: ; ; In the formula , For pipes At the initial moment The water depth and flow rate, The upper limit of the flow rate; is the lower limit of flow rate; is the length of the river; Road water depth The calculation formula is: ; ; In the formula, For road surface and rainwater collection wells The traffic exchange volume is When the rainwater is collected from the rainwater collection well Overflow to the road, when When ; express Time Road rainfall; Indicates the road catchment area; for Time Drainage Truck Drain into rainwater collection well The amount of water; Indicates the assembly of emergency drainage vehicles; represents a road set; for The amount of rainwater lost at any given moment due to evaporation and infiltration; The process of constructing the coordinated control model of distribution network reconstruction and drainage network flow direction topology transformation is specifically as follows: The distribution network reconstruction must meet the node power balance and line capacity constraints. At the same time, the node load reduction should be limited to the allowable range: ; ; ; In the formula, , They are used to inject mobile emergency power supply and distributed power supply into grid nodes respectively. The active power, , They are used to inject mobile emergency power supply and distributed power supply into grid nodes respectively. Reactive power; , They are Timeline Active and reactive currents flowing through; , They are Timeline Active and reactive currents flowing through; , They are Time grid node Active power demand and reactive power demand of the pumping station; , They are Time grid node Active power demand and reactive power demand of the sluice gate; , They are Time grid node Other active and reactive loads except pump and gate loads; , They are Time grid node The reduction of active load and reactive load, is a set of power grid nodes; The distribution network reconstruction constraints should also satisfy the distribution network radial network constraints: ; ; ; ; ; In the formula, and express Timeline Connectivity state variable, if the line Closed, then , , if the line If disconnected, , ; is a 0-1 state variable, where Representation Node Is a node If not, then ; is a 0-1 state variable, where Representation Node Is a node If not, then ; To express Timeline A 0-1 variable for the switch state change, where Indicates that the circuit breaker is closed. Indicates that the line switch is disconnected; It is a collection of power grid branches; The relationship between the drainage flow and power of the drainage pump station in the drainage network and the operating power limit of the drainage pump station are as follows: ; ; ; In the formula, for Time drainage pump station Active power consumed; for Time drainage pump station The extraction flow rate; is the water density; For drainage pumping station drainage efficiency; For drainage pumping station of water head; for Time drainage pump station Reactive power consumed; For drainage pumping station Power factor; , Separate drainage pump station The upper and lower limits of operating power; express Time drainage pump station A binary variable for the start / stop state; It represents a collection of drainage pumping stations; During the operation of the drainage pump station, if the power supply of the power grid is lower than the minimum power limit To avoid damage to the drainage pump station, the drainage pump station will automatically shut down, as follows: ; In the formula, is any positive number; For drainage pumping station The extraction flow rate; The calculation formula for active power and reactive power consumed by the opening and closing of the sluice gate in the drainage pump station is as follows: ; ; In the formula, , They are Water gate at all times Active and reactive power consumed; Indicates sluice gate A binary variable in the on state. Always open the floodgates ,have , and when Keep the floodgates closed at all times ,have ; Indicates sluice gate Active power of a single start and stop; For sluice gate Power factor; Assemble for the sluice gate; When the sluice gate is closed, the flow rate of the pipe is zero. When the sluice gate is opened, the flow rate of the pipe does not exceed the maximum flow rate of the sluice gate: ; In the formula, is a 0-1 variable indicating the operation status of the pipeline, where 0 indicates the closed state and 1 indicates the pipeline is in a closed state. In a connected state; For sluice gate Maximum water flow rate; To express A 0-1 variable indicating the flow state of the pipe at the moment, where Indicates water flow from Flow to Node , if not, then ; In addition, frequent changes in the opening and closing status of the sluice gate will lead to unstable hydrodynamic characteristics of the pipeline. It is necessary to ensure that the opening and closing time interval and the number of opening and closing times allowed by the sluice gate within the scheduling cycle are within a reasonable range, as shown below: ; ; ; ; In the formula, Indicates sluice gate A binary variable in the closed state, when Always open the floodgates ,have , and when Keep the floodgates closed at all times ,have ; , They are the minimum opening time and minimum closing time of the electric water gate respectively; Indicates the maximum number of times the sluice gate is allowed to be opened and closed within the scheduling cycle; Indicates the length of the scheduling time domain, Set the opening time intervals for all sluice gates; The set of closing time intervals for all sluice gates; express and The moment element in the collection; is a set of positive integers; When a blockage occurs in a pipe in the urban drainage network, rainwater will overflow at both ends of the pipe. At this time, the nodes at the beginning and end of the pipe should be regarded as fault nodes: ; ; ; ; At the same time, considering the difficulty of repairing underground drainage network pipe faults in rainstorm weather, pipe fault repair is not considered here, so after the pipe fault occurs, the fault will always exist during the scheduling cycle: ; ; In the formula, express Time channel node 0-1 variable for the fault status, express Time channel node A 0-1 variable of the fault status, 0 means the node is a non-faulty node, 1 means the node is a faulty node; express Time Channel A 0-1 variable for the fault state, where 0 means the conduit is in a non-fault state and 1 means the conduit is in a fault state; If a failure occurs in a connected pipeline, the sluice gate at the location will be closed to isolate the failure: ; ; The sluice gate located on the faulty channel cannot be used for drainage network flow topology reconstruction: ; The connectivity of the drainage network is affected by the opening and closing status of the sluice gates: ; ; ; In order to avoid poor drainage and prevent water flow from impacting the wall of different-diameter pipes, the topological reconstruction of the drainage network flow direction should also ensure that the total cross-sectional area of the connected pipes at the outlet of a single pipe is not less than the total cross-sectional area of the connected pipes at the inlet of the pipe: ; ; In the formula, To express A 0-1 variable indicating the flow state of the pipe at the moment, where Indicates water flow from Flow to Node , if not, then ; For The node is the outlet node of the pipeline Cross-sectional area; For The node is the inlet node of the pipeline Cross-sectional area; Indicates export and The collection of pipes and conduits connected to the node; For entrance and A collection of pipes and conduits connected to a node.
2. According to claim 1, a method for coordinating topology reconstruction of a distribution network and a drainage network to cope with a rainstorm waterlogging disaster is characterized in that: The step S2 is specifically as follows: The unpressurized unsteady flow drainage model in step S1 is preprocessed by linear approximation to obtain: ; ; ; In the formula, represents the water velocity per unit cross section, , is a complex frequency domain variable; and Respectively represent matrices The characteristic value of express Time Channel The change in flow rate, express Time Channel The amount of change in water depth; is the width of the pipe; is the determinant of the matrix. To facilitate the expression of the formula, take the matrix It is an intermediate variable and has no specific meaning; , They are Time Drainage Network Changes in water depth and flow rate, , , is the process variable; The equation for the relationship between the water depth at the outlet node of the pipe and the flow rate change at the inlet and outlet under heavy rain weather is as follows: ; ; In the formula, express Time Channel The change of water depth at the outlet node; express Time Channel The traffic change of the inlet node, where Indicates pipe Water flow delay coefficient, Express Round down; express Time Channel The traffic change at the egress node; express Time Channel The change of water depth at the outlet node; Indicates pipe The length of the pipe, Indicates the time change.
3. The method for coordinating topology reconstruction of a distribution network and a drainage network to cope with rainstorm waterlogging disasters according to claim 1 is characterized in that: The step S3 is specifically as follows: To describe the changes of node voltage amplitude and water depth with the changes of net power injection and net rainwater injection, the safety area of the power-drainage network is established: ; ; In the formula, The upper limit of water depth is The difference in water depth at that time; is the upper limit of voltage amplitude and The difference in voltage amplitude at each moment; represents the vectors related to the control variables of the drainage network and the distribution network; represents the component constant; The constant coefficient matrix representing the current drainage network topology, A constant coefficient matrix representing the current distribution network topology; Indicates that the conduit inlet is The flow rate change at each moment; , Indicates that the rainwater storage tank is Changes in water storage and discharge flow at each moment; express Change in water flow at the outlet at each moment; Indicates that the drainage pump station The change in displacement at each moment; , Indicates the change in active power and reactive power of the distribution network; is the transpose; If the drainage network node Depth of water or Node The node voltage amplitude When the upper limit is reached, the corresponding or is equal to zero; When the voltage amplitude at a node in the distribution network or the water level at a node in the drainage network reaches the upper limit, the control variable will reach the critical operating point: ; In the formula, the physical quantity superscript " " indicates an adjacent value, so it contains " The variables in the formula "correspond to the critical working points of the distribution network and the drainage network respectively. , , , , , , They correspond to the flow at the inlet of the pipe, the amount of water stored in the rainwater storage tank, the discharge flow of the rainwater storage tank, the water flow at the outlet, the discharge of the drainage pump station, the upper limit of the active power of the distribution network, and the upper limit of the reactive power of the distribution network; The above equation is equivalent to the following hyperplane equation: ; ; ; In the formula, is the element parameter matrix, where , , , , The constant coefficient matrix representing the modified drainage network topology, , , The constant coefficient matrix representing the modified distribution network topology. The larger the matrix coefficient value, the greater the impact of rain changes on water depth, or the greater the impact of power injection changes on voltage magnitude. and represents a unit vector; The lower limits of water depth and voltage amplitude are derived, and finally the composite safety area of the power-drainage network is obtained. , as shown below, where and represents the constant coefficient matrix, which is related to the critical operating point and corresponds to the lower limit of water depth and voltage amplitude: 。 4. A method for coordinating topology reconstruction of a distribution network and a drainage network to cope with rainstorm waterlogging disasters according to claim 2, characterized in that: The step S4 specifically includes constructing an objective function and establishing operation constraints for emergency drainage and power supply guarantee of the power distribution system; wherein the scheduling objective function is: Current moment The amount of power grid load reduction, road surface water depth, and the next moment Until the end of the scheduling The sum of power load reduction and road water depth is minimum: ; In the formula, is the weight factor; To represent the distribution network node The weight coefficient of the upper load priority, Indicates a rainstorm scene The probability of occurrence, and ; Indicates the total number of scenes; The scheduling end time, express Time Road Depth of water on the road surface, for Time grid node The amount of active load reduction.
5. A method for coordinating topology reconstruction of a distribution network and a drainage network to cope with rainstorm waterlogging disasters according to claim 4, characterized in that: The emergency drainage and power supply operation constraints of the distribution system include: pressure / non-pressure non-constant flow dynamic constraints of the drainage network, flow direction topology reconstruction constraints of the drainage network, flow balance constraints of the drainage network nodes, water level balance constraints of the drainage network nodes, dispatching operation constraints of mobile emergency vehicles, and Operational constraints; where: The flow balance constraint of the drainage network node is: ; The water level balance constraint of the drainage network node is: ; The dispatching and operation constraints of mobile emergency vehicles are: ; ; ; ; The operating constraints are: ; ; In the formula, express Time Channel Export flow; Indicates pipe Inlet flow; Indicates that water flows into the node A collection of pipes and conduits; Indicates the water flow out of the node A collection of pipes and conduits; express Time Drainage Truck Enqueue Node Traffic volume; and Represents rainwater storage tank exist The amount of water stored and the discharge flow at each moment; For Node Drainage pump station exist Displacement at the time; for Time Channel Water level at the outlet; for Time Channel Water level at the inlet; express Time Drainage Network Node water level; represents the vehicle travel time on non-flooded roads; Indicates that the vehicle is Time Road Travel time; Indicates the road Length; For the road The design speed of vehicles when there is no water on the road surface; and Road The median value of the road surface water depth threshold and the elastic attenuation coefficient during the interruption; Indicates mobile emergency vehicle From the parking garage Arrival Node Journey time; To indicate the road Is it a path? k 0-1 variables, Indicates the road Belong to the path ; Indicates mobile emergency vehicle In the parking garage A 0-1 variable for the deployment status, Indicates deployment to this node; is a 0-1 variable, Indicates mobile emergency vehicle exist From the parking garage Passing the path Arrival Node ; and represent the road set and the flooded road set respectively; From the parking garage Arrival Node A collection of paths; Indicates a parking garage collection; Indicates the set of distribution network nodes to which the emergency power supply vehicle can be connected; Indicates the set of nodes that the emergency drainage vehicle can access; and They represent the collection of emergency drainage vehicles and emergency power supply vehicles respectively; and Respectively Maximum and minimum output power; and They are Downward and upward climbing power constraints; express gather.
6. The method for coordinating topology reconstruction of distribution network and drainage network to cope with rainstorm waterlogging disasters according to claim 1 is characterized in that: Also includes: Step S5, an equivalent linear method is proposed for the nonlinear formula in the model obtained in S1 to improve the solution speed, and finally realize the emergency linkage operation of the coordinated reconstruction of the distribution network and the drainage network topology.
7. A method for coordinating topology reconstruction of a distribution network and a drainage network to cope with rainstorm waterlogging disasters according to claim 6, characterized in that: The equivalent linearization in step S5 specifically refers to converting the rainwater inflow and overflow functions of the rainwater collection well obtained in step S1 into linear constraints: ; ; ; ; In the formula, and are continuous variables; is a 0-1 variable, Indicates rainwater collection well exist The depth of the water at that moment, Indicates The depth of the rainwater collection well.
Citation Information
Patent Citations
Flexible linkage operation method for urban power distribution network and watershed water system network
CN115173445A
Air-ground emergency resource planning method considering power-communication-traffic network coupling
CN116090677A
Power distribution network and drainage basin network flexibility resource aggregation regulation and control method in high-temperature drought weather
CN116882718A
Power facility submerging risk dynamic assessment and early warning method and system
CN117034810A