A method and system for evaluating the adjustable power consumption capacity of cement industry users

By constructing a cement industry user's adjustable power consumption capability evaluation model based on process flow and energy flow, and combining working condition information and production plan, it evaluates its adjustable power for the power grid, the problem of insufficient interaction between cement industry users and the power grid is solved, and the problem of insufficient interaction between cement industry users and the power grid is improved. The balance between supply and demand of the power grid.

CN118396352BActive Publication Date: 2024-11-29STATE GRID ZHEJIANG ELECTRIC POWER CO MARKETING SERVICE CENT +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410860616.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-11-29
Estimated Expiration
2044-06-28

AI Technical Summary

Technical Problem

The cement industry users have insufficient interaction with the power grid and the low interaction reliability rate has led to a serious imbalance in supply and demand of the power system, and it is urgent to improve the demand-side resource regulation capabilities.

Method used

Construct an adjustable capacity evaluation model for cement industry users based on process flow and energy flow. Combined with working condition information and production plan, and evaluate its adjustable capacity for the power grid by establishing a mixed integer linear model, considering process adjustment and reserve capacity and multi-energy conversion, if energy storage is configured, energy storage constraints will be added.

Benefits of technology

It effectively reduces the error in the evaluation of the adjustable power capacity of cement industry users, improves their ability to participate in the response interaction of grid demand, and enhances the stability of grid operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118396352B_ABST
    Figure CN118396352B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for evaluating the adjustable power capacity of cement industry users. The adjustable power capacity evaluation method of the present invention comprises: establishing an equivalent model of process flow and energy flow of cement industry users based on a typical cement industry production process; establishing an adjustable power capacity evaluation model for cement industry users, taking the maximum adjustable power capacity of cement industry users as the objective function; based on the equivalent model of process flow and energy flow of cement industry users, considering process regulation, process coupling, material storage capacity, production plan, and multi-energy conversion and utilization, establishing constraints for the adjustable power capacity evaluation model for cement industry users. The present invention can realize the effective evaluation of the adjustable power capacity of cement industry users and enhance the ability of cement industry users to participate in interactive regulation of demand response facing the power grid.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an evaluation method and system for evaluating the adjustable power consumption capacity of industrial users participating in power grid interaction, and in particular to an evaluation method and system for the adjustable power consumption capacity of cement industry users considering process technology. Background Art

[0002] With the continuous development of new energy and smart grid technologies, the power system has gradually transformed from a traditional centralized power system to a distributed power system, resulting in the need for more demand-side flexibility resources to participate in the regulation of the power grid. In addition, under the "dual carbon" goal, electricity substitution is implemented on the energy consumption side, and the demand for electricity has further increased. The imbalance between supply and demand in the power system has become more serious, and it is urgent to further explore the adjustable potential of demand-side resources to alleviate the contradiction between supply and demand.

[0003] Realizing the supply and demand interaction between the power grid and users through demand response is one of the effective ways to alleviate the imbalance between supply and demand of the power system and improve the stability of power grid operation. As one of the potential adjustable resources on the demand side of the current power system, the cement industry is accompanied by the conversion and utilization of energy such as electricity and heat during the production and manufacturing process, and has great adjustment potential. In the cement production process, there is a situation where the yield of the previous process is greater than the yield of the next process. Therefore, the raw material crushers and various types of grinding mills of cement industry users can transfer the power supply pressure during peak loads through interruption and translation; the rotary kiln of the clinker burning process can also participate in the regulation by reducing production. In addition, the material reserve warehouse equipped by cement industry users also brings great flexible adjustment capabilities, and has great scheduling potential to participate in the demand side response of the power grid.

[0004] Currently, there is insufficient interaction between cement industry users and the power grid, and the reliability of interaction is low. Summary of the invention

[0005] The purpose of the present invention is to propose a method and system for evaluating the adjustable electricity capacity of cement industry users taking into account process technology. It constructs an evaluation model for the adjustable electricity capacity of cement industry users based on process flow and energy flow to achieve effective evaluation of the adjustable electricity capacity of cement industry users and enhance the ability of cement industry users to participate in interactive regulation of demand response facing the power grid.

[0006] To this end, the present invention adopts the following technical solution: a method for evaluating the adjustable power consumption capacity of cement industry users, which comprises:

[0007] Step 1: Based on the typical cement industry production process, establish an equivalent model of cement industry user process flow and energy flow;

[0008] Step 2: Establish an evaluation model for the adjustable power consumption capacity of cement industry users, with the maximum adjustable power consumption capacity of cement industry users as the objective function. The adjustable capacity is represented by the difference between the power demand of cement industry users to the grid predicted when producing according to the production plan and the power demand of cement industry users to the grid after considering the adjustable process;

[0009] Step 3: If the cement industry user configures an energy storage system, then establish the energy storage system charging and discharging constraints and capacity constraints; if no energy storage system is configured, directly proceed to step 4;

[0010] Step 4: Based on the equivalent model of process flow and energy flow of cement industry users, the constraints of the electricity adjustable capacity evaluation model of cement industry users are established by considering process adjustment, process coupling, material storage capacity, production plan, and multi-energy conversion and utilization.

[0011] Most of the existing methods for evaluating the adjustable power consumption capacity evaluate the responsiveness of the cement industry based on historical data fitting, while the present invention is based on an equivalent model of process flow and energy flow, combined with the operating information, production plan and multi-energy conversion relationship of cement industry users, taking into account the full-process production process of cement users, and evaluating their adjustable capacity for the power grid, which can effectively reduce the evaluation error of the cement industry's regulation capacity.

[0012] The cement industry user power adjustable capacity assessment model established in the present invention is a mixed integer linear model, and the model solution is achieved by calling the commercial solver Gurobi.

[0013] Furthermore, in step 1, the cement industry user process flow and energy flow equivalent model includes a raw material crushing process, a raw material grinding process, a clinker burning process, a cement grinding process, a coal grinding process, a raw material reserve warehouse, a raw material reserve warehouse and a clinker reserve warehouse. The raw material reserve warehouse is located between the raw material crushing process and the raw material grinding process, the raw material reserve warehouse is located between the raw material grinding process and the clinker burning process, the clinker reserve warehouse is located between the clinker burning process and the cement grinding process, and the material output from the coal grinding process enters the clinker burning process;

[0014] In the cement manufacturing process, the power supply is respectively supplied to the raw material crushing process, raw material grinding process, clinker burning process, cement grinding process, coal grinding process, raw material storage warehouse, raw material storage warehouse and clinker storage warehouse. The clinker burning process improves energy utilization rate through waste heat power generation, which consists of 8 nodes and 21 branches.

[0015] Furthermore, in step 1, the process flow and energy flow equivalent model of cement industry users is used to obtain the process flow and energy flow branch set as follows:

[0016] (1)

[0017] in, , They are the electricity demand for the grid and the waste heat power generation; - They are the electricity consumption of the raw material crushing process, raw material storage warehouse, raw material grinding process, raw material storage warehouse, coal grinding process, clinker burning process, clinker storage warehouse and cement grinding process; The heat generated during the clinker burning process. is the heat consumption of the waste heat power generation device; The material consumption of raw material crushing in the raw material crushing process; - They are the material output of the raw material crushing process, raw material grinding process, clinker burning process, coal grinding process and cement grinding process; The amount of material output from the raw material storage warehouse to the raw material grinding process; The amount of material output from the raw material storage to the clinker burning process; The amount of material output from the clinker storage to the cement grinding process.

[0018] Furthermore, in step 2, the objective function is expressed as the following formula:

[0019] (2)

[0020] in, for Always consider the electricity demand of cement industry users to the grid after the adjustable process. for The electricity demand from cement industry users to the grid is predicted when production is carried out according to the production plan at all times.

[0021] Furthermore, in step 3, if the cement industry user has an energy storage system configuration, the energy storage must meet the energy storage system charging and discharging constraints and capacity constraints, as follows:

[0022] (3)

[0023] in, , Energy storage Discharge and charge status at all times; , Respectively The charging and discharging power of energy storage at all times; , Respectively Maximum charging and discharging power of energy storage at all times; Indicates that storage The amount of power stored at any time; , They are the upper and lower limits of energy storage capacity respectively; , are the charging and discharging efficiency of energy storage respectively; , They represent the storage capacity at the initial and final moments of energy storage respectively.

[0024] Furthermore, in step 4, the constraints include process adjustment constraints, process energy and material balance constraints, material reserve inventory constraints, material transfer rate constraints, production plan constraints, and system energy balance constraints.

[0025] Furthermore, in step 4, the process adjustment constraints are as follows:

[0026] a) Discrete regulation constraints

[0027] For raw material crushers, raw material mills and cement grinding mills, if there is enough material in the material reserve and it does not affect the subsequent production, they can be shut down appropriately to participate in the grid demand response. Their operating states are only working and not working, so they belong to discrete regulation. The regulation constraints are established as follows:

[0028] (4)

[0029] in, is a 0-1 variable, subscript i When it is 1, it indicates the raw material crushing process, subscript i When it is 2, it indicates the raw material grinding process, subscript i When it is 5, it indicates cement grinding process; when When The equipment is in a non-working state at all times, and the energy consumption and material output of this link are 0; Indicates that the element is 1 and the dimension is 1× i Matrix of Discrete adjustment of processes for cement industry users The working status matrix at each moment; for The process flow and energy flow branch set at the moment; for Always consider the process flow and energy flow branch set after the discrete adjustable process is adjusted;

[0030] Frequent start and stop have a great impact on the life of the equipment. In order to ensure the planned output, the number of start and stop times of the equipment is limited. The constraints are as follows:

[0031] (5)

[0032] Where N is the minimum required operating time within the operating cycle;

[0033] c) Continuously adjustable constraints

[0034] For the rotary kiln in the clinker burning process, its rotation speed determines the material yield and also determines its operating power. The operating power is adjusted by adjusting the material output. Due to operating constraints, its adjustment has upper and lower limits:

[0035] (6)

[0036] in, , They are the upper and lower limits of material output for rotary kiln operation respectively; for Material output of rotary kiln at any time.

[0037] Furthermore, in step 4, the process energy and material balance constraints are as follows:

[0038] The operating power of the raw material crushing, raw material grinding, cement grinding and coal grinding processes in cement production is determined by the process condition information. When the above processes are in working state, their operating power is regarded as a fixed value. When they are in non-working state, the operating power and material output are 0. For the material input and output of the raw material crushing process, raw material grinding process, cement grinding process and the corresponding material storage depot, it is regarded as no material loss, that is, the material output is equal to the material input. Therefore, only the clinker burning process involves multi-energy conversion and utilization and material loss, and its energy / material balance constraints are established as follows:

[0039] (7)

[0040] in, is the energy conversion coefficient matrix of clinker burning process; , , , is the energy conversion coefficient, i.e. the power consumption, waste heat recovery, coal powder consumption and raw material consumption corresponding to the unit material output of the clinker burning process; , , , is the constant term in the linear relationship between energy consumption and production, forming a constant matrix ; , , Respectively represent zero matrices of dimensions 5×2, 5×4, and 5×7;

[0041] The material reserve inventory constraints are as follows:

[0042] For the raw material / raw material / cooked material storage, there are upper and lower limit constraints, so the following constraints must be met:

[0043] (8)

[0044] (9)

[0045] In the formula, express Material storage warehouse Inventory capacity; , Material storage warehouse The upper and lower limits of capacity; Formula (8) indicates Material storage warehouse The inventory capacity is Material storage warehouse Inventory capacity plus Always enter the material reserve The amount of material minus the material reserve Output to process The amount of materials; material storage When it is 1, it means the raw material reserve warehouse, material reserve warehouse When it is 2, it means raw material storage warehouse, material storage warehouse When it is 3, it means the clinker storage; process When it is 1, it means the raw material crushing process. When it is 2, it means the raw material grinding process. When it is 4, it means coal grinding process. When it is 3, it means the clinker burning process. When it is 5, it indicates cement grinding process;

[0046] The material transmission rate constraints are as follows:

[0047] In accordance with the equipment production requirements, there are certain upper and lower limits for material transportation between processes, that is, there are material transmission rate constraints as follows:

[0048] (10)

[0049] In the formula, , Process The upper and lower limits of material output; , Material storage warehouse To process The upper and lower limits of material output.

[0050] Furthermore, in step 4, the system energy balance constraint is as follows:

[0051] The entire production process for cement industry users involves the conversion and utilization of electricity, heat and other energy sources. Energy conservation is the key during the conversion process, so the energy balance constraints are as follows:

[0052] (11)

[0053] (12)

[0054] (13)

[0055] in, The clinker burning process Heat production at each moment; For waste heat power generation Heat consumption at the time; for The amount of electricity demanded by the grid at any given moment; for The amount of waste heat power generation at the time; The thermoelectric conversion efficiency of the waste heat power generation device; for The discharge power of energy storage at any time; for Charging power for energy storage at all times; - They are The electricity consumption of raw material crushing process, raw material storage warehouse, raw material grinding process, raw material storage warehouse, coal grinding process, clinker burning process, clinker storage warehouse and cement grinding process at all times.

[0056] Furthermore, in step 4, the production plan constraints are as follows:

[0057] (14)

[0058] in, for The material output of cement grinding process at the moment; T is the whole production cycle; is the planned total output.

[0059] The present invention also adopts the following technical solution: a cement industry user power adjustable capacity evaluation system, which includes:

[0060] Equivalent model building unit: Based on the typical cement industry production process, establish the equivalent model of cement industry user process flow and energy flow;

[0061] Adjustable capacity evaluation model establishment unit: Establish an adjustable capacity evaluation model for cement industry users, with the maximum adjustable capacity of cement industry users as the objective function. The adjustable capacity is expressed as the difference between the power demand of cement industry users facing the grid when producing according to the production plan and the power demand of cement industry users facing the grid after considering the adjustable process;

[0062] Energy storage system judgment unit: If the cement industry user configures an energy storage system, then the energy storage system charging and discharging constraints and capacity constraints are established; if there is no energy storage system configuration, then the constraint condition establishment unit is directly entered;

[0063] Constraint establishment unit: Based on the equivalent model of process flow and energy flow of cement industry users, considering process adjustment, process coupling, material storage capacity, production plan, and multi-energy conversion and utilization, the constraint conditions of the cement industry user electricity adjustable capacity evaluation model are established.

[0064] The beneficial effects of the present invention are as follows: Based on the equivalent model of process flow and energy flow, the present invention combines the operating information, production plan and multi-energy conversion relationship of cement industry users, considers the whole process production process of cement users, and establishes an evaluation model for the adjustable electricity consumption capacity of cement industry users to evaluate their adjustable capacity for the power grid. This can effectively reduce the evaluation error of the cement industry's regulation capacity and provide technical support for cement industry users to participate in the interaction between power grid supply and demand. BRIEF DESCRIPTION OF THE DRAWINGS

[0065] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0066] Figure 1 It is a flow chart of the method for evaluating the adjustable power consumption capacity of cement industry users of the present invention;

[0067] Figure 2 It is the equivalent model diagram of process flow and energy flow of cement industry users of the present invention;

[0068] Figure 3 It is a structural diagram of the electricity adjustable capacity evaluation system for cement industry users of the present invention;

[0069] Figure 4 It is an equivalent model diagram of process flow and energy flow of cement industry users in the application example of the present invention;

[0070] Figure 5 This is a graph showing the evaluation results of the adjustable capacity of cement industry users in the application example of the present invention. DETAILED DESCRIPTION

[0071] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0072] This embodiment provides a method for evaluating the adjustable power consumption capacity of cement industry users. Figure 1 As shown, the steps are as follows:

[0073] Step 1: Based on the typical cement industry production process, establish an equivalent model of cement industry user process flow and energy flow.

[0074] Taking the typical cement industry production line as a reference, the equivalent model of cement industry user process flow and energy flow is established as follows: Figure 2 As shown, it includes 5 processes of raw material crushing, raw material grinding, clinker burning, cement grinding and coal grinding, and 3 storage warehouses of raw material storage warehouse, raw material storage warehouse and clinker storage warehouse. The raw material storage warehouse is located between the raw material crushing process and the raw material grinding process, the raw material storage warehouse is located between the raw material grinding process and the clinker burning process, the clinker storage warehouse is located between the clinker burning process and the cement grinding process, and the material output from the coal grinding process enters the clinker burning process, forming an equivalent diagram with 8 nodes and 21 branches. Figure 2 It can be seen that in the cement manufacturing process, the power supply is respectively supplied to the raw material crushing process, the raw material grinding process, the clinker burning process, the cement grinding process, the coal grinding process, the raw material storage warehouse, the raw material storage warehouse and the clinker storage warehouse. The clinker burning process can improve energy utilization by recovering waste heat. In the entire production process, the operating information of energy-consuming equipment determines the power consumption of the entire cement industry user. Due to the time sequence of materials, the operating information of each process has an important impact on the entire production process. Therefore, considering all factors comprehensively, an evaluation model for its adjustable power consumption capacity is established.

[0075] According to the established equivalent model of process flow and energy flow of cement industry users, the set of process flow and energy flow branches is obtained as follows:

[0076] (1)

[0077] in, , They are the electricity demand for the grid and the waste heat power generation; - They are the electricity consumption of the raw material crushing process, raw material storage warehouse, raw material grinding process, raw material storage warehouse, coal grinding process, clinker burning process, clinker storage warehouse and cement grinding process; The heat generated during the clinker burning process. is the heat consumption of the waste heat power generation device; The material consumption of raw material crushing in the raw material crushing process; - They are the material output of the raw material crushing process, raw material grinding process, clinker burning process, coal grinding process and cement grinding process; The amount of material output from the raw material storage warehouse to the raw material grinding process; The amount of material output from the raw material storage to the clinker burning process; The amount of material output from the clinker storage to the cement grinding process.

[0078] Step 2, establish a cement industry user adjustable electricity capacity evaluation model, with the maximum cement industry user adjustable electricity capacity as the objective function, and the adjustable capacity is expressed as the difference between the cement industry user's electricity demand to the grid predicted when producing according to the production plan and the cement industry user's electricity demand to the grid after considering the adjustable process.

[0079] The objective function is to maximize the electricity regulation capacity of cement industry users at a certain moment, which is expressed as the difference between the power demand of cement industry users facing the grid when producing according to the production plan at a certain moment and the power demand of cement industry users facing the grid after considering the adjustable process:

[0080] (2)

[0081] in, for Always consider the electricity demand of cement industry users to the grid after the adjustable process. for The electricity demand from cement industry users to the grid is predicted when production is carried out according to the production plan at all times.

[0082] Step 3: If the cement industry user configures an energy storage system, then establish the energy storage system charging and discharging constraints and capacity constraints; if no energy storage system is configured, directly proceed to step 4;

[0083] The energy storage system charging and discharging constraints and capacity constraints are as follows:

[0084] (3)

[0085] in, , Energy storage Discharge and charge status at all times; , Respectively The charging and discharging power of energy storage at all times; , Respectively Maximum charging and discharging power of energy storage at all times; Indicates that storage The amount of power stored at any time; , They are the upper and lower limits of energy storage capacity respectively; , are the charging and discharging efficiency of energy storage respectively; , They represent the storage capacity at the initial and final moments of energy storage respectively.

[0086] Step 4: Based on the equivalent model of process flow and energy flow of cement industry users, the constraints of the electricity adjustable capacity evaluation model of cement industry users are established by considering process adjustment, process coupling, material storage capacity, production plan, and multi-energy conversion and utilization.

[0087] The constraints include process adjustment constraints, process energy and material balance constraints, material reserve inventory constraints, material transfer rate constraints, production plan constraints, and system energy balance constraints.

[0088] The process adjustment constraints are as follows:

[0089] a) Discrete regulation constraints

[0090] For raw material crushers, raw material mills, and cement grinding mills, if there is enough material in the material reserve and it does not affect the subsequent production, they can be shut down appropriately to participate in the grid demand response. Their operating states are only working and not working, so they belong to discrete regulation. The regulation constraints are established as follows:

[0091] (4)

[0092] in, is a 0-1 variable, subscript i When it is 1, it indicates the raw material crushing process, subscript i When it is 2, it indicates the raw material grinding process, subscript i When it is 5, it indicates cement grinding process; when When The equipment is in a non-working state at all times, and the energy consumption and material output of this link are 0; Indicates that the element is 1 and the dimension is 1× i Matrix of Discrete adjustment of processes for cement industry users The working status matrix at each moment; for The process flow and energy flow branch set at the moment; for Always consider the set of process flow and energy flow branches after discrete adjustable steps are adjusted.

[0093] Frequent start and stop have a great impact on the life of the equipment, and in order to ensure the planned output, the number of start and stop times of the equipment is limited, and the constraints are as follows:

[0094] (5)

[0095] Where N is the minimum required operating time within the operating cycle.

[0096] c) Continuously adjustable constraints

[0097] For the rotary kiln in the clinker burning process, its rotation speed determines the material yield and also determines its operating power. The operating power can be adjusted by adjusting the material output. Due to operating constraints, its adjustment has upper and lower limits:

[0098] (6)

[0099] in, , They are the upper and lower limits of the material output of the rotary kiln respectively. for Material output of rotary kiln at any time.

[0100] The process energy and material balance constraints are as follows:

[0101] The operating power of raw material crushing, raw material grinding, cement grinding and coal grinding processes in cement production is determined by the process working condition information, and the material output has little effect on it. Therefore, when the above processes are in working state, their operating power can be regarded as a fixed value, and when they are in non-working state, the operating power and material output are 0. For the material input and output of raw material crushing, raw material grinding, cement grinding and corresponding material storage depots, it can be regarded as no material loss, that is, the material output is equal to the material input. Therefore, only the clinker burning process involves multi-energy conversion and utilization and material loss, and its energy / material balance constraints are established as follows:

[0102] (7)

[0103] in, is the energy conversion coefficient matrix of clinker burning process; , , , is the energy conversion coefficient, i.e. the power consumption, waste heat recovery, coal powder consumption and raw material consumption corresponding to the unit material output of the clinker burning process; , , , is the constant term in the linear relationship between energy consumption and production, forming a constant matrix ; , , They represent zero matrices of dimensions 5×2, 5×4, and 5×7, respectively.

[0104] The material reserve inventory constraints are as follows:

[0105] For the raw material / raw material / cooked material storage, there are upper and lower limit constraints, so the following constraints must be met:

[0106] (8)

[0107] (9)

[0108] In the formula, express Material storage warehouse Inventory capacity; , Material storage warehouse The upper and lower limits of capacity; Formula (8) indicates Material storage warehouse The inventory capacity is Material storage warehouse Inventory capacity plus Always enter the material reserve The amount of material minus the material reserve Output to process The amount of materials; material storage When it is 1, it means the raw material reserve warehouse, material reserve warehouse When it is 2, it means raw material storage warehouse, material storage warehouse When it is 3, it means the clinker storage; process When it is 1, it means the raw material crushing process. When it is 2, it means the raw material grinding process. When it is 4, it means coal grinding process. When it is 3, it means the clinker burning process. When it is 5, it indicates the cement grinding process.

[0109] The material transmission rate constraints are as follows:

[0110] In accordance with the equipment production requirements, there are certain upper and lower limits for material transportation between processes, that is, there are material transmission rate constraints as follows:

[0111] (10)

[0112] In the formula, , Process The upper and lower limits of material output; , Material storage warehouse To process The upper and lower limits of material output.

[0113] The system energy balance constraints are as follows:

[0114] The entire production process for cement industry users involves the conversion and utilization of multiple energy sources such as electricity and heat. Energy conservation is the key during the conversion process, so the energy balance constraints are as follows:

[0115] (11)

[0116] (12)

[0117] (13)

[0118] in, The clinker burning process Heat production at each moment; For waste heat power generation Heat consumption at the time; for The electricity demand of cement industry users to the power grid at any given moment; For waste heat power generation The amount of electricity generated at the time; The thermoelectric conversion efficiency of the waste heat power generation device; for The discharge power of energy storage at any time; for Charging power for energy storage at all times; - They are The electricity consumption of raw material crushing process, raw material storage warehouse, raw material grinding process, raw material storage warehouse, coal grinding process, clinker burning process, clinker storage warehouse and cement grinding process at all times.

[0119] The production plan constraints are as follows:

[0120] During the entire production cycle, due to the production orders signed with customers, the planned total production output must be met, so the production plan constraints are as follows:

[0121] (14)

[0122] in, for The material output of cement grinding process at the moment; T is the whole production cycle; is the planned total output.

[0123] The objective function (2) and constraint condition (3) to (14) above are combined to form the user adjustable capacity evaluation model for the cement industry. The model is a mixed integer linear model, which is solved by calling the commercial solver Gurobi.

[0124] This embodiment also provides a system for evaluating the adjustable power consumption capacity of cement industry users. Figure 3 As shown, it consists of an equivalent model building unit, an adjustable capacity evaluation model building unit, an energy storage system judgment unit and a constraint condition building unit.

[0125] The equivalent model building unit is used to build an equivalent model of cement industry user process flow and energy flow based on a typical cement industry production process.

[0126] The adjustable capacity evaluation model establishment unit is: to establish an evaluation model for the adjustable power consumption capacity of cement industry users, with the maximum adjustable power consumption capacity of cement industry users as the objective function, and the adjustable capacity is represented by the difference between the power demand of cement industry users to the power grid predicted when producing according to the production plan and the power demand of cement industry users to the power grid after considering the adjustable process.

[0127] The energy storage system judgment unit: if the cement industry user configures the energy storage system, then the energy storage system charging and discharging constraints and capacity constraints are established; if there is no energy storage system configuration, then the constraint condition establishment unit is directly entered.

[0128] The constraint condition establishment unit is based on the equivalent model of process flow and energy flow of cement industry users, taking into account process adjustment, process coupling, material storage capacity, production plan and multi-energy conversion and utilization, to establish the constraint conditions of the cement industry user electricity adjustable capacity evaluation model.

[0129] The specific contents of the above-mentioned units correspond to the steps in the method for evaluating the adjustable power consumption capacity of cement industry users, and will not be described in detail here.

[0130] Application Examples

[0131] According to the electricity adjustable capacity evaluation model of cement industry users in the above embodiment, the electricity adjustable capacity of a cement industry user at 12 o'clock in a day is evaluated on an hourly time scale to verify the effectiveness of the electricity adjustable capacity evaluation method of the present invention. The cement industry is a full-process production, from mining to the delivery of cement finished products. The raw materials mined from the mine are transported to 3 crushers for crushing, and the crushers do not distinguish between production lines. There are 2 production lines in the factory, each of which consists of a raw material grinder, a raw material reserve, a rotary kiln, a clinker reserve, and a cement grinder. Figure 4 This is the equivalent diagram of the process flow and energy flow of the cement industry user. The energy consumption equipment parameters of each process are shown in Table 1. The parameters in the table are data for one device. According to the above method, confirm the parameters of each step:

[0132] (1) Without considering process adjustment and according to the production plan, the predicted power demand of cement industry users to the grid is ,like Figure 5 medium orange curve;

[0133] (2) The cement industry user is equipped with energy storage, the energy storage parameters are 2MW / 4MWh, and the charging and discharging efficiency is 0.9;

[0134] (3) Discrete adjustment constraints: set the raw material crusher to run for at least 12 hours, and the raw material mill and cement mill to run for at least 20 hours within the operating cycle;

[0135] (4) Continuously adjustable constraints: The upper limit of the rotary kiln material output is 430t / h and the lower limit is 280t / h;

[0136] (5) The conversion relationship between energy and materials in the clinker burning process is as follows: the energy and material consumption of the clinker burning process is approximately linear, that is, the constant terms are all 0. For every ton of clinker produced, the power consumption coefficient is 21.4 kW / t, the waste heat recovery power generation coefficient is 29.67 kW / t, the coal consumption coefficient is 2.86, and the raw material consumption coefficient is 1.54;

[0137] (6) The upper and lower limits of material inventory in the material reserve warehouse are shown in Table 1;

[0138] (7) The upper limit of the material transfer rate of each process is the yield of the corresponding energy-consuming equipment, and the lower limit is 0;

[0139] (8) The rated operating power of the energy-consuming equipment corresponding to each process is shown in Table 1; among them, waste heat power generation directly provides power generation data, and no longer specifies heat consumption and thermoelectric conversion efficiency;

[0140] (9) The planned daily output is at least 12,000 tons;

[0141] (10) In addition, the stable load that cannot be regulated is 12.95MW, such as lighting, air conditioning, material transportation, etc.

[0142] Some parameters are summarized in Table 1. Finally, the electricity purchase demand of the cement industry user at each moment in the operation cycle under the maximum regulation capacity of 12 hours is obtained as follows: Figure 5 shown.

[0143] Table 1 Energy consumption equipment parameters of a cement industry user

[0144]

[0145] Depend on Figure 5 It can be seen that at 12 o'clock, the electricity purchase demand of cement industry users from the power grid is negative, indicating that at this time, cement industry users have excess electricity to send back to the power grid to alleviate the imbalance between supply and demand. When the configuration of energy storage for cement industry users is not considered, the adjustable power capacity is 50.5MW; when the configuration of energy storage for cement industry users is considered, the adjustable power capacity is 52.5MW, that is, energy storage increases the adjustable power capacity of cement industry users through the maximum discharge power. Figure 5 It can also be seen that by taking energy storage into consideration, the power regulation capability can be moved in time sequence, that is, by advancing or delaying production, there is more room for regulation during peak load periods.

[0146] It is obvious that those skilled in the art can easily make various modifications to the above embodiments and apply the general principles described herein to other embodiments without creative work. Therefore, the present invention is not limited to the above embodiments, and improvements and modifications made by those skilled in the art to the present invention based on the disclosure of the present invention should be within the protection scope of the present invention.

Claims

1. A method for evaluating the adjustable power consumption capacity of cement industry users, characterized in that: include: Step 1: Based on the typical cement industry production process, establish an equivalent model of cement industry user process flow and energy flow; Step 2: Establish an evaluation model for the adjustable power consumption capacity of cement industry users, with the maximum adjustable power consumption capacity of cement industry users as the objective function. The adjustable capacity is represented by the difference between the power demand of cement industry users to the grid predicted when producing according to the production plan and the power demand of cement industry users to the grid after considering the adjustable process; Step 3: If the cement industry user configures an energy storage system, then establish the energy storage system charging and discharging constraints and capacity constraints; if no energy storage system is configured, directly proceed to step 4; Step 4: Based on the equivalent model of process flow and energy flow of cement industry users, considering process adjustment, process coupling, material storage capacity, production plan, and multi-energy conversion and utilization, establish the constraint conditions of the electricity adjustable capacity evaluation model of cement industry users; In step 1, the process flow and energy flow equivalent model of the cement industry user includes a raw material crushing process, a raw material grinding process, a clinker burning process, a cement grinding process, a coal grinding process, a raw material reserve, a raw material reserve and a clinker reserve. The raw material reserve is located between the raw material crushing process and the raw material grinding process, the raw material reserve is located between the raw material grinding process and the clinker burning process, the clinker reserve is located between the clinker burning process and the cement grinding process, and the material output from the coal grinding process enters the clinker burning process; In the cement manufacturing process, the power supply is respectively supplied to the raw material crushing process, raw material grinding process, clinker burning process, cement grinding process, coal grinding process, raw material storage warehouse, raw material storage warehouse and clinker storage warehouse. The clinker burning process improves energy utilization rate through waste heat power generation, which consists of 8 nodes and 21 branches; Using the equivalent model of process flow and energy flow of cement industry users, the process flow and energy flow branch set is obtained as follows: (1) in, , They are the electricity demand for the grid and the waste heat power generation; to They are the electricity consumption of the raw material crushing process, raw material storage warehouse, raw material grinding process, raw material storage warehouse, coal grinding process, clinker burning process, clinker storage warehouse and cement grinding process; The heat generated during the clinker burning process. is the heat consumption of the waste heat power generation device; The material consumption of raw material crushing in the raw material crushing process; to They are the material output of the raw material crushing process, raw material grinding process, clinker burning process, coal grinding process and cement grinding process; The amount of material output from the raw material storage warehouse to the raw material grinding process; The amount of material output from the raw material storage to the clinker burning process; The amount of material output from the clinker storage to the cement grinding process; In step 4, the constraints include process adjustment constraints, process energy and material balance constraints, material reserve inventory constraints, material transfer rate constraints, production plan constraints, and system energy balance constraints; In step 4, the process adjustment constraints are as follows: a) Discrete regulation constraints For raw material crushers, raw material mills and cement grinding mills, when there is enough material in the storage and the subsequent production is not affected, they can be shut down appropriately to participate in the grid demand response. Their operating states are only working and not working, so they belong to discrete regulation. The regulation constraints are established as follows: (4) in, is a 0-1 variable, subscript i When it is 1, it indicates the raw material crushing process, subscript i When it is 2, it indicates the raw material grinding process, subscript i When it is 5, it indicates cement grinding process; when When The equipment is in a non-working state at all times, and the energy consumption and material output of this link are 0; Indicates that the element is 1 and the dimension is 1× i Matrix of Discrete adjustment of processes for cement industry users The working status matrix at each moment; for The process flow and energy flow branch set at the moment; for Always consider the process flow and energy flow branch set after the discrete adjustable process is adjusted; Frequent start and stop have a great impact on the life of the equipment. In order to ensure the planned output, the number of start and stop times of the equipment is limited. The constraints are as follows: (5) Where N is the minimum required operating time within the operating cycle; b) Continuously adjustable constraints For the rotary kiln in the clinker burning process, its rotation speed determines the material yield and also determines its operating power. The operating power is adjusted by adjusting the material output. Due to operating constraints, its adjustment has upper and lower limits: (6) in, , They are the upper and lower limits of the material output of the rotary kiln respectively. for Material output of rotary kiln at any time; In step 4, the process energy and material balance constraints are as follows: The operating power of the raw material crushing, raw material grinding, cement grinding and coal grinding processes in cement production is determined by the process condition information. When the above processes are in working state, their operating power is regarded as a fixed value. When they are in non-working state, the operating power and material output are 0. For the material input and output of the raw material crushing process, raw material grinding process, cement grinding process and the corresponding material storage depot, it is regarded as no material loss, that is, the material output is equal to the material input. Therefore, only the clinker burning process involves multi-energy conversion and utilization and material loss, and its energy / material balance constraints are established as follows: (7) in, is the energy conversion coefficient matrix of clinker burning process; , , , is the energy conversion coefficient, i.e. the power consumption, waste heat recovery, coal powder consumption and raw material consumption corresponding to the unit material output of the clinker burning process; , , , is the constant term in the linear relationship between energy consumption and production, forming a constant matrix ; , , Respectively represent zero matrices of dimensions 5×2, 5×4, and 5×7; The material reserve inventory constraints are as follows: For the raw material / raw material / cooked material storage, there are upper and lower limit constraints, so the following constraints must be met: (8) (9) In the formula, express Material storage warehouse Inventory capacity; , Material storage warehouse The upper and lower limits of capacity; Formula (8) indicates Material storage warehouse The inventory capacity is Material storage warehouse Inventory capacity plus Always enter the material reserve The amount of material minus the material reserve Output to process The amount of materials; material storage When it is 1, it means the raw material reserve warehouse, material reserve warehouse When it is 2, it means raw material storage warehouse, material storage warehouse When it is 3, it means the clinker storage; process When it is 1, it means the raw material crushing process. When it is 2, it means the raw material grinding process. When it is 4, it means coal grinding process. When it is 3, it means the clinker burning process. When it is 5, it indicates cement grinding process; The material transmission rate constraints are as follows: In accordance with the equipment production requirements, there are certain upper and lower limits for material transportation between processes, that is, there are material transmission rate constraints as follows: (10) In the formula, , Process The upper and lower limits of material output; , Material storage warehouse To process The upper and lower limits of material output; In step 4, the system energy balance constraints are as follows: The entire production process for cement industry users involves the conversion and utilization of multiple energy sources such as electricity and heat. Energy conservation is the key in the conversion process, so the system energy balance constraints are as follows: (11) (12) (13) in, The clinker burning process Heat production at each moment; For waste heat power generation Heat consumption at the time; for The amount of electricity demanded by the grid at any given moment; for The amount of waste heat power generation at the time; The thermoelectric conversion efficiency of the waste heat power generation device; for The discharge power of energy storage at any time; for Charging power for energy storage at all times; to They are The electricity consumption of raw material crushing process, raw material storage warehouse, raw material grinding process, raw material storage warehouse, coal grinding process, clinker burning process, clinker storage warehouse and cement grinding process at all times; In step 4, the production plan constraints are as follows: (14) in, for Material output of cement grinding process at the moment; T For the entire production cycle; is the planned total output.

2. The method for evaluating the adjustable power consumption capacity of cement industry users according to claim 1 is characterized in that: In step 2, the objective function is expressed as the following formula: (2) in, for Always consider the electricity demand of cement industry users to the grid after the adjustable process. for The electricity demand from cement industry users to the grid is predicted when production is carried out according to the production plan at all times.

3. The method for evaluating the adjustable power consumption capacity of cement industry users according to claim 1 is characterized in that: In step 3, if the cement industry user has an energy storage system configuration, the energy storage must meet the energy storage system charging and discharging constraints and capacity constraints, as follows: (3) in, , Energy storage Discharge and charge status at all times; , Respectively The charging and discharging power of energy storage at all times; , Respectively Maximum charging and discharging power of energy storage at all times; Indicates that storage The amount of power stored at any time; , They are the upper and lower limits of energy storage capacity respectively; , are the charging and discharging efficiency of energy storage respectively; , They represent the storage capacity at the initial and final moments of energy storage respectively.

4. A cement industry user power adjustable capacity assessment system, used to implement the cement industry user power adjustable capacity assessment method according to any one of claims 1 to 3, characterized in that: include: Equivalent model building unit: Based on the typical cement industry production process, establish the equivalent model of cement industry user process flow and energy flow; Adjustable capacity evaluation model establishment unit: Establish an adjustable capacity evaluation model for cement industry users, with the maximum adjustable capacity of cement industry users as the objective function. The adjustable capacity is expressed as the difference between the power demand of cement industry users facing the grid when producing according to the production plan and the power demand of cement industry users facing the grid after considering the adjustable process; Energy storage system judgment unit: If the cement industry user configures an energy storage system, then the energy storage system charging and discharging constraints and capacity constraints are established; if there is no energy storage system configuration, then the constraint condition establishment unit is directly entered; Constraint establishment unit: Based on the equivalent model of process flow and energy flow of cement industry users, considering process adjustment, process coupling, material storage capacity, production plan, and multi-energy conversion and utilization, the constraint conditions of the cement industry user electricity adjustable capacity evaluation model are established.

Citation Information

Patent Citations

  • Iron and steel enterprise outsourcing electricity adjustable potential assessment method considering multi-energy coupling and process optimization

    CN113361122A

  • Multi-agent simulation-based evaluation method for electric power peak regulation response capability of electric smelting furnace for magnesia

    CN114385963A