A carbon dioxide purification device and a method of using the same

By using pairs of dry adsorbers alternately and hot regeneration gas temporary storage technology in the carbon dioxide purification device, the problem of high energy consumption in the dryer regeneration stage is solved, achieving a significant reduction in energy consumption and efficient utilization of regeneration gas.

CN118403480BActive Publication Date: 2024-10-25连云港石化有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410878115.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-10-25
Estimated Expiration
2044-07-02

AI Technical Summary

Technical Problem

In the existing carbon dioxide purification process, the energy consumption of the dryer regeneration stage is relatively high, resulting in carbon capture being unable to meet energy conservation and emission reduction requirements.

Method used

Design a carbon dioxide purification device, which uses pairs of dry adsorbers alternately, is equipped with hot regeneration gas and cold regeneration gas branches, uses heat recovery heat exchangers and anti-corrosion gas storage tanks, and uses adjustable three-way valves and belts. The valve piston realizes the temporary storage and switching of hot regeneration gas, reducing the production and use of regeneration gas.

Benefits of technology

It effectively reduces the energy consumption of the heater, reduces the production and use of external regeneration gas, improves the efficiency of the regeneration gas, and reduces the overall energy consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118403480B_ABST
    Figure CN118403480B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of carbon dioxide capture and recovery, and discloses a carbon dioxide purification device and a method for using the same, wherein a second cooler and a second gas-liquid separator are further provided between the dryer and the compressor, the first cooler is sequentially connected to the first gas-liquid separator, the compressor, the second cooler, the second gas-liquid separator, the dry adsorber, the precooler, the liquefier, the distillation tower, the reboiler and the subcooler through pipelines, at least one pair of dry adsorbers is connected between the second gas-liquid separator and the precooler, the second cooler is a refrigerant cooler and includes a refrigerant condensation unit, the dry adsorber is provided with a regeneration unit, the light component gas discharge unit of the distillation tower is connected to the regeneration unit for gas supply, the regeneration unit is connected to the refrigerant condensation unit to absorb the heat output by the refrigerant, and then connected to the dry adsorber through a heater for conveying heated regeneration gas. The present invention solves the technical problem of high energy consumption in the regeneration stage of the dryer in the carbon dioxide purification device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of carbon dioxide capture and recovery, and in particular relates to a carbon dioxide purification device and a method for using the same. Background Art

[0002] Under the background of "dual carbon", green and low-carbon industries are developing rapidly, and carbon dioxide capture and utilization projects are being accelerated. The methods for recovering high-concentration carbon dioxide exhaust gas mainly include adsorption distillation and catalytic oxidation + dry distillation. The current process is that after the carbon dioxide raw gas compression process, the raw gas temperature is directly dried and liquefied at 40°C. The water content in carbon dioxide gas is relatively high, so a separate dryer needs to be set up. The dryer regeneration gas volume and regeneration heater power are large, and the liquefaction energy consumption is high.

[0003] The high energy consumption is mainly due to the following reasons: First, the moisture content in the raw gas is high, so the adsorption saturation rate of the dryer is fast, resulting in the need for frequent drying and regeneration. This process requires heating the regeneration gas to be input into the dryer, so the energy consumption is high. Secondly, the regeneration gas needs to use a gas with a low moisture content to desorb the water adsorbed in the desiccant, and the preparation and transportation of the regeneration gas requires energy. The existing technology uses a separate removal system for purification of some impurities such as ethylene glycol and grease, which also uses an adsorption device with a similar structure to the dryer. This part also requires the corresponding regeneration gas to regenerate the adsorbent, resulting in a high supply of regeneration gas, which also increases energy consumption. In addition, since the regeneration stage generally includes a series of processes such as depressurization, heating desorption, cooling desorption and pressure increase, this process either needs to use a heater to control the temperature of the regenerated gas with the process switch to achieve the heating desorption and cooling desorption process, or the heater needs to be kept on during the entire regeneration stage to switch the transmission path to achieve the switching of heating desorption and cooling desorption. In the former, since the heating and cooling before and after the heater switch require a lot of time, not only is the switching untimely, but the pipeline at the heater needs to be cooled to dissipate heat during cooling desorption, and the heating process requires the gas to be reheated to a higher temperature, which requires additional energy consumption; although the latter can change the temperature of the input regenerated gas in time, it requires the heater to continuously consume energy, so both methods have obvious energy waste problems. The above multiple reasons lead to high energy consumption in the dryer regeneration stage during the carbon dioxide purification process in the prior art, resulting in the carbon capture and carbon absorption process itself not being able to meet the requirements of energy conservation and emission reduction. Summary of the invention

[0004] The object of the present invention is to provide a carbon dioxide purification device for solving the technical problem of high energy consumption in the dryer regeneration stage in the prior art.

[0005] The carbon dioxide purification device described herein comprises dry adsorbers arranged in pairs, the paired dry adsorbers are used alternately, one dry adsorber is in the dry adsorption stage while the other dry adsorber is in the regeneration stage, the dry adsorber is provided with a regeneration unit, the regeneration unit is provided with a hot regeneration gas branch and a cold regeneration gas branch connected to the dry adsorber, as well as a heat recovery heat exchanger and an anti-corrosion gas storage tank, the light component gas discharged from the distillation tower is respectively transported to the hot regeneration gas branch and the cold regeneration gas branch for gas supply via an adjustable three-way valve, a heater is provided on the hot regeneration gas branch, the dry adsorbers are all connected with a desorption gas pipe, the desorption gas pipe is used to output the desorbed gas in the dry adsorber during the regeneration stage, the desorption gas pipe is connected to the heat medium pipeline of the heat recovery heat exchanger via the anti-corrosion gas storage tank, and the hot regeneration gas branch and The heat recovery heat exchanger is connected, and the cold medium pipeline of the heat recovery heat exchanger is connected to the heater. The tank body of the anti-corrosion gas storage tank is provided with a valved piston arranged in a sliding seal along the length direction of the tank body, and the valved piston divides the inner cavity of the anti-corrosion gas storage tank into a hot regeneration gas temporary storage cavity and a desorption gas cavity. The valved piston is provided with a first inlet and a temperature sensor on the side of the desorption gas cavity, and the valved piston is provided with a follow-up inlet and a telescopic air guide pipe on the side of the hot regeneration gas temporary storage cavity. The telescopic air guide pipe passes through one end of the tank body, and a desorption gas inlet is provided at the other end of the tank body. A regeneration gas outlet and a regeneration gas inlet are provided on the side of the tank body. A valve device is provided in the valved piston, and the valve device is used to switch the connection relationship with the telescopic air guide pipe between the desorption gas cavity and the hot regeneration gas temporary storage cavity according to the temperature change in the desorption gas cavity.

[0006] Preferably, the valve device has a telescopic joint connected to the hot regeneration gas temporary storage chamber and can extend to the side; when the valved piston is at an initial height, the telescopic joint extends out to connect with the regeneration gas outlet; the telescopic joint closes itself when the valve core of the valve device contracts and enters the valved piston; the proximity sensor is used to detect whether the valved piston slides to the second position of the hot regeneration gas temporary storage chamber when the desorption gas chamber is not connected to the telescopic air duct; when the valved piston slides toward the second position, the hot regeneration gas temporary storage chamber shrinks; when the valved piston is in the second position, the valve device switches to a state of connecting the desorption gas chamber and the telescopic air duct.

[0007] Preferably, the valve device includes a driving motor, a crank-connecting rod structure and a valve core that slides horizontally in the valve cavity of the valved piston, the valve core is provided with a first air channel and a second air channel connected to the follow-up inlet, the first air channel is a through air channel that is consistent with the direction of the telescopic air pipe, the first inlet is relative to the telescopic air pipe and can be connected to the telescopic air pipe through the first air channel, one end of the second air channel can be connected to the telescopic air pipe downward, and the other end is laterally connected to the telescopic joint, the follow-up inlet is connected to the side of the second air channel, the follow-up inlet is slidably matched with the sliding groove on the side of the valved piston, and the follow-up inlet is provided with a closing cover plate that closes the sliding groove during sliding.

[0008] Preferably, one end of the lateral opening of the second airway is fixedly connected to a cavity tube, a two-way closed cavity is provided in the cavity tube, a spring and a closing plate are provided in the two-way closed cavity, the two ends of the two-way closed cavity are respectively a first opening and a second opening, the outer side of the first opening is fixedly sleeved with one end of the spring, the other end of the spring is connected to the closing plate, and the spring presses the closing plate onto the second opening to achieve closure in a natural state, the connecting end of the telescopic joint is slidably sleeved on the outer side of the cavity tube, the extending end of the telescopic joint can extend from the extending port on the side of the valved piston, a sealing member is provided between the connecting end and the cavity tube, and the side of the extending end is provided with a ventilated groove The end face of the extended end is fixed with a push rod extending toward the closing plate, and the valve core pushes out the cavity tube when it extends toward the side. When the expansion joint is blocked by the side wall of the tank body, the push rod pushes the closing plate onto the first port to achieve closure. The first position of the valve piston is located at the air inlet end of the regeneration gas outlet. When the expansion joint is extended from the extended port, the extended end is inserted into the air inlet end of the regeneration gas outlet so that the groove is connected to the regeneration gas outlet. At the same time, the closing plate is pushed between the first port and the second port by the push rod, and the expansion joint is connected to the second airway through the cavity tube.

[0009] Preferably, an elastic closing structure is provided at the air inlet end of the regeneration gas outlet, and a sliding closing piece of the elastic closing structure slides axially along the tank body to close or open the air inlet end of the regeneration gas outlet; a piston closing structure fixed on the inner wall of the tank body is provided at the second position, and a cold desorption gas outlet is also provided on the side of the tank body, and the sliding closing piece of the piston closing structure slides axially along the tank body to close or open the cold desorption gas outlet, and the sliding closing piece of the piston closing structure corresponds to the proximity sensor.

[0010] Preferably, the telescopic air guide pipe includes an inner pipe section and an outer pipe section, the inner pipe section is slidably and sealingly inserted in the outer pipe section, the end of the inner pipe section is connected to the center of the valved piston, the outer pipe section is fixed to the end of the tank body and extends out of the tank body, and the end of the outer pipe section extending into the tank body is the limiting end for the valved piston to slide toward the hot regeneration gas temporary storage chamber.

[0011] Preferably, the carbon dioxide purification device also includes a first cooler, a first heat exchanger, a first gas-liquid separator, a compressor, a precooler, a liquefier, a distillation tower, a reboiler and a subcooler. A second cooler and a second gas-liquid separator are also provided between the dry adsorber and the compressor. The first cooler is connected to the first gas-liquid separator, the compressor, the second cooler, the second gas-liquid separator, the dry adsorber, the precooler, the liquefier, the distillation tower, the reboiler and the subcooler in sequence through pipelines. At least one pair of dry adsorbers is connected between the second gas-liquid separator and the precooler. The hot regeneration gas branch is connected to the heat recovery heat exchanger via the cold medium pipeline of the first heat exchanger and the hot regeneration gas tank. The hot medium pipeline of the first heat exchanger is connected to the feed gas delivery pipe and is connected in parallel with the first cooler.

[0012] Preferably, the output ends of the hot regeneration gas branch and the cold regeneration gas branch are connected in parallel with corresponding exhaust pipes, and the two exhaust pipes are connected in parallel to the regeneration gas direct exhaust main pipe. The outlet of the heat medium pipeline of the heat recovery heat exchanger and the cold desorption gas outlet are both connected in parallel to the desorption gas exhaust main pipe.

[0013] The present invention also provides a method for using a carbon dioxide purification device, wherein the regeneration process of the dry adsorber is as follows: Step 1, pressure reduction: at the end of the working cycle, the raw gas in the dry adsorber is released to reduce the internal gas pressure.

[0014] Step 2, heating and desorption: generate hot regeneration gas by heating and input the hot regeneration gas into the dry adsorber to achieve desorption, and simultaneously fill the hot regeneration gas into the anti-corrosion gas storage tank, and when the hot desorption gas first enters the anti-corrosion gas storage tank, use the charging pressure of the hot desorption gas to fill the hot regeneration gas in the anti-corrosion gas storage tank into the heat recovery heat exchanger to complete the preheating and drying of the heat recovery heat exchanger.

[0015] Step 3, cooling and desorption: The unheated cold regeneration gas is input into the dry adsorber for cooling and desorption. When the cold regeneration gas enters the anti-corrosion gas storage tank, the charging pressure of the cold regeneration gas is used to charge the hot regeneration gas in the anti-corrosion gas storage tank into the heat recovery heat exchanger to complete the drying of the heat recovery heat exchanger, and at the same time change the delivery path of the desorption gas.

[0016] Step 4: Boosting the pressure: Fill the dry adsorber with gas to boost the pressure, the valve device is reset, and the desorption cycle ends.

[0017] The advantages of the present invention are: in order to effectively reduce energy consumption and reduce the production and use of external regeneration gas, the present invention utilizes the light component gas produced by the distillation tower for desorption. The light component gas, as a distillation product, has previously been freed of moisture and corresponding impurity gases in a dry adsorber, and is therefore suitable for use as regeneration gas.

[0018] The hot desorbed gas discharged after heating and desorption has a high temperature, so the present invention recovers its heat through a heat recovery heat exchanger to heat the hot regeneration gas input to the heater, thereby effectively reducing the energy consumption of the heater. However, since the hot desorbed gas contains a lot of impurity gases, water vapor, and oil, these substances are not easy to condense under high temperature conditions, but the initial temperature in the heat recovery heat exchanger is low. Therefore, when the hot desorbed gas first enters the heat exchanger shell, it is easy to condense on the heat exchange tube and the shell surface and further adsorb the impurity gas to cause corrosion. Even regular cleaning will produce a certain corrosion effect. Therefore, this scheme uses an anti-corrosion gas storage tank and a valved piston therein to achieve temporary storage of the heated hot regeneration gas, and before inputting the hot desorbed gas into the heat recovery heat exchanger, the hot regeneration gas temporarily stored is sent into the heat exchanger shell by using the hot desorption gas pressure, while increasing the temperature in the heat exchanger shell and drying the heat recovery heat exchanger, avoiding the condensation of water and oil caused by the cooling of the hot desorption gas and excessive humidity.

[0019] After that, the hot regeneration gas is continuously transported to store a certain amount of hot regeneration gas in the anti-corrosion gas storage tank again. After the cold desorption gas starts to be output, the present invention uses the gas pressure of the cold desorption gas again to transport the temporarily stored hot regeneration gas to the heat recovery heat exchanger, thereby exhausting the hot desorption gas in the heat recovery heat exchanger and leaving the dry hot regeneration gas therein. In this way, when the hot desorption gas is stopped from being transported, the gas in the heat recovery heat exchanger will not produce excessive water and oil condensation when it is cooled down, thus avoiding corrosion effects. When the cold desorption gas is transported, the cold desorption gas is discharged from the cold desorption gas outlet to realize the change of the transport route of the desorption gas, and no longer enters the heat recovery heat exchanger, thereby avoiding the cooling of the hot regeneration gas input to the heater.

[0020] In order to reduce the drying burden of the drying adsorber, reduce the regeneration cycle, and reduce energy consumption, the present invention first cools down the refrigerant cooler to liquefy most of the water before drying adsorption, and then separates it through a second gas-liquid separator. At the same time, the present invention uses the condenser of the refrigerant to preliminarily heat the light component gas, and the light component gas is divided into a cold regeneration gas branch and a hot regeneration gas branch for transportation, thereby forming a separate transportation and storage of cold regeneration gas and hot regeneration gas, and providing sufficient regeneration gas for the subsequent gas path switching to achieve the switching of cold and hot regeneration gas. The hot regeneration gas continues to pass through the heater after heat exchange through the condenser to ensure that the temperature of the heater is high enough before heating. During the heating and desorption process, the hot regeneration gas quickly reaches a sufficient temperature to avoid the low temperature of the light component gas itself causing the temperature rise and fall of the heater to generate additional heating energy consumption. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a schematic structural diagram of a carbon dioxide purification device of the present invention.

[0022] Figure 2 for Figure 1 Magnified view of the regeneration unit in the structure shown.

[0023] Figure 3 for Figure 1 Structural schematic diagram of the corrosion-resistant gas storage tank in the structure shown.

[0024] Figure 4 for Figure 3 Schematic diagram of the structure with valve piston and telescopic air guide tube in the structure shown.

[0025] Figure 5 for Figure 3 A partial cross-sectional view of a valved piston in the illustrated configuration.

[0026] Figure 6 It is a schematic structural diagram of the valve device in the present invention when the valve piston moves to the first position.

[0027] Figure 7 It is a schematic diagram of the structure of the valve device in the present invention when the expansion joint is connected to the regeneration gas outlet.

[0028] The markings in the attached drawings are: 1. first cooler, 2. first gas-liquid separator, 3. compressor, 4. second cooler, 5. second gas-liquid separator, 6. first dry adsorber, 7. second dry adsorber, 8. precooler, 9. liquefier, 10. distillation tower, 11. reboiler, 12. subcooler, 13. first heat exchanger, 14. regeneration unit, 1401. discharge pipe, 1402. regeneration gas direct discharge main pipe, 1403. desorption gas discharge main pipe, 15. hot regeneration gas tank, 16. heat recovery heat exchanger, 17. heater, 18. corrosion-resistant gas storage tank; 1801. tank body, 1802. piston with valve, 1803. inner pipe section, 1804. outer pipe section, 1805. regeneration gas inlet, 1806. regeneration gas outlet, 1807. elastic sealing structure, 1808. cold desorption gas outlet, 1809 , piston closing structure, 1810, desorption gas inlet, 1811, first inlet, 1812, temperature sensor, 1813, extension port, 1814, valve device, 1815, drive motor, 1816, proximity sensor, 1817, follow-up inlet, 1818, crank-connecting rod structure, 1819, valve core, 1820, cavity tube, 1821, expansion joint, 1822, first air channel, 1823, second air channel, 1824, slide groove, 1825, closing cover plate, 1826, first port, 1827, spring, 1828, second port, 1829, two-way closed cavity, 1830, closing plate, 1831, connecting end, 1832, extension end, 1833, push rod, 1834, guide column, 1835, compression spring, 1836, sliding closing member, 1837, fixing member. DETAILED DESCRIPTION

[0029] The specific implementation modes of the present invention are further explained in detail below by describing the embodiments with reference to the accompanying drawings, so as to help those skilled in the art to have a more complete, accurate and in-depth understanding of the inventive concept and technical solution of the present invention.

[0030] like Figure 1-7As shown, the present invention provides a carbon dioxide purification device, including dry adsorbers arranged in pairs, the paired dry adsorbers are used alternately, one dry adsorber is in the dry adsorption stage while the other dry adsorber is in the regeneration stage, the dry adsorber is provided with a regeneration unit 14, the regeneration unit 14 is provided with a hot regeneration gas branch and a cold regeneration gas branch connected to the dry adsorber, as well as a heat recovery heat exchanger 16 and an anti-corrosion gas storage tank 18, the light component gas discharged from the distillation tower 10 is respectively transported to the hot regeneration gas branch and the cold regeneration gas branch for gas supply through an adjustable three-way valve, the hot regeneration gas branch is provided with a heater 17, the dry adsorbers are all connected with a desorption gas pipe, and the desorption gas pipe is used for regeneration. The desorbed gas in the drying adsorber is output in the stage, the desorbed gas pipe is connected to the hot medium pipeline of the heat recovery heat exchanger 16 through the anti-corrosion gas storage tank 18, the heat recovery heat exchanger 16 is connected in parallel to the hot regeneration gas branch, the cold medium pipeline of the heat recovery heat exchanger 16 is connected to the heater 17, the tank body 1801 of the anti-corrosion gas storage tank 18 is provided with a valve piston 1802 which is slidingly sealed along the length direction of the tank body 1801, the valve piston 1802 divides the inner cavity of the anti-corrosion gas storage tank 18 into a hot regeneration gas temporary storage cavity and a desorption gas cavity, the valve piston 1802 is provided with a first inlet 1811 and a temperature sensor 1812 on the side of the desorption gas cavity, the A follow-up inlet 1817 and a telescopic air duct are provided on the side of the valved piston 1802 facing the hot regeneration gas temporary storage chamber. The telescopic air duct passes through one end of the tank body 1801. A desorption gas inlet 1810 is provided at the other end of the tank body 1801. A regeneration gas outlet 1806 and a regeneration gas inlet 1805 are provided on the side of the tank body 1801. A valve device 1814 is provided in the valved piston 1802. The valve device 1814 is used to switch the connection relationship with the telescopic air duct between the desorption gas chamber and the hot regeneration gas temporary storage chamber according to the temperature change in the desorption gas chamber. The valve device 1814 has a telescopic joint 1821 that is connected to the hot regeneration gas temporary storage chamber and can extend to the side. When the piston 1802 is at the initial height, the telescopic joint 1821 extends out to communicate with the regeneration gas outlet 1806. When the valve core 1819 of the valve device 1814 contracts and enters the valved piston 1802, the telescopic joint 1821 closes itself. The proximity sensor 1816 is used to detect whether the valved piston 1802 slides to the second position of the hot regeneration gas storage chamber when the desorption gas chamber is not connected to the telescopic air duct. When the valved piston 1802 slides toward the second position, the hot regeneration gas storage chamber shrinks. When the valved piston 1802 is in the second position, the valve device 1814 switches to a state of connecting the desorption gas chamber and the telescopic air duct.

[0031] The valve device 1814 includes a driving motor 1815, a crank-connecting rod structure 1818 and a valve core 1819 that slides horizontally in the valve cavity of the valved piston 1802. The valve core 1819 is provided with a first air channel 1822 and a second air channel 1823 that is connected to the follow-up inlet 1817. The first air channel 1822 is a through air channel that is consistent with the direction of the telescopic air pipe. The first inlet 1811 is relative to the telescopic air pipe and can be connected to the telescopic air pipe through the first air channel 1822. One end of the second air channel 1823 can be connected to the telescopic air pipe downward, and the other end is laterally connected to the telescopic joint 1821. The follow-up inlet 1817 is connected to the side of the second air channel 1823. The follow-up inlet 1817 is slidably matched with the slide groove 1824 on the side of the valved piston 1802. The follow-up inlet 1817 is provided with a closing cover plate 1825 that closes the slide groove 1824 during the sliding process.

[0032] One end of the lateral opening of the second airway 1823 is fixedly connected to a cavity tube 1820, a two-way closed cavity 1829 is provided in the cavity tube 1820, a spring 1827 and a closing plate 1830 are provided in the two-way closed cavity 1829, two ends of the two-way closed cavity 1829 are respectively a first opening 1826 and a second opening 1828, one end of the spring 1827 is fixedly sleeved on the outside of the first opening 1826, the other end of the spring 1827 is connected to the closing plate 1830, the spring 1827 naturally presses the closing plate 1830 onto the second opening 1828 to achieve sealing, the connecting end 1831 of the telescopic joint 1821 is slidably sleeved on the outside of the cavity tube 1820, the extending end 1832 of the telescopic joint 1821 can extend from the extending port 1813 on the side of the valved piston 1802, a sealing member is provided between the connecting end 1831 and the cavity tube 1820, and the side of the extending end 1832 is provided with a sealing member that can The ventilated slot, the end face of the protruding end 1832 is fixed with a push rod 1833 extending toward the closing plate 1830, the valve core 1819 pushes out the cavity 1820 when it extends to the side, when the expansion joint 1821 is blocked by the side wall of the tank body 1801, the push rod 1833 pushes the closing plate 1830 to the first opening 1826 to achieve closure, the first position of the valved piston 1802 is located at the air inlet end of the regeneration gas outlet 1806, when the expansion joint 1821 is extended from the protruding port 1813, the protruding end 1832 is inserted into the air inlet end of the regeneration gas outlet 1806 to connect the regeneration gas outlet 1806, and at the same time, the closing plate 1830 is pushed between the first opening 1826 and the second opening 1828 by the push rod 1833, and the expansion joint 1821 is connected with the second airway 1823 through the cavity 1820.

[0033] The air inlet end of the regeneration gas outlet 1806 is provided with an elastic closing structure 1807, and the sliding closing member 1836 of the elastic closing structure 1807 slides axially along the tank body 1801 to close or open the air inlet end of the regeneration gas outlet 1806. When the valve piston 1802 presses the sliding closing member 1836 to open the air inlet end of the regeneration gas outlet 1806, the air inlet end of the regeneration gas outlet 1806 is located on the side of the valve piston 1802.

[0034] The second position is provided with a piston closing structure 1809 fixed on the inner wall of the tank body 1801, and a cold desorption gas outlet 1808 is also provided on the side of the tank body 1801. The sliding closing member 1836 of the piston closing structure 1809 slides axially along the tank body 1801 to close or open the cold desorption gas outlet 1808. The sliding closing member 1836 of the piston closing structure 1809 corresponds to the proximity sensor 1816. When the valve piston 1802 presses the sliding closing member 1836 to open the cold desorption gas outlet 1808, the cold desorption gas outlet 1808 is located in the desorption gas chamber, and the valve piston 1802 is located in the third position. The second position is between the first position and the third position.

[0035] The piston closing structure 1809 and the elastic closing structure 1807 both include a fixing part 1837, a compression spring 1835, a guide column 1834 and a sliding closing part 1836. The sliding closing part 1836 is provided with a baffle portion perpendicular to the side wall of the tank body 1801, and the guide column 1834 is fixedly installed on the baffle portion. The guide column 1834 is slidably plugged into the fixing part 1837, and the baffle portion and the fixing part 1837 are connected by a compression spring 1835.

[0036] The telescopic air duct includes an inner pipe section 1803 and an outer pipe section 1804, the inner pipe section 1803 is slidably and sealingly inserted in the outer pipe section 1804, the end of the inner pipe section 1803 is connected to the center of the valved piston 1802, the outer pipe section 1804 is fixed to the end of the tank body 1801 and extends out of the tank body 1801, and the end of the outer pipe section 1804 extending into the tank body 1801 is the limiting end for the valved piston 1802 to slide toward the hot regeneration gas temporary storage chamber.

[0037] The carbon dioxide purification device also includes a first cooler 1, a first heat exchanger 13, a first gas-liquid separator 2, a compressor 3, a precooler 8, a liquefier 9, a distillation tower 10, a reboiler 11 and a subcooler 12. A second cooler 4 and a second gas-liquid separator 5 are also provided between the dry adsorber and the compressor 3. The first cooler 1 is connected to the first gas-liquid separator 2, the compressor 3, the second cooler 4, the second gas-liquid separator 5, the dry adsorber, the precooler 8, the liquefier 9, the distillation tower 10, the reboiler 11 and the subcooler 12 in sequence through pipelines. At least one pair of dry adsorbers is connected between the second gas-liquid separator 5 and the precooler 8. The hot regeneration gas branch is connected to the heat recovery heat exchanger 16 via the cold medium pipeline of the first heat exchanger 13 and the hot regeneration gas tank 15. The hot medium pipeline of the first heat exchanger 13 is connected to the feed gas delivery pipe and is connected in parallel with the first cooler 1.

[0038] The output ends of the hot regeneration gas branch and the cold regeneration gas branch are connected in parallel with corresponding discharge pipes 1401, and the two discharge pipes 1401 are connected in parallel to the regeneration gas direct discharge main pipe 1402. The outlet of the heat medium pipeline of the heat recovery heat exchanger 16 and the cold desorption gas outlet 1808 are connected in parallel to the desorption gas discharge main pipe 1403. The heat recovery heat exchanger 16 is a shell and tube heat exchanger, the heat medium pipeline is the shell side, and the cold medium pipeline is the tube side.

[0039] The compressor 3 is a multi-shaft centrifugal compressor and adopts a four-stage compression structure. The first cooler 1 is a circulating water cooler. If the device is to stably meet the requirements of food-grade liquid carbon dioxide, a catalytic reactor and a catalytic cooler must be added after the compressor 3 to remove hydrocarbon substances using a catalytic oxidation method. This embodiment only includes a pair of dry adsorbers, namely a first dry adsorber 6 and a second dry adsorber 7.

[0040] The carbon dioxide purification device provided by the present invention further cools the gas after compression by passing through the second cooler 4, so that most of the high-boiling point gases such as water vapor in the compressed gas are liquefied in large quantities, and then separated by the second gas-liquid separator 5, thereby greatly reducing the water vapor impurities in the gas input to the dry adsorber, effectively increasing the use time of the corresponding dry adsorbent in the dry adsorber, increasing the regeneration cycle, and reducing the regeneration frequency, thereby greatly reducing the energy consumption of regeneration gas transportation and heating. At the same time, since the temperature is lowered and the water vapor impurities are reduced, the dryer and the adsorber can be integrated into one, so that there is no need to use different regeneration gases to regenerate the desiccant and the adsorbent respectively, which can also reduce energy consumption.

[0041] In this scheme, the regeneration gas is not an external gas, but a light component gas output from the distillation tower 10, which is processed by the hot regeneration gas branch 20 and the cold regeneration gas branch 21 after passing through the precooler 8. The hot regeneration gas branch 20 uses the first heat exchanger 13 for heat dissipation of the refrigerant in the second cooler 4 to exchange heat. The heat dissipation effect of the low-temperature light component gas can replace the first cooler 1. The hot regeneration gas is also heated by the initial raw gas with a higher temperature and sent to the hot regeneration gas tank 15 for storage. After the hot regeneration gas tank 15 stores a sufficient amount of hot regeneration gas required for heating and desorption, the excess is discharged to the gas processing equipment of the regeneration gas through the gas path in the heater 17. In this way, the gas path in the heater 17 is maintained at a relatively high temperature, so that at the beginning of heating and desorption, the time and energy consumption required to increase the gas temperature to the required temperature after the heater 17 is turned on are greatly reduced.

[0042] The hot regeneration gas in the hot regeneration gas branch 20 cannot be used for the cooling and desorption process. Therefore, the present solution continuously transports and discharges the light component gas that has not been heated by the feed gas through the cold regeneration gas branch 21. When cooling and desorption is performed, the low-temperature light component gas is directly input into the dry adsorber to achieve cooling and desorption.

[0043] The present invention also provides a method for using the above-mentioned carbon dioxide purification device, comprising: inputting a raw gas into a first cooler 1, the raw gas being a carbon dioxide raw gas with a conveying gas pressure of 20 kpa, a temperature of 60°C and containing gas impurities, the first cooler 1 reducing the temperature of the raw gas to 40°C, separating the condensate through a first gas-liquid separator 2, and then transmitting the gas to a centrifugal compressor, obtaining a raw gas with a gas pressure of 2.6 MPa and a temperature of 40°C through centrifugal compression, and then inputting the raw gas into a second cooler 4 to reduce the temperature of the raw gas to 10°C through a refrigerant, and then separating the condensate through a second gas-liquid separator 5, and then sending the raw gas obtained by further separating the liquid into a dry adsorber in a dry adsorption stage to remove water and ethylene in the raw gas. The purified carbon dioxide gas is heat exchanged and cooled with the light component gas output from the distillation tower 10 in the precooler 8, and then enters the liquefier 9 to be cooled to -15°C by the refrigerant and liquefied, and then the liquefied substance is sent to the distillation tower 10. The liquid carbon dioxide in the distillation tower 10 is subjected to mass and heat transfer with the stripping gas countercurrently flowing upward from the bottom of the tower on the surface of the packing. Nitrogen, oxygen, argon and a small amount of light component impurities in the liquid with a higher boiling point than carbon dioxide are discharged from the top of the tower in the form of light component gas. The reboiler 11 at the bottom of the distillation tower 10 obtains the high-purity liquid carbon dioxide product output from the distillation tower 10. The carbon dioxide product is supercooled by the cooler 12 and sent to the finished product tank or downstream device.

[0044] After the distillation tower 10 produces light component gas, the light component gas enters the hot regeneration gas branch. The first heat exchanger 13 on the hot regeneration gas branch replaces the first cooler 1 to cool the raw gas. The light component gas is heated by the first heat exchanger 13 and then input into the hot regeneration gas tank 15 for storage. Before entering the regeneration stage, the gas in the hot regeneration gas tank 15 is full and then transported through the heat recovery heat exchanger 16 and the heater 17 and the gas transported by the cold regeneration gas branch 21 is discharged after being collected in the regeneration gas direct discharge main pipe 1402.

[0045] When the device is used, the regeneration process of the dry adsorber is as follows.

[0046] Step 1: Pressure reduction: At the end of the working cycle, the raw gas in the dry adsorber is released to reduce the internal pressure.

[0047] Step 2, heating and desorption: hot regeneration gas is generated by heating and input into the dry adsorber to achieve desorption. In this step, the hot regeneration gas is simultaneously filled into the anti-corrosion gas storage tank 18, and when the hot desorption gas first enters the anti-corrosion gas storage tank 18, the charging pressure of the hot desorption gas is used to fill the hot regeneration gas in the anti-corrosion gas storage tank 18 into the heat recovery heat exchanger 16 to complete the preheating and drying of the heat recovery heat exchanger 16.

[0048] In this step, the heater 17 is turned on to heat the hot regeneration gas passing through, and the hot regeneration gas branch 20 is switched to supply gas to the dry adsorber that needs to be regenerated. The hot regeneration gas heated by the heater 17 enters the hot regeneration gas temporary storage chamber at the same time and pushes the valve piston 1802 to the first position. The hot regeneration gas temporary storage chamber is connected to the regeneration gas outlet 1806 to transport the hot regeneration gas to the corresponding dry adsorber for heating and desorption. The hot desorption gas after heating and desorption enters the desorption gas chamber of the anti-corrosion gas storage tank 18. The temperature sensor 1812 detects the temperature rise and sends a signal. The valve device 1814 drives the valve core 1819 to retract and start the proximity sensor 1816, disconnecting the expansion joint 1821 from the regeneration gas outlet 1806. The hot regeneration gas temporary storage chamber is connected to the telescopic air duct, so that the hot desorption gas pushes the valve piston 1802 to compress the hot regeneration gas temporary storage chamber, and the hot regeneration gas therein is input into the heat medium pipeline of the heat recovery heat exchanger 16. When the valve piston 1802 drops to the second position, the proximity sensor 1816 detects that the sliding sealing member 1836 of the piston sealing structure 1809 sends a signal, so that the valve device 1814 drives the valve core 1819 to extend laterally, so that the telescopic air duct is connected to the desorption gas chamber to close the exhaust of the second airway 1823, and the hot regeneration gas pushes the valve piston 1802 to move to the first position again. Under the action of the spring 1827, the telescopic joint 1821 extends to connect to the hot regeneration gas outlet 1806 for exhaust outward.

[0049] Step three, cooling and desorption: the unheated cold regenerated gas is input into the dry adsorber for cooling and desorption. In this step, the anti-corrosion gas storage tank 18 still retains the hot regenerated gas temporarily stored in the previous step, and when the cold regenerated gas enters the anti-corrosion gas storage tank 18, the charging pressure of the cold regenerated gas is used to charge the hot regenerated gas in the anti-corrosion gas storage tank 18 into the heat recovery heat exchanger 16 to complete the drying of the heat recovery heat exchanger 16, and at the same time change the delivery path of the desorbed gas.

[0050] In the cooling and desorption step, the heater 17 is turned off, and the hot regeneration gas branch 20 is switched again to discharge gas from the regeneration gas direct exhaust main pipe 1402, and the cold regeneration gas branch is switched to supply gas to the dry adsorber that needs to be regenerated. The hot desorption gas after heating and desorption enters the desorption gas chamber of the corrosion-resistant gas storage tank 18, and the temperature sensor 1812 detects the temperature drop and sends a signal. The valve device 1814 drives the valve core 1819 to retract and close the proximity sensor 1816, disconnects the connection between the telescopic joint 1821 and the regeneration gas outlet 1806, and connects the hot regeneration gas temporary storage chamber with the telescopic air guide pipe, so that the cold desorption gas pushes the valve piston 1802 to compress the hot regeneration gas temporary storage chamber, and inputs the hot regeneration gas therein into the heat medium pipeline of the heat recovery heat exchanger 16. When the valve piston 1802 descends to the third position, it is limited and stopped and the cold desorption gas outlet 1808 is opened, and the cold desorption gas is discharged from the cold desorption gas outlet 1808.

[0051] Step 4: Boosting the pressure: Fill the dry adsorber with gas to boost the pressure, the valve device 1814 is reset, and the desorption cycle ends.

[0052] In this step, the cold regeneration gas branch 21 is switched again to discharge the gas from the regeneration gas direct discharge main pipe 1402, and the gas is filled into the dry adsorber to complete the pressure increase in the pressure increase step, and the valve device 1814 is reset.

[0053] The present invention is described above by way of example in conjunction with the accompanying drawings. It is obvious that the specific implementation of the present invention is not limited to the above-mentioned method. As long as various non-substantial improvements are made using the inventive concept and technical solution of the present invention, or the inventive concept and technical solution are directly applied to other occasions without improvement, they are all within the protection scope of the present invention.

Claims

1. A carbon dioxide purification device, comprising dry adsorbers arranged in pairs, the paired dry adsorbers being used alternately, one dry adsorber being in a dry adsorption stage while the other dry adsorber being in a regeneration stage, characterized in that: The dry adsorber is provided with a regeneration unit (14), the regeneration unit (14) is provided with a hot regeneration gas branch and a cold regeneration gas branch connected to the dry adsorber, as well as a heat recovery heat exchanger (16) and an anti-corrosion gas storage tank (18), the light component gas discharged from the rectification tower (10) is respectively transported to the hot regeneration gas branch and the cold regeneration gas branch through an adjustable three-way valve, the hot regeneration gas branch is provided with a heater (17), the dry adsorbers are all connected with a desorption gas pipe, the desorption The gas pipe is used to output the gas desorbed from the dry adsorber during the regeneration stage. The desorption gas pipe is connected to the hot medium pipeline of the heat recovery heat exchanger (16) via the anti-corrosion gas storage tank (18). The heat recovery heat exchanger (16) is connected in parallel to the hot regeneration gas branch. The cold medium pipeline of the heat recovery heat exchanger (16) is connected to the heater (17). The tank body (1801) of the anti-corrosion gas storage tank (18) is provided with a sliding plate along the length direction of the tank body (1801). A valve piston (1802) is provided with a sealing arrangement, wherein the valve piston (1802) divides the inner cavity of the anti-corrosion gas storage tank (18) into a hot regeneration gas temporary storage cavity and a desorption gas cavity, wherein the valve piston (1802) is provided with a first inlet (1811) and a temperature sensor (1812) on the side facing the desorption gas cavity, and the valve piston (1802) is provided with a follower inlet (1817) and a telescopic air guide tube on the side facing the hot regeneration gas temporary storage cavity, wherein the telescopic air guide tube is connected from the tank The tank body (1801) is provided with a desorption gas inlet (1810) at one end thereof, and a regeneration gas outlet (1806) and a regeneration gas inlet (1805) are provided on the side of the tank body (1801). A valve device (1814) is provided in the valve piston (1802). The valve device (1814) is used to switch the connection relationship between the desorption gas chamber and the hot regeneration gas temporary storage chamber and the telescopic air guide pipe according to the temperature change in the desorption gas chamber. The valve piston (1802) is also provided with a proximity sensor (1816) on the side facing the hot regeneration gas temporary storage chamber. The valve device (1814) has a telescopic joint (1821) connected to the hot regeneration gas temporary storage chamber and capable of extending to the side. When the valve piston (1802) is at an initial height, the telescopic joint (1821) extends out to communicate with the regeneration gas outlet (1806). The telescopic joint (1821) enters the valve piston (1802) as the valve core (1819) of the valve device (1814) contracts. When the piston (1802) is in the second position, the telescopic joint (1821) is automatically closed, and the proximity sensor (1816) is used to detect whether the valved piston (1802) slides to the second position of the hot regeneration gas temporary storage chamber when the desorption gas chamber is not connected to the telescopic air duct. When the valved piston (1802) slides toward the second position, the hot regeneration gas temporary storage chamber shrinks. When the valved piston (1802) is in the second position, the valve device (1814) switches to a state of connecting the desorption gas chamber and the telescopic air duct. The valve device (1814) comprises a driving motor (1815), a crank connecting rod structure (1818) and a valve core (1819) which slides horizontally in the valve cavity of the valve piston (1802). The valve core (1819) is provided with a first air passage (1822) and a second air passage (1823) which is connected to the follower inlet (1817). The first air passage (1822) is a through air passage which is consistent with the direction of the telescopic air guide tube. The first inlet (1811) is relatively close to the telescopic air guide tube and can pass through the first inlet (1811). The air channel (1822) is connected to the telescopic air duct, one end of the second air channel (1823) can be connected to the telescopic air duct downward, and the other end is connected to the telescopic joint (1821) laterally, the follow-up inlet (1817) is connected to the side of the second air channel (1823), the follow-up inlet (1817) is slidably matched with the slide groove (1824) on the side of the valve piston (1802), and the follow-up inlet (1817) is provided with a closing cover plate (1825) for closing the slide groove (1824) during the sliding process; The telescopic air guide pipe includes an inner pipe section (1803) and an outer pipe section (1804), the inner pipe section (1803) is slidably and sealingly inserted in the outer pipe section (1804), the end of the inner pipe section (1803) is connected to the center of the valved piston (1802), the outer pipe section (1804) is fixed to the end of the tank body (1801) and extends out of the tank body (1801), and the end of the outer pipe section (1804) extending into the tank body (1801) is the limiting end for the valved piston (1802) to slide toward the hot regeneration gas temporary storage chamber.

2. A carbon dioxide purification device according to claim 1, characterized in that: One end of the lateral opening of the second airway (1823) is fixedly connected to a cavity tube (1820), a two-way closed cavity (1829) is provided in the cavity tube (1820), a spring (1827) and a closing plate (1830) are provided in the two-way closed cavity (1829), two ends of the two-way closed cavity (1829) are respectively a first opening (1826) and a second opening (1828), one end of the spring (1827) is fixedly sleeved on the outer side of the first opening (1826), and the other end of the spring (1827) is connected to the closing plate (1830). 830), the spring (1827) in a natural state presses the closing plate (1830) onto the second opening (1828) to achieve closure, the connecting end (1831) of the telescopic joint (1821) is slidably sleeved on the outside of the cavity (1820), the extending end (1832) of the telescopic joint (1821) can extend from the extending port (1813) on the side of the valved piston (1802), a sealing member is provided between the connecting end (1831) and the cavity (1820), and a sealing member is provided on the side of the extending end (1832). The valve core (1819) is provided with a notch for ventilation, and a push rod (1833) extending toward the closing plate (1830) is fixed to the end surface of the extending end (1832). When the valve core (1819) extends toward the side, the cavity tube (1820) is pushed out. When the expansion joint (1821) is blocked by the side wall of the tank body (1801), the push rod (1833) pushes the closing plate (1830) onto the first opening (1826) to achieve closure. The first position of the valve piston (1802) is located at the regeneration gas outlet (1806). ), when the expansion joint (1821) is extended from the extension port (1813), the extension end (1832) is inserted into the air inlet end of the regeneration gas outlet (1806) so that the slot is connected to the regeneration gas outlet (1806), and at the same time, the closing plate (1830) is pushed between the first port (1826) and the second port (1828) by the push rod (1833), and the expansion joint (1821) is connected to the second airway (1823) through the cavity tube (1820).

3. A carbon dioxide purification device according to claim 2, characterized in that: The air inlet end of the regeneration gas outlet (1806) is provided with an elastic sealing structure (1807), and the sliding sealing member (1836) of the elastic sealing structure (1807) slides axially along the tank body (1801) to close or open the air inlet end of the regeneration gas outlet (1806); the second position is provided with a piston sealing structure (1809) fixed on the inner wall of the tank body (1801), and the side of the tank body (1801) is also provided with a cold desorption gas outlet (1808), and the sliding sealing member (1836) of the piston sealing structure (1809) slides axially along the tank body (1801) to close or open the cold desorption gas outlet (1808), and the sliding sealing member (1836) of the piston sealing structure (1809) corresponds to the proximity sensor (1816).

4. A carbon dioxide purification device according to claim 3, characterized in that: The carbon dioxide purification device further comprises a first cooler (1), a first heat exchanger (13), a first gas-liquid separator (2), a compressor (3), a precooler (8), a liquefier (9), a distillation tower (10), a reboiler (11) and a subcooler (12); a second cooler (4) and a second gas-liquid separator (5) are further arranged between the dry adsorber and the compressor (3); the first cooler (1) is connected in sequence to the first gas-liquid separator (2), the compressor (3), the second cooler (4), the second gas-liquid separator (5) through pipelines. ), the dry adsorber, the precooler (8), the liquefier (9), the distillation tower (10), the reboiler (11) and the subcooler (12), at least one pair of dry adsorbers are connected between the second gas-liquid separator (5) and the precooler (8), the hot regeneration gas branch is connected to the heat recovery heat exchanger (16) via the cold medium pipeline of the first heat exchanger (13) and the hot regeneration gas tank (15), the hot medium pipeline of the first heat exchanger (13) is connected to the feed gas delivery pipe and is connected in parallel with the first cooler (1).

5. A carbon dioxide purification device according to claim 4, characterized in that: The output ends of the hot regeneration gas branch and the cold regeneration gas branch are both connected in parallel with corresponding exhaust pipes (1401), and the two exhaust pipes (1401) are connected in parallel to the regeneration gas direct exhaust main pipe (1402), and the outlet of the heat medium pipeline of the heat recovery heat exchanger (16) and the cold desorption gas outlet (1808) are both connected in parallel to the desorption gas exhaust main pipe (1403).

6. A method for using the carbon dioxide purification device according to claim 5, characterized in that: The regeneration process of the dry adsorber is as follows: Step 1: Pressure reduction: After the working cycle is over, the raw gas in the dry adsorber is released to reduce the internal pressure; Step 2, heating and desorption: generating hot regeneration gas by heating and inputting the hot regeneration gas into the dry adsorber to achieve desorption, and simultaneously charging the hot regeneration gas into the anti-corrosion gas storage tank (18), and when the hot desorption gas first enters the anti-corrosion gas storage tank (18), using the charging pressure of the hot desorption gas to charge the hot regeneration gas in the anti-corrosion gas storage tank (18) into the heat recovery heat exchanger (16) to complete the preheating and drying of the heat recovery heat exchanger (16); Step 3, cooling and desorption: the unheated cold regeneration gas is input into the drying adsorber for cooling and desorption, and when the cold regeneration gas enters the anti-corrosion gas storage tank (18), the hot regeneration gas in the anti-corrosion gas storage tank (18) is charged into the heat recovery heat exchanger (16) by the charging pressure of the cold regeneration gas to complete the drying of the heat recovery heat exchanger (16), and at the same time, the delivery path of the desorption gas is changed; Step 4: Boosting the pressure: Fill the dry adsorber with gas to boost the pressure, the valve device (1814) is reset, and the desorption cycle ends.