A shield tunnel excavation face stability test method
By simulating the shield tunnel excavation process on the model test platform, the formation deformation and soil pressure laws when excavation surfaces in the sand and pebbles are instable, the problem of instability of shield tunnel excavation surfaces in the sand and pebbles is solved. A detailed study of formation deformation and soil pressure is achieved, and a method for analyzing the range of soil disturbances is provided.
Patent Information
- Application Number
- CN202410881445.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-03
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-07-03
AI Technical Summary
In sand-pebbles, the excavation surface of the shield tunnel is prone to instability, resulting in complex stratigraphic deformation. The existing technology lacks effective research methods to understand the stratigraphic deformation changes and soil disturbance range when the excavation surface is instable.
Using a model test platform that can truly simulate the shield excavation process, the continuous excavation of spiral unearthed simulators simulates the changes in soil pressure, combined with the formation displacement meter and soil pressure box, the excavation surface instability of sand and pebble formations of different relative density is studied. The formation deformation and soil pressure rules are used to simulate the soil extrusion effect conduction of the soil layer through the rubber joint structure to avoid extrusion backlog in the narrow model box.
The surface deformation, formation deformation and soil pressure development laws of shield tunnel excavation surfaces of sand and pebble formations of different relative densities were successfully studied, providing a method to analyze soil disturbance range, and improving the authenticity and accuracy of model experiments. .
Smart Images

Figure CN118408884B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground engineering, in particular to a shield tunnel excavation face stability test method. Background Art
[0002] At present, the construction of subways in China is booming, and most of them are constructed by shield method. When shield method is used in sand and gravel strata, over-excavation often occurs due to the disturbance and scattering of the face, collapse, etc., resulting in cavities and ground collapse, which has a serious impact on the upper roads, pipelines and buildings. Over-excavation in subway construction may cause ground collapse pits, resulting in traffic blockage, water pipe bursting, building tilting and cracking and other accidents. This is mainly because sand and gravel is a typical mechanically unstable stratum with large pores and no cohesion between particles. In the waterless state, the sand and gravel stratum transmits force point to point between particles, and the stratum reacts sensitively. When the cutterhead rotates and cuts, the stratum can easily destroy the original relatively stable or balanced state and collapse, causing greater surrounding rock disturbance, making the excavation surface and the tunnel wall lose constraints and become unstable.
[0003] There is little research in the existing literature on the stratum deformation and soil disturbance range during the instability of the excavation face of a shield tunnel in sandy and gravel strata, and the stratum deformation change law caused by the instability of the excavation face in sandy and gravel strata is very complex.
[0004] Therefore, a shield tunnel excavation face stability test method is needed to study the deformation change law of the stratum caused by the instability of the excavation face in the sandy and gravel stratum. Summary of the invention
[0005] The purpose of the present invention is to provide a shield tunnel excavation face stability test method in accordance with the above-mentioned deficiencies of the prior art. Based on a shield model test platform that can truly and effectively reflect the characteristics of the shield excavation process, similar model tests of sand and gravel strata with different relative densities are carried out; a method of continuous excavation with a spiral excavator is used to simulate the continuous reduction of pressure in the soil cabin, so as to study the variation law of stratum deformation and soil pressure when the tunnel excavation face gradually becomes unstable to overall destruction; the relationship between the displacement at different positions in the stratum and the instability time when the excavation face becomes unstable is studied in detail; as the instability time increases, the development law of the lateral distribution of settlement is also studied in detail; combined with stratum deformation monitoring data and surface settlement phenomena, the soil disturbance range when the shield tunnel excavation face in complex strata with different relative densities becomes unstable can be analyzed; a rubber clamping structure is used to simulate the transmission of the soil squeezing effect of the soil layer to a distance, so as to avoid the phenomenon of squeezing and compacting of the soil layer at the inner wall surface of the plate body, and simulate the process in which the conduction of the soil layer gradually weakens during the squeezing process, rather than directly stopping.
[0006] The purpose of the present invention is achieved by the following technical solutions:
[0007] A shield tunnel excavation face stability test method, characterized in that the method comprises:
[0008] (S1) installing a model box, pasting wallpaper on the inner side of the model box, and setting scale lines on the wallpaper;
[0009] (S2) using the scale lines on the wallpaper to fill the model box in layers, setting an observation section perpendicular to the propulsion direction of the shield machine, and arranging a stratum displacement meter, an earth pressure box and a surface displacement meter around the observation section;
[0010] Wherein, the stratum displacement meter and the earth pressure box are arranged inside the soil body, and the surface displacement meter is arranged on the surface of the soil body;
[0011] (S3) a shield machine is arranged at the rear end plate of the model box, and the shield machine is used to drill soil in the model box to simulate tunnel excavation, and data of the surface displacement meter, the stratum displacement meter and the earth pressure box are recorded;
[0012] (S4) in the process of the shield machine drilling into the model box, based on the soil squeezing effect of the shield machine on the longitudinal direction and both sides during excavation, each of the through-axis linear screw mechanisms is controlled to support forward so that the front end plate is displaced in the longitudinal direction and the side plates on both sides are displaced outward, and the rubber wall plate is extended accordingly;
[0013] (S5) Soil bodies with different relative densities are selected to simulate gravel strata with different relative densities, and the above steps S1 to S4 are repeated to study the surface deformation, stratum deformation and soil pressure development law caused by the instability of the shield tunnel excavation face in gravel strata with different relative densities.
[0014] The model box is a cubic box with an open top, including a bottom plate, a front plate, a rear plate, side plates on both sides and two corner connecting plates; wherein:
[0015] The two ends of the front end plate are connected to the side plates through the corner connecting plates respectively; the corner connecting plates are in a right angle shape; the ends of the corner connecting plates, the ends of the side plates and the ends of the front end plate are all connected by a rubber clamping structure;
[0016] A rubber clamping structure is also used between the two end portions of the rear end plate and the two side plates.
[0017] The rubber clamping structure comprises a rubber wall plate and a through-axis linear screw mechanism, wherein bosses are respectively provided at both ends of the rubber wall plate, and slots are respectively provided at the ends of the corner connecting plate, the ends of the side plate, the ends of the front end plate, and the ends of the rear end plate, wherein the bosses and the slots are adapted to each other in size and shape, and the clamping is achieved by clamping the bosses at both ends of the rubber wall plate into the slots at the ends of the plate body to be connected; the through-axis linear screw mechanism is pre-embedded in the ends of the side plate, the ends of the front end plate, and the ends of the rear end plate, and a through hole is provided at the center of the rubber wall plate for the screw in the through-axis linear screw mechanism to pass through, and the rubber wall plate is finely adjusted to be compressed or stretched by driving the screw forward or backward;
[0018] For the rubber clamping structure provided between the side plate and the corner connecting plate, the through-shaft linear screw mechanism of the rubber clamping structure is pre-buried in the side plate and the screw front end of the through-shaft linear screw mechanism is rotatably connected to the end of the corner connecting plate;
[0019] For the rubber clamping structure provided between the front end plate and the corner connecting plate, the through-axis linear screw mechanism of the rubber clamping structure is pre-buried in the front end plate and the screw front end of the through-axis linear screw mechanism is rotatably connected to the end of the corner connecting plate;
[0020] For the rubber clamping structure arranged between the rear end plate and the side plate, the through-axis linear screw mechanism of the rubber clamping structure is pre-buried in the rear end plate and the front end of the screw of the through-axis linear screw mechanism is rotatably connected to the end of the side plate.
[0021] During the layered filling process in step S2, the soil mass required for each layer of filling is calculated by the relative density of the soil, and then the soil is weighed and filled into the model box, and at the same time, it is compacted with a rammer and checked with a laser level. After the filling reaches a predetermined height, the specific burial positions of the stratum displacement meter and the soil pressure box are determined by the laser level.
[0022] The stratum displacement meters are respectively arranged above the shield machine excavation area, above the boundary of the shield machine excavation area and above one side of the shield machine excavation area, and the stratum displacement meters are connected to the grating ruler displacement monitoring system.
[0023] The surface displacement meters are respectively arranged above the shield machine excavation area, above the boundary of the shield machine excavation area and above the other side of the shield machine excavation area; the surface displacement meters are connected to the static strain collector and the static strain collector is used to collect and record all surface displacement and deformation data.
[0024] The earth pressure boxes are respectively arranged above the excavation area of the shield machine, on both sides of the excavation area of the shield machine, and above both sides of the excavation area of the shield machine.
[0025] In step S3, the shield machine is arranged on a support pedestal and driven to move forward and backward by a ball screw mechanism.
[0026] The required displacement data of the front end plate and the side plate are calculated respectively based on the displacement data of the formation displacement meter.
[0027] The advantages of the present invention are:
[0028] (1) Through deformation model tests and soil pressure change model tests, the development laws of surface deformation, stratum deformation and soil pressure caused by the instability of the shield tunnel excavation face in sandy and gravel strata with different relative densities are studied;
[0029] (2) By setting a rubber clamping structure that can generate longitudinal and lateral displacements on the model box, that is, a rubber wall panel that can adapt to stretching or compression and a through-axis linear screw mechanism that can drive the rubber wall panel to deform, the actual soil layer environment can be better simulated, avoiding the soil squeezing effect caused by the soil layer terminating displacement transmission at the side panels and the front end panel in the narrow model box, causing the soil layer to be compacted at the wall panel position. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a plan view of the model box and the shield machine test mechanism in the present invention;
[0031] Figure 2 It is a split schematic diagram of the rubber wall panel, the corner connecting plate and the side plate in the present invention;
[0032] Figure 3 For the present invention Figure 1 An enlarged schematic diagram of the local A in FIG.
[0033] Figure 4 It is a schematic diagram of the screw in the through-shaft linear screw mechanism of the present invention pushing the corner connecting plate to extend the rubber wall plate;
[0034] Figure 5 For the present invention Figure 1 Schematic diagram of the layout of the surface displacement meter from the top view of the middle model box;
[0035] Figure 6 For the present invention Figure 1 Schematic diagram of the arrangement of the surface displacement meter and the formation displacement meter from the B-direction viewing angle of the middle model box;
[0036] Figure 7 For the present invention Figure 1 Schematic diagram of the arrangement of the surface displacement meter and the formation displacement meter from the C-direction viewing angle of the middle model box;
[0037] Figure 8 For the present invention Figure 1 The layout of the earth pressure box under the top view of the model box;
[0038] Fig. 9 For the present invention Figure 1 The layout of the earth pressure box from the B-direction perspective of the middle model box;
[0039] Fig.10 For the present invention Figure 1 The layout of the earth pressure box from the C-direction perspective of the middle model box;
[0040] Fig.11 It is a schematic diagram of test parameters of soils with different relative densities according to the present invention;
[0041] Fig.12 It is a schematic diagram of test parameters of the shield machine in different relative density strata during excavation of the present invention. DETAILED DESCRIPTION
[0042] The features of the present invention and other related features are further described in detail below through embodiments in conjunction with the accompanying drawings to facilitate understanding by those skilled in the art:
[0043] like Figure 1-12 As shown, the reference numerals in the figure are respectively: shield machine test mechanism 1, shield machine 11, ball screw mechanism 12, support pedestal 13; model box 2, side plate 21, front end plate 22, rear end plate 23, corner connecting plate 24, rubber wall plate 25, through-axis linear screw mechanism 26, through hole 27; surface displacement meter 3, stratum displacement meter 4.
[0044] Example: Figure 1-12 As shown, this embodiment relates to a shield tunnel excavation face stability test method, which mainly includes:
[0045] (S1) Figure 1-4 As shown, smooth wallpaper is pasted on the inner side of the model box 2 to reduce the friction between the soil and the inside of the box, and scale lines are set on the wallpaper to ensure more accurate control of the soil sample density during the filling process.
[0046] The length, width and height of the model box 2 are 2000 mm×2000 mm×1500 mm respectively. The model box 2 is a cubic box with an open top, including a bottom plate, a front plate 22, a rear plate 23, side plates 21 on both sides and two corner connecting plates 24. The bottom plate is laid flat on the ground, the two ends of the front plate 22 are connected to the side plates 21 on both sides through the corner connecting plates 24, and the two ends of the rear plate 23 are connected to the side plates 21 on both sides, together forming the circumferential vertical panel of the model box 2.
[0047] The corner connecting plate 24 is in a right-angle shape, and one end of the corner connecting plate 24 is clamped to the end of the side plate 21 via a rubber clamping structure, and the other end of the corner connecting plate 24 is clamped to the end of the front end plate 22 via a rubber clamping structure; in addition, the two ends of the rear end plate 23 are also clamped to the ends of the side plates 21 on both sides via a rubber clamping structure.
[0048] like Figure 2 , 3 4, each rubber clamping structure adopts the same structure. In this embodiment, the rubber clamping structure between the corner connecting plate 24 and the side plate 21 is used as an example for explanation. The rubber clamping structure includes a rubber wall plate 25 and a through-axis linear screw mechanism 26. The two ends of the rubber wall plate 25 are respectively provided with bosses and the middle position has the same thickness as the side plate 21. The ends of the corner connecting plate 24 and the ends of the side plate 21 are respectively provided with card grooves. The shapes and sizes of the bosses and the card grooves correspond to each other. When assembling, by The bosses of 25 are correspondingly assembled in the slots of the two end plates to form a snap-fit relationship; the through-axis linear screw mechanism 26 is pre-buried and fixed in the front end cavity of the side plate 21, and a through hole 27 is provided in the center of the rubber wall plate 25 for the screw in the through-axis linear screw mechanism 26 to pass through. The front end of the screw in the through-axis linear screw mechanism 26 is fixedly connected to the end surface of the corner connecting plate 24 (but the screw can be rotated), and the rubber section in the middle of the rubber wall plate 25 is finely adjusted to be compressed or stretched by driving the screw forward or backward. Specifically, by driving the through-axis linear screw mechanism 26 in the two sets of rubber snap-fit structures here, the longitudinal displacement of the front end plate 22 can be achieved.
[0049] like Figure 1-4 As shown, for the rubber clamping structure located between the front end plate 22 and the corner connecting plate 24, a through-axis linear screw mechanism 26 is pre-buried in the front end plate 22 and the front end of the screw of the through-axis linear screw mechanism 26 is fixedly connected to the end of the corner connecting plate 24 and can rotate relatively.
[0050] For the rubber clamping structure between the rear end plate 23 and the side plate 21 , the through-axis linear screw mechanism 26 is embedded in the rear end plate 23 and the front end of the screw of the through-axis linear screw mechanism 26 is fixedly connected to the rear end of the side plate 21 and can rotate relatively.
[0051] Specifically, when the through-shaft linear screw mechanisms 26 in the front end plate 22 and the rear end plate 23 are driven simultaneously, lateral displacement of the side plates 21 on both sides can be achieved.
[0052] (S2) Figure 1-7 As shown, the scale lines on the wallpaper are used to fill the model box 2 in layers, and an observation section is set perpendicular to the propulsion direction of the shield machine 11. In this embodiment, the observation section is set at 1 / 2 of the entire propulsion length in the model box 2, and a stratum displacement meter 4, an earth pressure box and a surface displacement meter 3 are arranged around the observation section.
[0053] like Figure 5-10 As shown, the stratum displacement meter 4 and the earth pressure box are arranged inside the soil, the surface displacement meter 3 is arranged on the surface of the soil, and the observation section is a vertical cross section and is set at 1 / 2 of the entire advancement length in the model box 2.
[0054] The unit height during the filling process is set to 10 cm. After calculating the mass of soil required for each layer of filling, the soil is weighed and filled into the model box 2, and compacted with a rammer and checked with a laser level. After the filling reaches the predetermined height, the specific burial position of the stratum displacement meter 4 and the earth pressure box is determined by a laser level. The minimum dry density and maximum dry density of the test soil sample are obtained through geotechnical tests. First, the minimum density obtained by filling the model box 2 with a 10 cm soil sample is tested, and then the maximum density obtained is tested in the same way. Finally, the minimum and maximum operable densities are determined. During the test, the corresponding soil filling density is calculated based on the relative density, and then the mass of the required soil is calculated according to 10 cm. In addition, the layered filling of the soil is achieved by filling the soil in blocks. After the filling and the arrangement of the stratum displacement meter 4 and the earth pressure box are completed, the flatness is checked again, and the positioning frame of the surface displacement meter 3 is set. After the surface displacement meter 3 and the formation displacement meter 4 are installed, the surface displacement meter 3 is connected to the static strain collector, the formation displacement meter is connected to the grating ruler displacement monitoring system, and the static strain collector and the grating ruler displacement monitoring system are connected to the computer. In this embodiment, the surface displacement meter 3 adopts a top rod displacement meter, and the static strain collector adopts a DH3818Y static strain collector, which is used to collect and record all surface displacement and deformation data, and its collection frequency is 1-200Hz. The formation displacement meter 4 is composed of a serrated steel plate, a steel strand and a plexiglass tube, and the unit of the collected data of the grating ruler displacement monitoring system is μm.
[0055] The ground displacement meter 4 is arranged above the excavation area of the shield machine 11, above the boundary of the excavation area of the shield machine 11, and above one side of the excavation area of the shield machine 11. The surface displacement meter 3 is arranged above the excavation area of the shield machine 11, above the boundary of the excavation area of the shield machine 11, and above the other side of the excavation area of the shield machine 11. The earth pressure box is arranged above the excavation area of the shield machine, on both sides of the excavation area of the shield machine, and above both sides of the excavation area of the shield machine to ensure the accuracy of data collection. The earth pressure box is used to measure x , y , z Earth pressure in three directions, y Direction is the excavation direction of the shield machine. x Direction perpendicular to y The horizontal direction of the direction, z is perpendicular to y The vertical direction of the direction. C / D =2.0, the layout positions of the stratum displacement meter 4, the surface displacement meter 3 and the earth pressure box can be found in Figure 5-10 As shown, C / D is the burial depth ratio of the shield machine in the model box.
[0056] (S3) The shield machine test mechanism 1 is arranged on the outer wall of the model box 2. The shield machine test mechanism 1 includes a shield machine 11, a ball screw mechanism 12 and a support pedestal 13. The shield machine 11 is arranged on the support pedestal 13, and the tail of the shield machine 11 is connected to the ball screw mechanism 12 and driven to move forward and backward. The shield machine 11 drills and digs the soil in the model box 2 to simulate tunnel excavation, and records the data of the surface displacement meter 3, the stratum displacement meter 4 and the earth pressure box.
[0057] The maximum design thrust of shield machine 11 is 60 kN, the maximum design torque of the cutterhead is 1800 N·m, the cutterhead diameter is 28 cm, the opening rate is 45%, and the maximum design torque of the spiral excavator is 60 N·m. The above design parameters all meet the test requirements.
[0058] (S4) In the process of controlling the shield machine 11 to simulate tunnel excavation in the soil layer of the model box 2, it is inevitable that a soil squeezing effect will be produced on the longitudinal front end and both sides of the shield machine 11, that is, the position close to the shield machine 11 is affected by the soil squeezing and the displacement is the largest. As the distance increases, the soil is affected by the soil squeezing less and the displacement will also be weakened. However, since the size of the model box 2 is generally small, the soil is usually blocked at the inner wall surface of the plate body of the model box 2 by the soil squeezing, resulting in the accumulation of soil layer compression at the inner wall surface, which makes it impossible to truly simulate the displacement and compression of the soil layer during the excavation process of the shield machine 11. In order to solve this problem, it is necessary to provide a stable supporting force to the rubber clamping structure between the plates of the model box 2 so that the rubber wall plate 25 thereon can be slowly extended to simulate the force transmission and displacement transmission of the soil layer, and the extension of the rubber wall plate 25 will still keep the inner wall surface of the model box 2 smooth.
[0059] Specifically, each through-axis linear screw mechanism 26 is controlled to support forward so that the front end plate 22 is displaced longitudinally and the side plates 21 on both sides are displaced outwardly, and the rubber wall plate 25 is slowly extended accordingly. The specific extension size of the rubber wall plate 25 can be determined based on experience or test parameters, and the extension value of the rubber wall plate 25 is controlled to be 1-10 mm during the entire excavation process of the shield machine 11.
[0060] In this embodiment, based on the displacement data of the stratum displacement meter 4, the law that the stratum displacement decreases with the increase of distance is sorted out, and then the values of the lateral displacement compensation required for the side plates 21 on both sides are derived according to the distance between the side plates 21 and the shield machine 11, that is, the required extension values of the rubber wall plates 25 at both ends of the rear plate 23, and the required extension values of the rubber wall plates 25 at both ends of the front plate 22. According to the advancement distance of the shield machine 11 in the model box 2, the through-axis linear screw mechanism 26 at both ends of the rear plate 23 is first controlled to slowly support and extend the rubber wall plates 25 at both ends of the rear plate 23. When the shield machine 11 is advanced in the model box 2 to the front plate 22, the through-axis linear screw mechanism 26 at both ends of the front plate 22 is further controlled to slowly support and extend the rubber wall plates 25 at both ends of the front plate 22.
[0061] In addition, the required longitudinal movement compensation value of the front end plate 22 , ie, the required extension value of the rubber wall plate 25 at the front ends of the side plates 21 on both sides, is derived according to the distance between the front end plate 22 and the front end of the shield machine 11 .
[0062] (S5) Soil bodies with different relative densities are selected to simulate gravel strata with different relative densities, and the above steps S1 to S4 are repeated to study the surface deformation, stratum deformation and soil pressure development law caused by the instability of the shield tunnel excavation face in gravel strata with different relative densities.
[0063] In this embodiment, three soils with different relative densities are tested. The test parameters of the three soils are shown in Fig.11 Correspondingly, the test parameters of the shield machine during excavation for three different relative density strata can be found in Fig.12 As shown. According to the instability characteristics of shield tunnel excavation faces in different relative density strata, the cutter head speed and spiral excavator speed are 0.2 r / min and 1.0 r / min respectively. In addition, D r = 0.35 and 0.55, the excavation face instability time is 41 minutes. D r =0.75, and the instability time is set to 71 minutes. The shield machine model test is divided into two stages: shield machine excavation and simulated excavation face instability. r is the relative density of the soil. It can be found that when the relative density D r =0.35 and 0.55, the instability time of the excavation face is almost the same, both about 41 minutes, while when the relative density D r =0.75, the soil tends to be more stable and the instability time of the excavation face is extended to 71 minutes.
[0064] The beneficial technical effects of this embodiment are:
[0065] (1) Through deformation model tests and soil pressure change model tests, the development laws of surface deformation, stratum deformation and soil pressure caused by the instability of the shield tunnel excavation face in sandy and gravel strata with different relative densities are studied;
[0066] (2) By setting a rubber clamping structure that can generate longitudinal and lateral displacements on the model box, that is, a rubber wall panel that can adapt to stretching or compression and a through-axis linear screw mechanism that can drive deformation, the actual soil environment can be better simulated to avoid the soil layer terminating displacement transmission at the side panels and the front end panel in the narrow model box, causing the soil layer to be compacted at the wall panel position.
[0067] Although the above embodiments have described in detail the concepts and embodiments of the present invention with reference to the accompanying drawings, ordinary technicians in this field can recognize that various improvements and changes can still be made to the present invention without departing from the scope of the claims, so they are not described one by one here.
Claims
1. A shield tunnel excavation face stability test method, characterized in that The method comprises: (S1) installing a model box, pasting wallpaper on the inner side of the model box, and setting scale lines on the wallpaper; The model box is a cubic box with an open top, including a bottom plate, a front plate, a rear plate, side plates on both sides and two corner connecting plates; wherein: The two ends of the front end plate are connected to the side plates through the corner connecting plates respectively; the corner connecting plates are in a right angle shape; the ends of the corner connecting plates, the ends of the side plates and the ends of the front end plate are all connected by a rubber clamping structure; A rubber clamping structure is also used between the two ends of the rear end plate and the two side plates; The rubber clamping structure includes a rubber wall plate and a through-shaft linear screw mechanism; the through-shaft linear screw mechanism is pre-buried in the end of the side plate, the end of the front plate, and the end of the rear plate; a through hole is provided in the center of the rubber wall plate for the screw in the through-shaft linear screw mechanism to pass through, and the rubber wall plate is finely adjusted to be compressed or extended by driving the screw forward or backward; (S2) using the scale lines on the wallpaper to fill the model box in layers, setting an observation section perpendicular to the propulsion direction of the shield machine, and arranging a stratum displacement meter, an earth pressure box and a surface displacement meter around the observation section; Wherein, the stratum displacement meter and the earth pressure box are arranged inside the soil body, and the surface displacement meter is arranged on the surface of the soil body; The observation section is set at a position of 1 / 2 of the entire propulsion length in the model box; (S3) a shield machine is arranged at the rear end plate of the model box, and the shield machine is used to drill soil in the model box to simulate tunnel excavation, and data of the surface displacement meter, the stratum displacement meter and the earth pressure box are recorded; (S4) in the process of the shield machine drilling into the model box, based on the soil squeezing effect generated by the shield machine in the longitudinal direction and on both sides during excavation, each of the through-axis linear screw mechanisms is controlled to support forward so that the front end plate is displaced in the longitudinal direction of the shield machine and the side plates on both sides are displaced outward, and the rubber wall plate is extended accordingly; (S5) Soil bodies with different relative densities are selected to simulate gravel strata with different relative densities, and the above steps S1 to S4 are repeated to study the surface deformation, stratum deformation and soil pressure development law caused by the instability of the shield tunnel excavation face in gravel strata with different relative densities.
2. A shield tunnel excavation face stability test method as claimed in claim 1, characterized in that Bosses are respectively provided at both ends of the rubber wall plate, and slots are respectively provided at the ends of the corner connecting plate, the ends of the side plate, the ends of the front plate, and the ends of the rear plate. The bosses and the slots are adapted to each other in size and shape, and the bosses at both ends of the rubber wall plate are clamped into the slots at the ends of the plate body to be connected to achieve clamping; For the rubber clamping structure arranged between the side plate and the corner connecting plate, the through-axis linear screw mechanism of the rubber clamping structure is pre-buried in the side plate and the front end of the screw of the through-axis linear screw mechanism is connected to the end of the corner connecting plate. Rotation connect; For the rubber clamping structure arranged between the front end plate and the corner connecting plate, the through-axis linear screw mechanism of the rubber clamping structure is pre-buried in the front end plate and the screw front end of the through-axis linear screw mechanism is connected to the end of the corner connecting plate. Rotation connect; For the rubber clamping structure arranged between the rear end plate and the side plate, the through-axis linear screw mechanism of the rubber clamping structure is pre-buried in the rear end plate and the front end of the screw of the through-axis linear screw mechanism is connected to the end of the side plate. Rotation connect.
3. A shield tunnel excavation face stability test method as claimed in claim 2, characterized in that During the layered filling process in step S2, the soil mass required for each layer of filling is calculated by the relative density of the soil, and then the soil is weighed and filled into the model box, and at the same time, it is compacted with a rammer and checked with a laser level. After the filling reaches a predetermined height, the specific burial positions of the stratum displacement meter and the soil pressure box are determined by the laser level.
4. A shield tunnel excavation face stability test method as claimed in claim 3, characterized in that The stratum displacement meters are respectively arranged above the shield machine excavation area, above the boundary of the shield machine excavation area and above one side of the shield machine excavation area, and the stratum displacement meters are connected to the grating ruler displacement monitoring system.
5. A shield tunnel excavation face stability test method as claimed in claim 4, characterized in that The surface displacement meters are respectively arranged above the shield machine excavation area, above the boundary of the shield machine excavation area and above the other side of the shield machine excavation area; the surface displacement meters are connected to the static strain collector and the static strain collector is used to collect and record all surface displacement and deformation data.
6. A shield tunnel excavation face stability test method as claimed in claim 5, characterized in that The earth pressure boxes are respectively arranged above the excavation area of the shield machine, on both sides of the excavation area of the shield machine, and above both sides of the excavation area of the shield machine.
7. A shield tunnel excavation face stability test method as claimed in claim 2, characterized in that In step S3, the shield machine is arranged on a support pedestal and driven to move forward and backward by a ball screw mechanism.
8. A shield tunnel excavation face stability test method as claimed in claim 1, characterized in that The required displacement data of the front end plate and the side plate are calculated respectively based on the displacement data of the formation displacement meter.
Citation Information
Patent Citations
Test method for simulating passive damage to shallow-buried shield tunnel excavation surface
CN108361042A
Excavation face stability test device and method considering vibration effect of shield cutter head
CN113188994A
Upward earth pressure shield excavation face stability test device and use method thereof
CN114878298A
Large-diameter earth pressure shield tunneling interface simulation test system
CN209945737U
Shallow earth covering shield excavating device and shield excavating method
JP2001193386A