An intelligent control method for wastewater treatment equipment at a dry bulk cargo terminal

By installing sensors in dry bulk cargo terminals and using edge computing and machine learning models to classify sewage types and dynamically adjust the parameters of sewage treatment equipment, the problems of incomplete data collection, unintelligent control strategies and insufficient fault prediction of existing sewage treatment equipment are solved. , achieving efficient and stable sewage treatment, reducing costs and ensuring that the effluent quality meets standards.

CN118410312BActive Publication Date: 2024-10-18TIANJIN RES INST FOR WATER TRANSPORT ENG M O T
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202410841119.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2024-10-18
Estimated Expiration
2044-06-27

AI Technical Summary

Technical Problem

The existing sewage treatment equipment at dry bulk terminals has problems such as incomplete data collection, insufficient intelligent control strategies, insufficient fault prediction and prevention, and low energy consumption and resource utilization. This makes it difficult for sewage treatment to adapt to complex changing needs and increases equipment maintenance. Cost and operational inefficiencies.

Method used

Install multiple types of sensors at key locations in dry bulk terminals, use edge computing nodes for real-time data collection and preprocessing, combine historical features and time features, use machine learning models to classify sewage types, and dynamically adjust through weighted voting and confidence assessment The operating parameters of sewage treatment equipment ensure the best treatment effect.

Benefits of technology

It improves the efficiency and effect of sewage treatment, reduces operating costs, enhances the stability and reliability of equipment, achieves efficient, stable and intelligent management of sewage treatment, ensures that the effluent quality meets standards and protects the environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118410312B_ABST
    Figure CN118410312B_ABST
Patent Text Reader

Abstract

The present invention discloses an intelligent control method for sewage treatment equipment at a dry bulk cargo terminal, which relates to the technical field of sewage treatment equipment control and is used to solve the problem of poor control of sewage treatment equipment at the terminal. The method comprises the following steps: by installing multiple types of sensors at key positions of the dry bulk cargo terminal, and using edge computing nodes for real-time data collection and preprocessing, combining historical characteristics and time characteristics, using machine learning models to classify sewage types, achieving efficient dynamic adjustment of sewage treatment equipment operating parameters, and then through weighted voting and confidence evaluation, integrating multiple classification results to ensure the best treatment effect, and continuously optimizing equipment control by analyzing the actual sewage treatment situation, thereby preventing failures, extending equipment life, and improving sewage treatment effects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of sewage treatment equipment control, and in particular to an intelligent control method for sewage treatment equipment at a dry bulk cargo terminal. Background Art

[0002] Dry bulk terminals are usually equipped with large-scale loading and unloading equipment, such as belt conveyors, grab cranes, loaders, etc., to facilitate efficient loading and unloading and handling of goods. In addition, these terminals will also have corresponding storage facilities, such as yards and silos, to meet the needs of temporary storage and transshipment of goods, especially in the import and export of mineral resources and agricultural commodities. Through dry bulk terminals, goods can be efficiently transported from the place of production to the place of consumption, ensuring the smooth and stable supply chain.

[0003] The existing technology has the following deficiencies: In the loading and unloading area of ​​the dry bulk terminal, flushing is often required. The flushing water will carry away the mud, oil and bulk materials (such as ore dust, grain residues, etc.) on the ground to form sewage. Ships docked at the terminal may also generate sewage, including domestic sewage (such as domestic sewage of crew members), oily sewage in the engine room and cargo hold cleaning wastewater, etc., and the existing dry bulk terminal sewage treatment equipment has problems such as incomplete data collection, insufficient intelligence of control strategy, insufficient fault prediction and prevention, and low energy consumption and resource utilization. These deficiencies make it impossible to monitor and record sewage-related data in real time, making it difficult for the sewage treatment control system to adapt to complex and changing needs, resulting in increased equipment maintenance costs and low operating efficiency.

[0004] The above information disclosed in this Background section is only for enhancement of understanding of the background of the present disclosure and therefore it may contain information that does not constitute the prior art that is already known to one of ordinary skill in the art. Summary of the invention

[0005] The purpose of the present invention is to provide an intelligent control method for sewage treatment equipment at a dry bulk cargo terminal. The present invention installs multiple types of sensors at key positions of the dry bulk cargo terminal, and uses edge computing nodes to perform real-time data collection and preprocessing. Combined with historical characteristics and time characteristics, a machine learning model is used to classify sewage types, thereby achieving efficient dynamic adjustment of sewage treatment equipment operating parameters. Then, through weighted voting and confidence evaluation, multiple classification results are integrated to ensure the best treatment effect, thereby addressing the deficiencies in the background technology.

[0006] In order to achieve the above object, the present invention provides the following technical solution: an intelligent control method for dry bulk cargo terminal sewage treatment equipment, comprising the following steps:

[0007] Install multiple types of sensors at different locations of the dry bulk terminal to collect sewage data in real time, conduct preliminary data preprocessing and analysis on sewage treatment, and obtain preliminary classification of sewage types;

[0008] Perform historical feature extraction and time feature extraction on historical data, and combine the extracted historical features and time features with the preprocessed data to form a complete feature vector for machine learning model input;

[0009] The model classifies according to the input feature vector, outputs the predicted probability or classification label of each sewage type, combines the rule-based classification and machine learning classification results, combines weighted voting with confidence assessment to obtain the final classification result, and dynamically adjusts the operating parameters of the sewage treatment equipment according to the final classification result;

[0010] Obtain the operation and processing information generated after adjusting the operating parameters of the sewage treatment equipment, determine the sewage treatment status after adjusting the equipment operating parameters according to the final classification results, and adjust and optimize the sewage equipment control according to the treatment results.

[0011] Preferably, preliminary data preprocessing and analysis is performed on the sewage treatment to obtain preliminary classification of sewage types, including:

[0012] Connect the sensor to the edge computing node, set the data collection frequency and data format through the edge computing node, and use mean filtering to denoise the data;

[0013] Standardize the data and convert it into a unified unit and scale;

[0014] Determine a preset water quality parameter threshold value based on various water quality parameters of sewage collected in real time, and use the water quality parameter threshold value as a classification condition;

[0015] Perform preliminary classification according to the preset water quality parameter thresholds, traverse each collected data sample, compare the water quality parameter thresholds of each water quality parameter of each data sample, perform preliminary classification based on the comparison results, and mark the classification results of each data sample.

[0016] Preferably, historical features and time features are extracted from historical data, and the extracted historical features and time features are combined with preprocessed data to form a complete feature vector for model input. The specific steps are as follows:

[0017] Extract according to time characteristics, determine the changes of sewage characteristics in different time periods, add time tags to each data sample, and divide it into different time periods according to the collection time;

[0018] Calculate the moving average and moving standard deviation within the time window of historical data, and extract historical features based on the calculation results;

[0019] After extracting and constructing the temporal features and historical features, the preprocessed real-time data is combined with the extracted temporal features and historical features as combined input and incorporated into the model;

[0020] Models include random forest, support vector machine, neural network.

[0021] Preferably, the rule-based classification and machine learning classification results are combined, and weighted voting and confidence evaluation are combined to obtain the final classification result. The specific steps are as follows:

[0022] Perform rule classification of data samples according to preset water quality parameter thresholds, and obtain one or more sewage types for each data sample according to the rule classification;

[0023] For each data sample, the classification results of the machine learning model and the rule-based classification results are weighted and voted, and different weights are determined for each classification method according to its accuracy;

[0024] Use machine learning models to classify data, evaluate the confidence of each category based on rule classification, and obtain the total confidence of each category;

[0025] Based on weighted voting combined with confidence assessment method, the final sewage type of each data sample is determined, and the final classification result of each data sample is output.

[0026] Preferably, the operation processing information generated after the operation parameters of the sewage treatment equipment are adjusted is obtained, and the sewage treatment status after the equipment operation parameters are adjusted according to the final classification result is determined. The specific steps are as follows:

[0027] Obtaining operation and processing information generated after adjusting the operation parameters of the sewage treatment equipment, the operation and processing information includes equipment operation information and sedimentation impact information;

[0028] Equipment operation information includes the operating equipment response stability index, and settlement impact information includes the multi-dimensional settlement deviation index:

[0029] The equipment control coefficient is generated by combining the operating equipment response stability index and the multi-dimensional settlement deviation index;

[0030] The response stability index of the operating equipment is inversely proportional to the equipment control coefficient, and the multidimensional settlement deviation index is proportional to the equipment control coefficient.

[0031] Preferably, the sewage equipment control is adjusted and optimized according to the treatment results, and the specific steps include:

[0032] Compare the generated equipment control coefficient with the intelligent control threshold;

[0033] If the equipment control coefficient is greater than the intelligent control threshold, a sewage treatment abnormality signal is generated and the sewage treatment control plan is adjusted;

[0034] If the equipment control coefficient is less than or equal to the intelligent control threshold, a sewage treatment stability signal is generated, and there is no need to perform sewage treatment control, and monitoring and maintenance will continue.

[0035] In the above technical solution, the technical effects and advantages provided by the present invention are:

[0036] The present invention installs multiple types of sensors at key locations of dry bulk terminals, utilizes edge computing nodes for real-time data collection and preprocessing, combines historical characteristics and time characteristics, and uses machine learning models to classify sewage types, thereby achieving efficient dynamic adjustment of sewage treatment equipment operating parameters. Then, through weighted voting and confidence evaluation, the present invention integrates multiple classification results to ensure the best treatment effect. By analyzing the actual sewage treatment situation, the present invention continuously optimizes equipment control, thereby preventing failures, extending equipment life, and improving sewage treatment effects.

[0037] The intelligent control method of sewage treatment equipment has significantly improved the efficiency and effect of sewage treatment, reduced operating costs, and enhanced the stability and reliability of equipment operation. Through intelligent monitoring, data analysis and dynamic adjustment, it has achieved efficient, stable and intelligent management of sewage treatment, ensuring that the effluent water quality meets the standards and protects the environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

[0039] Figure 1 The present invention is a flow chart of an intelligent control method for dry bulk cargo terminal sewage treatment equipment. DETAILED DESCRIPTION

[0040] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in a variety of forms and should not be construed as limited to the examples set forth herein; rather, these example embodiments are provided so that the description of the present disclosure will be more comprehensive and complete, and the concept of the example embodiments will be fully conveyed to those skilled in the art.

[0041] Embodiment 1: The present invention provides Figure 1 The method for intelligent control of wastewater treatment equipment at a dry bulk cargo terminal shown in the figure comprises the following steps:

[0042] Install multiple types of sensors at different locations of the dry bulk terminal to collect sewage data in real time, conduct preliminary data preprocessing and analysis on sewage treatment, and obtain preliminary classification of sewage types;

[0043] Perform historical feature extraction and time feature extraction on historical data, and combine the extracted historical features and time features with the preprocessed data to form a complete feature vector for machine learning model input;

[0044] The model classifies according to the input feature vector, outputs the predicted probability or classification label of each sewage type, combines the rule-based classification and machine learning classification results, combines weighted voting with confidence assessment to obtain the final classification result, and dynamically adjusts the operating parameters of the sewage treatment equipment according to the final classification result;

[0045] Obtain the operation and processing information generated after adjusting the operating parameters of the sewage treatment equipment, determine the sewage treatment status after adjusting the equipment operating parameters according to the final classification results, and adjust and optimize the sewage equipment control according to the treatment results.

[0046] Select key locations of the terminal for monitoring, including water inlet, water outlet, treatment tank, rainwater collection area, flushing area, mechanical cleaning area, ship sewage discharge port, etc. Install multiple types of sensors at different locations of the dry bulk terminal to collect comprehensive sewage data. The sensors include water quality monitoring sensors, which are used to monitor the pH value, dissolved oxygen, chemical oxygen demand (COD), biological oxygen demand (BOD), suspended solids concentration, heavy metal content, etc. in sewage. Water quality monitoring sensors are installed at water inlet, water outlet, treatment tank, rainwater collection area, flushing area, etc.

[0047] Flow sensors measure sewage flow and are installed at the inlets and outlets of major drainage pipes. Temperature sensors monitor sewage temperature and are installed at key points such as water inlets and treatment tanks. Oil pollution monitoring sensors monitor oil pollution content and are installed in mechanical cleaning areas, ship sewage discharge outlets, etc.

[0048] Connect these sensors to edge computing nodes to ensure that data can be transmitted to edge computing devices in real time. Use IoT technologies such as LoRa and NB-IoT to transmit sensor data to the cloud in real time, store and manage sensor data in the cloud, and ensure data security and accessibility.

[0049] Edge computing nodes are installed at each monitoring point for preliminary data processing and analysis. The edge computing nodes process sensor data in real time, perform preprocessing (such as denoising and standardization), and classify sewage types according to preset rules. The specific steps are as follows:

[0050] Configure the data receiving function on the edge computing node to receive real-time data from the sensor, set the data collection frequency and data format, apply the filtering algorithm mean filtering to perform denoising, remove the noise in the sensor data, ensure the accuracy of the data, and standardize the data to convert the data into a unified unit and scale;

[0051] Mean filtering is achieved by selecting a window size k, calculating the average value of each data point in the window, and replacing the original data point. , data after mean filtering The calculation formula is: , where k is the window size and i is in the range of arrive ;

[0052] Standardize the data using Min-Max standardization. , the standardized data The calculation formula is: , where min represents the minimum value of the sequence and max represents the maximum value of the sequence;

[0053] Rule-based classification: preliminary classification is performed according to the preset water quality parameter thresholds, the collected data is divided into multiple data samples, and the water quality parameter thresholds are determined based on various water quality parameters of sewage collected in real time, such as pH value, COD concentration, dissolved oxygen (DO), etc. For example, pH < 6 is initially classified as strongly acidic sewage, pH > 9 is classified as strongly alkaline sewage, COD concentration threshold COD > 200 mg / L is initially classified as highly organically polluted sewage, and DO < 2 mg / L is classified as low dissolved oxygen sewage;

[0054] Determine a preset water quality parameter threshold value based on various water quality parameters of sewage collected in real time, and use the water quality parameter threshold value as a classification condition;

[0055] Traverse each collected data sample, check whether its various water quality parameters meet the classification conditions, compare the water quality parameter thresholds of each data sample, check the various water quality parameters of each data sample according to the preset classification conditions, perform preliminary classification, mark the classification results of each data sample, and ensure that the sewage treatment equipment can adopt the best treatment plan according to different types of sewage;

[0056] Through the above specific steps, the sewage from the dry bulk terminal can be effectively classified according to the preset water quality parameter thresholds, ensuring that the sewage treatment equipment can adopt the best treatment plan according to different types of sewage, thereby improving the efficiency and effect of sewage treatment.

[0057] Extract the time characteristics (such as daytime and nighttime) and historical characteristics (using moving average, moving standard deviation, etc.) of historical data (historical sewage-related data of dry bulk terminals), enhance the data characteristics, and input the preprocessed data into the trained machine learning model (such as random forest, support vector machine, neural network, etc.) for real-time classification. The specific steps are as follows:

[0058] Extract according to time characteristics, define time periods, and divide a day into different time periods (such as daytime, nighttime, morning, evening, etc.) to determine the changes in sewage characteristics in different time periods. The division of time periods can be based on actual experience and data analysis results. For example, daytime is 6:00 to 18:00, and nighttime is 18:00 to 6:00;

[0059] Add a time label to each data sample and divide it into different time periods according to the collection time;

[0060] Historical features are extracted from historical data, and the moving average within the time window is calculated to reflect the short-term trend of sewage parameters, such as the moving average of pH value in a 5-minute window. The moving standard deviation within the time window can also be calculated to reflect the volatility of sewage parameters, such as the moving standard deviation of pH value in a 5-minute window. The historical maximum and minimum values ​​within a certain time window are calculated to reflect the extreme changes in parameters.

[0061] After extracting and constructing the time features and historical features, the preprocessed real-time data is combined with the extracted time features and historical features to form a complete feature vector for model input;

[0062] Use feature selection algorithms such as recursive feature elimination and principal component analysis to filter out the features that have the greatest impact on classification, reduce feature redundancy, and improve model efficiency;

[0063] Principal component analysis (PCA) projects the data into a low-dimensional space through linear transformation and extracts the principal components that best explain the data variance:

[0064] Calculate the data covariance matrix, then calculate the eigenvalues ​​and eigenvectors of the covariance matrix, select the eigenvectors corresponding to the first k largest eigenvalues, and construct the eigenvector matrix W;

[0065] Project the data into a low-dimensional space: Z=XW, where Z is the principal component matrix, X is the original data matrix, and W is the eigenvector matrix;

[0066] Divide the dataset into training set and test set, usually with a ratio of 80% training set and 20% test set. Use cross-validation methods (such as k-fold cross-validation) to further divide the training set to evaluate the stability and generalization ability of the model.

[0067] The training set is divided into k subsets, and the model is trained with k-1 subsets each time, and the model is tested with the remaining subset. This is repeated k times, and the average performance index is calculated. The k-fold cross validation formula is:

[0068] ,in, is the performance index of the ith verification;

[0069] Choose a suitable machine learning model according to specific needs, such as random forest, support vector machine (SVM), neural network, etc. Random forest is suitable for processing multi-feature data and has strong generalization ability and robustness. Support vector machine (SVM) is suitable for high-dimensional data classification and can find the optimal classification hyperplane; neural network is suitable for modeling complex data relationships and can automatically extract features;

[0070] Use the training set data to train the selected model and adjust the model parameters (such as the number of trees for random forests, the type of kernel function for SVMs, the number of layers and neurons in the neural network) to optimize model performance;

[0071] Use grid search or random search to optimize the model's hyperparameters. For example, the hyperparameters of a random forest include the number of trees, the maximum depth of the tree, etc.

[0072] Perform k-fold cross validation to evaluate the performance of the model under different data partitions to ensure the stability and generalization ability of the model;

[0073] The model performance is evaluated using indicators such as accuracy, precision, recall, and F1 score. Accuracy is the ratio of data samples correctly predicted by the model to the total data samples, precision is the ratio of data samples predicted by the model to be positive that are actually positive, recall is the ratio of data samples predicted by the model to be positive, and F1 score is the harmonic mean of precision and recall.

[0074] Use the test set data to evaluate the trained model and calculate various evaluation indicators to ensure the generalization ability and stability of the model.

[0075] The model performs classification based on the input features and outputs the predicted probability or classification label for each sewage type. For example, the model may predict that a data sample is "highly organically polluted water" or "strongly acidic / alkaline sewage."

[0076] Combining the rule-based classification and machine learning classification results, weighted voting and confidence assessment are used to obtain the final classification results. According to the final classification results, the operating parameters of the sewage treatment equipment are dynamically adjusted to ensure the best treatment effect;

[0077] Classification is performed based on the preset water quality parameter thresholds. For example, if the pH value is less than 6 or greater than 9, it is initially classified as "strong acid / alkaline sewage". Similarly, if the COD value exceeds a certain threshold (such as 200 mg / L), it is initially classified as "highly organic polluted water";

[0078] For each data sample, one or more possible sewage types are obtained according to the classification rules;

[0079] For each data sample, the classification results from the machine learning model and the rule-based classification results are weighted voted. Each classification method can be given different weights according to its accuracy or reliability. For example, if the machine learning model has a higher accuracy, it can be given a higher weight.

[0080] The specific steps of the weighted voting mechanism are: use machine learning models (such as random forests, SVMs, neural networks) to classify the data and obtain the predicted probability of each category;

[0081] The data is classified according to the preset water quality parameter thresholds, and each category vote (1 or 0) is obtained; the weights of the machine learning model and the rule-based classification are determined, and the weights are assigned according to their respective accuracy and reliability. Assume that the weight of the machine learning model is , the weight of the rule-based classification is ;

[0082] Perform a weighted vote on the results of each category, combining the prediction probability of the machine learning model and the vote of the rule-based classification. , where argmax represents the input value corresponding to the maximum value, LB is the category, and c is the category (such as strong acid / alkaline sewage, highly organic polluted water, etc.). The machine learning model predicts the probability of classification c, is the vote (1 or 0) of the rule-based classification on classification c, is the weight of the machine learning model, The weight of the rule-based classification.

[0083] If the machine learning model provides a probability distribution of the classification, these probabilities can be used as confidence indicators to comprehensively judge the final classification results based on the confidence of the machine learning model and the rule-based classification;

[0084] Use machine learning models to classify data and obtain the confidence (probability) of each category. The confidence assessment of each category based on rule classification can be set to a fixed value or dynamically adjusted based on historical accuracy;

[0085] The confidence of each category is combined to calculate the total confidence of each category. The calculation formula is: ,in, represents the confidence of the machine learning model in classification c, Indicates the confidence of the rule-based classification for classification c;

[0086] According to the weighted voting combined with the confidence assessment method, the final sewage type of each data sample is determined, and the final classification result of each data sample is output for further sewage treatment equipment control decision-making;

[0087] For example, the machine learning model predicts that the probability that a data sample is "strong acid / strong alkaline sewage" is 0.7, and the probability that it is "highly organic polluted water" is 0.3;

[0088] According to the rule-based classification, the data sample is classified as "strong acid / alkaline sewage" (vote is 1) and is not classified as "highly organic polluted water" (vote is 0). Assuming that the machine learning model weight is 0.7 and the rule-based classification weight is 0.3;

[0089] For "strong acid / alkaline sewage": 0.7×0.7+0.3×1=0.49+0.3=0.79, for "highly organic polluted water": 0.7×0.3+0.3×0=0.21;

[0090] The data samples are classified, and the final classification result is "strong acid / strong alkaline sewage";

[0091] For "strong acid / alkaline sewage": the confidence of the machine learning model is 0.7, the confidence of the rule-based classification is 0.5, and the comprehensive confidence is 0.7+0.5=1.20. For "highly organic polluted water": the confidence of the machine learning model is 0.3, the confidence of the rule-based classification is 0.2, and the comprehensive confidence is 0.3+0.2=0.5. The final classification result is "strong acid / alkaline sewage";

[0092] The final classification results of the sewage data samples are obtained through comprehensive weighted voting and confidence assessment methods. The classification results are used to guide the adjustment of operating parameters of sewage treatment equipment to ensure the best treatment effect.

[0093] Obtaining the operation and processing information generated after adjusting the operation parameters of the sewage treatment equipment, analyzing the operation and processing information, determining the sewage treatment status after adjusting the equipment operation parameters according to the final classification results, and adjusting and optimizing the sewage equipment control according to the treatment results. The operation and processing information includes equipment operation information and sedimentation impact information;

[0094] The equipment operation information includes the operating equipment response stability index, and the settlement impact information includes the multi-dimensional settlement deviation index. After collection, the operating equipment response stability index and the multi-dimensional settlement deviation index are calibrated as YXS and DWC respectively.

[0095] The operating equipment response stability index is a comprehensive index used to evaluate the stability and reliability of the response of sewage treatment equipment during the treatment process. The operating equipment response stability index reflects whether the equipment can make stable and efficient adjustments when facing sewage changes and maintain the stability of the treatment effect. By monitoring the equipment adjustment time, operating parameter fluctuations and failure frequency, and analyzing the results, it can help identify and solve problems in equipment operation, optimize treatment strategies, improve equipment reliability and treatment efficiency, and ensure the stability of treatment effects.

[0096] The operating equipment response stability index has the following functions:

[0097] Improve equipment reliability: By continuously monitoring the equipment's adjustment time, operating parameter fluctuations, and failure frequency, potential problems in equipment operation can be discovered in a timely manner, signs of unstable equipment response can be identified in advance, equipment failures can be prevented, unplanned downtime can be reduced, and resources can be concentrated on key maintenance of unstable equipment to improve equipment reliability;

[0098] Optimize treatment strategy: By running the feedback of equipment response stability index, dynamically adjust equipment operation parameters (such as aeration time, reagent dosage, stirring speed, etc.), optimize sewage treatment plan, and evaluate and improve the equipment's response speed to sewage changes, to ensure that the treatment plan can adapt to changes in sewage characteristics in a timely manner and improve treatment efficiency;

[0099] Reduce operating costs: By improving the stability and reliability of equipment, reducing the cost of frequent maintenance and replacement of parts, and optimizing equipment operating parameters and processing strategies, improving processing efficiency, reducing energy consumption and drug consumption, and saving operating costs.

[0100] For example, the adjustment time of a certain aeration equipment fluctuates greatly when treating high organic load sewage. Maintenance is carried out in advance according to the response stability index of the operating equipment, thus avoiding downtime caused by equipment failure, and further adjusting the aeration time and the dosage of the agent to optimize the treatment effect and ensure that the effluent water quality is stable and meets the standards.

[0101] The logic for obtaining the response stability index of the running device is as follows:

[0102] Through the installed sensors and monitoring equipment, the equipment adjustment time, operating parameters and fault occurrence are monitored in real time, the start and end time of each adjustment operation are recorded, and the adjustment time data is obtained. The data set of equipment operation is regularly recorded, including adjustment time, operating parameters, fault occurrence time and frequency, and the actual adjustment time is obtained. and expected adjustment time , and calculate the standard deviation and mean value of the adjustment time, calculate the adjustment time deviation, and the calculation expression is: ;

[0103] Extract the time point and amplitude ΔParam of parameter changes from the data set and record the time point when the parameter reaches a stable state and the time point at which the parameters change , calculate the parameter change response time: , obtain the number of equipment failures F and the total running time T in the time period;

[0104] Get the standard deviation of the adjusted time and average , calculate the stable value of the adjustment time, the calculation expression is: , get the standard deviation of the operating parameter deviation and average , calculate the fluctuation value of the operating parameters: , calculate the response stability index of the running equipment, the calculation expression is: .

[0105] It should be noted that the amplitude of parameter change is the difference between the initial value and the adjusted stable value of the parameter. The initial value and stable value of the parameter are extracted from the data, and the absolute value of the difference between the two is taken as the amplitude of parameter change. The number of equipment failures and the total operating time within the time period are analyzed by statistically analyzing the specified time period. The specific time range is determined according to actual needs.

[0106] The multidimensional sedimentation deviation index is used to indicate the deviation of sewage sedimentation effect during sewage treatment. The multidimensional sedimentation deviation index reflects the comprehensive performance, deviation and instability of the sedimentation process by comprehensively evaluating the deviation of each key parameter in the sedimentation process, thereby helping to identify and quantify problems in the sedimentation process, optimize the treatment process, and improve the overall effect and efficiency of sewage treatment.

[0107] The multidimensional settlement deviation index affects the following aspects:

[0108] Sewage treatment efficiency: By monitoring and optimizing the multi-dimensional sedimentation deviation index, deviations in the sedimentation process can be discovered in a timely manner, and measures can be taken to adjust them, thereby improving the efficiency of solid-liquid separation and ensuring that the effluent quality is stable and up to standard. By optimizing the sedimentation process, unnecessary energy and reagent consumption can be reduced, and resource utilization efficiency can be improved;

[0109] Environmental impact: By optimizing the sedimentation process, improving the removal efficiency of pollutants, reducing pollutant emissions, and protecting the environment, the effluent quality can be improved, the treated sewage can be more widely reused, and water resources can be saved.

[0110] The logic of obtaining the multidimensional settlement deviation index is as follows:

[0111] Obtain the total suspended solids content TS in the sewage, the volume of sludge after sedimentation TJ and the interface sedimentation velocity SD in the data sample to obtain the ideal total suspended solids concentration value , ideal sludge volume index value , ideal interface sedimentation velocity value , calculate the total suspended solids deviation value: , establish a set of total suspended solids deviation values and sludge volume index value set and interface sedimentation velocity value set , and perform standardization to obtain the standard value of total suspended solids deviation: , n represents the total number of data samples, max represents the maximum value function, and min represents the minimum value function. Similarly, the standard value of sludge volume index TJP and the standard value of interface sedimentation velocity SDP are calculated, and the multidimensional sedimentation deviation index is calculated. The calculation expression is: .

[0112] It should be noted that the total suspended solids reflect the content of solid particles in sewage. The total suspended solids can be obtained by obtaining a certain amount of sewage samples from the sewage treatment facility, filtering, drying and weighing, and calculating the weight difference before and after drying and the volume ratio of the sewage sample to obtain the total suspended solids content; obtaining sludge samples from the sedimentation tank or aeration tank in the sewage treatment facility, pouring the sludge sample into a measuring cylinder, letting it stand for 30 minutes, and measuring the volume of the sludge after sedimentation; the interfacial sedimentation velocity reflects the sinking rate of the solid-liquid interface during the sedimentation process, which refers to the sedimentation rate of the sludge suspension interface per unit time.

[0113] The obtained operating equipment response stability index and multi-dimensional settlement deviation index are normalized and calculated to generate the equipment control coefficient, which is calibrated as , based on the formula: , where , are the preset proportional coefficients of the operating equipment response stability index and the multi-dimensional settlement deviation index, respectively, and , All are greater than 0;

[0114] It should be noted that the formula is obtained by technicians in this field to collect multiple groups of data sample data and set corresponding preset proportional coefficients for each group of data sample data. The specific calculation process is: substitute the acquired operating equipment response stability index and multi-dimensional sedimentation deviation index into the formula to form an equation group, and then screen and average the calculated preset proportional coefficients to obtain the preset proportional coefficients. Since each group of data sample data is different, the specific values ​​of the preset proportional coefficients under different data sample data are also different.

[0115] From the formula of the equipment control coefficient, it can be seen that the smaller the response stability index of the operating equipment and the larger the multidimensional sedimentation deviation index, that is, the larger the value of the equipment control coefficient, the more it indicates that the equipment is unstable in response during operation, the adjustment is not timely, the operating parameters fluctuate greatly, the deviation in the sedimentation process is large, and there is a significant difference between the actual treatment effect and the expected target value. It is necessary to immediately optimize the equipment operating parameters and process conditions to improve the stability of the equipment response and the sedimentation treatment effect, and ensure that the effluent water quality meets the standard;

[0116] The larger the response stability index of the operating equipment and the smaller the multidimensional sedimentation deviation index, that is, the smaller the performance value of the equipment control coefficient, it means that the equipment shows a high degree of stability and reliability in responding to changes in sewage characteristics, and the adjustment is quick and accurate, and the operating parameters fluctuate very little. This shows that the equipment response is very stable, the adjustment is timely, the sedimentation process deviation is small, the treatment effect is excellent, the operating status is good, and the resource and energy utilization efficiency is high. Continuing to maintain and optimize the existing strategies can ensure the continued high efficiency and stability of the sewage treatment process.

[0117] The generated equipment control coefficient is compared with the intelligent control threshold, and different signals are generated according to the comparison results, namely, a sewage treatment stable signal and a sewage treatment abnormal signal;

[0118] After obtaining the generated equipment control coefficient, the generated equipment control coefficient is compared with the intelligent control threshold. If the equipment control coefficient is greater than the intelligent control threshold, a sewage treatment abnormality signal is generated, indicating that the sewage treatment process operation status is abnormal, indicating that the equipment operating parameters and process conditions need to be optimized immediately to improve the stability of the equipment response and the sedimentation treatment effect, and ensure that the effluent water quality meets the standard. This mechanism can help to promptly discover and solve problems in operation and ensure the efficiency and stability of the sewage treatment process.

[0119] If the equipment control coefficient is less than or equal to the intelligent control threshold, a sewage treatment stability signal is generated, indicating that under the current circumstances, the sewage treatment equipment responds stably, the treatment effect is ideal, the operating status is good, and the effluent water quality meets the standard. In this case, the sewage treatment system operates normally and no emergency adjustment is required, but monitoring and maintenance should continue to ensure continued efficient operation.

[0120] When an abnormal sewage treatment signal is generated, it indicates that the process operation status of the sewage treatment equipment is abnormal, and the following specific measures need to be taken immediately to optimize the equipment operating parameters and process conditions;

[0121] Analyze the sewage conditions during the time period when the sewage treatment abnormal signal is generated. Draw a time trend chart of key parameters during the abnormal signal period according to the specific time and duration of the sewage treatment abnormal signal. Observe the changes of each parameter, conduct correlation analysis, calculate the correlation between key parameters, identify which parameter changes may lead to the generation of abnormal signals, compare the data during the abnormal signal period with the data during normal operation, and find out the abnormal points during the abnormal signal period;

[0122] Analyze the timing data before and after the abnormal signal is generated, find out the possible triggering events or conditions, analyze the operating status of the equipment during the abnormal signal, check whether the equipment is faulty or operating abnormally, check whether the process parameter settings are reasonable, and whether they need to be adjusted and optimized;

[0123] According to the analysis results, the aeration volume, chemical dosage, sedimentation time, sludge return volume and other operating parameters are optimized. The specific measures include adjusting the aeration equipment operating parameters, optimizing the aeration volume and time, ensuring the activity of microorganisms, optimizing chemical dosing, adjusting the dosage and type of chemical dosage, and ensuring the best treatment effect; monitoring and adjusting the sludge return flow, adjusting the sludge return flow according to the sludge concentration and sedimentation performance, ensuring the appropriate sludge load, optimizing the sludge return ratio, and preventing the sludge load from being too high or too low and affecting the treatment effect;

[0124] According to the sewage characteristics and treatment effects, optimize the process flow, improve the treatment efficiency, maintain and upgrade the equipment with problems to ensure the normal operation of the equipment, and strengthen the real-time monitoring and early warning system to promptly discover and deal with potential problems.

[0125] Through detailed analysis of the sewage conditions during the period when abnormal sewage treatment signals are generated, the causes of the abnormal signals can be found and corresponding improvement measures can be formulated to optimize equipment operating parameters and process conditions, ensure the efficiency and stability of the sewage treatment process, and ensure that the effluent water quality meets the standards.

[0126] It should be noted that the relevant threshold information in this embodiment is pre-set by professionals and will not be explained in detail here.

[0127] The present invention installs multiple types of sensors at key locations of dry bulk terminals, utilizes edge computing nodes for real-time data collection and preprocessing, combines historical characteristics and time characteristics, and uses machine learning models to classify sewage types, thereby achieving efficient dynamic adjustment of sewage treatment equipment operating parameters. Then, through weighted voting and confidence evaluation, the present invention integrates multiple classification results to ensure the best treatment effect. By analyzing the actual sewage treatment situation, the present invention continuously optimizes equipment control, thereby preventing failures, extending equipment life, and improving sewage treatment effects.

[0128] The intelligent control method of sewage treatment equipment has significantly improved the efficiency and effect of sewage treatment, reduced operating costs, and enhanced the stability and reliability of equipment operation. Through intelligent monitoring, data analysis and dynamic adjustment, it has achieved efficient, stable and intelligent management of sewage treatment, ensuring that the effluent water quality meets the standards and protects the environment.

[0129] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.

[0130] The above description is only by way of illustration of certain exemplary embodiments of the present invention. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.

[0131] It should be noted that, in this article, if there are relational terms such as first and second, etc., they are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0132] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. An intelligent control method for wastewater treatment equipment at a dry bulk cargo terminal, It is characterized in that The steps include: Install multiple types of sensors at different locations of the dry bulk terminal to collect sewage data in real time, conduct preliminary data preprocessing and analysis on sewage treatment, and obtain preliminary classification of sewage types; Perform historical feature extraction and time feature extraction on historical data, and combine the extracted historical features and time features with the preprocessed data to form a complete feature vector for machine learning model input; The model classifies according to the input feature vector, outputs the predicted probability or classification label of each sewage type, combines the rule-based classification and machine learning classification results, combines weighted voting with confidence assessment to obtain the final classification result, and dynamically adjusts the operating parameters of the sewage treatment equipment according to the final classification result; Obtaining the operation and processing information generated after adjusting the operation parameters of the sewage treatment equipment, determining the sewage treatment status after adjusting the equipment operation parameters according to the final classification results, and adjusting and optimizing the sewage equipment control according to the obtained treatment results; Obtain the operation and processing information generated after adjusting the operation parameters of the sewage treatment equipment, and determine the sewage treatment status after adjusting the equipment operation parameters according to the final classification results. The specific steps are as follows: Obtaining operation and processing information generated after adjusting the operation parameters of the sewage treatment equipment, the operation and processing information includes equipment operation information and sedimentation impact information; Equipment operation information includes the operating equipment response stability index, and settlement impact information includes the multi-dimensional settlement deviation index: The equipment control coefficient is generated by combining the operating equipment response stability index and the multi-dimensional settlement deviation index; The response stability index of the operating equipment is inversely proportional to the equipment control coefficient, and the multidimensional settlement deviation index is proportional to the equipment control coefficient; The multidimensional sedimentation deviation index is used to indicate the deviation of sewage sedimentation effect during sewage treatment; The operating equipment response stability index is used to indicate the stability and reliability of the response of sewage treatment equipment during the treatment process; The logic for obtaining the response stability index of the running device is as follows: Through the installed sensors and monitoring equipment, the equipment adjustment time, operating parameters and fault occurrence are monitored in real time, the start and end time of each adjustment operation are recorded, and the adjustment time data is obtained. The data set of equipment operation is regularly recorded, including adjustment time, operating parameters, fault occurrence time and frequency, and the actual adjustment time is obtained. and expected adjustment time , and calculate the standard deviation and mean value of the adjustment time, calculate the adjustment time deviation, and the calculation expression is: ; Extract the time point and amplitude ΔParam of parameter changes from the data set and record the time point when the parameter reaches a stable state and the time point at which the parameters change , calculate the parameter change response time: , obtain the number of equipment failures F and the total running time T in the time period; Get the standard deviation of the adjusted time and average , calculate the stable value of the adjustment time, the calculation expression is: , get the standard deviation of the operating parameter deviation and average , calculate the fluctuation value of the operating parameters: , calculate the response stability index of the running equipment, the calculation expression is: ; The logic of obtaining the multidimensional settlement deviation index is as follows: Obtain the total suspended solids content TS in the sewage, the volume of sludge after sedimentation TJ and the interface sedimentation velocity SD in the data sample to obtain the ideal total suspended solids concentration value , ideal sludge volume index value , ideal interface sedimentation velocity value , calculate the total suspended solids deviation value: , establish a set of total suspended solids deviation values and sludge volume index value set and interface sedimentation velocity value set , and perform standardization to obtain the standard value of total suspended solids deviation: , n represents the total number of data samples, max represents the maximum value function, and min represents the minimum value function. Similarly, the standard value of sludge volume index TJP and the standard value of interface sedimentation velocity SDP are calculated, and the multidimensional sedimentation deviation index is calculated. The calculation expression is: .

2. According to claim 1, a dry bulk cargo terminal sewage treatment equipment intelligent control method, It is characterized in that Preliminary data preprocessing and analysis of sewage treatment was performed to obtain preliminary classification of sewage types, including: Connect the sensor to the edge computing node, set the data collection frequency and data format through the edge computing node, and use mean filtering to denoise the data; Standardize the data and convert it into a unified unit and scale; Determine a preset water quality parameter threshold value according to the water quality parameters of the sewage collected in real time, and use the water quality parameter threshold value as a classification condition; Perform preliminary classification according to the preset water quality parameter thresholds, traverse each collected data sample, compare the water quality parameter thresholds of each water quality parameter of each data sample, perform preliminary classification based on the comparison results, and mark the classification results of each data sample.

3. According to claim 2, a dry bulk cargo terminal sewage treatment equipment intelligent control method, It is characterized in that Perform historical feature extraction and time feature extraction on historical data, and combine the extracted historical features and time features with the preprocessed data to form a complete feature vector for model input. The specific steps are as follows: Extract according to time characteristics, determine the changes of sewage characteristics in different time periods, add time tags to each data sample, and divide it into different time periods according to the collection time; Calculate the moving average and moving standard deviation within the time window of historical data, and extract historical features based on the calculation results; After extracting and constructing the temporal features and historical features, the preprocessed real-time data is combined with the extracted temporal features and historical features as combined input and incorporated into the model; Models include random forest, support vector machine, neural network.

4. According to claim 3, a dry bulk cargo terminal sewage treatment equipment intelligent control method, It is characterized in that Combining the rule-based classification and machine learning classification results, weighted voting and confidence evaluation are combined to obtain the final classification result. The specific steps are as follows: Perform rule classification of data samples according to preset water quality parameter thresholds, and obtain one or more sewage types for each data sample according to the rule classification; For each data sample, the classification results of the machine learning model and the rule-based classification results are weighted and voted, and different weights are determined for each classification method according to its accuracy; Use the machine learning model to classify the data samples, evaluate the confidence of each category according to the rule classification, and obtain the total confidence of each category; Based on weighted voting combined with confidence assessment method, the final sewage type of each data sample is determined, and the final classification result of each data sample is output.

5. According to claim 4, a dry bulk cargo terminal sewage treatment equipment intelligent control method, It is characterized in that Adjust and optimize the sewage equipment control according to the treatment results. The specific steps include: Compare the generated equipment control coefficient with the intelligent control threshold; If the equipment control coefficient is greater than the intelligent control threshold, a sewage treatment abnormality signal is generated and the sewage treatment control plan is adjusted; If the equipment control coefficient is less than or equal to the intelligent control threshold, a sewage treatment stability signal is generated, and there is no need to perform sewage treatment control, and monitoring and maintenance will continue.

Citation Information

Patent Citations

  • Support vector machine mechanical fault diagnosis method based on voting mechanism

    CN108734192A

  • Water quality prediction method based on optimal classification

    CN108846512A

  • Water quality prediction method based on combination of support vector machine and KNN

    CN110598902A

  • Water quality monitoring and early warning method and system based on big data technology

    CN117115637A

  • Municipal sewage water quality classification method based on machine learning

    CN117171601A