A risk analysis method for inaccurate flash flood disaster warning based on Monte Carlo simulation
Through the flash flood disaster early warning inaccurate risk analysis method based on the Monte Carlo simulation method, the problem of insufficient data and uncertainty in the existing technology has been solved, the early warning accuracy and emergency response capabilities have been improved, and the safety of life and property has been protected.
Patent Information
- Application Number
- CN202410869870.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-01
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-07-01
AI Technical Summary
Existing risk analysis methods for flash flood disaster early warning inaccuracy are affected by insufficient data and uncertainty factors, resulting in insufficient early warning accuracy and timeliness, and need to be improved urgently.
A risk analysis method for flash flood disaster early warning inaccuracy based on the Monte Carlo simulation method is adopted. By collecting historical flash flood data, extracting initial indicators, conducting sensitivity analysis and feature selection, building an indicator system, weighting indicators, establishing an early warning model, and calculating early warning inaccuracy. probability, and adjust the weight iteratively to improve warning accuracy.
It effectively improves the accuracy of flash flood warnings and emergency response capabilities, reduces risk costs, promotes scientific decision-making, and protects people's lives and property.
Smart Images

Figure CN118411034B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of flash flood disaster warning, and in particular to a flash flood disaster warning inaccuracy risk analysis method based on Monte Carlo simulation method. Background Art
[0002] By analyzing the risk of inaccurate flash flood disaster warnings, we can better understand and assess the risks of flash flood disasters, improve the accuracy and timeliness of warnings, thereby reducing losses and protecting people’s lives and property.
[0003] At present, the risk analysis method of inaccurate flash flood disaster warning requires a large amount of data support. Sometimes these data are insufficient or of low quality, which affects the accuracy and reliability of the analysis. At the same time, it is affected by multiple factors such as meteorological conditions and topography. The uncertainty in the prediction leads to a certain impact on the accuracy of the warning results.
[0004] Therefore, there is an urgent need to solve the current technical problem of how to improve the accuracy, timeliness and reliability of flash flood disaster warnings. Summary of the invention
[0005] In view of the shortcomings of the prior art, the present invention provides a method for analyzing the risk of misaligned early warning of flash flood disasters to solve the above-mentioned problems of the prior art. On the other hand, a system for analyzing the risk of misaligned early warning of flash flood disasters is provided.
[0006] The present invention is achieved through the following technical solutions:
[0007] A method for analyzing the risk of inaccurate flash flood disaster warning based on Monte Carlo simulation method comprises the following steps:
[0008] Step S1, collect historical flash flood data in the study area, extract initial flash flood disaster indicators and conduct sensitivity analysis, screen out sensitive indicators, reduce the weight of sensitive indicators to obtain a flash flood disaster indicator set, and build a flash flood disaster indicator system;
[0009] Step S2: weighting the flash flood disaster indicators by using the subjective weight method and the objective weight method respectively, obtaining the comprehensive weights of the flash flood disaster indicators, and constructing a flash flood disaster early warning model;
[0010] Step S3, extracting historical flash flood data of the study area and inputting it into the flash flood disaster warning model to obtain a flash flood disaster warning, setting a warning inaccuracy threshold based on the flash flood index system, and inputting the flash flood disaster warning into the flash flood disaster index system to calculate the flash flood disaster warning inaccuracy probability;
[0011] Step S4, make decisions on the weight adjustment of flash flood disaster indicators, and feed the decision results back to the flash flood disaster warning model, set a predetermined number of iterations, extract historical flash flood data in the study area and input it into the iterated flash flood disaster warning model, and stop the iteration when the deviation between the iterative result and the expected value is within the warning inaccuracy threshold.
[0012] Furthermore, the step S1 is specifically as follows:
[0013] Step S11, collect historical flash flood data in the study area, and use meta-analysis to extract initial flash flood disaster indicators, including hazard indicators, vulnerability indicators, and comprehensive management indicators;
[0014] Step S12: using Monte Carlo simulation method to conduct sensitivity analysis on initial indicators of flash flood disasters and screen out sensitive indicators;
[0015] Step S13: using a feature selection method based on machine learning to reduce the weight of sensitive indicators and obtain a flash flood disaster indicator set;
[0016] Step S14: construct a hazard index system, a vulnerability index system and a comprehensive management index system based on the flash flood disaster index set, namely, a flash flood disaster index system.
[0017] Furthermore, the step S12 is specifically as follows:
[0018] Step S12a, fitting the probability distribution of each initial indicator of flash flood disaster in turn, and randomly sampling to generate multiple groups of parameter values;
[0019] Step S12b, respectively calculating each group of parameter values to obtain multiple groups of output index values;
[0020] Step S12c: for each initial indicator of flash flood disaster, calculate its variation range under different parameter values, mark the indicator with a variation range greater than a threshold as a sensitive indicator, and screen out the sensitive indicators.
[0021] Furthermore, the step S13 is specifically as follows:
[0022] Step S13a, using LASSO method to perform feature selection on sensitive indicators and using random forest to calculate the importance of sensitive indicator features;
[0023] Step S13b, sorting the importance of all sensitive indicator features, and extracting all indicators whose importance is greater than a threshold;
[0024] Step S13c: construct a flash flood disaster indicator set based on all indicators whose importance is greater than a threshold.
[0025] Furthermore, the step S2 is specifically as follows:
[0026] Step S21, using the analytic hierarchy process to determine the subjective weight value of the flash flood disaster index;
[0027] Step S22, respectively using principal component analysis method, entropy method and fuzzy comprehensive evaluation method to determine the objective weight value of the flash flood disaster index;
[0028] Step S23: Based on the subjective weight value and objective weight value of the flash flood disaster index, a game theory method is used to obtain a comprehensive weight value of the flash flood disaster index;
[0029] Step S24: construct a flash flood disaster warning model, wherein the flash flood disaster warning model is the product of the flash flood disaster index value and its comprehensive weight value.
[0030] Furthermore, the step S22 is specifically as follows:
[0031] Step S22a, perform principal component analysis, extract principal components, calculate the variance contribution of each principal component, and determine the weight of each principal component;
[0032] Step S22b, respectively calculating the information entropy and entropy value of each flash flood disaster indicator, and obtaining the weight of each flash flood disaster indicator based on the entropy value calculation result;
[0033] Step S22c, constructing a fuzzy relationship matrix and calculating the weights of various flash flood disaster indicators;
[0034] Step S22d: using the weighted average method to integrate the weight values determined by the component analysis method, the entropy method and the fuzzy comprehensive evaluation method, to obtain the objective weight value of the flash flood disaster index.
[0035] Furthermore, the step S22 a is specifically as follows: standardize the original data so that the mean of each feature is 0 and the variance is 1; calculate the covariance matrix of the standardized data; perform eigenvalue decomposition on the covariance matrix to obtain eigenvalues and corresponding eigenvectors; arrange the eigenvalues in descending order, and select the eigenvalues corresponding to the first one-third of the eigenvectors as the principal components; calculate the variance contribution of the principal component according to the proportion of the principal component explaining the overall variance; the weight of the principal component is the corresponding eigenvector.
[0036] Furthermore, the step S23 is specifically as follows:
[0037] Step S23a, constructing a cooperative game model;
[0038] Step S23b: setting cooperative benefit distribution rules based on the flash flood disaster indicator system;
[0039] Step S23c: Calculate the subjective and objective benefits respectively based on the cooperative benefit distribution rule, use the benefits as the comprehensive weight value, and obtain the comprehensive weight value of the flash flood disaster index.
[0040] Furthermore, the step S3 is specifically as follows:
[0041] Step S31, extracting historical flash flood data in the study area and dividing it into a test set and a validation set;
[0042] Step S32: input the test set into the flash flood disaster warning model to obtain a flash flood disaster warning, and use the verification set for verification;
[0043] Step S33, setting a warning inaccuracy threshold, inputting the flash flood disaster warning into the flash flood disaster indicator system, calculating whether the difference between the two exceeds the warning inaccuracy threshold, and determining the flash flood disaster warning that exceeds the threshold as a warning inaccuracy;
[0044] Step S34, calculating in turn whether all flash flood disaster warnings are inaccurate, and obtaining the probability of inaccurate flash flood disaster warnings.
[0045] Furthermore, the step S4 is specifically as follows:
[0046] Step S41, making a decision on the weight adjustment of flash flood disaster indicators, and feeding the decision result back to the flash flood disaster early warning model;
[0047] Step S42, setting a predetermined number of iterations to obtain an iterated flash flood disaster warning model;
[0048] Step S43, extracting historical flash flood data of the study area and inputting it into the iterated flash flood disaster warning model to obtain a flash flood disaster warning and calculate the risk of inaccurate flash flood disaster warning;
[0049] Step S44, iterate and calculate the risk of inaccurate flash flood disaster warning for multiple times until the risk of inaccurate flash flood disaster warning is reduced to zero and then stop the iteration.
[0050] According to another aspect of the present application, an electronic device is provided, including:
[0051] at least one processor; and
[0052] a memory communicatively connected to at least one of the processors; wherein,
[0053] The memory stores instructions that can be executed by the processor, and the instructions are used to be executed by the processor to implement the method for analyzing the risk of inaccurate flash flood disaster warning.
[0054] The beneficial effects of the present invention are as follows:
[0055] The use of risk analysis methods for inaccurate flash flood disaster warnings can effectively improve warning accuracy, response efficiency and emergency response capabilities, reduce risk costs, and promote scientific decision-making, so as to better respond to the challenges brought by flash floods and protect people’s lives and property. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] Figure 1 It is the overall flow chart of the present invention;
[0057] Figure 2 is a sub-flow chart of step (1) of the present invention;
[0058] Figure 3 is a sub-flow chart of step (2) of the present invention;
[0059] Figure 4 is a sub-flow chart of step (3) of the present invention;
[0060] Figure 5 It is a sub-flow chart of step (4) of the present invention. DETAILED DESCRIPTION
[0061] like Figure 1 According to one aspect of the present application, a method for analyzing the risk of inaccurate early warning of flash flood disasters is provided, comprising the following steps:
[0062] Step S1, collect historical flash flood data in the study area, extract initial flash flood disaster indicators and conduct sensitivity analysis, screen out sensitive indicators, reduce the weight of sensitive indicators to obtain a flash flood disaster indicator set, and build a flash flood disaster indicator system;
[0063] Step S2: weighting the flash flood disaster indicators by using the subjective weight method and the objective weight method respectively, obtaining the comprehensive weights of the flash flood disaster indicators, and constructing a flash flood disaster early warning model;
[0064] Step S3, extracting historical flash flood data of the study area and inputting it into the flash flood disaster warning model to obtain a flash flood disaster warning, setting a warning inaccuracy threshold based on the flash flood index system, and inputting the flash flood disaster warning into the flash flood disaster index system to calculate the flash flood disaster warning inaccuracy probability;
[0065] Step S4, make decisions on the weight adjustment of flash flood disaster indicators, and feed the decision results back to the flash flood disaster warning model, set a predetermined number of iterations, extract historical flash flood data in the study area and input it into the iterated flash flood disaster warning model, and stop the iteration when the deviation between the iterative result and the expected value is within the warning inaccuracy threshold.
[0066] According to one aspect of the present application, Figure 2 As shown, the step S1 is further as follows:
[0067] Step S11, collect historical flash flood data in the study area, and use meta-analysis to extract initial flash flood disaster indicators, including hazard indicators, vulnerability indicators, and comprehensive management indicators;
[0068] Flash flood disaster risk assessment is mainly based on the risk analysis of the study area, calculating the single index values of various factors that cause the risk to occur, and reflecting the possibility of risk occurrence and the degree of loss in the study area through the size of the index value. It is then compared with the economic development level of the study area and the risk standards that can be tolerated in the region to finally determine the flood disaster risk level of the study area.
[0069] Hazard indicators are selected from the aspects of climate, underlying surface factors and human intervention capacity, mainly including rainfall during the main flood season, ground elevation, terrain slope, river network density, reservoir capacity density, and flood storage and detention area density; vulnerability indicators are extracted from economic and social disaster-stricken bodies, mainly including population, GDP, and crop planting area; as well as comprehensive management indicators.
[0070] Step S12: using Monte Carlo simulation method to conduct sensitivity analysis on initial indicators of flash flood disasters and screen out sensitive indicators;
[0071] Step S13: using a feature selection method based on machine learning to reduce the weight of sensitive indicators and obtain a flash flood disaster indicator set;
[0072] Step S14: construct a hazard index system, a vulnerability index system and a comprehensive management index system based on the flash flood disaster index set, namely, a flash flood disaster index system.
[0073] According to one aspect of the present application, step S12 further comprises:
[0074] Step S12a, fitting the probability distribution of each initial indicator of flash flood disaster in turn, and randomly sampling to generate multiple groups of parameter values;
[0075] Step S12b, respectively calculating each group of parameter values to obtain multiple groups of output index values;
[0076] Step S12c: for each initial indicator of flash flood disaster, calculate its variation range under different parameter values, mark the indicator with a variation range greater than a threshold as a sensitive indicator, and screen out the sensitive indicators.
[0077] Monte Carlo simulation is a numerical calculation method based on random sampling. It simulates uncertainty factors by generating a large number of random numbers, thereby performing numerical simulation and statistical analysis. The basic idea of this method is to generate a large number of possible input data through random sampling, and then simulate and calculate these data to finally obtain the probability distribution or statistical characteristics of the results.
[0078] Compared with other methods, Monte Carlo simulation is more comprehensive and objective in dealing with uncertainty problems, has higher applicability and reliability, can provide more information and data support, helps to better understand and deal with complex problems, and has unique advantages in dealing with uncertainty problems.
[0079] Therefore, in this embodiment, the Monte Carlo simulation method is used to perform sensitivity analysis on the initial indicators of flash flood disasters to screen out sensitive indicators.
[0080] According to one aspect of the present application, step S13 is further:
[0081] Step S13a, using LASSO method to perform feature selection on sensitive indicators and using random forest to calculate the importance of sensitive indicator features;
[0082] Step S13b, sorting the importance of all sensitive indicator features, and extracting all indicators whose importance is greater than a threshold;
[0083] Step S13c: construct a flash flood disaster indicator set based on all indicators whose importance is greater than a threshold.
[0084] Feature selection based on machine learning refers to the use of machine learning algorithms to automatically select the features that have the greatest impact on the prediction of the target variable. The purpose of feature selection is to improve the performance of the model, reduce the risk of overfitting, reduce computational complexity, and help understand the key features in the data.
[0085] In a certain embodiment, specifically:
[0086] Train the model through machine learning algorithms and use feature importance indicators in the model to evaluate the contribution of each feature to the model performance;
[0087] Evaluate and rank the features using statistical methods and machine learning algorithms, and select the top-ranked features as the final feature subset;
[0088] Use a specific machine learning algorithm to iteratively train the model, removing the features that have the least impact on model performance in each iteration until the set number of features or performance indicators are reached;
[0089] During the model training process, regularization technology is used to automatically select features that have a greater impact on model performance.
[0090] Compared with traditional feature selection methods, feature selection methods based on machine learning can automatically select features that affect model performance, reduce the need for manual intervention, and improve efficiency and accuracy; machine learning algorithms can comprehensively consider the complex relationships between features, better discover the interactions between features, and thus select more representative and influential features; feature selection methods based on machine learning can be flexibly adjusted according to the characteristics of specific problems and data, and are applicable to various types of data and problems.
[0091] According to one aspect of the present application, Figure 3 As shown, the step S2 is further as follows:
[0092] Step S21, using the analytic hierarchy process to determine the subjective weight value of the flash flood disaster index;
[0093] In a certain embodiment, specifically:
[0094] Establish a hierarchical structure model and construct all judgment matrices in each level. For each sub-factor belonging to a factor in the previous level, use the 1-9 comparison scale method to compare the relative importance of each sub-factor in the level, and construct all judgment matrices in each level.
[0095] The eigenvector of the maximum eigenvalue corresponding to the judgment matrix is, after normalization, the ranking weight of the relative importance of each sub-factor at the same level to a factor at the previous level. Through single hierarchical sorting, the influence of each sub-factor at the lower level on a factor at the upper level is determined, and the eigenvector corresponding to the maximum eigenvalue is used as the weight vector of the influence of the compared factor on a factor at the upper level. The greater the inconsistency, the greater the judgment error caused.
[0096] Step S22, respectively using principal component analysis method, entropy method and fuzzy comprehensive evaluation method to determine the objective weight value of the flash flood disaster index;
[0097] Step S23: Based on the subjective weight value and objective weight value of the flash flood disaster index, a game theory method is used to obtain a comprehensive weight value of the flash flood disaster index;
[0098] Step S24: construct a flash flood disaster warning model, wherein the flash flood disaster warning model is the product of the flash flood disaster index value and its comprehensive weight value.
[0099] According to one aspect of the present application, step S22 is further:
[0100] Step S22a: perform principal component analysis, extract principal components, calculate variance contribution of each principal component, and determine the weight of each principal component; in a certain embodiment, specifically:
[0101] The original data is standardized so that the mean of each feature is 0 and the variance is 1;
[0102] Calculate the covariance matrix of the standardized data;
[0103] Perform eigenvalue decomposition on the covariance matrix to obtain the eigenvalues and corresponding eigenvectors;
[0104] Arrange the eigenvalues in descending order and select the eigenvalues corresponding to the first one-third of the eigenvectors as the principal components;
[0105] The variance contribution of the principal component is calculated according to the proportion of the total variance explained by the principal component;
[0106] The weight of the principal component is the corresponding eigenvector.
[0107] Step S22b, respectively calculating the information entropy and entropy value of each flash flood disaster indicator, and obtaining the weight of each flash flood disaster indicator based on the entropy value calculation result;
[0108] In a certain embodiment, specifically:
[0109] For each indicator i, calculate its information entropy H: H=-\sum{j=1}^{k}p{ij}\log2(p{ij})
[0110] In the formula, k is the number of types of indicator values, and p{ij} is the probability of the indicator in the jth category;
[0111] Normalize the information entropy and calculate the entropy value:
[0112] E=\frac{H{max}-H}{H{max}-H{min}}
[0113] In the formula, H{max} and H{min} are the maximum and minimum values of information entropy respectively;
[0114] Calculate the weight of each indicator according to the entropy value:
[0115] W = \frac{E}{\sum{i=1}^{n}E}
[0116] In the formula, W is the weight value and E is the entropy value.
[0117] Step S22c, constructing a fuzzy relationship matrix and calculating the weights of various flash flood disaster indicators;
[0118] In a certain embodiment, specifically:
[0119] The maximum likelihood estimation method is used to transform the fuzzy relationship matrix into a one-time matrix;
[0120] Perform eigenvalue decomposition and weight vector calculation on the consistency matrix to obtain the indicator weight vector;
[0121] Normalize the weight vector so that the sum of the weights is 1;
[0122] The indicator weight is the final normalized weight vector.
[0123] Step S22d: using the weighted average method to integrate the weight values determined by the component analysis method, the entropy method and the fuzzy comprehensive evaluation method, to obtain the objective weight value of the flash flood disaster index.
[0124] According to one aspect of the present application, step S23 is further:
[0125] Step S23a, constructing a cooperative game model;
[0126] Step S23b: setting cooperative benefit distribution rules based on the flash flood disaster indicator system;
[0127] Step S23c: Calculate the subjective and objective benefits respectively based on the cooperative benefit distribution rule, use the benefits as the comprehensive weight value, and obtain the comprehensive weight value of the flash flood disaster index.
[0128] According to one aspect of the present application, Figure 4 As shown, the step S3 is further as follows:
[0129] Step S31, extracting historical flash flood data in the study area and dividing it into a test set and a validation set;
[0130] Step S32: input the test set into the flash flood disaster warning model to obtain a flash flood disaster warning, and use the verification set for verification;
[0131] Step S33, setting a warning inaccuracy threshold, inputting the flash flood disaster warning into the flash flood disaster indicator system, calculating whether the difference between the two exceeds the warning inaccuracy threshold, and determining the flash flood disaster warning that exceeds the threshold as a warning inaccuracy;
[0132] Step S34, calculating in turn whether all flash flood disaster warnings are inaccurate, and obtaining the probability of inaccurate flash flood disaster warnings.
[0133] The risk of inaccurate flash flood disaster warning is defined as the possibility that the alarm issued by the early warning system is inconsistent with or inaccurate with the actual situation before a flash flood disaster occurs. This risk may lead to the risk of underreporting, false alarm, insufficient accuracy and poor information transmission. Accurate flash flood disaster warning is crucial to reducing disaster losses and protecting people’s lives and property.
[0134] In this embodiment, by extracting flash flood disaster indicators of multiple historical flash floods and inputting them into the flash flood disaster warning model, a simulated flash flood disaster warning is obtained, and the accuracy of the model is verified by comparing it with the historical flash flood disaster data. At the same time, the flash flood disaster warning is input into the flash flood disaster indicator system, and the difference between the predicted data and the actual data is calculated to calculate whether the flash flood disaster warning is inaccurate, and the probability of inaccurate warning of the flash flood disaster warning model is calculated by calculating the accuracy of multiple warnings.
[0135] According to one aspect of the present application, Figure 5 As shown, the step S4 is further as follows:
[0136] Step S41, making a decision on the weight adjustment of flash flood disaster indicators, and feeding the decision result back to the flash flood disaster early warning model;
[0137] Step S42, setting a predetermined number of iterations to obtain an iterated flash flood disaster warning model;
[0138] Step S43, extracting historical flash flood data of the study area and inputting it into the iterated flash flood disaster warning model to obtain a flash flood disaster warning and calculate the risk of inaccurate flash flood disaster warning;
[0139] Step S44, iterate and calculate the risk of inaccurate flash flood disaster warning for multiple times until the risk of inaccurate flash flood disaster warning is reduced to zero and then stop the iteration.
[0140] In this embodiment, it is known that the constructed flash flood disaster warning model has the risk of inaccurate warning. The flash flood disaster warning model is iterated by adjusting the decision of the flash flood disaster indicator weights, and the probability of inaccurate warning of the flash flood disaster warning model after the iteration is repeatedly calculated. The above steps are performed again according to the results until the warning is no longer inaccurate, and the iteration is stopped. At this time, the flash flood disaster warning model is a risk-free model.
[0141] According to another aspect of the present application, an electronic device is provided, including:
[0142] at least one processor; and
[0143] a memory communicatively connected to at least one of the processors; wherein,
[0144] The memory stores instructions that can be executed by the processor, and the instructions are used to be executed by the processor to implement the method for analyzing the risk of inaccurate flash flood disaster warning.
[0145] The preferred embodiments of the present invention are described in detail above; however, the present invention is not limited to the specific details in the above embodiments. Within the technical concept of the present invention, various equivalent transformations can be made to the technical solutions of the present invention, and these equivalent transformations all belong to the protection scope of the present invention.
Claims
1. A method for analyzing the risk of inaccurate flash flood disaster warning based on Monte Carlo simulation method, characterized in that: The steps include: Step S1: collect historical flash flood data in the study area, extract initial flash flood disaster indicators and conduct sensitivity analysis, screen out sensitive indicators, reduce the weight of sensitive indicators to obtain a flash flood disaster indicator set, and construct a flash flood disaster indicator system; specifically: Step S11, collect historical flash flood data in the study area, and use meta-analysis to extract initial flash flood disaster indicators, including hazard indicators, vulnerability indicators, and comprehensive management indicators; Step S12: using Monte Carlo simulation method to conduct sensitivity analysis on initial indicators of flash flood disasters and screen out sensitive indicators; specifically: Step S12a, fitting the probability distribution of each initial indicator of flash flood disaster in turn, and randomly sampling to generate multiple groups of parameter values; Step S12b, respectively calculating each group of parameter values to obtain multiple groups of output index values; Step S12c, for each initial indicator of flash flood disaster, calculate its variation range under different parameter values, mark the indicator with a variation range greater than a threshold as a sensitive indicator, and screen out the sensitive indicators; Step S13: using a feature selection method based on machine learning to reduce the weight of sensitive indicators and obtain a flash flood disaster indicator set; specifically: Step S13a, using LASSO method to perform feature selection on sensitive indicators and using random forest to calculate the importance of sensitive indicator features; Step S13b, sorting the importance of all sensitive indicator features, and extracting all indicators whose importance is greater than a threshold; Step S13c, constructing a flash flood disaster indicator set based on all indicators whose importance is greater than a threshold; Step S14: constructing a dangerousness index system, a vulnerability index system and a comprehensive management index system based on the flash flood disaster index set, namely, a flash flood disaster index system; Step S2: weighting the flash flood disaster indicators by using the subjective weight method and the objective weight method respectively, obtaining the comprehensive weights of the flash flood disaster indicators, and constructing a flash flood disaster early warning model; Step S3, extracting historical flash flood data of the study area and inputting it into the flash flood disaster warning model to obtain a flash flood disaster warning, setting a warning inaccuracy threshold based on the flash flood index system, and inputting the flash flood disaster warning into the flash flood disaster index system to calculate the flash flood disaster warning inaccuracy probability; Step S4, make decisions on the weight adjustment of flash flood disaster indicators, and feed the decision results back to the flash flood disaster warning model, set a predetermined number of iterations, extract historical flash flood data in the study area and input it into the iterated flash flood disaster warning model, and stop the iteration when the deviation between the iterative result and the expected value is within the warning inaccuracy threshold.
2. The method for analyzing the risk of inaccurate early warning of flash flood disasters according to claim 1, characterized in that: The step S2 is specifically as follows: Step S21, using the analytic hierarchy process to determine the subjective weight value of the flash flood disaster index; Step S22, respectively using principal component analysis method, entropy method and fuzzy comprehensive evaluation method to determine the objective weight value of the flash flood disaster index; Step S23: Based on the subjective weight value and objective weight value of the flash flood disaster index, a game theory method is used to obtain a comprehensive weight value of the flash flood disaster index; Step S24: construct a flash flood disaster warning model, wherein the flash flood disaster warning model is the product of the flash flood disaster index value and its comprehensive weight value.
3. The method for analyzing the risk of inaccurate early warning of flash flood disasters according to claim 2, characterized in that: The step S22 is specifically as follows: Step S22a, perform principal component analysis, extract principal components, calculate the variance contribution of each principal component, and determine the weight of each principal component; Step S22b, respectively calculating the information entropy and entropy value of each flash flood disaster indicator, and obtaining the weight of each flash flood disaster indicator based on the entropy value calculation result; Step S22c, constructing a fuzzy relationship matrix and calculating the weights of various flash flood disaster indicators; Step S22d: using the weighted average method to integrate the weight values determined by the component analysis method, the entropy method and the fuzzy comprehensive evaluation method, to obtain the objective weight value of the flash flood disaster index.
4. The method for analyzing the risk of inaccurate early warning of flash flood disasters according to claim 3, characterized in that: The step S22a is specifically as follows: standardize the original data so that the mean of each feature is 0 and the variance is 1; calculate the covariance matrix of the standardized data; perform eigenvalue decomposition on the covariance matrix to obtain eigenvalues and corresponding eigenvectors; arrange the eigenvalues in descending order, and select the eigenvalues corresponding to the first one-third of the eigenvectors as the principal components; calculate the variance contribution of the principal component according to the proportion of the principal component explaining the overall variance; the weight of the principal component is the corresponding eigenvector.
5. The method for analyzing the risk of inaccurate early warning of flash flood disasters according to claim 2, characterized in that: The step S23 is specifically as follows: Step S23a, constructing a cooperative game model; Step S23b: setting cooperative benefit distribution rules based on the flash flood disaster indicator system; Step S23c: Calculate the subjective and objective benefits respectively based on the cooperative benefit distribution rule, use the benefits as the comprehensive weight value, and obtain the comprehensive weight value of the flash flood disaster index.
6. The method for analyzing the risk of inaccurate early warning of flash flood disasters according to claim 1, characterized in that: The step S3 is specifically as follows: Step S31, extracting historical flash flood data in the study area and dividing it into a test set and a validation set; Step S32: input the test set into the flash flood disaster warning model to obtain a flash flood disaster warning, and use the verification set for verification; Step S33, setting a warning inaccuracy threshold, inputting the flash flood disaster warning into the flash flood disaster indicator system, calculating whether the difference between the two exceeds the warning inaccuracy threshold, and determining the flash flood disaster warning that exceeds the threshold as a warning inaccuracy; Step S34, calculating in turn whether all flash flood disaster warnings are inaccurate, and obtaining the probability of inaccurate flash flood disaster warnings.
7. The method for analyzing the risk of inaccurate early warning of flash flood disasters according to claim 1, characterized in that: The step S4 is specifically as follows: Step S41, making a decision on the weight adjustment of flash flood disaster indicators, and feeding the decision result back to the flash flood disaster early warning model; Step S42, setting a predetermined number of iterations to obtain an iterated flash flood disaster warning model; Step S43, extracting historical flash flood data of the study area and inputting it into the iterated flash flood disaster warning model to obtain a flash flood disaster warning and calculate the risk of inaccurate flash flood disaster warning; Step S44, iterate and calculate the risk of inaccurate flash flood disaster warning for multiple times until the risk of inaccurate flash flood disaster warning is reduced to zero and then stop the iteration.
