A method and system for suppressing dust in construction sites based on multi-AGV collaboration

By obtaining the site structure data of the construction site and using AGV collaborative control, the problem of poor dust suppression effect during construction was solved, automatic and efficient dust suppression was achieved, and the intelligence level of the construction site was improved.

CN118426308BActive Publication Date: 2024-10-11ANHUI CHANGHUAI ENVIRONMENTAL PROTECTION TECH CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202410497269.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2024-10-11
Estimated Expiration
2044-04-24

AI Technical Summary

Technical Problem

The dust suppression effect during construction at construction sites is poor. Traditional methods require a lot of labor and cannot meet the needs of large construction sites.

Method used

By obtaining the site structure data of the construction site, AGVs are used to collaboratively suppress dust. Strategies are determined based on the site structure and dust suppression requirements, and the AGVs are controlled to go to the dust suppression area, and dust suppression devices are used for collaborative suppression.

Benefits of technology

It realizes automation and efficiency of dust suppression at construction sites and improves the intelligence level of construction sites.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118426308B_ABST
    Figure CN118426308B_ABST
Patent Text Reader

Abstract

The present invention provides a method and system for suppressing dust in construction sites based on multi-AGV collaboration. The method comprises: obtaining first site structure data of the construction site, the first site structure data including structure data of outdoor areas and structure data of indoor areas; after receiving a dust suppression request, retrieving second site structure data from the site structure data according to the dust suppression request; wherein the dust suppression request includes location information of the dust suppression area; determining a dust suppression strategy according to the second site structure data, determining a number of AGVs according to the dust suppression strategy, controlling each AGV to go to the dust suppression area, and collaboratively suppressing dust in the dust suppression area according to the dust suppression strategy. The scheme of the present invention is based on the site structure data of the construction site and the collaborative control of multiple AGVs, thereby realizing the automatic and efficient implementation of dust suppression operations on the construction site and improving the intelligence of the construction site.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of smart construction sites, and in particular to a method and system for suppressing dust during construction at a construction site based on multi-AGV collaboration. Background Art

[0002] During the construction process of a construction site, dust is a problem that cannot be ignored, and some measures need to be taken to suppress dust. Traditional methods of suppression are to spray water mist or lay out anti-dust fences and felt cloth at the construction site. These methods generally have poor suppression effects and require a lot of manpower to implement, which cannot meet the dust suppression needs of large construction sites. Summary of the invention

[0003] In order to solve at least one of the above technical problems, the present invention specifically provides a method, system, electronic device, computer storage medium and computer program product for suppressing dust in construction sites based on multi-AGV collaboration.

[0004] The present invention provides a method for suppressing dust in construction sites based on multi-AGV collaboration, comprising the following steps:

[0005] Acquire first site structural data of a construction site, wherein the first site structural data includes structural data of an outdoor area and structural data of an indoor area;

[0006] After receiving the dust suppression request, retrieve the second site structure data from the site structure data according to the dust suppression request; wherein the dust suppression request includes the location information of the dust suppression area;

[0007] Determine a dust suppression strategy according to the second site structure data, determine a number of AGVs according to the dust suppression strategy, control each AGV to go to the dust suppression area, and collaboratively suppress dust in the dust suppression area according to the dust suppression strategy;

[0008] Wherein, the AGV is equipped with a dust suppression device.

[0009] Furthermore, the obtaining of first site structure data of the construction site includes:

[0010] Acquire electronic drawing data of architectural design of the construction site, perform three-dimensional modeling on the electronic drawing data of architectural design using Revit software, and obtain site structure data of the construction site;

[0011] The drone is controlled to take real-scene photos of the construction site, and a position matching calculation is performed between the real-scene images obtained by the photography and the site structure data, so as to obtain the first site structure data.

[0012] Further, determining the dust suppression strategy according to the second site structure data includes:

[0013] Determine the contour curve and area of ​​the dust suppression area according to the second site structure data, determine a number of dust suppression points according to the area, and equip each of the dust suppression points with an AGV; wherein each of the dust suppression points is located on the contour curve;

[0014] Calculate the first distances between the dust suppression points in pairs, use the largest of the first distances as the second distance, and use the smallest of the first distances as the third distance;

[0015] Calculate a dust suppression operation load coefficient according to the second distance and the third distance, and determine the dust suppression operation intensity of each AGV according to the dust suppression operation load coefficient;

[0016] The dust suppression strategy is determined according to each of the dust suppression points and the dust suppression operation intensity.

[0017] Further, the dust suppression operation load coefficient is calculated according to the second distance and the third distance, including:

[0018]

[0019] Wherein, Load is the dust suppression operation load coefficient; Load base is the basic load factor for dust suppression operations, which is determined according to the area of ​​the area; d length is the second distance, d width is the third distance; d i is the i-th of the remaining first distances excluding the second distance and the third distance, and n is the number of the first distances.

[0020] Furthermore, the dust suppression request also includes an expected dust intensity level, and the determining of the dust suppression strategy according to the second site structure data further includes:

[0021] Inputting the expected dust intensity level, the contour curve and the area of ​​the region into a machine analysis model to obtain dust three-dimensional structure prediction data;

[0022] Determine the highest point of the dust three-dimensional structure prediction data, and calculate the dust suppression angle of the AGV corresponding to each of the dust suppression points according to the highest point and the positions of each of the dust suppression points;

[0023] The dust suppression strategy is determined according to each of the dust suppression points, the dust suppression operation intensity and the dust suppression angle of each AGV.

[0024] Further, the dust suppression strategy is determined according to each of the dust suppression points, the dust suppression operation intensity and the dust suppression angle of each AGV, including:

[0025] The number of straight angles is calculated based on the dust suppression operation load coefficient and the corresponding direct proportional function;

[0026] Determine the number of flat-angle AGVs obtained in an interval manner, and use the remaining AGVs as elevation-angle AGVs;

[0027] Each of the flat-angle AGVs and each of the elevation-angle AGVs is matched with the corresponding dust suppression point, and the dust suppression operation intensity is uniformly configured for each of the flat-angle AGVs and each of the elevation-angle AGVs.

[0028] The present invention also provides a construction dust suppression system based on multi-AGV collaborative construction site, comprising a communication module, a processing module, and a plurality of AGVs, wherein the processing module is electrically connected to the communication module and each AGV;

[0029] The communication module is used to obtain first site structure data of the construction site, wherein the first site structure data includes structure data of an outdoor area and structure data of an indoor area; and receive a dust suppression request;

[0030] The processing module is used to, after receiving a dust suppression request, retrieve second site structure data from the site structure data according to the dust suppression request, wherein the dust suppression request includes location information of a dust suppression area; and determine a dust suppression strategy according to the second site structure data, determine a number of AGVs according to the dust suppression strategy, control each AGV to go to the dust suppression area, and collaboratively perform dust suppression on the dust suppression area according to the dust suppression strategy.

[0031] The present invention provides an electronic device, comprising: a memory storing executable program code; a processor coupled to the memory; the processor calls the executable program code stored in the memory to execute any of the methods described in the preceding items.

[0032] The present invention provides a computer storage medium, on which a computer program is stored. When the computer program is run by a processor, any of the above methods is executed.

[0033] The present invention provides a computer program product, comprising a computer program stored on a non-transitory computer-readable medium, wherein when the computer program is executed by a processor, the method described in any one of the above items is implemented.

[0034] The beneficial effects of the present invention are as follows: the scheme of the present invention is based on the site structure data of the construction site and the coordinated control of multiple AGVs, thereby realizing the automatic and efficient implementation of dust suppression operations on the construction site and improving the intelligence of the construction site. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0036] Figure 1 It is a structural schematic diagram of a method for suppressing dust in construction sites based on multi-AGV collaboration disclosed in an embodiment of the present invention;

[0037] Figure 2 It is a structural schematic diagram of a dust suppression system for construction site based on multi-AGV collaboration disclosed in an embodiment of the present invention. DETAILED DESCRIPTION

[0038] The following is a description of exemplary embodiments of the present disclosure in conjunction with the accompanying drawings, including various details of the embodiments of the present disclosure to facilitate understanding, which should be considered as merely exemplary. Therefore, it should be recognized by those of ordinary skill in the art that various changes and modifications may be made to the embodiments described herein without departing from the scope and spirit of the present disclosure. Similarly, for the sake of clarity and conciseness, the description of well-known functions and structures is omitted in the following description.

[0039] See also Figure 1 As shown in the flowchart, an embodiment of the present invention provides a method for suppressing dust in construction sites based on multi-AGV collaboration, including the following steps:

[0040] Acquire first site structural data of a construction site, wherein the first site structural data includes structural data of an outdoor area and structural data of an indoor area;

[0041] After receiving the dust suppression request, retrieve the second site structure data from the site structure data according to the dust suppression request; wherein the dust suppression request includes the location information of the dust suppression area;

[0042] Determine a dust suppression strategy according to the second site structure data, determine a number of AGVs according to the dust suppression strategy, control each AGV to go to the dust suppression area, and collaboratively suppress dust in the dust suppression area according to the dust suppression strategy;

[0043] Wherein, the AGV is equipped with a dust suppression device.

[0044] In this embodiment, the site structure data of the construction site is obtained in advance. The site structure data is preferably three-dimensional structure data, which includes outdoor areas and indoor areas in the construction site. When construction workers in a certain area need the platform to perform dust suppression for them, they can send a dust suppression request to the platform. The dust suppression request includes the location information of the area, which can be coordinates or area numbers. The platform determines the corresponding sub-site structure data from the site structure data, that is, the above-mentioned second site structure data. Then, the best dust suppression strategy is determined based on the second site structure data, and multiple AGVs are controlled to reach the dust suppression area to collaboratively perform dust suppression. Therefore, the scheme of the present invention is based on the site structure data of the construction site and the collaborative control of multiple AGVs, which realizes the automatic and efficient implementation of dust suppression operations on the construction site, and improves the intelligence of the construction site.

[0045] It should be noted that the AGVs involved in the present invention are all equipped with dust suppression devices, which can be water spray type or air suction filter type, or both types of dust suppression devices can be equipped at the same time. The specific conditions of the dust suppression area are determined, and the present invention does not limit this.

[0046] Furthermore, the obtaining of first site structure data of the construction site includes:

[0047] Acquire electronic drawing data of architectural design of the construction site, perform three-dimensional modeling on the electronic drawing data of architectural design using Revit software, and obtain site structure data of the construction site;

[0048] The drone is controlled to take real-scene photos of the construction site, and a position matching calculation is performed between the real-scene images obtained by the photography and the site structure data, so as to obtain the first site structure data.

[0049] In this embodiment, before the construction is carried out, the electronic drawing data of the building design will be prepared in advance, which includes the construction design details of the construction site, including the structural size of the building, the number of floors, the structural layout of each floor, the relative position relationship between the buildings, etc. The Revit software can be used to realize the three-dimensional modeling of the construction site and preliminarily obtain the site structure data. At the same time, the construction site is photographed by a drone in real scene, and the real scene image is matched with the preliminarily obtained site structure data, that is, the real scene image of the corresponding position is replaced with the corresponding position of the site structure data. In this way, the first site structure data obtained has the characteristics of combining virtual and real, which is conducive to the subsequent optimal dust suppression strategy.

[0050] It should be noted that the drone takes real-life images of the construction site at a certain altitude, and the real-life images taken are generally limited to images of the open areas of the construction site. Therefore, when performing the above-mentioned position matching calculations, only the model images corresponding to the open areas in the site structure data are replaced with real-life images.

[0051] Further, determining the dust suppression strategy according to the second site structure data includes:

[0052] Determine the contour curve and area of ​​the dust suppression area according to the second site structure data, determine a number of dust suppression points according to the area, and equip each of the dust suppression points with an AGV; wherein each of the dust suppression points is located on the contour curve;

[0053] Calculate the first distances between the dust suppression points in pairs, use the largest of the first distances as the second distance, and use the smallest of the first distances as the third distance;

[0054] Calculate a dust suppression operation load coefficient according to the second distance and the third distance, and determine the dust suppression operation intensity of each AGV according to the dust suppression operation load coefficient;

[0055] The dust suppression strategy is determined according to each of the dust suppression points and the dust suppression operation intensity.

[0056] In this embodiment, the dust suppression strategy includes the number of AGVs to be used, the layout location of each AGV, and the operation intensity. Specifically, by performing a relatively simple analysis on the second site structure data of the dust suppression area where dust suppression is required, the contour curve and area of ​​the dust suppression area can be determined, and the appropriate number of dust suppression points can be calculated based on the size of the area. Then, the distance between all dust suppression points, i.e., the first distance, is calculated in pairs, so as to obtain the largest second distance and the smallest third distance. The dust suppression work load coefficient used to characterize the difficulty of suppression in the dust suppression area can be calculated based on the second distance and the third distance. Among them, the area of ​​the dust suppression area can only roughly characterize its dust suppression work load. Generally speaking, the larger the area of ​​the dust suppression area, the larger the corresponding dust suppression work load (for the same number of AGVs), and vice versa. However, under the same area conditions, the dust suppression work loads corresponding to dust suppression areas of different geometric structures are also different. For example, the dust suppression work load corresponding to the long strip dust suppression area is lower than that of the circular dust suppression area, because in the long strip dust suppression area, the AGVs on both sides facing each other only need to suppress the dust in the area of ​​a shorter distance, while the AGVs on both sides facing each other in the circular dust suppression area need to suppress the dust in the area of ​​a longer distance. The present invention calculates the dust suppression work load coefficient used to characterize the difficulty of dust suppression based on the second distance and the third distance mentioned above, and determines the dust suppression work intensity of the AGVs participating in this dust suppression based on this.

[0057] Among them, the dust suppression operation intensity of the AGV is positively correlated with the dust suppression operation load coefficient, that is, the greater the dust suppression operation load coefficient, the greater the dust suppression operation intensity, that is, the AGV performs dust suppression operations with greater operating power or operating efficiency; conversely, the AGV performs dust suppression operations with less operating power or operating efficiency. In addition, the corresponding relationship between the two can be established in advance, for example, in the form of a comparison table, and the dust suppression operation intensity corresponding to the dust suppression operation load coefficient can be determined by looking up the table when using it.

[0058] It should be noted that in order to reduce the difficulty of control, all AGVs can be set to adopt the same dust suppression operation intensity. The dust suppression operation intensity is mainly characterized by the water mist injection rate and the dust adsorption and filtration rate.

[0059] Further, the dust suppression operation load coefficient is calculated according to the second distance and the third distance, including:

[0060]

[0061] Wherein, Load is the dust suppression operation load coefficient; Load base is the basic load factor for dust suppression operations, which is determined according to the area of ​​the area; d length is the second distance, d width is the third distance; d i is the i-th of the remaining first distances excluding the second distance and the third distance, and n is the number of the first distances.

[0062] In this embodiment, it can be seen from the above formula that the present invention first determines the basic load coefficient Load of the dust suppression operation according to the area of ​​the dust suppression area. base , Load base It is also positively correlated with the area of ​​the region. At the same time, the maximum length and minimum length of the dust suppression area are also considered. The two can represent the length and width of the dust suppression area, and the ratio of the two reflects the degree of similarity to the long strip structure and circular structure of the dust suppression area. The larger the ratio, the closer it is to the long strip structure, and the smaller the ratio, the closer it is to the circular structure. In order to further improve the calculation of the above approximation, other first distances are also considered, that is, the average value of other first distances is considered. Obviously, the smaller the average value is, the closer it is to a long strip structure, and the larger the average value is, the closer it is to a circular structure.

[0063] Among them, the basic load factor Load of dust suppression operation base The corresponding relationship with the regional area can also be pre-established in the form of a comparison table, which will not be described in detail.

[0064] Furthermore, the dust suppression request also includes an expected dust intensity level, and the determining of the dust suppression strategy according to the second site structure data further includes:

[0065] Inputting the expected dust intensity level, the contour curve and the area of ​​the region into a machine analysis model to obtain dust three-dimensional structure prediction data;

[0066] Determine the highest point of the dust three-dimensional structure prediction data, and calculate the dust suppression angle of the AGV corresponding to each of the dust suppression points according to the highest point and the positions of each of the dust suppression points;

[0067] The dust suppression strategy is determined according to each of the dust suppression points, the dust suppression operation intensity and the dust suppression angle of each AGV.

[0068] In this embodiment, the dust suppression request issued by the construction worker may also include an expected dust intensity level, which can be determined according to parameters such as the construction type (such as excavation, mixing, painting, etc.), the construction intensity level (number of equipment, number of workers, etc.), etc. It can be determined manually by the construction worker according to a comparison table containing the above-mentioned multiple parameters, or it can be calculated using a specific analysis model, which is not limited by the present invention. A pre-built machine analysis model is used to comprehensively analyze the expected dust intensity level, the contour curve of the dust suppression area, and the area of ​​the area, and the dust three-dimensional structure prediction data can be obtained. The dust three-dimensional structure prediction data characterizes the three-dimensional structure of the dust group in the dust suppression area under the expected dust intensity level, which includes the highest point. In order to improve the dust suppression effect and prevent the dust from high places from spreading to other areas, the present invention is set to calculate the dust suppression angle of the AGV corresponding to each dust suppression point according to the position of the highest point and each dust suppression point, that is, by controlling the dust suppression angle of the AGV to align with the highest point of the dust group, the dust from high places can be effectively reduced from spreading to other areas.

[0069] Among them, the machine analysis model is constructed based on the machine learning algorithm, and preferably uses a deep learning algorithm, such as generative adversarial networks GANs, deep learning RL algorithms, etc.

[0070] Further, the dust suppression strategy is determined according to each of the dust suppression points, the dust suppression operation intensity and the dust suppression angle of each AGV, including:

[0071] The number of straight angles is calculated based on the dust suppression operation load coefficient and the corresponding direct proportional function;

[0072] Determine the number of flat-angle AGVs obtained in an interval manner, and use the remaining AGVs as elevation-angle AGVs;

[0073] Each of the flat-angle AGVs and each of the elevation-angle AGVs is matched with the corresponding dust suppression point, and the dust suppression operation intensity is uniformly configured for each of the flat-angle AGVs and each of the elevation-angle AGVs.

[0074] In this embodiment, in order to ensure the comprehensiveness of dust suppression, it is also necessary to set up a part of AGVs to perform dust suppression operations on the dust suppression area at a horizontal angle to prevent part of the dust in the dust group from spreading from the bottom to other areas. The number of flat-angle AGVs is determined according to the dust suppression operation load coefficient and the corresponding direct proportional function. The higher the dust suppression operation load coefficient, the greater the dust intensity at the bottom, and more flat-angle AGVs need to be configured. Conversely, fewer flat-angle AGVs need to be configured. The remaining AGVs are used as elevation AGVs, that is, they perform dust suppression operations at an elevation angle aligned with the aforementioned highest point. Therefore, by combining the top and the bottom, a more comprehensive dust suppression can be achieved.

[0075] like Figure 2 As shown, an embodiment of the present invention provides a construction dust suppression system based on multi-AGV collaborative construction site, including a communication module and a processing module, and a plurality of AGVs, wherein the processing module is electrically connected to the communication module and each AGV;

[0076] The communication module is used to obtain first site structure data of the construction site, wherein the first site structure data includes structure data of an outdoor area and structure data of an indoor area; and receive a dust suppression request;

[0077] The processing module is used to, after receiving a dust suppression request, retrieve second site structure data from the site structure data according to the dust suppression request, wherein the dust suppression request includes location information of a dust suppression area; and determine a dust suppression strategy according to the second site structure data, determine a number of AGVs according to the dust suppression strategy, control each AGV to go to the dust suppression area, and collaboratively perform dust suppression on the dust suppression area according to the dust suppression strategy.

[0078] The present invention provides an electronic device, comprising: a memory storing executable program code; a processor coupled to the memory; the processor calls the executable program code stored in the memory to execute the method described in the above embodiment.

[0079] The present invention provides a computer storage medium, on which a computer program is stored. When the computer program is executed by a processor, the method described in the above embodiment is executed.

[0080] The present invention provides a computer program product, including a computer program stored on a non-transitory computer-readable medium, wherein when the computer program is executed by a processor, the method described in the above embodiments is implemented.

[0081] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.

[0082] The program code for implementing the method of the present disclosure may be written in any combination of one or more programming languages. These program codes may be provided to a processor or controller of a general-purpose computer, a special-purpose computer, or other programmable load balancing device, so that when the program code is executed by the processor or controller, the functions / operations specified in the flowchart and / or block diagram are performed.

[0083] Operations are performed. The program code may execute entirely on the machine, partly on the machine, as a stand-alone software package, partly on the machine and partly on a remote machine or entirely on the remote machine or server.

[0084] In the context of the present disclosure, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0085] The systems and techniques described herein may be implemented in a computing system that includes back-end components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes front-end components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such back-end components, middleware components, or front-end components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), and the Internet.

[0086] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in this disclosure can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solutions disclosed in this disclosure can be achieved, and this document does not limit this.

[0087] The above specific implementations do not constitute a limitation on the protection scope of the present disclosure. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present disclosure shall be included in the protection scope of the present disclosure.

Claims

1. A construction site dust suppression method based on multi-AGV collaboration, characterized in that: The steps include: Acquire first site structural data of a construction site, wherein the first site structural data includes structural data of an outdoor area and structural data of an indoor area; After receiving the dust suppression request, retrieve the second site structure data from the site structure data according to the dust suppression request; wherein the dust suppression request includes the location information of the dust suppression area; Determine a dust suppression strategy according to the second site structure data, determine a number of AGVs according to the dust suppression strategy, control each AGV to go to the dust suppression area, and collaboratively suppress dust in the dust suppression area according to the dust suppression strategy; Wherein, the AGV is equipped with a dust suppression device; The determining of the dust suppression strategy according to the second site structure data includes: Determine the contour curve and area of ​​the dust suppression area according to the second site structure data, determine a number of dust suppression points according to the area, and equip each of the dust suppression points with an AGV; wherein each of the dust suppression points is located on the contour curve; Calculate the first distances between the dust suppression points in pairs, use the largest of the first distances as the second distance, and use the smallest of the first distances as the third distance; Calculate a dust suppression operation load coefficient according to the second distance and the third distance, and determine the dust suppression operation intensity of each AGV according to the dust suppression operation load coefficient; Determine the dust suppression strategy according to each of the dust suppression points and the dust suppression operation intensity; The dust suppression operation load coefficient is calculated according to the second distance and the third distance, comprising: Wherein, Load is the dust suppression operation load coefficient; Load base is the basic load factor for dust suppression operations, which is determined according to the area of ​​the area; d length is the second distance, d width is the third distance; d i is the i-th of the remaining first distances excluding the second distance and the third distance, and n is the number of the first distances.

2. A method for suppressing construction dust at a construction site based on multi-AGV collaboration according to claim 1, characterized in that: The obtaining of first site structure data of the construction site comprises: Acquire electronic drawing data of architectural design of the construction site, perform three-dimensional modeling on the electronic drawing data of architectural design using Revit software, and obtain site structure data of the construction site; The drone is controlled to take real-scene photos of the construction site, and a position matching calculation is performed between the real-scene images obtained by the photography and the site structure data, so as to obtain the first site structure data.

3. The method for suppressing dust at a construction site based on multi-AGV collaboration according to claim 1 is characterized in that: The dust suppression request also includes an expected dust intensity level, and the determining of the dust suppression strategy according to the second site structure data further includes: Inputting the expected dust intensity level, the contour curve and the area of ​​the region into a machine analysis model to obtain dust three-dimensional structure prediction data; Determine the highest point of the dust three-dimensional structure prediction data, and calculate the dust suppression angle of the AGV corresponding to each of the dust suppression points according to the highest point and the positions of each of the dust suppression points; The dust suppression strategy is determined according to each of the dust suppression points, the dust suppression operation intensity and the dust suppression angle of each AGV.

4. The method for suppressing construction dust at a construction site based on multi-AGV collaboration according to claim 3 is characterized in that: The dust suppression strategy is determined according to each of the dust suppression points, the dust suppression operation intensity and the dust suppression angle of each AGV, including: The number of straight angles is calculated based on the dust suppression operation load coefficient and the corresponding direct proportional function; Determine the number of flat-angle AGVs obtained in an interval manner, and use the remaining AGVs as elevation-angle AGVs; Each of the flat-angle AGVs and each of the elevation-angle AGVs is matched with the corresponding dust suppression point, and the dust suppression operation intensity is uniformly configured for each of the flat-angle AGVs and each of the elevation-angle AGVs.

5. A construction site dust suppression system based on multi-AGV collaboration, characterized by: It comprises a communication module, a processing module, and a plurality of AGVs, wherein the processing module is electrically connected to the communication module and each AGV, and executes the method according to any one of claims 1 to 4; The communication module is used to obtain first site structure data of the construction site, wherein the first site structure data includes structure data of an outdoor area and structure data of an indoor area; and receiving dust suppression requests; The processing module is used to, after receiving a dust suppression request, retrieve second site structure data from the site structure data according to the dust suppression request, wherein the dust suppression request includes location information of a dust suppression area; and determine a dust suppression strategy according to the second site structure data, determine a number of AGVs according to the dust suppression strategy, control each AGV to go to the dust suppression area, and collaboratively perform dust suppression on the dust suppression area according to the dust suppression strategy.

6. An electronic device comprising: A memory storing executable program code; A processor coupled to the memory; characterized in that: the processor calls the executable program code stored in the memory to execute the method according to any one of claims 1-4.

7. A computer storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 4 is executed.

8. A computer program product comprising a computer program stored on a non-transitory computer readable medium, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 4 is implemented.

Citation Information

Patent Citations

  • Construction site dynamic patrol and dust measurement and control robot

    CN109235352A

  • Big data dust evaluation method for construction site based on big data

    CN109358163A

  • Construction site flying dust concentration prediction method and system

    CN114626580A

  • Rail train purging robot negative pressure dust suppression control method and control device

    CN115805911A

  • Task assignment method, system and equipment for construction site and storage medium

    CN116187700A