A method and system for generating engineering project ledgers based on intelligent AI

The intelligent AI generation of engineering project ledger method solves the problem of inefficiency of traditional methods through data correction, correlation graph analysis and risk warning model, achieves efficient generation and stability of engineering project ledger, and ensures project accuracy and resource optimization. .

CN118428912BActive Publication Date: 2024-10-08VISA TECH (XIAN) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410896948.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-05
Publication Date
2024-10-08
Estimated Expiration
2044-07-05

AI Technical Summary

Technical Problem

Traditional engineering project ledger management methods are inefficient, difficult to meet the real-time update and accurate control requirements of large-scale or rapidly changing projects, and are error-prone.

Method used

Intelligent AI is used to generate engineering project ledger methods. By obtaining project data, removing duplicate records, performing data correction and correlation diagram analysis, using risk warning models to identify cost factors and risk factors, constructing dynamic cost control strategies and overall project goals, and generating projects Project ledger.

Benefits of technology

It improves the efficiency and stability of project ledger generation, ensures the consistency and accuracy of key information, reduces potential financial losses, optimizes resource allocation, and ensures that projects are completed on time and maximizes benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118428912B_ABST
    Figure CN118428912B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of engineering technology, and proposes a method and system for generating an engineering project ledger based on intelligent AI, the method comprising: obtaining engineering project data and cleaning and deduplication, importing into a data warehouse after correction, establishing a network data node and a data association diagram, analyzing and obtaining target data, using a risk warning model to identify data risk factors, determining cost factors and formulating a dynamic cost control strategy, calculating cost deviation values, constructing overall engineering goals based on the deviation values, including safety, construction period and quality goals, and generating an engineering project ledger to achieve controllable cost monitoring and engineering goal achievement. The present invention can improve the efficiency and stability of generating an engineering project ledger.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of engineering technology, and in particular to a method and system for generating an engineering project ledger based on intelligent AI. Background Art

[0002] In modern engineering project management, ledgers, as a tool for recording and tracking key information such as project progress, cost, resource allocation, etc., are crucial to ensuring the smooth progress of the project.

[0003] Traditional project ledger management methods usually rely on manual recording and processing. Although this method is intuitive, it is often inefficient and error-prone when faced with large-scale, complex or rapidly changing projects. Especially when the project data volume is huge and changes are frequent, it is difficult to meet the needs of real-time updates and accurate control. Summary of the invention

[0004] The present invention provides a method and system for generating engineering project ledgers based on intelligent AI, the main purpose of which is to improve the efficiency and stability of engineering project ledger generation.

[0005] A method for generating an engineering project ledger based on intelligent AI, characterized in that the method comprises:

[0006] Acquire an engineering project, extract project data from the engineering project, remove duplicate records from the project data to obtain unique data, and perform data correction on the unique data to obtain corrected data;

[0007] After the corrected data is imported into a preset data warehouse, a network data node is set in the data warehouse, a data association graph corresponding to the corrected data is constructed based on the network data node, associated data corresponding to the data association graph is analyzed, and the corrected data and the associated data are aggregated to obtain target data;

[0008] Using a preset risk warning model to identify the risk of the target data, obtain data risk factors, calculate the distribution prior values ​​corresponding to the data risk factors, and identify the cost factors of the engineering project based on the distribution prior values, wherein the cost factors include: direct factors, indirect factors, and change factors;

[0009] Based on the cost factors, a dynamic cost control strategy corresponding to the engineering project is constructed and based on the dynamic cost control strategy, a controllable cost in the engineering project is determined, wherein the controllable cost includes: actual controllable cost and budget controllable cost, and based on the controllable cost, a cost deviation value corresponding to the engineering project is calculated;

[0010] Based on the cost deviation value, the overall engineering goal corresponding to the engineering project is constructed, and the overall engineering goal includes: safety goal, construction period goal and quality goal. The target sub-item data corresponding to the overall engineering goal are identified, and based on the target sub-item data, the engineering project ledger corresponding to the engineering project is generated.

[0011] Optionally, performing data correction on the unique data to obtain corrected data includes:

[0012] Performing field scanning on the unique data to obtain a data field corresponding to the unique data;

[0013] Interpolating and filling missing values ​​in the data field to obtain interpolated data;

[0014] Extracting data logic points in the interpolation data;

[0015] Based on the data logic points, construct correction logic corresponding to the interpolation data;

[0016] The correction logic is used to perform data correction on the unique data to obtain corrected data.

[0017] Optionally, constructing a data association graph corresponding to the corrected data based on the network data nodes includes:

[0018] Querying the node relationship between the network data nodes;

[0019] Performing quantitative analysis on the node relationship to obtain quantitative strength of the relationship;

[0020] Based on the relationship quantification strength, construct a network topology structure corresponding to the network data node;

[0021] The correction data is mapped to the network topology to obtain a data association graph corresponding to the correction data.

[0022] Optionally, the aggregating the corrected data and the associated data to obtain target data includes:

[0023] removing redundant data from the correction data and the associated data;

[0024] Associating the corrected data after removing the redundant data with the associated data to obtain an associated data set;

[0025] Extracting target features from the associated data set;

[0026] Based on the target feature, the correction data and the associated data are aggregated to obtain target data.

[0027] Optionally, the using a preset risk warning model to identify the risk of the target data to obtain data risk factors includes:

[0028] After inputting the target data into the data input layer of the preset risk warning model, the target conversion data corresponding to the target data is obtained;

[0029] Utilizing a feature extraction layer in a preset risk warning model to extract a target feature vector corresponding to the target conversion data;

[0030] Performing a risk level assessment on the target feature vector using a risk assessment layer in a preset risk warning model to determine the risk level corresponding to the target feature vector;

[0031] Based on the risk level, the risk identification layer in the preset risk warning model is used to perform risk identification on the target data to obtain data risk factors.

[0032] Optionally, the calculating the distribution prior value corresponding to the data risk factor includes:

[0033] The distribution prior value corresponding to the data risk factor is calculated using the following formula:

[0034] ;

[0035] in, represents the distribution prior value corresponding to the data risk factor, is the prior probability, is the probability of risk occurring. It refers to the adjustment coefficient of the probability of a risk occurring. Indicates the risk impact, It refers to the adjustment coefficient of a risk impact. It refers to risk weight.

[0036] Optionally, the identifying the cost factor in the engineering project based on the allocated prior value includes:

[0037] Based on the allocation priori value, performing cost correlation analysis on the engineering project to obtain project cost analysis data;

[0038] mining cost drivers in the project cost analysis data;

[0039] Performing cost grading on the cost driving factors to obtain graded cost data;

[0040] Cost factors in the hierarchical cost data are extracted.

[0041] Optionally, the calculating, based on the controllable cost, a cost deviation value corresponding to the engineering project includes:

[0042] The cost deviation value corresponding to the engineering project is calculated using the following formula:

[0043] ;

[0044] in, Indicates the cost deviation value corresponding to the engineering project, represents the actual controllable cost, Indicates budget controllable costs, represents the total cost, represents the planned cost corresponding to the engineering project, represents the cost rate, Represents cost cycle time.

[0045] Optionally, constructing an overall engineering goal corresponding to the engineering project based on the cost deviation value includes:

[0046] Based on the cost deviation value, determining the project cost amount corresponding to the engineering project;

[0047] Query the cost priority corresponding to the project cost amount;

[0048] Based on the cost priorities, formulate short-term goals corresponding to the engineering project;

[0049] And carry out overall planning for the engineering project according to the short-term goal to obtain the overall engineering goal corresponding to the engineering project.

[0050] In order to solve the above problems, the present invention also provides a system for generating engineering project ledgers based on intelligent AI, the system comprising:

[0051] A data correction module, used for acquiring an engineering project, extracting project data in the engineering project, removing duplicate records in the project data to obtain unique data, and performing data correction on the unique data to obtain corrected data;

[0052] A data aggregation module is used to import the corrected data into a preset data warehouse, set a network data node in the data warehouse, construct a data association graph corresponding to the corrected data based on the network data node, analyze the associated data corresponding to the data association graph, and aggregate the corrected data and the associated data to obtain target data;

[0053] A factor identification module is used to identify the risk of the target data using a preset risk warning model, obtain data risk factors, calculate the distribution prior values ​​corresponding to the data risk factors, and identify the cost factors of the engineering project based on the distribution prior values. The cost factors include: direct factors, indirect factors and change factors;

[0054] A deviation value calculation module is used to construct a cost dynamic control strategy corresponding to the engineering project based on the cost factor and determine the controllable cost in the engineering project based on the cost dynamic control strategy. The controllable cost includes: actual controllable cost and budget controllable cost. Based on the controllable cost, the cost deviation value corresponding to the engineering project is calculated;

[0055] A ledger generation module is used to construct the overall engineering goal corresponding to the engineering project based on the cost deviation value, and the overall engineering goal includes: safety goal, construction period goal and quality goal, identify the target sub-item data corresponding to the overall engineering goal, and generate the engineering project ledger corresponding to the engineering project based on the target sub-item data.

[0056] First, the present invention can monitor the project progress, cost and resource usage in real time by acquiring the engineering project and extracting the project data in the engineering project, ensuring the consistency and accuracy of all key information. At the same time, the present invention imports the corrected data into the preset data warehouse, and sets the network data node in the data warehouse, which improves the accessibility and comprehensibility of the data, so that the project team can more intuitively understand the patterns and trends behind the data, so as to make more accurate and timely strategy adjustments. The present invention uses the preset risk warning model to identify the risk of the target data and obtain the data risk factor, which can reduce potential financial losses, and also help maintain the overall stability of the project and protect key milestones from being delayed or interrupted. The present invention constructs the cost dynamic control strategy corresponding to the engineering project based on the cost factor, which helps to optimize resource allocation, improve resource utilization efficiency, and ensure that the project can be completed on time within the budget. Further, the present invention constructs the overall engineering goal corresponding to the engineering project based on the cost deviation value, which can motivate the team to improve work efficiency, reasonably allocate resources, and ultimately achieve project goals while ensuring the maximization of project benefits. Therefore, the method and system for generating engineering project ledgers based on intelligent AI proposed by the present invention can improve the efficiency and stability of engineering project ledger generation. BRIEF DESCRIPTION OF THE DRAWINGS

[0057] Figure 1 A flowchart of a method for generating an engineering project ledger based on intelligent AI provided by one embodiment of the present invention;

[0058] Figure 2A schematic diagram of a module for generating an engineering project ledger system based on intelligent AI according to an embodiment of the present invention.

[0059] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0060] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0061] The embodiment of the present application provides a method for generating a project ledger based on intelligent AI. The execution subject of the method for generating a project ledger based on intelligent AI includes but is not limited to at least one of the electronic devices such as a server, a terminal, etc. that can be configured to execute the method provided in the embodiment of the present application. In other words, the method for generating a project ledger based on intelligent AI can be executed by software or hardware installed on a terminal device or a server device, and the software can be a blockchain platform. The server includes but is not limited to: a single server, a server cluster, a cloud server or a cloud server cluster, etc. The server can be an independent server, or it can be a cloud server that provides basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, content delivery networks (Content Delivery Network, CDN), and big data and artificial intelligence platforms.

[0062] Reference Figure 1 As shown, it is a flow chart of a method for generating a project ledger based on intelligent AI provided by an embodiment of the present invention. In this embodiment, the method for generating a project ledger based on intelligent AI includes:

[0063] S1. Acquire a project, extract project data from the project, remove duplicate records from the project data to obtain unique data, and perform data correction on the unique data to obtain corrected data.

[0064] The present invention can monitor the project progress, cost and resource usage in real time by acquiring engineering projects and extracting project data in the engineering projects, thereby ensuring the consistency and accuracy of all key information.

[0065] Among them, the engineering project refers to various engineering activities such as ongoing or planned construction, infrastructure, mechanical equipment installation, etc. These activities usually involve multiple links such as design, construction, supervision, and procurement; the project data refers to all information and records related to the engineering project, including: project plan and schedule, cost budget and actual expenditure, human resource allocation and working time records, procurement and use of materials and equipment, quality control and safety management records. Optionally, the project data extracted from the engineering project can be obtained through data extraction tools, such as: Informatica, Talend, SSIS and other tools.

[0066] Furthermore, the present invention obtains unique data by removing duplicate records in the project data, thereby avoiding problems such as repeated calculations and statistical errors, making data analysis more accurate and reliable, and providing a more accurate basis and reference for project management and decision-making, thereby improving the efficiency and results of engineering projects.

[0067] The unique data refers to unique records or entries that do not appear repeatedly in the project data. Optionally, the removal of duplicate records in the project data can be achieved through a data cleaning tool, such as OpenRefine, Trifacta Wrangler.

[0068] Furthermore, the present invention performs data correction on the unique data to obtain corrected data, which helps to eliminate errors, inconsistencies or format problems in the data, thereby improving the quality and reliability of the data.

[0069] The corrected data refers to data that has been processed by the correction logic, in which the original errors, inconsistencies or anomalies have been corrected.

[0070] As an embodiment of the present invention, the data correction of the unique data to obtain corrected data includes: performing field scanning on the unique data to obtain a data field corresponding to the unique data; interpolating and filling missing values ​​in the data field to obtain interpolated data; extracting data logic points in the interpolated data; based on the data logic points, constructing correction logic corresponding to the interpolated data; and using the correction logic to perform data correction on the unique data to obtain corrected data.

[0071] Among them, the data field refers to the various components or attributes in the unique data, such as project name, cost, duration, person in charge, etc.; the interpolation data refers to the data processed by the interpolation method, in which the missing values ​​have been filled; the data logic point refers to the key point or feature with specific logical meaning in the interpolation data; the correction logic refers to the logical rules established based on the data logic point for correcting the data.

[0072] Furthermore, the field scanning of the unique data can be achieved through SQL tools, such as Python's pandas and other tools; the interpolation and filling of missing values ​​in the data field can be achieved through interpolation functions, such as linear interpolation, polynomial interpolation and other functions; the extraction of data logic points in the interpolated data can be achieved through statistical analysis tools, such as SPSS, SAS and other tools; the construction of correction logic corresponding to the interpolated data can be achieved through a rule engine, such as Drools; the data correction of the unique data can be achieved by utilizing the correction logic.

[0073] S2. After importing the corrected data into a preset data warehouse, a network data node is set in the data warehouse, and based on the network data node, a data association graph corresponding to the corrected data is constructed, and the associated data corresponding to the data association graph is analyzed, and the corrected data and the associated data are summarized to obtain the target data.

[0074] The present invention imports the corrected data into a preset data warehouse and sets a network data node in the data warehouse, thereby improving the accessibility and comprehensibility of the data, allowing the project team to more intuitively understand the patterns and trends behind the data, thereby making more accurate and timely strategy adjustments.

[0075] Among them, the preset data warehouse refers to an established and configured database system, which is designed to store, manage and retrieve large amounts of structured or semi-structured data; the network data nodes refer to data points or records in the data warehouse, and these nodes are interconnected through specific relationships or connections. Optionally, the setting of network data nodes in the data warehouse can be achieved through data warehouse design tools, such as: Informatica, Talend and other tools.

[0076] Furthermore, the present invention constructs a data association graph corresponding to the corrected data based on the network data nodes, which can quickly identify key influencing factors, optimize resource allocation, and predict potential risks, thereby improving the overall efficiency and response speed of project management.

[0077] The data association graph refers to a graphical representation formed after mapping the corrected data to a network topology structure.

[0078] As an embodiment of the present invention, constructing a data association graph corresponding to the corrected data based on the network data nodes includes: querying the node relationships between the network data nodes; performing quantitative analysis on the node relationships to obtain relationship quantification strengths; constructing a network topology structure corresponding to the network data nodes based on the relationship quantification strengths; and mapping the corrected data to the network topology structure to obtain a data association graph corresponding to the corrected data.

[0079] Among them, the node relationship refers to the connection or interaction between the network data nodes, and these relationships can be direct (such as project A depends on resource B) or indirect (such as project A affects project C through an intermediate node); the relationship quantitative strength refers to the measure of the importance or influence of the node relationship; the network topology structure refers to the layout of the network data nodes and the graphical representation of the relationship between them.

[0080] Furthermore, the query of the node relationship between the network data nodes can be obtained through the Neo4j tool, such as: in Neo4j, the Cypher query language can be used to find the relationship between nodes; the quantitative analysis of the node relationship can be obtained through the Python tool, such as: in Python, the pandas and scipy libraries can be used to calculate the correlation of node relationships; the construction of the network topology structure corresponding to the network data nodes can be obtained through the NetworkX tool, such as: in NetworkX, a graph object can be created, and nodes and edges can be added to represent the network topology structure.

[0081] In detail, the corrected data is mapped to the network topology structure to obtain a data association graph corresponding to the corrected data, including: identifying the corrected data item and its data attributes corresponding to the corrected data; creating a data node for the corrected data item; and defining the node relationship between the data nodes based on the data attributes, and obtaining the node relationship strength by quantitatively analyzing the node relationship, and based on the node relationship strength, mapping all corrected data to the relationship connection corresponding to the network topology structure, and generating the data association graph corresponding to the corrected data based on the relationship connection.

[0082] Among them, the corrected data item refers to the specific data unit after deduplication and correction processing, such as project name, resource type, cost value, etc.; the data attribute refers to the characteristics or properties of each corrected data item, such as data type (text, value, etc.), data source, timestamp, etc.

[0083] Furthermore, the identification of the corrected data items and data attributes corresponding to the corrected data can be obtained through data analysis tools, such as Tableau, Power BI and other tools; the definition of the node relationship between the data nodes can be obtained through graph theory algorithms, such as Dijkstra algorithm, PageRank algorithm and other algorithms; the quantitative analysis of the node relationship can be obtained through statistical analysis tools, such as R language; the generation of the data association graph corresponding to the corrected data can be obtained through visualization tools, such as D3.js, Plotly and other tools.

[0084] By analyzing the associated data corresponding to the data association diagram, the present invention helps to identify key nodes and bottlenecks, optimize resource allocation, predict project development trends, and plan response strategies in advance, thereby improving the foresight and flexibility of project management and ensuring the smooth realization of project goals.

[0085] The associated data refers to the information related to network data nodes and their relationships displayed in the data association graph. Optionally, the associated data corresponding to the analysis of the data association graph can be obtained through a graphic analysis tool, such as Gephi, Cytoscape and other graphic analysis tools.

[0086] Furthermore, the correction data and the associated data are aggregated to obtain the target data, which can enable efficient collaboration based on a unified data platform, optimize resource allocation, and respond to project changes in a timely manner, thereby improving the overall quality and efficiency of project execution.

[0087] The target data refers to the project data after aggregation and analysis, which contains key project indicators and information for supporting project management decisions.

[0088] As an embodiment of the present invention, the aggregating the corrected data and the associated data to obtain target data includes: removing redundant data in the corrected data and the associated data; associating the corrected data after removing the redundant data with the associated data to obtain an associated data set; extracting target features in the associated data set; and aggregating the corrected data and the associated data based on the target features to obtain target data.

[0089] Among them, the redundant data refers to those data items that appear repeatedly in the corrected data and the associated data; the associated data set refers to a data set that combines the corrected data and the associated data through data association technology; the target features refer to key indicators related to project management, such as progress, cost, quality, etc.

[0090] Furthermore, the removal of redundant data in the corrected data and the associated data can be achieved through ETL tools, such as Extract, Transform, Load and other tools; the data association between the corrected data after removing the redundant data and the associated data can be achieved through a distributed computing framework, such as Apache Spark, Flink and other tools; the extraction of target features in the associated data set can be achieved through feature selection methods, such as filtering, wrapping, embedding and other methods; the data aggregation of the corrected data and the associated data can be achieved through data visualization tools, such as Tableau, Power BI and other tools.

[0091] S3. Use a preset risk warning model to identify risks of the target data, obtain data risk factors, calculate the distribution prior values ​​corresponding to the data risk factors, and identify the cost factors in the engineering project based on the distribution prior values. The cost factors include: direct factors, indirect factors and change factors.

[0092] The present invention uses a preset risk warning model to identify risks of the target data and obtain data risk factors, which can reduce potential financial losses, help maintain the overall stability of the project, and protect key milestones from being delayed or interrupted.

[0093] Among them, the preset risk warning model refers to a pre-built and trained machine learning system, which is designed to automatically analyze and identify potential risks in the project. This model usually includes the following key components: data input layer: This is the first layer of the model, responsible for receiving the original data and converting it into a format that the model can process; feature extraction layer: This layer is responsible for extracting features related to project risks from the preprocessed data; risk assessment layer: In this layer, the model assesses the risks faced by the project based on the extracted features; risk identification layer: In the risk identification layer, the model will identify factors or features that may lead to specific risks from the original data based on the risk assessment results; the data risk factor refers to the specific factors that may lead to potential risks identified from the original data by the risk identification layer based on the risk level.

[0094] As an embodiment of the present invention, the use of a preset risk warning model to identify risks of the target data to obtain data risk factors includes: after inputting the target data into the data input layer of the preset risk warning model, obtaining target conversion data corresponding to the target data; using the feature extraction layer in the preset risk warning model to extract the target feature vector corresponding to the target conversion data; using the risk assessment layer in the preset risk warning model to perform risk level assessment on the target feature vector to determine the risk level corresponding to the target feature vector; based on the risk level, using the risk identification layer in the preset risk warning model to identify risks of the target data to obtain data risk factors.

[0095] Among them, the target conversion data refers to a set of normalized data obtained after preprocessing and converting the original data through the data input layer; the target feature vector refers to a set of meaningful features extracted from the preprocessed data, and these features are combined into an ordered numerical vector; the risk level refers to the quantitative indicator of the project risk level determined according to the risk assessment results output by the model.

[0096] Furthermore, the extraction of the target feature vector corresponding to the target conversion data can be achieved by utilizing the feature extraction layer in a preset risk warning model; the risk level assessment of the target feature vector can be achieved by utilizing the risk assessment layer in a preset risk warning model; and the risk identification of the target data can be achieved by utilizing the risk identification layer in a preset risk warning model.

[0097] As an embodiment of the present invention, the calculating the distribution prior value corresponding to the data risk factor includes:

[0098] The distribution prior value corresponding to the data risk factor is calculated using the following formula:

[0099] ;

[0100] middle, represents the distribution prior value corresponding to the data risk factor, is the prior probability, is the probability of risk occurring. It refers to the adjustment coefficient of the probability of a risk occurring. Indicates the risk impact, It refers to the adjustment coefficient of a risk impact. It refers to risk weight.

[0101] It should be noted that, in the present invention, the prior probability can be understood as a quantitative estimated probability of the possibility of occurrence of a risk factor, which is usually estimated based on historical data or expert experience. For example, if historical data shows that when a specific risk is a specific value of 1, it has occurred three times in the past ten years, and there are a total of thirty similar projects, then the prior probability can be estimated as 1x3 / 30 = 0.1; the probability of risk occurrence can be understood as an indicator probability that measures the possibility of a risk, which can be calculated by a risk assessment model, such as Monte Carlo simulation, Bayesian network or risk matrix. For example, Monte Carlo simulation can be used to simulate the operation of a project under different conditions, thereby estimating the probability of risk occurrence; the adjustment coefficient of the risk occurrence probability can be understood as a rate used to control the impact of the risk occurrence probability on the final assigned prior value, which can be set based on the specific circumstances of the project and the risk management strategy. For example, if the project is highly sensitive to risk, a smaller value may be selected. value to enhance the impact of the probability of risk occurrence on the allocation prior value; the risk impact can be determined by evaluating the impact of the risk on the project goals (such as cost, schedule, and quality) after the risk occurs. For example, if a risk may cause the project to be delayed by one month, and the monthly delay cost is US$100,000, then the risk impact can be set to US$100,000; the adjustment coefficient of the risk impact can be understood as the rate at which the risk impact affects the final allocation prior value, which can be set based on the specific situation of the project and the risk management strategy. For example, if the project is very sensitive to cost changes, a larger value to enhance the impact of risk influence on the assigned prior value; the risk weight can be understood as a weight value that reflects the importance of the risk relative to other risks in the project, which can be determined by comparing the impact of different risks on the overall goals of the project. For example, if a risk poses a greater threat to the success of the project than other risks, then its weight may be higher.

[0102] Furthermore, by identifying the cost factors in the engineering project based on the allocation prior values, limited budgets and resources can be planned and managed more effectively, thereby reducing the risk of cost overruns.

[0103] Among them, the allocated prior value refers to a value calculated based on multiple parameters such as prior probability, risk occurrence probability, risk influence and risk weight, which is used to measure the importance and priority of risk in the project, and can guide the project team to take appropriate actions to prioritize which risks when resources are limited; the cost factor refers to the factor that specifically affects the project cost in the hierarchical cost data, and the cost factor includes: direct factor, indirect factor and variation factor.

[0104] As an embodiment of the present invention, identifying the cost factors in the engineering project based on the allocation prior value includes: performing a cost correlation analysis on the engineering project based on the allocation prior value to obtain project cost analysis data; mining the cost driving factors in the project cost analysis data; performing cost grading on the cost driving factors to obtain graded cost data; and extracting cost factors from the graded cost data.

[0105] Among them, the project cost analysis data refers to all data collected related to the project cost, including budget data, actual expenditure data, classification and description of cost elements, etc.; the cost drivers refer to factors that can directly affect the project cost, such as raw material prices, labor costs, design complexity, construction technology, etc.; the hierarchical cost data refers to a data set that is sorted according to importance and priority through further analysis of cost drivers.

[0106] Furthermore, the cost correlation analysis of the engineering project can be achieved through statistical analysis models, such as variance analysis, multiple linear regression models, correlation matrix analysis and other models; the mining of cost drivers in the project cost analysis data can be achieved through data analysis tools, such as SPSS, SAS and other tools; the cost grading of the cost drivers can be achieved through BI tools, such as using BI tools to visualize graded data, and assigning weights to cost drivers for grading through decision support tools such as hierarchical analysis method; the extraction of cost factors in the graded cost data can be achieved through SQL or NoSQL tools.

[0107] S4. Based on the cost factors, a dynamic cost control strategy corresponding to the engineering project is constructed, and based on the dynamic cost control strategy, the controllable costs in the engineering project are determined. The controllable costs include: actual controllable costs and budgeted controllable costs. Based on the controllable costs, the cost deviation value corresponding to the engineering project is calculated.

[0108] The present invention constructs a dynamic cost control strategy corresponding to the engineering project based on the cost factors, which helps to optimize resource allocation, improve resource utilization efficiency, and ensure that the project can be completed on time within the budget.

[0109] Among them, the cost dynamic control strategy refers to a cost management method based on real-time data, which emphasizes continuous monitoring, analysis and adjustment of costs throughout the project life cycle. Optionally, the cost dynamic control strategy corresponding to the engineering project can be achieved through RICE tools, such as: Reach, Impact, Confidence, Effort, etc.

[0110] Furthermore, the present invention determines the controllable costs in the engineering project based on the dynamic cost control strategy, which can more effectively optimize resource allocation, provide early warning of potential budget overrun risks, ensure smooth implementation of the project within the budget, and ultimately maximize project profits.

[0111] The controllable costs refer to the costs that can be directly controlled by a specific responsibility center during a specific period. The controllable costs include actual controllable costs and budgeted controllable costs. Optionally, the controllable costs in the project can be determined through cost estimation and budgeting tools, such as CostXpert, Crystal Ball and other tools.

[0112] As an embodiment of the present invention, the step of calculating the cost deviation value corresponding to the engineering project based on the controllable cost includes:

[0113] The cost deviation value corresponding to the engineering project is calculated using the following formula:

[0114] ;

[0115] in, Indicates the cost deviation value corresponding to the engineering project, represents the actual controllable cost, Indicates budget controllable costs, represents the total cost, represents the planned cost corresponding to the engineering project, represents the cost rate, Represents cost cycle time.

[0116] It should be noted that, in the present invention, the actual controllable cost can be determined by tracking and recording the controllable costs actually incurred during the execution of the project, for example, direct labor, material and equipment usage costs recorded by the project accounting system; the budgeted controllable cost can be determined through the cost estimation and budget preparation process in the project planning stage, for example, calculated through a cost estimation model based on historical data, market prices and project requirements; the total cost includes all expected costs, including direct costs, indirect costs and other related costs, which are usually determined by comprehensively considering all cost elements in the project budget stage; the planned cost corresponding to the engineering project can be determined by the expected cost based on the project schedule and resource allocation plan, for example, through project management software or Gantt chart to plan and track the cost of each stage; the cost interest rate can be determined based on the market interest rate or the company's internal capital cost rate, for example, if the company uses a loan to finance the project, then the cost interest rate may be the loan interest rate; the cost cycle time refers to the total time span of the project from start to finish, which can be determined through the project schedule, usually in months or years.

[0117] S5. Based on the cost deviation value, construct the overall engineering goal corresponding to the engineering project, the overall engineering goal includes: safety goal, construction period goal and quality goal, identify the target sub-item data corresponding to the overall engineering goal, and generate the engineering project ledger corresponding to the engineering project based on the target sub-item data.

[0118] The present invention constructs the overall engineering goal corresponding to the engineering project based on the cost deviation value, which can motivate the team to improve work efficiency, reasonably allocate resources, and ultimately achieve the project goal while ensuring the maximization of project benefits.

[0119] The overall project goal is obtained by integrating short-term goals and overall planning, which ensures the financial health and risk management of the project, including: safety goals, construction period goals and quality goals.

[0120] As an embodiment of the present invention, the overall engineering goal corresponding to the engineering project is constructed based on the cost deviation value, including: determining the project cost amount corresponding to the engineering project based on the cost deviation value; querying the cost priority corresponding to the project cost amount; formulating short-term goals corresponding to the engineering project based on the cost priority; and making an overall plan for the engineering project according to the short-term goals to obtain the overall engineering goal corresponding to the engineering project.

[0121] Among them, the project cost amount refers to the sum of all expected fixed costs and variable costs in the project; the cost priority refers to the ranking of costs based on their relative importance or urgency to project success, which is a key factor in determining project resource allocation and priority; the short-term goal refers to the cost saving goal that can be achieved in a shorter period of time (such as a few months or a quarter).

[0122] Furthermore, the determination of the project cost amount corresponding to the engineering project can be achieved through cost estimation tools, such as Excel, CostX, Candy and other tools; the query of the cost priority corresponding to the project cost amount can be achieved through ROI evaluation models, such as Cost-Benefit Analysis Model (cost-benefit analysis model), Break-even Analysis Model (break-even analysis model) and other models; the formulation of short-term goals corresponding to the engineering project can be achieved through project management tools, such as Trello, Jira, Asana and other tools; the overall planning of the engineering project can be achieved through planning models, such as PERT, CPM and the like.

[0123] The present invention can reveal potential bottleneck problems and room for improvement by identifying target sub-item data corresponding to the overall project goal, so that measures can be taken in advance to avoid delays or reduce costs.

[0124] The target sub-item data refers to the decomposition of the overall project goal into smaller and more specific components or indicators, which represent the key aspects of project success. Optionally, the target sub-item data corresponding to the overall project goal can be obtained through mind mapping tools, such as MindMeister, Lucidchart, Microsoft Visio and other tools.

[0125] Furthermore, the present invention generates a project ledger corresponding to the project based on the target sub-item data, which helps to improve the efficiency of the project team, promote cross-departmental collaboration and transparency, ensure the accurate tracking and implementation of project goals, and provide real-time and accurate data support for project decision-making, thereby improving the success rate of the project and the overall execution effect.

[0126] Among them, the engineering project ledger refers to an important tool for recording and tracking key information such as project progress, cost, resource allocation, quality, safety, etc. in engineering projects. It is usually presented in tables, charts or other visual forms so that the project team and management can quickly understand the status of the project and make necessary adjustments. Optionally, the engineering project ledger corresponding to the engineering project can be obtained through advanced project management tools, such as: Asana, Trello, Jira and other tools.

[0127] First, the present invention can monitor the project progress, cost and resource usage in real time by acquiring the engineering project and extracting the project data in the engineering project, ensuring the consistency and accuracy of all key information. At the same time, the present invention imports the corrected data into the preset data warehouse, and sets the network data node in the data warehouse, which improves the accessibility and comprehensibility of the data, so that the project team can more intuitively understand the patterns and trends behind the data, so as to make more accurate and timely strategy adjustments. The present invention uses the preset risk warning model to identify the risk of the target data and obtain the data risk factor, which can reduce potential financial losses, and also help maintain the overall stability of the project and protect key milestones from being delayed or interrupted. The present invention constructs the cost dynamic control strategy corresponding to the engineering project based on the cost factor, which helps to optimize resource allocation, improve resource utilization efficiency, and ensure that the project can be completed on time within the budget. Further, the present invention constructs the overall engineering goal corresponding to the engineering project based on the cost deviation value, which can motivate the team to improve work efficiency, reasonably allocate resources, and ultimately achieve project goals while ensuring the maximization of project benefits. Therefore, the method and system for generating engineering project ledgers based on intelligent AI proposed by the present invention can improve the efficiency and stability of engineering project ledger generation.

[0128] like Figure 2 As shown, it is a functional module diagram of an engineering project ledger generation system based on intelligent AI provided by one embodiment of the present invention.

[0129] The system 200 for generating an engineering project ledger based on intelligent AI of the present invention can be installed in an electronic device. According to the functions implemented, the system 200 for generating an engineering project ledger based on intelligent AI can include a data correction module 201, a data aggregation module 202, a factor identification module 203, a signal generation module 204, and a ledger generation module 205. The module of the present invention can also be referred to as a unit, which refers to a series of computer program segments that can be executed by an electronic device processor and can complete fixed functions, which are stored in the memory of the electronic device.

[0130] In this embodiment, the functions of each module / unit are as follows:

[0131] The data correction module 201 is used to obtain a project, extract project data in the project, remove duplicate records in the project data, obtain unique data, and perform data correction on the unique data to obtain corrected data;

[0132] The data aggregation module 202 is used to import the corrected data into a preset data warehouse, set a network data node in the data warehouse, construct a data association graph corresponding to the corrected data based on the network data node, analyze the associated data corresponding to the data association graph, and aggregate the corrected data and the associated data to obtain target data;

[0133] The factor identification module 203 is used to identify the risk of the target data using a preset risk warning model, obtain data risk factors, calculate the distribution prior values ​​corresponding to the data risk factors, and identify the cost factors of the engineering project based on the distribution prior values. The cost factors include: direct factors, indirect factors and change factors;

[0134] Deviation value calculation module 204, used to construct a cost dynamic control strategy corresponding to the engineering project based on the cost factor and determine the controllable cost in the engineering project based on the cost dynamic control strategy, wherein the controllable cost includes: actual controllable cost and budget controllable cost, and calculate the cost deviation value corresponding to the engineering project based on the controllable cost;

[0135] The ledger generation module 205 is used to construct the overall engineering goal corresponding to the engineering project based on the cost deviation value, and the overall engineering goal includes: safety goal, construction period goal and quality goal, identify the target sub-item data corresponding to the overall engineering goal, and generate the engineering project ledger corresponding to the engineering project based on the target sub-item data.

[0136] In detail, each module described in the system 200 for generating an engineering project ledger based on intelligent AI in the embodiment of the present invention adopts the same technical means as the method for generating an engineering project ledger based on intelligent AI described in the accompanying drawings when used, and can produce the same technical effects, which will not be repeated here.

[0137] The above description is only a specific embodiment of the present invention, so that those skilled in the art can understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but should conform to the widest scope consistent with the principles and novel features invented herein.

Claims

1. A method for generating engineering project ledgers based on intelligent AI, characterized in that: The method comprises: Acquire an engineering project, extract project data from the engineering project, remove duplicate records from the project data to obtain unique data, and perform data correction on the unique data to obtain corrected data; After the corrected data is imported into a preset data warehouse, a network data node is set in the data warehouse, a data association graph corresponding to the corrected data is constructed based on the network data node, associated data corresponding to the data association graph is analyzed, and the corrected data and the associated data are aggregated to obtain target data; Using a preset risk warning model to identify the risk of the target data, obtain data risk factors, calculate the distribution prior values ​​corresponding to the data risk factors, and identify the cost factors in the engineering project based on the distribution prior values. The cost factors include: direct factors, indirect factors, and variable factors. The cost factors refer to factors that specifically affect the project cost in the hierarchical cost data. Based on the cost factors, a dynamic cost control strategy corresponding to the engineering project is constructed and based on the dynamic cost control strategy, a controllable cost in the engineering project is determined, wherein the controllable cost includes: actual controllable cost and budget controllable cost, and based on the controllable cost, a cost deviation value corresponding to the engineering project is calculated; Based on the cost deviation value, construct the overall project goal corresponding to the project, the overall project goal includes: safety goal, construction period goal and quality goal, identify the target sub-item data corresponding to the overall project goal, and generate the project account corresponding to the project based on the target sub-item data; The method of constructing a data association graph corresponding to the corrected data based on the network data nodes includes: querying the node relationship between the network data nodes; performing quantitative analysis on the node relationship to obtain the quantitative strength of the relationship; constructing a network topology structure corresponding to the network data nodes based on the quantitative strength of the relationship; mapping the corrected data to the network topology structure to obtain the data association graph corresponding to the corrected data; The step of aggregating the corrected data and the associated data to obtain the target data includes: removing redundant data from the corrected data and the associated data; associating the corrected data after removing the redundant data with the associated data to obtain an associated data set; extracting target features from the associated data set; and aggregating the corrected data and the associated data based on the target features to obtain the target data; The method of using a preset risk warning model to identify the risk of the target data to obtain data risk factors includes: inputting the target data into a data input layer in a preset risk warning model to obtain target conversion data corresponding to the target data; extracting a target feature vector corresponding to the target conversion data using a feature extraction layer in a preset risk warning model; performing a risk level assessment on the target feature vector using a risk assessment layer in a preset risk warning model to determine the risk level corresponding to the target feature vector; and based on the risk level, performing risk identification on the target data using a risk identification layer in a preset risk warning model to obtain data risk factors. The calculating the distribution prior value corresponding to the data risk factor includes: The distribution prior value corresponding to the data risk factor is calculated using the following formula: , in, represents the distribution prior value corresponding to the data risk factor, is the prior probability, is the probability of risk occurring. It refers to the adjustment coefficient of the probability of a risk occurring. Indicates the risk impact, It refers to the adjustment coefficient of a risk impact. refers to the risk weight; The identifying the cost factors in the engineering project based on the assigned prior value comprises: performing a cost correlation analysis on the engineering project based on the assigned prior value to obtain project cost analysis data; mining cost driving factors in the project cost analysis data; performing cost grading on the cost driving factors to obtain graded cost data; and extracting cost factors from the graded cost data; The calculating the cost deviation value corresponding to the engineering project based on the controllable cost includes: The cost deviation value corresponding to the engineering project is calculated using the following formula: , in, Indicates the cost deviation value corresponding to the engineering project, represents the actual controllable cost, Indicates budget controllable costs, represents the total cost, represents the planned cost corresponding to the engineering project, represents the cost rate, represents the cost cycle time; The constructing the overall engineering goal corresponding to the engineering project based on the cost deviation value includes: determining the project cost amount corresponding to the engineering project based on the cost deviation value; querying the cost priority corresponding to the project cost amount; formulating the short-term goal corresponding to the engineering project based on the cost priority; and making an overall plan for the engineering project according to the short-term goal to obtain the overall engineering goal corresponding to the engineering project; The mapping of the corrected data to the network topology structure to obtain a data association graph corresponding to the corrected data includes: identifying the corrected data item corresponding to the corrected data and its data attributes; creating a data node for the corrected data item; defining the node relationship between the data nodes according to the data attributes, and obtaining the node relationship strength by quantitatively analyzing the node relationship; based on the node relationship strength, mapping all corrected data to the relationship connection corresponding to the network topology structure; and generating the data association graph corresponding to the corrected data according to the relationship connection.

2. The method for generating an engineering project ledger based on intelligent AI as claimed in claim 1, characterized in that: The step of performing data correction on the unique data to obtain corrected data comprises: Performing field scanning on the unique data to obtain a data field corresponding to the unique data; Interpolating and filling missing values ​​in the data field to obtain interpolated data; Extracting data logic points in the interpolation data; Based on the data logic points, construct correction logic corresponding to the interpolation data; The correction logic is used to perform data correction on the unique data to obtain corrected data.

3. Generate engineering project ledger system based on intelligent AI, characterized by: The system is used to execute the method for generating an engineering project ledger based on intelligent AI as described in any one of claims 1-2, and comprises: A data correction module, used for acquiring an engineering project, extracting project data in the engineering project, removing duplicate records in the project data to obtain unique data, and performing data correction on the unique data to obtain corrected data; A data aggregation module is used to import the corrected data into a preset data warehouse, set a network data node in the data warehouse, construct a data association graph corresponding to the corrected data based on the network data node, analyze the associated data corresponding to the data association graph, and aggregate the corrected data and the associated data to obtain target data; A factor identification module is used to identify the risk of the target data using a preset risk warning model, obtain data risk factors, calculate the distribution prior values ​​corresponding to the data risk factors, and identify the cost factors in the engineering project based on the distribution prior values. The cost factors include: direct factors, indirect factors, and variable factors. The cost factors refer to the factors that specifically affect the project cost in the hierarchical cost data. A deviation value calculation module is used to construct a cost dynamic control strategy corresponding to the engineering project based on the cost factor and determine the controllable cost in the engineering project based on the cost dynamic control strategy. The controllable cost includes: actual controllable cost and budget controllable cost. Based on the controllable cost, the cost deviation value corresponding to the engineering project is calculated; A ledger generation module is used to construct an overall engineering goal corresponding to the engineering project based on the cost deviation value, wherein the overall engineering goal includes: a safety goal, a construction period goal, and a quality goal, identify target sub-item data corresponding to the overall engineering goal, and generate an engineering project ledger corresponding to the engineering project based on the target sub-item data; The method of constructing a data association graph corresponding to the corrected data based on the network data nodes includes: querying the node relationship between the network data nodes; performing quantitative analysis on the node relationship to obtain the quantitative strength of the relationship; constructing a network topology structure corresponding to the network data nodes based on the quantitative strength of the relationship; mapping the corrected data to the network topology structure to obtain the data association graph corresponding to the corrected data; The step of aggregating the corrected data and the associated data to obtain the target data includes: removing redundant data from the corrected data and the associated data; associating the corrected data after removing the redundant data with the associated data to obtain an associated data set; extracting target features from the associated data set; and aggregating the corrected data and the associated data based on the target features to obtain the target data; The method of using a preset risk warning model to identify the risk of the target data to obtain data risk factors includes: inputting the target data into a data input layer in a preset risk warning model to obtain target conversion data corresponding to the target data; extracting a target feature vector corresponding to the target conversion data using a feature extraction layer in a preset risk warning model; performing a risk level assessment on the target feature vector using a risk assessment layer in a preset risk warning model to determine the risk level corresponding to the target feature vector; and based on the risk level, performing risk identification on the target data using a risk identification layer in a preset risk warning model to obtain data risk factors. The calculating the distribution prior value corresponding to the data risk factor includes: The distribution prior value corresponding to the data risk factor is calculated using the following formula: , in, represents the distribution prior value corresponding to the data risk factor, is the prior probability, is the probability of risk occurring. It refers to the adjustment coefficient of the probability of a risk occurring. Indicates the risk impact, It refers to the adjustment coefficient of a risk impact. refers to the risk weight; The identifying the cost factors in the engineering project based on the assigned prior value comprises: performing a cost correlation analysis on the engineering project based on the assigned prior value to obtain project cost analysis data; mining cost driving factors in the project cost analysis data; performing cost grading on the cost driving factors to obtain graded cost data; and extracting cost factors from the graded cost data; The calculating the cost deviation value corresponding to the engineering project based on the controllable cost includes: The cost deviation value corresponding to the engineering project is calculated using the following formula: , in, Indicates the cost deviation value corresponding to the engineering project, represents the actual controllable cost, Indicates budget controllable costs, represents the total cost, represents the planned cost corresponding to the engineering project, represents the cost rate, represents the cost cycle time; The constructing the overall engineering goal corresponding to the engineering project based on the cost deviation value includes: determining the project cost amount corresponding to the engineering project based on the cost deviation value; querying the cost priority corresponding to the project cost amount; formulating the short-term goal corresponding to the engineering project based on the cost priority; and making an overall plan for the engineering project according to the short-term goal to obtain the overall engineering goal corresponding to the engineering project; The mapping of the corrected data to the network topology structure to obtain a data association graph corresponding to the corrected data includes: identifying the corrected data item corresponding to the corrected data and its data attributes; creating a data node for the corrected data item; defining the node relationship between the data nodes according to the data attributes, and obtaining the node relationship strength by quantitatively analyzing the node relationship; based on the node relationship strength, mapping all corrected data to the relationship connection corresponding to the network topology structure; and generating the data association graph corresponding to the corrected data according to the relationship connection.