A flowing water aeration control system, method, device and storage medium
Through the design of the flowing water aeration control system, the first-level regulation unit and monitoring unit are used to adjust the water flow rate and aeration parameters in real time, which solves the problem of inaccurate control of aeration parameters and improves the energy efficiency and water quality stability of the sewage treatment system .
Patent Information
- Application Number
- CN202410553101.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-07
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-05-07
AI Technical Summary
The aeration parameters control in the existing sewage aeration treatment system are inaccurate, resulting in excessive energy consumption and difficulty in monitoring and adjusting water quality for a long time.
A flowing water aeration control system is designed, including a first-level regulation unit, a monitoring unit, an aeration control unit and a water quantity control unit. Through monitoring data and water quality data, the water flow and aeration parameters are adjusted in real time, so as to realize the water body in the aeration tank. and long-term monitoring and adjustment of the processing process.
It improves the energy utilization efficiency of the aeration system, maintains the stability of important water quality parameters in the water body, reduces energy consumption, and prevents the occurrence of water quality problems in a timely manner.
Smart Images

Figure CN118439737B_ABST
Abstract
Description
Technical Field
[0001] The present specification relates to the field of sewage aeration treatment, and in particular to a flowing water aeration control system, method, device and storage medium. Background Art
[0002] In the sewage treatment process, aeration is often used to force oxygenation into the sewage, strengthen the contact between organic matter and microorganisms and dissolved oxygen in the pool, and oxidize and decompose the organic matter in the sewage. However, the current control of aeration devices and systems often results in inaccurate aeration parameters, resulting in unnecessary energy consumption.
[0003] In response to the problem of inaccurate aeration parameters, CN114132980B proposed a short-range intelligent precise aeration control method and system for sewage treatment. This method monitors important parameters in sewage treatment, discards parameters that are difficult to measure and have low relevance, shortens the time between feedforward and feedback, and achieves short-range precise aeration control. However, it does not involve long-term accurate monitoring and evaluation of water quality and aeration treatment process.
[0004] Therefore, it is hoped that a flowing water aeration control system, method, device and storage medium can be provided to achieve long-term monitoring of the water body and the aeration treatment process in the aeration tank, and timely adjust the parameters related to the aeration treatment process to reasonably save energy. Summary of the invention
[0005] One or more embodiments of the present specification provide a flowing water aeration control system, the system comprising a primary control unit, a secondary control unit, a monitoring unit, an aeration control unit, a water volume regulating unit, and a water quality collection unit, wherein: the water quality collection unit, the water volume regulating unit, and the secondary control unit are communicatively connected to the primary control unit, and the monitoring unit and the aeration control unit are communicatively connected to the secondary control unit; the water quality collection unit is used to collect water quality data, and the monitoring unit is used to obtain monitoring data through at least one monitoring device; the water volume regulating unit performs water volume regulation based on the water volume control instruction issued by the primary control unit, and the water volume The control instruction includes a water flow control amount; the aeration control unit adjusts at least one aeration device based on the aeration control instruction issued by the secondary control unit; the primary control unit is configured on a terminal device in a control room, and the primary control unit is configured to determine the water flow control amount and generate the water volume control instruction based on the monitoring data and the water quality data; the secondary control unit is configured on the at least one aeration device, and the secondary control unit is configured to determine the aeration parameters of the at least one aeration device in at least one target time period and generate the aeration control instruction, and the aeration parameters include at least one of blowing power and fan blade speed.
[0006] One or more embodiments of the present specification provide a method for regulating aeration of flowing water, which is implemented by the flowing water aeration regulation system, and includes: determining a water flow control amount and generating a water volume control instruction based on monitoring data and water quality data, and controlling a water volume regulating unit to regulate water volume based on the water volume control instruction; wherein the monitoring data is collected by at least one monitoring device configured in the monitoring unit, and the water quality data is collected by a water quality collection unit; determining aeration parameters of at least one aeration equipment in at least one target time period and generating an aeration control instruction, and adjusting the at least one aeration equipment based on the aeration control instruction, wherein the aeration parameters include at least one of a blowing power and a fan blade speed.
[0007] One or more embodiments of the present specification provide a flowing water aeration control device, characterized in that the device includes at least one processor and at least one memory; the at least one memory is used to store computer instructions; the at least one processor is used to execute at least part of the computer instructions to implement the flowing water aeration control method described in the above embodiment.
[0008] One or more embodiments of the present specification provide a computer-readable storage medium, wherein the storage medium stores computer instructions, and is characterized in that after a computer reads the computer instructions in the storage medium, the computer executes the flowing water aeration control method described in the above embodiment. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] This specification will be further described in the form of exemplary embodiments, which will be described in detail by the accompanying drawings. These embodiments are not restrictive, and in these embodiments, the same number represents the same structure, wherein:
[0010] Figure 1 is a schematic diagram of the structure of a flowing water aeration control system according to some embodiments of this specification;
[0011] Figure 2 is an exemplary flow chart of a method for regulating and controlling aeration of flowing water according to some embodiments of this specification;
[0012] Figure 3 is an exemplary flow chart of generating aeration control instructions according to some embodiments of the present specification;
[0013] Figure 4 is an exemplary flow chart for determining the water flow control amount according to some embodiments of this specification;
[0014] Figure 5 It is an exemplary schematic diagram of a jump point data prediction model according to some embodiments of this specification. DETAILED DESCRIPTION
[0015] In order to more clearly illustrate the technical solutions of the embodiments of this specification, the following briefly introduces the drawings required for describing the embodiments. The drawings do not represent all implementation methods.
[0016] It should be understood that the "system", "device", "unit" and / or "module" used herein are a method for distinguishing different components, elements, parts, portions or assemblies at different levels. If other words can achieve the same purpose, the words can be replaced by other expressions.
[0017] As shown in this specification and claims, unless the context clearly indicates an exception, the words "a", "an", "an" and / or "the" do not refer to the singular and may also include the plural. Generally speaking, the terms "comprise" and "include" only indicate the inclusion of the steps and elements that have been clearly identified, and these steps and elements do not constitute an exclusive list. The method or device may also include other steps or elements.
[0018] When the operations are performed according to the step description in the embodiments of this specification, unless otherwise specified, the order of the steps is interchangeable, the steps may be omitted, and other steps may be included in the operation process.
[0019] Sewage treatment is an important part of urban water circulation. Currently, sewage treatment mostly uses aeration treatment to oxidize and decompose organic matter in sewage by strengthening the contact between organic matter and microorganisms and dissolved oxygen in the pool. Some embodiments of this specification provide a flowing water aeration control system, method, device and storage medium, which obtains monitoring data of water bodies, predicts water quality fluctuations in advance, and adjusts aeration parameters in time before water quality changes occur to adapt to expected water quality changes, thereby preventing the occurrence of water quality problems, improving the energy utilization efficiency of the aeration system, and maintaining the stability of important water quality parameters in the water body, which is practical and economical.
[0020] Figure 1 It is a structural schematic diagram of a flowing water aeration control system according to some embodiments of this specification.
[0021] In some embodiments, the flowing water aeration control system 100 may include a primary control unit 110, a secondary control unit 120, a monitoring unit 130, an aeration control unit 140, a water volume adjustment unit 150, and a water quality collection unit 160. The water quality collection unit 160, the water volume adjustment unit 150, and the secondary control unit 120 are connected to the primary control unit 110 in communication, and the monitoring unit 130 and the aeration control unit 140 are connected to the secondary control unit 120 in communication.
[0022] The water volume regulating unit 150 is used to regulate the water flow entering the aeration tank. In some embodiments, the water volume regulating unit can regulate the water volume based on the water volume control instruction issued by the primary control unit 110.
[0023] The water volume control instruction refers to an instruction for controlling the water volume regulating unit 150 to regulate the water volume. In some embodiments, the water volume control instruction may include a water flow control amount. In response to receiving the water volume control instruction, the water volume regulating unit 150 may regulate the water volume according to the water flow control amount included in the water volume control instruction.
[0024] The water quality collection unit 160 is used to collect water quality data. In some embodiments, the water quality collection unit 160 can be configured in the water body to be monitored to collect water quality data of the water body. In some embodiments, the water quality collection unit 160 can be configured before the entrance of the aeration tank or inside the aeration tank to collect water quality data of the water body before aeration treatment. In some embodiments, the water quality collection unit 160 can be configured at the water body outlet of the aeration tank to collect water quality data of the water body after aeration treatment. The aeration tank refers to a place where aeration treatment is provided.
[0025] In some embodiments, the water quality collection unit 160 may include at least one water quality collection device, and the at least one water quality collection device may be disposed near at least one aeration device (eg, at least one aeration disk or at least one stirring device).
[0026] Water quality data refers to data related to the composition of water in the aeration tank. In some embodiments, the water quality data may include sewage composition, dissolved oxygen, chemical oxygen demand, ammonia nitrogen, etc. Sewage components may include heavy metal ions, harmful organic matter, etc.
[0027] In some embodiments, the water quality collection unit 160 may collect water quality data based on a preset period. For example, the water quality collection unit 160 may collect water quality data once every preset period. The preset period may be preset based on historical experience.
[0028] The monitoring unit 130 is used to obtain monitoring data through at least one monitoring device. In some embodiments, the monitoring unit may include multiple monitoring devices. For example, an environmental monitoring device and a water body monitoring device. Among them, the environmental monitoring device may include a temperature sensor, a pressure sensor, and a humidity sensor. The water body monitoring device may include a temperature sensor, a flow rate detector, etc. The temperature sensor in the environmental monitoring device is used to collect the ambient temperature, and the temperature sensor in the water body monitoring device is used to collect the water body temperature. The environmental monitoring device can be configured near the aeration tank, and the water body monitoring device can be configured before the entrance of the aeration tank or inside the aeration tank to obtain the water body temperature and water body flow rate before aeration treatment.
[0029] In some embodiments, the monitoring data may include environmental parameters, water body temperature, and water body flow rate. The environmental parameters may include ambient air temperature, ambient air pressure, and air humidity.
[0030] In some embodiments, the monitoring unit 130 may collect monitoring data based on a preset period. The preset period may be preset based on historical experience.
[0031] The aeration control unit 140 is used to adjust the aeration parameters of at least one aeration device. In some embodiments, the aeration control unit can adjust the aeration parameters of at least one aeration device based on the aeration control instruction issued by the secondary control unit 120.
[0032] The aeration control instruction refers to an instruction for controlling the aeration control unit 140 to adjust aeration parameters.
[0033] Aeration equipment refers to equipment used to aerate water. In some embodiments, at least one aeration equipment can be distributed and arranged at at least one preset position in the aeration tank. The preset position can be preset based on historical experience.
[0034] In some embodiments, the aeration device may include a blower or a stirring device.
[0035] The blower is used to mix air bubbles into the water. The stirring device is used to stir the water.
[0036] Aeration parameters refer to parameters related to the operation of the aeration device. In some embodiments, the aeration parameters may include blowing power and fan blade speed. Blowing power refers to the operating power of the blower. Fan blade speed refers to the speed of the fan blade of the stirring device.
[0037] The secondary control unit 120 may process data and / or information from the monitoring unit 130 .
[0038] In some embodiments, the secondary control unit 120 can be configured on at least one aeration device.
[0039] In some embodiments, the secondary control unit 120 may be connected to the monitoring unit 130 and the aeration control unit 140 in communication with each other in any feasible manner, such as communication cables, wireless transmission, etc.
[0040] In some embodiments, the secondary control unit 120 may be configured to determine the aeration parameters of at least one aeration device in at least one target period and generate an aeration control instruction. For instructions on how to generate an aeration control instruction, see Figure 2 and its related description.
[0041] In some embodiments, the secondary control unit 120 can be further configured to: determine the jump point data in the first monitoring data set based on the first continuous time point collected by the monitoring unit, and send the jump point data to the primary control unit; and adjust the aeration parameters based on the estimated blast power and estimated fan blade speed corresponding to the future time period obtained from the primary control unit, and generate an aeration control instruction based on the adjusted aeration parameters. For more information about this part, please refer to Figure 3 and its related description.
[0042] The primary control unit 110 can process data and / or information from at least one unit of the flowing water aeration control system 100. The primary control unit 110 can execute program instructions based on these data, information and / or processing results to perform one or more functions described in the embodiments of this specification. In some embodiments, the primary control unit 110 may include one or more sub-processing devices (e.g., a single-core processing device or a multi-core multi-core processing device). As an example only, the primary control unit 110 may include a central processing unit (CPU), an application specific integrated circuit (ASIC), an application specific instruction processor (ASIP), a graphics processing unit (GPU), etc., or any combination thereof.
[0043] In some embodiments, the primary control unit 110 may be configured on a terminal device in a control room. The control room refers to a space for controlling the flowing water aeration control system 100. The terminal device may include a mobile device, a tablet computer, a laptop computer, and the like.
[0044] In some embodiments, the primary control unit 110 can be connected to the water quality collection unit 160, the water volume adjustment unit 150, and the secondary control unit 120 in any feasible manner, such as communication cables, wireless transmission, etc.
[0045] In some embodiments, the primary control unit 110 is configured to determine the water flow control amount and generate a water flow control instruction based on the monitoring data and water quality data. For instructions on how to generate a water flow control instruction, see Figure 2 and its related description.
[0046] In some embodiments, the primary control unit 110 may be further configured to determine the estimated blowing power and the estimated fan blade speed corresponding to the future time period based on the jump point data obtained from the secondary control unit 120, and send the estimated blowing power and the estimated fan blade speed to the secondary control unit 120. For more information about this part, please refer to Figure 3 and its related description.
[0047] In some embodiments, the primary control unit 110 can be further configured to: determine interference data based on the jump point data in the first monitoring data set; determine credible monitoring data based on the first monitoring data set and the interference data; determine the estimated blowing power and the estimated fan blade speed based on the water flow, credible monitoring data and jump point data. For more information about this part, please refer to Figure 3 and its related description.
[0048] In some embodiments, the primary control unit 110 may be further configured to determine the interference data through an interference data determination model based on the first monitoring data set, the jump point data, and the aeration parameters. For more information about this part, please refer to Figure 3 and its related description.
[0049] In some embodiments, the primary control unit 110 can be further configured to: determine the collection period of the water quality collection unit based on the second continuous time point; obtain the second monitoring data set of the second continuous time point through the monitoring unit, and obtain the water quality data set collected based on the collection period through the water quality collection unit; determine the water flow control amount based on the second monitoring data set and the water quality data set. For more information about this part, please refer to Figure 4 and its related description.
[0050] In some embodiments of the present specification, the water flow rate can be regulated by the primary control unit based on monitoring data and water quality data to avoid excessive or insufficient water flow entering the aeration tank, which may lead to a decrease in aeration effect or waste of energy. The aeration parameters can be adjusted in real time by the secondary control unit before the water quality data changes or fluctuates, thereby ensuring that the aeration effect meets the requirements while reducing energy consumption.
[0051] Figure 2 is an exemplary flow chart of a method for regulating aeration of flowing water according to some embodiments of this specification. In some embodiments, process 200 is performed by a flowing water aeration regulation system. Figure 2 As shown, process 200 includes the following steps:
[0052] Step 210, based on the monitoring data and water quality data, determine the water flow control amount and generate a water volume control instruction.
[0053] For information on monitoring data and water quality data, please refer to Figure 1 and its related description.
[0054] In some embodiments, the primary control unit can determine the water flow control amount in a variety of ways based on the water flow rate and water quality data in the monitoring data. For example, the primary control unit can query the reference water flow corresponding to the water flow rate and water quality data in the preset flow table based on the water flow rate and water quality data, calculate the difference between the reference water flow and the current water flow, and obtain the water flow control amount. If the current water flow is less than the reference water flow and the water flow needs to be increased, the water flow control amount is positive; if the current water flow is greater than the reference water flow and the water flow needs to be reduced, the water flow control amount is negative.
[0055] In some embodiments, the primary control unit may take the product of the water flow rate and the inlet surface area of the aeration tank as the current water flow rate.
[0056] The preset flow table can be pre-set based on historical data. The preset flow table can include a combination of multiple water body flow rates and water quality data and a reference water body flow rate corresponding to each of the multiple combinations. Among them, the reference water body flow rate can be obtained through multiple experiments. The experimental process can include selecting multiple water body flow rates for multiple experiments based on a set of water body flow rates and water quality data, and taking the water body flow rate corresponding to the experimental process with the best aeration effect as the reference water body flow rate corresponding to the set of water body flow rates and water quality data. The aeration effect can characterize the amount of sewage components in the water quality data of the water body after aeration treatment. The less sewage components, the better the aeration effect.
[0057] In some embodiments, the primary control unit can determine the collection period of the water quality collection unit based on the second continuous time point; obtain the second monitoring data set of the second continuous time point through the monitoring unit, and obtain the water quality data set collected based on the collection period through the water quality collection unit; determine the water flow control amount based on the second monitoring data set and the water quality data set. For more information about this part, please refer to Figure 4 and its related description.
[0058] In some embodiments, the primary control unit may generate a water volume control instruction based on the water volume flow control amount.
[0059] Step 220: Control the water volume regulating unit to regulate the water volume based on the water volume control instruction.
[0060] In some embodiments, the primary control unit may send a water volume control instruction to the water volume regulating unit to control the water volume regulating unit to regulate the water volume according to the water flow control amount.
[0061] Step 230, determining an aeration parameter of at least one aeration device in at least one target time period and generating an aeration control instruction.
[0062] The target period refers to the future period during which aeration treatment is performed. For a description of aeration parameters, see Figure 1 and its related description.
[0063] In some embodiments, the secondary control unit may determine the preset aeration parameters as the aeration parameters of at least one aeration device in at least one target period and generate an aeration control instruction. The preset aeration parameters may be pre-set based on historical experience.
[0064] In some embodiments, the secondary control unit can determine the jump point data in the first monitoring data set based on the first monitoring data set collected by the monitoring unit at the first continuous time point; determine the estimated blowing power and estimated fan blade speed corresponding to the future time period based on the jump point data; and adjust the current aeration parameters of at least one aeration device based on the estimated blowing power and estimated fan blade speed corresponding to the future time period, and generate an aeration control instruction based on the adjusted aeration parameters. For more information about this part, please refer to Figure 3 and its related description.
[0065] Step 240: Adjust at least one aeration device based on the aeration control instruction.
[0066] In some embodiments, the secondary control unit may send an aeration control instruction to the aeration control unit to adjust at least one aeration device.
[0067] In some embodiments, in response to the aeration control unit adjusting the aeration parameters of at least one aeration device based on the aeration control instruction issued by the secondary control unit, the primary control unit can obtain water quality data after aeration treatment through the water quality collection unit; and determine the status of the monitoring device based on the water quality data after aeration treatment.
[0068] The monitoring device condition can reflect the operating condition of the monitoring device. In some embodiments, the monitoring device condition can include the presence or absence of a fault in the monitoring device.
[0069] In some embodiments, the primary control unit can determine whether the sewage composition in the water quality data after aeration treatment meets the preset conditions, and determine the status of the monitoring device according to the judgment result. If the sewage composition in the water quality data meets the preset conditions, it can be determined that the monitoring device is not faulty; if the sewage composition in the water quality data does not meet the preset conditions, it can be determined that the monitoring device is faulty. Among them, the preset condition can be that the content of the sewage component is lower than the content threshold. The content threshold can be preset based on historical experience.
[0070] In some embodiments of the present specification, whether a monitoring device fails is determined by monitoring water quality data after aeration treatment, so that the monitoring device can be repaired or replaced in time to ensure the certainty of the monitoring data.
[0071] In some embodiments of the present specification, water volume control instructions and aeration control instructions can be used to make timely adjustments to aeration parameters and water flow before water quality data changes or fluctuates, thereby greatly improving the efficiency and energy saving of the aeration system while ensuring the stability of important water quality parameters in the water body.
[0072] It should be noted that the above description of process 200 is only for illustration and description, and does not limit the scope of application of this specification. For those skilled in the art, various modifications and changes can be made to the process hand-eye calibration under the guidance of this specification. However, these modifications and changes are still within the scope of this specification.
[0073] Figure 3 is an exemplary flow chart of generating aeration control instructions according to some embodiments of this specification. In some embodiments, process 300 is performed by a flowing water aeration control system. Figure 3 As shown, process 300 includes the following steps:
[0074] Step 310: Determine jumping point data in the first monitoring data set based on a first monitoring data set of first continuous time points collected by a monitoring unit.
[0075] The first continuous time point refers to a plurality of continuous historical time points at which monitoring data is obtained within a preset period. The preset period is a historical time period. The preset period can be preset. For example, 1 day, the morning period of 1 day, etc.
[0076] In some embodiments, the first continuous time point can be preset. For example, a time point can be set every hour within a preset period, and the number of set time points can also be preset. All time points within the preset period can be determined as the first continuous time points.
[0077] The first monitoring data set refers to a set of multiple historical monitoring data collected by the monitoring unit at the first continuous time point. For example, the first monitoring data set can be a set consisting of multiple continuous historical time points and corresponding historical monitoring data. For an explanation of monitoring data, see Figure 1 and its related description.
[0078] Jump point data refers to monitoring data with large fluctuations in the first monitoring data set and its corresponding historical time points.
[0079] In some embodiments, the secondary control unit can determine whether the historical monitoring data corresponding to each historical time point in the first monitoring data set meets the preset conditions, and determine the historical monitoring data that meets the preset conditions and the corresponding historical time point as the jumping point data. When the historical monitoring data meets the preset conditions, the historical monitoring data is the historical monitoring data with jumping points. The historical time point corresponding to the historical monitoring data is the jumping point time.
[0080] In some embodiments, the preset condition includes: there are two or more sub-monitoring data in the historical monitoring data corresponding to a certain historical time point that exceed the preset quantile interval. The monitoring data includes multiple sub-monitoring data such as ambient temperature, ambient air pressure, air humidity, water temperature, and water flow rate.
[0081] The preset quantile interval is an interval consisting of the sub-monitoring data corresponding to the upper quantile and the sub-monitoring data corresponding to the lower quantile. The preset quantile interval can be determined based on the preset quantile.
[0082] The preset quantile is used to divide a set of data sorted in numerical order (for example, from small to large) into multiple equal parts.
[0083] In some embodiments, the preset quantile can be preset. For example, the system or a human can preset the preset quantile to 4, and a set of data can be divided into 4 equal parts. For another example, the system or a human can preset the preset quantile to 3, and a set of data can be divided into 3 equal parts.
[0084] In some embodiments, the secondary control unit can determine the upper quantile and the lower quantile in a group of data sorted in numerical order (for example, from small to large) based on a preset quantile. The upper quantile refers to the position corresponding to the largest equal portion after a group of data sorted from small to large in numerical order is divided into multiple equal portions. The lower quantile refers to the position corresponding to the smallest equal portion after a group of data sorted from small to large in numerical order is divided into multiple equal portions.
[0085] Exemplarily, a group of data (12) are arranged from small to large according to the numerical value, and the preset quantile can be 4. The upper quantile can be the position in the top 25% of the group of data (9th in the ranking), and the lower quantile can be the position in the bottom 25% of the group of data (3rd in the ranking).
[0086] In some embodiments, the preset quantile interval can be a data interval consisting of sub-monitoring data corresponding to the upper quantile and the lower quantile respectively in a group of sub-monitoring data arranged in order of numerical value. For different items of sub-monitoring data, the preset quantile interval of the sub-monitoring data can be determined according to the upper quantile and the lower quantile.
[0087] In some embodiments, for each sub-monitoring data, the secondary control unit can sort the multiple sub-monitoring data corresponding to the first continuous time point according to the data size (the multiple sub-monitoring data are the sub-monitoring data corresponding to the same sub-monitoring data at multiple different historical time points at the first continuous time point), and determine the preset quantile interval of each sub-monitoring data based on the preset quantile. For example, if the preset quantile is 4, then the numerical interval between the sub-monitoring data corresponding to the first continuous time point and the sub-monitoring data at the top 25% (i.e., the upper quantile) and the sub-monitoring data at the bottom 25% (i.e., the lower quantile) can be used as the preset quantile interval.
[0088] Taking the sub-monitoring data as water body temperature as an example, the multiple water body temperatures at the first continuous time point are: 6, 47, 49, 15, 42, 41, 7, 39, 43, 40, 36, and the multiple water body temperatures are sorted from small to large according to the numerical value: 6, 7, 15, 36, 39, 40, 41, 42, 43, 47, 49. The preset quantile is 4, then the upper quantile is the 9th quantile (i.e. 43) in the sorting, and the lower quantile is the 3rd quantile (i.e. 15) in the sorting. Among the multiple water body temperatures, 6 and 7 are both lower than the lower quantile, 47 and 49 are both higher than the upper quantile, and 6, 7, 47, and 49 are all jump point data.
[0089] In some embodiments, after determining the preset percentile interval, the secondary control unit can determine whether there are two or more sub-monitoring data in each historical monitoring data in the first monitoring data set that exceed their corresponding preset percentile interval. In response to the existence of two or more sub-monitoring data exceeding the preset percentile interval, the historical monitoring data and its corresponding historical time point are determined to be jump point data.
[0090] In some embodiments, the secondary control unit may send the hopping point data to the primary control unit.
[0091] In some embodiments, the secondary control unit may determine the preset quantile based on the historical water quality fluctuation amplitude of at least one historical aeration treatment process and the ratio of the aeration surface area to the water surface area in the aeration tank.
[0092] The historical water quality fluctuation range can reflect the fluctuation of water quality data of historical aeration treatment processes. In some embodiments, the secondary control unit can calculate the variance and mean of sewage composition and / or dissolved oxygen in the historical water quality data of each historical aeration treatment process based on the historical water quality data of at least one historical aeration treatment process, and determine the ratio of the variance to the mean of sewage composition and / or dissolved oxygen as the historical water quality fluctuation range corresponding to the historical aeration treatment process.
[0093] In some embodiments, the secondary control unit may store water quality data of the aeration treatment process in a storage device. The water quality data of a single aeration treatment process may include water quality data collected at least one time point before the aeration treatment, water quality data collected at least one time point during the aeration treatment, and / or water quality data collected at least one time point after the aeration treatment.
[0094] In some embodiments, the secondary control unit can read the water quality data of each aeration treatment process from a storage device. The storage device can be a storage device provided by the flowing water aeration control system, or an external storage device that does not belong to the flowing water aeration control system, such as a hard disk, a CD, etc. In some embodiments, the water quality data of each aeration treatment process can also be obtained by any method well known to those skilled in the art, and this specification does not limit this.
[0095] In some embodiments, the secondary control unit can calculate the historical water quality fluctuation amplitudes in multiple historical aeration treatment processes based on historical data, and select the historical water quality fluctuation amplitude of at least one historical aeration treatment process that conforms to the normal distribution. It can be understood that the historical water quality fluctuation amplitude that conforms to the normal distribution is more in line with the actual situation.
[0096] The aeration surface area in the aeration tank refers to the surface area of the aeration disk of the aeration equipment that performs aeration work. If there are multiple aeration equipments in the aeration tank, the aeration surface area in the aeration tank is the sum of the surface areas of the aeration disks of the multiple aeration equipments.
[0097] The water surface area refers to the surface area of the water in the aeration tank. In some embodiments, the secondary control unit can obtain the aeration surface area and the water surface area in the aeration tank through user input and other methods.
[0098] In some embodiments, the secondary control unit can determine the preset quantile through a corresponding relationship based on the historical water quality fluctuation amplitude of at least one historical aeration treatment process and the ratio of the aeration surface area in the aeration tank to the water surface area. The corresponding relationship can be preset based on historical experience. The corresponding relationship may include that the preset quantile is positively correlated with the historical water quality fluctuation amplitude of at least one historical aeration treatment process and the ratio of the aeration surface area in the aeration tank to the water surface area. For example, the greater the historical water quality fluctuation amplitude of at least one historical aeration treatment process, the greater the ratio of the aeration surface area in the aeration tank to the water surface area, and the larger the preset quantile.
[0099] It is understandable that the greater the fluctuation range of historical water quality in at least one historical aeration treatment process, the lower the stability of the aeration treatment environment in the aeration tank, so a larger preset quantile should be set, so that the standard for judging the monitoring data as jump point data is stricter; the larger the ratio of the aeration surface area to the water surface area in the aeration tank, the greater the aeration intensity, that is, the greater the impact of aeration on water treatment, and a higher aeration intensity will reduce the stability of the aeration treatment environment in the aeration tank, so a larger preset quantile should be set, so that the standard for judging the monitoring data as jump point data is stricter.
[0100] In some embodiments of the present specification, the historical water quality fluctuation amplitude and the ratio of the aeration surface area to the water surface area in the aeration tank are taken into consideration when determining the preset quantile, so that the setting of the preset quantile is more in line with the actual environmental conditions of the aeration tank, thereby obtaining a more reasonable jump point data screening standard.
[0101] Step 320, based on the jump point data, determine the estimated blowing power and the estimated fan blade speed corresponding to the future time period.
[0102] The future time period refers to the time period after the aeration treatment. In some embodiments, the future time period may include the first continuous time point after the aeration treatment. For example, the first continuous time point may be 8:00, 9:00, and 10:00 in a day, a total of three time points, and the aeration treatment time is from 10:00 to 15:00, then the first continuous time points after the aeration treatment are 16:00, 17:00, and 18:00.
[0103] The estimated blowing power refers to the blowing power estimated in the future time period. The estimated fan blade speed refers to the fan blade speed estimated in the future time period.
[0104] In some embodiments, the primary control unit can determine the estimated blast power and the estimated fan blade speed in a variety of ways based on the jump point data. For example, the primary control unit can query the reference blast power and the reference fan blade speed corresponding to the number of jump point times of the jump point data in the preset parameter table based on the jump point data, and use the determined reference blast power and the reference fan blade speed as the estimated blast power and the estimated fan blade speed. Among them, the jump point time refers to the historical time point corresponding to the historical monitoring data where the jump point appears in the first continuous time point. The number of jump point times is the number of jump point times in the first continuous time point.
[0105] The preset parameter table can be pre-set based on historical data. The preset parameter table may include multiple jump point time numbers and corresponding reference blast power and reference fan blade speed. Exemplarily, the primary control unit may select multiple aeration processes with good aeration effects in the historical data, and construct a clustering vector based on the jump point time number in the jump point data corresponding to the first continuous time point of the previous group of each aeration process and the historical blast power and historical fan blade speed corresponding to the first continuous time point of the next group, and perform clustering to obtain a preset number of cluster center sets; the jump point time number of the cluster center of each cluster center set is counted into the preset parameter table, and the historical blast power and historical fan blade speed corresponding to the first continuous time point after each jump point time number are counted as reference blast power and reference fan blade speed into the preset parameter table. Among them, the preset number can be pre-set. Among them, the types of clustering algorithms may include multiple types, for example, the clustering algorithm may include K-Means (K mean) clustering, density-based clustering method (DBSCAN), etc. The method of determining the cluster center can be carried out in any manner known to those skilled in the art.
[0106] In some embodiments, the primary control unit may send the estimated blowing power and the estimated fan blade speed corresponding to the future time period to the second control unit.
[0107] In some embodiments, the primary control unit can determine the interference data based on the jump point data in the first monitoring data set; determine the credible monitoring data based on the first monitoring data set and the interference data; and determine the estimated blowing power and the estimated fan blade speed in the future time period based on the water flow, the credible monitoring data and the jump point data. For an explanation of the water flow, please refer to Figure 2 and its related description.
[0108] Interference data refers to data with sudden changes in values in the first monitoring data set.
[0109] In some embodiments, the primary control unit may determine the interference data in a variety of ways based on the jumping point data in the first monitoring data set. For example, the primary control unit may calculate the jump degree of the jumping point data based on the jumping point data in the first monitoring data set, and determine the jumping point data with a jump degree greater than a jump degree threshold as interference data. The jump degree threshold may be preset.
[0110] The jump degree of the jumping point data can represent the difference between the jumping point data and the monitoring data of the adjacent time points. In some embodiments, the jump degree of the jumping point data can be the average of the ratios of multiple sub-monitoring data in the jumping point data to multiple sub-monitoring data of the adjacent time points.
[0111] In some embodiments, the primary control unit may determine the interference data through an interference data determination model based on the first monitoring data set, the jump point data, and the aeration parameters.
[0112] The interference data determination model refers to a model used to determine interference data. In some embodiments, the interference data determination model may be a machine learning model. For example, the interference data determination model may include any one or combination of a long short-term memory network (LSTM) model or other custom model structures. The aeration parameter input into the interference data determination model may be the current aeration parameter of at least one aeration device.
[0113] In some embodiments, the interference data determination model may include a multi-layer structure, for example, an input layer, a hidden layer, and an output layer.
[0114] The input layer may include at least one input node, each input node is used to input a type of data. In some embodiments, the primary control unit may determine the number of input layer nodes based on the feature number of the first monitoring data set, aeration parameters, and jump point data, and each node corresponds to a feature. In some embodiments, the primary control unit may determine the feature number of the first monitoring data set, aeration parameters, and jump point data by any feasible method. For example, statistical analysis method, principal component analysis method, etc.
[0115] In some embodiments, the primary control unit may combine the monitoring data, aeration parameters, and jump point data in the first monitoring data set into a feature vector as an input of the interference data determination model. In this case, the number of input nodes is one.
[0116] The hidden layer includes multiple LSTM network units, each of which includes a memory unit, an input gate, a forget gate, and an output gate. The number of hidden layers and the number of LSTM network units in each layer are determined based on the complexity and scale of the input data. The more complex and larger the input data, the more hidden layers there are and the more LSTM network units there are in each layer.
[0117] In some embodiments, since too many hidden layers may lead to overfitting, the number of hidden layers may be set between 1 and 3. In some embodiments, the number of long short-term memory network units may be set between 20 and 200. In some embodiments, the number of long short-term memory network units may be set between 30 and 180. In some embodiments, the number of long short-term memory network units may be set between 80 and 150. In some embodiments, the number of long short-term memory network units may be set between 100 and 120.
[0118] The output layer may include at least one output node. In some embodiments, the number of output nodes may be equal to the amount of interference data required to be obtained. The amount of interference data required to be obtained may be preset based on historical experience.
[0119] In some embodiments, the primary control unit may determine the model based on a large number of first training samples with first labels, by training interference data such as gradient descent method. The first training sample may include a sample first monitoring data set, sample jump point data, and sample aeration parameters, and the first label of the first training sample may be interference data in the sample jump point data. In some embodiments, the first training sample may be obtained based on historical data. The sample aeration parameter refers to the aeration parameter of at least one aeration device at the time of obtaining the sample first monitoring data set.
[0120] In some embodiments, the first label can be determined based on manual labeling. For example, a technician can label the data in the sample jump point data that actually affects the estimated blowing power and the estimated fan blade speed, and determine it as the first label.
[0121] In some embodiments, the primary control unit may update the weight and bias of the interference data determination model based on the first preset algorithm. The weight refers to the influence of the first monitoring data set, the jump point data, and the aeration parameter on the output of the interference data determination model. The bias refers to the adjustment value of the output of the interference data determination model. The first preset algorithm may include a back propagation algorithm.
[0122] In some embodiments, the learning rate, batch size, and number of iterations of the interference data determination model can be preset. The learning rate refers to the step size of updating the interference data determination model parameters. The batch size refers to the number of samples used to update the interference data determination model parameters during each iterative training. For example, the batch size can be set between 32 and 256. The number of iterations refers to the total number of iterations for training the interference data determination model.
[0123] During the model training process, by appropriately adjusting the above parameters, the interference data determination model can be better adapted to the prediction task, and the prediction accuracy and generalization ability of the interference data determination model can be improved.
[0124] In some embodiments, the primary control unit may pre-process the data before the first monitoring data set, aeration parameters, and jump point data are input into the interference data determination model. For example, the primary control unit may remove abnormal values and noise of the monitoring data, aeration parameters, and jump point data in the first monitoring data set, and perform normalization or standardization processing. The noise refers to data that is irrelevant to the monitoring data, aeration parameters, and jump point data in the first monitoring data set.
[0125] In some embodiments, the input to the interference data determination model may include bubble characteristics at first consecutive time points.
[0126] The bubble characteristics may characterize the distribution of air bubbles in the water body. In some embodiments, the bubble characteristics may include the amount of bubbles and the bubble density in each of a plurality of preset areas in the aeration tank.
[0127] In some embodiments, the preset area can be divided based on a variety of methods. For example, the aeration tank can be divided into grids of a preset size, and each grid is divided into a preset area. For another example, the aeration tank can be divided according to the location of the blower, and the area of the preset size near the location of each blower is divided into a preset area. For another example, the aeration tank can be divided according to the location of the monitoring device, and the area of the preset size near the location of each monitoring device is divided into a preset area.
[0128] In some embodiments, one or more cameras may be arranged near the aeration tank to photograph the water surface of the aeration tank. In some embodiments, in response to at least one aeration device being in aeration operation, the primary control unit may control one or more cameras to photograph the water surface of the aeration tank to obtain at least one image. The primary control unit may mark at least one image according to the divided preset areas, and mark the image area of each preset area in the image; recognize at least one image based on an image recognition algorithm, obtain the amount of bubbles in each image area and the bubble spacing between multiple bubbles, and take the inverse of the average value of the multiple bubble spacings to obtain the bubble density. The image recognition algorithm may include a convolutional neural network, a support vector machine, and the like.
[0129] In some embodiments, if the input of the interference data determination model includes bubble features at first continuous time points, the first training sample includes sample bubble features.
[0130] In some embodiments of the present specification, bubble features are added to the input of the interference data determination model, and the interference data determination model can be used to obtain the correlation between the bubble features and the interference data. Furthermore, the distribution of air bubbles in the aerated water body can be taken into account when outputting the interference data, thereby improving the accuracy of determining the interference data.
[0131] In some embodiments of the present specification, the first monitoring data set, the jump point data, and the aeration parameters are processed by using a machine learning model, and the self-learning ability of the machine learning model is utilized to improve the accuracy and efficiency of determining the interference data.
[0132] Credible monitoring data refers to monitoring data with a high degree of credibility.
[0133] In some embodiments, the primary control unit may remove interference data from the first monitoring data set based on the first monitoring data set and the interference data, and determine the monitoring data in the first monitoring data set after the interference data is removed as credible monitoring data.
[0134] In some embodiments, the primary control unit can determine the estimated blast power and the estimated fan blade speed in a variety of ways based on the water flow, credible monitoring data, and jump point data. For example, the primary control unit can construct a vector to be matched based on the water flow, credible monitoring data, and jump point data, match the standard vector that meets the preset matching conditions between the vector to be matched in the vector database, and determine the standard blast power and standard fan blade speed corresponding to the standard vector that meets the preset matching conditions as the estimated blast power and estimated fan blade speed corresponding to the vector to be matched. Among them, the vector to be matched can be a feature vector constructed based on the water flow, credible monitoring data, and jump point data. In some embodiments, the preset matching condition can include that the similarity between the standard vector and the vector to be matched is the highest. Among them, the vector distance is negatively correlated with the similarity, that is, the larger the vector distance, the smaller the similarity. The vector distance can include Euclidean distance, cosine distance, etc.
[0135] In some embodiments, the primary control unit can construct a vector database based on historical data, and the vector database can include multiple standard vectors and standard blast powers and standard fan blade speeds corresponding to the standard vectors. The standard vector can be a feature vector constructed based on water flow, credible monitoring data, and jump point data in the historical data.
[0136] In some embodiments, the primary control unit can select multiple aeration processes with good aeration effects in the historical data, and construct the water flow, credible monitoring data, jump point data, blast power and fan blade speed corresponding to each aeration process into a cluster vector for clustering, thereby forming a preset number of cluster centers; construct a feature vector based on the water flow, credible monitoring data and jump point data corresponding to the cluster center, determine the obtained feature vector as a standard vector, and use the blast power and fan blade speed corresponding to the cluster center as the standard blast power and standard fan blade speed corresponding to the standard vector. The preset number can be set in advance.
[0137] In some embodiments, the primary control unit can determine the estimated blowing power and the estimated fan blade speed through a machine learning model based on water flow, trusted monitoring data, and jump point data.
[0138] like Figure 5As shown, the first-level control unit can determine the estimated jumping point data 540 for the future time period through the jumping point data prediction model 520 based on the candidate blowing power 511, the candidate fan blade speed 512, the water flow 531, the trusted monitoring data 532 and the jumping point data 533; and determine the estimated blowing power and the estimated fan blade speed corresponding to the future time period based on the estimated jumping point data 540.
[0139] The jumping point data prediction model refers to a model used to determine the estimated jumping point data. In some embodiments, the jumping point data prediction model can be a machine learning model. For example, the jumping point data prediction model can include any one or combination of a graph neural network (GNN) model, a neural network (NN) model, or other custom model structures.
[0140] In some embodiments, Figure 5 As shown, the jumping point data prediction model 520 may include a water quality prediction layer 521 and a jumping point prediction layer 522. The water quality prediction layer may include a graph neural network (GNN) model, and the jumping point prediction layer may include any one or combination of a neural network (NN) model or other custom model structures.
[0141] In some embodiments, Figure 5 As shown, the input of the water quality prediction layer 521 may include the aeration graph structure 513 , and the output of the water quality prediction layer 521 may include the estimated water quality data 530 of each node.
[0142] The estimated water quality data refers to the estimated water quality data after aeration treatment according to the candidate blowing power and the candidate fan blade speed.
[0143] The aeration graph structure 513 refers to a graph structure that reflects the positional relationship between aeration devices.
[0144] In some embodiments, the primary control unit may construct an aeration graph structure based on the positional relationship between the aeration devices. The nodes of the aeration graph structure correspond to the blowers or the stirring devices. The node features may include node type, monitoring data, candidate blast power, or candidate fan blade speed.
[0145] Candidate blast power 511 refers to the blast power to be determined. Candidate fan blade speed 512 refers to the fan blade speed to be determined. In some embodiments, the primary control unit can randomly generate candidate blast power and candidate fan blade speed based on the reference range of blast power and fan blade speed. In some embodiments, the reference range can be pre-set based on historical experience.
[0146] In some embodiments, the primary control unit can construct an aeration graph structure with different node characteristics (candidate air blower power and candidate fan blade speed) based on different combinations of candidate air blower power and candidate fan blade speed, and input them into the jump point data prediction model respectively to determine the estimated water quality data of each node under different combinations of candidate air blower power and candidate fan blade speed, and further determine the estimated jump point data under different combinations of candidate air blower power and candidate fan blade speed.
[0147] The edges of the aeration graph structure can represent the connectivity between nodes or the distance between nodes. In some embodiments, in response to the presence of a pipeline connection between two blowers, the primary control unit can connect the edges between the nodes representing the two blowers as first-class edges; in response to the distance between a blower and a stirring device being less than a distance threshold, the primary control unit can connect the edges between the nodes representing the blower and the stirring device as second-class edges; in response to the distance between the two stirring devices being less than a distance threshold, the primary control unit can connect the edges between the nodes representing the two stirring devices as third-class edges. The characteristics of the edges can include the distance between the nodes and the type of edge (e.g., first-class edge, second-class edge, or third-class edge).
[0148] In some embodiments, Figure 5 As shown, the input of the jumping point prediction layer 522 may include water flow 531, estimated water quality data 530 (for example, including estimated water quality data of each node), trusted monitoring data 532 and jumping point data 533, and the output of the jumping point prediction layer 522 may include estimated jumping point data 540.
[0149] The estimated jump point data refers to the jump point data corresponding to the first continuous time point in the estimated future time period.
[0150] In some embodiments, the primary control unit may train a jump point data prediction model based on a large number of second training samples with second labels by gradient descent method or the like. The second training samples may include sample candidate blast power, sample candidate fan blade speed, sample aeration graph structure, sample water flow, sample credible monitoring data, and sample jump point data. The second label of the second training sample may be the actual jump point data of the future time period after the aeration equipment is operated based on the sample candidate blast power and the sample candidate fan blade speed. In some embodiments, the second training sample may be obtained based on historical data. The second label may be determined based on experiments. Among them, the sample aeration graph structure may include a historical aeration graph structure determined based on historical data, and the nodes and attributes, edges and attributes of the historical aeration graph structure are similar to the above description.
[0151] Exemplarily, the first-level control unit can input sample candidate blowing power, sample candidate fan blade speed and sample aeration map structure into the initial water quality prediction layer to obtain estimated water quality data output by the initial water quality prediction layer; the estimated water quality data is used as input, together with the sample water body flow, sample trusted monitoring data and sample jump point data, into the initial jump point prediction layer, and a loss function is constructed through the second label and the estimated jump point data output by the initial jump point prediction layer; the initial jump point prediction layer is updated based on the iterative result of the loss function, and the initial water quality prediction layer is updated synchronously, and the jump point data prediction model training is completed when the loss functions of the initial jump point prediction layer and the initial water quality prediction layer meet preset conditions, wherein the preset conditions may be that the loss function converges, the number of iterations reaches a set value, etc.
[0152] In some embodiments, the primary control unit can use the jumping point data prediction model to process the aeration graph structures with different node characteristics (for example, different combinations of candidate blowing powers and candidate fan blade speeds) respectively, and determine the estimated jumping point data under different combinations of candidate blowing powers and candidate fan blade speeds; and select the aeration graph structure with the least estimated jumping point data, and use the candidate blowing power and candidate fan blade speed in the node characteristics of the aeration graph structure as the estimated blowing power and the estimated fan blade speed.
[0153] In some embodiments of the present specification, scattered aeration equipment and their attributes can be effectively organized through the construction of an aeration map structure, which helps to quickly and efficiently obtain the positional relationship of the aeration equipment from the aeration map structure; the candidate blowing power, candidate fan blade speed, aeration map structure, water flow, trusted monitoring data and jump point data are processed by a jump point data prediction model, and the unique advantages of the machine learning model can be utilized to clarify the correlation between the input content and the output results based on a large amount of complex data, so as to obtain more accurate estimated jump point data.
[0154] In some embodiments of the present specification, by removing interference data in the monitoring data, more reliable monitoring data can be obtained, thereby improving the accuracy of predicting the blowing power and fan blade speed in the future time period.
[0155] Step 330, adjusting aeration parameters based on the estimated blowing power and the estimated fan blade speed, and generating aeration control instructions based on the adjusted aeration parameters.
[0156] In some embodiments, the secondary control unit can determine the estimated blowing power and the estimated fan blade speed as the blowing power and the fan blade speed in the aeration parameters based on the estimated blowing power and the estimated fan blade speed obtained from the primary control unit, and generate an aeration control instruction based on the adjusted aeration parameters.
[0157] In some embodiments of the present specification, the blower power and fan blade speed that can better meet the aeration needs of the future time period can be predicted based on the jump point data, and the aeration parameters are adjusted based on the predicted blower power and fan blade speed, and then the aeration equipment is adjusted to ensure the quality of subsequent aeration treatment.
[0158] Figure 4 This is an exemplary flow chart for determining the water flow control amount according to some embodiments of this specification.
[0159] Step 410: determining a collection period of the water quality collection unit based on the second continuous time point.
[0160] The second continuous time points refer to a plurality of continuous time points after a period of aeration treatment. The second continuous time points can be adjusted according to actual conditions.
[0161] In some embodiments, the primary control unit may obtain the second continuous time points through user input, etc. For example, the user may specify multiple continuous time points as the second continuous time points.
[0162] In some embodiments, the primary control unit may determine the second continuous time point based on the jumping point data in the first monitoring data set.
[0163] In some embodiments, the primary control unit may query the preset continuous time points corresponding to the jumping point data in the preset time table based on the jumping point data in the first monitoring data set, and determine the preset continuous time points as the second continuous time points.
[0164] The preset flow table can be preset based on historical data. The preset flow table may include multiple sets of jump point data and corresponding preset continuous time points. Exemplarily, the primary control unit may select multiple aeration processes with good aeration effects in the historical data, count the jump point data in the multiple aeration processes, select the aeration process with the most jump point data in the aeration process using the same aeration parameters, and use the second continuous time point of the aeration process as the preset continuous time point, and include it in the preset time table together with the jump point data of the aeration process.
[0165] In some embodiments of the present specification, since the jumping point data can reflect the stability of the current monitoring data, the second continuous time point that better meets the current monitoring needs can be determined according to the jumping point data.
[0166] The collection cycle refers to the period during which the water quality collection unit collects water quality data. The collection cycle may include multiple collection time points for collecting water quality data.
[0167] In some embodiments, the primary control unit may determine the ratio of the time length of the second continuous time point to the number of time points of the second continuous time point as the acquisition period, wherein the time length of the second continuous time point refers to the time interval from the first time point to the last time point in the second continuous time.
[0168] Step 420: acquiring a second monitoring data set at a second continuous time point through the monitoring unit, and acquiring a water quality data set collected based on a collection period through the water quality collection unit.
[0169] The second monitoring data set refers to a set of monitoring data collected by the monitoring unit at the second continuous time point. In some embodiments, the primary control unit can obtain the second monitoring data set at the second continuous time point through the monitoring unit.
[0170] The water quality data set refers to a set of water quality data collected by the water quality collection unit based on a collection period. In some embodiments, the water quality data set may include water quality data collected by at least one water quality collection device at multiple collection time points.
[0171] In some embodiments, the primary control unit may obtain a water quality data set through a water quality collection unit.
[0172] Step 430, determining the water flow control amount based on the second monitoring data set and the water quality data set.
[0173] In some embodiments, the primary control unit can determine the water flow control amount by a variety of methods based on the second monitoring data set and the water quality data set. For example, the primary control unit can count the mean of each monitoring data in the second monitoring data set and determine the water flow control amount by a second preset algorithm.
[0174] Exemplarily, the second preset algorithm may be as shown in formula (1):
[0175] S=(k1*M+k2*cos(q, p))*AB (1)
[0176] Among them, S represents the water flow control amount, M represents the sum of the means of each monitoring data in the second monitoring data set, q represents the vector composed of water quality data, p represents the standard water quality data vector, A represents the standard water flow, B represents the current water flow, k1 represents the coefficient of the sum of the means of each monitoring data in the second monitoring data set, and k2 represents the coefficient of cos(q, p). For an explanation of water flow, please refer to Figure 3 and its related description.
[0177] The standard water quality data vector refers to a vector composed of standard water quality data. The standard water quality data refers to the theoretical water quality data of the current water body. The standard water flow is the theoretical water flow of the current water body. The standard water quality data and the standard water flow can be preset based on experiments.
[0178] In some embodiments, the primary control unit can determine the credible monitoring data at the second continuous time point based on the monitoring data in the second monitoring data set and the jump point data corresponding to the second monitoring data set; determine the water flow control amount based on the credible monitoring data at the second continuous time point, the water quality data set, and the estimated blowing power and the estimated fan blade speed. Among them, the method for determining the jump point data corresponding to the second monitoring data set and the method for determining the credible monitoring data at the second continuous time point are similar to the above. For instructions on estimating blowing power and estimating fan blade speed, please refer to Figure 3 and its related description.
[0179] In some embodiments, the primary control unit may determine the water flow control amount through a third preset algorithm based on the trusted monitoring data at the second continuous time point, the water quality data set, the estimated blowing power and the estimated fan blade speed.
[0180] Exemplarily, the third preset algorithm may be as shown in formula (2):
[0181] S=(w1*M+w2*cos(q,p)+w3*x+w4*y)*AB (2)
[0182] Among them, S represents the water flow control amount, M represents the sum of the means of each monitoring data in the second monitoring data set, q represents the vector composed of water quality data, p represents the standard water quality data vector, x represents the estimated blowing power, y represents the estimated fan blade speed, A represents the standard water flow, B represents the current water flow, w1 represents the coefficient of the sum of the means of each monitoring data in the second monitoring data set, w2 represents the coefficient of cos(q, p), w3 represents the coefficient of the estimated blowing power, and w4 represents the coefficient of the estimated fan blade speed.
[0183] In some embodiments of the present specification, a water flow control amount more suitable for a subsequent aeration treatment process can be determined based on the credible monitoring data at the second continuous time point, the water quality data set, and the estimated blowing power and the estimated fan blade speed.
[0184] In some embodiments, the primary control unit may determine the water flow control amount through a fourth preset algorithm based on the trusted monitoring data at the second continuous time points, the water quality data set, the estimated blowing power and the estimated fan blade speed.
[0185] In some embodiments, the fourth preset algorithm can be pre-set. For example, the fourth preset algorithm can be that in response to the estimated blowing power, the estimated fan blade speed being consistent with the current blowing power and the fan blade speed, the water body flow control amount is 0; in response to the estimated blowing power, the estimated fan blade speed being inconsistent with the current blowing power and the fan blade speed, the estimated jump point data corresponding to the candidate water body flow can be determined through the jump point data prediction model based on the trusted monitoring data, water quality data set, candidate water body flow, and estimated blowing power and estimated fan blade speed at the second continuous time point, and the candidate water body flow with the least estimated jump point data is selected, and the difference between the candidate water body flow and the current water body flow is determined as the water body flow control amount. Among them, if the current water body flow is less than the candidate water body flow, the water body flow needs to be increased, then the water body flow control amount is positive; if the current water body flow is greater than the candidate water body flow, the water body flow needs to be reduced, then the water body flow control amount is negative. For instructions on determining the estimated jump point data, please refer to Figure 3 and its related description.
[0186] The candidate water flow refers to the water flow to be determined. In some embodiments, the primary control unit can randomly generate candidate water flow based on a reference range of water flow. In some embodiments, the reference range can be pre-set based on historical experience.
[0187] In some embodiments of the present specification, the optimal candidate water flow rate can be selected based on the estimated jump point data, thereby determining a more reasonable water flow rate control amount.
[0188] In some embodiments of the present specification, the second monitoring data set and the water quality data set can reflect the aeration treatment effect after aeration treatment, and a more appropriate water flow control amount can be determined based on the second monitoring data set and the water quality data set, thereby ensuring a better aeration treatment effect.
[0189] Some embodiments of the present specification also provide a flowing water aeration control device, including at least one processor and at least one memory, the memory is used to store computer instructions, and the processor is used to execute at least part of the computer instructions to implement any of the flowing water aeration control methods described in the above embodiments.
[0190] Some embodiments of the present specification also provide a computer-readable storage medium, which stores computer instructions. When a computer reads the computer instructions in the storage medium, the computer executes the flowing water aeration control method described in any one of the above embodiments.
[0191] Furthermore, certain features, structures or characteristics in one or more embodiments of this specification may be appropriately combined.
[0192] In some embodiments, numbers describing the number of components and attributes are used. It should be understood that such numbers used in the description of the embodiments are modified by the modifiers "about", "approximately" or "substantially" in some examples. Unless otherwise specified, "about", "approximately" or "substantially" indicate that the numbers are allowed to vary by ±20%. Accordingly, in some embodiments, the numerical parameters used in the specification and claims are approximate values, which may change according to the required features of individual embodiments. In some embodiments, the numerical parameters should take into account the specified significant digits and adopt the general method of retaining digits. Although the numerical domains and parameters used to confirm the breadth of their range in some embodiments of this specification are approximate values, in specific embodiments, the setting of such numerical values is as accurate as possible within the feasible range.
[0193] If there is any inconsistency or conflict between the descriptions, definitions, and / or usage of terms in the materials cited in this specification and the contents described in this specification, the descriptions, definitions, and / or usage of terms in this specification shall prevail.
Claims
1. A flowing water aeration control system, characterized in that: The system includes a primary control unit, a secondary control unit, a monitoring unit, an aeration control unit, a water volume regulating unit, and a water quality collection unit, wherein: the water quality collection unit, the water volume regulating unit, and the secondary control unit are in communication connection with the primary control unit, and the monitoring unit and the aeration control unit are in communication connection with the secondary control unit; the water quality collection unit is used to collect water quality data, and the monitoring unit is used to obtain monitoring data through at least one monitoring device, and the monitoring data includes environmental parameters, water body temperature, and water body flow rate, wherein the environmental parameters include ambient temperature, ambient air pressure, and air humidity; The water volume regulating unit performs water volume regulation based on the water volume control instruction issued by the primary regulating unit, wherein the water volume control instruction includes a water flow control amount; The aeration control unit adjusts the aeration parameters of at least one aeration device based on the aeration control instruction issued by the secondary control unit; The primary control unit is configured on a terminal device in a control room, and the primary control unit is configured to determine the water flow control amount and generate the water volume control instruction based on the monitoring data and the water quality data; The secondary control unit is configured on the at least one aeration device, and the secondary control unit is configured to determine an aeration parameter of the at least one aeration device in at least one target period and generate the aeration control instruction, wherein the aeration parameter includes at least one of a blast power and a fan blade speed; The secondary control unit is further configured as follows: Based on a first monitoring data set of first continuous time points collected by the monitoring unit, determining jumping point data in the first monitoring data set, and sending the jumping point data to the primary control unit, wherein the jumping point data refers to the monitoring data with larger fluctuations in the first monitoring data set and its corresponding historical time point, in order to determine the jumping point data, the secondary control unit is further configured as follows: Determining a preset quantile based on a historical water quality fluctuation amplitude of at least one historical aeration treatment process and a ratio of an aeration surface area to a water surface area in the aeration tank, wherein the historical water quality fluctuation amplitude of at least one historical aeration treatment process conforms to a normal distribution; A preset quantile interval is determined based on the preset quantile, the preset quantile interval is an interval composed of sub-monitoring data corresponding to an upper quantile and sub-monitoring data corresponding to a lower quantile, the preset quantile interval can be determined based on a preset quantile, the preset quantile is used to divide a group of data sorted in numerical order into a plurality of equal parts, the secondary control unit determines the upper quantile and the lower quantile in the group of data sorted in numerical order based on the preset quantile, wherein the upper quantile refers to a position corresponding to the largest portion after a group of data sorted in numerical order from small to large is divided into a plurality of equal parts, and the lower quantile refers to a position corresponding to the smallest portion after a group of data sorted in numerical order from small to large is divided into a plurality of equal parts; Determine whether the historical monitoring data corresponding to each historical time point in the first monitoring data set meets a preset condition, and determine the historical monitoring data that meets the preset condition and the corresponding historical time point as the jump point data, wherein the preset condition includes: there are two or more sub-monitoring data in the historical monitoring data corresponding to a certain historical time point that exceed the preset quantile interval; Adjusting the aeration parameters based on the estimated blowing power and the estimated fan blade speed corresponding to the future time period obtained from the primary control unit, and generating the aeration control instruction based on the adjusted aeration parameters; The primary control unit is further configured as follows: Based on the jump point data obtained from the secondary control unit, the estimated blowing power and the estimated fan blade speed corresponding to the future time period are determined, and the estimated blowing power and the estimated fan blade speed are sent to the secondary control unit. In order to determine the estimated blowing power and the estimated fan blade speed, the primary control unit is further configured as follows: Determining interference data based on the hopping point data in the first monitoring data set; Determining credible monitoring data based on the first monitoring data set and the interference data; Determine the estimated blowing power and the estimated fan blade speed based on the water flow, the credible monitoring data and the jump point data; The primary control unit is further configured as: Acquiring water quality data after aeration treatment based on the water quality collection unit; The monitoring device status is determined based on the water quality data after the aeration treatment, and the monitoring device status includes whether there is a fault in the monitoring device.
2. The system according to claim 1, characterized in that The primary control unit is further configured as follows: Based on the first monitoring data set, the jump point data and the aeration parameter, the interference data is determined by an interference data determination model, and the interference data determination model is a machine learning model.
3. The system according to claim 1, characterized in that The primary control unit is further configured as follows: Determining a collection period of the water quality collection unit based on the second continuous time point; Acquire a second monitoring data set at the second continuous time point through the monitoring unit, and acquire a water quality data set collected based on the collection period through the water quality collection unit; The water body flow control amount is determined based on the second monitoring data set and the water quality data set.
4. A method for regulating aeration of flowing water, characterized in that: The method is implemented by the flowing water aeration control system, and the method comprises: Based on the monitoring data and water quality data, determine the water flow control amount and generate a water volume control instruction, and control the water volume regulation unit to adjust the water volume based on the water volume control instruction; wherein the monitoring data is collected by at least one monitoring device configured in the monitoring unit, and the water quality data is collected by the water quality collection unit, and the monitoring data includes environmental parameters, water body temperature and water body flow rate, wherein the environmental parameters include ambient temperature, ambient air pressure and air humidity; Determining an aeration parameter of at least one aeration device in at least one target time period and generating an aeration control instruction, and adjusting the at least one aeration device based on the aeration control instruction, wherein the aeration parameter includes at least one of a blast power and a fan blade speed; Based on a first monitoring data set of first continuous time points collected by the monitoring unit, determining jumping point data in the first monitoring data set, wherein the jumping point data refers to the monitoring data with large fluctuations in the first monitoring data set and its corresponding historical time point, wherein determining the jumping point data includes: Determining a preset quantile based on a historical water quality fluctuation amplitude of at least one historical aeration treatment process and a ratio of an aeration surface area to a water surface area in the aeration tank, wherein the historical water quality fluctuation amplitude of at least one historical aeration treatment process conforms to a normal distribution; A preset quantile interval is determined based on the preset quantile, the preset quantile interval is an interval composed of sub-monitoring data corresponding to an upper quantile and sub-monitoring data corresponding to a lower quantile, the preset quantile interval can be determined based on a preset quantile, the preset quantile is used to divide a group of data sorted in numerical order into multiple equal parts, and the upper quantile and the lower quantile are determined in the group of data sorted in numerical order based on the preset quantile, wherein the upper quantile refers to a position corresponding to the largest equal part after a group of data sorted in numerical order from small to large is divided into multiple equal parts, and the lower quantile refers to a position corresponding to the smallest equal part after a group of data sorted in numerical order from small to large is divided into multiple equal parts; Determine whether the historical monitoring data corresponding to each historical time point in the first monitoring data set meets a preset condition, and determine the historical monitoring data that meets the preset condition and the corresponding historical time point as the jump point data, wherein the preset condition includes: there are two or more sub-monitoring data in the historical monitoring data corresponding to a certain historical time point that exceed the preset quantile interval; adjusting the aeration parameters based on the estimated blast power and the estimated fan blade speed corresponding to the future time period, and generating the aeration control instruction based on the adjusted aeration parameters; Based on the jump point data, an estimated blast power and an estimated fan blade speed corresponding to a future time period are determined, wherein determining the estimated blast power and the estimated fan blade speed includes: Determining interference data based on the hopping point data in the first monitoring data set; Determining credible monitoring data based on the first monitoring data set and the interference data; Determine the estimated blowing power and the estimated fan blade speed based on the water flow, the credible monitoring data and the jump point data; Acquiring water quality data after aeration treatment based on the water quality collection unit; The monitoring device status is determined based on the water quality data after the aeration treatment, and the monitoring device status includes whether there is a fault in the monitoring device.
5. The method according to claim 4, characterized in that Determining the water flow control amount based on monitoring data and water quality data includes: Determining a collection period of the water quality collection unit based on the second continuous time point; The second monitoring data set at the second continuous time point is obtained through the monitoring unit, and the water quality data set collected based on the collection period is obtained through the water quality collection unit; based on the second monitoring data set and the water quality data set, the water body flow control amount is determined.
6. A flowing water aeration control device, characterized in that: The apparatus comprises at least one processor and at least one memory; The at least one memory is used to store computer instructions; The at least one processor is used to execute at least part of the computer instructions to implement the flowing water aeration control method according to any one of claims 4 to 5.
7. A computer-readable storage medium storing computer instructions, characterized in that: After the computer reads the computer instructions in the storage medium, the computer executes the flowing water aeration control method as described in any one of claims 4 to 5.
