A tunnel stratum pre-grouting reinforcement method and device

By arranging semicircular reinforced warehouses and chambers in the tunnel, and using closing plates and solenoid valves to realize the injection and solidification of cement mortar, the problem of inability to synchronize reinforcement during the construction process in the existing technology is solved, and the load-bearing capacity and load-bearing capacity of the tunnel are improved. Stable and waterproof.

CN118462244BActive Publication Date: 2024-10-15XIAMEN METRO CONSTR CO LTD +2
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410910235.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-10-15
Estimated Expiration
2044-07-09

AI Technical Summary

Technical Problem

The existing pre-grouting reinforcement method for tunnel strata cannot perform bottom and top operations simultaneously during the construction process, and removal of supports reduces the support at the top of the tunnel, resulting in a decrease in structural strength.

Method used

A tunnel stratum pre-grouting reinforcement device is designed, including a semicircular reinforced warehouse and fixed components. By setting up chambers and reinforcements in the tunnel, the cement mortar is injected and solidified using closing plates and solenoid valves to form a solid Reinforcement layer to improve the load-bearing capacity and stability of the tunnel.

Benefits of technology

It realizes the simultaneous reinforcement of the bottom and top during the tunnel construction process, improves the load-bearing capacity and stability of the tunnel, and has a waterproof effect, protecting the safety of the tunnel structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118462244B_ABST
    Figure CN118462244B_ABST
Patent Text Reader

Abstract

The invention relates to the field of tunnel stratum pre-grouting, and discloses a tunnel stratum pre-grouting reinforcement method and device, comprising a reinforcement chamber installed in a tunnel to be formed, and the reinforcement chamber is fixed in the tunnel through a fixing component, the reinforcement chamber is arranged in a semicircular shape, and the forming process of the chamber is actually a grouting and reinforcement process, by pouring cement mortar into the chamber and allowing it to penetrate into tiny cracks and pores on the tunnel surface, the physical and mechanical properties of the tunnel surface can be effectively improved, and the bearing capacity and stability of the tunnel can be improved, and the setting of reinforcement members further enhances the effect of the reinforcement layer, these reinforcement members not only penetrate the cement mortar layer, but also are inserted into the tunnel surface, playing a supporting and reinforcing role, the forming process of the chamber also has a certain waterproof effect, when the cement mortar is completely cured, it can effectively seal the cracks and pores on the tunnel surface, prevent the penetration of moisture and harmful substances, and protect the structural safety of the tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of tunnel stratum pre-grouting, and in particular to a tunnel stratum pre-grouting reinforcement method and device. Background Art

[0002] During tunnel construction, the stability and strength of the stratum are key factors to ensure construction safety and tunnel quality. Especially in the case of complex geological conditions, weak stratum or rich water content, it is particularly important to take effective reinforcement measures. Tunnel stratum pre-grouting reinforcement technology is a widely used reinforcement method. It injects solidifying materials into the stratum on the surface to enhance the bearing capacity and stability of the stratum, thus providing guarantee for the smooth excavation and long-term operation of the tunnel.

[0003] This type of tunnel is usually formed directly through mechanical excavation. After excavation and forming, the bottom of the tunnel needs to be poured first and the ground level needs to be raised before the top of the tunnel can be worked on. Multiple layers of reinforcement and cement pouring are required, and the tunnel can only be formed after being supported for a certain period of time by reinforcement members. However, this method wastes too much time and cannot allow the pouring of the bottom and top of the tunnel to be carried out simultaneously. In addition, when the support members are subsequently removed, the support for the top of the tunnel will be reduced, reducing the structural strength of the tunnel. Summary of the invention

[0004] The present invention provides a tunnel stratum pre-grouting reinforcement method and device, which overcomes the shortcomings described in the background technology.

[0005] The technical solution adopted by the present invention to solve its technical problem is:

[0006] A tunnel stratum pre-grouting reinforcement device, comprising a reinforcement bin installed in a tunnel to be formed, and the reinforcement bin is fixed in the tunnel through a fixing assembly, the reinforcement bin is arranged in a semicircular shape, and there is a cavity for pouring cement mortar between the surfaces of the reinforcement bin tunnel, and the front and rear ends are respectively covered and closed by a closing plate, and the front and rear ends of the reinforcement bin are provided with an adapting groove corresponding to the closing plate, and when the closing plate is used to cover the cavity, the closing plate is embedded in the adapting groove;

[0007] A plurality of reinforcing members are arranged in the chamber, and the reinforcing members penetrate through the cement mortar layer and are inserted into the tunnel surface.

[0008] A preferred technical solution, the fixing assembly includes fixing rails installed on both sides of the reinforced warehouse, the two fixing rails are embedded in the tunnel, and a slot is provided at the corresponding positions of the two sides of the reinforced warehouse and the fixing rails, and the two fixing rails are embedded in the corresponding slots;

[0009] The lower side of the reinforced bin is open, and the inner side of the reinforced bin corresponding to the card slot is provided with outwardly protruding step layers, the step layers are covered with multiple pad partitions, every two adjacent pad partitions abut against each other, and there is an opening between two adjacent pad partitions for pouring cement mortar.

[0010] A preferred technical solution is that both sides of the cushion partition are provided with an inwardly recessed groove, and two adjacent grooves form an opening for pouring cement mortar, and the opening extends in the length direction of the cushion partition.

[0011] A preferred technical solution, the fixed track includes a supporting slide rail and a reinforcing rib, the surface of the supporting slide rail is provided with a plurality of openings for the reinforcing ribs to pass through, all the reinforcing ribs are inserted into the tunnel surface after passing through the supporting slide rail, and the supporting slide rail is fixed to the tunnel surface through the reinforcing ribs;

[0012] The side of the reinforcing rib away from the tunnel protrudes from the side of the supporting slide rail, and when the reinforcing bin is installed on the supporting slide rail, the reinforcing rib extends into the slot.

[0013] A preferred technical solution is that the surface of the reinforced bin is provided with a plurality of discharge ports, and a solenoid valve corresponding to and connected to the discharge port is provided above each cushion partition, and each solenoid valve is supported by a bracket, and the output end of the solenoid valve is connected to the discharge port;

[0014] The surface of the reinforcement bin is also provided with a plurality of threaded holes, and the reinforcement tube is inserted into the tunnel surface after passing through the threaded holes.

[0015] In a preferred technical solution, the reinforcement member is a reinforcing screw rod, and the reinforcing screw rod is threadedly connected with the threaded hole.

[0016] A reinforcement method, based on the tunnel stratum pre-grouting reinforcement device, comprises the following specific steps:

[0017] S1: Forming the main body of the tunnel to be cast by mechanical excavation;

[0018] S2: Drive reinforcing ribs into both sides of the inner end of the tunnel in sequence, install the support rails on the reinforcing ribs and then form the fixings. After aligning the horizontal heights of the two fixings, push the reinforcing bin into the tunnel and insert the fixings into the slots on both sides of the reinforcing bin to fix them;

[0019] S3: Pave the steps in the reinforced bin with cushioning plates, and make adjacent cushioning plates close to each other, and form an opening between two cushioning plates, and fill cement mortar, gravel, etc. into the lower end of the inner side of the tunnel through the opening, and install a bracket on the cushioning plate, and install a solenoid valve on the bracket, so that the output end of the solenoid valve is connected to the discharge port, and the cement mortar is pumped toward the solenoid valve by means of an external pump, and discharged to the outside through the discharge port into the chamber between the reinforced bin and the tunnel.

[0020] Compared with the prior art, this technical solution has the following advantages:

[0021] When the grouting process begins, the closing plate is first removed from the adapter slot to expose the chamber. Subsequently, the pre-mixed cement mortar is poured into the chamber. As the cement mortar is gradually injected, it will fill the entire chamber and gradually penetrate into the tiny cracks and pores on the tunnel surface. During this process, multiple reinforcements in the chamber will also pass through the cement mortar layer and be inserted into the tunnel surface to reinforce and support the tunnel. When the cement mortar is completely cured, the closing plate is embedded in the adapter slot again to seal the chamber. At this time, the reinforcement bin and the cement mortar layer inside it form a solid reinforcement layer, which effectively improves the bearing capacity and stability of the tunnel.

[0022] The cavity forming process is actually a grouting and reinforcement process. By pouring cement mortar into the cavity and allowing it to penetrate into the tiny cracks and pores on the tunnel surface, the physical and mechanical properties of the tunnel surface can be effectively improved, and the bearing capacity and stability of the tunnel can be improved. The setting of reinforcements further enhances the effect of the reinforcement layer. These reinforcements not only penetrate the cement mortar layer, but also are inserted into the tunnel surface, playing a supporting and reinforcing role. The cavity forming process also has a certain waterproof effect. When the cement mortar is completely cured, it can effectively seal the cracks and pores on the tunnel surface, prevent the penetration of moisture and harmful substances, and protect the structural safety of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0024] Figure 1 This is an overall diagram of the present invention.

[0025] Figure 2 This is a three-dimensional picture of the reinforced warehouse.

[0026] Figure 3 for Figure 1 Schematic diagram from another angle.

[0027] Figure 4 This is a schematic diagram of the exploded view of the reinforcement bin and bracket.

[0028] Figure 5 This is a schematic diagram of the decomposition of the reinforcement warehouse.

[0029] Figure 6 This is a top view schematic diagram of the reinforcement bin, solenoid valve, and bracket.

[0030] Figure 7 It is a three-dimensional schematic diagram of the embedded plate.

[0031] Figure 8 for Figure 7 Half-section diagram of .

[0032] In the figure: reinforced bin 1, cushion partition 2, solenoid valve 3, bracket 4, fixed track 5, support beam 6;

[0033] The outlet 11, the closing plate 12, the threaded hole 13, the reinforcing screw 14, the slot 15, the adapting slot 16, the supporting slide rail 51, the reinforcing rib 52, the supporting plate body 61, and the embedded plate body 62;

[0034] Insertion plate 611 , limiting slot 612 , flow channel 621 , limiting groove 622 . DETAILED DESCRIPTION Embodiment 1

[0035] like Figures 1 to 8 As shown, in this embodiment, a tunnel stratum pre-grouting reinforcement device is proposed, including a reinforcement bin 1 installed in a tunnel to be formed, and the reinforcement bin 1 is fixed in the tunnel through a fixing assembly, the reinforcement bin 1 is arranged in a semicircular shape, and there is a chamber for pouring cement mortar between the tunnel surface of the reinforcement bin 1, and the front and rear ends are respectively covered and closed by a closing plate 12, and the front and rear ends of the reinforcement bin 1 are provided with an adapter groove 16 corresponding to the closing plate 12, when the closing plate 12 is used to cover the chamber, the closing plate 12 is embedded in the adapter groove 16, and a plurality of reinforcement members are arranged in the chamber, and the reinforcement members penetrate through the cement mortar layer and then are inserted into the tunnel surface;

[0036] The working principle of the tunnel stratum pre-grouting reinforcement device mainly revolves around the setting of the reinforcement chamber 1 and the use of the closing plate 12. First, the reinforcement chamber 1 is firmly installed in the tunnel to be formed through the fixing assembly. Its semicircular structure ensures that a chamber for pouring cement mortar is formed between the tunnel surface. The front and rear ends of the chamber are covered and closed by the closing plate 12 to form a closed grouting environment. When the grouting process starts, the closing plate 12 is first removed from the adapter groove 16 to expose the chamber. Subsequently, the pre-mixed cement mortar is poured into the chamber. As the cement mortar is gradually injected, it will fill the entire chamber and gradually penetrate into the tiny cracks and pores on the tunnel surface. In this process, multiple reinforcements in the chamber will also pass through the cement mortar layer and be inserted into the tunnel surface to play a role in reinforcement and support. When the cement mortar is completely cured, the closing plate 12 is embedded in the adapter groove 16 again to close the chamber. At this time, the reinforcement chamber 1 and the cement mortar layer inside it form a solid reinforcement layer, which effectively improves the bearing capacity and stability of the tunnel.

[0037] The cavity forming process is actually a grouting and reinforcement process. By pouring cement mortar into the cavity and allowing it to penetrate into the tiny cracks and pores on the tunnel surface, the physical and mechanical properties of the tunnel surface can be effectively improved, and the bearing capacity and stability of the tunnel can be improved. The setting of reinforcements further enhances the effect of the reinforcement layer. These reinforcements not only penetrate the cement mortar layer, but also are inserted into the tunnel surface, playing a supporting and reinforcing role. The cavity forming process also has a certain waterproof effect. When the cement mortar is completely cured, it can effectively seal the cracks and pores on the tunnel surface, prevent the penetration of moisture and harmful substances, and protect the structural safety of the tunnel.

[0038] A preferred technical solution, the fixing assembly includes a fixing rail 5 installed on both sides of the reinforcement warehouse 1, the two fixing rails 5 are embedded in the tunnel, and a slot 15 is provided at the corresponding positions of the two sides of the reinforcement warehouse 1 and the fixing rail 5, and the two fixing rails 5 are embedded in the corresponding slots 15. The installation of the fixing assembly requires the pre-installation of two fixing rails 5 in the tunnel. The two rails will be embedded in the corresponding positions of the tunnel to play a supporting and fixing role, and the slots 15 on both sides of the reinforcement warehouse 1 are aligned with the installed fixing rails 5, and then the reinforcement warehouse 1 is slid along the fixing rails 5 until the slots 15 are completely embedded in the fixing rails 5. By embedding the fixing rails 5 in the tunnel And it cooperates closely with the slot 15 of the reinforced bin 1, ensuring the stability and position accuracy of the reinforced bin 1 during the grouting process. This design avoids the movement or deformation of the reinforced bin 1 during the grouting process, and ensures the uniformity and reliability of the grouting effect. The lower side of the reinforced bin 1 is open, and the inner side of the reinforced bin 1 corresponding to the slot 15 is respectively provided with outwardly protruding step layers, and the step layers are covered with multiple pad partitions 2, and every two adjacent pad partitions 2 abut against each other, and there is an opening between two adjacent pad partitions 2 for pouring cement mortar. The pad partitions 2 are provided to provide a certain working space for the operator and provide corresponding support for the subsequent bracket 4.

[0039] Furthermore, both sides of the pad partition 2 are provided with an inwardly recessed groove, and two adjacent grooves form an opening for pouring cement mortar, and the opening extends in the length direction of the pad partition 2, and the fixed track 5 includes a supporting slide rail 51 and a reinforcing rib 52. The surface of the supporting slide rail 51 is provided with a plurality of openings for the reinforcing rib 52 to pass through, and all the reinforcing ribs 52 are inserted into the tunnel surface after passing through the supporting slide rail 51. The supporting slide rail 51 is fixed to the tunnel surface by the reinforcing rib 52. The opening formed by the grooves on both sides of the pad partition 2 extends along the length direction of the pad partition 2 to form a plurality of continuous mortar channels. The design of the pad partition 2 enables the cement mortar to flow evenly into the bottom of the tunnel to form a continuous and dense mortar layer, thereby ensuring the uniformity and reliability of grouting. When the reinforced bin 1 is installed on the fixed track 5, the pad partition 2 is installed in place accordingly. At this time, by pouring cement mortar into the opening of the reinforced bin 1, the mortar will flow along the opening between the pad partitions 2 to fill the entire chamber.

[0040] Among them, the side of the reinforcing rib 52 away from the tunnel protrudes from the side of the supporting slide rail 51, and when the reinforcing bin 1 is installed on the supporting slide rail 51, the reinforcing rib 52 extends into the slot 15, wherein a plurality of discharge ports 11 are arranged on the surface of the reinforcing bin 1, and a solenoid valve 3 corresponding to and connected to the discharge port 11 is arranged above each cushion partition 2, and each solenoid valve 3 is supported by a bracket 4, and the output end of the solenoid valve 3 is connected to the discharge port 11, and a plurality of threaded holes 13 are also arranged on the surface of the reinforcing bin 1, and the reinforcing member tube passes through the threaded hole 13 and is inserted into the tunnel surface, and the reinforcing member is a reinforcing screw 14, and the reinforcing screw 14 forms a threaded connection with the threaded hole 13.

[0041] And if Figure 1 As shown, a support beam 6 is further provided under the reinforced bin 1. When installing the reinforced bin 1, the support beam 6 can be first installed on the tunnel surface, and then the fixed track 5 can be installed. The fixed track 5 is supported by the support beam 6, and the fixedness between the reinforced bin 1 and the tunnel is formed by the support beam 6 and the fixed track 5.

[0042] And as Figure 7 , Figure 8 As shown, the support beam 6 includes a support plate body 61 and an embedded plate body 62. The support plate body 61 is inserted into the embedded plate body 62 through an insert plate 611, and a flow channel 621 is provided on the upper and lower sides of the embedded plate body 62. The flow channel 621 extends along the length direction of the embedded plate body 62, and a plurality of inwardly recessed limiting grooves 622 are arranged equidistantly on the surface of the flow channel 621. During installation, a mounting groove is first formed on the tunnel surface, and the embedded plate body 62 is installed into the mounting groove, and then the support plate body 61 is inserted into the embedded plate body 62 through the insert plate 611 to be fixed, and the fixed rail 5 is supported by the limiting card groove 612 provided on the surface of the support plate body 61. Embodiment 2

[0043] A reinforcement method, based on the tunnel stratum pre-grouting reinforcement device, comprises the following specific steps:

[0044] S1: The main body of the tunnel to be cast is formed by mechanical excavation, and the main structure of the tunnel is excavated underground by mechanical excavation to ensure that the size, shape and stability of the tunnel meet the design requirements.

[0045] S2: reinforcing ribs 52 are driven into the two sides of the inner end of the tunnel in sequence, and the supporting slide rails 51 are installed on the reinforcing ribs 52 to form the fixing parts. After aligning the horizontal heights of the two fixing parts, the reinforcing bin 1 is pushed into the tunnel, and the fixing parts are embedded in the slots 15 on both sides of the reinforcing bin 1 to form a fixation;

[0046] S3: Pave the steps in the reinforced bin 1 with cushioning plates 2, and make adjacent cushioning plates 2 close to each other, and form an opening between two cushioning plates 2, and fill the lower end of the inner side of the tunnel with cement mortar, gravel, etc. through the opening, and install a bracket 4 on the cushioning plates 2, and install a solenoid valve 3 on the bracket 4, so that the output end of the solenoid valve 3 is connected to the discharge port 11, and the cement mortar is pumped toward the solenoid valve 3 by means of an external pump, and discharged to the outside through the discharge port 11 into the chamber between the reinforced bin 1 and the tunnel.

[0047] The above description is only a preferred embodiment of the present invention, and therefore cannot be used to limit the scope of the present invention. That is, equivalent changes and modifications made according to the patent scope of the present invention and the contents of the specification should still fall within the scope of the present invention.

Claims

1. A tunnel stratum pre-grouting reinforcement device, characterized in that: The invention comprises a reinforcement bin (1) installed in a tunnel to be formed, wherein the reinforcement bin (1) is fixed in the tunnel via a fixing assembly, the reinforcement bin (1) is arranged in a semicircular shape, and a cavity for pouring cement mortar is present between the tunnel surface of the reinforcement bin (1), and the front and rear ends are respectively covered and closed by a closing plate (12), and the front and rear ends of the reinforcement bin (1) are provided with an adapting groove (16) corresponding to the closing plate (12), and when the closing plate (12) is used to cover the cavity, the closing plate (12) is embedded in the adapting groove (16); A plurality of reinforcing members are arranged in the chamber, and the reinforcing members penetrate through the cement mortar layer and are inserted into the tunnel surface; the fixing assembly comprises fixing rails (5) installed on both sides of the reinforcing bin (1), the two fixing rails (5) are both embedded in the tunnel, and a slot (15) is respectively provided at the corresponding positions of the fixing rails (5) on both sides of the reinforcing bin (1), and the two fixing rails (5) are both embedded in the corresponding slots (15); The lower side of the reinforcement bin (1) is open, and the inner side of the reinforcement bin (1) and the corresponding positions of the card slot (15) are respectively provided with outwardly protruding step layers, and the step layers are covered with a plurality of cushioning partitions (2), and every two adjacent cushioning partitions (2) abut against each other, and there is an opening between the two adjacent cushioning partitions (2) for pouring cement mortar; An inwardly recessed groove is provided on both sides of the spacer (2), and two adjacent grooves form an opening for pouring cement mortar, and the opening extends in the length direction of the spacer (2); The fixed rail (5) comprises a supporting slide rail (51) and reinforcing ribs (52); a plurality of openings for the reinforcing ribs (52) to pass through are provided on the surface of the supporting slide rail (51); all the reinforcing ribs (52) are inserted into the tunnel surface after passing through the supporting slide rail (51); the supporting slide rail (51) is fixed to the tunnel surface via the reinforcing ribs (52); The reinforcing rib (52) protrudes from the side of the supporting slide rail (51) on the side away from the tunnel, and when the reinforcing bin (1) is mounted on the supporting slide rail (51), the reinforcing rib (52) extends into the slot (15).

2. A tunnel stratum pre-grouting reinforcement device according to claim 1, characterized in that: The surface of the reinforced bin (1) is provided with a plurality of discharge ports (11), and a solenoid valve (3) corresponding to and connected to the discharge port (11) is provided above each cushion partition (2), and each solenoid valve (3) is supported by a bracket (4), and an output end of the solenoid valve (3) is connected to the discharge port (11); The surface of the reinforcement bin (1) is also provided with a plurality of threaded holes (13), and the reinforcement tube passes through the threaded holes (13) and is then inserted into the tunnel surface.

3. A tunnel stratum pre-grouting reinforcement device according to claim 2, characterized in that: The reinforcement member is a reinforcing screw rod (14), and the reinforcing screw rod (14) is threadedly connected to the threaded hole (13).

4. A reinforcement method, based on the tunnel stratum pre-grouting reinforcement device according to claim 3, characterized in that: The reinforcement method comprises the following specific steps: S1: Forming the main body of the tunnel to be cast by mechanical excavation; S2: reinforcing ribs (52) are driven into the two sides of the inner end of the tunnel in sequence, the supporting slide rails (51) are mounted on the reinforcing ribs (52), and then the fixing pieces are formed. After the horizontal heights of the two fixing pieces are aligned, the reinforcing bin (1) is pushed into the tunnel, and the fixing pieces are embedded into the slots (15) on both sides of the reinforcing bin (1) to form a fixed structure; S3: The steps in the reinforced chamber (1) are covered with cushioning baffles (2), and adjacent cushioning baffles (2) are placed close to each other. An opening is formed between two cushioning baffles (2), and cement mortar and gravel are filled into the lower end of the inner side of the tunnel through the opening. A bracket (4) is installed on the cushioning baffles (2), and a solenoid valve (3) is installed on the bracket (4). The output end of the solenoid valve (3) is connected to the discharge port (11), and cement mortar is pumped toward the solenoid valve (3) by means of an external pump, and discharged to the outside through the discharge port (11) into the chamber between the reinforced chamber (1) and the tunnel.

Citation Information

Patent Citations

  • Tunnel ground surface pre-grouting reinforcement method

    CN112081127A

  • Reinforcing structure for shield tunnel and reinforcing method thereof

    CN116398172A

  • Temporary supporting structure for tunnel exit

    CN117005900A

  • Supporting structure for large deformation section of weak surrounding rock tunnel

    CN213450403U

  • Tunnel constructing method

    JP1995071184A