Intelligent diagnosis system and method for power grid status based on artificial intelligence

Through the intelligent diagnosis method of power grid status based on artificial intelligence, power grid data is collected and analyzed in real time, and the nature of overload is automatically distinguished and adjusted. This solves the problem that the existing system cannot automatically adjust mild or moderate overload, and improves the accuracy of power grid fault handling. reliability and efficiency, ensuring the stability of power supply.

CN118465439BActive Publication Date: 2024-10-18HUNAN XILAIKE ENERGY STORAGE TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410912204.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-10-18
Estimated Expiration
2044-07-09

AI Technical Summary

Technical Problem

The existing power grid diagnostic system cannot automatically adjust when there is mild or moderate overload and requires manual intervention. It cannot accurately distinguish between continuous overload and intermittent overload, which affects the accuracy and efficiency of fault handling.

Method used

Adopt an intelligent diagnosis method of power grid status based on artificial intelligence, collect voltage, current and temperature difference data in real time, perform linear regression fitting and derivative analysis, use the overload property prediction model to distinguish between continuous and intermittent overload, and perform automatic adjustment. If it fails, the fault location is reported.

Benefits of technology

It can accurately distinguish the nature of overload under mild and moderate overload conditions, automatically adjust transmission lines, reduce trip frequency, ensure power supply stability, and optimize the automatic adjustment process through power consumption prediction models.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118465439B_ABST
    Figure CN118465439B_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of power grid diagnosis, and discloses an intelligent diagnosis system and method for power grid status based on artificial intelligence; the method comprises: when the real-time current of a transmission line exceeds the rated current of the transmission line, starting to collect the voltage, current and temperature difference in the subsequent unit time; the temperature difference is the absolute value of the difference between the temperature of the transmission line and the ambient temperature; the voltage, current and temperature difference collected in the subsequent unit time are respectively used to establish a voltage set, a current set and a temperature difference set in the order of collection time; linear regression fitting is performed on the voltage set, the current set and the temperature difference set respectively to obtain a voltage trend equation, a current trend equation and a temperature difference trend equation; the invention can accurately distinguish between continuous overload and intermittent overload under mild and moderate overload conditions, automatically adjust the continuous overload to restore it to normal, reduce the tripping frequency caused by overload, and ensure the stability of power supply.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grid diagnosis, and more specifically, to an intelligent diagnosis system and method for power grid status based on artificial intelligence. Background Art

[0002] The power grid is an important infrastructure in modern society, but due to its complexity and large scale, it often faces various failures and abnormal situations.

[0003] The Chinese patent with publication number CN108879912A discloses an intelligent control system for circuit breakers based on load current detection: the information storage module is used to store the average load current I0 of the target line at a specified time m days before the current date; the information acquisition module is used to acquire the actual average load current I1 of the target line at a specified time on the current date; the node division module is used to obtain the actual load current at m acquisition nodes respectively; the circuit breaker control module is used to control the start and stop state of the circuit breaker on the target line. The invention is provided with multiple load current acquisition nodes, and the actual load current at different positions on the target line is collected and analyzed through the sub-nodes, which can ensure the timely and accurate collection of load current changes at different positions, so as to more quickly find the area with excessive load current on the target line, so as to timely and quickly adjust the working state of the circuit breaker on the line, and ensure the stability and safety of the target line.

[0004] Although the above method can meet most scenarios, research and practical application of the above method and existing technology have found that the above method and existing technology have at least the following defects:

[0005] (1) The existing system can only identify and report faults, but cannot automatically adjust when a transmission line is slightly or moderately overloaded. Manual on-site intervention is required, resulting in a long response time and slow power supply restoration.

[0006] (2) The existing system cannot accurately distinguish between continuous overload and intermittent overload, resulting in the inability to take appropriate treatment measures for overloads of different natures, affecting the accuracy and efficiency of fault handling.

[0007] In view of this, the present invention proposes an artificial intelligence-based intelligent diagnosis system and method for power grid status to solve the above problems. Summary of the invention

[0008] In order to overcome the above-mentioned defects of the prior art and to achieve the above-mentioned purpose, the present invention provides the following technical solution: an intelligent diagnosis method for power grid status based on artificial intelligence, comprising:

[0009] When the real-time current of the transmission line in the power grid exceeds the rated current of the transmission line, the voltage, current and temperature difference in the subsequent unit time are collected; the temperature difference is the absolute value of the difference between the temperature of the transmission line and the ambient temperature; the current data is collected by the current sensor; the voltage data is collected by the voltage sensor, and the temperature is collected by the temperature sensor;

[0010] The voltage, current and temperature difference collected in the subsequent unit time are respectively used to establish the voltage set, current set and temperature difference set in the order of collection time; the voltage set, current set and temperature difference set are respectively subjected to linear regression fitting to obtain the voltage trend equation , Current trend equation and temperature difference trend equation ; Derivative the trend equations respectively to obtain the voltage trend equation derivative set, the current trend equation derivative set and the temperature difference trend equation derivative set;

[0011] Inputting the voltage trend equation derivative set, the current trend equation derivative set and the temperature difference trend equation derivative set into the trained overload property prediction model to obtain the overload property; the overload property includes continuous overload and intermittent overload;

[0012] If the overload of the transmission line is a continuous overload, the continuously overloaded transmission line is automatically adjusted to restore the transmission line to normal; if the automatic adjustment fails, the fault location and the automatic adjustment process are recorded and reported to the power grid power supply server.

[0013] Furthermore, the start time of the subsequent unit time is when the real-time current of the transmission line exceeds a preset rated current.

[0014] Furthermore, the method for obtaining the voltage trend equation derivative set, the current trend equation derivative set and the temperature difference trend equation derivative set is:

[0015] Use the LinearRegression class of the scikit-learn library in Python to perform linear regression fitting on the voltage set, current set, and temperature difference set to obtain the voltage trend equation , Current trend equation and temperature difference trend equation ; For the voltage trend equation The derivative is , substitute the voltages in the voltage set into Construct a set of derivatives of the voltage trend equation; for the current trend equation The derivative is , substitute the currents in the current set into Construct the derivative set of current trend equation; for temperature difference trend equation The derivative is , substitute the temperature differences in the temperature difference set into Construct a set of derivatives of the temperature difference trend equation.

[0016] Furthermore, the training method of the overload property prediction model includes:

[0017] Pre-collecting a transmission line overload data set, wherein the transmission line overload data set includes a trend equation derivative set and an overload property corresponding to the trend equation derivative set; the trend equation derivative set includes a voltage trend equation derivative set, a current trend equation derivative set and a temperature difference trend equation derivative set;

[0018] The transmission line overload data set is divided into a training set and a test set, a classifier is constructed, the trend equation derivative set in the training set is used as the input of the overload property prediction model, the overload property in the training set is used as the output of the overload property prediction model, the classifier is trained to obtain an initial classifier, the initial classifier is tested using the test set, and a classifier that meets a preset accuracy is output as the overload property prediction model. The classifier is preferably a naive Bayes model or a support vector machine model.

[0019] Furthermore, the steps for automatically adjusting the continuously overloaded transmission line are as follows:

[0020] Step 1: obtaining R sub-power consumption areas and N available lines connected to each sub-power consumption area according to the topological structure data of the power transmission line, where R and N are any integers greater than 0;

[0021] Step 2: obtaining actual current demand values ​​of R sub-power consumption areas, and determining the number of sub-power consumption areas according to the number of shunt lines of the transmission line, that is, each shunt line supplies power to one sub-power consumption area;

[0022] Step 3: Let r∈R, let n∈N, the initial values ​​of r and n are 1, obtain the actual current demand value of the nth available line in the rth sub-power consumption area for the power consumption area, and the current capacity corresponding to the nth available line, and calculate the upper limit shunt current value of the nth available line; if the upper limit shunt current value of the nth available line is less than the actual current demand value of the rth sub-power consumption area, execute step 5; if the upper limit shunt current value of the nth available line is greater than or equal to the actual current demand value of the rth sub-power consumption area, generate a call instruction and send it to the rth sub-power consumption area connection switch, and the rth sub-power consumption area connection switch connects the connection with the nth available line according to the call instruction, and disconnects the connection with the transmission line at the same time;

[0023] Step 4: Mark the sub-power consumption area corresponding to the call instruction generated in step 3 as the shunt sub-power consumption area, calculate the total actual current demand value of the R sub-power consumption areas except the shunt sub-power consumption area, if the total actual current demand value is less than or equal to the transmission current capacity of the transmission line, it is considered that the automatic recovery of the overload fault of the transmission line is successful, and the step loop is ended, otherwise, step 6 is executed; the transmission current capacity is 80% of the actual current capacity of the transmission line;

[0024] Step 5: Let n=n+1, and continue to execute step 3. When n=N, if the upper limit shunt current value of the nth available line is still not greater than or equal to the actual current demand value of the rth sub-power consumption area, execute step 6;

[0025] Step 6: Let r=r+1, execute step 3. When r=R, if the total actual current demand value is still not less than or equal to the transmission current capacity of the transmission line, the fault category of the transmission line will be reported, and it will be regarded as a failure of automatic recovery of the transmission line overload fault, and the maintenance personnel will handle it.

[0026] Furthermore, the method for obtaining the actual current demand values ​​of the R sub-power consumption areas includes:

[0027] Obtain each shunt line connected to the continuously overloaded transmission line and the K branch currents in the subsequent unit time, sort the K branch currents according to the collection time, establish a branch current set, calculate the change rate of every two adjacent branch currents in the branch current set in turn, and obtain a change rate set. The change rates in the change rate set are sorted according to the branch current collection time; input the branch current set and the change rate set into the trained power consumption prediction model, and output the predicted actual current demand value.

[0028] Furthermore, the training method of the power consumption prediction model includes:

[0029] Pre-collecting a power consumption data set of a transmission line when it is slightly overloaded and moderately overloaded, wherein the power consumption data set includes a branch current set, a change rate set, and an actual current demand value;

[0030] The electricity consumption data set is divided into a training set and a test set, a classifier is constructed, the branch current set and the change rate set in the training set are used as the input of the electricity consumption prediction model, the actual current demand value in the training set is used as the output of the electricity consumption prediction model, the classifier is trained to obtain an initial classifier, the initial classifier is tested using the test set, and the classifier that meets the preset accuracy is output as the electricity consumption prediction model, and the electricity consumption prediction model is a naive Bayes model or a support vector machine model.

[0031] Furthermore, the method for calculating the upper limit shunt current value includes:

[0032] (The current capacity corresponding to the nth available line × 80%) - the actual current demand value of the nth available line for the power application area = the upper limit shunt current value of the nth available line.

[0033] The power grid state intelligent diagnosis system based on artificial intelligence implements the power grid state intelligent diagnosis method based on artificial intelligence, including:

[0034] The data acquisition module starts to collect the voltage, current and temperature difference in the subsequent unit time when the real-time current of the transmission line in the power grid exceeds the rated current of the transmission line; the temperature difference is the absolute value of the difference between the transmission line temperature and the ambient temperature;

[0035] The data processing module uses the voltage, current, and temperature difference collected in subsequent unit time to establish voltage sets, current sets, and temperature difference sets in the order of collection time; linear regression fitting is performed on the voltage set, current set, and temperature difference set to obtain the voltage trend equation , Current trend equation and temperature difference trend equation ; Derivative the trend equations respectively to obtain the voltage trend equation derivative set, the current trend equation derivative set and the temperature difference trend equation derivative set;

[0036] An overload property prediction module inputs a voltage trend equation derivative set, a current trend equation derivative set, and a temperature difference trend equation derivative set into a trained overload property prediction model to obtain overload properties; the overload properties include continuous overload and intermittent overload;

[0037] The intelligent repair and reporting module automatically adjusts the continuously overloaded transmission line to restore the transmission line to normal if the overload is a continuous overload; if the automatic adjustment fails, the fault location and the automatic adjustment process are recorded and reported to the power grid power supply server.

[0038] The technical effects and advantages of the power grid status intelligent diagnosis system and method based on artificial intelligence of the present invention are as follows:

[0039] It can accurately distinguish between continuous overload and intermittent overload under mild and moderate overload conditions, automatically adjust continuous overload to restore it to normal, reduce the frequency of tripping caused by overload, and ensure the stability of power supply; secondly, in the automatic adjustment process, obtain the branch current data and change rate of each connected shunt line in the subsequent unit time, and use the trained power consumption prediction model to predict the actual current demand value of the sub-power consumption area, and the prediction value is more accurate; then, according to the actual demand of the sub-power consumption area and the available line capacity, automatically adjust the connection of the power supply line, so that the transmission line can quickly return to normal, further ensuring the stability of power supply. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 It is a schematic diagram of the intelligent diagnosis system of the power grid state based on artificial intelligence of the present invention;

[0041] Figure 2 It is a principle flow chart of the intelligent diagnosis method of power grid status based on artificial intelligence of the present invention;

[0042] Figure 3 is a schematic diagram of an electronic device of the present invention;

[0043] Figure 4 Schematic diagram of the storage medium of the present invention. DETAILED DESCRIPTION

[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] Example 1

[0046] See also Figure 1 As shown, the artificial intelligence-based intelligent diagnosis system for the power grid status described in this embodiment includes a data acquisition module, a data processing module, an overload property prediction module and an intelligent repair and reporting module, and each module is connected by wire and / or wirelessly.

[0047] The data acquisition module starts to collect the voltage, current and temperature difference in the subsequent unit time when the real-time current of the transmission line in the power grid exceeds the rated current of the transmission line; the temperature difference is the absolute value of the difference between the temperature of the transmission line and the ambient temperature, and the start time of the subsequent unit time is when the real-time current of the transmission line exceeds the preset rated current;

[0048] It should be noted that a real-time current exceeding the rated current of the transmission line by 10% to 20% is a mild overload, a real-time current exceeding the rated current of the transmission line by 20% to 50% is a moderate overload, and a real-time current exceeding the rated current of the transmission line by 50% is a severe overload; severe overload will immediately cause the circuit breaker to trip, while mild overload and moderate overload usually do not immediately cause the circuit breaker to trip, but will cause the transmission line to heat up; if a continuous overload occurs, it will cause the circuit breaker to trip, and the trip time of moderate overload will be earlier than the trip time of mild overload; for example, if the rated current of the wire is 10A, the current of mild overload is between 11A and 12A, and the current of moderate overload is between 12A and 15A; the intelligent diagnosis system for the power grid status based on artificial intelligence provided in this embodiment is to automatically adjust the transmission line when it is mildly overloaded and moderately overloaded, so that the transmission line returns to normal.

[0049] The data processing module uses the voltage, current, and temperature difference collected in subsequent unit time to establish voltage sets, current sets, and temperature difference sets in the order of collection time; linear regression fitting is performed on the voltage set, current set, and temperature difference set to obtain the voltage trend equation , Current trend equation and temperature difference trend equation ; Derivative the trend equation respectively to obtain the trend equation derivative set;

[0050] The trend equation derivative set includes a voltage trend equation derivative set, a current trend equation derivative set and a temperature difference trend equation derivative set;

[0051] The method for obtaining the set of derivatives of the voltage trend equation, the set of derivatives of the current trend equation, and the set of derivatives of the temperature difference trend equation is:

[0052] Use the LinearRegression class of the scikit-learn library in Python to perform linear regression fitting on the voltage set, current set, and temperature difference set to obtain the voltage trend equation , Current trend equation and temperature difference trend equation ;The main function of the LinearRegression class is to fit a linear model and use the least squares method to estimate the model parameters;The scikit-learn library is a popular machine learning Python library.

[0053] The voltage trend equation is: ; t is time;

[0054] in is the regression coefficient of the voltage trend equation, is the intercept of the voltage trend equation, and It is calculated by the least squares method. The specific calculation method is as follows:

[0055] ;

[0056] ;

[0057] It should be noted that is the number of voltages in the voltage set, a≤A, The ath voltage in the voltage set, for The corresponding time point.

[0058] The current trend equation is ;

[0059] in is the regression coefficient of the current trend equation, is the intercept of the current trend equation, and It is calculated by the least squares method. The specific calculation method is as follows:

[0060] ;

[0061] ;

[0062] It should be noted that is the number of currents in the current set, b≤B, is the bth current in the voltage set, for The corresponding time point.

[0063] The temperature difference trend equation is: ;

[0064] in is the regression coefficient of the temperature difference trend equation, is the intercept of the temperature difference trend equation, and It is calculated by the least squares method. The specific calculation method is as follows:

[0065] ;

[0066] ;

[0067] It should be noted that is the number of temperature differences in the temperature difference set, d≤D, is the dth temperature difference in the temperature difference set, for The corresponding time point.

[0068] Voltage trend equation The derivative is , substitute the voltages in the voltage set into Construct a set of derivatives of the voltage trend equation; for the current trend equation The derivative is , substitute the currents in the current set into Construct the derivative set of current trend equation; for temperature difference trend equation The derivative is , substitute the temperature differences in the temperature difference set into Construct a set of derivatives of the temperature difference trend equation.

[0069] It should be noted that the derivative reflects the trend of the trend equation. When the derivative is greater than 0, the equation is increasing, and the larger the derivative value, the faster the equation increases; when the derivative is equal to 0, the equation is a straight line; when the derivative is less than 0, the equation is decreasing, and the smaller the derivative value, the faster the equation decreases; if the initial value of the data in the derivative set of the voltage trend equation is less than 0 and continues to be less than 0, the voltage continues to drop; if the initial value of the data in the derivative set of the current trend equation is greater than 0 and continues to be greater than 0, the current continues to rise; if the voltage continues to drop and the current continues to rise, it means that the probability of the overload being a continuous overload is higher; otherwise, it means that the probability of the overload being an intermittent overload is higher.

[0070] The overload property prediction module inputs the voltage trend equation derivative set, the current trend equation derivative set and the temperature difference trend equation derivative set into the trained overload property prediction model to obtain the overload property; the overload property includes continuous overload and intermittent overload. If the overload property of the transmission line is continuous overload, automatic adjustment is required; if the overload property is intermittent overload, it is accidental and no automatic adjustment is required temporarily.

[0071] The training method of the overload property prediction model includes:

[0072] Pre-collecting a transmission line overload data set, wherein the transmission line overload data set includes a trend equation derivative set and an overload property corresponding to the trend equation derivative set; the trend equation derivative set includes a voltage trend equation derivative set, a current trend equation derivative set and a temperature difference trend equation derivative set;

[0073] The transmission line overload data set is divided into a training set and a test set, a classifier is constructed, the trend equation derivative set in the training set is used as the input of the overload property prediction model, the overload property in the training set is used as the output of the overload property prediction model, the classifier is trained to obtain an initial classifier, the initial classifier is tested using the test set, and a classifier that meets a preset accuracy is output as the overload property prediction model. The classifier is preferably a naive Bayes model or a support vector machine model.

[0074] The intelligent repair and reporting module is used to automatically adjust the continuously overloaded transmission line to restore the transmission line to normal; if the automatic adjustment fails, the fault location and the automatic adjustment process are recorded and reported to the power grid power supply server.

[0075] The specific processing steps for automatic adjustment of the transmission line with continuous overload are as follows:

[0076] Step 1: According to the topological structure data of the transmission line, R sub-power consumption areas and N available lines connected to each sub-power consumption area are obtained, where R and N are any integers greater than 0; the number of available lines connected to each sub-power consumption area can be the same or different, that is, the value of N can be the same or different.

[0077] Step 2: Obtain actual current demand values ​​of R sub-power consumption areas. The R sub-power consumption areas are pre-divided in advance. The specific division can determine the number of sub-power consumption areas according to the number of shunt lines of the transmission line, that is, each shunt line supplies power to one sub-power consumption area.

[0078] The method for obtaining the actual current demand values ​​of the R sub-power consumption areas includes:

[0079] Obtain each shunt line connected to the continuously overloaded transmission line and the K branch currents in the subsequent unit time, sort the K branch currents according to the acquisition time, establish a branch current set, calculate the change rate of each two adjacent branch currents in the branch current set in turn, and obtain a change rate set. The change rates in the change rate set are sorted according to the branch current acquisition time; input the branch current set and the change rate set into the trained power consumption prediction model, and output the predicted actual current demand value;

[0080] It should be noted that the branch currents in the branch current set sorted by collection time can reflect the growth in electricity consumption, and the change rate in the change rate set can reflect the growth rate of electricity consumption. By analyzing the branch current set and the change rate set, it is convenient to predict in advance the actual current demand value of the sub-power consumption area corresponding to each shunt line.

[0081] The reason for predicting the actual current demand value of the sub-power consumption area corresponding to each shunt line through the branch current set and the change rate set is that when the transmission line is in a continuous overload, it will generally trip within 3 to 5 minutes, and the current collected by each shunt line at the time of tripping is often lower than the actual current demand value of the sub-power consumption area; therefore, it is more accurate to predict the actual current demand value of the sub-power consumption area corresponding to each shunt line through the branch current set and the change rate set, and it can be processed in advance to avoid and reduce the occurrence of tripping, which is convenient for subsequent automatic adjustment to restore the transmission line to normal.

[0082] The training method of the power consumption prediction model includes:

[0083] Pre-collecting a power consumption data set of a transmission line when it is slightly overloaded and moderately overloaded, wherein the power consumption data set includes a branch current set, a change rate set, and an actual current demand value;

[0084] The electricity consumption data set is divided into a training set and a test set, a classifier is constructed, the branch current set and the change rate set in the training set are used as the input of the electricity consumption prediction model, the actual current demand value in the training set is used as the output of the electricity consumption prediction model, the classifier is trained to obtain an initial classifier, the initial classifier is tested using the test set, and the classifier that meets the preset accuracy is output as the electricity consumption prediction model, and the electricity consumption prediction model is a naive Bayes model or a support vector machine model.

[0085] It should be noted that the actual current demand values ​​corresponding to the branch current set and the change rate set are collected in advance, and the actual current demand values ​​at this time are the actual current demand values ​​when the power supply of the sub-power consumption area returns to normal.

[0086] Step 3: Let r∈R, let n∈N, the initial values ​​of r and n are 1, obtain the actual current demand value of the nth available line in the rth sub-power consumption area for the power consumption area, and the current capacity corresponding to the nth available line, and calculate the upper limit shunt current value of the nth available line; if the upper limit shunt current value of the nth available line is less than the actual current demand value of the rth sub-power consumption area, execute step 5; if the upper limit shunt current value of the nth available line is greater than or equal to the actual current demand value of the rth sub-power consumption area, generate a call instruction and send it to the rth sub-power consumption area connection switch, and the rth sub-power consumption area connection switch connects the connection with the nth available line according to the call instruction, and disconnects the connection with the transmission line at the same time;

[0087] The calculation method of the upper shunt current value includes:

[0088] (The current capacity corresponding to the nth available line × 80%) - the actual current demand value of the nth available line for the application area = the upper limit of the diversion current value of the nth available line;

[0089] Step 4: Mark the sub-power consumption area corresponding to the call instruction generated in step 3 as the shunt sub-power consumption area, calculate the total actual current demand value of the R sub-power consumption areas except the shunt sub-power consumption area, if the total actual current demand value is less than or equal to the transmission current capacity of the transmission line, it is considered that the automatic recovery of the overload fault of the transmission line is successful, and the step loop is ended, otherwise, step 6 is executed; the transmission current capacity is 80% of the actual current capacity of the transmission line, which can improve the stability and reliability of the transmission line;

[0090] Step 5: Let n=n+1, and continue to execute step 3. When n=N, if the upper limit shunt current value of the nth available line is still not greater than or equal to the actual current demand value of the rth sub-power consumption area, execute step 6;

[0091] Step 6: Let r=r+1, execute step 3. When r=R, if the total actual current demand value is still not less than or equal to the transmission current capacity of the transmission line, the fault category of the transmission line will be reported, and it will be regarded as a failure of automatic recovery of the transmission line overload fault, and the maintenance personnel will handle it.

[0092] Example 2

[0093] See also Figure 2 As shown, the power grid state intelligent diagnosis method based on artificial intelligence provided by this embodiment includes:

[0094] When the real-time current of the transmission line in the power grid exceeds the rated current of the transmission line, the voltage, current and temperature difference in the subsequent unit time are collected; the temperature difference is the absolute value of the difference between the transmission line temperature and the ambient temperature;

[0095] The voltage, current and temperature difference collected in the subsequent unit time are respectively used to establish the voltage set, current set and temperature difference set in the order of collection time; the voltage set, current set and temperature difference set are respectively subjected to linear regression fitting to obtain the voltage trend equation , Current trend equation and temperature difference trend equation ; Derivative the trend equations respectively to obtain the voltage trend equation derivative set, the current trend equation derivative set and the temperature difference trend equation derivative set;

[0096] Inputting the voltage trend equation derivative set, the current trend equation derivative set and the temperature difference trend equation derivative set into the trained overload property prediction model to obtain the overload property; the overload property includes continuous overload and intermittent overload. If the overload property of the transmission line is continuous overload, automatic adjustment is performed;

[0097] Automatically adjust the continuously overloaded transmission line to restore the transmission line to normal; if the automatic adjustment fails, the fault location and the automatic adjustment process record are reported to the power grid power supply server.

[0098] Example 3

[0099] See also Figure 3As shown, the present application also provides an electronic device 500. The electronic device 500 may include one or more processors and one or more memories. The memory stores a computer-readable code, and when the computer-readable code is executed by one or more processors, the above-mentioned intelligent diagnosis method for power grid status based on artificial intelligence can be executed.

[0100] The method or system according to the embodiment of the present application can also be used by Figure 3 The electronic device architecture shown in FIG. Figure 3 As shown, the electronic device 500 may include a bus 501, one or more CPUs 502, ROM 503, RAM 504, a communication port 505 connected to a network, an input / output 506, a hard disk 507, etc. The storage device in the electronic device 500, such as ROM 503 or hard disk 507, may store the intelligent diagnosis method for power grid status based on artificial intelligence provided by the present application. Furthermore, the electronic device 500 may also include a user interface 508. Of course, Figure 3 The architecture shown is only exemplary and can be omitted according to actual needs when implementing different devices. Figure 3 One or more components of an electronic device are shown.

[0101] Example 4

[0102] See also Figure 4 As shown, a computer-readable storage medium 600 according to an embodiment of the present application is shown. Computer-readable instructions are stored on the computer-readable storage medium 600. When the computer-readable instructions are executed by the processor, the intelligent diagnosis method for the power grid state based on artificial intelligence according to the embodiment of the present application described with reference to the above figures can be executed. The storage medium 600 includes, but is not limited to, for example, volatile memory and / or non-volatile memory. Volatile memory may include, for example, random access memory (RAM) and cache memory (cache), etc. Non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc.

[0103] In addition, according to the implementation of the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the present application provides a non-transitory machine-readable storage medium, which stores machine-readable instructions, and the machine-readable instructions can be executed by a processor to execute instructions corresponding to the method steps provided in the present application, such as: an intelligent diagnosis system and method for power grid status based on artificial intelligence. When the computer program is executed by a central processing unit (CPU), the above functions defined in the method of the present application are executed.

[0104] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

[0105] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An intelligent diagnosis method for power grid status based on artificial intelligence, characterized in that: include: When the real-time current of the transmission line in the power grid exceeds the rated current of the transmission line, the voltage, current and temperature difference in the subsequent unit time are collected; The temperature difference is the absolute value of the difference between the transmission line temperature and the ambient temperature; The voltage, current and temperature difference collected in the subsequent unit time are respectively used to establish the voltage set, current set and temperature difference set in the order of collection time; the voltage set, current set and temperature difference set are respectively subjected to linear regression fitting to obtain the voltage trend equation , Current trend equation and temperature difference trend equation ; Derivative the trend equations respectively to obtain the voltage trend equation derivative set, the current trend equation derivative set and the temperature difference trend equation derivative set; Inputting the voltage trend equation derivative set, the current trend equation derivative set and the temperature difference trend equation derivative set into the trained overload property prediction model to obtain the overload property; the overload property includes continuous overload and intermittent overload; If the overload of the power transmission line is a continuous overload, the continuously overloaded power transmission line is automatically adjusted to restore the power transmission line to normal; If the automatic adjustment fails, the fault location and the automatic adjustment process record will be reported to the power supply server of the power grid.

2. The method for intelligent diagnosis of power grid status based on artificial intelligence according to claim 1 is characterized in that: The start time of the subsequent unit time is when the real-time current of the transmission line exceeds the preset rated current.

3. The method for intelligent diagnosis of power grid status based on artificial intelligence according to claim 1 is characterized in that: The method for obtaining the set of derivatives of the voltage trend equation, the set of derivatives of the current trend equation, and the set of derivatives of the temperature difference trend equation is: Use the LinearRegression class of the scikit-learn library in Python to perform linear regression fitting on the voltage set, current set, and temperature difference set to obtain the voltage trend equation , Current trend equation and temperature difference trend equation ; For the voltage trend equation The derivative is , substitute the voltages in the voltage set into Constructing a set of derivatives of the voltage trend equation; Current trend equation The derivative is , substitute the currents in the current set into Construct the derivative set of current trend equation; for temperature difference trend equation The derivative is , substitute the temperature differences in the temperature difference set into Construct a set of derivatives of the temperature difference trend equation.

4. The method for intelligent diagnosis of power grid status based on artificial intelligence according to claim 3 is characterized in that: The training method of the overload property prediction model includes: Pre-collecting a transmission line overload data set, wherein the transmission line overload data set includes a trend equation derivative set and an overload property corresponding to the trend equation derivative set; the trend equation derivative set includes a voltage trend equation derivative set, a current trend equation derivative set and a temperature difference trend equation derivative set; The transmission line overload data set is divided into a training set and a test set, a classifier is constructed, the trend equation derivative set in the training set is used as the input of the overload property prediction model, the overload property in the training set is used as the output of the overload property prediction model, the classifier is trained to obtain an initial classifier, the initial classifier is tested using the test set, and a classifier that meets a preset accuracy is output as the overload property prediction model, and the classifier is a naive Bayes model or a support vector machine model.

5. The method for intelligent diagnosis of power grid status based on artificial intelligence according to claim 4 is characterized in that: The steps for automatic regulation of a continuously overloaded transmission line are as follows: Step 1: obtaining R sub-power consumption areas and N available lines connected to each sub-power consumption area according to the topological structure data of the power transmission line, where R and N are any integers greater than 0; Step 2: obtaining actual current demand values ​​of R sub-power consumption areas, and determining the number of sub-power consumption areas according to the number of shunt lines of the transmission line, that is, each shunt line supplies power to one sub-power consumption area; Step 3: Let r∈R, let n∈N, the initial values ​​of r and n are 1, obtain the actual current demand value of the nth available line in the rth sub-power consumption area for the power consumption area, and the current capacity corresponding to the nth available line, and calculate the upper limit shunt current value of the nth available line; If the upper limit shunt current value of the nth available line is less than the actual current demand value of the rth sub-power consumption area, execute step 5; If the upper limit shunt current value of the nth available line is greater than or equal to the actual current demand value of the rth sub-power consumption area, a call instruction is generated and sent to the rth sub-power consumption area connection switch, and the rth sub-power consumption area connection switch connects the connection with the nth available line according to the call instruction, and disconnects the connection with the transmission line at the same time; Step 4: Mark the sub-power consumption area corresponding to the call instruction generated in step 3 as the shunt sub-power consumption area, calculate the total actual current demand value of the R sub-power consumption areas except the shunt sub-power consumption area, if the total actual current demand value is less than or equal to the transmission current capacity of the transmission line, it is considered that the automatic recovery of the overload fault of the transmission line is successful, and the step loop is ended, otherwise, step 6 is executed; The transmission current capacity is 80% of the actual current capacity of the transmission line; Step 5: Let n=n+1, and continue to execute step 3. When n=N, if the upper limit shunt current value of the nth available line is still not greater than or equal to the actual current demand value of the rth sub-power consumption area, execute step 6; Step 6: Let r=r+1, execute step 3. When r=R, if the total actual current demand value is still not less than or equal to the transmission current capacity of the transmission line, the fault category of the transmission line will be reported, and it will be regarded as a failure of automatic recovery of the transmission line overload fault, and the maintenance personnel will handle it.

6. The method for intelligent diagnosis of power grid status based on artificial intelligence according to claim 5 is characterized in that: The method for obtaining the actual current demand values ​​of the R sub-power consumption areas includes: Obtain each shunt line connected to the continuously overloaded transmission line and the K branch currents in the subsequent unit time, sort the K branch currents according to the collection time, establish a branch current set, calculate the change rate of every two adjacent branch currents in the branch current set in turn, and obtain a change rate set. The change rates in the change rate set are sorted according to the branch current collection time; input the branch current set and the change rate set into the trained power consumption prediction model, and output the predicted actual current demand value.

7. The method for intelligent diagnosis of power grid status based on artificial intelligence according to claim 6 is characterized in that: The training method of the power consumption prediction model includes: Pre-collecting a power consumption data set of a transmission line when it is slightly overloaded and moderately overloaded, wherein the power consumption data set includes a branch current set, a change rate set, and an actual current demand value; The electricity consumption data set is divided into a training set and a test set, a classifier is constructed, the branch current set and the change rate set in the training set are used as the input of the electricity consumption prediction model, the actual current demand value in the training set is used as the output of the electricity consumption prediction model, the classifier is trained to obtain an initial classifier, the initial classifier is tested using the test set, and the classifier that meets the preset accuracy is output as the electricity consumption prediction model, and the electricity consumption prediction model is a naive Bayes model or a support vector machine model.

8. The method for intelligent diagnosis of power grid status based on artificial intelligence according to claim 5 is characterized in that: The method for calculating the upper limit shunt current value includes: (The current capacity corresponding to the nth available line × 80%) - the actual current demand value of the nth available line for the power application area = the upper limit shunt current value of the nth available line.

9. An intelligent diagnosis system for power grid status based on artificial intelligence, implementing the intelligent diagnosis method for power grid status based on artificial intelligence according to any one of claims 1 to 8, characterized in that: include: The data acquisition module starts to collect the voltage, current and temperature difference in the subsequent unit time when the real-time current of the transmission line in the power grid exceeds the rated current of the transmission line; The temperature difference is the absolute value of the difference between the transmission line temperature and the ambient temperature; The data processing module uses the voltage, current, and temperature difference collected in subsequent unit time to establish voltage sets, current sets, and temperature difference sets in the order of collection time; linear regression fitting is performed on the voltage set, current set, and temperature difference set to obtain the voltage trend equation , Current trend equation and temperature difference trend equation ; Derivative the trend equations respectively to obtain the voltage trend equation derivative set, the current trend equation derivative set and the temperature difference trend equation derivative set; An overload property prediction module inputs a voltage trend equation derivative set, a current trend equation derivative set, and a temperature difference trend equation derivative set into a trained overload property prediction model to obtain overload properties; the overload properties include continuous overload and intermittent overload; An intelligent repair and reporting module, if the overload of the transmission line is a continuous overload, automatically adjusts the continuously overloaded transmission line to restore the transmission line to normal; If the automatic adjustment fails, the fault location and the automatic adjustment process record will be reported to the power supply server of the power grid.

Citation Information

Patent Citations

  • Circuit breaker intelligent regulation and control system based on load current detection

    CN108879912A

  • Overload risk state identifying method for power distribution network

    CN102751725A

  • Intelligent power grid regulation and control equipment fault diagnosis system

    CN114977483A