A method and system for constructing a power supply and distribution network diagram
By dividing the power supply and distribution areas and determining the credibility of the map data, matching the matching coefficients of the historical power grid map, and generating the optimal update processing plan, the problem of low efficiency in the update processing of the power supply and distribution grid map is solved, and the reliability of the update process is improved. and efficiency.
Patent Information
- Application Number
- CN202410944788.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-07-15
AI Technical Summary
During the construction process of the power supply and distribution grid diagram, there are multiple historical versions of the power supply and distribution grid diagram within the power company, making it difficult to meet the update processing efficiency requirements.
By dividing the urban distribution network into multiple power supply and distribution areas, using updated data of power equipment and users to determine the updateable areas, determining the credibility of the map data based on the similarity and update time of the historical power grid map, and matching the historical power grid map Matching coefficients, generate multiple update processing plans and select the optimal plan for update processing.
It realizes the screening and determination of the optimal update processing plan from multiple perspectives, improves the reliability and efficiency of update processing, and avoids high complexity problems caused by more updates to power equipment and users.
Smart Images

Figure CN118467861B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of data processing, and in particular relates to a method and system for constructing a power supply and distribution network diagram. Background Art
[0002] With the development of Internet maps and mobile application technologies, mobile applications can effectively reduce the cost of users obtaining information, improve communication efficiency, and play a very positive role in the development of on-site work. The power grid resource business center maintains complete power grid graphics, topology and attribute data, and the desktop has realized data maintenance, graphic visualization, power grid analysis, system integration and application and other functions. Therefore, how to realize the construction of a unified power grid map has become a technical problem that needs to be solved urgently.
[0003] In order to solve the above technical problems, in the invention patent CN201510070131.1 "A method and device for generating image data", each object graph model is processed according to the object attribute information of the device object data and the connection object data to obtain the power distribution network image data. However, it is not difficult to find out through analysis that there are the following technical problems:
[0004] When constructing a power supply and distribution network diagram, there are often multiple historical versions of the power supply and distribution network diagram within the power company. Therefore, if the update process cannot be performed based on the existing network diagram, the efficiency of constructing the network diagram may be difficult to meet the requirements.
[0005] In response to the above technical problems, the present invention provides a method and system for constructing a power supply and distribution network diagram. Summary of the invention
[0006] To achieve the purpose of the present invention, the present invention adopts the following technical solutions:
[0007] According to one aspect of the present invention, a method for constructing a power supply and distribution network diagram is provided.
[0008] A method for constructing a power supply and distribution network diagram, characterized in that it specifically includes:
[0009] S1 divides the urban distribution network into multiple power supply and distribution areas, and when the power supply and distribution area is determined to be an updateable area by using the updated installation data of the power equipment in different power supply and distribution areas and the updated data of the power users, proceeds to the next step;
[0010] S2: determining the credibility of map data of different updateable areas based on the similarity of different historical power grid maps of different updateable areas and the update processing time, and when determining that the updateable area belongs to the screening update area by using the map data credibility, proceeding to the next step;
[0011] S3 determines the matching historical power grid diagram based on the screening and updating area, and determines the matching coefficients of different matching historical power grid diagrams and the candidate power grid diagrams of different screening and updating areas by using the similarities with other matching historical power grid diagrams and the parameter matching conditions of different types of power equipment;
[0012] S4 generates multiple update processing schemes by combining alternative power grid maps of different screening update areas, and determines the optimal update processing scheme for constructing the power grid map of the screening update area according to the number of historical power grid maps involved in different update processing schemes and the matching coefficients of different screening update areas.
[0013] The beneficial effects of the present invention are:
[0014] 1. In the present invention, the update installation data of power equipment in different power supply and distribution areas and the update data of power users are used to determine whether the power supply and distribution area is an updateable area, thereby realizing the screening of updateable areas from two perspectives of the update installation status of power equipment and the update status of power users, avoiding the emergence of technical problems such as high update complexity caused by more updates of power equipment and power users, and ensuring the reliability of update processing.
[0015] 2. In the present invention, the optimal update processing scheme for constructing the power grid map of the screening update area is determined according to the number of historical power grid maps involved in different update processing schemes and the matching coefficients of different screening update areas. This not only takes into account the differences in update processing complexity of the update processing schemes due to the differences in the number of historical power grid maps involved, but also takes into account the matching conditions of the historical power grid maps of different update processing schemes by further combining the matching coefficients of the screening update areas, thereby realizing the screening of the optimal update processing scheme from multiple angles.
[0016] A further technical solution is to divide the urban distribution network into multiple power supply and distribution areas, including:
[0017] The urban distribution network is divided into equal intervals based on a preset area to obtain a division result, and a plurality of power supply and distribution areas are obtained using the division result.
[0018] A further technical solution is that the updated installation data of the power equipment is determined according to the update time of the historical power grid map corresponding to the power supply and distribution area, and specifically the updated installation data of the power equipment is determined according to the updated installation status of the power equipment after the update time.
[0019] A further technical solution is to determine that the power supply and distribution area is a renewable area, specifically including:
[0020] Determine the updated power equipment in the power supply and distribution area by using the updated installation data, and determine the equipment update status value in the power supply and distribution area according to the number of updated power equipment and the distribution of different updated power equipment;
[0021] Determine updated power users in the power supply and distribution area by using the updated data of the power users, and determine the user update status value in the power supply and distribution area according to the number of updated power users and the distribution of different updated power users;
[0022] The update status value of the power supply and distribution area is determined by weighting the user update status value and the device update status value, and the update status value is used to determine whether the power supply and distribution area is an updateable area.
[0023] A further technical solution is to use the update status value to determine whether the power supply and distribution area is an updateable area, specifically including:
[0024] When the update status value of the power supply and distribution area is not less than a preset update threshold, it is determined that the power supply and distribution area does not belong to an updateable area.
[0025] A further technical solution is that, when the power supply and distribution area does not belong to an updateable area, there is no need to update the power grid map, and the power grid map of the power supply and distribution area is reconstructed.
[0026] A further technical solution is that the method for determining the update processing solution is:
[0027] Based on the candidate power grid diagrams of different screening and updating areas, the candidate processing schemes of different screening and updating areas are determined, and the candidate processing schemes of different screening and updating areas are combined to generate multiple update processing schemes.
[0028] A further technical solution is that the method for determining the optimal update processing solution for constructing the power grid map of the screening update area is:
[0029] Obtaining the number of historical power grid maps involved in different update processing schemes, and determining the construction complexity of different update processing schemes in combination with the number of candidate power grid maps corresponding to the different historical power grid maps involved;
[0030] Determining the comprehensive matching degree of different update processing schemes through the matching coefficients of different screening update areas of the update processing schemes;
[0031] The comprehensive evaluation quantities of different update processing schemes are determined based on their comprehensive matching degrees and construction complexities, and the optimal update processing scheme for constructing the power grid map of the screening update area is determined using the comprehensive evaluation quantities.
[0032] On the other hand, the present invention provides a system for constructing a power supply and distribution network diagram, which adopts the above-mentioned method for constructing a power supply and distribution network diagram, and is characterized in that it specifically includes:
[0033] Area screening module, update area screening module, alternative power grid diagram acquisition module, processing solution output module;
[0034] The regional screening module is responsible for dividing the urban distribution network into multiple power supply and distribution areas, and using the updated installation data of power equipment in different power supply and distribution areas and the updated data of power users to determine whether the power supply and distribution area is an updateable area;
[0035] The update area screening module is responsible for determining the map data credibility of different updateable areas based on the similarity of different historical power grid maps of different updateable areas and the update processing time, and using the map data credibility to determine whether the updateable area belongs to the screening update area;
[0036] The candidate power grid diagram acquisition module is responsible for determining the matching historical power grid diagram based on the screening and updating area, and determining the matching coefficients of different matching historical power grid diagrams and the candidate power grid diagrams of different screening and updating areas by using the similarities with other matching historical power grid diagrams and the parameter matching conditions of different types of power equipment;
[0037] The processing scheme output module is responsible for generating multiple update processing schemes by combining the alternative power grid maps of different screening update areas, and determining the optimal update processing scheme for constructing the power grid map of the screening update area based on the number of historical power grid maps involved in different update processing schemes and the matching coefficients of different screening update areas.
[0038] Other features and advantages will be described in the following description, and partly become apparent from the description, or understood by practicing the invention. The purpose and other advantages of the invention are realized and obtained by the structures particularly pointed out in the description and the drawings.
[0039] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The above and other features and advantages of the present invention will become more apparent by describing in detail exemplary embodiments thereof with reference to the attached drawings.
[0041] Figure 1 It is a flow chart of a method for constructing a power supply and distribution network diagram;
[0042] Figure 2 is a flow chart of a method for determining a deviation sub-region;
[0043] Figure 3 is a flow chart of a method for determining the credibility of map data of an updateable area;
[0044] Figure 4 is a flow chart of a method for determining a matching coefficient for matching a historical power grid diagram;
[0045] Figure 5 The invention is a flow chart of a system for constructing a power supply and distribution network diagram. DETAILED DESCRIPTION
[0046] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in a variety of forms and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided so that the present invention will be comprehensive and complete and fully convey the concepts of the example embodiments to those skilled in the art. The same reference numerals in the figures represent the same or similar structures, and thus their detailed description will be omitted.
[0047] The terms "a", "an", "the", and "said" are used to indicate the presence of one or more elements / components / etc.; the terms "comprising" and "having" are used to express an open-ended inclusive meaning and mean that additional elements / components / etc. may be present in addition to the listed elements / components / etc.
[0048] Example 1
[0049] Specifically, according to one aspect of the present invention, Figure 1 As shown, a method for constructing a power supply and distribution network diagram is provided, which is characterized by specifically comprising:
[0050] S1 divides the urban distribution network into multiple power supply and distribution areas, and when the power supply and distribution area is determined to be an updateable area by using the updated installation data of the power equipment in different power supply and distribution areas and the updated data of the power users, proceeds to the next step;
[0051] Furthermore, the urban distribution network is divided into multiple power supply and distribution areas, including:
[0052] The urban distribution network is divided into equal intervals based on a preset area to obtain a division result, and a plurality of power supply and distribution areas are obtained using the division result.
[0053] Specifically, the updated installation data of the power equipment is determined according to the update time of the historical power grid map corresponding to the power supply and distribution area, and specifically determined according to the updated installation status of the power equipment after the update time.
[0054] Specifically, determining that the power supply and distribution area is an updateable area specifically includes:
[0055] Determine the updated power equipment in the power supply and distribution area by using the updated installation data, and determine the equipment update status value in the power supply and distribution area according to the number of updated power equipment and the distribution of different updated power equipment;
[0056] Determine updated power users in the power supply and distribution area by using the updated data of the power users, and determine the user update status value in the power supply and distribution area according to the number of updated power users and the distribution of different updated power users;
[0057] The update status value of the power supply and distribution area is determined by weighting the user update status value and the device update status value, and the update status value is used to determine whether the power supply and distribution area is an updateable area.
[0058] Further, determining whether the power supply and distribution area is an updateable area by using the update status value specifically includes:
[0059] When the update status value of the power supply and distribution area is not less than a preset update threshold, it is determined that the power supply and distribution area does not belong to an updateable area.
[0060] It should be noted that, when the power supply and distribution area does not belong to an updateable area, there is no need to update the power grid map and re-construct the power grid map of the power supply and distribution area.
[0061] In another embodiment, determining that the power supply and distribution area is an updateable area specifically includes:
[0062] Determine the updated power equipment in the power supply and distribution area by using the updated installation data, and judge whether the number of updated power equipment in the power supply and distribution area meets the requirement, if yes, proceed to the next step, if no, determine that the power supply and distribution area does not belong to the updateable area;
[0063] Determine updated power users in the power supply and distribution area by using the updated data of the power users, and judge whether the number of updated power users in the power supply and distribution area meets the requirement, if so, proceed to the next step, if not, determine that the power supply and distribution area does not belong to the updateable area;
[0064] Determine the equipment update status value of the power supply and distribution area according to the number of updated power equipment and the distribution of different updated power equipment, and judge whether the equipment update status value of the power supply and distribution area meets the requirements, if yes, proceed to the next step, if not, determine that the power supply and distribution area does not belong to the updateable area;
[0065] Determine the user update status value of the power supply and distribution area according to the number of updated power users and the distribution of different updated power users, and judge whether the user update status value of the power supply and distribution area meets the requirements, if so, proceed to the next step, if not, determine that the power supply and distribution area does not belong to the updateable area;
[0066] The update status value of the power supply and distribution area is determined by weighting the user update status value and the device update status value, and the update status value is used to determine whether the power supply and distribution area is an updateable area.
[0067] In another embodiment, determining that the power supply and distribution area is an updateable area specifically includes:
[0068] Divide the power supply and distribution area into a plurality of sub-areas using the second preset area, determine the updated power equipment in the power supply and distribution area using the updated installation data, determine the updated power users in the power supply and distribution area using the updated data of the power users, and use the sub-areas where updated power users or updated power equipment exist as updated sub-areas, and determine whether the number of updated sub-areas meets the requirement, if yes, proceed to the next step, if not, determine that the power supply and distribution area does not belong to an updateable area;
[0069] Determine the distribution dispersion of the update sub-area according to the distances between different update sub-areas, and judge whether the distribution dispersion of the update sub-area meets the requirements. If yes, proceed to the next step; if not, determine that the power supply and distribution area does not belong to the updateable area;
[0070] Determine the comprehensive update status value of the update sub-area by using the number of update power devices in different update sub-areas and the distribution of different update power devices, the number of update power users and the distribution of different update power users, and judge whether the comprehensive update status value is less than the required number of update sub-areas. If so, proceed to the next step; if not, determine that the power supply and distribution area does not belong to the updateable area.
[0071] Determine the equipment update status value of the power supply and distribution area according to the number of updated power equipment and the distribution of different updated power equipment, and judge whether the equipment update status value of the power supply and distribution area meets the requirements, if yes, proceed to the next step, if not, determine that the power supply and distribution area does not belong to the updateable area;
[0072] Determine the user update status value of the power supply and distribution area according to the number of updated power users and the distribution of different updated power users, and judge whether the user update status value of the power supply and distribution area meets the requirements, if so, proceed to the next step, if not, determine that the power supply and distribution area does not belong to the updateable area;
[0073] The update status value of the power supply and distribution area is determined by weighting the user update status value and the device update status value, and the update status value is used to determine whether the power supply and distribution area is an updateable area.
[0074] S2: determining the credibility of map data of different updateable areas based on the similarity of different historical power grid maps of different updateable areas and the update processing time, and when determining that the updateable area belongs to the screening update area by using the map data credibility, proceeding to the next step;
[0075] Furthermore, the similarity of the historical power grid map includes the number of deviation sub-areas of the historical power grid map and the distribution of different deviation sub-areas.
[0076] Specifically, Figure 2 As shown, the method for determining the deviation sub-region is:
[0077] Dividing the historical power grid map into a plurality of sub-areas using a second preset area, and taking the sub-areas where the power grid map has deviations as deviation sub-areas;
[0078] The similarity of the historical power grid map is determined according to the proportion of the number of deviation sub-areas.
[0079] Specifically, Figure 3 As shown, the method for determining the credibility of the map data of the updateable area is:
[0080] Acquire the number of historical power grid maps of the updateable area, and determine the credibility of basic data of the updateable area in combination with update processing times of different historical power grid maps;
[0081] Determine the number of deviation sub-areas between different historical power grid maps through similar situations of different historical power grid maps, and determine the map credibility of the updateable area in combination with the distribution of different deviation sub-areas;
[0082] The map credibility of the updateable area is used to determine a compensation amount of the basic data credibility, and the map data credibility of the updateable area is determined based on the compensation amount and the basic data credibility.
[0083] Further, the credibility of the map data of the updateable area ranges from 0 to 1, wherein when the credibility of the map data of the updateable area is greater than a preset credibility threshold, the updateable area is determined to be a screening update area.
[0084] It should be noted that, when the power supply and distribution area does not belong to the screening and updating area, there is no need to update the power grid map, and the power grid map of the power supply and distribution area needs to be reconstructed.
[0085] In another embodiment, the method for determining the credibility of the map data of the updateable area is:
[0086] Determine whether there is a historical power grid map in the updateable area whose update processing time is within a preset time limit, if yes, proceed to the next step, if no, determine that the updateable area does not belong to the screening update area;
[0087] Obtain the number of historical power grid maps of the updateable area, and determine the credibility of the basic data of the updateable area in combination with the update processing time of different historical power grid maps, and judge whether the credibility of the basic data of the updateable area meets the requirements. If so, proceed to the next step; if not, determine that the updateable area does not belong to the screening update area;
[0088] Determine the number of deviation sub-areas between different historical power grid maps by similarity of different historical power grid maps, and determine the map information similarity between different historical power grid maps in combination with the distribution of different deviation sub-areas, and judge whether there is a historical power grid map whose map information similarity meets the requirements, if so, proceed to the next step, if not, determine that the updateable area does not belong to the screening update area;
[0089] The historical power grid map whose map information similarity meets the requirements is used as the screening power grid map, and the data credibility of the screening power grid map is determined according to the number of the screening power grid maps and the update processing time, and it is judged whether the data credibility of the screening power grid map meets the requirements. If so, proceed to the next step; if not, it is determined that the updateable area does not belong to the screening update area;
[0090] The number of deviation sub-areas between different historical power grid maps is determined through similarities of different historical power grid maps, and the map credibility of the updateable area is determined in combination with the distribution of different deviation sub-areas. The map credibility of the updateable area is used to determine the compensation amount of the basic data credibility, and the map data credibility of the updateable area is determined based on the compensation amount and the basic data credibility.
[0091] In another embodiment, the method for determining the credibility of the map data of the updateable area is:
[0092] Determine the number of deviation sub-areas between different historical power grid maps through similar situations of different historical power grid maps, and determine the map credibility of the updateable area in combination with the distribution of different deviation sub-areas, and judge whether the map credibility of the updateable area meets the requirements, if yes, proceed to the next step, if not, determine that the updateable area does not belong to the screening update area;
[0093] The number of deviation sub-areas between different historical power grid maps is determined by the similarity of different historical power grid maps, and the map information similarity between different historical power grid maps is determined in combination with the distribution of different deviation sub-areas. The historical power grid maps that meet the requirements of map information similarity are used as screening power grid maps, and it is determined whether there is a screening power grid map that meets the timeliness requirements. If so, the next step is entered; if not, it is determined that the updateable area does not belong to the screening update area;
[0094] Determine the data credibility of the screened power grid map according to the number of the screened power grid maps and the update processing time, and judge whether the data credibility of the screened power grid map meets the requirements. If yes, proceed to the next step; if no, determine that the updateable area does not belong to the screened update area;
[0095] The map credibility of the updateable area is used to determine a compensation amount of the basic data credibility, and the map data credibility of the updateable area is determined based on the compensation amount and the basic data credibility.
[0096] S3 determines the matching historical power grid diagram based on the screening and updating area, and determines the matching coefficients of different matching historical power grid diagrams and the candidate power grid diagrams of different screening and updating areas by using the similarities with other matching historical power grid diagrams and the parameter matching conditions of different types of power equipment;
[0097] Specifically, Figure 4 As shown, the method for determining the matching coefficient of the matching historical power grid diagram is:
[0098] Determine the number of deviation sub-areas between the matching historical power grid diagram and other matching historical power grid diagrams based on the similarity between the matching historical power grid diagram and other matching historical power grid diagrams, determine the map information similarity between the matching historical power grid diagram and other matching historical power grid diagrams in combination with the distribution of different deviation sub-areas, and determine the information credibility of the matching historical power grid diagram based on the map information similarity with other matching historical power grid diagrams;
[0099] Determine the number of different types of power equipment whose parameters meet the requirements based on the parameter conditions of different types of power equipment of the matching historical power grid diagram, and determine the parameter matching coefficient of the matching historical power grid diagram according to the number of different types of power equipment whose parameters meet the requirements;
[0100] The matching coefficient of the matching historical power grid diagram is determined by the information credibility of the matching historical power grid diagram and the parameter matching coefficient.
[0101] Furthermore, the value range of the matching coefficient of the matching historical power grid diagram is between 0 and 1, wherein when the matching coefficient of the matching historical power grid diagram meets the requirement, the matching historical power grid diagram is determined to be an alternative power grid diagram.
[0102] In another embodiment, the method for determining the matching coefficient of the matching historical power grid diagram is:
[0103] Determine the number of deviation sub-areas between the matching historical power grid diagram and other matching historical power grid diagrams based on the similarity between the matching historical power grid diagram and other matching historical power grid diagrams, and determine the map information similarity between the matching historical power grid diagram and other matching historical power grid diagrams in combination with the distribution of different deviation sub-areas, and judge whether the average value of the map information similarity with other matching historical power grid diagrams meets the requirements, if so, proceed to the next step, if not, determine that the matching historical power grid diagram does not belong to the candidate power grid diagram;
[0104] Determine the number of different types of power equipment whose parameters meet the requirements based on the parameter conditions of different types of power equipment of the matching historical power grid diagram, and judge whether the number of power equipment whose parameters meet the requirements meets the requirements, if so, proceed to the next step, if not, determine that the matching historical power grid diagram does not belong to the alternative power grid diagram;
[0105] Determine the information credibility of the matching historical power grid map based on the map information similarity with other matching historical power grid maps, and judge whether the information credibility of the matching historical power grid map meets the requirements, if so, proceed to the next step, if not, determine that the matching historical power grid map does not belong to the candidate power grid map;
[0106] Determine the parameter matching coefficient of the matching historical power grid diagram according to the number of different types of power equipment whose parameters meet the requirements, and judge whether the parameter matching coefficient of the matching historical power grid diagram meets the requirements, if so, proceed to the next step, if not, determine that the matching historical power grid diagram does not belong to the candidate power grid diagram;
[0107] The matching coefficient of the matching historical power grid diagram is determined by the information credibility of the matching historical power grid diagram and the parameter matching coefficient.
[0108] S4 generates multiple update processing schemes by combining alternative power grid maps of different screening update areas, and determines the optimal update processing scheme for constructing the power grid map of the screening update area according to the number of historical power grid maps involved in different update processing schemes and the matching coefficients of different screening update areas.
[0109] Specifically, the method for determining the update processing solution is:
[0110] Based on the candidate power grid diagrams of different screening and updating areas, the candidate processing schemes of different screening and updating areas are determined, and the candidate processing schemes of different screening and updating areas are combined to generate multiple update processing schemes.
[0111] Specifically, the method for determining the optimal update processing solution for constructing the power grid map of the screening update area is:
[0112] Obtaining the number of historical power grid maps involved in different update processing schemes, and determining the construction complexity of different update processing schemes in combination with the number of candidate power grid maps corresponding to the different historical power grid maps involved;
[0113] Determining the comprehensive matching degree of different update processing schemes through the matching coefficients of different screening update areas of the update processing schemes;
[0114] The comprehensive evaluation quantities of different update processing schemes are determined based on their comprehensive matching degrees and construction complexities, and the optimal update processing scheme for constructing the power grid map of the screening update area is determined using the comprehensive evaluation quantities.
[0115] Example 2
[0116] On the other hand, Figure 5 As shown, the present invention provides a power supply and distribution network diagram construction system, which adopts the above-mentioned power supply and distribution network diagram construction method, and is characterized in that it specifically includes:
[0117] Area screening module, update area screening module, alternative power grid diagram acquisition module, processing solution output module;
[0118] The regional screening module is responsible for dividing the urban distribution network into multiple power supply and distribution areas, and using the updated installation data of power equipment in different power supply and distribution areas and the updated data of power users to determine whether the power supply and distribution area is an updateable area;
[0119] The update area screening module is responsible for determining the map data credibility of different updateable areas based on the similarity of different historical power grid maps of different updateable areas and the update processing time, and using the map data credibility to determine whether the updateable area belongs to the screening update area;
[0120] The candidate power grid diagram acquisition module is responsible for determining the matching historical power grid diagram based on the screening and updating area, and determining the matching coefficients of different matching historical power grid diagrams and the candidate power grid diagrams of different screening and updating areas by using the similarities with other matching historical power grid diagrams and the parameter matching conditions of different types of power equipment;
[0121] The processing scheme output module is responsible for generating multiple update processing schemes by combining the alternative power grid maps of different screening update areas, and determining the optimal update processing scheme for constructing the power grid map of the screening update area based on the number of historical power grid maps involved in different update processing schemes and the matching coefficients of different screening update areas.
[0122] Through the above embodiments, the present application achieves the following technical effects:
[0123] 1. In the present invention, the update installation data of power equipment in different power supply and distribution areas and the update data of power users are used to determine whether the power supply and distribution area is an updateable area, thereby realizing the screening of updateable areas from two perspectives of the update installation status of power equipment and the update status of power users, avoiding the emergence of technical problems such as high update complexity caused by more updates of power equipment and power users, and ensuring the reliability of update processing.
[0124] 2. In the present invention, the optimal update processing scheme for constructing the power grid map of the screening update area is determined according to the number of historical power grid maps involved in different update processing schemes and the matching coefficients of different screening update areas. This not only takes into account the differences in update processing complexity of the update processing schemes due to the differences in the number of historical power grid maps involved, but also takes into account the matching conditions of the historical power grid maps of different update processing schemes by further combining the matching coefficients of the screening update areas, thereby realizing the screening of the optimal update processing scheme from multiple angles.
[0125] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device, equipment, and non-volatile computer storage medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0126] The above is a description of a specific embodiment of the specification. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0127] The above description is only one or more embodiments of this specification and is not intended to limit this specification. For those skilled in the art, one or more embodiments of this specification may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of one or more embodiments of this specification shall be included in the scope of the claims of this specification.
Claims
1. A method for constructing a power supply and distribution network diagram, It is characterized in that Specifically include: Divide the urban distribution network into multiple power supply and distribution areas, and when the power supply and distribution area is determined to be an updateable area by using the updated installation data of the power equipment in different power supply and distribution areas and the updated data of the power users, proceed to the next step; Determine the credibility of map data of different updateable areas based on the similarity of different historical power grid maps of different updateable areas and the update processing time, and when it is determined by using the map data credibility that the updateable area belongs to the screening update area, proceed to the next step; Determine the matching historical power grid diagram based on the screening and updating area, and determine the matching coefficients of different matching historical power grid diagrams and the candidate power grid diagrams of different screening and updating areas by using the similarities with other matching historical power grid diagrams and the parameter matching conditions of different types of power equipment; Generating multiple update processing schemes by combining candidate power grid maps of different screening update areas, and determining the optimal update processing scheme for constructing the power grid map of the screening update area according to the number of historical power grid maps involved in different update processing schemes and the matching coefficients of different screening update areas; Determining the power supply and distribution area as an updateable area specifically includes: Determine the updated power equipment in the power supply and distribution area by using the updated installation data, and judge whether the number of updated power equipment in the power supply and distribution area meets the requirement, if yes, proceed to the next step, if no, determine that the power supply and distribution area does not belong to the updateable area; Determine updated power users in the power supply and distribution area by using the updated data of the power users, and judge whether the number of updated power users in the power supply and distribution area meets the requirement, if so, proceed to the next step, if not, determine that the power supply and distribution area does not belong to the updateable area; Determine the equipment update status value of the power supply and distribution area according to the number of updated power equipment and the distribution of different updated power equipment, and judge whether the equipment update status value of the power supply and distribution area meets the requirements, if yes, proceed to the next step, if not, determine that the power supply and distribution area does not belong to the updateable area; Determine the user update status value of the power supply and distribution area according to the number of updated power users and the distribution of different updated power users, and judge whether the user update status value of the power supply and distribution area meets the requirements, if so, proceed to the next step, if not, determine that the power supply and distribution area does not belong to the updateable area; Determining the update status value of the power supply and distribution area by weighting the user update status value and the device update status value, and determining whether the power supply and distribution area is an updateable area by using the update status value; The method for determining the matching coefficient of the matching historical power grid diagram is: Determine the number of deviation sub-areas between the matching historical power grid diagram and other matching historical power grid diagrams based on the similarity between the matching historical power grid diagram and other matching historical power grid diagrams, determine the map information similarity between the matching historical power grid diagram and other matching historical power grid diagrams in combination with the distribution of different deviation sub-areas, and determine the information credibility of the matching historical power grid diagram based on the map information similarity with other matching historical power grid diagrams; Determine the number of different types of power equipment whose parameters meet the requirements based on the parameter conditions of different types of power equipment of the matching historical power grid diagram, and determine the parameter matching coefficient of the matching historical power grid diagram according to the number of different types of power equipment whose parameters meet the requirements; Determining a matching coefficient of the matching historical power grid diagram according to the information credibility of the matching historical power grid diagram and the parameter matching coefficient; The value range of the matching coefficient of the matching historical power grid diagram is between 0 and 1, wherein when the matching coefficient of the matching historical power grid diagram meets the requirement, the matching historical power grid diagram is determined as an alternative power grid diagram; The method for determining the credibility of the map data of the updateable area is: Acquire the number of historical power grid maps of the updateable area, and determine the credibility of basic data of the updateable area in combination with update processing times of different historical power grid maps; Determine the number of deviation sub-areas between different historical power grid maps through similar situations of different historical power grid maps, and determine the map credibility of the updateable area in combination with the distribution of different deviation sub-areas; Determine the compensation amount of the basic data credibility by using the map credibility of the updateable area, and determine the map data credibility of the updateable area based on the compensation amount and the basic data credibility; The credibility of the map data of the updateable area ranges from 0 to 1, wherein when the credibility of the map data of the updateable area is greater than a preset credibility threshold, the updateable area is determined to be a screening update area; When the power supply and distribution area does not belong to the screening and updating area, there is no need to update the power grid map, and the power grid map of the power supply and distribution area is rebuilt; The method for determining the optimal update processing scheme for constructing the power grid map of the screening update area is: Obtaining the number of historical power grid maps involved in different update processing schemes, and determining the construction complexity of different update processing schemes in combination with the number of candidate power grid maps corresponding to the different historical power grid maps involved; Determining the comprehensive matching degree of different update processing schemes through the matching coefficients of different screening update areas of the update processing schemes; The comprehensive evaluation quantities of different update processing schemes are determined based on their comprehensive matching degrees and construction complexities, and the optimal update processing scheme for constructing the power grid map of the screening update area is determined using the comprehensive evaluation quantities.
2. The method for constructing a power supply and distribution network diagram according to claim 1, It is characterized in that The urban distribution network is divided into multiple power supply and distribution areas, including: The urban distribution network is divided into equal intervals based on a preset area to obtain a division result, and a plurality of power supply and distribution areas are obtained using the division result.
3. The method for constructing a power supply and distribution network diagram according to claim 1, It is characterized in that The updated installation data of the electric power equipment is determined according to the update time of the historical power grid map corresponding to the power supply and distribution area, and specifically determined according to the updated installation status of the electric power equipment after the updated time.
4. The method for constructing a power supply and distribution network diagram according to claim 1, It is characterized in that Determining whether the power supply and distribution area is an updateable area by using the update status value specifically includes: When the update status value of the power supply and distribution area is not less than a preset update threshold, it is determined that the power supply and distribution area does not belong to an updateable area.
5. The method for constructing a power supply and distribution network diagram according to claim 1, It is characterized in that The similarity of the historical power grid map includes the number of deviation sub-areas of the historical power grid map and the distribution of different deviation sub-areas.
6. The method for constructing a power supply and distribution network diagram according to claim 1, It is characterized in that The method for determining the deviation sub-region is: Dividing the historical power grid map into a plurality of sub-areas using a second preset area, and taking the sub-areas where the power grid map has deviations as deviation sub-areas; The similarity of the historical power grid map is determined according to the proportion of the number of deviation sub-areas.
7. A system for constructing a power supply and distribution network diagram, using a method for constructing a power supply and distribution network diagram according to any one of claims 1 to 6, It is characterized in that Specifically include: Area screening module, update area screening module, alternative power grid diagram acquisition module, processing solution output module; The regional screening module is responsible for dividing the urban distribution network into multiple power supply and distribution areas, and using the updated installation data of power equipment in different power supply and distribution areas and the updated data of power users to determine whether the power supply and distribution area is an updateable area; The update area screening module is responsible for determining the map data credibility of different updateable areas based on the similarity of different historical power grid maps of different updateable areas and the update processing time, and using the map data credibility to determine whether the updateable area belongs to the screening update area; The candidate power grid diagram acquisition module is responsible for determining the matching historical power grid diagram based on the screening and updating area, and determining the matching coefficients of different matching historical power grid diagrams and the candidate power grid diagrams of different screening and updating areas by using the similarities with other matching historical power grid diagrams and the parameter matching conditions of different types of power equipment; The processing scheme output module is responsible for generating multiple update processing schemes by combining the alternative power grid maps of different screening update areas, and determining the optimal update processing scheme for constructing the power grid map of the screening update area based on the number of historical power grid maps involved in different update processing schemes and the matching coefficients of different screening update areas.