A three-dimensional mineralization prediction method and system for ore body data based on GOCAD software

Through GOCAD software and Bayesian analysis, combined with geological and geochemical data, a three-dimensional model is generated, which solves the problems of inaccurate ore body prediction and poor universality in the existing technology, and achieves more efficient ore body mineralization prediction.

CN118469740BActive Publication Date: 2024-10-25CHENGDU UNIVERSITY OF TECHNOLOGY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410910693.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-10-25
Estimated Expiration
2044-07-09

AI Technical Summary

Technical Problem

The existing ore body prediction system requires multi-faceted data survey when predicting unknown areas, and lacks universality, resulting in difficulty in artificially obtaining engineering information and inaccurate predictions.

Method used

The three-dimensional mineralization prediction method of ore body data based on GOCAD software is used to establish a geological surface model and a three-dimensional grid model by acquiring geological data, combine the geochemical data to generate a three-dimensional geological model, and use Bayesian analysis to calculate the probability of mineralization, reducing artificial Exploration error.

Benefits of technology

It improves the accuracy of ore body prediction, reduces the time spent on manual exploration data, and enhances the system's universality and prediction accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118469740B_ABST
    Figure CN118469740B_ABST
Patent Text Reader

Abstract

The invention discloses a three-dimensional mineralization prediction method and system for ore body data based on GOCAD software. The invention relates to the technical field of ore body prediction, and solves the technical problem that engineering information other than data needs to be acquired artificially, is not universal, and has errors in artificial exploration and prediction. The invention generates a geological surface model and a three-dimensional grid model by performing comprehensive modeling and analysis on geological data of an application area, further generates a geological grid model based on the two, and generates a geological three-dimensional model by comprehensively acquiring geochemical data. The application area is analyzed as a whole through the geological three-dimensional model to reduce the time spent on artificial exploration data. Secondly, the mineralization probability of the application area is analyzed through the geological three-dimensional model, and Bayesian probability analysis is used for comprehensive analysis to reduce the error of artificial exploration prediction and improve the accuracy of the overall prediction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of ore body prediction, and in particular to a three-dimensional mineralization prediction method and system for ore body data based on GOCAD software. Background Art

[0002] Exploration geochemical methods are an important means of geological prospecting. Its basic idea is to use highly efficient geochemical exploration methods to quickly narrow the prospecting target area. The application of geochemical exploration is gradually expanding. It can not only be used for prospecting, but also provide valuable information for solving environmental pollution, agriculture, animal husbandry, endemic diseases and various geological problems. In recent years, with the widespread application of three-dimensional geological modeling technology, exploration geochemical data has also expanded from two-dimensional applications to three-dimensional space.

[0003] Some existing ore prediction systems require multi-faceted data surveys when predicting unknown areas. Except for surface data with clear three-dimensional spatial coordinates, the rest of the projects are recorded by cataloguing personnel using corresponding methods to the specific locations of the projects. Professional software or cumbersome calculations are required to obtain the three-dimensional coordinates, which is not universal. At the same time, manual surveys and ore predictions may lead to inaccurate predictions. Summary of the invention

[0004] In view of the shortcomings of the prior art, the present invention provides a three-dimensional mineralization prediction method and system for ore body data based on GOCAD software, which solves the problem that engineering information other than data needs to be manually acquired, is not universal, and there are errors in manual exploration and prediction.

[0005] To achieve the above purpose, the present invention is implemented by the following technical scheme: a three-dimensional mineralization prediction method of ore body data based on GOCAD software, step one: determine the area to be applied, and obtain geological data of the area to be applied, and establish a geological surface model and a three-dimensional grid model based on the acquired geological data of the area to be applied, and generate a geological grid model by integrating the two, and the specific establishment method is as follows:

[0006] The geological data obtained specifically refer to the rock type, stratum thickness, element content and isotope ratio of the area to be applied. The determination of the application area is based on the actual exploration situation and is determined by professional geologists.

[0007] Detailed geological maps, exploration line profiles and mid-section plans, surface and prospecting engineering geochemical data.

[0008] Based on GOCAD software, a 3D grid model is constructed on demand according to the scope of the acquired geological data. In the actual construction, the visual SLAM (Simultaneous Localization and Mapping) technology and the depth camera can be combined to extract point cloud information from the environment to construct an accurate 3D model.

[0009] Based on GOCAD software, a geological surface model of the area to be applied is constructed according to the scope of geological data. In the process of establishing the geological surface model, the acquired geological data needs to be cleaned. The specific cleaning methods are as follows:

[0010] All geological data and their corresponding data formats are obtained, and the data format here represents the scale for obtaining geological data. Then a standard data format is obtained, and the geological data is standardized in the standard data format to obtain cleaned geological data. At the same time, a model is constructed based on the obtained cleaned geological data to obtain a geological surface model.

[0011] The obtained geological surface model is intersected with the three-dimensional grid model to obtain a geological grid model, and the specific intersecting method includes the following steps:

[0012] Ensure that the data formats of the geological surface model and the 3D grid model are compatible and have been imported into the corresponding modeling software;

[0013] Positioning two models in 3D space so that they are aligned in the correct position and orientation for accurate intersection;

[0014] Run the cutting tool or algorithm, which will calculate the intersection of the two models and generate a new model that represents the intersection of the geological surface model and the three-dimensional grid model to obtain a geological grid model.

[0015] Step 2: Obtain the geological grid model and geochemical data, and combine them to generate a geological 3D model based on discrete smooth difference. The specific establishment method is as follows:

[0016] According to the geological grid model of the area to be applied, the distribution density of geochemical elements and the occurrence characteristics of the ore body, the size of each grid in the geological grid model is determined, and then the geochemical data is interpolated by DSI using professional geoscience modeling software (such as GeoSoong or Surpac) to obtain interpolation data, and the interpolation data obtained by DSI interpolation is assigned to the geological grid model to obtain a geological three-dimensional model. Specifically, in the process of interpolating geochemical data, a three-dimensional distribution model representing the concentration of chemical elements or compounds will be generated, and the geological three-dimensional model will be verified using independent geochemical sample data or other auxiliary information, and the interpolation parameters will be adjusted as needed.

[0017] Step 3: Obtain the mineralization information of the area to be applied based on the established geological three-dimensional model, and perform Bayesian analysis on the mineralization information to obtain the mineralization probability. The specific method of analyzing the mineralization probability is as follows:

[0018] Based on the geological unit model, the mineralization information of the area to be applied is obtained, and the mineralization information includes the geochemical composition and geological values ​​of the area to be applied, and the geochemical composition includes the type of element, element content and isotope ratio, and the chemical composition value of the area to be applied is calculated according to the geochemical composition, and the specific calculation method is as follows:

[0019] All elements are labeled as a, where a=1, 2, ..., n, and then the element content corresponding to element a is obtained and recorded as Ga. The element content here is obtained by predicting and estimating after sampling and analysis, and the isotope ratio corresponding to element a is obtained and recorded as Za. The isotope ratio represents the relative abundance ratio of different isotopes in an element, usually expressed as the ratio of heavy isotopes to light isotopes.

[0020] Then substitute the obtained element content Ga and isotope ratio Za into the formula The chemical composition value Q of the area to be applied is calculated, where Gp is ​​the mean value of all element contents, Zp is the mean value of all element isotope ratios, and e is a natural constant;

[0021] Then the geological values ​​are analyzed and calculated, and the specific analysis and calculation methods are as follows:

[0022] Obtain the rock type in the area to be applied, record it as b, and classify the rock type b to obtain mineralized rock b1 and non-mineralized rock b2. Then obtain the stratum thickness in the area to be applied, record it as L, and substitute the obtained rock type b and stratum thickness L into the formula The geological value W of the area b to be applied is calculated, and θ is the preset proportional coefficient;

[0023] The chemical composition Q and geological value W are calculated by Bayesian probability to obtain the mineralization probability, and the specific calculation method is as follows:

[0024] Substitute the obtained parameters into the formula The mineralization probability P is calculated.

[0025] Step 4: Compare the calculated mineralization probability to determine the mineralization results of the area to be applied, and the specific comparison method is as follows:

[0026] Obtain the preset value of mineralization probability Py, and compare the two. When P≥Py, it means that there is mineralization possibility in the application area, and mineralization information is generated. On the contrary, when P<Py, it means that there is no mineralization possibility in the application area, and mineralization information is generated. The mineralization result is generated by combining the two.

[0027] Beneficial Effects

[0028] The present invention provides a three-dimensional mineralization prediction method and system for ore body data based on GOCAD software. Compared with the prior art, it has the following beneficial effects:

[0029] The present invention generates a geological surface model and a three-dimensional grid model by performing comprehensive modeling and analysis on the geological data of the application area, further generates a geological grid model based on the two, and generates a geological three-dimensional model by comprehensively acquiring geochemical data. The application area is analyzed as a whole through the geological three-dimensional model to reduce the time spent on manual exploration data. Secondly, the mineralization probability of the application area is analyzed through the geological three-dimensional model, and a comprehensive analysis is performed using Bayesian probability analysis to reduce the error of manual exploration prediction and improve the accuracy of the overall prediction. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 is a flow chart of the method of the present invention;

[0031] Figure 2 This is a block diagram of the system principle of the present invention. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] For example, see Figure 1 The present application provides a three-dimensional mineralization prediction method for ore body data based on GOCAD software, which specifically includes the following steps:

[0034] Step 1: Determine the area to be applied, obtain the geological data of the area to be applied, and establish a geological surface model and a three-dimensional grid model based on the geological data of the area to be applied, and combine the two to generate a geological grid model. The specific establishment method is as follows:

[0035] The geological data obtained specifically refer to the rock type, stratum thickness, element content and isotope ratio of the area to be applied. The determination of the application area is based on the actual exploration situation and is determined by professional geologists.

[0036] Detailed geological maps, exploration line profiles and mid-section plans, surface and prospecting engineering geochemical data.

[0037] Based on GOCAD software, a 3D grid model is constructed on demand according to the scope of the acquired geological data. In the actual construction, the visual SLAM (Simultaneous Localization and Mapping) technology and the depth camera can be combined to extract point cloud information from the environment to construct an accurate 3D model.

[0038] Based on GOCAD software, a geological surface model of the area to be applied is constructed according to the scope of geological data. In the process of establishing the geological surface model, the acquired geological data needs to be cleaned. The specific cleaning methods are as follows:

[0039] All geological data and their corresponding data formats are obtained, and the data format here represents the scale for obtaining geological data. Then a standard data format is obtained, and the geological data is standardized in the standard data format to obtain cleaned geological data. At the same time, a model is constructed based on the obtained cleaned geological data to obtain a geological surface model.

[0040] Specifically, we first collect all relevant geological data in the study area, including topographic surveys, drilling records, stratigraphic information, rock physical properties, etc., use GIS (geographic information system) and other professional software to process the geological data, generate digital elevation models (DEMs), geological layers, and surface coverage maps, and finally, use three-dimensional visualization technology to present the geological surface model in a graphical interface.

[0041] The obtained geological surface model is intersected with the three-dimensional grid model to obtain a geological grid model, and the specific intersecting method includes the following steps:

[0042] Ensure that the data formats of the geological surface model and the 3D grid model are compatible and have been imported into the corresponding modeling software;

[0043] Positioning two models in 3D space so that they are aligned in the correct position and orientation for accurate intersection;

[0044] Run the cutting tool or algorithm, which will calculate the intersection of the two models and generate a new model that represents the intersection of the geological surface model and the three-dimensional grid model to obtain a geological grid model.

[0045] Step 2: Obtain the geological grid model and geochemical data, and combine them to generate a geological 3D model based on discrete smooth difference. The specific establishment method is as follows:

[0046] According to the geological grid model of the area to be applied, the distribution density of geochemical elements and the occurrence characteristics of the ore body, the size of each grid in the geological grid model is determined, and then the geochemical data is interpolated by DSI using professional geoscience modeling software (such as GeoSoong or Surpac) to obtain interpolation data, and the interpolation data obtained by DSI interpolation is assigned to the geological grid model to obtain a geological three-dimensional model. Specifically, in the process of interpolating geochemical data, a three-dimensional distribution model representing the concentration of chemical elements or compounds will be generated, and the geological three-dimensional model will be verified using independent geochemical sample data or other auxiliary information, and the interpolation parameters will be adjusted as needed.

[0047] Step 3: Obtain the mineralization information of the area to be applied based on the established geological three-dimensional model, and perform Bayesian analysis on the mineralization information to obtain the mineralization probability. The specific method of analyzing the mineralization probability is as follows:

[0048] Based on the geological unit model, the mineralization information of the area to be applied is obtained, and the mineralization information includes the geochemical composition and geological values ​​of the area to be applied, and the geochemical composition includes the type of element, element content and isotope ratio, and the chemical composition value of the area to be applied is calculated according to the geochemical composition, and the specific calculation method is as follows:

[0049] All elements are labeled as a, where a=1, 2, ..., n, and then the element content corresponding to element a is obtained and recorded as Ga. The element content here is obtained by predicting and estimating after sampling and analysis, and the isotope ratio corresponding to element a is obtained and recorded as Za. The isotope ratio represents the relative abundance ratio of different isotopes in an element, usually expressed as the ratio of heavy isotopes to light isotopes.

[0050] Then substitute the obtained element content Ga and isotope ratio Za into the formula The chemical composition value Q of the area to be applied is calculated, where Gp is ​​the mean value of all element contents, Zp is the mean value of all element isotope ratios, and e is a natural constant;

[0051] Then the geological values ​​are analyzed and calculated, and the specific analysis and calculation methods are as follows:

[0052] Obtain the rock type in the area to be applied, record it as b, and classify the rock type b to obtain mineralized rock b1 and non-mineralized rock b2. Then obtain the stratum thickness in the area to be applied, record it as L, and substitute the obtained rock type b and stratum thickness L into the formula The geological value W of the area b to be applied is calculated, and θ is the preset proportional coefficient;

[0053] The chemical composition Q and geological value W are calculated by Bayesian probability to obtain the mineralization probability, and the specific calculation method is as follows:

[0054] Substitute the obtained parameters into the formula The mineralization probability P is calculated.

[0055] Step 4: Compare the calculated mineralization probability to determine the mineralization results of the area to be applied, and the specific comparison method is as follows:

[0056] Obtain the preset value of mineralization probability Py, and compare the two. When P≥Py, it means that there is mineralization possibility in the application area, and mineralization information is generated. On the contrary, when P<Py, it means that there is no mineralization possibility in the application area, and mineralization information is generated. The mineralization result is generated by combining the two.

[0057] For example 2, please refer to Figure 2 A three-dimensional mineralization prediction system for ore body data based on GOCAD software, the system includes: a geological information acquisition unit, a geological surface model construction unit, a three-dimensional model establishment unit, a data mineralization analysis unit and a mineralization information output unit.

[0058] A geological information acquisition unit is used to acquire geological information of the application area and transmit the acquired geological information to a geological surface model building unit;

[0059] The geological surface model building unit is used to build a three-dimensional grid model and a geological surface model for the application area according to the acquired geological information, and to generate a geological grid model by intersecting the two, and at the same time transmit the generated geological grid model to the three-dimensional model building unit.

[0060] The three-dimensional model building unit is used to generate a geological three-dimensional model based on the acquired geological grid model and the integrated geochemical data according to the discrete smooth difference, and transmit the geological three-dimensional model to the data mineralization analysis unit;

[0061] The data mineralization analysis unit is used to obtain the chemical composition value and geological value of the area to be applied according to the geological three-dimensional model, and obtain the mineralization probability value of the area to be applied based on the Bayesian probability calculation, and at the same time compare the mineralization probability values ​​to generate mineralization results, and then transmit the mineralization results to the mineralization information output unit;

[0062] The mineralization information output unit is used to display the acquired mineralization results to the operator.

[0063] Embodiment 3, as the embodiment 3 of the present invention, focuses on combining the implementation processes of embodiment 1 and embodiment 2 for implementation.

[0064] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.

[0065] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. A three-dimensional mineralization prediction method for ore body data based on GOCAD software, characterized in that: The method comprises the following steps: Step 1: Obtain geological data of the area to be applied, and establish a geological surface model and a three-dimensional grid model based on the geological data of the area to be applied, and intersect the two models to obtain a geological grid model of the area to be applied. The specific method of generating the geological surface model and the three-dimensional grid model is as follows: Based on GOCAD software, combined with visual technology and depth cameras, point cloud information is extracted from the environment to build an accurate 3D model; Based on GOCAD software, the acquired geological data of the area to be applied are cleaned to obtain cleaned geological data, and a three-dimensional visualization analysis is performed based on the cleaned geological data to obtain a geological surface model; And the specific method of generating the geological grid model is: Import the geological surface model and the 3D grid model with compatible data formats into the modeling software, align the position and direction of the two models in 3D space, run the cutting tool or algorithm, calculate the intersection of the two models to generate the geological grid model; Step 2: Obtain geochemical data of the area to be applied, and combine the geological grid model to obtain a geological three-dimensional model by comprehensive analysis of the two based on discrete smooth difference. The specific method of generating the geological three-dimensional model is as follows: According to the geological grid model of the area to be applied, the distribution density of geochemical elements and the occurrence characteristics of the ore body, the size of each grid in the geological grid model is determined, and then the geochemical data is interpolated by DSI using the geoscience modeling software to obtain interpolation data, and the interpolation data obtained by DSI interpolation is assigned to the geological grid model to obtain a geological three-dimensional model; Step 3: Obtain the mineralization information of the area to be applied based on the established geological three-dimensional model, and calculate the chemical composition value and geological value in the mineralization information. At the same time, perform Bayesian analysis based on the chemical composition value and geological value to obtain the mineralization probability. The chemical composition value and geological value are calculated in the following way: S1: Label all elements in the application area as a, where a = 1, 2, ..., n, then obtain the element content corresponding to element a as Ga, and obtain the isotope ratio corresponding to element a as Za, and substitute the two into the formula The chemical composition value Q of the area to be applied is calculated, where Gp is ​​the mean value of all element contents, Zp is the mean value of all element isotope ratios, and e is a natural constant; S2: Obtain the rock type in the area to be applied, record it as b, and classify the rock type b to obtain mineralized rock b1 and non-mineralized rock b2. Then obtain the stratum thickness in the area to be applied, record it as L, and substitute the obtained rock type b and stratum thickness L into the formula The geological value W of the area b to be applied is calculated, and θ is the preset proportional coefficient; The specific method for calculating the probability of mineralization based on geological values ​​and chemical composition values ​​is as follows: The chemical composition Q and geological value W are calculated by Bayesian probability to obtain the mineralization probability. The calculation formula is: The mineralization probability P is calculated; Step 4: Compare the obtained mineralization probabilities and determine the mineralization results in the area to be applied.

2. A three-dimensional mineralization prediction method for ore body data based on GOCAD software according to claim 1, characterized in that: The specific method of comparing the mineralization probability and generating the mineralization result in step 4 is as follows: Obtain the preset value Py of the mineralization probability, and compare the mineralization probability P with Py. When P≥Py, generate possible mineralization information. Otherwise, when P is less than Py, generate impossible mineralization information.