An information management system based on comprehensive utilization of municipal lighting facilities
Through real-time monitoring and one-dimensional convolutional neural network to identify abnormal patterns, combined with sparse coding and stochastic gradient descent algorithms to optimize energy distribution, it solves the problem of low response efficiency of traditional municipal lighting facility management systems under complex faults and environmental changes, and achieves high efficiency The effect of usability and reducing operating costs.
Patent Information
- Application Number
- CN202410920476.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-07-10
AI Technical Summary
Traditional municipal lighting facility management systems lack in-depth data analysis and prediction capabilities, resulting in inefficient response in complex or non-standard fault situations, increasing unnecessary maintenance costs and energy waste, especially during dramatic weather changes or special events. Inability to fully utilize energy increases operating costs.
The data collection and analysis module is used to monitor current and voltage parameters in real time, identify abnormal patterns through a one-dimensional convolutional neural network, optimize energy distribution using sparse coding technology, and use stochastic gradient descent algorithms to adjust lighting equipment status and energy distribution plans to match environmental changes. , optimize lighting facility management performance.
It achieves instant identification of potential faults, improves fault prediction accuracy and response speed, significantly reduces energy waste, improves overall energy efficiency and lighting facility management performance, dynamically adapts to environmental changes, and reduces operating costs.
Smart Images

Figure CN118485280B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of lighting management, and in particular to an information management system based on the comprehensive utilization of municipal lighting facilities. Background Art
[0002] The field of lighting management technology mainly involves the use of information technology and communication technology to control and optimize the operation of lighting systems, including automated control systems, sensor technology, and data analysis and management software, aiming to improve lighting efficiency and reduce energy consumption. By integrating intelligent dimming, timing control, remote monitoring and maintenance functions, it can achieve refined management while supporting environmental sustainable development goals.
[0003] Among them, the information management system based on the comprehensive utilization of municipal lighting facilities is a management system that uses information technology to integrate and optimize municipal lighting facilities. The purpose of this system is to monitor and control the city's lighting equipment through a centralized management platform to achieve energy efficiency optimization and cost reduction. Its uses include but are not limited to automatically adjusting the brightness of street lighting, adjusting lighting according to actual needs and weather conditions, and performing fault detection and preventive maintenance.
[0004] The traditional system lacks in-depth data analysis and prediction capabilities, which limits the system's response efficiency in complex or non-standard fault situations, leading to misunderstanding of equipment problems, unnecessary maintenance costs and energy waste. The traditional system also has deficiencies in real-time data analysis and immediate response capabilities, especially when dynamically adjusting lighting intensity to adapt to changing urban needs. The lack of flexibility leads to inefficiency and waste of resources in emergency or uncommon situations, which is particularly prominent during drastic weather changes or special events, and energy cannot be fully utilized, increasing operating costs. Summary of the invention
[0005] The purpose of the present invention is to solve the shortcomings of the prior art and to propose an information management system based on the comprehensive utilization of municipal lighting facilities.
[0006] In order to achieve the above-mentioned purpose, the present invention adopts the following technical solution: an information management system based on the comprehensive utilization of municipal lighting facilities, the system comprising:
[0007] The data collection and analysis module continuously collects current and voltage parameters based on real-time monitoring of municipal lighting equipment, compares them with historical data, determines whether the parameter deviation exceeds the threshold, and generates current and voltage deviation indicators;
[0008] The feature extraction and anomaly detection module applies a one-dimensional convolutional neural network based on the current and voltage deviation indicators to extract features from the current and voltage data, identify abnormal patterns in the data, and obtain abnormal signal indicators;
[0009] The energy optimization allocation module calculates the energy demand of the lighting node based on the abnormal signal indicator and real-time monitoring data using sparse coding technology, adjusts the energy allocation, optimizes the lighting efficiency, and generates an adjusted energy configuration;
[0010] Based on the adjusted energy configuration, the learning and feedback module uses a stochastic gradient descent algorithm to adjust the state prediction process and energy allocation plan of the lighting equipment to match environmental changes, and continuously monitors and evaluates the management performance of the lighting facilities to obtain management performance optimization results.
[0011] The present invention is improved in that the steps of collecting the current and voltage parameters are specifically as follows:
[0012] Based on the real-time monitoring of municipal lighting equipment, the data collection frequency is set to once per minute to obtain the collection frequency;
[0013] According to the set collection frequency, sensors are used to collect current and voltage data of municipal lighting equipment in real time, using the formula:
[0014] ,
[0015] Get real-time current and voltage data, where: is the data at time t, and are the current and voltage values at time t, and is the adjustment factor of current and voltage, is the normalization factor, is the emphasis of current on voltage;
[0016] The current and voltage data collected every minute are integrated into a continuous data stream using the formula:
[0017] ,
[0018] Obtain the continuous data stream S during the monitoring period, where T is the total acquisition time length, is the data collected every minute. is the time decay factor, and t is each time point in the time series.
[0019] The present invention is improved in that the steps of obtaining the current and voltage deviation index are specifically as follows:
[0020] Based on the collected current and voltage parameters, the current and voltage deviations at each time point are calculated using the formula:
[0021] ,
[0022] Get real-time deviation ,in, and are the average current and voltage of historical data respectively, and are the weight coefficients of current and voltage, and is the smoothing factor, is the current data, is the voltage data;
[0023] According to the set threshold T, judge the real-time deviation Whether it exceeds the threshold, the threshold setting adopts a dynamic adjustment method based on the historical deviation standard deviation:
[0024] ,
[0025] in, is the standard deviation of the historical deviation data, and is the adjustment factor, The baseline used to adjust the threshold, Used to enhance the threshold's responsiveness to deviations. , the data at that time point is marked as abnormal, and a current and voltage deviation index is generated.
[0026] The present invention is improved in that the feature extraction step of the current and voltage data is specifically as follows:
[0027] Based on the current and voltage deviation indicators, a one-dimensional convolutional neural network is applied to the real-time current and voltage data:
[0028] ,
[0029] Get feature data ,in, Indicates at time The current and voltage data pairs, is the convolution kernel weight, It is with time is the associated adjustment factor, b is the bias term, is the regularization constant to avoid overfitting, ReLU is the activation function, and k is the convolution window size;
[0030] For the feature data obtained from the convolution operation Normalize using the formula:
[0031] ,
[0032] Get the extracted feature data ,in, and The characteristic data are The minimum and maximum values of and is the regulating factor.
[0033] The present invention is improved in that the step of obtaining the abnormal signal indicator is specifically as follows:
[0034] Based on the extracted current and voltage characteristic data, a standardized score is calculated using the formula:
[0035] ,
[0036] in, It is feature data The mean of is the standard deviation, and are the minimum and maximum values of the feature data, respectively. and is an adjustment factor used to optimize the calculation accuracy;
[0037] Use the threshold to determine whether it is abnormal, using the formula:
[0038] ,
[0039] Obtain judgment results ,in, is the set sensitivity threshold, is the multiplication factor that optimizes the threshold sensitivity;
[0040] like , the data at the marked time point is abnormal, and the abnormal signal indicator is recorded or generated :
[0041] ,
[0042] in, is the labeling intensity factor used to optimize the representation of abnormal signals.
[0043] The present invention is improved in that the step of calculating the energy demand of the lighting node is specifically:
[0044] Collect real-time data from each lighting node, including current light intensity, usage time, and ambient light conditions;
[0045] Based on the abnormal signal indicators, combined with real-time data, the energy demand of each node is calculated , using the formula:
[0046] ,
[0047] in, is the basic power requirement of node i, is the additional power requirement adjusted according to the abnormal signal indicator, and is the adjustment factor, is a nonlinear exponent used to adjust for the effect of additional power demand, is the abnormal signal indicator of node i, and n is the total number of lighting nodes.
[0048] The present invention is improved in that the step of obtaining the adjusted energy configuration is specifically:
[0049] According to the energy demand of the lighting node, sparse coding technology is used to adjust energy distribution and optimize lighting efficiency, using the formula:
[0050] ,
[0051] Get adjusted energy configuration ,in, is the energy requirement for node i computation, is the energy allocation proportional factor, reflecting the criticality of node i, is the regulating factor, is the demand difference of node i, is the demand threshold, is an exponent used to adjust the strength and response speed of the function.
[0052] The present invention is improved in that the steps of obtaining the management performance optimization result are specifically as follows:
[0053] Based on the adjusted energy configuration, the state prediction process of the lighting device is adjusted using the stochastic gradient descent algorithm, using the formula:
[0054] ,
[0055] Get new parameter values of the prediction model ,in, is the parameter value of the previous step, is the learning rate, is the loss function J for The partial derivative of is the regularization coefficient, is the strength adjustment factor of the regularization term;
[0056] Update the energy allocation plan according to environmental changes, using the formula:
[0057] ,
[0058] is the energy configuration adjusted according to environmental changes, where is the basic energy configuration, D is the difference between demand and preset demand, is to adjust the threshold, It is to adjust the intensity and control the degree of impact of demand differences;
[0059] Continuously monitor and evaluate the management performance of lighting facilities, using the formula for performance evaluation:
[0060] ,
[0061] Obtain management performance optimization results ,in, is the performance index of the i-th lighting node, n is the total number of nodes, is a weighted index for performance evaluation.
[0062] Compared with the prior art, the advantages and positive effects of the present invention are:
[0063] In the present invention, real-time monitoring and accurate analysis of current and voltage parameters of municipal lighting equipment and comparison with historical data allow the system to instantly detect slight changes in operating status, identify potential faults in a timely manner, and improve the accuracy and response speed of fault prediction. The application of one-dimensional convolutional neural networks makes the identification of abnormal patterns more accurate and effectively supports the parsing of complex data patterns. Sparse coding technology realizes the regulation of energy demand of lighting nodes in energy optimization, significantly reduces energy waste and improves overall energy efficiency. The stochastic gradient descent algorithm ensures the system's dynamic adaptation to environmental changes. Through continuous adjustment and optimization, the overall performance of lighting facility management is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] Figure 1 A module diagram of an information management system based on comprehensive utilization of municipal lighting facilities is proposed for the present invention;
[0065] Figure 2 The present invention proposes a flow chart for collecting current and voltage parameters in an information management system based on comprehensive utilization of municipal lighting facilities;
[0066] Figure 3 The present invention proposes a flow chart for obtaining current and voltage deviation indicators in an information management system based on comprehensive utilization of municipal lighting facilities;
[0067] Figure 4 The present invention proposes a feature extraction flow chart of current and voltage data in an information management system based on comprehensive utilization of municipal lighting facilities;
[0068] Figure 5 The present invention proposes a flow chart for obtaining abnormal signal indicators in an information management system based on comprehensive utilization of municipal lighting facilities;
[0069] Figure 6 The present invention proposes a flow chart for calculating the energy demand of lighting nodes in an information management system based on comprehensive utilization of municipal lighting facilities;
[0070] Figure 7 The present invention proposes a flow chart for obtaining adjusted energy configuration in an information management system based on comprehensive utilization of municipal lighting facilities;
[0071] Figure 8 The present invention proposes a flow chart for obtaining management performance optimization results in an information management system based on comprehensive utilization of municipal lighting facilities. DETAILED DESCRIPTION
[0072] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0073] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating positions or positional relationships, are based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.
[0074] Example:
[0075] See also Figure 1 The present invention provides a technical solution: an information management system based on comprehensive utilization of municipal lighting facilities includes:
[0076] The data collection and analysis module continuously collects current and voltage parameters based on real-time monitoring of municipal lighting equipment, compares them with historical data, determines whether the parameter deviation exceeds the threshold, and generates current and voltage deviation indicators;
[0077] The feature extraction and anomaly detection module uses a one-dimensional convolutional neural network based on the current and voltage deviation indicators to extract features from the current and voltage data, identify abnormal patterns in the data, and obtain abnormal signal indicators;
[0078] The energy optimization allocation module uses sparse coding technology to calculate the energy demand of lighting nodes based on abnormal signal indicators and real-time monitoring data, adjusts energy allocation, optimizes lighting efficiency, and generates adjusted energy configuration;
[0079] Based on the adjusted energy configuration, the learning and feedback module uses the stochastic gradient descent algorithm to adjust the state prediction process and energy allocation plan of the lighting equipment to match environmental changes, and continuously monitors and evaluates the management performance of the lighting facilities to obtain management performance optimization results.
[0080] The current and voltage deviation indicators include current deviation value, voltage deviation value, and deviation status rating. The abnormal signal indicators include abnormal intensity level, abnormal occurrence frequency, and abnormal mode type. The adjusted energy configuration includes energy-saving target ratio, energy allocation efficiency, and node energy consumption optimization results. The management performance optimization results include performance improvement ratio, stability improvement record, and response time reduction information.
[0081] See also Figure 2 , the specific steps for collecting current and voltage parameters are as follows:
[0082] Based on the real-time monitoring of municipal lighting equipment, the data collection frequency is set to once per minute to obtain the collection frequency;
[0083] According to the set collection frequency, sensors are used to collect current and voltage data of municipal lighting equipment in real time, using the formula:
[0084] ,
[0085] Get real-time current and voltage data, where: is the data at time t, and are the current and voltage values at time t, and is the adjustment factor of current and voltage, is the normalization factor, is the emphasis of current on voltage;
[0086] The current and voltage data collected every minute are integrated into a continuous data stream using the formula:
[0087] ,
[0088] Obtain the continuous data stream S during the monitoring period, where T is the total acquisition time length, is the data collected every minute. is the time decay factor, which is used to emphasize the impact of time proximity on the data, and t is each time point in the time series.
[0089] Assume the following data:
[0090] and Represents the current and voltage values at time t, which are real-time data read directly from the sensor;
[0091] and is the adjustment coefficient of current and voltage, which is used to adjust their respective weights and set =1.2 and 0.8;
[0092] is a normalization factor used to ensure the consistency of the results. =2.0
[0093] For the emphasis on current over voltage, set =0.5, used to emphasize the effect of current on the results.
[0094] Calculation process:
[0095] Suppose that in a certain minute, the current =100 amperes; voltage =220 volts;
[0096] Calculate the current and voltage weighted results:
[0097] ,
[0098] Calculate the absolute value of the current-voltage difference:
[0099] ,
[0100] Assume the following data:
[0101] It is the comprehensive data of current and voltage per minute obtained from the above;
[0102] T is the total acquisition time, assumed to be 60 minutes;
[0103] is the time decay factor, set to =0.01, which is used to reduce the impact of old data on the final result.
[0104] Calculation process:
[0105] Assuming continuous data collection for 60 minutes, Calculate as above.
[0106] For every minute data ,use Calculate the adjusted value:
[0107] When t=1:
[0108] ,
[0109] When t=60:
[0110] ,
[0111] See also Figure 3 , the specific steps for obtaining the current and voltage deviation indicators are as follows:
[0112] Based on the collected current and voltage parameters, calculate the current and voltage deviation at each time point using the formula:
[0113] ,
[0114] Get real-time deviation ,in, and are the average current and voltage of historical data respectively, and is the weight coefficient of current and voltage, which is used to adjust the influence of current and voltage in deviation calculation. and is a smoothing factor used to adjust the sensitivity of current and voltage deviations, is the current data, is the voltage data;
[0115] According to the set threshold T, judge the real-time deviation Whether it exceeds the threshold, the threshold setting adopts a dynamic adjustment method based on the historical deviation standard deviation:
[0116] ,
[0117] in, is the standard deviation of the historical deviation data, which indicates the average variation of current and voltage deviations in historical measurements. and is the adjustment factor, The baseline used to adjust the threshold, Used to enhance the threshold's responsiveness to deviations. , the data at that time point is marked as abnormal, and a current and voltage deviation index is generated.
[0118] Assume the following data:
[0119] , current current reading;
[0120] , current voltage reading;
[0121] , historical average current;
[0122] , historical average voltage;
[0123] =1.5, current weight coefficient;
[0124] =2.0, current smoothing factor;
[0125] =1.2, voltage weight coefficient;
[0126] =2.5, voltage smoothing factor.
[0127] Calculation process:
[0128] Calculate the current deviation part:
[0129] ,
[0130] Calculate the voltage deviation part:
[0131] ,
[0132] Calculate the overall deviation:
[0133] ,
[0134] Setting of deviation threshold:
[0135] ,
[0136] =10, assuming the standard deviation of historical data;
[0137] =1.1, coefficient for adjusting threshold baseline;
[0138] =1.5, the coefficient of enhanced responsiveness.
[0139] Calculation process:
[0140] Calculate the dynamic threshold:
[0141] ,
[0142] See also Figure 4 , the feature extraction steps of current and voltage data are as follows:
[0143] Based on the current and voltage deviation indicators, a one-dimensional convolutional neural network is applied to the real-time current and voltage data:
[0144] ,
[0145] Get feature data ,in, Indicates at time The current and voltage data pairs, is the convolution kernel weight, It is with time The associated adjustment factor optimizes the weight that decreases over time, b is the bias term, is the regularization constant to avoid overfitting, ReLU is the activation function, and k is the convolution window size;
[0146] For the feature data obtained from the convolution operation Normalize using the formula:
[0147] ,
[0148] Get the extracted feature data ,in, and The characteristic data are The minimum and maximum values of and is a scaling factor used to adjust the flexibility of the normalization range.
[0149] Assume the following data:
[0150] , convolution kernel weight;
[0151] , time decay factor;
[0152] b = 0.1, bias;
[0153] , regularization constant;
[0154] , , , current and voltage data for three consecutive time points.
[0155] Calculation process:
[0156] Convolution operation calculation:
[0157] ,
[0158] Assume the following data:
[0159] =1, =1 is the normalized range adjustment factor.
[0160] Calculation process:
[0161] Normalization operation calculation:
[0162] ,
[0163] See also Figure 5 , the specific steps for obtaining abnormal signal indicators are:
[0164] Based on the extracted current and voltage feature data, the normalized score is calculated using the formula:
[0165] ,
[0166] in, It is feature data The mean of is the standard deviation, and are the minimum and maximum values of the feature data, respectively. and is an adjustment factor used to optimize the calculation accuracy;
[0167] Use the threshold to determine whether it is abnormal, using the formula:
[0168] ,
[0169] Obtain judgment results ,in, is the set sensitivity threshold, is the multiplication factor that optimizes the threshold sensitivity;
[0170] like , the data at the marked time point is abnormal, and the abnormal signal indicator is recorded or generated :
[0171] ,
[0172] in, is the labeling intensity factor used to optimize the representation of abnormal signals.
[0173] Identify unusual patterns in feature data:
[0174] Assume the following data:
[0175] Assume feature data is [0.1, 0.2, 0.3, 0.4, 0.5, 0.6, 0.7, 0.8, 0.9];
[0176] Mean, ,
[0177] Standard deviation, set to 0.29;
[0178] ;
[0179] ;
[0180] =0.1;
[0181] =0.1;
[0182] calculate use :
[0183] ,
[0184] Abnormal judgment logic:
[0185] Assuming a sensitivity threshold =2 and the multiplication factor =1.5.
[0186] calculate use :
[0187] ,
[0188] Generate abnormal signal indicators:
[0189] Assuming labeling intensity factor =2;
[0190] calculate use :
[0191] ;
[0192] See also Figure 6 ,The steps to calculate the energy demand of lighting nodes are as follows:
[0193] Collect real-time data from each lighting node, including current light intensity, usage time, and ambient light conditions;
[0194] Based on abnormal signal indicators and real-time data, calculate the energy demand of each node , using the formula:
[0195] ,
[0196] in, is the basic power requirement of node i, is the additional power requirement adjusted according to the abnormal signal indicator, and is the adjustment factor used to adjust the base and additional power requirements based on node demand and historical performance, It is a nonlinear index used to adjust the impact of additional power demand, strengthening or weakening the impact of abnormal signals. is the abnormal signal indicator of node i, indicating whether power needs to be increased to maintain performance, and n is the total number of lighting nodes.
[0197] Assume there are two lighting nodes with data to calculate:
[0198] Node 1:
[0199] =100 watts;
[0200] =20 watts;
[0201] =1 (abnormal signal indicator, 1 means abnormal);
[0202] =0.9 (power demand adjustment factor);
[0203] =0.1 (additional demand adjustment factor).
[0204] Node 2:
[0205] = 150 watts;
[0206] =30 watts;
[0207] =0 (no exception);
[0208] =0.85;
[0209] =0.15;
[0210] =2 (non-linear adjustment index).
[0211] Calculation process:
[0212] For each node, the energy demand is calculated according to the formula:
[0213] Energy requirement of node 1:
[0214] ,
[0215] Energy demand of node 2 (since there is no abnormality, The impact is 0):
[0216] ,
[0217] Total energy requirement:
[0218] .
[0219] See also Figure 7 , the specific steps for obtaining the adjusted energy configuration are:
[0220] According to the energy demand of lighting nodes, sparse coding technology is used to adjust energy distribution and optimize lighting efficiency, using the formula:
[0221] ,
[0222] Get adjusted energy configuration ,in, is the energy requirement for node i computation, is the energy allocation proportional factor, reflecting the criticality of node i, is a regulation factor used to dynamically adjust energy allocation according to the needs of node i, is the demand difference of node i, is the demand threshold, is an exponent used to adjust the strength and response speed of the function.
[0223] Node 1:
[0224] = 150 watts;
[0225] =0.7;
[0226] =0.5;
[0227] =10 (indicates the difference between the current node demand and the scheduled demand);
[0228] =5 (reference threshold for demand variance).
[0229] Node 2:
[0230] =200 watts;
[0231] =0.8;
[0232] =0.3;
[0233] =8;
[0234] =5.
[0235] Global Parameters = 1.5, used in the final exponential calculation to enhance the responsiveness of the system.
[0236] Calculation process:
[0237] Energy configuration calculation for node 1:
[0238] ,
[0239] Energy configuration calculation for node 2:
[0240] ,
[0241] Total energy configuration:
[0242] .
[0243] See also Figure 8 , the specific steps for obtaining management performance optimization results are:
[0244] Based on the adjusted energy configuration, the stochastic gradient descent algorithm is used to adjust the state prediction process of the lighting device, using the formula:
[0245] ,
[0246] Get new parameter values of the prediction model ,in, is the parameter value of the previous step, is the learning rate, is the loss function J for The partial derivative of is the regularization coefficient, is the strength adjustment factor of the regularization term;
[0247] Update the energy allocation plan according to environmental changes, using the formula:
[0248] ,
[0249] is the energy configuration adjusted according to environmental changes, where is the basic energy configuration, D is the difference between demand and preset demand, is to adjust the threshold, It is to adjust the intensity and control the degree of impact of demand differences;
[0250] Continuously monitor and evaluate the management performance of lighting facilities, using the formula for performance evaluation:
[0251] ,
[0252] Obtain management performance optimization results ,in, is the performance index of the i-th lighting node, n is the total number of nodes, is a weighted index for performance evaluation.
[0253] Apply the stochastic gradient descent algorithm:
[0254] Assumptions:
[0255] Initial Parameters =5.0
[0256] Learning Rate =0.01
[0257] Loss function gradient =-0.5, indicating that the parameter should be increased to reduce the loss;
[0258] Regularization coefficient =0.1
[0259] Modulating Factor =0.2.
[0260] Compute the regularization term:
[0261] ,
[0262] Update parameters:
[0263] ,
[0264] Matching environmental changes:
[0265] Assumptions:
[0266] Basic Energy =1000 watts;
[0267] The difference between actual demand and expected demand is D=15;
[0268] Adjusting the Threshold =10;
[0269] Adjust the intensity =0.05.
[0270] Calculate the adjustment factor:
[0271] ,
[0272] Update energy configuration:
[0273] ,
[0274] Ongoing monitoring and evaluation:
[0275] Assumptions:
[0276] The total number of nodes n=5;
[0277] Node performance indicators ;
[0278] Weighted index for performance evaluation .
[0279] Calculate the average performance:
[0280] ,
[0281] Compute performance optimization results:
[0282] ,
[0283] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. An information management system based on comprehensive utilization of municipal lighting facilities, characterized in that: The system comprises: The data collection and analysis module continuously collects current and voltage parameters based on real-time monitoring of municipal lighting equipment, compares them with historical data, determines whether the parameter deviation exceeds the threshold, and generates current and voltage deviation indicators; The feature extraction and anomaly detection module applies a one-dimensional convolutional neural network based on the current and voltage deviation indicators to extract features from the current and voltage data, identify abnormal patterns in the data, and obtain abnormal signal indicators; The energy optimization allocation module calculates the energy demand of the lighting node based on the abnormal signal indicator and real-time monitoring data using sparse coding technology, adjusts the energy allocation, optimizes the lighting efficiency, and generates an adjusted energy configuration; The learning and feedback module uses a stochastic gradient descent algorithm based on the adjusted energy configuration to adjust the state prediction process and energy allocation plan of the lighting equipment to match environmental changes, and continuously monitors and evaluates the management performance of the lighting facilities to obtain management performance optimization results; The feature extraction steps of the current and voltage data are specifically as follows: Based on the current and voltage deviation indicators, a one-dimensional convolutional neural network is applied to the real-time current and voltage data: , Get feature data ,in, Indicates at time The current and voltage data pairs, is the convolution kernel weight, It is with time is the associated adjustment factor, b is the bias term, is the regularization constant to avoid overfitting, ReLU is the activation function, and k is the convolution window size; For the feature data obtained from the convolution operation Normalize using the formula: , Get the extracted feature data ,in, and The characteristic data are The minimum and maximum values of and is the regulating factor; The steps for obtaining the abnormal signal indicator are specifically as follows: Based on the extracted current and voltage characteristic data, a standardized score is calculated using the formula: , in, It is feature data The mean of is the standard deviation, and are the minimum and maximum values of the feature data, respectively. and is an adjustment factor used to optimize the calculation accuracy; Use the threshold to determine whether it is abnormal, using the formula: , Obtain judgment results ,in, is the set sensitivity threshold, is the multiplication factor that optimizes the threshold sensitivity; like , the data at the marked time point is abnormal, and the abnormal signal indicator is recorded or generated : , in, is the labeling intensity factor used to optimize the representation of abnormal signals.
2. The information management system based on comprehensive utilization of municipal lighting facilities according to claim 1 is characterized in that: The steps for collecting the current and voltage parameters are specifically as follows: Based on the real-time monitoring of municipal lighting equipment, the data collection frequency is set to once per minute to obtain the collection frequency; According to the set collection frequency, sensors are used to collect current and voltage data of municipal lighting equipment in real time, using the formula: , Get real-time current and voltage data, where: is the data at time t, and are the current and voltage values at time t, and is the adjustment factor of current and voltage, is the normalization factor, is the emphasis of current on voltage; The current and voltage data collected every minute are integrated into a continuous data stream using the formula: , Obtain the continuous data stream S during the monitoring period, where T is the total acquisition time length, is the data collected every minute. is the time decay factor, and t is each time point in the time series.
3. The information management system based on comprehensive utilization of municipal lighting facilities according to claim 1 is characterized in that: The steps for obtaining the current and voltage deviation index are specifically as follows: Based on the collected current and voltage parameters, the current and voltage deviations at each time point are calculated using the formula: , Get real-time deviation ,in, and are the average current and voltage of historical data respectively, and are the weight coefficients of current and voltage, and is the smoothing factor, is the current data, is the voltage data; According to the set threshold T, judge the real-time deviation Whether it exceeds the threshold, the threshold setting adopts a dynamic adjustment method based on the historical deviation standard deviation: , in, is the standard deviation of the historical deviation data, and is the adjustment factor, The baseline used to adjust the threshold, Used to enhance the threshold's responsiveness to deviations. , the data at that time point is marked as abnormal, and a current and voltage deviation index is generated.
4. The information management system based on comprehensive utilization of municipal lighting facilities according to claim 1 is characterized in that: The steps of calculating the energy demand of the lighting node are specifically as follows: Collect real-time data from each lighting node, including current light intensity, usage time, and ambient light conditions; Based on the abnormal signal indicators, combined with real-time data, the energy demand of each node is calculated , using the formula: , in, is the basic power requirement of node i, is the additional power requirement adjusted according to the abnormal signal indicator, and is the adjustment factor, is a nonlinear exponent used to adjust for the effect of additional power demand, is the abnormal signal indicator of node i, and n is the total number of lighting nodes.
5. The information management system based on comprehensive utilization of municipal lighting facilities according to claim 1 is characterized in that: The steps for obtaining the adjusted energy configuration are specifically as follows: According to the energy demand of the lighting node, sparse coding technology is used to adjust energy distribution and optimize lighting efficiency, using the formula: , Get adjusted energy configuration ,in, is the energy requirement for node i computation, is the energy allocation proportional factor, reflecting the criticality of node i, is the regulating factor, is the demand difference of node i, is the demand threshold, is an exponent used to adjust the strength and response speed of the function.
6. The information management system based on comprehensive utilization of municipal lighting facilities according to claim 1 is characterized in that: The steps for obtaining the management performance optimization result are specifically as follows: Based on the adjusted energy configuration, the state prediction process of the lighting device is adjusted using the stochastic gradient descent algorithm, using the formula: , Get new parameter values of the prediction model ,in, is the parameter value of the previous step, is the learning rate, is the loss function J for The partial derivative of is the regularization coefficient, is the strength adjustment factor of the regularization term; Update the energy allocation plan according to environmental changes, using the formula: , is the energy configuration adjusted according to environmental changes, where is the basic energy configuration, D is the difference between demand and preset demand, is to adjust the threshold, It is to adjust the intensity and control the degree of impact of demand differences; Continuously monitor and evaluate the management performance of lighting facilities, using the formula for performance evaluation: , Obtain management performance optimization results ,in, is the performance index of the i-th lighting node, n is the total number of nodes, is a weighted index for performance evaluation.