A method and computer program product for monitoring water pollution in seasonally dry rivers

By dividing the river into monitoring flow sections and adjusting the monitoring frequency and adding monitoring items according to the hydrological characteristics, combined with the pollutant diffusion simulation model, the problem of lagging response in water quality monitoring in the existing technology is solved, and timely monitoring of water quality parameters and pollution are achieved. Risk prevention ensures water quality safety.

CN118503890BActive Publication Date: 2024-10-11SHENZHEN SHENGRUN ENG CO LTD +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410962694.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-10-11
Estimated Expiration
2044-07-18

AI Technical Summary

Technical Problem

The existing water quality monitoring system based on the Internet of Things cannot dynamically adjust the monitoring frequency according to different hydrological characteristics of the river, resulting in delayed response when water quality parameters exceed the standard, and the inability to timely monitor changes in water quality parameters.

Method used

By dividing the river into multiple monitoring sections, the monitoring frequency is automatically adjusted according to hydrological parameters, and appropriate additional monitoring items are added. The pollutant diffusion simulation model is used to predict the migration trend of pollutants, determine the flocculant placement plan, and predict seasonal droughts. pollution risks and formulate prevention and control plans.

Benefits of technology

It is possible to dynamically adjust monitoring frequency and increase monitoring items based on river hydrological characteristics, timely monitor whether water quality parameters exceed standards, predict and prevent pollution risks, and ensure water quality safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118503890B_ABST
    Figure CN118503890B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and computer program product for monitoring water pollution in seasonal drought rivers. The method comprises the following steps: dividing a river into a plurality of monitoring sections and monitoring water quality and hydrological parameters according to an initial monitoring frequency; judging the hydrological state period of the monitoring section according to the hydrological parameters, automatically adjusting its monitoring frequency and adding additional monitoring items accordingly; obtaining pollutant monitoring data of the monitoring section, and using a pollutant diffusion simulation model to predict its pollutant migration trend and concentration change trend accordingly; determining and outputting a flocculant delivery plan according to the water quality parameters, pollutant migration trend and concentration change trend of the monitoring section; and determining and outputting a prevention and control plan according to rainfall forecast information, hydrology and water quality parameters in the river basin, if it is predicted that there will be a risk of seasonal drought pollution. The method can adjust the monitoring frequency according to different hydrological characteristics of the river, and can timely monitor whether water quality parameters exceed the standard when the river is in different hydrological characteristics.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of water pollution monitoring, and in particular to a method and a computer program product for monitoring water pollution in seasonal drought rivers. Background Art

[0002] Water quality monitoring is the process of monitoring the types of pollutants in water bodies, the concentrations of various pollutants and their changing trends, and evaluating the water quality. The traditional monitoring method is that technicians regularly sample river water bodies, take them to the laboratory for analysis, and obtain the corresponding water quality data. This method is inefficient and can only measure the water quality data of the river at multiple discrete time points. It cannot obtain time-continuous water quality data and cannot analyze the continuous changes in river water quality. With the development of Internet of Things technology, the industry has proposed some water quality monitoring systems based on the Internet of Things, which set sensors in rivers to monitor river water quality data and upload the monitored water quality data to the background monitoring center through Internet of Things communication technology. The hydrological characteristics of rivers are different at different times, and the water quality change rate is different under different hydrological characteristics. The existing water quality monitoring system based on the Internet of Things adopts a fixed monitoring frequency. If the current rate of deterioration of the river water quality becomes faster, the water quality monitoring system may detect that the water quality parameters have exceeded the standard threshold for a period of time, and it is impossible to monitor the exceeding of the water quality parameters in time. Summary of the invention

[0003] The purpose of the present invention is to provide a method for monitoring water pollution in seasonally dry rivers and a computer program product that can implement the method when executed. The method can adjust the monitoring frequency according to the different hydrological characteristics of the river, and can timely monitor whether the water quality parameters exceed the standard when the river has different hydrological characteristics.

[0004] In order to achieve the above object, the present invention provides a method for monitoring water pollution in a seasonally dry river, comprising the following steps:

[0005] S1. Divide the river into multiple monitoring sections according to its historical hydrological characteristics;

[0006] S2. Multiple monitoring points are set in each monitored flow section, and water quality parameters and hydrological parameters of each monitoring point are monitored by water quality monitoring equipment and hydrological monitoring equipment according to a preset initial monitoring frequency;

[0007] S3. According to the hydrological parameters of each monitored flow section, the hydrological state period of each monitored flow section is determined. The hydrological state period includes two situations: a dry period and a water flow period.

[0008] S4. According to the hydrological state period of each monitored flow section, automatically adjust the monitoring frequency and add corresponding additional monitoring items for the monitored flow section, wherein the added additional monitoring items are selected from at least one pollutant monitoring item and at least one drought monitoring item;

[0009] S5. For each monitored flow section, the pollutant monitoring data in the water quality parameters currently monitored by each monitoring point of the monitored flow section are obtained, and the pollutant diffusion simulation model corresponding to the hydrological state period of the monitored flow section is used to predict the pollutant migration trend and pollutant concentration change trend of the monitored flow section in the future preset time period;

[0010] S6. For each monitored flow section, determine the corresponding flocculant placement plan based on its current water quality parameters and the predicted pollutant migration trend and pollutant concentration change trend;

[0011] S7. Based on the rainfall forecast information within the preset number of days in the river basin and the hydrological parameters and water quality parameters of each monitored section of the river, predict whether the river will have seasonal drought pollution risk and its risk level in the future. If so, determine the corresponding prevention and control plan based on the predicted seasonal drought pollution risk and its risk level;

[0012] S8. Output the flocculant placement plan for each monitored section of the river. If step S7 predicts that the river will have seasonal drought pollution risk in the future, then also output the prevention and control plan corresponding to the seasonal drought pollution risk level.

[0013] Further, step S1 includes:

[0014] S11. Divide the river into several sections;

[0015] S12, obtaining a time series of hydrological parameters of each river section within a preset historical time period, where the hydrological parameters include water level, flow velocity and flow;

[0016] S13, taking a time series of a hydrological parameter as a feature vector, using K-means clustering algorithm to perform cluster analysis on each river section, and dividing each river section into multiple categories;

[0017] S14. Take one category as a monitored flow section, and each monitored flow section includes at least one river section.

[0018] Furthermore, in step S2, the number and location of monitoring points are determined based on the topographical characteristics and river characteristics of each monitored flow section; water quality parameters include pH value, conductivity, dissolved oxygen concentration, ammonia nitrogen concentration, water temperature, chemical oxygen demand and total phosphorus concentration, and hydrological parameters include water level, flow rate and flow.

[0019] Further:

[0020] Step S3 specifically:

[0021] S31, obtaining the time series of hydrological parameters of each monitored section of the river in the previous N years;

[0022] S32, using a time series analysis method to analyze the periodic changes of the hydrological parameter time series of each monitored flow section in the previous N years over time, and dividing the flood time period and the dry time period accordingly;

[0023] S33, taking the average water level of the flood period of each monitored flow section in the previous N years as the flood level threshold of the monitored flow section, and taking the average water level of the dry period of each monitored flow section in the previous N years as the dry level threshold of the monitored flow section;

[0024] S34, obtaining water level information from the current hydrological parameters of each monitored flow section. If the current water level of the monitored flow section is higher than the flood level threshold of the monitored flow section, the monitored flow section is determined to be in a water flow period. If the current water level of the monitored flow section is lower than the low water level threshold of the monitored flow section, the monitored flow section is determined to be in a drought period.

[0025] And / or step S4 specifically:

[0026] S41. If the monitored flow section is in a drought period, the monitoring frequency of water quality parameters is increased and the monitoring frequency of hydrological parameters is reduced, and groundwater level monitoring items, soil moisture monitoring items and heavy metal lead monitoring items are added to the monitored flow section;

[0027] S42. If the monitored flow section is in the water flow period, the monitoring frequency of water quality parameters is reduced and the monitoring frequency of hydrological parameters is increased, and the suspended matter concentration monitoring item, turbidity monitoring item and fecal coliform group monitoring item are added to the monitored flow section;

[0028] Among them, the groundwater level monitoring project and the soil moisture monitoring project are drought monitoring projects, and the heavy metal lead monitoring project, the suspended matter concentration monitoring project, the turbidity monitoring project and the fecal coliform monitoring project are pollutant monitoring projects.

[0029] Furthermore, the pollutant diffusion simulation model in step S5 is constructed specifically according to the following steps:

[0030] Obtaining the historical hydrological parameter time series and the historical pollutant monitoring data time series of the river to be monitored during the dry period and the water period, wherein the pollutant monitoring data time series includes the pollutant concentration time series and the pollutant distribution position time series;

[0031] Taking the hydrological parameters at a certain time point in the time series of historical hydrological parameters during the drought period and the pollutant monitoring data at that time point in the time series of historical pollutant monitoring data as input, and taking the pollutant monitoring data sequence within a preset time period after that time point in the time series of historical pollutant monitoring data during the drought period as output, a set of drought period training samples is formed, and multiple sets of such drought period training samples are constructed accordingly;

[0032] Taking the hydrological parameters at a certain time point in the historical hydrological parameter time series of the water flow period and the pollutant monitoring data at that time point in the historical pollutant monitoring data time series as input, and taking the pollutant monitoring data sequence within a preset time period after that time point in the historical pollutant monitoring data time series of the water flow period as output, a set of water flow period training samples is formed, and multiple sets of such water flow period training samples are constructed accordingly;

[0033] Machine learning algorithms were used to construct pollutant diffusion simulation models during drought and during water supply periods.

[0034] The drought period training samples are used to train the drought period pollutant diffusion simulation model, so that the drought period pollutant diffusion simulation model has the ability to identify hydrological parameters and pollutant monitoring data to obtain the pollutant monitoring data sequence within a preset time period. The water flow period training samples are used to train the water flow period pollutant diffusion simulation model, so that the water flow period pollutant diffusion simulation model has the ability to identify hydrological parameters and pollutant monitoring data to obtain the pollutant monitoring data sequence within a preset time period.

[0035] Further:

[0036] Step S6 specifically determines the pollution risk level of the monitored flow section according to the current water quality parameters and the predicted pollutant migration trend and pollutant concentration change trend, and then searches the pre-established correspondence between the pollution risk level and the flocculant placement plan according to the pollution risk level to determine the flocculant placement plan corresponding to the pollution risk level of the monitored flow section;

[0037] And / or step S7 specifically searches for a pre-established correspondence between seasonal drought pollution risk levels and prevention and control plans based on the seasonal drought pollution risk levels, and determines a corresponding prevention and control plan.

[0038] Furthermore, including step Q executed between steps S4 and S5, if any value among the water quality parameters, hydrological parameters and monitoring results of additional monitoring items monitored at the monitoring point exceeds the corresponding normal threshold, an alarm is sent to the river management personnel via SMS, email, APP push and / or AI phone.

[0039] Further, step S9 is included after step S8, and the following steps are performed for each monitoring point:

[0040] S91, obtaining the water quality parameters currently monitored at the monitoring point, inputting the water quality parameters into a pre-trained water quality prediction model, and using the water quality prediction model to derive the water quality change trend of the monitoring point within a preset time period in the future according to the water quality parameters;

[0041] S92, obtaining the hydrological parameters currently monitored at the monitoring point, inputting the hydrological parameters into a pre-trained hydrological prediction model, and using the hydrological prediction model to derive the hydrological change trend of the monitoring point within a preset time period in the future according to the hydrological parameters;

[0042] S93. Output the water quality change trend and hydrological change trend of the monitoring point to the user; if the water quality parameter value in the water quality change trend of the monitoring point exceeds the corresponding normal water quality threshold or the hydrological parameter value in the hydrological change trend exceeds the corresponding normal hydrological threshold, generate an early warning prompt and output it to the user.

[0043] Furthermore, step S10 is performed after step S9, and the pollutant migration trend and pollutant concentration change trend of each monitored flow section and the water quality change trend and hydrological change trend of each monitoring point are respectively displayed to the user in the form of visual charts.

[0044] The present invention also provides a computer program product, including a computer program, which, when executed by a processor, implements the water pollution monitoring method for seasonal drought rivers as described above.

[0045] The method for monitoring water pollution of seasonal drought rivers provided by the present invention, on the one hand, uses step S4 to adjust the monitoring frequency and add corresponding additional monitoring items according to the hydrological characteristics of each monitored section of the river, so that when the river is in different hydrological characteristics, it can timely monitor whether the water quality parameters exceed the standard, and can also add corresponding additional monitoring items based on different hydrological characteristics, so that the water quality monitoring under different hydrological characteristics is more targeted; on the other hand, by virtue of step S5, the pollution conditions of each monitored section of the river are predicted, and then the corresponding flocculant delivery plan is obtained through step S6. Step S7 is also used to predict whether the river will have seasonal drought pollution risks and their risk levels in the future. When it is predicted that there will be seasonal drought pollution risks, a corresponding prevention and control plan is automatically given, and then step S8 outputs the flocculant delivery plan and the prevention and control plan. In this way, the present invention can effectively predict the river pollution conditions and the pollution risks caused by seasonal droughts, and automatically give corresponding flocculant delivery plans and prevention and control plans to ensure water quality safety and prevent problems before they occur. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 It is a flow chart of the water pollution monitoring method for seasonally dry rivers. DETAILED DESCRIPTION

[0047] The present invention is further described in detail below in conjunction with specific implementation methods.

[0048] This embodiment is implemented by computer code programming. Figure 1 The computer program product of the seasonal drought river water pollution monitoring method shown in the figure is executed by a processor to implement the following Figure 1 The water pollution monitoring method for seasonal drought rivers is shown in the figure. The following takes the process of executing the method by the river monitoring center server as an example to illustrate the execution process of the method.

[0049] S1. Divide the river into several monitoring sections based on its historical hydrological characteristics.

[0050] The river monitoring center server needs to monitor a river. First, the river is divided into several river sections. In this embodiment, the river sections are divided according to a fixed length. For example, starting from the source of the river, each 10 meters is divided into a river section to obtain several river sections. After the river sections are divided, the river monitoring center server obtains the hydrological parameter time series of each river section in the previous three years (that is, the preset historical time period is set to the previous three years). The hydrological parameters include water level, flow velocity and flow; then a hydrological parameter time series is used as a feature vector, that is, the water level time series is used as a feature vector, the flow velocity time series is used as a feature vector, and the flow time series is used as a feature vector, a total of three feature vectors, and then the K-means clustering algorithm is used based on these three feature vectors to perform cluster analysis on each river section, calculate the similarity between each river section through the Euclidean distance, and iteratively optimize the cluster center, and finally divide each river section into multiple categories, with one category as a monitoring flow section, and each monitoring flow section includes at least one river section. The hydrological characteristics of each river section in each monitoring flow section are similar, and the same monitoring measures can be taken.

[0051] S2. Multiple monitoring points are set in each monitored flow section, and water quality parameters and hydrological parameters of each monitoring point are obtained according to a preset initial monitoring frequency through water quality monitoring equipment and hydrological monitoring equipment.

[0052] After the river monitoring center server divides the monitoring flow section, it analyzes and determines the number and location of monitoring points in each monitoring flow section according to the terrain characteristics and river characteristics of each monitoring flow section. This embodiment adopts an optimization algorithm to determine the optimal number and location of monitoring points in each monitoring flow section. Specifically: in each monitoring flow section, a particle swarm optimization algorithm is adopted, with the spatial distribution density and coverage of monitoring points as the optimization target, while considering the constraints such as the terrain characteristics and river characteristics of the monitoring flow section, and solving the optimal number and location of monitoring points. For example, in a monitoring flow section of Poyang Lake, 10 monitoring points and their locations are finally determined by the particle swarm algorithm, the average spacing of the monitoring points is 5km, and the coverage rate reaches 95%. After determining the number and location of monitoring points, the river monitoring center server sends the number and location of monitoring points of each monitoring flow section to relevant staff. The staff arranges water quality monitoring equipment and hydrological monitoring equipment at each monitoring point. The water quality monitoring equipment includes a variety of water quality parameter sensors, such as pH sensors, conductivity sensors, dissolved oxygen sensors, ammonia nitrogen sensors, water temperature sensors, chemical oxygen demand sensors, and total phosphorus sensors. The water quality monitoring equipment monitors the water quality parameters of the monitoring point according to the preset initial monitoring frequency (for example, once a day), and the monitored water quality parameters include pH value, conductivity, dissolved oxygen concentration, ammonia nitrogen concentration, water temperature, chemical oxygen demand and total phosphorus concentration. The water quality monitoring equipment can also be changed to use a multi-parameter water quality probe to monitor the above-mentioned multiple water quality parameters, which can reduce the number of sensors compared to the use of single parameter sensors. The hydrological monitoring equipment includes multiple hydrological parameter sensors, such as water level sensors, flow rate sensors and flow sensors. The hydrological monitoring equipment monitors the hydrological parameters of the monitoring point according to the preset initial monitoring frequency (for example, once a day), and the monitored hydrological parameters include water level, flow rate and flow. The water quality monitoring equipment and the hydrological monitoring equipment monitor the water quality parameters and hydrological parameters of the monitoring point according to the initial monitoring frequency, and then the Internet of Things communication protocols such as LoRa transmit the monitored water quality parameters and hydrological parameters to the river monitoring center server in real time, with a transmission delay of less than 1 second and a data packet loss rate of less than 0.1%. After receiving the water quality parameters and hydrological parameters from each monitoring point, the river monitoring center server stores the water quality parameters and hydrological parameters in the water quality database and the hydrological database respectively.

[0053] S3. According to the hydrological parameters of each monitored flow section, the current hydrological state period of each monitored flow section is determined. The hydrological state period includes two situations: a drought period and a water flow period.

[0054] The river monitoring center server obtains the hydrological parameters of each monitored section based on the hydrological parameters of each monitoring point in each monitored section. For example, the average value of the hydrological parameters of each monitoring point in this monitored section is used as the hydrological parameter of this monitored section. Then the river monitoring center server determines the current hydrological state period of each monitored section based on the hydrological parameters of each monitored section. Specifically: the river monitoring center server obtains the time series of hydrological parameters of each monitored section of the river in the previous three years (that is, N is 3). Taking the current year 2024 as an example, the time series of hydrological parameters of each monitored section of the river in 2021, 2022, and 2023 are obtained; the river monitoring center server then uses the time series analysis method to analyze the periodic changes of the time series of hydrological parameters of each monitored section in the previous three years over time, and divides the flood time period and the dry time period accordingly, for example, 5- October is the flood season, and November to April of the following year is the dry season; for each monitored stream segment, the river monitoring center server calculates the average water level of the flood season of the monitored stream segment in the previous three years as the flood level threshold of the monitored stream segment, and calculates the average water level of the dry season of the monitored stream segment in the previous three years as the dry level threshold; the river monitoring center server then obtains the water level information from the current hydrological parameters of each monitored stream segment. If the current water level of the monitored stream segment is higher than the flood level threshold of the monitored stream segment, the monitored stream segment is determined to be in the water flow period; if the current water level of the monitored stream segment is lower than the dry level threshold of the monitored stream segment, the monitored stream segment is determined to be in the drought period. Non-preferred embodiments may be changed to obtain the hydrological parameter time series of the previous two years or the previous five years.

[0055] S4. According to the hydrological status period of each monitored flow section, the monitoring frequency is automatically adjusted and corresponding additional monitoring items are added for the monitored flow section. The added additional monitoring items are selected from at least one pollutant monitoring item and at least one drought monitoring item.

[0056] After the river monitoring center server determines the hydrological status period of each monitored section, for each monitored section, if the monitored section is in a drought period, the monitoring frequency of its water quality parameters is increased and the monitoring frequency of its hydrological parameters is reduced. For example, the monitoring frequency of the water quality parameters of the monitored section is increased from the initial monitoring frequency of once a day to four times a day, and the monitoring frequency of the hydrological parameters of the monitored section is reduced from the initial monitoring frequency of once a day to once every two days. At the same time, groundwater level monitoring items, soil moisture monitoring items and heavy metal lead monitoring items are added to the monitored section; if the monitored section is in a water flow period, the water quality parameters are reduced. The monitoring frequency of its hydrological parameters is increased by adjusting the monitoring frequency of the water quality parameters of the monitored flow section, for example, the monitoring frequency of the water quality parameters of the monitored flow section is reduced from the initial monitoring frequency of once a day to once every two days, and the monitoring frequency of the hydrological parameters of the monitored flow section is increased from the initial monitoring frequency of once a day to four times a day, and at the same time, the suspended matter concentration monitoring project, turbidity monitoring project and fecal coliform group monitoring project are added to the monitored flow section; among them, the groundwater level monitoring project and the soil moisture monitoring project are drought monitoring projects, and the heavy metal lead monitoring project, the suspended matter concentration monitoring project, the turbidity monitoring project and the fecal coliform group monitoring project are pollutant monitoring projects. This embodiment takes into account that the river flow rate is low during the drought period, and pollutants are easily accumulated in the water, that is, the rate of deterioration of water quality parameters may be accelerated. Therefore, this embodiment increases the monitoring frequency of water quality parameters, and adds the monitoring project of heavy metal lead of pollutants on the basis of conventional water quality monitoring projects. There is generally less rain during the drought period, and seasonal drought is prone to occur. In addition, the hydrological parameters are relatively stable, and the rate of change of hydrological parameters is slow. Therefore, this embodiment reduces the monitoring frequency of hydrological parameters and adds drought-related monitoring projects such as groundwater level monitoring projects and soil moisture monitoring projects. During the water supply period, there is usually abundant rain and the water flow rate is fast, which can flush the pollutants in the river and reduce the concentration of pollutants to a certain extent, that is, the rate of deterioration of water quality parameters may slow down. Therefore, this embodiment reduces the monitoring frequency of water quality parameters. Since the water level of the river decreases during the dry period, animals may defecate on the riverbed exposed by drought, and these feces may be flushed into the river during the water supply period. Therefore, this embodiment adds fecal coliform monitoring items to the monitoring flow section in the water supply period on the basis of conventional water quality monitoring items. In addition, the water flow rate is fast during the water supply period, which can easily flush the materials deposited on the bottom of the river to the surface of the river, causing excessive suspended matter in the river water and turbidity in the river water. For this reason, this embodiment adds suspended matter concentration monitoring items and turbidity monitoring items. After the river monitoring center server adjusts the monitoring frequency of water quality and hydrological parameters of each monitoring flow section and adds the required additional monitoring items, it monitors the original conventional monitoring items of water quality parameters, conventional monitoring items of hydrological parameters and additional monitoring items for each monitoring flow section according to the new monitoring frequency.

[0057] Preferably, the river monitoring center server collects the monitoring values ​​of water quality parameters, hydrological parameters and related additional monitoring items monitored at each monitoring point according to the new monitoring frequency each time, and then judges whether the monitoring values ​​of each water quality parameter, hydrological parameter and related additional monitoring items exceed the standard. Specifically, the river monitoring center server pre-stores the normal threshold values ​​corresponding to each water quality parameter, hydrological parameter and related additional monitoring items. Each time the river monitoring center server collects the monitoring values ​​of each water quality parameter, hydrological parameter and related additional monitoring items, it compares the monitoring values ​​of each water quality parameter, hydrological parameter and related additional monitoring items with the corresponding normal threshold values. If any value exceeds the corresponding normal threshold, an alarm is issued to the river management personnel via SMS, email, APP push and / or AI phone call.

[0058] For the monitoring of heavy metal lead, the river monitoring center server collects the lead content data in the river water through the heavy metal lead monitoring sensor, and then uses professional heavy metal content calculation methods, such as the geo-integral method or the flux method, to analyze and calculate the lead content monitoring data collected at each monitoring point. The geo-integral method divides the monitoring section into several units according to the spatial distribution characteristics of heavy metals in the water body, calculates the heavy metal content in each unit respectively, and then accumulates the content of the entire section. The flux method calculates the heavy metal flux passing through the monitoring point section per unit time according to the concentration distribution of heavy metals on the monitoring point section and the water flow rate, and then accumulates the flux to obtain the cumulative amount within a certain period of time. Through the above method, the river monitoring center server can obtain the cumulative amount of lead pollutants at each monitoring point in different time periods, and compare it with the historical mean value for the same period. If it is higher than the historical mean value for the same period, the monitoring section where the monitoring point is located will be automatically marked as a key monitoring area for lead pollution, and an early warning message will be generated and sent to the user. The river monitoring center server uses intelligent algorithms such as particle swarm optimization to automatically adjust the monitoring strategy of heavy metal lead at each monitoring point in the key monitoring area. The particle swarm optimization algorithm searches for the optimal monitoring solution in the solution space by simulating the foraging behavior of bird flocks. Specifically, the monitoring frequency, monitoring interval and other parameter settings of heavy metal lead at each monitoring point are regarded as a "particle", and multiple particles form a "particle swarm". The optimal parameter combination is found through iterative optimization. The optimization goal is to obtain as comprehensive and accurate monitoring data as possible at the lowest monitoring cost, and to detect pollution anomalies as early as possible. Through the optimization of the particle swarm algorithm, the monitoring strategy in the key monitoring area can be made more intelligent and efficient. Based on the analysis and calculation of the heavy metal lead content data, the river monitoring center server uses data visualization technology to generate intuitive visualization charts and graphs of heavy metal lead content, and superimposes the spatial distribution heat map of lead content on the GIS electronic map, which can clearly show the spatial distribution characteristics of lead pollution in the basin and the key pollution areas. In addition, the river monitoring center server uses the lead content data regularly monitored by each monitoring point to generate a time series line chart of lead content, which can reflect the time trend of lead pollution. The river monitoring center server also uses the hydrological parameters and corresponding lead contents monitored regularly at each monitoring point to generate a scatter plot of the correlation between lead content and hydrological parameters, which can reveal the correlation between lead pollution and hydrological parameters. The river monitoring center server uses the correlation between the two to analyze and predict the changing trend of lead content based on the predicted changing trend of hydrological parameters.

[0059] S5. For each monitored flow section, the pollutant monitoring data in the water quality parameters currently monitored by each monitoring point of the monitored flow section is obtained, and the pollutant diffusion simulation model corresponding to the hydrological state period of the monitored flow section is used to predict the pollutant migration trend and pollutant concentration change trend of the monitored flow section within a preset time period in the future.

[0060] The river monitoring center server constructs the pollutant diffusion simulation model in step S5 in advance according to the following steps:

[0061] First, the river monitoring center server obtains the historical hydrological parameter time series and historical pollutant monitoring data time series of the river to be monitored during the drought period and the water period, wherein the pollutant monitoring data time series includes the pollutant concentration time series and the pollutant distribution position time series.

[0062] Then, in the first aspect, the river monitoring center server takes the hydrological parameters at a certain time point in the historical hydrological parameter time series of the drought period and the pollutant monitoring data (including pollutant concentration and pollutant distribution position) at that time point in the historical pollutant monitoring data time series as input, and takes the pollutant monitoring data sequence (including pollutant concentration sequence and pollutant distribution position sequence) within one week after that time point (in this embodiment, the preset time period is set to one week) in the historical pollutant monitoring data time series of the drought period as output, to form a set of drought period training samples, and thus construct multiple sets of such drought period training samples. In the second aspect, the river monitoring center server takes the hydrological parameters at a certain time point in the historical hydrological parameter time series of the water flow period and the pollutant monitoring data (including pollutant concentration and pollutant distribution position) at that time point in the historical pollutant monitoring data time series as input, and takes the pollutant monitoring data sequence (including pollutant concentration sequence and pollutant distribution position sequence) within one week after that time point in the historical pollutant monitoring data time series of the water flow period as output, to form a set of water flow period training samples, and thus construct multiple sets of such water flow period training samples.

[0063] The river monitoring center server then uses machine learning algorithms such as support vector regression (SVR) or random forest regression (RFR) to construct a drought period pollutant diffusion simulation model and a water flow period pollutant diffusion model, respectively. The river monitoring center server uses drought period training samples to train the drought period pollutant diffusion simulation model, so that the drought period pollutant diffusion simulation model has the ability to identify hydrological parameters and pollutant monitoring data to obtain pollutant monitoring data sequences (including pollutant concentration sequences and pollutant distribution location sequences) within the next week. The river monitoring center server uses water flow period training samples to train the water flow period pollutant diffusion simulation model, so that the water flow period pollutant diffusion simulation model has the ability to identify hydrological parameters and pollutant monitoring data to obtain pollutant monitoring data sequences (including pollutant concentration sequences and pollutant distribution location sequences) within the next week.

[0064] In the process of monitoring water quality and hydrological parameters, the river monitoring center server uses a pre-built and trained pollutant diffusion simulation model to predict and analyze the relevant pollutant monitoring data in the water quality parameters. Specifically: the river monitoring center server obtains the hydrological parameters currently monitored by each monitoring point in the monitored section and the pollutant monitoring data in the water quality parameters for each monitored section. The pollutant monitoring data includes the pollutant concentration and the distribution location of the pollutants. The mean value of the hydrological parameters of each monitoring point in the monitored section is used as the hydrological parameter of the monitored section, and the mean value of the pollutant monitoring data in the water quality parameters of each monitoring point in the monitored section is used as the pollutant monitoring data of the monitored section. Then the hydrological parameters and pollutant monitoring data (pollutant concentration and pollutant distribution location) of the monitored flow section are taken as input and input into the pollutant diffusion simulation model corresponding to the hydrological state period of the monitored flow section, and the pollutant diffusion simulation model is used to predict the pollutant migration trend and pollutant concentration change trend of the monitored flow section in the next week. Specifically, the pollutant diffusion simulation model obtains the pollutant concentration change and pollutant distribution location change in the next week based on the input hydrological parameters and pollutant monitoring data (pollutant concentration and pollutant distribution location), that is, the pollutant concentration change trend and pollutant migration trend in the next week are obtained.

[0065] In this embodiment, pollutants include ammonia nitrogen and total phosphorus monitored in the routine monitoring items of water quality parameters, and also include heavy metal lead, suspended matter, and fecal coliform group monitored in the additional monitoring items. In this embodiment, preferably, the pollutant diffusion simulation model corresponding to the training is constructed for each pollutant according to the above construction and training process, that is, the ammonia nitrogen diffusion simulation model, the total phosphorus diffusion simulation model, the heavy metal lead diffusion simulation model, the suspended matter diffusion simulation model, and the fecal coliform group diffusion simulation model are constructed and trained respectively. In this way, the diffusion simulation model corresponding to each pollutant can be used to predict the concentration change trend and migration trend of each pollutant.

[0066] S6. For each monitored flow section, determine the corresponding flocculant delivery plan based on its current water quality parameters and the predicted pollutant migration trend and pollutant concentration change trend.

[0067] After obtaining the pollutant migration trend and pollutant concentration change trend of each monitored section, the river monitoring center server determines the pollution risk level according to the current water quality parameters of the monitored section (the average of the water quality parameters of each monitoring point in the monitored section) and the predicted pollutant migration trend and pollutant concentration change trend, and then queries the pre-established correspondence between the pollution risk level and the flocculant delivery plan according to the pollution risk level, and determines the flocculant delivery plan corresponding to the pollution risk level of the monitored section. Exemplarily, in this embodiment, the technical personnel pre-establish the correspondence between multiple pollution risk levels and flocculant delivery plans based on experience, for example, if the pollution risk level is low, it corresponds to flocculant delivery plan 1; if the pollution risk level is medium, it corresponds to flocculant delivery plan 2; if the pollution risk level is high, it corresponds to flocculant delivery plan 3. The pollution risk level determination process is as follows: This embodiment adopts the water pollution index method to evaluate the degree of river pollution. Specifically, according to the water quality parameters monitored by each monitoring point of each monitoring section, the weighted average method is used to calculate the current comprehensive pollution index P of each monitoring section; This embodiment is based on the surface water environmental quality standard (GB3838-2002), and divides the comprehensive index into 5 levels, corresponding to different pollution levels; The river monitoring center server obtains the pollution level according to the calculated comprehensive pollution index, and then determines the pollution risk level according to the current pollution level and the predicted pollutant migration trend and pollutant concentration change trend.

[0068] Preferably, this embodiment can be changed to automatically generate a flocculant delivery plan corresponding to each pollution risk level according to the following process:

[0069] This embodiment constructs a flocculant delivery simulation model based on the EFDC model. Specifically, in the EFDC model, the flocculant action mechanism is introduced, and the flocculant delivery effect on the pollutant concentration is simulated by adding a flocculation reaction kinetic equation. Commonly used flocculation kinetic equations include the first-order kinetic equation and the Langmuir equation. Taking the first-order kinetic equation as an example, its expression is dC / dt=-kC, where C is the pollutant concentration, t is the time, and k is the first-order reaction rate constant. The range of k values ​​is determined by experimental determination or literature research, and then the model parameter calibration method, such as trial and error method, least squares method, etc., is used to adjust the k value to minimize the error between the model simulation value and the measured value, thereby determining the optimal k value. For example, the flocculation rate k of PAC for COD is determined to be in the range of 0.1~0.5 through literature research, and then the k value is optimized using the least squares fitting method, so that the square sum of the error between the fitting curve and the COD measured removal rate data of 10 groups of different doses is minimized, and the optimal k=0.3 is determined.

[0070] This embodiment adopts EFDC and other three-dimensional hydrodynamic-water quality coupling models to simulate the flow field distribution and pollutant concentration field of the river under each pollution risk level, and quantitatively evaluates the interception and retention efficiency of the flocculant by comparing and analyzing the pollution plume migration trajectory and concentration change trend with and without flocculants. The decision variables such as the placement location, time, amount and particle size of the flocculant are set in the model, and the multi-objective genetic algorithm (NSGA-II) is used to optimize the flocculant placement plan. The specific steps are as follows: encode the decision variables to generate an initial population with a population size of 50; decode each individual and calculate its fitness value; the fitness function is set to the pollutant removal rate, which is characterized by the relative error between the model simulation value and the measured value; perform selection, crossover and mutation operations to generate a new generation of population, such as tournament selection, simulated binary crossover, and polynomial mutation, and repeat the above steps for the new generation of population until the maximum evolutionary generation (such as 50 generations) is reached; screen the non-dominated solutions in the final population to obtain the Pareto optimal solution set; combine the constraints such as cost and engineering quantity to select the optimal flocculant placement plan from the Pareto optimal solution set. After obtaining the optimal flocculant delivery plan, the river monitoring center server delivers the flocculant according to the optimal flocculant delivery plan, and then monitors the changes in water quality parameters through water quality monitoring equipment, compares the actual data monitored with the simulated data of the flocculant delivery simulation model, and dynamically feeds back the actual removal effect of the flocculant. If the difference between the simulated data and the actual data is large, the model is adaptively corrected and the delivery plan is automatically optimized through parameter update algorithms such as the sequential Bayesian method. In this process, for key parameters (such as flocculant type, dosage, and dosage time, etc.), the orthogonal experimental design method can be used to design the best combination of preferred parameters. Taking the flocculant dosage and dosage time as an example, three levels can be selected, namely low, medium, and high values ​​of the dosage (such as 1, 3, and 5 mg / L), and early, medium, and late values ​​of the dosage time (such as 1, 3, and 5 days after the pollution occurs). The L9 (3^4) orthogonal table is used to design 9 groups of experimental plans. According to each group of test schemes, the input parameters of the flocculant delivery simulation model are adjusted to simulate the effect of reducing pollutant concentration after flocculant delivery. Then, the pollutant removal rate of each group of test schemes is calculated using numerical simulation methods, and histograms are drawn to compare the effect differences of each parameter level. The range analysis is performed to determine the optimal level combination of each parameter, and the significance level of each parameter is calculated through variance analysis. On this basis, the parameter values ​​are further optimized, and superimposed and combined with other parameters (such as flocculant type, particle size, etc.), and finally the optimal configuration scheme of each parameter is determined, and the optimal flocculant delivery scheme is obtained.

[0071] The above is a fixed use of the same flocculant, and the flocculant action mechanism is introduced into the EFDC three-dimensional hydrodynamic-water quality coupling model, that is, the flocculation reaction kinetic equation is added to the above model to simulate the effect of reducing pollutant concentration after flocculant is added, so as to determine the optimal flocculant addition plan. Preferably, in other embodiments, the river monitoring center server can be changed to generate the flocculant addition plan according to the following process:

[0072] First, the optimal type of flocculant may be different for different pollution levels (i.e. different water quality parameter values). Therefore, the river monitoring center server first builds a "water quality parameter-optimal flocculant type" prediction model to achieve automatic matching and selection of the optimal flocculant type under different water quality conditions. The specific process is as follows:

[0073] In this embodiment, multiple experimental groups are prepared in advance, for example, twelve experimental groups are designed, four groups are water samples with water quality parameter values ​​at a low pollution level, four groups are water samples with water quality parameter values ​​at a medium pollution level, and four groups are water samples with water quality parameter values ​​at a high pollution level. Then, the twelve experimental groups are used to conduct experiments. Specifically, the same dose of four flocculants (for example, aluminum sulfate, polyaluminum chloride, polyacrylamide, and polyaluminum silicate) are respectively added to the three groups of water samples with a low pollution level, and the same dose of four flocculants (for example, aluminum sulfate, polyaluminum chloride, polyacrylamide, and polyaluminum silicate) are respectively added to the three groups of water samples with a medium pollution level. Four flocculants (such as aluminum sulfate, polyaluminum chloride, polyacrylamide, and polyaluminum silicate) were added to three groups of water samples with high pollution levels at the same dose. Then, key water quality parameters such as turbidity, pH value, conductivity, COD, etc. of the twelve experimental water samples were collected through online water quality monitoring sensors. The collection frequency was not less than once every 5 minutes, and the data were transmitted back to the river monitoring center server in real time through the wireless communication network to form a continuous time series of water quality parameter changes. In this way, the time series of water quality parameter changes of different types of flocculants under different pollution levels were obtained. The river monitoring center server takes a set of water quality parameter values ​​(including turbidity, pH value, conductivity, COD and other parameter values) of the experimental group as input, and takes the optimal flocculant type of the water quality parameter change time series of the experimental group as output, to form a set of training samples, and then constructs multiple sets of training samples; then a machine learning algorithm such as a decision tree or a support vector machine is used to construct a "water quality parameter-optimal flocculant type" prediction model, and the above training samples are used to train the prediction model so that it can derive the optimal flocculant type according to different water quality parameters. In this way, the river monitoring center server can use the trained "water quality parameter-optimal flocculant type" prediction model to derive the corresponding optimal flocculant type according to the current water quality parameter values ​​of each monitored section of the river, and then output the flocculant delivery plan obtained above and the optimal flocculant type to the user, so that the user can carry out pollution treatment according to the above flocculant delivery plan and the optimal flocculant type.

[0074] For the optimal type of flocculant under each pollution degree, the Jar test method was used. Under laboratory conditions, for each pollution degree, multiple groups of identical water samples were simulated. By adding different doses of the optimal type of flocculant to these groups of water samples, the change of the Zeta potential of the colloid during the flocculation process was measured, and the relationship curve between the Zeta potential and the dosage was plotted. The critical dosage when the Zeta potential is zero was determined. For example, when the dosage is 20, 32 and 8 mg / L, the Zeta potential is close to 0, and these three can be regarded as the optimal dosage. The server of the river monitoring center inputs the optimal type of flocculant and the optimal dosage into the EFDC and other three-dimensional hydrodynamic-water quality coupling models, sets a green tracer in the model, simulates the migration and diffusion process of the flocculant in the water body, and evaluates the interception and degradation effect of flocculant on the pollution plume by superimposing the tracer concentration field and the actual pollutant concentration field of each monitored section of the river; at the same time, considering the flocculation reaction kinetics, the coupling term of flocculant concentration and pollutant concentration is introduced into the convection diffusion equation to simulate the interaction process between the two, and evaluate the water quality improvement under the flocculant dosage scheme (optimal type of flocculant, optimal dosage). For example, 10 tracers with different particle sizes (1100μm) are set in the EFDC model to simulate the migration and diffusion process of different flocculants, and at the same time, considering the flocculation kinetic equation r=-kCmCn (C is the pollutant concentration, m and n are the reaction orders of the agent and the pollutant, respectively), calculate the concentration changes of 10 particle size tracers in 100 grid cells, and deduce the pollutant reduction effect after 24 hours. Furthermore, the river monitoring center server generates a pollutant concentration spatial distribution map based on the current water quality monitoring data (including pollutant concentration data) of each monitoring point in the monitored flow section, extracts the high-value area of ​​pollutant concentration distribution from the pollutant concentration spatial distribution map, and uses it as the best location for flocculant delivery, that is, the optimal flocculant delivery location is obtained. For example, a pollutant concentration spatial distribution map is generated based on the measured pollutant concentration data of all monitoring points in the monitored flow section, and the area with the measured pollutant concentration greater than 10 mg / L is extracted as the optimal delivery location. At the same time, the river monitoring center server sets different flocculant delivery start and stop times in the three-dimensional hydrodynamic-water quality coupling model to simulate the pollution control effect of flocculant delivery at different times. Through scenario analysis and cost-benefit evaluation, the optimal delivery time with the fastest pollutant reduction rate and the most economical dosage (such as the initial stage of pollution, before the peak of pollutant concentration occurs, etc.) is selected to obtain the optimal delivery time of flocculants. The river monitoring center server forms the optimal flocculant delivery plan based on the obtained optimal flocculant type, optimal delivery amount, optimal delivery location and optimal delivery time, so that the optimal flocculant delivery plan under each pollution degree can be obtained.The river monitoring center server derives the optimal flocculant dosage plan under various pollution risk levels based on the correspondence between the pollution degree and the pollution risk level and the optimal flocculant dosage plan under various pollution degrees. Specifically, the optimal flocculant dosage plan under low pollution degree is used as the optimal flocculant dosage plan under low pollution risk level, the optimal flocculant dosage plan under medium pollution degree is used as the optimal flocculant dosage plan under medium pollution risk level, and the optimal flocculant dosage plan under high pollution degree is used as the optimal flocculant dosage plan under high pollution risk level.

[0075] S7. Based on the rainfall forecast information within the preset number of days in the river basin and the hydrological parameters and water quality parameters of each monitored section of the river, predict whether the river will have seasonal drought pollution risks and its risk level in the future. If so, determine the corresponding prevention and control plan based on the predicted seasonal drought pollution risks and their risk levels.

[0076] In this embodiment, the technical personnel pre-establish the corresponding relationship between the seasonal drought pollution risk level and the prevention and control plan based on experience. For example, low seasonal drought pollution risk corresponds to prevention and control plan 1, moderate seasonal drought pollution risk corresponds to prevention and control plan 2, and high seasonal drought pollution risk corresponds to prevention and control plan 3. The river monitoring center server predicts whether the river will have seasonal drought pollution risks and their risk levels in the future based on the meteorological forecast information within a preset number of days in the river basin and the hydrological parameters and water quality parameters of each monitored section of the river. When it is predicted that the river will have seasonal drought pollution risks, the server queries the pre-established corresponding relationship between seasonal drought pollution risk levels and prevention and control plans based on the seasonal drought pollution risk levels to determine the corresponding prevention and control plans. The process is described in detail as follows:

[0077] The river monitoring center server accesses the rainfall forecast data interface of the meteorological department to obtain the daily rainfall forecast data for the river basin in the next week (the preset number of days is set to seven days, i.e. one week). At the same time, the hydrological characteristic monitoring data such as water level, flow, and sediment content of each monitoring point in the river basin are collected through hydrological monitoring equipment, and these measured data are summarized with the rainfall forecast data to form a complete hydrological and meteorological characteristic data set. On the GIS platform, the river monitoring center server overlays and analyzes spatial information such as digital elevation model (DEM), land use / cover data, and soil type data, extracts hydrological and geomorphological parameters such as the terrain relief, runoff density, and vegetation coverage of the basin, and then uses these parameters to construct distributed hydrological models such as Basin-Scale Water-Energy Balance Model (BWEBM). According to the physical mechanism and mathematical equations of the model, the transformation process of rainfall in the runoff area is simulated. The model mainly includes modules such as evapotranspiration calculation, infiltration calculation, and surface runoff calculation, and is solved using numerical methods such as finite difference method and finite element method. By calibrating the hydraulic conductivity and soil moisture parameters of the model, the simulated values ​​are made consistent with the measured flow process and water level process, so that the distributed hydrological model can predict the rainfall-runoff relationship curve (i.e., the trend of river runoff change). The river monitoring center server inputs the hydrological and meteorological characteristic data set obtained above into the distributed hydrological model, and uses the model to analyze the daily change trend of river runoff in the next week. The river monitoring center server analyzes the degree of deviation between the water level of each monitoring point of the river and the historical mean value in the same period in the next week based on the daily change trend of river runoff in the next week, and combines the comparison of water level process lines with design water level, guaranteed water level and other indicators to comprehensively judge the risk level of seasonal drought in the basin. For example, taking a river basin as an example, the river monitoring center server obtains the daily rainfall forecast data for the next 7 days through the API interface, with a time resolution of 1 hour and a spatial resolution of 1km×1km; then the hydrological monitoring equipment at each monitoring point in each monitoring section in the river basin obtains the current water level (accuracy 0.01m) and flow (accuracy 0.1m³ / s) data of the monitoring section, and uses IDW spatial interpolation to rasterize the rainfall forecast information and hydrological data to form a complete hydrological and meteorological characteristic data set. The river monitoring center server then establishes a BWEBM distributed hydrological model with a resolution of 100m. The model parameters are calibrated using the particle swarm optimization algorithm, and the Nash efficiency coefficient after calibration is 0.85.The river monitoring center server inputs the hydrological and meteorological characteristic data set into the distributed hydrological model, and uses the model to derive the river runoff change trend in the next 7 days based on the input hydrological and meteorological characteristics. For example, the river runoff change trend obtained by the model simulation shows that if the daily rainfall is less than 2mm for 3 consecutive days in the future and is lower than 20% of the historical average value (10mm) for the same period, the daily average flow at the river basin outlet will be lower than the design guarantee rate of 90% (500m³ / s) after 7 days. The river center server analyzes whether the river will face seasonal drought pollution risks in the next week based on the river runoff change trend obtained by the model simulation and the water quality data monitored by the recent water quality monitoring equipment. For example, the ammonia nitrogen concentration monitored by the water quality monitoring equipment at each monitoring point of each monitoring section of the river has exceeded the standard by more than 20% for 3 consecutive days. Then, combined with the river runoff change trend obtained by the model simulation, the river monitoring center server determines that the river will face moderate seasonal drought pollution risks in the next week, that is, moderate water quality pollution risks caused by seasonal droughts. In this embodiment, the risk levels are divided into three levels: low, medium and high, corresponding to different flow rates and different degrees of pollution exceeding the standard. For example: the daily average flow rate at the river basin outlet will be lower than the design guarantee rate of 80% (500m³ / s) and the ammonia nitrogen concentration will exceed the standard by 10% for three consecutive days, which is a low seasonal drought pollution risk; the daily average flow rate at the river basin outlet will be lower than the design guarantee rate of 90% (500m³ / s) and the ammonia nitrogen concentration will exceed the standard by 20% for three consecutive days, which is a moderate seasonal drought pollution risk; the daily average flow rate at the river basin outlet will be lower than the design guarantee rate of 95% (500m³ / s) and the ammonia nitrogen concentration will exceed the standard by 30% for three consecutive days, which is a high seasonal drought pollution risk.

[0078] After predicting that the river will have a moderate seasonal drought pollution risk in the next 7 days, the river center server will query the pre-established correspondence between the seasonal drought pollution risk level and the prevention and control plan, and find the prevention and control plan 2 corresponding to the moderate seasonal drought pollution risk. Prevention and control plan 2, for example, is to add potassium permanganate at a rate of 100kg / hour and lay out three interception belts within 500m on both sides of the polluted river section. After implementing this prevention and control plan 2, the ammonia nitrogen concentration in the polluted river section can be reduced to below 1.5mg / L within 2 days.

[0079] S8. Output the flocculant placement plan for each monitored section of the river. If step S7 predicts that the river will have seasonal drought pollution risk in the future, then also output the prevention and control plan corresponding to the seasonal drought pollution risk level.

[0080] After obtaining the flocculant delivery plan and the prevention and control plan, the river monitoring center server will output both to the user (such as a manager) at the same time, allowing the user to carry out anti-pollution treatment on the river according to the flocculant delivery plan and the prevention and control plan. It should be noted that if it is predicted in step S7 that the river will not face the risk of seasonal drought pollution in the future, only the flocculant delivery plan will be output to the user. Preferably, other embodiments can be changed to output the flocculant delivery plan of each monitored flow section to the flocculant delivery device of each monitored flow section, so that the flocculant delivery device can automatically deliver the flocculant according to the delivery plan without manual intervention; the prevention and control plan can be output to the pollution emergency disposal device such as the potassium permanganate delivery device and the interception belt setting device, so that the potassium permanganate delivery device can automatically deliver potassium permanganate according to the prevention and control plan, and the interception belt setting device can automatically set the interception belt according to the prevention and control plan without manual intervention.

[0081] In this embodiment, preferably, after step S8, the following steps S9 and S10 are also performed.

[0082] S9. Perform the following steps for each monitoring point:

[0083] S91, obtaining the water quality parameters currently monitored at the monitoring point, inputting the water quality parameters into a pre-trained water quality prediction model, and using the water quality prediction model to derive the water quality change trend of the monitoring point within a preset time period in the future according to the water quality parameters;

[0084] S92, obtaining the hydrological parameters currently monitored at the monitoring point, inputting the hydrological parameters into a pre-trained hydrological prediction model, and using the hydrological prediction model to derive the hydrological change trend of the monitoring point within a preset time period in the future according to the hydrological parameters;

[0085] S93. Output the water quality change trend and hydrological change trend of the monitoring point to the user; if the water quality parameter value in the water quality change trend of the monitoring point exceeds the corresponding normal water quality threshold or the hydrological parameter value in the hydrological change trend exceeds the corresponding normal hydrological threshold, generate an early warning prompt and output it to the user.

[0086] S10, respectively presenting the pollutant migration trend and pollutant concentration change trend of each monitored flow section and the water quality change trend and hydrological change trend of each monitoring point to the user in the form of visual charts.

[0087] The river monitoring center server uses machine learning algorithms such as LSTM and GRU to establish water quality prediction models and hydrological prediction models, and then constructs hydrological training samples and water quality training samples based on historical hydrological monitoring data and historical water quality monitoring data. Specifically: the hydrological parameter values ​​at a certain time point in the historical hydrological monitoring data are used as input, and the hydrological parameter values ​​within a period of time (such as one week) after the time point are used as output to form a group of hydrological training samples, and multiple groups of hydrological training samples are constructed accordingly; the water quality parameter values ​​at a certain time point in the historical water quality monitoring data are used as input, and the water quality parameter values ​​within a period of time (such as one week) after the time point are used as output to form a group of water quality training samples, and multiple groups of water quality training samples are constructed accordingly. The river monitoring center server uses hydrological training samples to train the hydrological prediction model, so that it has the ability to identify the hydrological parameter values ​​and obtain the hydrological parameter values ​​within a period of time in the future (such as one week), that is, to predict the trend of hydrological parameter changes in the next week. The river monitoring center server uses water quality training samples to train the water quality prediction model, so that it has the ability to identify water quality parameter values ​​and obtain water quality parameter values ​​for a period of time in the future (such as one week), that is, to predict the trend of water quality parameter changes in the next week. The river monitoring center server uses the trained model to predict the water quality change trend (such as pH value change in the next week) and hydrological change trend (such as water level change in the next week) of each monitoring point in the next week. The prediction results can be used to guide the scheduling and management of water resources, such as timely adjustment of reservoir water storage according to hydrological predictions, timely arrangement of water quality treatment of water intakes according to water quality predictions, etc., thereby providing a scientific basis for water resource management decisions. The river monitoring center server can automatically determine whether water quality abnormalities or hydrological abnormalities will occur in the future based on the predicted water quality change trends and hydrological change trends, and issue an early warning if an abnormality occurs. Specifically: if the water quality parameter value in the water quality change trend of the monitoring point exceeds the corresponding normal water quality threshold or the hydrological parameter value in the hydrological change trend exceeds the corresponding normal hydrological threshold, an early warning prompt is generated and output to the user, so that the user can take relevant treatment measures in advance to prevent water quality abnormalities or hydrological abnormalities. In order to improve the reliability and accuracy of monitoring data, the river center server encrypts and stores the water quality parameters and hydrological parameters collected at each monitoring point to ensure the authenticity and non-tamperability of the monitoring data. At the same time, the verification algorithm is used to automatically verify and review the monitoring data to improve the credibility of the monitoring data. The river monitoring center server builds a visualization platform and uses data visualization technology to display the pollutant migration trend and pollutant concentration change trend of each monitored section, as well as the water quality change trend and hydrological change trend of each monitoring point, to users in the form of visual charts, so that users can intuitively see the pollutant migration trend and pollutant concentration change trend of each monitored section, as well as the water quality change trend and hydrological change trend of each monitoring point.

[0088] The method for monitoring water pollution of seasonal drought rivers provided by the present invention, on the one hand, uses step S4 to adjust the monitoring frequency and add corresponding additional monitoring items according to the hydrological characteristics of each monitored section of the river, so that when the river is in different hydrological characteristics, it can timely monitor whether the water quality parameters exceed the standard, and can also add corresponding additional monitoring items based on different hydrological characteristics, so that the water quality monitoring under different hydrological characteristics is more targeted; on the other hand, by virtue of step S5, the pollution conditions of each monitored section of the river are predicted, and then the corresponding flocculant delivery plan is obtained through step S6. Step S7 is also used to predict whether the river will have seasonal drought pollution risks and their risk levels in the future. When it is predicted that there will be seasonal drought pollution risks, a corresponding prevention and control plan is automatically given, and then step S8 outputs the flocculant delivery plan and the prevention and control plan. In this way, the present invention can effectively predict the river pollution conditions and the pollution risks caused by seasonal droughts, and automatically give corresponding flocculant delivery plans and prevention and control plans to ensure water quality safety and prevent problems before they occur.

[0089] The above is only an implementation method of the invention, and does not limit the scope of patent protection. Those skilled in the art can make non-substantial changes or substitutions based on the invention, which still fall within the scope of patent protection.

Claims

1. A method for monitoring water pollution in seasonally dry rivers, characterized in that: The following steps are involved: S1. Divide the river into multiple monitoring sections according to its historical hydrological characteristics; S2. Multiple monitoring points are set in each monitored flow section, and water quality parameters and hydrological parameters of each monitoring point are monitored by water quality monitoring equipment and hydrological monitoring equipment according to a preset initial monitoring frequency; S3. According to the hydrological parameters of each monitored flow section, the hydrological state period of each monitored flow section is determined. The hydrological state period includes two situations: a dry period and a water flow period. S4. According to the hydrological state period of each monitored flow section, automatically adjust the monitoring frequency and add corresponding additional monitoring items for the monitored flow section, wherein the added additional monitoring items are selected from at least one pollutant monitoring item and at least one drought monitoring item; S5. For each monitored flow section, the pollutant monitoring data in the water quality parameters currently monitored by each monitoring point of the monitored flow section are obtained, and the pollutant diffusion simulation model corresponding to the hydrological state period of the monitored flow section is used to predict the pollutant migration trend and pollutant concentration change trend of the monitored flow section in the future preset time period; S6. For each monitored flow section, determine the corresponding flocculant placement plan based on its current water quality parameters and the predicted pollutant migration trend and pollutant concentration change trend; S7. Based on the rainfall forecast information within the preset number of days in the river basin and the hydrological parameters and water quality parameters of each monitored section of the river, predict whether the river will have seasonal drought pollution risk and its risk level in the future. If so, determine the corresponding prevention and control plan based on the predicted seasonal drought pollution risk and its risk level; S8, outputting the flocculant delivery plan for each monitored section of the river. If step S7 predicts that the river will have seasonal drought pollution risk in the future, then outputting the prevention and control plan corresponding to the seasonal drought pollution risk level; Step S1 includes: S11. Divide the river into several sections; S12, obtaining a time series of hydrological parameters of each river section within a preset historical time period, where the hydrological parameters include water level, flow velocity and flow; S13, taking a time series of a hydrological parameter as a feature vector, using K-means clustering algorithm to perform cluster analysis on each river section, and dividing each river section into multiple categories; S14, taking one category as a monitoring stream section, each monitoring stream section includes at least one river section; Specifically, the pollutant diffusion simulation model in step S5 is constructed according to the following steps: Obtaining the historical hydrological parameter time series and the historical pollutant monitoring data time series of the river to be monitored during the dry period and the water period, wherein the pollutant monitoring data time series includes the pollutant concentration time series and the pollutant distribution position time series; Taking the hydrological parameters at a certain time point in the time series of historical hydrological parameters during the drought period and the pollutant monitoring data at that time point in the time series of historical pollutant monitoring data as input, and taking the pollutant monitoring data sequence within a preset time period after that time point in the time series of historical pollutant monitoring data during the drought period as output, a set of drought period training samples is formed, and multiple sets of such drought period training samples are constructed accordingly; Taking the hydrological parameters at a certain time point in the historical hydrological parameter time series of the water flow period and the pollutant monitoring data at that time point in the historical pollutant monitoring data time series as input, and taking the pollutant monitoring data sequence within a preset time period after that time point in the historical pollutant monitoring data time series of the water flow period as output, a set of water flow period training samples is formed, and multiple sets of such water flow period training samples are constructed accordingly; Machine learning algorithms were used to construct pollutant diffusion simulation models during drought and during water supply periods. The drought period training samples are used to train the drought period pollutant diffusion simulation model, so that the drought period pollutant diffusion simulation model has the ability to identify hydrological parameters and pollutant monitoring data to obtain the pollutant monitoring data sequence within a preset time period. The water flow period training samples are used to train the water flow period pollutant diffusion simulation model, so that the water flow period pollutant diffusion simulation model has the ability to identify hydrological parameters and pollutant monitoring data to obtain the pollutant monitoring data sequence within a preset time period.

2. The method for monitoring water pollution in seasonal drought rivers as claimed in claim 1, characterized in that: In step S2, the number and location of monitoring points are determined based on the topographical characteristics and river characteristics of each monitored flow section; water quality parameters include pH value, conductivity, dissolved oxygen concentration, ammonia nitrogen concentration, water temperature, chemical oxygen demand and total phosphorus concentration; hydrological parameters include water level, flow rate and flow.

3. The method for monitoring water pollution in seasonal drought rivers as claimed in claim 1, characterized in that: Step S3 specifically: S31, obtaining the time series of hydrological parameters of each monitored section of the river in the previous N years; S32, using a time series analysis method to analyze the periodic changes of the hydrological parameter time series of each monitored flow section in the previous N years over time, and dividing the flood time period and the dry time period accordingly; S33, taking the average water level of the flood period of each monitored flow section in the previous N years as the flood level threshold of the monitored flow section, and taking the average water level of the dry period of each monitored flow section in the previous N years as the dry level threshold of the monitored flow section; S34, obtaining water level information from the current hydrological parameters of each monitored flow section. If the current water level of the monitored flow section is higher than the flood level threshold of the monitored flow section, the monitored flow section is determined to be in a water flow period. If the current water level of the monitored flow section is lower than the low water level threshold of the monitored flow section, the monitored flow section is determined to be in a drought period. And / or step S4 specifically: S41. If the monitored flow section is in a drought period, the monitoring frequency of water quality parameters is increased and the monitoring frequency of hydrological parameters is reduced, and groundwater level monitoring items, soil moisture monitoring items and heavy metal lead monitoring items are added to the monitored flow section; S42. If the monitored flow section is in the water flow period, the monitoring frequency of water quality parameters is reduced and the monitoring frequency of hydrological parameters is increased, and the suspended matter concentration monitoring item, turbidity monitoring item and fecal coliform group monitoring item are added to the monitored flow section; Among them, the groundwater level monitoring project and the soil moisture monitoring project are drought monitoring projects, and the heavy metal lead monitoring project, the suspended matter concentration monitoring project, the turbidity monitoring project and the fecal coliform monitoring project are pollutant monitoring projects.

4. The method for monitoring water pollution in seasonal drought rivers as claimed in claim 1, characterized in that: Step S6 specifically determines the pollution risk level of the monitored flow section according to the current water quality parameters and the predicted pollutant migration trend and pollutant concentration change trend, and then searches the pre-established correspondence between the pollution risk level and the flocculant placement plan according to the pollution risk level to determine the flocculant placement plan corresponding to the pollution risk level of the monitored flow section; And / or step S7 specifically searches for a pre-established correspondence between seasonal drought pollution risk levels and prevention and control plans based on the seasonal drought pollution risk levels, and determines a corresponding prevention and control plan.

5. The method for monitoring water pollution in seasonal drought rivers as claimed in claim 1, characterized in that: Including step Q executed between steps S4 and S5, if any value of the water quality parameters, hydrological parameters and monitoring results of additional monitoring items monitored by the monitoring point exceeds the corresponding normal threshold, an alarm is sent to the river management personnel via SMS, email, APP push and / or AI phone.

6. The method for monitoring water pollution in seasonal drought rivers as claimed in claim 1, characterized in that: The method comprises the following steps: performing step S9 after step S8, performing the following steps for each monitoring point: S91, obtaining the water quality parameters currently monitored at the monitoring point, inputting the water quality parameters into a pre-trained water quality prediction model, and using the water quality prediction model to derive the water quality change trend of the monitoring point within a preset time period in the future according to the water quality parameters; S92, obtaining the hydrological parameters currently monitored at the monitoring point, inputting the hydrological parameters into a pre-trained hydrological prediction model, and using the hydrological prediction model to derive the hydrological change trend of the monitoring point within a preset time period in the future according to the hydrological parameters; S93, outputting the water quality change trend and hydrological change trend of the monitoring point to the user; If the water quality parameter value in the water quality change trend of the monitoring point exceeds the corresponding normal water quality threshold or the hydrological parameter value in the hydrological change trend exceeds the corresponding normal hydrological threshold, an early warning prompt is generated and output to the user.

7. The method for monitoring water pollution in seasonal drought rivers as claimed in claim 6, characterized in that: The method comprises step S10 executed after step S9, respectively presenting the pollutant migration trend and pollutant concentration change trend of each monitored flow section and the water quality change trend and hydrological change trend of each monitoring point to the user in the form of visual charts.

8. A computer program product comprising a computer program, characterized in that When the computer program is executed by a processor, the method for monitoring water pollution in a seasonal drought river as described in any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Water quality early warning and forecasting system and water quality early warning and forecasting method

    CN108009736A

  • Hydrological monitoring method and system

    CN114352357A

  • Drainage basin water environment prediction and early warning method and system and computer equipment

    CN117929671A