A cotton yarn production material management system and method

By selecting the most used material in cotton yarn production as the main material, and comparing it with other materials, the changes in the remaining proportion can be judged in real time, which solves the material shortage problem caused by improper raw material management in cotton yarn production and ensures smooth production.

CN118504849BActive Publication Date: 2024-10-01YIBIN HONGQU THREAD CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410977545.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-10-01
Estimated Expiration
2044-07-22

AI Technical Summary

Technical Problem

In the cotton yarn production process, improper management of raw materials leads to unpredictable production losses and material shortages, affecting the smooth progress of production.

Method used

By selecting the most used material in each batch as the main material and comparing it with other materials, changes in the proportion of remaining quantities can be judged in real time, and early warnings can be issued and replenished to avoid material shortages.

Benefits of technology

It effectively avoids the shortage of production materials, ensures the smooth progress of production tasks, and improves the sophistication of material management and the stability of production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118504849B_ABST
    Figure CN118504849B_ABST
Patent Text Reader

Abstract

The present invention provides a cotton yarn production material management system and method that can effectively manage materials in a more refined manner and ensure the smooth progress of production. The above method specifically includes the following steps: S10, selecting at least one type of material from a batch of materials including multiple types as the main material; S20, based on the main material and the quantity of the main material required to be used in this task, calibrating the secondary materials and their quantities used together with the main material in this task; S30, marking the numbers of the selected main materials and the calibrated secondary materials, as well as the corresponding quantities of the corresponding materials in the warehouse, and freezing the materials marked with these numbers in the database. The cotton yarn production material management method provided by the present invention can effectively avoid shortages of production materials and ensure the smooth progress of production tasks by selecting a main material from each batch of materials as a judgment basis.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of intelligent management, and in particular relates to a cotton yarn production material management system and method. Background Art

[0002] In the production process of cotton yarn, a variety of raw materials are needed for production. In the process of raw material management, the required amount of various raw materials will be estimated and stored before each production task. However, as the production task progresses, not only will unpredictable production losses occur, resulting in a shortage of at least some raw materials, but the raw materials stored in the warehouse will also be temporarily called by other production tasks, eventually resulting in a large material gap, which in turn affects production. Summary of the invention

[0003] The present invention provides a cotton yarn production material management system and method, which can effectively manage materials in a more refined manner and ensure smooth production.

[0004] The present invention is achieved through the following technical solutions:

[0005] In one aspect, the present invention provides a cotton yarn production material management method, comprising the following steps:

[0006] S10, selecting at least one type of material from a batch of multiple types of materials as a main material;

[0007] S20. Based on the main material and the quantity of the main material required for this task, calibrate the secondary materials and their quantities used together with the main material in this task; the secondary materials are materials other than the main material required for this task;

[0008] S30, marking the numbers of the selected main materials and the calibrated secondary materials, as well as the corresponding quantities of the corresponding materials in the warehouse, and freezing the materials marked with these numbers in the database;

[0009] S40. In the task operation, it is determined in real time whether the remaining ratio of the main material to the secondary material in the frozen material changes;

[0010] S50. If a change occurs, and the remaining amount ratio of the main material to any secondary material in the frozen materials exceeds a preset ratio range, an early warning is issued.

[0011] In some embodiments, after issuing the warning, the following steps are also included:

[0012] S60. The console determines the abnormal situation, which specifically includes the following steps:

[0013] S601. Check in the database whether the material corresponding to the frozen number has been called;

[0014] S602. If a call occurs, materials are replenished according to the called quantity, and the replenished materials are frozen again.

[0015] In some embodiments, after S601, searching in the database whether the material corresponding to the frozen number has been called, the following steps are also included:

[0016] S603: If no call occurs, further determine whether it is a production loss;

[0017] S604: When it is determined to be production loss, corresponding replenishment is performed.

[0018] In some embodiments, when it is determined to be a production loss, the corresponding supplementation includes the following steps:

[0019] S6041, obtain the initial ratio of the secondary material to the main material with the ratio change ,in, For the Type The remaining quantity at the time of the second measurement, Main material The remaining quantity at the time of the second measurement;

[0020] S6042, preset ratio range is [ , ], obtain the preset proportion touched in any preset proportion for issuing an early warning;

[0021] S6043, when the preset ratio of touch is When the secondary materials are replenished;

[0022] S6044, when the preset ratio of touch is When the main material is replenished.

[0023] In some embodiments, when it is determined to be a production loss, the corresponding supplementation includes the following steps:

[0024] S6041, obtain the initial ratio of the secondary material to the main material whose ratio changes exceed the preset ratio range ,in, For the Type The remaining quantity at the time of the second measurement, Main material The remaining quantity at the time of the second measurement;

[0025] S6042, preset ratio range is [ , ], obtain the preset proportion touched in any preset proportion for issuing an early warning;

[0026] S6043-1. Obtain the interval time from the start of the task operation to the issuance of the warning;

[0027] S6044-1. Based on the interval time, after the same interval time, measure the material group with abnormality again to obtain the remaining quantity of the main material and the secondary material. ;

[0028] S6045-1, further determine whether ;

[0029] S6046-1. If not, replenish the materials.

[0030] In some embodiments, when determining When replenishing materials, the following steps are included:

[0031] T10, when the preset ratio of touch is When the secondary materials are replenished;

[0032] T20, when the preset ratio of touch is When the main material is replenished.

[0033] In some of the embodiments, the material with the largest usage in the current batch of materials is selected as the main material.

[0034] On the other hand, an embodiment of the present application provides a cotton yarn production material management system, including a memory and a processor, wherein a computer program is stored in the memory, and the processor executes the computer program to implement the cotton yarn production material management method of any one of the above embodiments.

[0035] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0036] The cotton yarn production material management method provided by the present invention selects a main material from each batch of materials as a judgment basis, and compares the main material with the secondary material in the production task to determine whether abnormal loss of the main material or the secondary material occurs, and whether it is abnormally called, thereby effectively avoiding shortages of production materials and ensuring the smooth progress of production tasks. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0038] Figure 1 A schematic diagram of a cotton yarn production material management method provided by some embodiments of the present invention;

[0039] Figure 2 A schematic diagram of a flow chart of a console providing some embodiments of the present invention for determining abnormal situations. DETAILED DESCRIPTION

[0040] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments.

[0041] In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc. used to indicate the orientation or position relationship are based on the orientation or position relationship shown in the accompanying drawings, or are the orientation or position relationship commonly placed when the product of the invention is used. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0042] In addition, if the terms "horizontal" or "vertical" appear in the description of the present invention, it does not mean that the components are required to be absolutely horizontal or suspended, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0043] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0044] The terms "include" and "have" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product, or device that includes a series of steps or modules is not limited to the listed steps or modules, but may optionally include steps or modules that are not listed, or may optionally include other steps or modules that are inherent to these processes, methods, products, or devices.

[0045] On the one hand, see Figure 1 The present application embodiment provides a cotton yarn production material management method, which mainly includes the following steps:

[0046] S10. Select at least one type of material from a batch of materials including multiple types as the main material. In S10, a batch of materials refers to all the materials required in a fixed task operation, and the materials usually include multiple types. In actual scenarios, more than one batch of materials are usually stacked in the warehouse, and the types and quantities of materials included in different batches may be different. For each fixed batch, select at least one type of material as the main material. In the selection of the main material, the one with the largest usage or the highest value can be selected as the main material.

[0047] S20, based on the main material and the quantity of the main material required for this task, mark the secondary materials and their quantities used together with the main material in this task. In S20, based on this production task, after determining the main material and the quantity of the main material required, mark and determine the corresponding secondary materials and their quantities. The secondary materials are other materials in this production task except the main material.

[0048] S30, mark the numbers of the selected main materials and the calibrated secondary materials, as well as the corresponding quantities of the corresponding materials in the warehouse, and freeze the materials marked with these numbers in the database. In S30, after the main materials and secondary materials required for this task are determined, they are marked in the database and frozen. Freezing means that at the database level, although these frozen materials are displayed, they cannot be called again.

[0049] S40, in the task operation, it is determined in real time whether the remaining ratio of the main material and the secondary material in the frozen material has changed. In S40, in the production task process, under normal circumstances, the remaining ratio of the main material and the secondary material is always in the same state, and the remaining amount of the main material and the secondary material is measured once at a certain interval. Because the secondary material may include multiple types, each type of secondary material needs to be compared with the main material to determine different ratios.

[0050] S50. In step S40, when the ratio of the remaining amount of the main material to any secondary material exceeds a preset ratio range, an early warning is issued.

[0051] In the above embodiment, a main material is selected from each batch of materials as a judgment basis, and the main material is compared with the secondary material in the production task to determine whether there is abnormal loss of the main material or the secondary material, and whether it is abnormally called, thereby effectively avoiding shortages of production materials and ensuring the smooth progress of production tasks.

[0052] In some embodiments, when the remaining ratio of the main material to any secondary material in the frozen materials exceeds a preset ratio range, after issuing an early warning, the following steps are also included:

[0053] S60, the console determines the abnormal situation, please refer to Figure 2 , specifically including the following steps:

[0054] S601. Check in the database whether the material corresponding to the frozen number is called. In S601, because some data in the database and the warehouse management cannot be completely synchronized, there will be differences between the data in the database and the data in the warehouse management, which will cause the material corresponding to the frozen number in the database to still be called.

[0055] S602: If a call occurs, materials are replenished according to the called quantity, and the replenished materials are frozen again. In S602, after a material call occurs, it can be replenished in time, which has a low impact on the production task. The purpose of freezing the replenished materials again is to obtain the materials required for the current production task more intuitively from the database.

[0056] Through the arrangement of the above embodiment, it is possible to timely discover the situation where frozen materials are called, and then replenish them in time to avoid affecting the production tasks.

[0057] In some of these embodiments, see Figure 2 , after step S601, the following steps are also included:

[0058] S603: If no call occurs, further determine whether it is a production loss. In S603, when the remaining ratio of the main material to the secondary material changes, possible reasons include material call, management loss, production loss, etc. Therefore, it is necessary to further determine whether it is a production loss.

[0059] S604: When it is determined to be production loss, corresponding replenishment is performed.

[0060] In the above embodiment, when it is determined to be production loss, production loss refers to abnormal loss in the production process, resulting in the loss of pre-prepared main materials or secondary materials. In the production process, due to the reasons of the equipment itself, such as equipment aging, abnormal equipment parameter settings, etc., the amount of lost materials will vary widely, and eventually some materials will be lost. Therefore, production loss is difficult to predict and has a particularly large impact on production tasks. Therefore, it is necessary to make corresponding supplements in time according to the specific losses of production to avoid excessive supplements, waste of materials, and insufficient supplements, resulting in the termination of production tasks.

[0061] In some embodiments, when it is determined to be a production loss, the corresponding supplementation includes the following steps:

[0062] S6041, obtain the initial ratio of the secondary material to the main material whose ratio changes exceed the preset ratio range ,in, For the Type The remaining quantity at the time of the second measurement, Main material The remaining quantity at the time of the next measurement.

[0063] S6042, preset ratio range is [ , ], obtain the preset ratio touched in any preset ratio for issuing an early warning. In S6042, the preset ratio is preset, and different values ​​can be set according to the types of main materials and secondary materials; and the value of the material and the quantity requirements can also be set accordingly. For example, if the value of the material is high, the quantity stored in the warehouse is small, or it is difficult to purchase, the preset ratio range can be set to be smaller. If the value of the material is low, or the quantity of the corresponding type of material stored in the warehouse is large, or it is convenient to purchase, the preset ratio range can be set to be larger.

[0064] S6043, when the preset ratio of touch is The preset ratio touched means that the ratio of the secondary material to the main material changes beyond the maximum or minimum value of the preset range.

[0065] S6044, when the preset ratio of touch is When the main material is replenished.

[0066] Through the arrangement of the above embodiment, materials lost in production can be replenished in time to avoid affecting production tasks.

[0067] In some other embodiments, when it is determined to be a production loss, the corresponding supplementation includes the following steps:

[0068] S6041, obtain the initial ratio of the secondary material to the main material whose ratio changes exceed the preset ratio range ,in, For the Type The remaining quantity at the time of the second measurement, Main material The remaining quantity at the time of the next measurement.

[0069] S6042, preset ratio range is [ , ], obtain the preset ratio touched in any preset ratio for issuing an early warning. In S6042, the preset ratio is preset, and different values ​​can be set according to the types of main materials and secondary materials; and the value of the material and the quantity requirements can also be set accordingly. For example, if the value of the material is high, the quantity stored in the warehouse is small, or it is difficult to purchase, the preset ratio range can be set to be smaller. If the value of the material is low, or the quantity of the corresponding type of material stored in the warehouse is large, or it is convenient to purchase, the preset ratio range can be set to be larger.

[0070] S6043-1. Obtain the interval time from the start of the task operation to the issuance of the warning.

[0071] S6044-1. Based on the interval time, after the same interval time, measure the material group with abnormality again to obtain the remaining quantity of the main material and the secondary material. .

[0072] S6045-1, further determine whether ;

[0073] S6046-1. If not, replenish the materials.

[0074] In the above embodiment, when a material abnormality occurs, further judgment is performed, so that the material management can have higher redundancy.

[0075] In some embodiments, when determining When replenishing materials, the following steps are included:

[0076] T10, when the preset ratio of touch is When the secondary materials are replenished;

[0077] T20, when the preset ratio of touch is When the main material is replenished.

[0078] In some of the embodiments, the material with the largest usage in the current batch of materials is selected as the main material.

[0079] On the other hand, an embodiment of the present application provides a cotton yarn production material management system, including a memory and a processor, wherein a computer program is stored in the memory, and the processor executes the computer program to implement the cotton yarn production material management method of any one of the above embodiments.

[0080] This embodiment also provides a computer storage medium on which a computer program is stored. The computer program is loaded by the processing module to implement the cotton yarn production material management method of any one of the above embodiments.

[0081] The above description is only a preferred embodiment of the present invention and does not constitute any limitation to the present invention. Any simple modification or equivalent changes made to the above embodiments based on the technical essence of the present invention shall fall within the protection scope of the present invention.

Claims

1. A cotton yarn production material management method, characterized in that: The following steps are involved: S10, selecting at least one type of material from a batch of multiple types of materials as a main material; S20. Based on the main material and the quantity of the main material required for this task, calibrate the secondary materials and their quantities used together with the main material in this task; the secondary materials are materials other than the main material required for this task; S30, marking the numbers of the selected main materials and the calibrated secondary materials, as well as the corresponding quantities of the corresponding materials in the warehouse, and freezing the materials marked with these numbers in the database; S40. In the task operation, it is determined in real time whether the remaining ratio of the main material to the secondary material in the frozen material changes; S50. If a change occurs, and the remaining amount ratio of the main material to any secondary material in the frozen materials exceeds a preset ratio range, an early warning is issued; After the warning is issued, the following steps are also included: S60. The console determines the abnormal situation, which specifically includes the following steps: S601. Check in the database whether the material corresponding to the frozen number has been called; S602: If a call occurs, materials are replenished according to the called quantity, and the replenished materials are frozen again; S601. After searching in the database whether the material corresponding to the frozen number has been called, the following steps are also included: S603: If no call occurs, further determine whether it is a production loss; S604, when it is determined to be production loss, corresponding replenishment is performed; When it is determined to be production loss, the corresponding supplementation includes the following steps: S6041, obtain the initial ratio of the secondary material to the main material with the ratio change ; S6042, preset ratio range is [ , ], obtain the preset proportion touched in any preset proportion for issuing an early warning; S6043, when the preset ratio of touch is When the secondary materials are replenished; S6044, when the preset ratio of touch is When the main material is replenished.

2. The cotton yarn production material management method according to claim 1, characterized in that: Select the material with the largest usage in the current batch as the main material.

3. A cotton yarn production material management method, characterized in that: The following steps are involved: S10, selecting at least one type of material from a batch of multiple types of materials as a main material; S20. Based on the main material and the quantity of the main material required for this task, calibrate the secondary materials and their quantities used together with the main material in this task; the secondary materials are materials other than the main material required for this task; S30, marking the numbers of the selected main materials and the calibrated secondary materials, as well as the corresponding quantities of the corresponding materials in the warehouse, and freezing the materials marked with these numbers in the database; S40. In the task operation, it is determined in real time whether the remaining ratio of the main material to the secondary material in the frozen material changes; S50. If a change occurs, and the remaining amount ratio of the main material to any secondary material in the frozen materials exceeds a preset ratio range, an early warning is issued; After the warning is issued, the following steps are also included: S60. The console determines the abnormal situation, which specifically includes the following steps: S601. Check in the database whether the material corresponding to the frozen number has been called; S602: If a call occurs, materials are replenished according to the called quantity, and the replenished materials are frozen again; S601. After searching in the database whether the material corresponding to the frozen number has been called, the following steps are also included: S603: If no call occurs, further determine whether it is a production loss; S604, when it is determined to be production loss, corresponding replenishment is performed; When it is determined to be production loss, the corresponding supplementation includes the following steps: S6041, obtain the initial ratio of the secondary material to the main material whose ratio changes exceed the preset ratio range ; S6042, preset ratio range is [ , ], obtain the preset proportion touched in any preset proportion for issuing an early warning; S6043-1. Obtain the interval time from the start of the task operation to the issuance of the warning; S6044-1. Based on the interval time, after the same interval time, measure the material group with abnormality again to obtain the ratio of the remaining quantity of the main material and the secondary material. ; S6045-1, further determine whether ; S6046-1. If not, replenish the materials.

4. The cotton yarn production material management method according to claim 3, characterized in that: When judging When replenishing materials, the following steps are included: T10, when the preset ratio of touch is When the secondary materials are replenished; T20, when the preset ratio of touch is When the main material is replenished.

5. The cotton yarn production material management method according to claim 3, characterized in that: Select the material with the largest usage in the current batch as the main material.

6. A cotton yarn production material management system, characterized in that: It comprises a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to implement the cotton yarn production material management method according to any one of claims 1 to 5.