A method and system for allocating power grid resources based on generative artificial intelligence

Through the power grid resource allocation method based on generative artificial intelligence, the load level and load uniformity of power equipment are analyzed, the resource allocation amount is adjusted, the problem of unreasonable power grid resource allocation in the power system is solved, and the accuracy and accuracy of power grid resource allocation are improved. stability.

CN118508454BActive Publication Date: 2024-10-01HUBEI CENT CHINA TECH DEV OF ELECTRIC POWER
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202410962161.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-10-01
Estimated Expiration
2044-07-18

AI Technical Summary

Technical Problem

Existing technology is difficult to effectively deal with abnormal data and changes in historical power generation data of the power system, resulting in unreasonable distribution of power grid resources and the inability to achieve reasonable adjustment of power resources.

Method used

A power grid resource allocation method based on generative artificial intelligence is used to obtain historical load data of power equipment, analyze load levels and load uniformity, calculate the unreasonable degree of the allocation model, and adjust the resource allocation amount when the preset threshold is exceeded to construct New allocation model to achieve reasonable allocation of grid resources.

Benefits of technology

It improves the accuracy and stability of power grid resource allocation, avoids equipment overload or underload, and improves power grid operation efficiency and flexibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118508454B_ABST
    Figure CN118508454B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of data processing technology, and in particular to a method and system for allocating power grid resources based on generative artificial intelligence. The method includes: obtaining historical load data of multiple power equipment, inputting the historical load data into a pre-constructed allocation model, obtaining resource allocation amount and power load data of each power equipment, the power load data including multiple data items, and the data items including multiple daily load values; determining the load level of each daily load value of the power equipment and the daily load uniformity of each data item in all power equipment; determining the load variation of each data item in all power equipment; calculating the unreasonable degree of the allocation model; when the unreasonable degree of the allocation model exceeds a preset threshold, adjusting the resource allocation amount of the power equipment and constructing a new allocation model to realize the allocation of power grid resources, which can effectively improve the accuracy of the power grid resource allocation effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data processing technology, and in particular to a power grid resource allocation method and system based on generative artificial intelligence. Background Art

[0002] Grid resources are an indispensable part of the power system. They are mainly composed of power sources, transmission lines, substations and distribution lines, which are used to transmit, distribute and control electric energy. In the power industry, optimizing the allocation of grid resources can improve the operating efficiency of the grid, reduce operating costs, and achieve sustainable development. The grid resource allocation method and system based on generative artificial intelligence can learn and simulate the complex interactive relationship of the grid system. It can realize intelligent resource allocation decision-making by constructing a grid resource allocation model, performing simulation and training.

[0003] The patent application document with publication number CN115425688A discloses a distributed intelligent orderly electricity consumption control analysis method, system, terminal and medium. The solution extracts basic power generation characteristics and basic electricity consumption characteristics from the historical power generation data of the new energy power generation end, inputs the basic power generation characteristics and basic electricity consumption characteristics into a pre-built power distribution model, and obtains a basic power dispatching strategy to reduce the requirements for the storage capacity of the energy storage unit.

[0004] The above-mentioned existing technical solutions mainly input historical power generation data into the power distribution model to obtain the basic power dispatching strategy. However, the historical power generation data of the power system often contain abnormal data or trend changes. If the power grid resources are directly allocated based on such data, the power distribution model will find it difficult to respond to data changes in a timely manner, resulting in the inability to reasonably allocate power grid resources and unreasonable resource allocation for power equipment.

[0005] Based on this, how to obtain the power resource allocation situation obtained by the power allocation model to achieve reasonable adjustment of power resource allocation is a problem that needs to be solved urgently by technical personnel in this field. Summary of the invention

[0006] In order to solve the technical problem of how to obtain the power resource allocation situation obtained by the power distribution model to achieve reasonable adjustment of power resource allocation, the present invention provides a power grid resource allocation method and system based on generative artificial intelligence.

[0007] In a first aspect, the present invention provides a method for allocating power grid resources based on generative artificial intelligence, which adopts the following technical solution:

[0008] A method for allocating power grid resources based on generative artificial intelligence comprises the following steps:

[0009] Obtain historical load data of multiple power equipment, input the historical load data into a pre-built allocation model, obtain resource allocation and power load data of each power equipment, the power load data includes multiple data items, and the data items include multiple daily load values; determine the load level of each daily load value of the power equipment, and the load level is positively correlated with the daily load value; obtain the difference between the load level of each daily load value in the power equipment and the load level average value, determine the daily load uniformity of each data item in all power equipment, and the daily load uniformity is positively correlated with the absolute value of the difference; determine the load variation of each data item in all power equipment, and the load variation is positively correlated with the daily load uniformity; calculate the unreasonableness of the allocation model: ; In the formula, Indicates the unreasonableness of the allocation model. Indicates the number of data items in the power equipment, Represents the load change degree of the jth data item in all power equipment; when the unreasonable degree of the allocation model exceeds a preset threshold, adjust the resource allocation amount of the power equipment; construct a new allocation model based on the adjusted resource allocation amount of the power equipment to realize the allocation of power grid resources.

[0010] The effect is that: the present invention takes into account the low accuracy of power grid resource allocation obtained by the allocation model based on generative artificial intelligence. Therefore, by analyzing the load level of each power equipment and the uniformity of load distribution between each power equipment, it avoids the situation where some equipment is overloaded while other equipment is underloaded, and accurately obtains the unreasonable degree of power grid resource allocation of the allocation model. When the unreasonable degree of the allocation model exceeds the preset threshold, the resource allocation amount of the power equipment is adjusted. This dynamic adjustment and optimization process can effectively improve the accuracy of the power grid resource allocation effect, thereby improving the operating efficiency and stability of the power grid.

[0011] According to a method for allocating power grid resources based on generative artificial intelligence provided by the present invention, the method of obtaining historical load data of multiple power equipment also includes: collecting operating data of the power equipment, preprocessing the operating data, and obtaining historical load data of the power equipment.

[0012] The effect is that the present invention takes into account that during the data collection process of the power equipment, due to environmental influences and problems with the equipment itself, the collected data may contain noisy data or abnormal data. Data preprocessing can improve data quality and accuracy, and enhance the accuracy and stability of the model.

[0013] According to a method for allocating power grid resources based on generative artificial intelligence provided by the present invention, the load level of the power equipment satisfies the relationship: ; In the formula, represents the load level of the daily load value of the jth data item on the i-th day in the power equipment, represents the daily load value of the jth data item on the i-th day in the power equipment, Represents the daily load average of the j-th data item in the power equipment.

[0014] According to a method for allocating power grid resources based on generative artificial intelligence provided by the present invention, the daily load uniformity of each data item in all power equipment satisfies the relationship:

[0015] ; In the formula, represents the daily load uniformity of the jth data item on the i-th day among all power equipment, Indicates the number of electrical equipment. represents the load level of the daily load value of the jth data item on the ith day in the kth power equipment, Represents the average load level of the j-th data item on the i-th day in all power equipment.

[0016] The effect is that the present invention provides an accurate daily load uniformity calculation method, which can accurately obtain the daily load uniformity of each data item in all power equipment.

[0017] According to a power grid resource allocation method based on generative artificial intelligence provided by the present invention, the load change degree of each data item in the power equipment satisfies the relationship: ;

[0018] In the formula, represents the load variation of the jth data item in all power equipment, Indicates the total number of days of data collection, represents the daily load uniformity of the jth data item on the i-th day among all power equipment, It represents the daily load uniformity of the j-th data item on the i-1th day among all power equipment.

[0019] The effect is that the present invention provides an accurate load variation calculation method, which can accurately obtain the load variation of each data item in the power equipment.

[0020] According to a generative artificial intelligence-based power grid resource allocation method provided by the present invention, when the irrationality of the allocation model exceeds a preset threshold, the resource allocation amount of the power equipment is adjusted, including: when the irrationality of the allocation model exceeds the preset threshold, the load level of each power equipment is obtained, and the power equipment is sorted from large to small based on the load level; the number of power equipment to be adjusted is preset, and in response to the arrangement order of the load levels of the power equipment, the resource allocation amount of the power equipment with the preset number of power equipment to be adjusted is adjusted; or when the irrationality of the allocation model exceeds the preset threshold, a load level threshold is preset; the load levels of the power equipment are normalized, and the power equipment whose load levels after normalization are greater than the load level threshold is used as the power equipment to be adjusted; and the resource allocation amount of the power equipment to be adjusted is adjusted.

[0021] The effect is that: the present invention takes into account that resource allocation of power equipment in different regions is different, and therefore determines the power equipment to be adjusted by means of preset thresholds, thereby effectively improving the accuracy and flexibility of power grid resource allocation.

[0022] According to a method for allocating power grid resources based on generative artificial intelligence provided by the present invention, the resource allocation amount of the power equipment is adjusted, including: ; In the formula, represents the resource allocation of power equipment k after adjustment, Represents the mean value of the load level of all data items in the power equipment, It represents the resource allocation amount of power equipment k obtained from the allocation model.

[0023] In a second aspect, the present invention provides a power grid resource allocation system based on generative artificial intelligence, which adopts the following technical solution:

[0024] A power grid resource allocation system based on generative artificial intelligence includes: a processor and a memory, wherein the memory stores computer program instructions, and when the computer program instructions are executed by the processor, the above-mentioned power grid resource allocation method based on generative artificial intelligence is implemented.

[0025] By adopting the above technical solution, the above-mentioned power grid resource allocation method based on generative artificial intelligence is generated into a computer program and stored in a memory to be loaded and executed by a processor, so that a terminal device is made according to the memory and the processor for easy use.

[0026] The present invention has the following technical effects:

[0027] Based on the above scheme, when the present invention performs power grid resource allocation based on generative artificial intelligence, taking into account the low accuracy of power grid resource allocation obtained by the allocation model based on generative artificial intelligence, the unreasonable degree of power grid resource allocation of the allocation model is accurately obtained by analyzing the load level of each power equipment and the uniformity of load distribution between each power equipment. When the unreasonable degree of the allocation model exceeds the preset threshold, the resource allocation amount of the power equipment is adjusted in time to avoid the situation where some equipment is overloaded and other equipment is underloaded. This dynamic adjustment and optimization process can effectively improve the accuracy of the power grid resource allocation effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] By reading the detailed description below with reference to the accompanying drawings, the above and other purposes, features and advantages of the exemplary embodiments of the present invention will become readily understood. In the accompanying drawings, several embodiments of the present invention are shown in an exemplary and non-restrictive manner, and the same or corresponding reference numerals represent the same or corresponding parts.

[0029] Figure 1 A schematic diagram of a flow chart of a method for allocating power grid resources based on generative artificial intelligence provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0031] It should be understood that when the terms "first", "second", etc. are used in the claims, descriptions, and drawings of the present invention, they are only used to distinguish different objects, rather than to describe a specific order. The terms "include" and "comprise" used in the description and claims of the present invention indicate the presence of the described features, wholes, steps, operations, elements, and / or components, but do not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components, and / or their collections.

[0032] The embodiment of the present invention discloses a power grid resource allocation method based on generative artificial intelligence, please refer to Figure 1 As shown, Figure 1 A schematic flow chart of a method for allocating power grid resources based on generative artificial intelligence provided by an embodiment of the present invention, the method comprising the following steps S1 to S6:

[0033] S1: Obtain historical load data of multiple power devices, input the historical load data into a pre-built allocation model, and obtain resource allocation and power load data of each power device.

[0034] For example, in an embodiment of the present invention, before acquiring the historical load data of a plurality of power devices, the operation data of the power devices may be collected, and the operation data may be preprocessed to obtain the historical load data of the power devices.

[0035] The preprocessing method can be specifically set according to actual needs, and the embodiment of the present invention does not impose too many restrictions on this.

[0036] For example, the pre-built allocation model can be constructed by a generative artificial intelligence algorithm, such as a generative adversarial network or deep reinforcement learning, etc., and can be specifically configured according to actual needs, and the embodiments of the present invention do not impose too many restrictions on this.

[0037] For example, the historical load data may be current, voltage, power, temperature, etc., and may be specifically set according to actual needs.

[0038] For example, in an embodiment of the present invention, the power load data includes multiple data items, and the data items include multiple daily load values.

[0039] For example, the data items in the power load data may be current, voltage, power, temperature, etc., which may be specifically set according to actual needs.

[0040] Among them, when obtaining the daily load value in the current, voltage, and power data items, the current, voltage, and power collected in one day can be processed, and the range in the current, voltage, or power can be used as the daily load value of the corresponding data item. It can be understood that the use of the range can reflect the degree of change of the power load data. The larger the range, the greater the degree of change of the power load data; conversely, the smaller the range, the smaller the degree of change of the power load data.

[0041] When obtaining the daily load value in the temperature data item, the temperature value of the day can be collected by the temperature sensor, and the average of the collected temperature values ​​of the day is used as the daily load value of the data item. It can be understood that the average of the temperature value can reflect the average load of the power load data. The larger the average value, the larger the average load of the power load data; conversely, the smaller the average value, the smaller the average load of the power load data.

[0042] In order to facilitate synchronous processing of power load data, the same collection parameters can be used when collecting data, where the collection parameters may include one or more of collection frequency, collection cycle, and collection duration, which can be set according to actual needs.

[0043] It should be noted that the power load data in the power equipment is a constantly changing quantity, and its characteristics depend on the structure of the power industry, region, seasonal changes, economic development and living standards, etc. It fluctuates greatly and may contain abnormal data. If the power grid resources are directly allocated based on such data, the allocation model will be difficult to respond to data changes in a timely manner and will not be able to reasonably allocate power grid resources, which will eventually lead to a high load on local power equipment and a major safety hazard. Based on this, the present invention obtains the unreasonable degree of allocation model when allocating power resources to each power equipment. When the unreasonable degree exceeds the threshold, the power resource allocation is adjusted in a timely manner, that is, the following steps are performed:

[0044] S2: Determine the load level of the power equipment at each day's load value.

[0045] It is understandable that the greater the power load of the power equipment, the more the allocation resources of the power equipment need to be adjusted; and for all power equipment, if some of the power equipment have a large power load and other power equipment have a small power load, it means that the resource allocation of the current allocation model is unreasonable and the power equipment needs to be adjusted. Based on this, the present invention determines the load level of each daily load value of the power equipment and the daily load uniformity of all power equipment to obtain the unreasonable degree of the allocation model:

[0046] The daily load value of the jth data item collected by the power equipment on the i-th day is recorded as , the average of all daily load values ​​in each data item of the power equipment is recorded as the daily load average of the data item After obtaining the parameter data, the load level of the daily load value of each data item of the power equipment is determined based on the following load level calculation formula:

[0047] For example, the load level of the daily load value of the data item in the power equipment is positively correlated with the daily load value. The load level can be determined by referring to the following formula:

[0048] ;

[0049] In the formula, represents the load level of the daily load value of the jth data item on the i-th day in the power equipment, represents the daily load value of the jth data item on the i-th day in the power equipment, Represents the daily load average of the j-th data item in the power equipment.

[0050] After obtaining the load level of each daily load value in the power equipment based on the above steps, continue to determine the daily load uniformity of the data item based on the following steps:

[0051] S3: Obtain the difference between the load level of each daily load value in the power equipment and the load level average value, and determine the daily load uniformity of each data item in all power equipment.

[0052] It can be understood that the difference between the load level of the power equipment and the load level average value can represent the deviation between the load level of the load value on that day and the overall average level. The larger the difference, the greater the deviation between the load level of the load value on that day and the overall average level. If the deviations between the load levels of more power equipment and the overall average level are large, it means that the overall resource allocation uniformity obtained by the allocation model is low.

[0053] For example, the daily load uniformity is positively correlated with the absolute value of the difference. To determine the daily load uniformity of the data item in the power equipment, please refer to the following formula:

[0054] ;

[0055] In the formula, represents the daily load uniformity of the jth data item on the i-th day among all power equipment, Indicates the number of electrical equipment. represents the load level of the daily load value of the jth data item on the ith day in the kth power equipment, Represents the average load level of the j-th data item on the i-th day in all power equipment.

[0056] It can be understood that the daily load uniformity corresponds to the number of days one by one, that is, each data item has only one daily load uniformity per day.

[0057] Taking the above formula as an example, if the data items are current and voltage, then based on the above formula, the daily load uniformity of the current data item and the daily load uniformity of the voltage data item in all power equipment can be obtained respectively.

[0058] Based on the above step S2, the load level of each daily load value of the power equipment can be determined. However, the load level based on a single power equipment cannot directly reflect the actual allocation effect of the allocation model. Therefore, the above step S3 is used to obtain the overall daily load uniformity of each data item in the power equipment after resource allocation based on the allocation model. The higher the daily load uniformity value, the lower the overall daily load uniformity of the power equipment, and the more the allocation model needs to be adjusted.

[0059] S4: Determine the load variation of each data item in all power equipment.

[0060] It should be noted that the daily load uniformity of the data items in the power equipment can only reflect the overall distribution effect of the distribution model on that day, while the power load data of the power equipment changes roughly in a regular manner. Therefore, it is necessary to collect the daily load uniformity of each data item over a period of time for analysis to obtain the load variation of each data item, that is, to perform the following steps:

[0061] The data collection time is set to d days, and the changes in the daily load uniformity of the data items in the power equipment on the i-th day and the daily load uniformity on the i-1th day are analyzed to obtain the load change degree of each data item in all power equipment:

[0062] For example, the load variability is positively correlated with the daily load uniformity.

[0063] Among them, the load change degree of each data item in all power equipment is determined, and the specific formula can be found in the following formula:

[0064] ;

[0065] In the formula, represents the load variation of the jth data item in all power equipment, Indicates the total number of days of data collection, represents the daily load uniformity of the jth data item on the i-th day among all power equipment, It represents the daily load uniformity of the j-th data item on the i-1th day among all power equipment.

[0066] In the above formula, the load variation The higher it is, the greater the change between the daily load uniformity of the i-th day and the daily load uniformity of the i-1-th day, and the more unstable the operation of the power equipment.

[0067] Based on the above formula, the load variation of all data items can be obtained. In order to evaluate the allocation effect of the allocation model, it is necessary to consider the impact of all data items on the power load, so as to obtain the unreasonable degree of the allocation model, that is, perform the following steps:

[0068] S5: Calculate the unreasonableness of the allocation model.

[0069] It should be noted that the irrationality of the allocation model can characterize the resource allocation effect of the allocation model. The higher the irrationality, the worse the resource allocation effect of the allocation model, and the more it is necessary to adjust the resource allocation amount of the allocation model. Conversely, the lower the irrationality, the better the resource allocation effect of the allocation model.

[0070] For example, the degree of irrationality of the allocation model may be determined by referring to the following formula:

[0071] ;

[0072] In the formula, Indicates the unreasonableness of the allocation model. Indicates the number of data items in the power equipment, Indicates the load variation of the jth data item in all power equipment;

[0073] After obtaining the unreasonable degree of the allocation model based on the above method, the allocation model with a higher unreasonable degree can be adjusted:

[0074] S6: When the unreasonable degree of the allocation model exceeds a preset threshold, the resource allocation amount of the power equipment is adjusted; and a new allocation model is constructed based on the adjusted resource allocation amount of the power equipment to realize the allocation of power grid resources.

[0075] It should be noted that since the power load data of power equipment is affected by factors such as the region's economic development level, industrial structure, climate and seasonal changes, and population size and distribution, a fixed preset threshold cannot be used to evaluate the irrationality of the allocation model for different regions. The preset threshold can be set specifically according to the influencing factors of the local power load data, and the embodiments of the present invention do not impose too many restrictions on this.

[0076] When the unreasonableness of the allocation model exceeds the preset threshold, it means that the allocation model needs to be adjusted:

[0077] For example, in an embodiment of the present invention, when the unreasonable degree of the allocation model exceeds a preset threshold, the resource allocation amount of the power equipment is adjusted, including the following two possible implementation methods:

[0078] In one possible implementation, when the unreasonableness of the allocation model exceeds a preset threshold, the load level of each power equipment is obtained, and the power equipment is sorted from large to small based on the load level; the number of power equipment to be adjusted is preset, and in response to the arrangement order of the load levels of the power equipment, the resource allocation amount of the preset number of power equipment to be adjusted is adjusted.

[0079] For example, the number of power equipment to be adjusted can be set according to actual needs.

[0080] For example, the number of power equipment to be adjusted can be preset to 3. When the unreasonableness of the allocation model exceeds the preset threshold, the power equipment corresponding to the top 3 load levels will be used as the power equipment to be adjusted, and the resource allocation amount of the power equipment to be adjusted will be adjusted.

[0081] In another possible implementation, when the unreasonableness of the allocation model exceeds a preset threshold, a load level threshold is preset; the load level of the power equipment is normalized, and the power equipment with a normalized load level greater than the load level threshold is used as the power equipment to be adjusted; and the resource allocation amount of the power equipment to be adjusted is adjusted.

[0082] The above two implementation methods for determining the power equipment to be adjusted can be specifically set according to actual needs. After obtaining the power equipment to be adjusted in the above method, the resource allocation amount of the power equipment can be adjusted based on the following method:

[0083] For example, in the embodiment of the present invention, when adjusting the resource allocation amount of the power equipment, the load level of each data item of each power equipment can be normalized to obtain the mean value , then obtain the resource allocation amount allocated to the power equipment by the allocation model, and adjust the resource allocation amount of the power equipment.

[0084] For example, the resource allocation amount of the adjusted power equipment is positively correlated with the average of the load levels of all data items in the power equipment. The resource allocation amount of the adjusted power equipment can be specifically determined by referring to the following formula:

[0085] ;

[0086] In the formula, represents the resource allocation of power equipment k after adjustment, Represents the mean value of the load level of all data items in the power equipment, It represents the resource allocation amount of power equipment k obtained from the allocation model.

[0087] After adjusting the resource allocation amount of the power equipment based on the above steps, the resource allocation amount obtained by each power equipment is more accurate and reasonable. In order to make the resource allocation of subsequent power equipment more accurate and reasonable, a new allocation model can be rebuilt based on the adjusted resource allocation amount of the power equipment, and the grid resources can be allocated based on the new allocation model. The new allocation model construction method can be specifically set according to actual needs, and the embodiment of the present invention does not impose too many restrictions on this.

[0088] It can be seen that in an embodiment of the invention, when power grid resource allocation is performed based on generative artificial intelligence, historical load data of multiple power equipment can be obtained, and the historical load data can be input into a pre-constructed allocation model to obtain the resource allocation amount and power load data of each power equipment, the power load data includes multiple data items, and the data items include multiple daily load values; the load level of each daily load value of the power equipment is determined, and the load level is positively correlated with the daily load value; the difference between the load level of each daily load value in the power equipment and the load level average value is obtained, and the daily load uniformity of each data item in all power equipment is determined, and the daily load uniformity is positively correlated with the absolute value of the difference; the load variation degree of each data item in all power equipment is determined, and the load variation degree is positively correlated with the daily load uniformity; the unreasonable degree of the allocation model is calculated; when the unreasonable degree of the allocation model exceeds the preset threshold, the resource allocation amount of the power equipment is adjusted; a new allocation model is constructed based on the resource allocation amount of the adjusted power equipment to realize the allocation of power grid resources.

[0089] In this way, the present invention takes into account the low accuracy of power grid resource allocation obtained by the allocation model based on generative artificial intelligence. Therefore, by analyzing the load level of each power equipment and the uniformity of load distribution among each power equipment, the unreasonable degree of power grid resource allocation of the allocation model is accurately obtained. When the unreasonable degree of the allocation model exceeds the preset threshold, the resource allocation amount of the power equipment is adjusted in time to avoid the situation where some equipment is overloaded and other equipment is underloaded. This dynamic adjustment and optimization process can effectively improve the accuracy of the power grid resource allocation effect.

[0090] An embodiment of the present invention also discloses a power grid resource allocation system based on generative artificial intelligence, including a processor and a memory, wherein the memory stores computer program instructions. When the computer program instructions are executed by the processor, a power grid resource allocation method based on generative artificial intelligence according to the present invention is implemented.

[0091] The above system also includes other components well known to those skilled in the art, such as a communication bus and a communication interface, and their configuration and functions are known in the art, so they will not be described in detail here.

[0092] In the present invention, the aforementioned memory may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, apparatus, or device. For example, a computer-readable storage medium may be any suitable magnetic storage medium or magneto-optical storage medium, such as a resistive random access memory RRAM, a dynamic random access memory DRAM, a static random access memory SRAM, an enhanced dynamic random access memory EDRAM, a high bandwidth memory HBM, a hybrid memory cube HMC, etc., or any other medium that can be used to store the required information and can be accessed by an application, a module, or both. Any such computer storage medium may be part of a device or accessible or connectable to a device.

[0093] Although this specification has shown and described a number of embodiments of the present invention, it will be apparent to those skilled in the art that such embodiments are provided by way of example only. Those skilled in the art will conceive of many modifications, changes and alternatives without departing from the ideas and spirit of the present invention. It should be understood that in the practice of the present invention, various alternatives to the embodiments of the present invention described herein may be employed.

[0094] The above are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, any equivalent changes made based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for allocating power grid resources based on generative artificial intelligence, It is characterized in that include: Acquire historical load data of multiple power devices, input the historical load data into a pre-built allocation model, and obtain resource allocation and power load data of each of the power devices, wherein the power load data includes multiple data items, wherein one data item includes one daily load value, and multiple data items include corresponding multiple daily load values; Determine the load level of each daily load value of the power equipment, where the load level is positively correlated with the daily load value; obtain the difference between the load level of each daily load value in the power equipment and the load level average value, and determine the daily load uniformity of each data item in all power equipment: ; In the formula, represents the daily load uniformity of the jth data item on the i-th day among all power equipment, Indicates the number of electrical equipment. represents the load level of the daily load value of the jth data item on the ith day in the kth power equipment, represents the load level average value of the j-th data item on the i-th day in all power equipment, and the daily load uniformity is positively correlated with the absolute value of the difference; determine the load variation degree of each data item in all power equipment: ; In the formula, represents the load variation of the jth data item in all power equipment, Indicates the total number of days of data collection, represents the daily load uniformity of the jth data item on the i-th day among all power equipment, represents the daily load uniformity of the j-th data item on the i-1th day in all power equipment, and the load variation is positively correlated with the daily load uniformity; calculates the unreasonableness of the allocation model: ; In the formula, Indicates the unreasonableness of the allocation model. Indicates the number of data items in the power equipment, Indicates the load variation of the jth data item in all power equipment; When the unreasonable degree of the allocation model exceeds a preset threshold, adjusting the resource allocation amount of the power equipment; A new allocation model is constructed based on the adjusted resource allocation of power equipment to realize the allocation of power grid resources.

2. A method for allocating power grid resources based on generative artificial intelligence according to claim 1, It is characterized in that The acquiring of historical load data of a plurality of electric power devices also includes: The operating data of the power equipment is collected, and the operating data is preprocessed to obtain the historical load data of the power equipment.

3. A power grid resource allocation method based on generative artificial intelligence according to claim 1, It is characterized in that The load level of the power equipment satisfies the relationship: ; In the formula, represents the load level of the daily load value of the jth data item on the i-th day in the power equipment, represents the daily load value of the jth data item on the i-th day in the power equipment, Represents the daily load average of the j-th data item in the power equipment.

4. A method for allocating power grid resources based on generative artificial intelligence according to claim 1, It is characterized in that When the unreasonable degree of the allocation model exceeds a preset threshold, adjusting the resource allocation amount of the power equipment includes: In the case where the irrationality of the allocation model exceeds a preset threshold, the load level of each power equipment is obtained, and the power equipment is sorted from large to small based on the load level; the number of power equipment to be adjusted is preset, and in response to the arrangement order of the load levels of the power equipment, the resource allocation amount of the power equipment of the preset number of power equipment to be adjusted is adjusted; or in the case where the irrationality of the allocation model exceeds a preset threshold, a load level threshold is preset; the load levels of the power equipment are normalized, and the power equipment whose load level after normalization is greater than the load level threshold is used as the power equipment to be adjusted; and the resource allocation amount of the power equipment to be adjusted is adjusted.

5. A method for allocating power grid resources based on generative artificial intelligence according to claim 1, It is characterized in that The adjusting of the resource allocation amount of the electric power equipment includes: ; In the formula, represents the resource allocation of power equipment k after adjustment, Represents the mean value of the load level of all data items in the power equipment, It represents the resource allocation amount of power equipment k obtained from the allocation model.

6. A power grid resource allocation system based on generative artificial intelligence, It is characterized in that include: A processor and a memory, wherein the memory stores computer program instructions, and when the computer program instructions are executed by the processor, a method for allocating power grid resources based on generative artificial intelligence according to any one of claims 1 to 5 is implemented.

Citation Information

Patent Citations

  • Distributed intelligent orderly power utilization control analysis method and system, terminal and medium

    CN115425688A

  • Power distribution network resource allocation method, device and equipment based on multi-dimensional indexes

    CN115600876A

  • New energy optimization scheduling method considering peak regulation demand of power grid

    CN116316889A

  • Coordination control method of power grid system

    CN117595391A

  • Power distribution network intelligent planning system based on artificial intelligence

    CN118137507A