Construction of single pile foundation without transition section and installation technology of wind turbine equipment in shallow sea wind farm
By adopting the design of locking and unlocking components on the single pile foundation of the wind farm in shallow waters, the anti-collision sheath can rotate and disperse the impact force when the ship hits, which solves the problem of the existing technology in which the anti-collision sheath cannot disperse the impact force. issues, improving safety and durability.
Patent Information
- Application Number
- CN202410977154.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-07-22
AI Technical Summary
The existing anti-collision sheath cannot disperse the impact force when the ship hits, resulting in local stress concentration and affecting the safety and durability of its structure.
A single pile foundation without a transition section for a shallow sea wind farm is designed. A locking component is used to fix the anti-collision sheath on the steel pile. The unlocking component is used to unlock the anti-collision sheath during impact, allowing the anti-collision sheath to rotate and disperse the impact force. Reduce local damage.
It effectively improves the structural stability between the anti-collision sheath and the steel piles, extends the service life of the anti-collision sheath, and reduces the degree of local damage when the ship hits.
Smart Images

Figure CN118517016B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of wind power monopile foundation, and in particular to the construction of monopile foundation without transition section in shallow sea wind farm and the installation process of wind turbine equipment. Background Art
[0002] The offshore wind power monopile foundation is currently the most widely used offshore wind power foundation. The diameter of the offshore wind power monopile foundation is about 6-10 meters, and the foundation pile is about 100 meters long. During construction, a large hydraulic pile hammer is used to directly drive the steel pipe pile into the seabed. The foundation flange is welded on the top of the steel pipe pile, which is connected to the tower through the flange and bolts. It is suitable for water depths of 10-60 meters and can be used to install offshore wind turbines of various capacities.
[0003] As offshore wind farms are often adjacent to and interspersed with sea routes, ships may lose control and hit wind turbine piles in extreme sea conditions. Therefore, offshore wind turbines are designed with supporting protective facilities near the waterline to reduce damage. At present, the main measures taken to prevent offshore wind turbine foundations from being hit by ships are: tightly surround the periphery of the offshore wind turbine foundation with anti-collision jackets to form a protective circle to ensure full coverage of vulnerable parts, thereby preventing ships from hitting the wind turbine foundation and causing damage to it.
[0004] Anti-collision sleeves are generally fixedly installed on the outer surface of steel pipe piles to protect them. However, once a ship collides with a single pile foundation, since the ship collision is an instantaneous, concentrated impact event with large kinetic energy, especially when a high-speed or large-tonnage ship collides, the impact force generated is very large. The anti-collision sleeves fixedly connected to the steel pipe piles are unable to disperse the impact force when receiving this impact force, resulting in local stress concentration on the anti-collision sleeves, causing them to be damaged, thereby affecting the safety and durability of the overall structure of the anti-collision sleeves. Summary of the invention
[0005] In view of the above-mentioned problems existing in the prior art, the technical problem to be solved by the present invention is: the existing anti-collision sleeve is generally fixedly installed on the outer surface of the steel pipe pile to protect it. When the anti-collision sleeve is subjected to the huge impact force generated by the collision of a ship, the impact force cannot be dispersed, resulting in local stress concentration on the anti-collision sleeve, causing it to be damaged, thereby affecting the safety and durability of the overall structure of the anti-collision sleeve.
[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions: a single pile without a transition section in a shallow sea wind farm includes a foundation cap, the upper end of the foundation cap is connected to a steel pile, the outer surface of the steel pile is fixedly connected to a fixing sleeve, the outer surface of the fixing sleeve is rotatably connected to an anti-collision sleeve, a first closed chamber and a second closed chamber are arranged inside the anti-collision sleeve, a locking assembly is arranged inside the first closed chamber, and the locking assembly is used to lock the anti-collision sleeve and the fixing sleeve with each other;
[0007] An unlocking component is arranged inside the second closed chamber, and the unlocking component is used to release the lock between the anti-collision sleeve and the fixing sleeve.
[0008] Through the above technical scheme, the anti-collision sleeve and the fixed sleeve can be locked with each other by using the locking component, so that the anti-collision sleeve is fixed on the outer surface of the steel pile, thereby ensuring the stability of the structure between the anti-collision sleeve and the steel pile, and facilitating the anti-collision sleeve to continuously and effectively provide anti-collision protection for the steel pile. When the anti-collision sleeve is subjected to the huge impact force of the ship collision, the unlocking component will release the lock between the anti-collision sleeve and the fixed sleeve. At this time, the anti-collision sleeve can rotate with the fixed sleeve. The anti-collision sleeve can disperse the impact force caused by the ship collision through rotation, thereby reducing the degree of local damage.
[0009] Furthermore, the locking assembly includes a sliding shaft, the outer surface of the sliding shaft is sleeved with a strong spring, the outer surface of the fixing sleeve is provided with a positioning hole, and the sliding shaft and the positioning hole are connected to each other.
[0010] Through the above technical solution, the strong spring pushes the sliding shaft, so that the sliding shaft passes through the anti-collision sleeve and is connected with the positioning hole, thereby stably connecting the anti-collision sleeve and the fixing sleeve, so that the two are locked with each other.
[0011] Furthermore, a connecting plate is sleeved on the outer surface of the sliding shaft, and the connecting plate and the sliding shaft are connected in a fixed manner. The connecting plates are distributed at equal angles with respect to the center of the anti-collision sleeve, and the connecting plates overlap each other.
[0012] Through the above technical solution, the connecting plates overlap and are distributed inside the anti-collision sleeve. The connecting plates restrain each other, thereby improving the stability of the connection between the anti-collision sleeve and the fixed sleeve. When one connecting plate is adjusted in position, it will drive the other three to move as well.
[0013] Furthermore, the unlocking assembly includes a connecting block, the upper end of the connecting block is rotatably connected to a fixed shaft, the fixed shaft is fixedly connected to the sliding shaft, the middle of the connecting block is fixedly connected to a rotating shaft, and both ends of the rotating shaft are respectively sleeved with torsion springs.
[0014] Through the above technical solution, when the connecting block rotates, the sliding shaft can be driven to move through the fixed shaft, so that the sliding shaft and the positioning hole are separated from each other, thereby releasing the lock between the anti-collision sleeve and the fixed sleeve.
[0015] Furthermore, both ends of the rotating shaft are rotatably connected with support blocks, and the support blocks are fixedly connected to the anti-collision sleeve.
[0016] Through the above technical solution, the support block can support the rotating shaft and the connecting block, so that the rotating shaft and the connecting block are stabilized inside the anti-collision sheath.
[0017] Furthermore, a sliding rod is arranged inside the anti-collision sleeve, one end of the sliding rod is fixedly connected to the anti-collision plate, and a groove is opened on one side of the connecting block, and the sliding rod and the groove correspond to each other.
[0018] Through the above technical solution, when the ship collides with the anti-collision plate, the sliding rod connected to the anti-collision plate will push the connecting block to move, so that the connecting block rotates to release the lock between the anti-collision sleeve and the fixing sleeve.
[0019] Furthermore, partition plates are arranged inside the second closed chamber, and the partition plates are distributed at equal angles with respect to the center of the anti-collision sheath.
[0020] Through the above technical solution, the partition plate divides the interior of the second closed chamber into multiple spaces. When a space is damaged and flooded, the other spaces still have sufficient buoyancy to support the anti-collision sheath to float on the sea.
[0021] Furthermore, a first flange is fixedly connected to the upper end of the steel pile, a tower is arranged above the steel pile, a second flange is fixedly connected to the lower end of the tower, the first flange and the second flange are connected to each other, and connecting holes are opened inside the first flange and the second flange.
[0022] Through the above technical solution, the first flange and the second flange are connected by bolts, so that the tower and the steel piles can be stably connected.
[0023] Furthermore, the outer surface of the steel pile is fixedly connected with a support seat, the upper end of the support seat is fixedly connected with a limiting sleeve, and the limiting sleeve is in a circular ring structure.
[0024] Through the above technical solution, the limiting sleeve can limit the connection between the first flange and the second flange, so that the first flange and the second flange remain concentric, thereby preventing the first flange and the second flange from being subjected to eccentric force when connected.
[0025] Furthermore, a slide groove is provided inside the support seat, and an indicating component is arranged inside the slide groove, the indicating component includes an adjusting block, a reset spring is connected to one side of the adjusting block, the other end of the reset spring is fixedly connected to an indicating shaft, the height of the indicating shaft is greater than the sum of the heights of the first flange and the second flange, the height of the indicating shaft is less than the height of the support seat, the indicating shaft is symmetrically distributed about the longitudinal center line of the support seat, a notch is provided on the lower surface of the support seat, a push rod is fixedly connected to the lower surface of the adjusting block, and the push rod passes through the notch.
[0026] Through the above technical solution, the installation sequence of the bolts can be indicated by the indicating assembly, ensuring that the bolts are tightened step by step in a symmetrical sequence, thereby avoiding eccentricity in the connection between the first flange and the second flange due to uneven force.
[0027] The invention also discloses a fan equipment installation process, which comprises the following steps:
[0028] S1: Put the construction vessel in place, install the pile gripper receiving seat at the stern of the pile-driving vessel, hoist and place the pile gripper on the preset receiving seat, tow the pile-driving vessel to the pile foundation coordinate point and drop anchor, accurately position the pile-driving vessel and the pile gripper by controlling the mooring system, and insert temporary support piles into the four-leg guide tubes of the pile gripper;
[0029] S2: Use a transport barge to transport the steel piles to the construction site in the sea area. Select a floating crane to hoist the steel piles according to the size, lug position and weight of the steel piles, so as to realize the lifting, turning over and delivering of the steel piles;
[0030] S3: After using the floating crane to lift the steel pile to the pile gripper, appropriately tighten the pipe clamp on the pile gripper platform, adjust the verticality of the steel pile, and when the steel pile sinks into the mud by gravity, adjust the top elevation, position and accuracy of the steel pipe pile, and install the replacement flange on the top of the steel pile;
[0031] S4: Lift the hydraulic impact hammer to drive the steel pipe pile into the pile. After the pile driving operation is completed, drop the hammer and remove the hook. Install the inner platform, carry out UT inspection and acceptance work, and pull out the positioning column after passing the inspection.
[0032] S5: Foundation protection of single pile foundation by dumping gravel;
[0033] S6: Install the anti-collision pipe, ladder, outer platform, cable protection pipe and other auxiliary structural parts, and install the fixing sleeve and anti-collision sleeve on the outer surface of the steel pile;
[0034] S7: Transport the large components of the wind turbine to the designated dock in advance for unloading and stacking.
[0035] S8: The major components of the wind turbine are transported to the wharf by land transportation. The tower, nacelle, generator set and hub are loaded on the transport barge and then transported to the wind farm site;
[0036] S9: Install the tower, nacelle, generator set and hub in sequence, interspersed with some electrical equipment debugging and other ancillary work, and then install the three blades respectively, complete other ancillary installation work and debugging, and the installation of the single pile wind turbine unit is completed.
[0037] Through the above technical solution, the installation process of wind turbine equipment can be appropriately adjusted according to the characteristics of different regions, which can shorten the installation time, speed up the project progress, and ensure the stability, reliability and safety of wind turbine operation.
[0038] Compared with the prior art, the present invention has the following beneficial effects:
[0039] Firstly, in the present invention, the anti-collision sleeve and the fixing sleeve can be locked with each other through a locking assembly, so that the anti-collision sleeve is fixed on the outer surface of the steel pile, thereby ensuring the stability of the structure between the anti-collision sleeve and the steel pile, and facilitating the anti-collision sleeve to continuously and effectively provide anti-collision protection for the steel pile.
[0040] Secondly, in the present invention, when the anti-collision shield is subjected to a huge impact force caused by a ship collision, the unlocking component will release the lock between the anti-collision shield and the fixed shield. At this time, the anti-collision shield can rotate with the fixed shield. The anti-collision shield can disperse the impact force caused by the ship collision through rotation, thereby reducing the degree of local damage.
[0041] Thirdly, in the present invention, in the process of connecting the first flange and the second flange by bolts to stably connect the tower and the steel piles, the limit sleeve can limit the connection between the first flange and the second flange, so that the first flange and the second flange remain concentric, thereby preventing the first flange and the second flange from being subjected to eccentric force when connected.
[0042] Fourthly, in the present invention, after the first flange and the second flange are precisely docked, the position of the indicating shaft can be adjusted by rotating the adjusting block, so that the indicating shaft passes through the first flange and the second flange and extends from the inside of the connecting hole, thereby indicating the installation position of the bolt, thereby ensuring that the bolt installation is gradually tightened in a symmetrical order, avoiding eccentricity of the connection between the first flange and the second flange due to uneven force. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0044] Figure 2 It is a schematic diagram of the connection structure between the fixing sleeve and the anti-collision sleeve in the present invention;
[0045] Figure 3 It is a schematic diagram of the front cross-section structure of the anti-collision sheath in the present invention;
[0046] Figure 4 It is a structural schematic diagram of the connecting plate in the present invention;
[0047] Figure 5 It is a schematic diagram of the connection structure between the sliding shaft and the fixed shaft in the present invention;
[0048] Figure 6 It is a schematic diagram of the cross-sectional structure of the anti-collision sheath in the present invention;
[0049] Figure 7 It is a structural schematic diagram of the fixing sleeve in the present invention;
[0050] Figure 8 It is a schematic diagram of the connection structure between the first flange and the second flange in the present invention;
[0051] Fig. 9 It is a schematic diagram of the connection structure between the support seat and the limiting sleeve in the present invention;
[0052] Fig.10 It is a cross-sectional structural schematic diagram of the support seat in the present invention;
[0053] Fig.11 It is a schematic diagram of the bottom view of the support seat in the present invention.
[0054] In the figure, 1. foundation bearing platform; 2. steel pile; 3. fixing sleeve; 4. positioning hole; 5. anti-collision sleeve; 6. first closed chamber; 7. second closed chamber; 8. sliding shaft; 9. connecting plate; 10. strong spring; 11. fixed shaft; 12. connecting block; 13. rotating shaft; 14. supporting block; 15. torsion spring; 16. groove; 17. sliding rod; 18. anti-collision plate; 19. partition plate; 20. first flange; 21. second flange; 22. tower; 23. connecting hole; 24. supporting seat; 25. limiting sleeve; 26. slide groove; 27. adjusting block; 28. reset spring; 29. indicating shaft; 30. notch; 31. push rod. DETAILED DESCRIPTION
[0055] The present invention is described in further detail below.
[0056] The technical solutions in the embodiments of the present application are described clearly and completely; obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application without making creative work are within the scope of protection of the present application.
[0057] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "set / connected", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0058] Embodiment 1: Figure 1 - Fig.11The shallow sea wind farm shown has a single pile without a transition section, including a foundation cap 1, a steel pile 2 is connected to the upper end of the foundation cap 1, a fixing sleeve 3 is fixedly connected to the outer surface of the steel pile 2, an anti-collision sleeve 5 is rotatably connected to the outer surface of the fixing sleeve 3, a first closed chamber 6 and a second closed chamber 7 are arranged inside the anti-collision sleeve 5, a locking assembly is arranged inside the first closed chamber 6, the locking assembly is used to lock the anti-collision sleeve 5 and the fixing sleeve 3 with each other, the locking assembly includes a sliding shaft 8, a strong spring 10 is sleeved on the outer surface of the sliding shaft 8, a positioning hole 4 is opened on the outer surface of the fixing sleeve 3, the sliding shaft 8 and the positioning hole 4 are mutually connected, a connecting plate 9 is sleeved on the outer surface of the sliding shaft 8, the connecting plate 9 and the sliding shaft 8 are connected in a fixed manner, the connecting plates 9 are distributed at equal angles with respect to the center of the anti-collision sleeve 5, and the connecting plates 9 overlap each other;
[0059] It is worth mentioning that the anti-collision sleeve 5 and the fixing sleeve 3 can be locked with each other through the locking assembly, so that the anti-collision sleeve 5 is fixed on the outer surface of the steel pile 2, thereby ensuring the stability of the structure between the anti-collision sleeve 5 and the steel pile 2, making it easier for the anti-collision sleeve 5 to continuously and effectively provide anti-collision protection to the steel pile 2.
[0060] See also Figure 1-Figure 7 An unlocking component is provided inside the second closed chamber 7, and the unlocking component is used to release the lock between the anti-collision sleeve 5 and the fixed sleeve 3. The unlocking component includes a connecting block 12, and the upper end of the connecting block 12 is rotatably connected to the fixed shaft 11, and the fixed shaft 11 is fixedly connected to the sliding shaft 8. A rotating shaft 13 is fixedly connected in the middle of the connecting block 12, and torsion springs 15 are respectively sleeved at both ends of the rotating shaft 13. Support blocks 14 are rotatably connected at both ends of the rotating shaft 13, and the support block 14 is fixedly connected to the anti-collision sleeve 5. A sliding rod 17 is provided inside the anti-collision sleeve 5, and an anti-collision plate 18 is fixedly connected to one end of the sliding rod 17. A groove 16 is provided on one side of the connecting block 12, and the sliding rod 17 and the groove 16 correspond to each other.
[0061] The working principle that can release the lock between the anti-collision sleeve 5 and the fixed sleeve 3 is: when the ship collides with the anti-collision plate 18, the anti-collision plate 18 will drive the sliding rod 17 to move toward the inside of the anti-collision sleeve 5 after being subjected to a huge impact force, and the sliding rod 17 pushes the connecting block 12, so that the connecting block 12 drives the rotating shaft 13 and the supporting block 14 to rotate, and then the connecting block 12 drives the sliding shaft 8 to move through the fixed shaft 11, so that the sliding shaft 8 moves to the outside of the anti-collision sleeve 5 and separates from the positioning hole 4. During the separation of the sliding shaft 8 and the fixed sleeve 3, the connecting plates 9 connected to the sliding shaft 8 also move to the outside of the anti-collision sleeve 5 and separate from each other. At this time, the lock between the anti-collision sleeve 5 and the fixed sleeve 3 is released. At this time, the anti-collision sleeve 5 can rotate with the fixed sleeve 3. The anti-collision sleeve 5 can disperse the impact force caused by the ship collision through rotation, thereby reducing its local damage.
[0062] See also Figure 3-Figure 4The second closed chamber 7 is provided with partition plates 19 inside, and the partition plates 19 are distributed at equal angles with respect to the center of the anti-collision sheath 5 .
[0063] The function of the partition plate 19 is: the partition plate 19 divides the interior of the second closed chamber 7 into multiple spaces. When a space is damaged and flooded, the other spaces still have sufficient buoyancy to support the anti-collision sheath 5 to float on the sea surface.
[0064] See also Figure 8-Figure 9 A first flange 20 is fixedly connected to the upper end of the steel pile 2, a tower 22 is arranged above the steel pile 2, a second flange 21 is fixedly connected to the lower end of the tower 22, the first flange 20 and the second flange 21 are connected to each other, connecting holes 23 are provided inside the first flange 20 and the second flange 21, a support seat 24 is fixedly connected to the outer surface of the steel pile 2, and a limiting sleeve 25 is fixedly connected to the upper end of the support seat 24, and the limiting sleeve 25 is in a circular ring structure.
[0065] The function of the limiting sleeve 25 is: in the process of connecting the first flange 20 and the second flange 21 by bolts, thereby stably connecting the tower 22 and the steel pile 2, the limiting sleeve 25 can limit the connection between the first flange 20 and the second flange 21, so that the first flange 20 and the second flange 21 remain concentric, thereby preventing the first flange 20 and the second flange 21 from being subjected to eccentric force when connected.
[0066] See also Figure 8-Figure 11 A slide groove 26 is provided inside the support seat 24, and an indication component is arranged inside the slide groove 26. The indication component includes an adjusting block 27, a return spring 28 is connected to one side of the adjusting block 27, and an indication shaft 29 is fixedly connected to the other end of the return spring 28. The height of the indication shaft 29 is greater than the sum of the heights of the first flange 20 and the second flange 21, and the height of the indication shaft 29 is less than the height of the support seat 24. The indication shaft 29 is symmetrically distributed about the longitudinal center line of the support seat 24. A notch 30 is provided on the lower surface of the support seat 24, and a push rod 31 is fixedly connected to the lower surface of the adjusting block 27, and the push rod 31 passes through the notch 30.
[0067] The working principle of indicating the installation sequence of the bolts is as follows: after the first flange 20 and the second flange 21 are precisely docked, the push rod 31 is first pulled, and the push rod 31 drives the adjustment block 27 to rotate inside the support seat 24, so that the indication shaft 29 penetrates the first flange 20 and the second flange 21 and extends from the inside of the connecting hole 23, and then the bolt is installed into the inside of the connecting hole 23 containing the indication shaft 29. During this process, the bolt will push the indication shaft 29 to move downward until it is stored in the inside of the support seat 24, and the return spring 28 is squeezed and compressed. When the two bolts are installed, the adjustment block 27 is rotated by the push rod 31, so that the adjustment block 27 drives the indication shaft 29 to move synchronously and penetrate the first flange 20 and the second flange 21 again, and extend from the inside of the connecting hole 23, and then the bolt is installed into the inside of the connecting hole 23 containing the indication shaft 29, and so on, until the bolts are installed. The installation sequence of the bolts can be indicated by the indication shaft 29, ensuring that the bolts are installed and tightened step by step in a symmetrical order, so as to avoid eccentricity caused by uneven force on the connection between the first flange 20 and the second flange 21.
[0068] Embodiment 2: The present invention also discloses a fan equipment installation process, comprising the following steps:
[0069] S1: Put the construction vessel in place, install the pile gripper receiving seat at the stern of the pile-driving vessel, hoist and place the pile gripper on the preset receiving seat, tow the pile-driving vessel to the pile foundation coordinate point and drop anchor, accurately position the pile-driving vessel and the pile gripper by controlling the mooring system, and insert temporary support piles into the four-leg guide tubes of the pile gripper;
[0070] S2: transport the steel pile 2 to the construction site in the sea area by transport barge, select floating crane to hoist the steel pile 2 according to the size, position of lifting lug and weight of the steel pile 2, and realize the lifting, turning over and delivering of the steel pile 2;
[0071] S3: After the steel pile 2 is hoisted to the pile gripper by a floating crane, the pipe clamp of the pile gripper platform is appropriately tightened to adjust the verticality of the steel pile 2. When the steel pile 2 sinks into the mud by gravity, the top elevation, position and accuracy of the steel pipe pile are adjusted, and a replacement flange is installed on the top of the steel pile 2;
[0072] S4: Lift the hydraulic impact hammer to drive the steel pipe pile into the pile. After the pile driving operation is completed, drop the hammer and remove the hook. Install the inner platform, carry out UT inspection and acceptance work, and pull out the positioning column after passing the inspection.
[0073] S5: Foundation protection of single pile foundation by dumping gravel;
[0074] S6: Install the anti-collision pipe, ladder, outer platform, cable protection pipe and auxiliary structural parts, and install the fixing sleeve 3 and the anti-collision sleeve 5 on the outer surface of the steel pile 2;
[0075] S7: Transport the large components of the wind turbine to the designated dock in advance for unloading and stacking;
[0076] S8: transporting the major components of the wind turbine to the wharf by land transportation, loading the tower 22, the nacelle, the generator set and the hub onto a transport barge and transporting them to the wind farm site;
[0077] S9: The tower 22, the nacelle, the generator set and the hub are installed in sequence, with some electrical equipment debugging and other ancillary work interspersed in between, and then the three blades are installed respectively, and other ancillary installation work and debugging are completed. The installation of the single pile wind turbine unit is completed.
[0078] It should be pointed out that appropriate adjustments to the fan equipment installation process based on the characteristics of different regions can shorten the installation time, speed up the project progress, and at the same time ensure the stability, reliability and safety of the fan operation.
[0079] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.
Claims
1. A single pile without a transition section for a shallow sea wind farm, comprising a foundation cap (1), characterized in that: The upper end of the foundation platform (1) is connected to a steel pile (2), the outer surface of the steel pile (2) is fixedly connected to a fixing sleeve (3), the outer surface of the fixing sleeve (3) is rotatably connected to an anti-collision sleeve (5), the interior of the anti-collision sleeve (5) is provided with a first closed chamber (6) and a second closed chamber (7), the interior of the first closed chamber (6) is provided with a locking assembly, the locking assembly is used to lock the anti-collision sleeve (5) and the fixing sleeve (3) with each other, the locking assembly comprises a sliding shaft (8), the outer surface of the sliding shaft (8) is sleeved with a strong spring (10), the outer surface of the fixing sleeve (3) is provided with a positioning hole (4), the sliding shaft (8) and the positioning hole (4) are mutually connected, the outer surface of the sliding shaft (8) is sleeved with a connecting plate (9), the connection mode of the connecting plate (9) and the sliding shaft (8) is a fixed connection, the connecting plates (9) are distributed at equal angles with respect to the center of the anti-collision sleeve (5), and the connecting plates (9) overlap each other; An unlocking assembly is arranged inside the second closed chamber (7), and the unlocking assembly is used to release the lock between the anti-collision sleeve (5) and the fixed sleeve (3). The unlocking assembly comprises a connecting block (12), and the upper end of the connecting block (12) is rotatably connected to a fixed shaft (11), and the fixed shaft (11) is fixedly connected to the sliding shaft (8). The middle of the connecting block (12) is fixedly connected to a rotating shaft (13), and the two ends of the rotating shaft (13) are respectively sleeved with torsion springs (15), and the two ends of the rotating shaft (13) are respectively rotatably connected to support blocks (14), and the support blocks (14) are fixedly connected to the anti-collision sleeve (5). A sliding rod (17) is arranged inside the anti-collision sleeve (5), and one end of the sliding rod (17) is fixedly connected to an anti-collision plate (18). A groove (16) is provided on one side of the connecting block (12), and the sliding rod (17) and the groove (16) correspond to each other.
2. The shallow sea wind farm monopile without transition section as claimed in claim 1, characterized in that: The second closed chamber (7) is provided with partition plates (19) inside, and the partition plates (19) are distributed at equal angles with respect to the center of the anti-collision sheath (5).
3. The shallow sea wind farm monopile without transition section as claimed in claim 1, characterized in that: A first flange (20) is fixedly connected to the upper end of the steel pile (2), a tower (22) is arranged above the steel pile (2), a second flange (21) is fixedly connected to the lower end of the tower (22), the first flange (20) and the second flange (21) are connected to each other, and connection holes (23) are provided inside the first flange (20) and the second flange (21).
4. The shallow sea wind farm monopile without transition section as claimed in claim 1, characterized in that: The outer surface of the steel pile (2) is fixedly connected to a support seat (24), the upper end of the support seat (24) is fixedly connected to a limiting sleeve (25), and the limiting sleeve (25) is in a circular ring structure.
5. The shallow sea wind farm monopile without transition section as claimed in claim 4, characterized in that: A slide groove (26) is provided inside the support seat (24), and an indication component is arranged inside the slide groove (26). The indication component comprises an adjustment block (27), one side of the adjustment block (27) is connected to a return spring (28), and the other end of the return spring (28) is fixedly connected to an indication shaft (29), the height of the indication shaft (29) is greater than the sum of the heights of the first flange (20) and the second flange (21), the height of the indication shaft (29) is less than the height of the support seat (24), and the indication shaft (29) is symmetrically distributed about the longitudinal center line of the support seat (24), a notch (30) is provided on the lower surface of the support seat (24), and a push rod (31) is fixedly connected to the lower surface of the adjustment block (27), and the push rod (31) passes through the notch (30).
6. A wind turbine equipment installation process, comprising a shallow sea wind farm monopile without transition section as claimed in any one of claims 1 to 5, characterized in that: The following steps are involved: S1: Put the construction vessel in place, install the pile gripper receiving seat at the stern of the pile-driving vessel, hoist and place the pile gripper on the preset receiving seat, tow the pile-driving vessel to the pile foundation coordinate point and drop anchor, accurately position the pile-driving vessel and the pile gripper by controlling the mooring system, and insert temporary support piles into the four-leg guide tubes of the pile gripper; S2: transporting the steel pile (2) to the construction site in the sea area by a transport barge, selecting a floating crane to hoist the steel pile (2) according to the size, position of the lifting lugs and weight of the steel pile (2), and realizing the lifting, turning over and erecting of the steel pile (2) and the delivery of the steel pile (2); S3: After the steel pile (2) is hoisted to the pile gripper by a floating crane, the pipe clamp of the pile gripper platform is appropriately tightened to adjust the verticality of the steel pile (2). When the steel pile (2) sinks into the mud by gravity, the top elevation, position and accuracy of the steel pipe pile are adjusted, and a replacement flange is installed on the top of the steel pile (2); S4: Lift the hydraulic impact hammer to drive the steel pipe pile into the pile. After the pile driving operation is completed, drop the hammer and remove the hook. Install the inner platform, carry out UT inspection and acceptance work, and pull out the positioning column after passing the inspection. S5: Foundation protection of single pile foundation by dumping gravel; S6: Install the anti-collision pipe, ladder, outer platform, cable protection pipe and auxiliary structural parts, and install the fixing sleeve (3) and the anti-collision sleeve (5) on the outer surface of the steel pile (2); S7: Transport the large components of the wind turbine to the designated dock in advance for unloading and stacking; S8: transporting the large parts of the wind turbine to the wharf by land transportation, loading the tower (22), the nacelle, the generator set and the hub onto a transport barge and transporting them to the wind farm site; S9: The tower (22), the nacelle, the generator set and the hub are installed in sequence, with some electrical equipment debugging and other auxiliary work interspersed in between, and then the three blades are installed respectively, and other auxiliary installation work and debugging are completed. The installation of the monopile wind turbine unit is completed.