A three-layer satellite resource scheduling scheme generation method based on intelligent search
Through intelligent search methods, combined with factors such as task priority, equipment and arc segment flexibility, conflict, etc., a three-layer satellite resource scheduling solution was designed, which solved the satellite resource scheduling problem under the three-layer topology structure and achieved efficient Resource allocation and scheduling.
Patent Information
- Application Number
- CN202410979125.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-07-22
AI Technical Summary
The existing technology is difficult to effectively solve the problem of satellite resource scheduling under the three-layer topology structure, especially when there are relay control satellites, the scheduling method under the original two-layer topology is difficult to directly apply, and the scheduling algorithm needs to be redesigned.
Using the three-layer satellite resource scheduling scheme generation method based on intelligent search, by building a data set, calculating the comprehensive priority of tasks, sorting and allocating tasks, a scheduling scheme covering multiple tasks needs is designed, including task priority and equipment flexibility. Comprehensive consideration of factors such as degree, arc segment flexibility, conflict degree and other factors.
It realizes efficient scheduling of satellite resources under the three-layer topology structure, ensures rationality and feasibility, meets the resource scheduling needs in the three-layer topology satellite management scenario, and improves scheduling efficiency.
Smart Images

Figure CN118521131B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of resource scheduling, and in particular to a method for generating a three-layer satellite resource scheduling solution based on intelligent search. Background Art
[0002] At present, the aerospace field, represented by satellites, is in a period of rapid development. A large number of national and commercial satellites with various functions are being continuously deployed and launched. Relying on their powerful earth observation and data acquisition capabilities, satellites are widely used in various fields such as national defense, transportation, and meteorology, playing a strong auxiliary and promoting role in the development of the industry.
[0003] Compared with the rapidly increasing number of satellites, the ground station facilities responsible for communicating, controlling, etc. with satellites are usually limited by factors such as site and equipment. Their number is far less than the total number of satellites that need to be observed. It is necessary to study and design reasonable and efficient satellite resource scheduling algorithms to ensure the ground station's control needs for satellites.
[0004] Typical satellite resource scheduling scenarios only consider the "ground station-satellite" two-layer topology. In real-world scenarios, controllable ground stations are relatively concentrated geographically and have limited visibility, making it difficult to observe and schedule satellites orbiting behind them. The current solution is to introduce relay control satellites, which complement these limited observation ranges and enable global satellite observation and scheduling.
[0005] The introduction of relay satellites has upgraded the original two-layer topology of "ground station-satellite" to a three-layer topology of "ground station-relay control satellite-satellite", making the problem constraints more complex and greatly changing the original problem model. The satellite resource scheduling method under the original two-layer topology is difficult to use directly, and it is necessary to redesign the problem modeling, constraint definition and even the scheduling algorithm, which is very difficult and challenging. Summary of the Invention
[0006] The embodiments of the present application provide a three-layer satellite resource scheduling solution generation method based on intelligent search, which solves the problem of satellite resource scheduling solution generation in a three-layer topology structure containing relay control satellites in the prior art.
[0007] Other features and advantages of the present application will become apparent from the following detailed description, or may be learned in part by practice of the present application.
[0008] According to a first aspect of an embodiment of the present application, a method for generating a three-layer satellite resource scheduling solution based on intelligent search is provided, comprising:
[0009] Step S1: constructing a data set used as an input for a satellite resource scheduling algorithm, wherein the data set includes target parameters, arc parameters, and mission parameters;
[0010] Step S2: Calculate the overall priority of the task;
[0011] Step S3: sorting the task parameters according to the comprehensive task priority to obtain a set of tasks to be assigned;
[0012] Step S4: Select the task with the highest priority from the set of tasks to be assigned;
[0013] Step S5: Check whether all optional arcs of the task have been assigned; if so, remove the task from the set of tasks to be assigned and return to step S4; if not, proceed to step S6;
[0014] Step S6: Allocate resources for the task and remove the task from the set of tasks to be allocated;
[0015] Step S7, repeating steps S4-S6 until the set of tasks to be assigned is empty;
[0016] Step S8: Output the final scheduling plan.
[0017] In some embodiments of the present application, based on the above solution, the comprehensive priority of the computing task includes:
[0018] Read task priority;
[0019] Calculate the flexibility of equipment available for the mission;
[0020] Calculate the flexibility of the arc segments available for the task;
[0021] Calculate the mission equipment arc conflict degree;
[0022] Calculate the conflict degree of mission equipment quantity;
[0023] The comprehensive priority of the task is calculated based on the task priority, the flexibility of the available equipment of the task, the flexibility of the available arc of the task, the conflict degree of the arc of the task equipment and the conflict degree of the quantity of the task equipment.
[0024] In some embodiments of the present application, based on the aforementioned solution, the computing task can utilize equipment flexibility, including:
[0025] Get the number of available equipment within the task execution time interval and the total number of observation equipment corresponding to the task type;
[0026] Based on the number of available equipment within the task execution time interval and the total number of observation equipment corresponding to the task type, the flexibility of the available equipment for the task is calculated using formula (1);
[0027] ; (1)
[0028] In formula (1), Indicates the flexibility of equipment available for the mission. Indicates the number of available equipment within the task execution time interval, Indicates the total number of observation equipment corresponding to the mission type.
[0029] In some embodiments of the present application, based on the above solution, the calculation task can use arc segment flexibility, including:
[0030] Get the total number of optional arcs for the task and the number of optional arcs corresponding to the task with the highest number of optional arcs in the task list;
[0031] Based on the total number of optional arcs of the task and the number of optional arcs corresponding to the task with the highest number of optional arcs in the task list, the flexibility of the available arcs of the task is calculated using formula (2);
[0032] ; (2)
[0033] In formula (2), Indicates the total number of optional arcs for the task, Indicates the number of optional segments corresponding to the task with the highest number of optional segments in the task list.
[0034] In some embodiments of the present application, based on the aforementioned solution, the calculation of the task equipment arc conflict degree includes:
[0035] List all relevant pending tasks for the observation equipment occupied by the task within the task execution time interval;
[0036] Calculate the ratio of the arc segments affected by the conflict in the set of tasks to be assigned to the total number of optional arc segments of the task, and record it as the conflict value of the task;
[0037] Calculate the average conflict value of the task based on the task conflict value;
[0038] The task equipment arc conflict degree is calculated based on the average conflict value of the task.
[0039] In some embodiments of the present application, based on the aforementioned solution, the calculation of the ratio of arcs affected by conflicts in the set of related tasks to be assigned to the total number of optional arcs of the tasks, recorded as the conflict value of the task, includes:
[0040] Use formula (3) to calculate the conflict value of the task;
[0041] ; (3)
[0042] In formula (3), Indicates a task In observation equipment The degree of conflict, Indicates related tasks In observation equipment The first Visible window arc segments, Indicates related tasks In observation equipment Optional Visible window arc segments, Indicates the manually set upper limit of the conflict value.
[0043] In some embodiments of the present application, based on the aforementioned solution, the step of calculating the task equipment arc conflict degree based on the average conflict value of the task includes:
[0044] The arc conflict degree of the mission equipment is calculated using formula (4);
[0045] ; (4)
[0046] In formula (4), Indicates the arc conflict degree of mission equipment, Indicates observation equipment, Represents the set of observation equipment occupied by the task during the execution time interval, represents the jth equipment in A, Indicates the total number of observation equipment occupied by the task during the execution time interval, Represents the average conflict value based on tasks.
[0047] In some embodiments of the present application, based on the aforementioned solution, the calculation of the degree of conflict of the number of task equipment includes:
[0048] Obtain the number of tasks that conflict with the calculated task's observation equipment resources and the maximum number of task conflicts among all tasks;
[0049] Based on the number of tasks that have observation equipment resource conflicts with the calculated task and the maximum number of task conflicts among all tasks, the equipment quantity conflict degree of the task is calculated using formula (5);
[0050] ; (5)
[0051] In formula (5), Indicates the conflict degree of equipment quantity in calculation task, Indicates the number of tasks that conflict with the observed equipment resources of the task being calculated. Indicates the maximum number of task conflicts among all tasks.
[0052] In some embodiments of the present application, based on the aforementioned solution, the calculation of the task comprehensive priority based on the task priority, the flexibility of the available equipment for the task, the flexibility of the available arc segment for the task, the conflict degree of the arc segment for the task equipment, and the conflict degree of the quantity of the task equipment includes:
[0053] The task priority, the flexibility of the available equipment for the task, the flexibility of the available arc segment for the task, the conflict degree of the arc segment for the task equipment and the conflict degree of the quantity of the task equipment are obtained respectively, and the comprehensive priority of the task is calculated using formula (6);
[0054] ; (6)
[0055] In formula (6), Indicates the overall priority of the task, Indicates the upper bound of the task static priority value range, Indicates the task priority, Indicates the degree of conflict in the number of mission equipment. Indicates the flexibility of equipment available for the mission. Indicates the flexibility of the arc segments available for the task, Indicates the arc conflict degree of mission equipment, The weight coefficient representing the conflict degree of the number of mission equipment, The weight coefficient representing the flexibility of the equipment available for the mission, The weight coefficient representing the flexibility of the available arc segments of the task, Indicates the weight coefficient of the mission equipment arc conflict degree, Indicates a task.
[0056] In some embodiments of the present application, based on the aforementioned solution, allocating resources for the task includes:
[0057] Step S61: Select the arc segment with the smallest conflict degree among the optional arc segments of the task and assign it to the task;
[0058] Step S62: Check whether the minimum number of arc segments required to complete the task is met; if so, put the task and the selected arc segments into the solution set and proceed to step S64; if not, proceed to step S63;
[0059] Step S63, checking whether there are any unassigned arcs in the optional arcs of the task; if so, returning to step S61; if not, proceeding to step S64;
[0060] Step S64: remove the task from the set of tasks to be assigned.
[0061] The beneficial effects of this application are as follows:
[0062] (1) This application conducts intelligent search and scheduling of satellite resources based on the comprehensive priority of tasks. By formulating and comprehensively considering the flexibility of task resources, the flexibility of visible windows, the conflict degree of equipment arc segments, and the conflict degree of equipment quantity, a method for generating satellite resource scheduling solutions that covers various task requirements is designed. This method can achieve high-efficiency scheduling of satellite resources while ensuring rationality and feasibility, and obtain relatively excellent comprehensive indicators.
[0063] (2) This application designs an algorithm based on a three-layer topology structure containing a relay control satellite, focusing on the resource scheduling scenario of the visible window between the control satellite and the satellite, and conducts problem modeling and algorithm design evaluation based on this scenario, so that this application can meet the satellite resource scheduling solution under the three-layer topology satellite control scenario.
[0064] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0065] The accompanying drawings are incorporated into and constitute a part of the specification, illustrating embodiments consistent with the present application and, together with the specification, explaining the principles of the present application. Obviously, the drawings described below are only some embodiments of the present application, and those skilled in the art can derive other drawings based on these drawings without inventive effort. In the drawings:
[0066] Figure 1 A schematic diagram of a process for generating a three-layer satellite resource scheduling solution based on intelligent search according to an embodiment of the present application is shown;
[0067] Figure 2 A block diagram of an electronic device according to an embodiment of the present application is shown;
[0068] Figure 3 A schematic diagram of the structure of a computer system suitable for implementing an electronic device according to an embodiment of the present application is shown. DETAILED DESCRIPTION
[0069] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in many forms and should not be construed as limited to the examples set forth herein; rather, these embodiments are provided so that this application will be thorough and complete and will fully convey the concepts of the example embodiments to those skilled in the art.
[0070] In addition, described feature, structure or characteristic can be combined in one or more embodiments in any suitable manner.In the following description, many specific details are provided so as to provide a full understanding of the embodiments of the present application. However, it will be appreciated by those skilled in the art that the technical scheme of the present application can be put into practice without one or more of the specific details, or other methods, components, devices, steps etc. can be adopted. In other cases, known methods, devices, implementations or operations are not shown or described in detail to avoid blurring the various aspects of the application.
[0071] The block diagrams shown in the accompanying drawings are merely functional entities and do not necessarily correspond to physically separate entities. That is, these functional entities may be implemented in software, in one or more hardware modules or integrated circuits, or in different networks and / or processor devices and / or microcontroller devices.
[0072] The flowcharts shown in the accompanying drawings are for illustrative purposes only and do not necessarily include all contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps may be decomposed, while others may be combined or partially combined. Therefore, the actual execution order may vary depending on the actual situation.
[0073] To make the objectives, technical solutions, and advantages of the present invention more clear, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts shall fall within the scope of protection of the present invention.
[0074] The following will describe some embodiments of the present application in detail with reference to the accompanying drawings. In the absence of conflict, the following embodiments and features therein may be combined with each other.
[0075] See also Figure 1 , shows a flow chart of a method for generating a three-layer satellite resource scheduling solution based on intelligent search according to an embodiment of the present application.
[0076] like Figure 1 As shown in the figure, a three-layer satellite resource scheduling solution generation method based on intelligent search is presented, including:
[0077] Step S1: constructing a data set used as an input for a satellite resource scheduling algorithm, wherein the data set includes target parameters, arc parameters, and mission parameters;
[0078] Step S2: Calculate the overall priority of the task;
[0079] Step S3: sorting the task parameters according to the comprehensive task priority to obtain a set of tasks to be assigned;
[0080] Step S4: Select the task with the highest priority from the set of tasks to be assigned;
[0081] Step S5: Check whether all optional arcs of the task have been assigned; if so, remove the task from the set of tasks to be assigned and return to step S4; if not, proceed to step S6;
[0082] Step S6: Allocate resources for the task and remove the task from the set of tasks to be allocated;
[0083] Step S7, repeating steps S4-S6 until the set of tasks to be assigned is empty;
[0084] Step S8: Output the final scheduling plan.
[0085] It should be noted that, in this embodiment, the target parameters include: the number of ground stations, relay control satellites, user satellites (satellites) involved in the scheduling task, as well as the payload types and payload capacity data.
[0086] Arc parameters involve the arc segment visible from the control satellite to the ground station and the arc segment visible from the user satellite to the control satellite, including: arc segment unique identifier, arc segment type (control satellite to ground station, user satellite to control satellite), observation equipment (ground station, control satellite), observed equipment (control satellite, user satellite), start time, end time. Multiple arc segments are entered in list form.
[0087] Mission parameters include: mission type (control satellite to ground station, user satellite to control satellite), mission priority, mission-involved ground stations, mission-involved control satellites, mission-involved user satellites, mission start time, mission end time, and the minimum number of arcs required to complete the mission.
[0088] It can be understood that in this embodiment, the above data is read and stored, and data screening and preprocessing are performed to obtain a set of available equipment resources and optional arc resources for subsequent operations.
[0089] It can be understood that the output scheduling plan is a set of all selected arc parameters, including arc unique identifier, arc type, observing equipment, observed equipment, start time and end time.
[0090] In the process of calculating the comprehensive priority of the task in step S2 of this embodiment, the scheduling priority of each task is comprehensively evaluated by considering the impact of multiple conflicts. In actual scenarios, due to the many-to-many relationship between the observation target and the observed target, different observation tasks often have different difficulties in meeting. Intuitively speaking, taking "allocating a sufficient number of observable window arcs within the task execution time interval" as the task satisfaction standard, tasks with more optional arcs are considered to be easier to meet, and at this time, the remaining tasks with fewer optional arcs tend to be met first, so as to avoid conflicts between tasks as much as possible. In this embodiment, the key is to quantify the rationality of the priority of the task, while taking into account the task's designated priority, the number of available equipment for the task, the number of optional arcs for the task, and the degree of conflict between the task and other tasks.
[0091] Based on this, in some feasible embodiments, based on the above solution, step S2 includes:
[0092] Step S21, reading the task priority;
[0093] Step S22: Calculate the flexibility of available equipment for the task;
[0094] Step S23: Calculate the available arc segment flexibility of the task;
[0095] Step S24, calculating the arc conflict degree of the mission equipment;
[0096] Step S25: Calculate the degree of conflict in the number of mission equipment;
[0097] Step S26: Calculate the comprehensive priority of the task based on the task priority, the flexibility of the available equipment for the task, the flexibility of the available arc segment for the task, the conflict degree of the arc segment of the task equipment, and the conflict degree of the quantity of the task equipment.
[0098] It should be noted that in step S21 of this embodiment, the task priority is recorded as , indicating the urgency or importance of the task, and its value is a natural number between 1 and N.
[0099] Considering the limited capabilities of observation equipment, by default, the same equipment can only perform observation tasks on the same target at the same time. Therefore, for tasks that can select multiple equipment for observation, the more equipment available, the more flexibility in equipment selection, and these can be deferred.
[0100] Based on this, in step S22 of this embodiment, the flexibility of the equipment available for the task is recorded as , is positively correlated with the number of observation equipment available for mission execution. The more equipment that can meet mission requirements, the more flexible the mission equipment is and the lower the mission scheduling priority.
[0101] In some feasible embodiments, based on the above solution, the computing task can be equipped with flexibility, including:
[0102] Get the number of available equipment within the task execution time interval and the total number of observation equipment corresponding to the task type;
[0103] Based on the number of available equipment within the task execution time interval and the total number of observation equipment corresponding to the task type, the flexibility of the available equipment for the task is calculated using formula (1);
[0104] ; (1)
[0105] In formula (1), Indicates the flexibility of equipment available for the mission. Indicates the number of available equipment within the task execution time interval, Indicates the total number of observation equipment corresponding to the mission type.
[0106] Similar to equipment flexibility, when there are more optional arcs within the task execution time interval, the task has greater flexibility in arc selection and can be satisfied later.
[0107] Based on this, in step S23 of this embodiment, the available arc segment flexibility of the task is recorded as ,The more visible window arcs that can be selected within the task execution time interval, the stronger the flexibility and the lower the task scheduling priority.
[0108] In some feasible embodiments, based on the above solution, the calculation task can use arc segment flexibility, including:
[0109] Get the total number of optional arcs for the task and the number of optional arcs corresponding to the task with the highest number of optional arcs in the task list;
[0110] Based on the total number of optional arcs of the task and the number of optional arcs corresponding to the task with the highest number of optional arcs in the task list, the flexibility of the available arcs of the task is calculated using formula (2);
[0111] ; (2)
[0112] In formula (2), Indicates the total number of optional arcs for the task, Indicates the number of optional segments corresponding to the task with the highest number of optional segments in the task list.
[0113] At the same time, the same observation equipment may be assigned to multiple tasks. This is considered an equipment conflict between these multiple tasks, meaning that the assignment of one task will cause the other tasks to be unsatisfied. In this embodiment, when a task has many conflicting tasks, the task is postponed to minimize the number of conflicts.
[0114] Based on this, in step S24 of this embodiment, the mission equipment arc conflict degree is recorded as , which indicates the degree of conflict in arc usage with other tasks to be allocated resources when a task occupies observation equipment resources.
[0115] In some feasible embodiments, based on the above solution, step S24 includes:
[0116] Step S241: List all relevant to-be-assigned task sets of the observation equipment occupied by the task within the task execution time interval;
[0117] Step S242: Calculate the ratio of the arc segments affected by the conflict in the task set to be assigned to the total number of optional arc segments of the task, and record it as the conflict value of the task;
[0118] Step S243: Calculate the average conflict value of the task based on the task conflict value;
[0119] Step S244: Calculate the task equipment arc conflict degree based on the average conflict value of the task.
[0120] It should be noted that, in step S242 , the conflict value of each task in the relevant set of tasks to be assigned needs to be calculated.
[0121] The mission equipment arc conflict degree is quantified based on the intersection relationship between arcs in the visible window. For the same observation equipment, any arc with two arcs that intersect in time is considered a conflicting arc. In this embodiment, the mission equipment arc conflict degree is represented by taking the quantified average of the arc conflicts for all optional equipment in a mission.
[0122] Based on this, in some feasible embodiments, based on the above solution, step S242 includes:
[0123] Use formula (3) to calculate the conflict value of the task;
[0124] ; (3)
[0125] In formula (3), Indicates a task In observation equipment The degree of conflict, Indicates related tasks In observation equipment The first Visible window arc segments, Indicates related tasks In observation equipment Optional Visible window arc segments, Indicates the manually set upper limit of the conflict value.
[0126] In some feasible embodiments, based on the above solution, in step S243, the method for calculating the average task conflict value is specifically as follows:
[0127] ; (4)
[0128] Where, represents the average task conflict value, For observation equipment The total number of tasks to be assigned that are affected by conflicts.
[0129] In some feasible embodiments, based on the above solution, in step S244, the method for calculating the mission equipment arc conflict degree is specifically as follows:
[0130] The arc conflict degree of the mission equipment is calculated using formula (5);
[0131] ; (5)
[0132] In formula (5), Indicates the arc conflict degree of mission equipment, Indicates observation equipment, Represents the set of observation equipment occupied by the task during the execution time interval, represents the jth equipment in A, Indicates the total number of observation equipment occupied by the task during the execution time interval, Represents the average conflict value based on tasks.
[0133] In short, the mission equipment arc conflict degree indicates the potential conflicts between a mission and other missions when the final arc is assigned. Similarly, the mission equipment quantity conflict degree more directly indicates the potential conflicts between a mission and other missions when selecting equipment.
[0134] Based on this, in step S25 of this embodiment, the task equipment quantity conflict degree is recorded as , indicating the degree of conflict between this task and other tasks.
[0135] In some feasible embodiments, based on the above solution, in step S25, the specific method for calculating the mission equipment quantity conflict degree is:
[0136] ; (6)
[0137] In formula (6), The conflict degree of the number of mission equipment, is the number of tasks that conflict with the observation equipment resources of this task, The maximum number of task conflicts among all tasks.
[0138] In this embodiment, the above-mentioned various data indicators that affect the task scheduling priority are comprehensively considered and weighted calculation is performed to obtain the comprehensive priority of each task. For ease of implementation, the calculation results are not negated or reciprocated in this embodiment, so that when scheduling tasks, the task scheduling priority and the task comprehensive priority are negatively correlated rather than positively correlated.
[0139] Based on this, in step S26, the task comprehensive priority is recorded as .
[0140] In some feasible embodiments, based on the above solution, step S26 includes:
[0141] The task priority, the flexibility of the available equipment for the task, the flexibility of the available arc segment for the task, the conflict degree of the arc segment for the task equipment and the conflict degree of the quantity of the task equipment are obtained respectively, and the comprehensive priority of the task is calculated using formula (7);
[0142] ; (7)
[0143] In formula (7), Indicates the overall priority of the task, Indicates the upper bound of the task static priority value range, Indicates the task priority, Indicates the degree of conflict in the number of mission equipment. Indicates the flexibility of equipment available for the mission. Indicates the flexibility of the arc segments available for the task, Indicates the arc conflict degree of mission equipment, The weight coefficient representing the conflict degree of the number of mission equipment, The weight coefficient representing the flexibility of the equipment available for the mission, The weight coefficient representing the flexibility of the available arc segments of the task, Indicates the weight coefficient of the mission equipment arc conflict degree, Indicates a task.
[0144] When a task is selected and enters the scheduling phase, it is completed by allocating the required number of arcs. The arc allocation logic is similar to the task priority evaluation logic, prioritizing arcs with the least conflict to maximize arc resource utilization.
[0145] Based on this, in some feasible embodiments, based on the above solution, in step S6, allocating resources for the task specifically includes:
[0146] Step S61: Select the arc segment with the smallest conflict degree among the optional arc segments of the task and assign it to the task;
[0147] Step S62: Check whether the minimum number of arc segments required to complete the task is met; if so, put the task and the selected arc segments into the solution set and proceed to step S64; if not, proceed to step S63;
[0148] Step S63, checking whether there are any unassigned arcs in the optional arcs of the task; if so, returning to step S61; if not, proceeding to step S64;
[0149] Step S64: remove the task from the set of tasks to be assigned.
[0150] like Figure 2 As shown, an embodiment of the present application also provides an electronic device 200, including a memory 210, a processor 220, and a computer program 211 stored in the memory 210 and executable on the processor. When the processor 220 executes the computer program 211, the steps of the above-mentioned method for generating a three-layer satellite resource scheduling solution based on intelligent search are implemented.
[0151] Since the electronic device introduced in this embodiment is a device used to implement a three-layer satellite resource scheduling scheme generation method based on intelligent search in the embodiment of the present application, based on the method introduced in the embodiment of the present application, technical personnel in this field can understand the specific implementation method of the electronic device of this embodiment and its various variations. Therefore, how the electronic device implements the method in the embodiment of the present application is no longer introduced in detail here. As long as the equipment used by technical personnel in this field to implement the method in the embodiment of the present application falls within the scope of protection of this application.
[0152] During the specific implementation process, when the computer program 211 is executed by the processor, any implementation method of the embodiments corresponding to the first aspect can be implemented.
[0153] Figure 3 A schematic diagram of the structure of a computer system suitable for implementing an electronic device according to an embodiment of the present application is shown.
[0154] It should be noted that Figure 3The computer system 300 of the electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.
[0155] like Figure 3 As shown, computer system 300 includes a central processing unit 301, which can perform various appropriate actions and processes based on programs stored in read-only memory 302 or programs loaded from storage unit 308 into random access memory 303, such as executing the methods described in the above embodiments. Random access memory 303 also stores various programs and data required for system operation. Central processing unit 301, read-only memory 302, and random access memory 303 are connected to each other via bus 304. Input / output interface 305 is also connected to bus 304.
[0156] The following components are connected to the input / output interface 305: an input section 306 including a keyboard, mouse, and the like; an output section 307 including devices such as a cathode ray tube (CRT), a liquid crystal display (LCD), and speakers; a storage section 308 including devices such as a hard disk; and a communication section 309 including a network interface card such as a LAN (Local Area Network) card or a modem. The communication section 309 performs communication processing via a network such as the Internet. A drive 310 is also connected to the input / output interface 305 as needed. Removable media 311, such as a magnetic disk, an optical disk, a magneto-optical disk, or a semiconductor memory, is installed in the drive 310 as needed, so that computer programs read from the media can be installed in the storage section 308 as needed.
[0157] In particular, according to an embodiment of the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present application includes a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program contains program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network via the communication section 309 and / or installed from a removable medium 311. When the computer program is executed by the central processing unit 301, the various functions defined in the system of the present application are performed.
[0158] It should be noted that the computer-readable medium described in the embodiments of this application may be a computer-readable signal medium or a computer-readable storage medium, or any combination thereof. A computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any combination thereof. More specific examples of computer-readable storage media may include, but are not limited to, an electrical connection having one or more conductors, a portable computer disk, a hard disk, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM), flash memory, optical fiber, a portable compact disc read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof. In this application, a computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in conjunction with an instruction execution system, apparatus, or device. In this application, a computer-readable signal medium may include a data signal transmitted in baseband or as part of a carrier wave, which carries computer-readable program code. Such propagated data signals may take various forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination thereof. A computer-readable signal medium may also be any computer-readable medium other than a computer-readable storage medium that can transmit, propagate, or transport a program for use by or in connection with an instruction execution system, apparatus, or device. Program code embodied on a computer-readable medium may be transmitted using any suitable medium, including but not limited to wireless, wired, or any suitable combination thereof.
[0159] The flowcharts and block diagrams in the accompanying drawings illustrate the possible implementation architecture, functions and operations of the systems, methods and computer program products according to various embodiments of the present application. Among them, each box in the flowchart or block diagram can represent a module, program segment, or part of the code, and the above-mentioned module, program segment, or part of the code contains one or more executable instructions for implementing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in an order different from that marked in the accompanying drawings. For example, two boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram or flowchart, and the combination of boxes in the block diagram or flowchart, can be implemented with a dedicated hardware-based system that performs the specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.
[0160] The units involved in the embodiments described in this application may be implemented by software or hardware, and the units described may also be set in a processor. In some cases, the names of these units do not constitute limitations on the units themselves.
[0161] As another aspect, the present application further provides a computer program product or computer program, which includes computer instructions stored in a computer-readable storage medium. A processor of a computer device reads the computer instructions from the computer-readable storage medium and executes the computer instructions, causing the computer device to perform the method for generating a three-tier satellite resource scheduling solution based on intelligent search as described in the above embodiment.
[0162] As another aspect, the present application also provides a computer-readable medium, which may be included in the electronic device described in the above embodiments, or may exist independently and not be incorporated into the electronic device. The computer-readable medium carries one or more programs, and when executed by the electronic device, the electronic device implements the method for generating a three-layer satellite resource scheduling solution based on intelligent search as described in the above embodiments.
[0163] It should be noted that, although several modules or units of the device for action execution are mentioned in the above detailed description, this division is not mandatory. In fact, according to the embodiment of the application, the features and functions of two or more modules or units described above can be concretized in one module or unit. On the contrary, the features and functions of one module or unit described above can be further divided into multiple modules or units to be concretized.
[0164] Through the description of the above embodiments, it is easy for those skilled in the art to understand that the example embodiments described herein can be implemented by software or by combining software with necessary hardware. Therefore, the technical solution according to the embodiments of the present application can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.) or on a network, and includes a number of instructions to enable a computing device (which can be a personal computer, a server, a touch terminal, or a network device, etc.) to execute the method according to the embodiments of the present application.
[0165] Those skilled in the art will readily appreciate other embodiments of the present application after considering the specification and practicing the embodiments disclosed herein. This application is intended to cover any variations, uses, or adaptations of the present application that follow the general principles of the present application and include common knowledge or customary techniques in the art that are not disclosed in this application. It should be understood that this application is not limited to the precise structures described above and shown in the accompanying drawings, and various modifications and changes can be made without departing from the scope thereof. The scope of this application is limited only by the appended claims.
Claims
1. A method for generating a three-layer satellite resource scheduling scheme based on intelligent search, characterized in that: include: Step S1, constructing a data set used as an input of a satellite resource scheduling algorithm, wherein the data set includes target parameters, arc parameters and mission parameters; Step S2, calculating the comprehensive priority of the task; Step S3, sorting the task parameters according to the comprehensive task priority to obtain a set of tasks to be assigned; Step S4, selecting the task with the highest priority from the set of tasks to be assigned; Step S5, check whether all optional arcs of the task have been allocated; if so, remove the task from the set of tasks to be allocated and return to step S4; if not, proceed to step S6; Step S6: Allocate resources for the task and remove the task from the set of tasks to be allocated; Step S7, repeating steps S4-S6 until the set of tasks to be assigned is empty; Step S8: output the final scheduling plan; The comprehensive priority of the computing task includes: Read task priority; Calculate the flexibility of equipment available for the mission; Calculate the flexibility of the arc segments available for the task; Calculate the arc conflict degree of mission equipment; Calculate the conflict degree of the number of mission equipment; Calculate the comprehensive priority of the task based on the task priority, the flexibility of the available equipment for the task, the flexibility of the available arc segment for the task, the conflict degree of the arc segment of the task equipment and the conflict degree of the number of equipment for the task; The computing tasks described can be equipped with flexibility, including: Get the number of available equipment within the task execution time interval and the total number of observation equipment corresponding to the task type; Based on the number of available equipment within the task execution time interval and the total number of observation equipment corresponding to the task type, the flexibility of the available equipment for the task is calculated using formula (1); ;(1) In formula (1), Indicates the flexibility of equipment available for the mission. Indicates the number of available equipment within the task execution time interval, Indicates the total number of observation equipment corresponding to the task type; The calculation task can be used with arc segment flexibility, including: Get the total number of optional arcs for the task and the number of optional arcs corresponding to the task with the highest number of optional arcs in the task list; Based on the total number of optional arcs of the task and the number of optional arcs corresponding to the task with the highest number of optional arcs in the task list, the flexibility of the available arcs of the task is calculated using formula (2); ;(2) In formula (2), Indicates the total number of optional arcs for the task, Indicates the number of optional arcs corresponding to the task with the highest number of optional arcs in the task list; The calculation of the task equipment arc segment conflict degree includes: List all relevant tasks to be assigned to the observation equipment occupied by the task within the task execution time interval; Calculate the ratio of the arc segments affected by the conflict in the task set to be assigned to the total number of optional arc segments of the task, and record it as the conflict value of the task; Calculate the average conflict value of the task based on the task conflict value; Calculate the task equipment arc conflict degree based on the average conflict value of the task; The calculation of the ratio of the arc segments affected by the conflict in the task set to be assigned to the total number of optional arc segments of the task, recorded as the conflict value of the task, includes: Use formula (3) to calculate the conflict value of the task; ;(3) In formula (3), Representation Task In observation equipment The degree of conflict, Indicates related tasks In observation equipment The first Visible window arc segments, Indicates related tasks In observation equipment Optional Visible window arc segments, Indicates the manually set upper limit of the conflict value; The calculating of the task equipment arc conflict degree based on the average conflict value of the task includes: The arc conflict degree of the mission equipment is calculated using formula (4); ;(4) In formula (4), Indicates the arc conflict degree of the mission equipment. Indicates observation equipment, Represents the set of observation equipment occupied by the task during the execution time interval, represents the jth equipment in A, Indicates the total number of observation devices occupied by the task during the execution time interval, represents the average conflict value based on the task; The calculation of the task equipment quantity conflict degree includes: Obtain the number of tasks that have observation equipment resource conflicts with the calculated task and the maximum number of task conflicts among all tasks; Based on the number of tasks that have observation equipment resource conflicts with the calculated task and the maximum number of task conflicts among all tasks, the task equipment quantity conflict degree is calculated using formula (5); ;(5) In formula (5), Indicates the conflict degree of equipment quantity in the calculation task. Indicates the number of tasks that conflict with the observed equipment resources of the task being calculated. Indicates the maximum number of task conflicts among all tasks; The calculating of the task comprehensive priority based on the task priority, the flexibility of the available equipment for the task, the flexibility of the available arc segment for the task, the arc segment conflict degree of the task equipment and the conflict degree of the number of task equipment comprises: The task priority, the flexibility of the available equipment for the task, the flexibility of the available arc segment for the task, the arc segment conflict degree of the task equipment and the conflict degree of the number of equipment for the task are respectively obtained, and the comprehensive priority of the task is calculated using formula (6); ;(6) In formula (6), Representation Task The overall priority of Indicates the upper bound of the task static priority range. Indicates the task priority. Indicates the conflict degree of the number of mission equipment. Indicates the flexibility of equipment available for the mission. Indicates the flexibility of the arc segments available for the task, Indicates the arc conflict degree of the mission equipment. The weight coefficient representing the conflict degree of the number of mission equipment, The weight coefficient representing the flexibility of the equipment available for the mission, The weight coefficient representing the flexibility of the available arc segments of the task, Represents the weight coefficient of the mission equipment arc conflict degree, Indicates a task.
2. The method for generating a three-layer satellite resource scheduling scheme based on intelligent search according to claim 1, characterized in that: The allocating resources for the task includes: Step S61, selecting an arc segment with the smallest conflict degree among the optional arc segments of the task, and assigning it to the task; Step S62, check whether the minimum number of arc segments required to complete the task is met; if so, put the task and the selected arc segments into the solution set and go to step S64; if not, go to step S63; Step S63, checking whether there are any unassigned arcs in the optional arcs of the task; if so, returning to step S61; if not, proceeding to step S64; Step S64: remove the task from the set of tasks to be assigned.