A method and system for processing hydrological forecast data based on full storage and runoff throughout the entire process

Through the full-process hydrological forecast data processing method based on full-process hydrological forecasting data, the modeling process of hydrological models is simplified, the problems of cumbersome modeling and difficult to determine parameters in the existing technology are solved, the modeling efficiency and accuracy are improved, and Significant social and economic benefits.

CN118521232BActive Publication Date: 2024-11-01POWER CHINA KUNMING ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410990539.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-11-01
Estimated Expiration
2044-07-23

AI Technical Summary

Technical Problem

The existing hydrological models are complicated in the modeling process, with many parameters and difficult to determine the initial value, especially in the case of insufficient data, which leads to low modeling efficiency.

Method used

Using the full-process hydrological forecast data processing method based on full-process full-production flow, by determining the target basin, obtaining basic hydrological data, screening section hydrological forecast data, building hydrological forecast schemes, performing evaporation calculations, flow calculations, water source division and river flow Calculate, establish a hydrological forecast model, and perform parameter rate determination to improve the modeling and simulation effect.

Benefits of technology

The hydrological model modeling process is simplified, the work efficiency is improved, and the dependence on early data is reduced, which has significant social and technical and economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118521232B_ABST
    Figure CN118521232B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of hydrological information processing, and in particular to a full-process hydrological forecast data processing method and system based on full storage and flow production, determining a target river basin, obtaining basic hydrological data of the target river basin; selecting and obtaining cross-section hydrological forecast data from the basic hydrological data, and constructing a hydrological forecast scheme for the target river basin according to the distribution of power stations in the target river basin; based on the hydrological forecast scheme, completing evapotranspiration calculation, flow production calculation, water source division, confluence calculation and river flow calculation for the target river basin, and obtaining a hydrological forecast model for the target river basin; modeling the power station and upstream hydrological station sections and tributary control sections of the target river basin according to the hydrological forecast model, and after parameter calibration, evaluating the modeling simulation effect. The present invention simplifies the hydrological modeling process, improves work efficiency, reduces dependence on previous data, and has significant social and technical and economic benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of hydrological information processing, and in particular to a method and system for processing hydrological forecast data for the entire process based on full storage and runoff. Background Art

[0002] Hydrological forecasting is the prediction of the flow process of a certain section in the future based on inputs such as precipitation, upstream flow, evaporation, and underlying surface conditions. It is of great significance for flood control and development of water conservancy facilities. In hydrological forecasting, the selection and establishment of hydrological models are very important. Currently, the most widely used models include Xinanjiang model, Sacramento (SAC) model, SWAT model, TOPMODEL model, etc.

[0003] In hydrological forecasting, the selection and establishment of hydrological models are very important. Although the models currently available on the market have a wide range of applications, they also have their own limitations, such as too many parameters, difficulty in initial value selection, difficulty in calibration in the absence of data, and cumbersome modeling. Summary of the invention

[0004] In order to solve the problem of cumbersome modeling, this application provides the following technical solutions:

[0005] According to a first aspect of the present invention, the present invention claims protection for a full-process hydrological forecast data processing method based on full storage and runoff, comprising:

[0006] Determine a target watershed and obtain basic hydrological data of the target watershed;

[0007] Filter and obtain cross-section hydrological forecast data from the basic hydrological data, and construct a hydrological forecast scheme for the target river basin according to the distribution of power stations in the target river basin;

[0008] Based on the hydrological forecasting scheme, evapotranspiration calculation, runoff calculation, water source division, confluence calculation and river flow calculation are completed for the target watershed to obtain a hydrological forecasting model for the target watershed;

[0009] The power station, upstream hydrological station section and tributary control section of the target basin are modeled based on the hydrological forecast model, and the modeling simulation effect is evaluated after parameter calibration.

[0010] Furthermore, the step of determining the target watershed and obtaining basic hydrological data of the target watershed further includes:

[0011] The basic hydrological data of the target basin at least include:

[0012] The location of controlling sections, distribution of hydrological stations and rain gauges, river length, basin area, and basin evaporation.

[0013] Furthermore, the step of selecting and obtaining cross-section hydrological forecast data from the basic hydrological data and constructing a hydrological forecast scheme for the target river basin according to the distribution of power stations in the target river basin also includes:

[0014] Selecting data suitable for cross-section hydrological forecasting from the basic hydrological data as cross-section hydrological forecasting data;

[0015] Acquire a plurality of cascade power stations in the target river basin, wherein the target river basin includes a main stream and tributaries;

[0016] For each power station of the cascade power stations, the nearest upstream mainstream control station is used as the inflow control station of the power station, and the tributaries are controlled by the tributary hydrological stations and calculated to the dam site through the river flow;

[0017] The rainfall in the basin interval is controlled by the rainfall monitoring points in the interval, and the interval flow is calculated to the dam site through the interval rainfall runoff. The outflow station of each cascade serves as the inflow control station of the next cascade, and rolling forecasts are made step by step to obtain the hydrological forecast scheme configuration of the cascade power stations.

[0018] Furthermore, the evapotranspiration calculation further includes:

[0019] The soil water storage capacity is divided into two layers, upper and lower, WM=WUM+WLM;

[0020] The actual water storage is divided into two layers, W(i)=WU(i)+WL(i), and the actual evaporation of the basin is also divided into two layers, E(i)=EU(i)+EL(i);

[0021] Wherein, WM represents the total soil water storage capacity, WUM represents the soil water storage upper layer capacity, WLM represents the soil water storage lower layer capacity, W(i) represents the actual water storage capacity of the i-th section of the basin, WU(i) represents the actual water storage capacity of the upper layer of the i-th section of the basin, and WL(i) represents the actual water storage capacity of the lower layer of the i-th section of the basin;

[0022] A watershed evaporation capacity model of the target watershed is constructed according to the water surface evaporation and the evaporation conversion coefficient, and the actual water storage capacity of the upper layer and the actual water storage capacity of the lower layer of the target watershed are calculated based on the watershed evaporation capacity model.

[0023] Furthermore, the flow generation calculation further includes:

[0024] Construct a full storage runoff model. Full storage runoff means that no runoff will be generated before the precipitation reaches the field water holding capacity, and all precipitation is absorbed by the soil.

[0025] After the precipitation meets the field water holding capacity, all the rainfall after deducting the evaporation in the same period will produce runoff;

[0026] The runoff equation was constructed based on the theory of full-storage runoff and the water balance relationship, and the runoff depth was calculated.

[0027] According to the spatially uneven characteristics of the runoff generation process of the target watershed, the runoff depth and actual water storage capacity of the target watershed are calculated based on the rainfall after deducting the evaporation in the same period.

[0028] Furthermore, the water source division also includes:

[0029] According to Darcy's law of soil water flow, when the soil water content reaches saturation, the capillary potential gradient value is ignored;

[0030] The vertical flux of water flow depends on the hydraulic conductivity, and its value is stable at a constant value, which is recorded as the stable infiltration rate FC;

[0031] The runoff is divided into surface runoff and groundrunoff based on the relationship between rainfall after deducting evaporation in the same period and soil steady infiltration rate FC.

[0032] Furthermore, the confluence calculation further includes:

[0033] According to the surface runoff of each unit basin and the unit line of time period, the surface runoff confluence of the target basin is calculated by using the difference form of convolution, and the underground runoff confluence of the target basin is calculated by using the linear reservoir algorithm;

[0034] From the unit basin to the basin outlet is the river confluence stage, and the Muskingum method is used to calculate the river confluence and the calculation parameters KE and XE.

[0035] Furthermore, the river flow calculation also includes:

[0036] Muskingum method is used to calculate model river flow;

[0037] For the target basin, the flow changes linearly within the time period △t, and the finite difference form of the Saint-Venant equation water balance is:

[0038] ;

[0039] Muskingum method tank storage equation:

[0040] W = KQ', Q' = xI + (1-x)Q;

[0041] Where: W—water storage capacity of the river channel in the river section;

[0042] K—storage constant (physical meaning is the propagation time of flood waves in a river section when the flow is constant, generally inversely proportional to Q');

[0043] x—flow weight factor;

[0044] I, Q—inflow and outflow of the river section, with footer 1 and 2 indicating the beginning and end of the period respectively;

[0045] Q'—the flow rate deduced from I, Q, and x, indicating the indicated storage flow rate;

[0046] △t—Calculation period length;

[0047] The flow calculation formula of Muskingum method is obtained by combining the water balance equation and the Muskingum method tank storage equation:

[0048] Q2=C0I2+C1I1+C2Q1;

[0049] Where:

[0050] ;

[0051] Muskingum method uses linear finite interpolation solution, which requires I and Q to be in the time period The flow rate changes linearly along the length of the river. ;

[0052] The K value is set according to the change of flow level;

[0053] C0, C1, and C2 are functions of the Muskingum method parameters K and x, and their sum is equal to 1.

[0054] According to the second aspect of the present invention, the present invention claims protection for a full-process hydrological forecast data processing system based on full storage and flow production, comprising:

[0055] one or more processors;

[0056] A memory having one or more programs stored thereon, when the one or more programs are executed by the one or more processors, the one or more processors implement the full-process hydrological forecast data processing method based on full storage and flow production.

[0057] The present application relates to the technical field of hydrological information processing, and in particular to a full-process hydrological forecast data processing method and system based on full storage and flow production, determining a target river basin, obtaining basic hydrological data of the target river basin; selecting and obtaining cross-section hydrological forecast data from the basic hydrological data, and constructing a hydrological forecast scheme for the target river basin according to the distribution of power stations in the target river basin; based on the hydrological forecast scheme, completing evapotranspiration calculation, flow production calculation, water source division, confluence calculation and river flow calculation for the target river basin, and obtaining a hydrological forecast model for the target river basin; modeling the power station and upstream hydrological station sections and tributary control sections of the target river basin according to the hydrological forecast model, and after parameter calibration, evaluating the modeling simulation effect. The present invention simplifies the hydrological modeling process, improves work efficiency, reduces dependence on previous data, and has significant social and technical and economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] Figure 1 A workflow diagram of a whole-process hydrological forecast data processing method based on full storage and flow production claimed in an embodiment of the present application;

[0059] Figure 2 A flood simulation effect diagram of a control section upstream of a power station according to a full-flow hydrological forecast data processing method as claimed in an embodiment of the present application;

[0060] Figure 3 A flood simulation effect diagram of a tributary section above a power station based on a full-flow hydrological forecast data processing method claimed in an embodiment of the present application;

[0061] Figure 4 A flood simulation effect diagram of the section where the power station is located, based on a full-process hydrological forecast data processing method for full storage and flow production, as claimed in an embodiment of the present application. DETAILED DESCRIPTION

[0062] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0063] The terms "first", "second" and "third" in this application are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features. Therefore, the features defined as "first", "second" and "third" can explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "multiple" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined. All directional indications (such as up, down, left, right, front, back...) in the embodiments of this application are only used to explain the relative position relationship, movement, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication also changes accordingly. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally also includes steps or units that are not listed, or optionally also includes other steps or units inherent to these processes, methods, products or devices.

[0064] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0065] According to the first embodiment of the present invention, the present invention claims a method for processing hydrological forecast data based on full storage and flow generation, referring to Figure 1 ,include:

[0066] Determine a target watershed and obtain basic hydrological data of the target watershed;

[0067] Filter and obtain cross-section hydrological forecast data from the basic hydrological data, and construct a hydrological forecast scheme for the target river basin according to the distribution of power stations in the target river basin;

[0068] Based on the hydrological forecasting scheme, evapotranspiration calculation, runoff calculation, water source division, confluence calculation and river flow calculation are completed for the target watershed to obtain a hydrological forecasting model for the target watershed;

[0069] The power station, upstream hydrological station section and tributary control section of the target basin are modeled based on the hydrological forecast model, and the modeling simulation effect is evaluated after parameter calibration.

[0070] Furthermore, the step of determining the target watershed and obtaining basic hydrological data of the target watershed further includes:

[0071] The basic hydrological data of the target basin at least include:

[0072] The location of controlling sections, distribution of hydrological stations and rain gauges, river length, basin area, and basin evaporation.

[0073] Furthermore, the step of selecting and obtaining cross-section hydrological forecast data from the basic hydrological data and constructing a hydrological forecast scheme for the target river basin according to the distribution of power stations in the target river basin also includes:

[0074] Selecting data suitable for cross-section hydrological forecasting from the basic hydrological data as cross-section hydrological forecasting data;

[0075] Acquire a plurality of cascade power stations in the target river basin, wherein the target river basin includes a main stream and tributaries;

[0076] For each power station of the cascade power stations, the nearest upstream mainstream control station is used as the inflow control station of the power station, and the tributaries are controlled by the tributary hydrological stations and calculated to the dam site through the river flow;

[0077] The rainfall in the basin interval is controlled by the rainfall monitoring points in the interval, and the interval flow is calculated to the dam site through the interval rainfall runoff. The outflow station of each cascade serves as the inflow control station of the next cascade, and rolling forecasts are made step by step to obtain the hydrological forecast scheme configuration of the cascade power stations.

[0078] Among them, in this embodiment, when the target basin is the Jinsha River Basin, there are multiple cascade power stations, with main streams and tributaries, and the hydrological forecasting scheme can be: the main stream control station closest to the upstream of each power station serves as the inflow control station of the power station at that level, and the main tributaries are controlled by the tributary hydrological stations, all of which are calculated to the dam site through the river flow; the rainfall in the basin interval is controlled by each rainfall monitoring point in the interval [including telemetered rainfall stations and telemetered hydrological (position) stations that also measure rainfall], and the interval flow is calculated to the dam site through the interval rainfall runoff, and the outflow station of each cascade serves as the inflow control station of the next cascade, and rolling forecasts are made step by step, so as to carry out the configuration of the hydrological forecasting scheme for the cascade power stations.

[0079] ;

[0080] Where: —Inflow flow of power station at time t;

[0081] —Upstream Control Station( ) Time flow, is the flood wave propagation time of the interval river system;

[0082] —Tributary Station( ) Time flow, is the flood wave propagation time from the tributary station to the dam site of the power station of this level;

[0083] — is the rainfall and evaporation in the basin.

[0084] Furthermore, the evapotranspiration calculation further includes:

[0085] The soil water storage capacity is divided into two layers, upper and lower, WM=WUM+WLM;

[0086] The actual water storage is divided into two layers, W(i)=WU(i)+WL(i), and the actual evaporation of the basin is also divided into two layers, E(i)=EU(i)+EL(i);

[0087] Wherein, WM represents the total soil water storage capacity, WUM represents the soil water storage upper layer capacity, WLM represents the soil water storage lower layer capacity, W(i) represents the actual water storage capacity of the i-th section of the basin, WU(i) represents the actual water storage capacity of the upper layer of the i-th section of the basin, and WL(i) represents the actual water storage capacity of the lower layer of the i-th section of the basin;

[0088] A watershed evaporation capacity model of the target watershed is constructed according to the water surface evaporation and the evaporation conversion coefficient, and the actual water storage capacity of the upper layer and the actual water storage capacity of the lower layer of the target watershed are calculated based on the watershed evaporation capacity model.

[0089] In this embodiment, the soil evapotranspiration of the watershed is calculated according to a two-layer evapotranspiration model, which divides evapotranspiration into upper and lower layers. When calculating evapotranspiration, the lower layer evapotranspiration begins when the upper layer soil moisture is exhausted. When it rains, the upper layer is replenished first, and then the lower layer is satisfied.

[0090] Basin evaporation capacity E p =K c *E0;

[0091] 1) When WU(i)+P(i)≥E p hour

[0092] EU(i)=E p ;

[0093] EL(i)=0;

[0094] 2) When WU(i)+P(i)<E p hour;

[0095] EU(i)=WU(i)+P(i);

[0096] EL(i)=[E p -EU(i)]*WL(i) / WLM;

[0097] Where: Ep —basin evaporation capacity, mm;

[0098] E0—water surface evaporation, mm;

[0099] K c —Evaporation conversion factor;

[0100] P—basin rainfall, mm;

[0101] EU, EL—evaporation of upper and lower layers of the basin, mm.

[0102] Furthermore, the flow generation calculation further includes:

[0103] Construct a full storage runoff model. Full storage runoff means that no runoff will be generated before the precipitation reaches the field water holding capacity, and all precipitation is absorbed by the soil.

[0104] After the precipitation meets the field water holding capacity, all the rainfall after deducting the evaporation in the same period will produce runoff;

[0105] The runoff equation was constructed based on the theory of full-storage runoff and the water balance relationship, and the runoff depth was calculated.

[0106] According to the spatially uneven characteristics of the runoff generation process of the target watershed, the runoff depth and actual water storage capacity of the target watershed are calculated based on the rainfall after deducting the evaporation in the same period.

[0107] In this embodiment, the flow generation equation according to the full-storage flow generation theory and the water balance relationship is:

[0108] R = PE - (W2 - W1);

[0109] Where: R—runoff depth, mm;

[0110] E—evaporation, mm;

[0111] P—precipitation, mm;

[0112] W1, W2—Average actual water storage in the basin at the beginning and end of the time period, mm.

[0113] The rainfall after deducting evaporation is PE=PE.

[0114] At any location, before the soil moisture content reaches the field holding capacity, all rainfall will replenish the soil moisture content and no runoff will be produced; when the soil is full, all subsequent rainfall will produce runoff.

[0115] The runoff generation after the water is filled up is controlled by satisfying the water shortage in the vadose zone. Due to the uneven spatial distribution of the previous climate and underlying surface, the spatial distribution of soil water shortage in the basin is uneven. Under the same other conditions, places with small water shortages are prone to be filled up after rainfall and runoff is generated first. Therefore, the runoff generation process in the basin is spatially uneven. Before the entire basin is filled up, some areas are filled up and runoff is generated.

[0116] 1) When PE(i)≤0, no flow occurs.

[0117] R(i)=0;

[0118] W(i+1)=W(i)+PE(i)-R(i)=W(i)+PE(i);

[0119] 2) When PE(i)>0, flow occurs, and

[0120] ① When W(i)+PE(i)≤WM, partial flow occurs;

[0121] R(i)=PE(i)*tan{π / 4*[W(i)+PE(i)] / WM};

[0122] W(i+1)=W(i)+PE(i)-R(i);

[0123] ②When W(i)+PE(i)>WM, complete flow is generated;

[0124] R(i)=W(i)+PE(i)-WM;

[0125] W(i+1)=WM;

[0126] Calculation of soil moisture content by layer:

[0127] 1) When WU(i)+P(i)-EU(i)-R(i)≤WUM;

[0128] WU(i+1)=WU(i)+P(i)-EU(i)-R(i);

[0129] WL(i+1)=WL(i)-EL(i);

[0130] 2) When WU(i)+P(i)-EU(i)-R(i)>WUM;

[0131] WU(i+1)=WUM;

[0132] WL(i+1)=WL(i)-EL(i)+(WU(i)+P(i)-EU(i)-R(i)-WUM).

[0133] According to the idea of ​​full storage and runoff, both surface runoff Rs and groundwater runoff Rg are generalized as linear functions of soil previous rainfall API. Soil previous rainfall API is related to previous precipitation, evaporation, basin area, basin slope, etc. It is a relatively complex parameter and has an unknown integral function relationship with basin precipitation.

[0134]

[0135] Where Ke is a hysteresis parameter related to basin evaporation and soil properties, which is generally a multiple of the system memory length m. The system memory length is usually related to the basin area, basin slope, etc., and can be determined through empirical analysis. σ is an integral variable, the X function represents the gross precipitation process, and U0 is the response function of the system.

[0136] ;

[0137] g1 and g2 are parameters related to the time-varying gain factor in the process of converting gross precipitation into net rain.

[0138] This model proposes a new method for calculating net rainfall R in the runoff generation stage. When compiling the basin hydrological forecast plan, it is optimized in combination with the basin characteristics, and the tangent function of the sum of soil moisture content and rainfall after deducting evaporation (W(i)+PE(i)) is used to simulate the runoff R, and then the water source of the runoff is divided.

[0139] That is, when PE(i)>0, flow occurs, and when W(i)+PE(i)≤WM, partial flow occurs.

[0140] R(i)=PE(i)*tan{π / 4*[W(i)+PE(i)] / WM}

[0141] Compared with the traditional full storage runoff model, this method simplifies the calculation process of net rainfall R, reduces the number of parameters, and makes modeling easier.

[0142] Furthermore, the water source division also includes:

[0143] According to Darcy's law of soil water flow, when the soil water content reaches saturation, the capillary potential gradient value is ignored;

[0144] The vertical flux of water flow depends on the hydraulic conductivity, and its value is stable at a constant value, which is recorded as the stable infiltration rate FC;

[0145] The runoff is divided into surface runoff and groundrunoff based on the relationship between rainfall after deducting evaporation in the same period and soil steady infiltration rate FC.

[0146] Among them, in this embodiment, the rainfall flow on the slope of the basin has different conditions and movement paths of the flow process, and is affected by the different regulation and storage functions of the basin, so the reactions of various runoff components on the flow process line are different. In actual work, various components need to be calculated or simulated separately, so the water source of the flow production needs to be divided.

[0147] The two-source water model divides runoff into surface runoff and groundrunoff through the soil steady infiltration rate FC.

[0148] The quantities of each water source are as follows:

[0149] 1) When PE≤FC;

[0150] RG=R, RS=R-RG=0;

[0151] 2) When PE>FC;

[0152] RG=FC*R / PE, RS=R-RG;

[0153] Where: FC—soil stable infiltration rate, mm;

[0154] RS, RG—surface runoff, underground runoff, mm.

[0155] Furthermore, the confluence calculation further includes:

[0156] According to the surface runoff of each unit basin and the unit line of time period, the surface runoff confluence of the target basin is calculated by using the difference form of convolution, and the underground runoff confluence of the target basin is calculated by using the linear reservoir algorithm;

[0157] From the unit basin to the basin outlet is the river confluence stage, and the Muskingum method is used to calculate the river confluence and the calculation parameters KE and XE.

[0158] In this embodiment, in the runoff calculation of the unit watershed, the runoff calculation of the surface runoff adopts the instantaneous unit line method.

[0159] JENash regards the basin as a series of n equivalent linear reservoirs. The instantaneous inflow of a unit is regulated by the n equivalent linear reservoirs in series, and its outflow is the instantaneous unit line IUH. The mathematical expression is:

[0160]

[0161] Where: —Gamma function;

[0162] n—equivalent to the number of reservoirs or the number of regulation times;

[0163] k—Parameter equivalent to the basin confluence time.

[0164] 1mm unit net rain unit line for each period ;

[0165]

[0166] Where: F—unit watershed area, km 2 ;

[0167] —Net rain period, h.

[0168] According to the surface runoff of each unit basin and the unit line of time period, the flow process of the surface runoff in the basin is calculated using the difference form of convolution.

[0169] The calculation formula for the confluence flow is:

[0170] QS=RS*UH;

[0171] Where: QS—surface runoff, m 3 / s;

[0172] UH—unit line of watershed period, * is the convolution operator.

[0173] 2) Calculation of underground runoff

[0174] The confluence calculation of groundwater runoff adopts the linear reservoir algorithm.

[0175] QG(i)=CG*QG(i-1)+(1-CG)*RG(i)*U;

[0176] Where: QG—underground runoff, m 3 / s;

[0177] CG—ground runoff (RG) recession coefficient;

[0178] U—conversion factor for converting runoff depth into flow rate;

[0179] ;

[0180] F represents the drainage area in km 2 , The unit of is h;

[0181] CG is related to the time period, the time period is day and the time period is △t, the conversion relationship between the two coefficients is

[0182] CG(△t)=

[0183] CG(△t)—time period decay coefficient;

[0184] CG(d)—daily decay coefficient;

[0185] n—the number of time periods in a day, n=24 / △t.

[0186] The traditional method of confluence calculation is divided into three steps:

[0187] Slope runoff: the process from the beginning of precipitation, the runoff from the underlying surface of the basin converges to the center of the unit basin;

[0188] River confluence: the process of flow from the center of a unit basin to the outlet of a unit basin;

[0189] River flow routing: the process of routing flow from the outlet of a unit basin to the downstream river.

[0190] This model proposes to omit the river confluence stage in the confluence stage and add a parameter τ (hysteresis coefficient, which is equivalent to simplifying the process of slope confluence to the unit basin outlet), changing the original surface runoff confluence calculation method from

[0191]

[0192] to:

[0193]

[0194] τ-hysteresis coefficient, which is equivalent to simplifying the process of slope confluence to the unit basin outlet

[0195] It can simplify the intermediate process of model runoff routing and reduce the workload of parameter determination.

[0196] Furthermore, the river flow calculation also includes:

[0197] Muskingum method is used to calculate model river flow;

[0198] For the target basin, the flow changes linearly within the time period △t, and the finite difference form of the Saint-Venant equation water balance is:

[0199] ;

[0200] Muskingum method tank storage equation:

[0201] W = KQ', Q' = xI + (1-x)Q;

[0202] Where: W—water storage capacity of the river channel in the river section;

[0203] K—storage constant (physical meaning is the propagation time of flood waves in a river section when the flow is constant, generally inversely proportional to Q');

[0204] x—flow weight factor;

[0205] I, Q—inflow and outflow of the river section, with footer 1 and 2 indicating the beginning and end of the period respectively;

[0206] Q'—the flow rate deduced from I, Q, and x, indicating the indicated storage flow rate;

[0207] △t—Calculation period length;

[0208] The flow calculation formula of Muskingum method is obtained by combining the water balance equation and the Muskingum method tank storage equation:

[0209] Q2=C0I2+C1I1+C2Q1;

[0210] Where:

[0211] ;

[0212] Muskingum method uses linear finite interpolation solution, which requires I and Q to be in the time period The flow rate changes linearly along the length of the river. ;

[0213] The K value is set according to the change of flow level;

[0214] C0, C1, and C2 are functions of the Muskingum method parameters K and x, and their sum is equal to 1.

[0215] In the river flow routing stage, Muskingum method is used. In this method, K is the storage constant, which physically means the propagation time of flood waves in a river section when the river section has a constant flow, and is generally inversely proportional to Q'.

[0216] In this model, a method of adjusting the K value according to different flow levels is proposed. The basic basis is that in the same river channel, the greater the flow rate, the faster the wave speed and the shorter the propagation time.

[0217] like Figure 2-4 As shown in the figure, a power station in the Jinsha River Basin and the upstream hydrological station section and tributary control section are modeled. After parameter calibration, the simulation effect is good.

[0218] According to the second embodiment of the present invention, the present invention claims protection for a full-process hydrological forecast data processing system based on full storage and flow production, comprising:

[0219] one or more processors;

[0220] A memory having one or more programs stored thereon, when the one or more programs are executed by the one or more processors, the one or more processors implement the full-process hydrological forecast data processing method based on full storage and flow production.

[0221] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.

[0222] In addition, each functional unit in each embodiment of the present application can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above integrated unit can be implemented in the form of hardware or in the form of software functional units. The above is only an implementation method of the present application, and does not limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the specification and drawings of this application, or directly or indirectly used in other related technical fields, is also included in the patent protection scope of the present application.

[0223] The specific implementation methods of the invention are described in detail above, but they are only examples, and the present application is not limited to the specific implementation methods described above. For those skilled in the art, any equivalent modification or substitution of the invention is also within the scope of the present application, and therefore, the equalization, modification, and improvement made without departing from the spirit and principle of the present application should be included in the scope of the present application.

Claims

1. A method for processing hydrological forecast data based on full storage and runoff. It is characterized in that include: Determine a target watershed and obtain basic hydrological data of the target watershed; Filter and obtain cross-section hydrological forecast data from the basic hydrological data, and construct a hydrological forecast scheme for the target river basin according to the distribution of power stations in the target river basin; Based on the hydrological forecasting scheme, evapotranspiration calculation, runoff calculation, water source division, confluence calculation and river flow calculation are completed for the target watershed to obtain a hydrological forecasting model for the target watershed; Model the power station, upstream hydrological station section and tributary control section of the target basin according to the hydrological forecast model, and evaluate the modeling simulation effect after parameter calibration; The flow calculation includes: According to the surface runoff of each unit basin and the unit line of time period, the surface runoff confluence of the target basin is calculated by using the difference form of convolution, and the underground runoff confluence of the target basin is calculated by using the linear reservoir algorithm; From the unit basin to the basin outlet is the river confluence stage, the Muskingum method is used to calculate the river confluence, the calculation parameters are KE and XE, KE is the river section propagation time; XE is the flow density coefficient, dimensionless; The river flow calculation includes: Muskingum method is used to calculate model river flow; For the target basin, the flow changes linearly within the time period △t, and the finite difference form of the Saint-Venant equation water balance is: ; Muskingum method tank storage equation: W = KQ', Q' = xI + (1-x)Q; Where: W—water storage capacity of the river channel in the river section; K—storage constant, the physical meaning of which is the propagation time of flood waves in a river section when the flow is constant, and is generally inversely proportional to Q'; x—flow weight factor; I, Q—inflow and outflow of the river section, with footer 1 and 2 indicating the beginning and end of the period respectively; Q'—the flow rate deduced from I, Q, and x, indicating the indicated storage flow rate; △t—Calculation period length; The flow calculation formula of Muskingum method is obtained by combining the water balance equation and the Muskingum method tank storage equation: Q 2 =C 0 I 2 +C 1 I 1 +C 2 Q 1 ; Where: ; Muskingum method uses linear finite interpolation solution, which requires I and Q to be in the time period The flow rate changes linearly along the length of the river. ; The K value is set according to the change of flow level; C 0 , C 1 , C 2 It is a function of the Muskingum method parameters K and x, the sum of which is equal to 1; The step of determining the target watershed and obtaining basic hydrological data of the target watershed further includes: The basic hydrological data of the target basin at least include: The location of the control section, the distribution of hydrological stations and rainfall stations, the length of the river, the area of ​​the basin, and the evaporation of the basin; The step of selecting and obtaining cross-section hydrological forecast data from the basic hydrological data and constructing a hydrological forecast scheme for the target river basin according to the distribution of power stations in the target river basin also includes: Selecting data suitable for cross-section hydrological forecasting from the basic hydrological data as cross-section hydrological forecasting data; Acquire a plurality of cascade power stations in the target river basin, wherein the target river basin includes a main stream and tributaries; For each power station of the cascade power stations, the nearest upstream mainstream control station is used as the inflow control station of the power station, and the tributaries are controlled by the tributary hydrological stations and calculated to the dam site through the river flow; The rainfall in the basin interval is controlled by the rainfall monitoring points in the interval, and the interval flow is calculated to the dam site through the interval rainfall runoff. The outflow station of each cascade serves as the inflow control station of the next cascade, and rolling forecasts are made step by step to obtain the hydrological forecast scheme configuration of the cascade power stations.

2. A method for processing hydrological forecast data based on full storage and runoff according to claim 1, It is characterized in that The evapotranspiration calculation also includes: The soil water storage capacity is divided into two layers, upper and lower, WM = WUM + WLM; The actual water storage is divided into two layers, W(i)=WU(i)+WL(i), and the actual evaporation of the basin is also divided into two layers, E(i)=EU(i)+EL(i); Wherein, WM represents the total soil water storage capacity, WUM represents the soil water storage upper layer capacity, WLM represents the soil water storage lower layer capacity, W(i) represents the actual water storage capacity of the i-th section of the basin, WU(i) represents the actual water storage capacity of the upper layer of the i-th section of the basin, and WL(i) represents the actual water storage capacity of the lower layer of the i-th section of the basin; A watershed evaporation capacity model of the target watershed is constructed according to the water surface evaporation and the evaporation conversion coefficient, and the actual water storage capacity of the upper layer and the actual water storage capacity of the lower layer of the target watershed are calculated based on the watershed evaporation capacity model.

3. A method for processing hydrological forecast data based on full storage and runoff according to claim 1, It is characterized in that The flow calculation also includes: Construct a full storage runoff model. Full storage runoff means that no runoff will be generated before the precipitation reaches the field water holding capacity, and all precipitation is absorbed by the soil. After the precipitation meets the field water holding capacity, all the rainfall after deducting the evaporation in the same period will produce runoff; The runoff equation was constructed based on the theory of full-storage runoff and the water balance relationship, and the runoff depth was calculated. According to the spatially uneven characteristics of the runoff generation process of the target watershed, the runoff depth and actual water storage capacity of the target watershed are calculated based on the rainfall after deducting the evaporation in the same period.

4. A method for processing hydrological forecast data based on full storage and runoff according to claim 1, It is characterized in that The water source division also includes: According to Darcy's law of soil water flow, when the soil water content reaches saturation, the capillary potential gradient value is ignored; The vertical flux of water flow depends on the hydraulic conductivity, and its value is stable at a constant value, which is recorded as the stable infiltration rate FC; The runoff is divided into surface runoff and groundrunoff based on the relationship between rainfall after deducting evaporation in the same period and soil steady infiltration rate FC.

5. A full-process hydrological forecast data processing system based on full storage and runoff production, It is characterized in that include: one or more processors; A memory having one or more programs stored thereon, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement a full-process hydrological forecast data processing method based on full storage and flow production according to any one of claims 1 to 4.