A method for performing maintenance work on transmission lines based on special UAVs combined with intelligent robots

Through special drones combined with intelligent robots to perform maintenance on transmission lines, and using intelligent detection and automatic disassembly and assembly technology, the safety risks and labor consumption problems of insulator string maintenance in the existing technology are solved, and intelligent detection and intelligent replacement are realized. Improved maintenance efficiency.

CN118523202BActive Publication Date: 2024-10-11JIANGSU HUACHENG XIEHONG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410985810.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-10-11
Estimated Expiration
2044-07-23

AI Technical Summary

Technical Problem

In the existing technology, maintenance of transmission lines requires workers to climb onto suspended insulator strings for inspection and replacement, which poses safety risks and is labor-intensive.

Method used

Special drones are used combined with intelligent robots to detect defects on the insulator strings, automatically disassemble and install new insulators, and use screw conveyors and robotic arms for maintenance.

Benefits of technology

It saves manpower, reduces safety risks, realizes intelligent detection and intelligent replacement of insulator strings, and improves maintenance efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118523202B_ABST
    Figure CN118523202B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of power transmission line maintenance, and discloses a method for performing maintenance operations on a power transmission line based on a special unmanned aerial vehicle combined with an intelligent robot, wherein S1, a first screw conveying device is operated to drive a first loading platform to move along the head to the tail of an insulator string; S2, a detection mechanism installed on the first loading platform is used to perform defect detection on a plurality of insulators constituting the insulator string; S3, a grasping mechanism installed on the first loading platform is used to fix the defective insulator; S4, a new insulator is transported to the missing part and installed in the insulator string through a disassembly and assembly mechanism; the method for performing maintenance operations on a power transmission line based on a special unmanned aerial vehicle combined with an intelligent robot performs intelligent detection on the insulator string on the power transmission line by using an intelligent robot instead of manual operation, and intelligently replaces the defective insulator, thereby saving manpower and reducing safety risks.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power transmission line maintenance, and specifically to a method for performing maintenance operations on power transmission lines based on a special unmanned aerial vehicle combined with an intelligent robot. Background Art

[0002] Transmission line maintenance refers to the work carried out to eliminate defects, improve equipment health, prevent accidents, and ensure safe operation of transmission lines based on problems found through inspection, testing, and testing. Overhead distribution line maintenance is generally divided into three major projects: improvement, overhaul, and maintenance. Among them, maintenance projects refer to all work done to maintain the normal operation of the line except overhaul and improvement projects, such as cleaning insulator dirt, insulator testing, replacing defective insulators, and handling line defects.

[0003] Among them, replacing defective insulators refers to inspecting and replacing insulator strings on overhead lines. Insulator strings are a series of insulators suspended on high-voltage power towers, which play the role of connecting power towers and cables, providing insulation, and increasing creepage distance. Insulators are usually made of glass or ceramics, and may break due to cracks and electrical breakdown during use, or due to external forces.

[0004] The inspection and maintenance of transmission lines requires workers to climb up the power towers to check whether there are any insulators that are completely or partially damaged on the insulator string, and then remove the damaged insulators and replace them with new ones. This operation method not only requires workers to climb up the suspended insulator string outside the power tower, but also requires them to carry heavy objects back and forth, which is labor-intensive and poses safety risks.

[0005] Therefore, in order to solve the above-mentioned technical problems existing in the prior art, a method for performing maintenance operations on transmission lines based on special UAVs combined with intelligent robots is proposed. Summary of the invention

[0006] The present invention provides a method for performing maintenance operations on transmission lines based on a special unmanned aerial vehicle in combination with an intelligent robot. The method has the advantages of using an intelligent robot to replace manual operations to intelligently detect insulator strings on transmission lines and intelligently replace defective insulators, thereby saving manpower and reducing safety risks. It solves the problem mentioned in the above background technology that in the prior art, workers need to climb onto the suspended insulator strings outside the power tower to perform maintenance on insulator strings, and also have to carry heavy objects back and forth, which is labor-intensive and poses safety risks.

[0007] The present invention provides the following technical solution: a method for performing maintenance work on a transmission line based on a special unmanned aerial vehicle combined with an intelligent robot, comprising the following steps:

[0008] S1, driving the first loading platform to move along the head to the tail of the insulator string through the operation of the first screw conveying device;

[0009] S2. performing defect detection on a plurality of insulators constituting the insulator string by means of a detection mechanism installed on the first stage;

[0010] S3. When a defective insulator is detected, the first screw conveying device is operated to drive the first loading platform to move to the defective insulator, and then the defective insulator is fixed by a grabbing mechanism installed on the first loading platform;

[0011] S4. Remove the defective insulator through the disassembly and assembly mechanism installed on the first loading platform, then transport the defective insulator to the head of the insulator string through the first screw conveying device, remove the defective insulator and put a new insulator on the grabbing mechanism, then transport the new insulator to the missing part and install the new insulator in the insulator string through the disassembly and assembly mechanism to complete the maintenance of the insulator string.

[0012] As an optional solution of the method of performing maintenance work on the transmission line based on the special UAV combined with the intelligent robot according to the present invention, the step S2 specifically includes:

[0013] S21, when the detection rod in the detection mechanism installed on the first loading platform contacts the canopy of the first insulator close to the head of the insulator string, the operation of the first screw conveying device is stopped;

[0014] S22, driving the detection rod to slide around the umbrella surface of the first insulator based on the central axis of the first insulator through the driving mechanism installed on the first stage, and detecting whether there is a defect in the partial umbrella surface of the first insulator through the detection rod;

[0015] S23. After the first screw conveying device is started again to drive the detection rod to move a certain distance along the central axis of the first insulator, the first screw conveying device stops running again, and then the driving mechanism drives the detection rod to circle around again for defect detection. The displacement and circling detection of the detection rod are repeated until the defect detection of the entire umbrella surface of the first insulator is completed, and then the defect detection is performed on the remaining insulators in turn.

[0016] As an optional solution of the method for performing maintenance work on a transmission line based on a special drone combined with an intelligent robot according to the present invention, wherein: the insulator comprises an insulating member, and a steel cap and a steel foot are respectively provided at both ends of the insulating member, and the steel foot is embedded in the adjacent steel cap and fixed by an M pin;

[0017] A second loading platform is slidably arranged on the first loading platform, a second screw conveying device is arranged on the second loading platform, a third loading platform is arranged on the second screw conveying device, a first cylinder is also arranged on the first loading platform, and a piston rod of the first cylinder is connected to the second loading platform.

[0018] As an optional solution of the method for performing maintenance work on a power transmission line based on a special unmanned aerial vehicle combined with an intelligent robot according to the present invention, wherein: the first screw conveying device includes a conveying frame, a screw and a first motor are arranged on the conveying frame, an output shaft of the first motor is connected to the screw, a nut is slidably arranged on the conveying frame, the nut is threadedly connected to the screw, and the first loading platform is arranged on the nut;

[0019] The structure of the second screw conveying device is the same as that of the first screw conveying device.

[0020] As an optional solution to the method of performing maintenance work on power transmission lines based on a special UAV combined with an intelligent robot as described in the present invention, the driving mechanism includes a first arc-shaped bracket arranged on the first loading platform, a second arc-shaped bracket is slidably arranged on the first arc-shaped bracket, and a third arc-shaped bracket is slidably arranged on the second arc-shaped bracket.

[0021] As an optional solution to the method of performing maintenance work on power transmission lines based on a special unmanned aerial vehicle combined with an intelligent robot as described in the present invention, the detection mechanism includes a connecting rod, the detection rod is slidably connected to the connecting rod, the detection rod is elastically connected to the connecting rod through a spring, and a sensor is also provided on the connecting rod.

[0022] As an optional solution of the method for performing maintenance work on a power transmission line based on a special drone combined with an intelligent robot according to the present invention, wherein: the detection mechanism further includes a slide bar slidably arranged on the third arc-shaped bracket, a rotating shaft is rotatably arranged on the slide bar, and the connecting rod is arranged on the rotating shaft;

[0023] The third arc-shaped bracket is provided with a second cylinder, the piston rod of the second cylinder is connected to the sliding rod, the sliding rod is rotatably provided with a third cylinder, and the piston rod of the third cylinder is connected to the connecting rod.

[0024] As an optional scheme of the method for performing maintenance operations on transmission lines based on a special unmanned aerial vehicle combined with an intelligent robot as described in the present invention, wherein: a second motor is arranged on the first arc-shaped bracket, a first gear is arranged on the output shaft of the second motor, a first ring gear and a third motor are arranged on the second arc-shaped bracket, the first gear and the first ring gear are meshed, a second gear is arranged on the output shaft of the third motor, a second ring gear is arranged on the third arc-shaped bracket, and the second gear and the second ring gear are meshed.

[0025] As an optional solution to the method of performing maintenance work on power transmission lines based on a special unmanned aerial vehicle combined with an intelligent robot as described in the present invention, the disassembly and assembly mechanism includes a mounting seat arranged on the second loading platform, an arc hammer is slidably arranged on the mounting seat, a fourth cylinder is rotatably arranged on the mounting seat, and the piston rod of the fourth cylinder is rotatably connected to the arc hammer.

[0026] As an optional solution to the method of performing maintenance operations on transmission lines based on a special UAV combined with an intelligent robot as described in the present invention, the grasping mechanism includes a first robotic arm and a second robotic arm arranged on the second loading platform, and a third robotic arm and a fourth robotic arm are arranged on the third loading platform.

[0027] The present invention has the following beneficial effects:

[0028] 1. This method is based on the maintenance work on the transmission line by combining special drones with intelligent robots. The intelligent robot performs intelligent maintenance on the insulator string on the transmission line. First, the detection rod is used to circle along the surface of several insulators that constitute the insulator string in turn to detect defects. When a defective insulator is detected, it is automatically removed and a new insulator is transported to the defective position for automatic installation. This saves manpower and solves the safety risk of workers having to climb up the suspended insulator string to replace it during manual maintenance.

[0029] 2. This method of performing maintenance work on the transmission line based on a special drone combined with an intelligent robot can replace multiple insulators at one time when replacing a defective insulator, depending on whether the adjacent insulators are defective. When replacing, first use multiple mechanical arms to clamp the insulator to be replaced, as well as the two adjacent insulators located at the head and tail sides of it. Then pull the adjacent insulator on the tail side to extend a certain distance, so that the steel cap and steel foot on the insulator to be replaced in the middle are in a relaxed state, thereby facilitating disassembly.

[0030] 3. The method for performing maintenance work on the transmission line based on the special UAV combined with the intelligent robot, when disassembling and installing the insulator, an arc hammer aimed at the M pin is rotated clockwise and counterclockwise respectively, and the upper and lower sides of the M pin can be hit. Thus, the M pin can be removed and installed by knocking respectively. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a schematic diagram of the overall structure of the present invention.

[0032] Figure 2 It is a schematic cross-sectional structural diagram of the present invention as a whole.

[0033] Figure 3 for Figure 2 A partial enlarged view of point A in the middle.

[0034] Figure 4 for Figure 3 A partial enlarged view of point B in the middle.

[0035] Figure 5 It is a schematic cross-sectional structural diagram of the driving mechanism in the present invention.

[0036] Figure 6 It is a cross-sectional structural schematic diagram of the disassembly and assembly mechanism in the present invention.

[0037] Figure 7 It is a schematic diagram of the explosion structure at the first loading platform in the present invention.

[0038] Figure 8 It is a schematic diagram of the explosion structure at the third loading platform in the present invention.

[0039] Fig. 9 It is a schematic diagram of the exploded structure of the grabbing mechanism in the present invention.

[0040] Fig.10 It is a schematic diagram of the explosion structure of the driving mechanism in the present invention.

[0041] Fig.11 It is a schematic diagram of the explosion structure of the detection mechanism in the present invention.

[0042] Fig.12 It is a schematic diagram of the explosion structure of the disassembly and assembly mechanism in the present invention.

[0043] In the figure: 100, insulator string; 110, insulator; 111, insulating member; 112, steel cap; 113, steel foot; 114, M pin; 120, cross arm side connecting plate; 130, conductor side connecting plate; 200, first screw rod conveying device; 201, conveying frame; 202, screw rod; 203, first motor; 204, screw nut; 210, first loading platform; 220, second loading platform; 300, second screw rod conveying device; 310, third loading platform; 320, first cylinder; 400, detection mechanism; 410, connecting rod; 420, detection rod; 430, spring; 440, sensor; 45 0, sliding rod; 460, rotating shaft; 470, second cylinder; 480, third cylinder; 500, driving mechanism; 510, first arc bracket; 520, second arc bracket; 530, third arc bracket; 540, second motor; 550, first gear; 560, first ring gear; 570, third motor; 580, second gear; 590, second ring gear; 600, disassembly and assembly mechanism; 610, mounting seat; 620, arc hammer; 630, fourth cylinder; 700, grasping mechanism; 710, first robotic arm; 720, second robotic arm; 730, third robotic arm; 740, fourth robotic arm. DETAILED DESCRIPTION

[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] For example, see Figure 1-Figure 9 The method for performing maintenance work on a transmission line based on a special UAV combined with an intelligent robot includes the following steps:

[0046] S1, the first screw conveying device 200 drives the first loading platform 210 to move along the head to the tail of the insulator string 100;

[0047] S2, performing defect detection on a plurality of insulators 110 constituting the insulator string 100 by means of the detection mechanism 400 installed on the first stage 210;

[0048] S21, when the detection rod 420 in the detection mechanism 400 installed on the first loading platform 210 contacts the canopy of the first insulator 110 close to the head of the insulator string 100, the operation of the first screw conveying device 200 is stopped;

[0049] S22, driving the detection rod 420 to slide around the umbrella surface of the first insulator 110 based on the central axis of the first insulator 110 through the driving mechanism 500 installed on the first stage 210, and detecting whether there is a defect in the partial umbrella surface of the first insulator 110 through the detection rod 420;

[0050] S23, after the first screw conveying device 200 is started again to drive the detection rod 420 to move a certain distance along the central axis direction of the first insulator 110, the first screw conveying device 200 stops running again, and then the driving mechanism 500 drives the detection rod 420 to circle around again for defect detection, and the displacement and circling detection of the detection rod 420 are repeated until the defect detection of the entire umbrella surface of the first insulator 110 is completed, and then the defect detection of the remaining insulators 110 is performed in turn;

[0051] S3, when a defective insulator 110 is detected, the first screw conveying device 200 is driven to move the first loading platform 210 to the defective insulator 110, and then the defective insulator 110 is fixed by the grabbing mechanism 700 installed on the first loading platform 210;

[0052] S4, the defective insulator 110 is removed by the disassembly and assembly mechanism 600 installed on the first loading platform 210, and then the defective insulator 110 is transported to the head of the insulator string 100 by the first screw conveying device 200, the defective insulator 110 is removed and a new insulator 110 is put on the grabbing mechanism 700, and then the new insulator 110 is transported to the missing part and installed in the insulator string 100 by the disassembly and assembly mechanism 600, thereby completing the inspection of the insulator string 100;

[0053] The insulator 110 includes an insulating member 111, and a steel cap 112 and a steel foot 113 are respectively provided at the head and tail ends of the insulating member 111, and the steel foot 113 is embedded in the adjacent steel cap 112 and fixed by an M pin 114;

[0054] A second stage 220 is slidably disposed on the first stage 210, a second screw conveying device 300 is disposed on the second stage 220, a third stage 310 is disposed on the second screw conveying device 300, and a first cylinder 320 is further disposed on the first stage 210, a piston rod of the first cylinder 320 is connected to the second stage 220;

[0055] The first screw conveying device 200 includes a conveying frame 201, on which a screw 202 and a first motor 203 are arranged, the output shaft of the first motor 203 is connected to the screw 202, a nut 204 is slidably arranged on the conveying frame 201, the nut 204 is threadedly connected to the screw 202, and the first loading platform 210 is arranged on the nut 204;

[0056] The structure of the second screw conveying device 300 is the same as that of the first screw conveying device 200;

[0057] The gripping mechanism 700 includes a first robot arm 710 and a second robot arm 720 disposed on the second stage 220 , and a third robot arm 730 and a fourth robot arm 740 are disposed on the third stage 310 .

[0058] In this embodiment: the insulator string 100 is composed of a plurality of insulators 110 connected end to end. In the figure, the left side is the head of the insulator string 100, and the right side is the tail of the insulator string 100. The insulating member 111 is in the shape of an umbrella facing left. The left end of the insulating member 111 is a steel cap 112 also called a bowl head, and the right end of the insulating member 111 is a steel foot 113 also called a Q head. The steel foot 113 on the insulating member 111 on the left is embedded in the steel cap 112 on the adjacent insulating member 111 on the right, and then fixed by an M pin 114 installed on the steel cap 112.

[0059] The cross arm side connecting plate 120 can be installed on the power tower, and the conductor side connecting plate 130 is used to connect the cables. The cross arm side connecting plate 120 is connected to the insulating member 111 located at the far left through a structure consistent with the steel foot 113, and the conductor side connecting plate 130 is connected to the insulating member 111 located at the far right through a structure consistent with the steel cap 112. Usually, two groups of insulator strings 100 are symmetrically installed on the cross arm side connecting plate 120, and two conductor side connecting plates 130 are connected to the corresponding right sides.

[0060] In order to realize automatic maintenance of the insulator string 100 by the intelligent robot, first, the base of the intelligent robot is the first screw conveying device 200, the left end of the first screw conveying device 200 can be installed on the cross arm side connecting plate 120 or the electric wire tower by a clamp, and the right end of the first screw conveying device 200 can be installed on the conductor side connecting plate 130 by a clamp to fix the first screw conveying device 200. Specifically, the intelligent robot can be pre-installed when the line is erected, or it can be installed by a hanger during line maintenance.

[0061] During the inspection process, the first motor 203 is first operated to drive the conveyor frame 201 to rotate, so that the nut 204 limited in the conveyor frame 201 slides to the right along the conveyor frame 201, and the nut 204 drives the first stage 210 to move to the right. The first stage 210 then drives the detection rod 420 to move to the right until the detection rod 420 contacts the umbrella surface of the first insulating member 111 located on the far left. Then, the driving mechanism 500 drives the detection rod 420 to rotate along the axis in the left-right direction. During this process, the detection rod 420 detects whether there is a defect on the local surface of the left side of the insulating member 111 through the change of pressure.

[0062] Then the first screw conveying device 200 drives the detection rod 420 to move rightward for a certain distance, and the detection rod 420 also climbs up along the umbrella surface of the insulating member 111 for a certain distance and then stops, and then the driving mechanism 500 drives the detection rod 420 to circle again. In this way, the entire surface of the insulating member 111 can be inspected for defects.

[0063] Then, similarly, a defect detection is performed on all the insulators 110. It is possible to choose to replace an insulator 110 with a defect when one is detected, or it is possible to choose to replace all the insulators 110 one by one after the detection is completed.

[0064] Before replacement, first determine the number of insulators 110 included in each replacement point. If there are intact insulators 110 on both sides of a defective insulator 110, only replace one at a time. If there are more than one defective and adjacent insulators 110, replace multiple insulators 110 at a time.

[0065] like Figure 2 and Figure 3 As shown in , it is assumed that the second insulator 110 is defective. At this time, the first stage 210 is driven to move left and right to align the position by the first screw conveyor 200, and then the first cylinder 320 drives the second stage 220 to rise. The first mechanical arm 710 installed on the left side of the second stage 220 clamps the right end of the first insulator 110, and the second mechanical arm 720 clamps the left end of the second insulator 110. The second screw conveyor 300 installed on the second stage 220 controls the third stage 310 to move left and right to align the position according to the number of insulators 110 to be replaced, so that the third mechanical arm 730 clamps the right end of the second insulator 110, and the fourth mechanical arm 740 clamps the left end of the third insulator 110.

[0066] Since the insulator 110 is in an arc shape with its opening upward under the action of gravity, each pair of steel caps 112 and steel legs 113 are in a taut state. Therefore, after the clamping is completed in the previous step, the third stage 310, the third mechanical arm 730 and the fourth mechanical arm 740 are driven by the second screw conveying device 300 to move a short distance to the right, so that the steel caps 112 and steel legs 113 on the insulator 110 to be replaced are relaxed, which is convenient for disassembly and assembly.

[0067] At this time, the M pins 114 on the left and right sides of the second insulator 110 are knocked downward by the disassembly mechanism 600 to disengage them, and the second insulator 110 is disassembled. Then the first mechanical arm 710 and the fourth mechanical arm 740 are released, and the second mechanical arm 720 and the third mechanical arm 730 clamp the second insulator 110.

[0068] Then the first cylinder 320 drives the removed insulator 110 to descend, and the first screw conveying device 200 drives the removed insulator 110 to move leftward. At this time, the defective insulator 110 can be removed manually or by installing a mechanical arm on the cross arm side plate 120 and the power tower, and then the new insulator 110 placed on the power tower in advance is placed in the second mechanical arm 720 and the third mechanical arm 730, and then the second mechanical arm 720 and the third mechanical arm 730 are controlled to clamp the new insulator 110. If more than one insulator 110 is replaced at a time, multiple insulators 110 can be assembled in advance.

[0069] Then, the first screw conveying device 200, the first cylinder 320 and the second screw conveying device 300 are operated to move the new insulator 110 to the missing position on the insulator string 100, and then the M pin 114 on the new insulator 110 and the M pin 114 on the third insulator 110 are knocked upward by the disassembly mechanism 600 to fix the new insulator 110 to the insulator string 100. The replacement of the defective insulator 110 is completed.

[0070] It should be supplemented that, since the insulator 110 may have cracks or other surfaces that are not damaged, the detection rod 420 cannot detect it at this time. You can choose to use a special drone to fly around the insulator string 100, and install a camera system on the drone to perform intelligent image analysis by taking pictures to detect whether there are defects. The above are conventional technical means of the prior art and will not be repeated.

[0071] Embodiment 2: This embodiment is an improvement on Embodiment 1. For details, please refer to Figure 1-Figure 11 The driving mechanism 500 includes a first arc-shaped bracket 510 disposed on the first stage 210, a second arc-shaped bracket 520 is slidably disposed on the first arc-shaped bracket 510, and a third arc-shaped bracket 530 is slidably disposed on the second arc-shaped bracket 520;

[0072] The detection mechanism 400 includes a connecting rod 410 , a detection rod 420 is slidably connected to the connecting rod 410 , the detection rod 420 is elastically connected to the connecting rod 410 via a spring 430 , and a sensor 440 is also disposed on the connecting rod 410 .

[0073] In this embodiment, considering that the insulator string 100 installed on the cross arm side connecting plate 120 has two strings, front and rear, and the device may need to be disassembled after the insulator string 100 is inspected and repaired, the supporting structure for supporting the detection rod 420 to surround the insulator 110 cannot be a complete ring, but a retractable arc structure.

[0074] The first arc bracket 510 mounted on the first stage 210, the second arc bracket 520 slidably mounted on the first arc bracket 510, and the third arc bracket 530 slidably mounted on the second arc bracket 520 form a telescopic arc structure, which can be installed from the front side of the insulator string 100 to the position shown in the figure when the arc structure is retracted. The center of the arc structure is coaxial with the center of the insulator 110.

[0075] The connecting rod 410 installed on the third arc-shaped bracket 530 has a detection rod 420 slidably installed at the opening of the lower end thereof, and the two are elastically connected by a spring 430. According to the change in the diameter of the umbrella surface of the insulator 110, the connecting rod 410 is controlled to rise and fall, so that the detection rod 420 contacts the umbrella surface of the insulator 110, and the spring 430 is compressed, and the detection rod 420 contacts the sensor 440. The sensor 440 can be a force contact sensor or a distance sensor.

[0076] The extension of the arc structure can drive the detection rod 420 to circle the insulator 110. If there is a defect on the surface of the insulator 110, the detection rod 420 will pop out under the elastic force of the spring 430, and the sensor 440 can sense the defect on the surface of the insulator 110.

[0077] Embodiment 3: This embodiment is an improvement made on the basis of Embodiment 2. For details, please refer to Figure 1-Figure 11 The detection mechanism 400 further includes a slide bar 450 slidably disposed on the third arc-shaped bracket 530 , a rotating shaft 460 is rotatably disposed on the slide bar 450 , and the connecting rod 410 is disposed on the rotating shaft 460 ;

[0078] A second cylinder 470 is disposed on the third arc-shaped bracket 530 , a piston rod of the second cylinder 470 is connected to the sliding rod 450 , a third cylinder 480 is rotatably disposed on the sliding rod 450 , and a piston rod of the third cylinder 480 is connected to the connecting rod 410 .

[0079] In this embodiment, considering that the right side of the umbrella structure of the insulator 110 is configured to be wavy in order to improve the insulation performance, the vertical detection rod 420 cannot completely cover the right umbrella part of the insulator 110 .

[0080] In order to maximize the coverage area, the connecting rod 410 and the detection rod 420 can also be tilted to the left. Specifically, the sliding rod 450 is connected to the connecting rod 410 through the rotating shaft 460. The piston rod of the second cylinder 470 is fixed to the sliding rod 450 through the shaft, and the operation of the second cylinder 470 can drive the sliding rod 450, the connecting rod 410 and the detection rod 420 to rise and fall as a whole.

[0081] The upper end of the third cylinder 480 is mounted on the slide bar 450 through an axis rotation, and can rotate based on the axis in the front-back direction. The lower end of the third cylinder 480 is fixed to the connecting rod 410 through an axis. The operation of the third cylinder 480 drives its piston rod to extend downward, which can drive the connecting rod 410 and the detection rod 420 to rotate clockwise at a certain angle based on the rotating shaft 460. The detection rod 420 tilted to the lower left corner can contact the right umbrella surface area of ​​the insulator 110 compared to the vertical detection rod 420.

[0082] Embodiment 4: This embodiment is an improvement made on the basis of Embodiment 2. For details, please refer to Figure 1-Figure 10 A second motor 540 is provided on the first arc-shaped bracket 510, a first gear 550 is provided on the output shaft of the second motor 540, a first ring gear 560 and a third motor 570 are provided on the second arc-shaped bracket 520, the first gear 550 and the first ring gear 560 are meshed, a second gear 580 is provided on the output shaft of the third motor 570, a second ring gear 590 is provided on the third arc-shaped bracket 530, and the second gear 580 and the second ring gear 590 are meshed.

[0083] In this embodiment, when the detection rod 420 is driven to circle the insulator 110, the second motor 540 drives the first gear 550 to rotate clockwise to drive the arc-shaped first gear ring 560 to slide backward, thereby driving the second arc-shaped bracket 520 to extend relative to the first arc-shaped bracket 510. The third motor 570 drives the second gear 580 to rotate clockwise to drive the arc-shaped second gear ring 590 to slide backward, thereby driving the third arc-shaped bracket 530 to extend relative to the second arc-shaped bracket 520.

[0084] Embodiment 5: This embodiment is an improvement on the embodiment 1. For details, please refer to Figure 1-Figure 12 The disassembly and assembly mechanism 600 includes a mounting seat 610 disposed on the second stage 220 , an arc hammer 620 is slidably disposed on the mounting seat 610 , a fourth cylinder 630 is rotatably disposed on the mounting seat 610 , and a piston rod of the fourth cylinder 630 is rotatably connected to the arc hammer 620 .

[0085] In this embodiment: Figure 6 As shown in , an arc-shaped groove is provided on the mounting seat 610, and the arc-shaped hammer 620 performs a circular motion based on its own center of the circle in the arc-shaped groove. The tail of the fourth cylinder 630 is mounted on the mounting seat 610 by shaft rotation, and the piston rod of the fourth cylinder 630 is mounted on the arc-shaped hammer 620 by shaft rotation, and the fourth cylinder 630 is tilted downward.

[0086] When the M pin 114 is removed, the piston rod of the fourth cylinder 630 is shortened to drive the arc hammer 620 to rotate counterclockwise. The upper part of the arc hammer 620 will hit the M pin 114 and push it downward, causing the steel cap 112 and the steel foot 113 to lose their fixation.

[0087] When installing the M pin 114, the piston rod of the fourth cylinder 630 is extended to drive the arc hammer 620 to rotate clockwise. The lower part of the arc hammer 620 will hit the M pin 114 and push it upward, so that the steel cap 112 and the steel foot 113 are fixed.

[0088] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0089] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for performing maintenance work on a transmission line based on a special UAV combined with an intelligent robot, characterized in that: The steps include: S1, driving the first carrier (210) to move along the head of the insulator string (100) toward the tail by operating the first screw conveying device (200); S2, performing defect detection on a plurality of insulators (110) constituting the insulator string (100) by means of a detection mechanism (400) installed on the first object platform (210); S3, when the presence of a defective insulator (110) is detected, the first screw conveying device (200) is operated to drive the first loading platform (210) to move to the defective insulator (110), and then the defective insulator (110) is fixed by a grabbing mechanism (700) installed on the first loading platform (210); S4, removing the defective insulator (110) through the disassembly and assembly mechanism (600) installed on the first loading platform (210), then transporting the defective insulator (110) to the head of the insulator string (100) through the first screw conveying device (200), removing the defective insulator (110) and placing a new insulator (110) on the grabbing mechanism (700), then transporting the new insulator (110) to the missing part, and installing the new insulator (110) into the insulator string (100) through the disassembly and assembly mechanism (600), thereby completing the inspection and repair of the insulator string (100); Wherein, the S2 step specifically includes: S21, when a detection rod (420) in a detection mechanism (400) installed on the first loading platform (210) contacts the canopy of the first insulator (110) near the head of the insulator string (100), the operation of the first screw conveying device (200) is stopped; S22, driving the detection rod (420) to slide around the umbrella surface of the first insulator (110) based on the central axis of the first insulator (110) through the driving mechanism (500) installed on the first loading platform (210), and detecting whether there is a defect in the local umbrella surface of the first insulator (110) through the detection rod (420); S23, after the first screw conveying device (200) is started again to drive the detection rod (420) to move a certain distance along the central axis direction of the first insulator (110), the first screw conveying device (200) stops running again, and then the driving mechanism (500) drives the detection rod (420) to circle around again for defect detection, and the displacement and circling detection of the detection rod (420) are repeated until the defect detection of the entire umbrella surface of the first insulator (110) is completed, and then the defect detection is sequentially performed on the remaining insulators (110); The driving mechanism (500) comprises a first arc-shaped bracket (510) arranged on the first loading platform (210), a second arc-shaped bracket (520) being slidably arranged on the first arc-shaped bracket (510), and a third arc-shaped bracket (530) being slidably arranged on the second arc-shaped bracket (520); The detection mechanism (400) comprises a connecting rod (410), the detection rod (420) is slidably connected to the connecting rod (410), the detection rod (420) is elastically connected to the connecting rod (410) via a spring (430), and a sensor (440) is also provided on the connecting rod (410); The detection mechanism (400) further comprises a sliding rod (450) slidably arranged on the third arc-shaped bracket (530), a rotating shaft (460) being rotatably arranged on the sliding rod (450), and the connecting rod (410) being arranged on the rotating shaft (460); A second cylinder (470) is disposed on the third arc-shaped bracket (530), a piston rod of the second cylinder (470) is connected to the sliding rod (450), a third cylinder (480) is rotatably disposed on the sliding rod (450), and a piston rod of the third cylinder (480) is connected to the connecting rod (410); A second motor (540) is arranged on the first arc-shaped bracket (510), a first gear (550) is arranged on the output shaft of the second motor (540), a first gear ring (560) and a third motor (570) are arranged on the second arc-shaped bracket (520), the first gear (550) and the first gear ring (560) are meshed, a second gear (580) is arranged on the output shaft of the third motor (570), a second gear ring (590) is arranged on the third arc-shaped bracket (530), and the second gear (580) and the second gear ring (590) are meshed.

2. The method for performing maintenance work on a transmission line based on a special unmanned aerial vehicle combined with an intelligent robot according to claim 1 is characterized in that: The insulator (110) comprises an insulating member (111), wherein the insulating member (111) is provided with a steel cap (112) and a steel foot (113) at both ends thereof, respectively, and the steel foot (113) is embedded in an adjacent steel cap (112) and fixed by an M pin (114); A second loading platform (220) is slidably arranged on the first loading platform (210), a second screw conveying device (300) is arranged on the second loading platform (220), a third loading platform (310) is arranged on the second screw conveying device (300), and a first cylinder (320) is also arranged on the first loading platform (210), and a piston rod of the first cylinder (320) is connected to the second loading platform (220).

3. The method for performing maintenance work on a transmission line based on a special unmanned aerial vehicle combined with an intelligent robot according to claim 2 is characterized in that: The first screw conveying device (200) comprises a conveying frame (201), a screw (202) and a first motor (203) are arranged on the conveying frame (201), an output shaft of the first motor (203) is connected to the screw (202), a nut (204) is slidably arranged on the conveying frame (201), the nut (204) is threadedly connected to the screw (202), and the first loading platform (210) is arranged on the nut (204); The structure of the second screw conveying device (300) is the same as that of the first screw conveying device (200).

4. The method for performing maintenance work on a transmission line based on a special unmanned aerial vehicle combined with an intelligent robot according to claim 2 is characterized in that: The disassembly and assembly mechanism (600) comprises a mounting seat (610) arranged on the second loading platform (220), an arc-shaped hammer (620) being slidably arranged on the mounting seat (610), a fourth cylinder (630) being rotatably arranged on the mounting seat (610), and a piston rod of the fourth cylinder (630) being rotatably connected to the arc-shaped hammer (620).

5. The method for performing maintenance work on a transmission line based on a special UAV combined with an intelligent robot according to claim 2 is characterized in that: The grasping mechanism (700) comprises a first mechanical arm (710) and a second mechanical arm (720) which are arranged on the second loading platform (220), and a third mechanical arm (730) and a fourth mechanical arm (740) are arranged on the third loading platform (310).