A power data acquisition and analysis terminal based on intelligent concentrator

By deploying multi-mode communication technology between smart concentrators and smart meters, dynamically optimizing network topology, and combining multi-source data analysis and prediction models, the problem of smart concentrator location determination and power resource allocation is solved, and power data transmission is realized. Stability and efficiency improve the flexibility and operating efficiency of the power grid.

CN118554642BActive Publication Date: 2024-10-18CETSDEC CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411018505.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-10-18
Estimated Expiration
2044-07-29

AI Technical Summary

Technical Problem

Traditional systems lack the flexibility to determine the optimal location of intelligent concentrators and dynamically manage multi-modal communication networks, making it difficult to respond and make decisions in a timely manner during peak loads or emergencies.

Method used

By deploying RFID and laser scanning technology, combined with GIS data and SDN controllers, we dynamically optimize network topology, collect and fuse multi-source data in real time, use LSTM models to predict future power demand, and optimize power resource allocation through multi-level caching and real-time monitoring systems. .

Benefits of technology

The communication method between smart concentrators and smart meters is optimized to ensure the stability and efficiency of power data transmission, enhance the flexibility and economic operation efficiency of the power grid, and improve the accuracy of power demand prediction and the efficiency of resource allocation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118554642B_ABST
    Figure CN118554642B_ABST
Patent Text Reader

Abstract

The present invention discloses an electric power data collection and analysis terminal based on an intelligent concentrator, which relates to the field of data processing technology, including a deployment module for determining the optimal position of the intelligent concentrator, deploying RFID and laser scanning technology between the intelligent concentrator and the intelligent meter to implement a multi-mode communication network and dynamically optimize the network topology; an analysis module for real-time collection and fusion of multi-source data, and predicting future power demand based on the fused multi-source data analysis; and an adjustment module for combining future power demand data and real-time power production data in different regions to allocate power resources. The present invention not only optimizes the communication mode between the intelligent concentrator and the intelligent meter, but also adapts to changes in network conditions through dynamic network topology technology, ensures the stability and efficiency of power data transmission, and enhances the flexibility and economic operation efficiency of the power grid by real-time collection and fusion of multi-source data, predicting future power demand and allocating resources.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of data processing, and in particular to an electric power data acquisition and analysis terminal based on an intelligent concentrator. Background Art

[0002] The development of smart grid technology began with the enhancement of the functions of traditional power grid systems, with the aim of improving the reliability, safety, efficiency and sustainability of power systems through advanced information and communication technologies. The widespread deployment of smart meters allows for the collection and real-time monitoring of more sophisticated power usage data, while the application of smart concentrators further enhances the centralized management and analysis capabilities of data. In addition, modern power grid management also integrates a variety of sensors and automation equipment to achieve power flow optimization and fault prevention. However, with the access of renewable energy and the diversification of consumption patterns, the load management and data processing requirements of the power grid have become more complex. Traditional systems lack a method to flexibly determine the optimal location of smart concentrators, dynamically manage multimodal communication networks, and respond and make decisions in a timely manner when facing peak loads or emergencies. Summary of the invention

[0003] In view of the above-mentioned problems existing in the existing power data acquisition and analysis terminal based on the intelligent concentrator, the present invention is proposed.

[0004] Therefore, the problem to be solved by the present invention is that the traditional system lacks a method for flexibly determining the optimal location of the intelligent concentrator, dynamically managing the multimodal communication network, and timely responding and making decisions when facing peak loads or emergencies.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a power data acquisition and analysis terminal based on an intelligent concentrator, comprising:

[0006] A deployment module is used to determine the optimal location of the smart concentrator, deploy RFID and laser scanning technology between the smart concentrator and the smart meter to implement a multi-mode communication network and dynamically optimize the network topology;

[0007] The analysis module is used to collect and fuse multi-source data in real time, and to analyze and predict future power demand based on the fused multi-source data;

[0008] An adjustment module for allocating power resources by combining future power demand data and real-time power production data in different regions;

[0009] The storage module is used to cache data at multiple levels through an intelligent concentrator.

[0010] As a preferred solution of the power data acquisition and analysis terminal based on the intelligent concentrator of the present invention, wherein: the determination of the optimal location of the intelligent concentrator refers to obtaining data of all potential nodes from the power grid management department, including location information of substations, distribution stations and load centers, collecting the communication capability and expected data flow information of each node, including bandwidth and historical data flow records, pre-processing the collected data, listing all potential intelligent concentrator installation nodes, and assigning a unique identifier to each node;

[0011] Use GIS data to determine the physical distance between nodes, and calculate the cost of establishing a stable communication connection between each pair of nodes based on the physical distance and the required bandwidth. For each pair of nodes i and j, the connection cost w ij It is expressed as:

[0012] ,

[0013] Where c1 is the equipment cost, c2 is the installation cost, c3 is the communication cost per unit distance, and d ij is the distance between nodes i and j;

[0014] All cost data are organized into a cost table, including the direct cost between each pair of nodes;

[0015] Use the cost table to construct a cost-effectiveness matrix, where the rows and columns of the matrix represent different nodes, and the value of each cell represents the cost of connecting the corresponding row and column nodes. Evaluate the preliminary cost matrix and use linear programming techniques to identify cost savings points.

[0016] A network graph is constructed based on the cost-benefit matrix. The nodes in the graph represent potential concentrator locations of the power grid, the edges represent connected nodes, and the weight of the edge represents the cost of connecting two nodes. The connections in the graph are adjusted according to real-time cost-benefit analysis, and new connections with high cost-effectiveness are added. All nodes in the graph are traversed until there are no isolated nodes in the graph.

[0017] Select a node as the starting node, use Prim's algorithm to gradually add the lowest cost edge, initialize an empty minimum spanning tree, evaluate the connection cost between the initial node and all other nodes not included in the current minimum spanning tree, select the lowest cost connection edge and add the edge and the connected nodes to the minimum spanning tree, repeat the evaluation and selection process, each time starting from the node in the most recently added spanning tree, select and update the lowest cost edge until all nodes are included;

[0018] After all nodes are connected, all nodes, their connecting edges and corresponding costs are listed according to the minimum spanning tree result generated by Prim's algorithm;

[0019] Each node is evaluated and the node with the lowest cost is selected as the installation location of the intelligent concentrator.

[0020] As a preferred solution of the power data collection and analysis terminal based on the smart concentrator of the present invention, wherein: the deployment of RFID and laser scanning technology between the smart concentrator and the smart meter to implement a multi-mode communication network refers to collecting the specific geographical locations of all smart meters and smart concentrators, evaluating the communication capabilities and data traffic of the smart meters and smart concentrators, determining the frequency of data transmission according to the real-time requirements of the power grid, and measuring the maximum distance between the smart meter and the smart concentrator;

[0021] Summarize the communication requirements of all smart meters and smart concentrators, and select two main communication technologies. If the data points are close and frequently accessed, choose RFID technology; if the data points are long-distance and require high security, choose laser scanning technology;

[0022] Install RFID readers in the meter concentration area and install RFID tags on each smart meter, configure the network of RFID readers and the signal strength and frequency of RFID tags, and install laser scanning equipment in substations and distribution stations.

[0023] As a preferred solution of the power data acquisition and analysis terminal based on the intelligent concentrator described in the present invention, the dynamically optimized network topology refers to deploying a network monitoring tool in the intelligent concentrator, collecting performance indicators of communication with the intelligent meter in real time, deploying an SDN controller in the network center as the hub of network configuration, installing and configuring the communication protocol between the SDN controller and the intelligent concentrator, setting the control strategy of the network equipment, integrating the network monitoring tool with the SDN controller to collect network performance data in real time;

[0024] The SDN controller uses the Dijkstra algorithm to calculate the shortest communication path between the smart meter and the smart concentrator in real time based on real-time network performance data;

[0025] Based on the results of the Dijkstra algorithm, the SDN controller automatically adjusts the communication route between the smart concentrator and the smart meter, continuously monitors the network performance and makes adjustments;

[0026] Collect real-time power data based on optimal communication paths.

[0027] As a preferred solution of the power data acquisition and analysis terminal based on the intelligent concentrator of the present invention, the real-time collection and fusion of multi-source data refers to collecting meteorological data, population density data, power consumption data and power production data, pre-processing the collected data and unifying the timestamp format of the collected data, and aligning data records from different sources through timestamps;

[0028] The meteorological data are divided into three groups according to different temperature ranges: low, medium and high. The population density data are divided into three groups according to the size of the city: large cities, medium cities and small cities. The electricity consumption data are divided into three groups according to the consumption level: low consumption, medium consumption and high consumption.

[0029] The data in each power consumption group is labeled according to the meteorological data and population density data. Within each power consumption group, the data is divided into layers according to the meteorological data and population density data, and the average power consumption, maximum power consumption and power consumption volatility of each layer are calculated.

[0030] Use multivariate analysis techniques to evaluate the impact of temperature data and population density data on electricity consumption and analyze the correlation between temperature data, population density data and electricity consumption;

[0031] Select meteorological and population density characteristics that have an impact on electricity consumption based on the correlation analysis results;

[0032] Kalman filtering is used to fuse feature data to obtain comprehensive data features.

[0033] As a preferred solution of the power data acquisition and analysis terminal based on the intelligent concentrator of the present invention, wherein: the prediction of future power demand based on the fused multi-source data analysis refers to building a demand prediction model based on the LSTM model, setting the model input layer dimension to (p, f), where p is the number of time steps, f is the number of features for each time step, adding a fully connected layer and an output layer after the LSTM layer and defining a loss function;

[0034] The comprehensive data features are input into the model as the training data set, and the Adam optimizer is used to iteratively optimize the model parameters until the loss reaches the minimum and then the iteration is stopped. The model parameters obtained by the iteration are input into the demand forecasting model;

[0035] Input the real-time power consumption data into the demand forecasting model to obtain future power demand;

[0036] Demonstrate regional distribution and trends of electricity consumption through geographic information systems.

[0037] As a preferred solution of the power data collection and analysis terminal based on the intelligent concentrator described in the present invention, wherein: the display of the regional distribution and trend of power consumption through a geographic information system refers to collecting geographic information including location coordinates and regional boundaries, combining power consumption data and future power demand data with geographic information, correctly matching power consumption data points and future power demand data points with corresponding geographic locations by using universal identifiers, creating different layers for different types of data using GIS software, indicating different levels of power usage through color coding, creating a visual representation based on predicted power demand, and displaying the changing trend of power demand in different regions.

[0038] As a preferred solution of the power data collection and analysis terminal based on the intelligent concentrator described in the present invention, wherein: the power resource allocation based on future power demand data and real-time power production data in different regions refers to verifying and synchronizing the future power demand data with the real-time power production data, using a linear regression matching method to match and analyze the future power demand data and the real-time power production data, evaluating the supply and demand balance at different time points, identifying the supply and demand gap, and formulating a power resource allocation strategy based on the results of the matching analysis. If the predicted power demand is equal to the real-time produced power resources, indicating that the power resources are insufficient, the output of the generator set is adjusted in advance. If the predicted power demand is less than the real-time produced power resources, indicating that the power resources are in excess, power storage and transfer are increased, and the effectiveness of the power resource allocation strategy is evaluated and adjusted in real time.

[0039] As a preferred solution of the power data acquisition and analysis terminal based on the intelligent concentrator described in the present invention, wherein: the evaluation of the effectiveness of the power resource allocation strategy and real-time adjustment refers to deploying a real-time monitoring system, continuously tracking power production data and power demand changes, and regularly evaluating the execution effect of the power resource allocation strategy, including cost-benefit analysis and system stability evaluation, and adjusting and optimizing the power resource allocation strategy according to the evaluation results and changes in real-time data.

[0040] As a preferred solution of the power data acquisition and analysis terminal based on the intelligent concentrator described in the present invention, wherein: the multi-level caching of data through the intelligent concentrator refers to multi-level caching of data in the intelligent concentrator, determining three levels of data caching, including local cache, regional cache and central cache, classifying data according to data access frequency and size, placing small data items with high frequency access in the local cache, placing data items with medium frequency access in the regional cache, and placing important large data items with low frequency access in the central cache, implementing a cache performance monitoring system, tracking and evaluating the performance of each layer of cache in real time, including hit rate, response time and capacity utilization, and adjusting cache strategy and resource allocation according to monitoring results.

[0041] The beneficial effects of the present invention are as follows: the present invention not only optimizes the communication mode between the smart concentrator and the smart meter, but also adapts to changes in network conditions through dynamic network topology technology, ensures the stability and efficiency of power data transmission, and predicts future power demand and allocates resources through real-time collection and fusion of multi-source data, thereby enhancing the flexibility and economic operation efficiency of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0043] Figure 1 This is a structural diagram of the power data acquisition and analysis terminal based on the intelligent concentrator.

[0044] Figure 2 Schematic diagram of the implementation of multi-source data fusion. DETAILED DESCRIPTION

[0045] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings.

[0046] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0047] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor is it a separate or selective embodiment that is mutually exclusive with other embodiments.

[0048] Example 1, reference Figure 1 and Figure 2 , which is the first embodiment of the present invention, and which provides a power data acquisition and analysis terminal based on an intelligent concentrator. The power data acquisition and analysis terminal based on an intelligent concentrator includes:

[0049] S1, deployment module, used to determine the optimal location of the smart concentrator, deploy RFID and laser scanning technology between the smart concentrator and the smart meter to implement a multi-mode communication network and dynamically optimize the network topology;

[0050] Specifically, determining the optimal location of the smart concentrator means obtaining data of all potential nodes from the power grid management department, including location information of substations, distribution stations, and load centers, collecting communication capabilities and expected data flow information of each node, including bandwidth and historical data flow records, pre-processing the collected data, listing all potential smart concentrator installation nodes, and assigning a unique identifier to each node;

[0051] Use GIS data to determine the physical distance between nodes, and calculate the cost of establishing a stable communication connection between each pair of nodes based on the physical distance and the required bandwidth. For each pair of nodes i and j, the connection cost w ij It is expressed as:

[0052] ,

[0053] Where c1 is the equipment cost, c2 is the installation cost, c3 is the communication cost per unit distance, and d ij is the distance between nodes i and j;

[0054] All cost data are organized into a cost table, including the direct cost between each pair of nodes;

[0055] Use the cost table to construct a cost-effectiveness matrix, where the rows and columns of the matrix represent different nodes, and the value of each cell represents the cost of connecting the corresponding row and column nodes. Evaluate the preliminary cost matrix and use linear programming techniques to identify cost savings points.

[0056] A network graph is constructed based on the cost-benefit matrix. The nodes in the graph represent potential concentrator locations of the power grid, the edges represent connected nodes, and the weight of the edge represents the cost of connecting two nodes. The connections in the graph are adjusted according to real-time cost-benefit analysis, and new connections with high cost-effectiveness are added. All nodes in the graph are traversed until there are no isolated nodes in the graph.

[0057] Select a node as the starting node, use Prim's algorithm to gradually add the lowest cost edge, initialize an empty minimum spanning tree, evaluate the connection cost between the initial node and all other nodes not included in the current minimum spanning tree, select the lowest cost connection edge and add the edge and the connected nodes to the minimum spanning tree, repeat the evaluation and selection process, each time starting from the node in the most recently added spanning tree, select and update the lowest cost edge until all nodes are included;

[0058] After all nodes are connected, all nodes, their connecting edges and corresponding costs are listed according to the minimum spanning tree result generated by Prim's algorithm;

[0059] Each node is evaluated and the total cost of each node as a smart concentrator is calculated, including the connection cost with other nodes:

[0060] ,

[0061] Where C(i)u is the total connection cost of node i, V is the set of all nodes, and w(i,j) is the connection cost between node i and node j;

[0062] Select the node with the lowest cost as the installation location of the intelligent concentrator.

[0063] By obtaining detailed information of all potential nodes including substations, distribution stations and load centers from the grid management department, this step aims to determine the strategic deployment location of the smart concentrator. This process takes into account the communication capabilities and historical data traffic of each node to ensure that the selected location can maximize the efficiency of data collection and transmission. Selecting the optimal location can significantly reduce data transmission delay and cost, enhance the reliability and response speed of the system, and thus improve the monitoring and management capabilities of the entire power system. The geographic information system (GIS) is used to determine the physical distance between nodes, and the connection cost is calculated in combination with the bandwidth requirements. This method takes into account the equipment cost, installation cost and communication cost, provides an economic evaluation for establishing a stable communication connection for each pair of nodes, and makes the grid design more economical and efficient. By accurately calculating the cost, it supports the grid to minimize investment and operating costs while maintaining communication quality. After constructing the cost-benefit matrix, the Prim algorithm is used to select the lowest cost connection method from it to construct the minimum spanning tree. This step is the key in network design, which can effectively connect all nodes without incurring excess costs. By optimizing the network structure, it not only improves the efficiency of data transmission, but also reduces the overall construction and maintenance costs. The application of the Prim algorithm ensures the scalability and flexibility of the power grid, enabling the network to expand economically as demand increases, and implements multi-level data caching through intelligent concentrators to optimize data storage and access strategies. This strategy classifies and stores data according to its frequency of use and importance, ensuring rapid response to high-frequency access data. Multi-level caching significantly improves data processing speed and overall system performance, which is particularly important for real-time data analysis and power demand forecasting. This mechanism reduces the pressure on the central data processing system and improves data security and access efficiency.

[0064] Furthermore, the deployment of RFID and laser scanning technology between smart concentrators and smart meters to implement a multi-mode communication network refers to collecting the specific geographical locations of all smart meters and smart concentrators, evaluating the communication capabilities and data traffic of smart meters and smart concentrators, determining the frequency of data transmission according to the real-time requirements of the power grid, and measuring the maximum distance between smart meters and smart concentrators;

[0065] Summarize the communication requirements of all smart meters and smart concentrators, including the maximum distance of data transmission, required data transmission speed, data packet size, and security requirements, and select two main communication technologies. If the data points are close and frequently accessed, select RFID technology; if the data points are long-distance and require high security, select laser scanning technology;

[0066] Install RFID readers in the meter concentration area and install RFID tags on each smart meter, configure the network of RFID readers and the signal strength and frequency of RFID tags, and install laser scanning equipment in substations and distribution stations.

[0067] Before effective communication between smart meters and concentrators is achieved, their specific geographical locations and communication capabilities are first evaluated. This step ensures that the system design can meet the real-time needs of the power grid, such as real-time monitoring and control of power grid loads. Measuring the maximum communication distance between smart meters and concentrators helps determine the most appropriate communication technology to ensure the stability and efficiency of data transmission. By summarizing communication requirements (such as data transmission speed, packet size, and security requirements), the most suitable communication technology is selected. RFID is used to handle high-frequency, short-distance data exchange, while laser scanning is suitable for long-distance and high-security occasions. This multi-mode communication strategy improves the flexibility and adaptability of the network and can select the best communication solution for different scenarios, thereby improving the overall communication efficiency and system reliability. RFID readers are installed in the meter concentration area, and RFID tags are installed on each smart meter. This configuration optimizes the processing efficiency of frequent data exchange and reduces the response time of the system. Laser scanning equipment is installed in substations and distribution stations to cover a wider area and ensure the security and accuracy of long-distance communication. Laser equipment can provide more accurate data transmission, especially in complex or restricted environments.

[0068] Furthermore, dynamically optimizing the network topology means deploying network monitoring tools in the smart concentrator to collect performance indicators of communication with smart meters in real time, deploying SDN controllers in the network center as the hub for network configuration, installing and configuring the communication protocol between the SDN controller and the smart concentrator, setting control policies for network devices, and integrating network monitoring tools with the SDN controller to collect network performance data in real time;

[0069] The SDN controller uses the Dijkstra algorithm to calculate the shortest communication path between the smart meter and the smart concentrator in real time based on real-time network performance data;

[0070] Set a distance value for each node. Initially, except for the starting node (intelligent concentrator), the distance value of all other nodes is set to infinity.

[0071] Create a priority queue to store the nodes to be processed and their distance values, and give priority to the nodes with the smallest distance values;

[0072] Take the node i with the smallest distance value from the priority queue, traverse all adjacent nodes j of node i, and calculate the distance value d from node i to node j:

[0073] ,

[0074] Where d1(i) is the current shortest distance value of node i, w(i,j) is the connection cost between node i and node j, also expressed as the weight of the edge from node i to node j;

[0075] If the calculated distance value d is less than the current distance value d1(i) of node i, then d1(i) is updated to the distance value d and node i is added back to the priority queue;

[0076] Repeat the steps of updating the distance values ​​and the shortest paths of the nodes until the priority queue is empty, which indicates that the shortest paths to all reachable nodes have been determined;

[0077] Trace back from the end node to the start node and extract the complete shortest path;

[0078] Based on the results of the Dijkstra algorithm, the SDN controller automatically adjusts the communication route between the smart concentrator and the smart meter, continuously monitors the network performance and makes adjustments;

[0079] Collect real-time power data based on optimal communication paths.

[0080] Deploy network monitoring tools in the smart concentrator to monitor and collect network performance data in real time, and deploy SDN controllers in the network center. By integrating monitoring tools and SDN controllers, comprehensive control of network status is achieved, which improves the adaptability and flexibility of the network, enables the power grid to quickly adjust network configuration according to real-time data, optimize data flow and reduce latency, and ensures the shortest path for data transmission, which not only improves communication efficiency, but also greatly reduces energy consumption and communication costs. This is particularly important for large-scale power grids, which can significantly improve the economy and sustainability of the network. According to the results of the Dijkstra algorithm, the SDN controller dynamically adjusts the communication route between the smart meter and the smart concentrator to adapt to changes in network performance. This dynamic adjustment mechanism enables the power grid to respond to environmental changes in real time, such as equipment failure or increased data traffic, ensuring the continuous stability and high efficiency of data communication. Based on the configuration of the optimal communication path, the smart concentrator can more effectively collect real-time power data from the smart meter. This efficient data collection strategy improves the reliability and accuracy of the data and provides high-quality decision support information for power grid operations, such as power demand forecasting and load management.

[0081] S2, analysis module, used to collect and fuse multi-source data in real time, and predict future power demand based on the fused multi-source data analysis;

[0082] Specifically, real-time collection and fusion of multi-source data refers to the collection of meteorological data, population density data, power consumption data, and power production data, pre-processing the collected data and unifying the timestamp format of the collected data, and aligning data records from different sources through timestamps;

[0083] The meteorological data are divided into three groups according to different temperature ranges: low, medium and high. The population density data are divided into three groups according to the size of the city: large cities, medium cities and small cities. The electricity consumption data are divided into three groups according to the consumption level: low consumption, medium consumption and high consumption.

[0084] The data in each power consumption group is labeled according to the meteorological data and population density data. Within each power consumption group, the data is divided into layers according to the meteorological data and population density data, and the average power consumption, maximum power consumption and power consumption volatility of each layer are calculated.

[0085] The average power consumption is calculated as:

[0086] ,

[0087] In the formula, is the average power consumption, n is the number of records in the group, that is, the total number of measurement points in the group, P q is the electricity consumption of the qth record;

[0088] The maximum power consumption is calculated as follows:

[0089] ,

[0090] Where P max is the maximum power consumption, P1, P2, ..., P n is the power consumption of all records in the group;

[0091] The formula for calculating the volatility of electricity consumption is:

[0092] ,

[0093] In the formula, is the standard deviation of electricity consumption, indicating the volatility or variability of electricity consumption, P q is the power consumption of the qth record, is the average power consumption, n is the number of records in the group;

[0094] Use multivariate analysis techniques to assess the impact of temperature data and population density data on electricity consumption:

[0095] ,

[0096] Where P' is the electricity consumption per square kilometer, T is the temperature, and D is the population density. is the error term, which represents the impact of other unobserved factors. is the intercept term, representing the baseline electricity consumption at zero temperature and zero population density, is the coefficient of temperature T, indicating how the power consumption P' will change when the temperature changes by one unit while other variables remain unchanged. is the coefficient of population density D, which indicates how the electricity consumption P' will change when the population density changes by one unit while other variables remain unchanged. , , Calculated by the least squares method;

[0097] Pearson correlation coefficient was used to analyze the correlation between temperature data and population density data and electricity consumption;

[0098] Select meteorological and population density characteristics that have an impact on electricity consumption based on the correlation analysis results;

[0099] Kalman filtering is used to fuse feature data to obtain comprehensive data features.

[0100] The collected multi-source data is preprocessed, and aligned by timestamp after unifying the time format to ensure the consistency of all data on the time axis, ensuring high consistency and reliability on the basis of data analysis, which is the premise for accurate analysis. Through precise grouping and label allocation, the impact of different variables on electricity consumption can be more effectively identified, providing a structured data framework for subsequent analysis. Multivariate analysis techniques are used to evaluate the impact of different data (such as temperature and population density) on electricity consumption, and analyze the correlation between these factors. This analysis helps reveal how different factors affect electricity demand and enhances the accuracy and reliability of the prediction model. Kalman filtering technology is used to fuse key feature data that affect electricity consumption to obtain comprehensive data features. Kalman filtering can optimize the estimation process of data features, reduce noise interference, and improve the accuracy and stability of data features. This is crucial for real-time dynamic adjustment of power grid operations and can provide stable and reliable data support in a changing environment.

[0101] Furthermore, predicting future electricity demand based on fused multi-source data analysis refers to building a demand forecasting model based on the LSTM model, setting the model input layer dimension to (p, f), where p is the number of time steps, f is the number of features for each time step, adding a fully connected layer and an output layer after the LSTM layer, and defining a loss function;

[0102] The comprehensive data features are input into the model as the training data set, and the Adam optimizer is used to iteratively optimize the model parameters until the loss reaches the minimum and then the iteration is stopped. The model parameters obtained by the iteration are input into the demand forecasting model;

[0103] Input the real-time power consumption data into the demand forecasting model to obtain future power demand;

[0104] Demonstrate regional distribution and trends of electricity consumption through geographic information systems.

[0105] By building a demand forecasting model that can handle complex data features, this configuration enables the model to capture long-term dependencies in time series data and enhances the ability to predict future electricity demand, especially in the face of highly dynamic and changing electricity markets. Using comprehensive data features as input, the Adam optimizer is applied to iteratively optimize the model parameters until the loss function is minimized. The Adam optimizer accelerates the model training process through adaptive learning rate adjustment, improves learning efficiency and convergence speed, and enables the model to reach high accuracy faster. Real-time electricity consumption data is input into the trained LSTM model to predict future electricity demand, allowing grid operators to respond to changes in market and consumer demand in real time, optimize resource allocation and electricity production, reduce waste, and improve the economy and efficiency of energy use. The regional distribution and trends of electricity consumption displayed through geographic information systems allow policymakers and grid operators to intuitively understand the geographical distribution of electricity demand, thereby conducting more accurate regional planning and grid optimization. The application of geographic information systems strengthens the visualization of data and supports better decision-making and strategy formulation.

[0106] Furthermore, displaying the regional distribution and trend of electricity consumption through a geographic information system means collecting geographic information including location coordinates and regional boundaries, combining electricity consumption data and future electricity demand data with the geographic information, correctly matching electricity consumption data points and future electricity demand data points with corresponding geographic locations by using universal identifiers, creating different layers for different types of data using GIS software, representing different levels of electricity usage through color coding, creating a visual representation based on predicted electricity demand, and displaying the changing trend of electricity demand in different regions.

[0107] Accurate geographic information collection and matching can ensure the accuracy and reliability of power consumption and demand data, improve the accuracy of analysis results and the effectiveness of decision-making, combine the collected power consumption data and future power demand data with geographic information, and correctly match them through universal identifiers. This data combination and matching method can ensure the consistency and integrity of the data, avoid data mismatch or loss, and improve the reliability and accuracy of data analysis. Through color coding and layer creation, the spatial distribution and change trend of power consumption can be intuitively displayed, helping users to quickly understand the data and make corresponding decisions. Visual representations are created based on predicted power demand to show the change trend of power demand in different regions. By combining future demand data with current consumption data and generating dynamic demand change charts, decision makers can identify potential peaks and troughs in power demand in advance, optimize the allocation and scheduling of power resources, and improve the operating efficiency and reliability of the power system.

[0108] S3, adjustment module, used to allocate power resources by combining future power demand data and real-time power production data of different regions;

[0109] Specifically, combining future electricity demand data and real-time electricity production data in different regions to allocate electricity resources means verifying and synchronizing future electricity demand data with real-time electricity production data, using a linear regression matching method to match and analyze future electricity demand data and real-time electricity production data, evaluating the supply and demand balance at different time points, identifying the supply and demand gap, and formulating an electricity resource allocation strategy based on the results of the matching analysis. If the predicted electricity demand is equal to the real-time produced electricity resources, indicating that electricity resources are insufficient, the output of the generator set is adjusted in advance. If the predicted electricity demand is less than the real-time produced electricity resources, indicating that electricity resources are in excess, electricity storage and transfer are increased, and the effectiveness of the electricity resource allocation strategy is evaluated and adjusted in real time.

[0110] Verifying and synchronizing the predicted future electricity demand data with the real-time electricity production data improves the reliability and accuracy of the data, reduces prediction errors, and ensures that the basic data for supply and demand balance assessment is credible. Through matching analysis, the balance state and potential gaps of electricity supply and demand can be accurately identified, helping power grid operators to identify and respond to power supply shortages or surpluses in advance. Early identification of supply and demand gaps can provide early warnings for power grid operators, facilitate the adoption of necessary regulatory measures, and ensure the stable operation of the power system. According to the results of the supply and demand matching analysis, specific power resource allocation strategies are formulated. When the predicted demand is equal to the real-time production, the output of the generator set is adjusted; when the demand is less than the production, power storage and transfer are increased. The formulation and implementation of power resource allocation strategies can effectively balance power supply and demand, reduce power waste or shortages caused by supply and demand imbalances, and improve the efficiency of power grid operation. The real-time evaluation and adjustment mechanism ensures the continuous optimization of power resource allocation strategies, adapts to rapidly changing power demand, and ensures the efficient and stable operation of the power grid.

[0111] Furthermore, evaluating the effectiveness of the power resource allocation strategy and adjusting it in real time means deploying a real-time monitoring system, continuously tracking power production data and changes in power demand, regularly evaluating the implementation effect of the power resource allocation strategy, including cost-benefit analysis and system stability assessment, and adjusting and optimizing the power resource allocation strategy based on the evaluation results and changes in real-time data.

[0112] The real-time monitoring system ensures that the power system can respond quickly to changes, improving the agility and accuracy of power distribution. Through continuous monitoring, potential problems can be discovered early to prevent power shortages or surpluses. Through systematic evaluation, the effectiveness of the power resource allocation strategy can be quantified, and deficiencies and room for improvement can be discovered. Cost-benefit analysis can ensure the economy of the resource allocation strategy and avoid waste of resources. System stability assessment ensures the reliability and continuity of power supply. The dynamic adjustment mechanism enables the power system to respond quickly to changes in demand, optimize resource allocation, and improve system efficiency and economy.

[0113] S4, storage module, used to cache data in multiple levels through the intelligent concentrator;

[0114] Specifically, multi-level caching of data through an intelligent concentrator refers to multi-level caching of data in an intelligent concentrator, determining three levels of data caching, including local cache, regional cache, and central cache, classifying data according to data access frequency and size, placing small data items with high frequency access in the local cache, placing data items with medium frequency access in the regional cache, and storing important large data items with low frequency access in the central cache, implementing a cache performance monitoring system, tracking and evaluating the performance of each level of cache in real time, including hit rate, response time, and capacity utilization, and adjusting cache strategies and resource allocation based on monitoring results.

[0115] In the intelligent concentrator, data is cached at multiple levels, including local cache, regional cache and central cache. This multi-level cache design can effectively improve the speed of data access and the responsiveness of the system. By storing high-frequency access data in the local cache, the delay of data access can be greatly reduced and the user experience can be improved. At the same time, medium-frequency and low-frequency access data can also be reasonably stored according to their characteristics to ensure the security and persistence of important data. The cache performance monitoring system can understand the operating status of each layer of cache in real time and provide a basis for the optimization of the cache strategy. By monitoring the hit rate, it can be judged whether the cache strategy is effective; by monitoring the response time, the responsiveness of the system can be evaluated; by monitoring the capacity utilization rate, the reasonable allocation and efficient utilization of cache resources can be ensured. Dynamic adjustment of the cache strategy can ensure that the system is always in the best performance state. By optimizing the cache strategy, the cache hit rate and response speed can be improved, and the system delay and resource waste can be reduced. At the same time, reasonable resource allocation ensures the efficient utilization of caches at each layer and avoids the waste of cache space and data loss.

[0116] Embodiment 2 is the second embodiment of the present invention. This embodiment is different from the previous embodiment in that:

[0117] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods described in various embodiments of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program codes.

[0118] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.

[0119] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.

[0120] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit with a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit with a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

Claims

1. A power data acquisition and analysis terminal based on an intelligent concentrator, characterized in that: include, A deployment module is used to determine the optimal location of the smart concentrator, deploy RFID and laser scanning technology between the smart concentrator and the smart meter to implement a multi-mode communication network and dynamically optimize the network topology; The analysis module is used to collect and fuse multi-source data in real time, and to analyze and predict future power demand based on the fused multi-source data; An adjustment module for allocating power resources by combining future power demand data and real-time power production data in different regions; A storage module is used to cache data in multiple levels through an intelligent concentrator; the determination of the optimal location of the intelligent concentrator refers to obtaining data of all potential nodes from the power grid management department, including location information of substations, distribution stations and load centers, collecting communication capabilities and expected data flow information of each node, including bandwidth and historical data flow records, pre-processing the collected data, listing all potential intelligent concentrator installation nodes, and assigning a unique identifier to each node; Use GIS data to determine the physical distance between nodes, and calculate the cost of establishing a stable communication connection between each pair of nodes based on the physical distance and the required bandwidth. For each pair of nodes i and j, the connection cost w ij It is expressed as: , Where c1 is the equipment cost, c2 is the installation cost, c3 is the communication cost per unit distance, and d ij is the distance between nodes i and j; All cost data are organized into a cost table, including the direct cost between each pair of nodes; Use the cost table to construct a cost-effectiveness matrix, where the rows and columns of the matrix represent different nodes, and the value of each cell represents the cost of connecting the corresponding row and column nodes. Evaluate the preliminary cost matrix and use linear programming techniques to identify cost savings points. A network graph is constructed based on the cost-benefit matrix. The nodes in the graph represent potential concentrator locations of the power grid, the edges represent connected nodes, and the weight of the edge represents the cost of connecting two nodes. The connections in the graph are adjusted according to real-time cost-benefit analysis, and new connections with high cost-effectiveness are added. All nodes in the graph are traversed until there are no isolated nodes in the graph. Select a node as the starting node, use Prim's algorithm to gradually add the lowest cost edge, initialize an empty minimum spanning tree, evaluate the connection cost between the initial node and all other nodes not included in the current minimum spanning tree, select the lowest cost connection edge and add the edge and the connected nodes to the minimum spanning tree, repeat the evaluation and selection process, each time starting from the node in the most recently added spanning tree, select and update the lowest cost edge until all nodes are included; After all nodes are connected, all nodes, their connecting edges and corresponding costs are listed according to the minimum spanning tree result generated by Prim's algorithm; Evaluate each node and select the node with the lowest cost as the installation location of the smart concentrator; The dynamic optimization of network topology refers to deploying network monitoring tools in the smart concentrator, collecting performance indicators of communication with smart meters in real time, deploying SDN controllers in the network center as the hub of network configuration, installing and configuring the communication protocol between the SDN controller and the smart concentrator, setting control strategies for network devices, and integrating network monitoring tools with the SDN controller to collect network performance data in real time; The SDN controller uses the Dijkstra algorithm to calculate the shortest communication path between the smart meter and the smart concentrator in real time based on real-time network performance data; Based on the results of the Dijkstra algorithm, the SDN controller automatically adjusts the communication route between the smart concentrator and the smart meter, continuously monitors the network performance and makes adjustments; Collect real-time power data based on optimal communication paths.

2. The power data acquisition and analysis terminal based on the intelligent concentrator according to claim 1, characterized in that: Deploying RFID and laser scanning technology to implement a multi-mode communication network between smart concentrators and smart meters refers to collecting the specific geographical locations of all smart meters and smart concentrators, evaluating the communication capabilities and data traffic of smart meters and smart concentrators, determining the frequency of data transmission according to the real-time requirements of the power grid, and measuring the maximum distance between smart meters and smart concentrators; Summarize the communication requirements of all smart meters and smart concentrators, and select two main communication technologies. If the data points are close and frequently accessed, choose RFID technology; if the data points are long-distance and require high security, choose laser scanning technology; Install RFID readers in the meter concentration area and install RFID tags on each smart meter, configure the network of RFID readers and the signal strength and frequency of RFID tags, and install laser scanning equipment in substations and distribution stations.

3. The power data acquisition and analysis terminal based on the intelligent concentrator according to claim 2, characterized in that: The real-time collection and fusion of multi-source data refers to the collection of meteorological data, population density data, power consumption data, and power production data, pre-processing the collected data and unifying the timestamp format of the collected data, and aligning data records from different sources through timestamps; The meteorological data are divided into three groups according to different temperature ranges: low, medium and high. The population density data are divided into three groups according to the size of the city: large cities, medium cities and small cities. The electricity consumption data are divided into three groups according to the consumption level: low consumption, medium consumption and high consumption. The data in each power consumption group is labeled according to the meteorological data and population density data. Within each power consumption group, the data is divided into layers according to the meteorological data and population density data, and the average power consumption, maximum power consumption and power consumption volatility of each layer are calculated. Use multivariate analysis techniques to evaluate the impact of temperature data and population density data on electricity consumption and analyze the correlation between temperature data, population density data and electricity consumption; Select meteorological and population density characteristics that have an impact on electricity consumption based on the correlation analysis results; Kalman filtering is used to fuse feature data to obtain comprehensive data features.

4. The power data acquisition and analysis terminal based on the intelligent concentrator as claimed in claim 3, characterized in that: The forecasting of future electricity demand based on the fused multi-source data analysis refers to building a demand forecasting model based on the LSTM model, setting the model input layer dimension to (p, f), where p is the number of time steps, f is the number of features for each time step, adding a fully connected layer and an output layer after the LSTM layer, and defining a loss function; The comprehensive data features are input into the model as the training data set, and the Adam optimizer is used to iteratively optimize the model parameters until the loss reaches the minimum and then the iteration is stopped. The model parameters obtained by the iteration are input into the demand forecasting model; Input the real-time power consumption data into the demand forecasting model to obtain future power demand; Demonstrate regional distribution and trends of electricity consumption through geographic information systems.

5. The power data acquisition and analysis terminal based on the intelligent concentrator according to claim 4, characterized in that: The display of regional distribution and trend of electricity consumption through geographic information system refers to collecting geographic information including location coordinates and regional boundaries, combining electricity consumption data and future electricity demand data with geographic information, correctly matching electricity consumption data points and future electricity demand data points with corresponding geographic locations by using universal identifiers, creating different layers for different types of data by using GIS software, indicating different levels of electricity usage by color coding, creating visual representations based on predicted electricity demand, and displaying the changing trend of electricity demand in different regions.

6. The power data acquisition and analysis terminal based on the intelligent concentrator according to claim 5, characterized in that: The power resource allocation in combination with future power demand data and real-time power production data in different regions refers to verifying and synchronizing future power demand data with real-time power production data, using a linear regression matching method to match and analyze future power demand data and real-time power production data, evaluating the supply and demand balance at different time points, identifying the supply and demand gap, and formulating a power resource allocation strategy based on the results of the matching analysis. If the predicted power demand is equal to the power resources produced in real time, indicating that power resources are insufficient, the output of the generator set is adjusted in advance. If the predicted power demand is less than the power resources produced in real time, indicating that power resources are in excess, power storage and transfer are increased, and the effectiveness of the power resource allocation strategy is evaluated and adjusted in real time.

7. The power data acquisition and analysis terminal based on the intelligent concentrator according to claim 6, characterized in that: The evaluation of the effectiveness of the power resource allocation strategy and real-time adjustment refers to the deployment of a real-time monitoring system, continuous tracking of power production data and changes in power demand, regular evaluation of the implementation effect of the power resource allocation strategy, including cost-benefit analysis and system stability assessment, and adjustment and optimization of the power resource allocation strategy based on the evaluation results and changes in real-time data.

8. The power data acquisition and analysis terminal based on the intelligent concentrator according to claim 7, characterized in that: The multi-level caching of data through the intelligent concentrator refers to multi-level caching of data in the intelligent concentrator, determining three levels of data caching, including local cache, regional cache and central cache, classifying data according to data access frequency and size, placing small data items with high frequency access in the local cache, placing data items with medium frequency access in the regional cache, and storing important large data items with low frequency access in the central cache, implementing a cache performance monitoring system, tracking and evaluating the performance of each level of cache in real time, including hit rate, response time and capacity utilization, and adjusting cache strategy and resource allocation according to monitoring results.

Citation Information

Patent Citations

  • Active distribution network dynamic topology reconstitution method based on mixed artificial intelligence

    CN103701117A

  • Topology identification and parameter estimation method for low-voltage distribution network

    CN112117763A