Geological structure deformation simulation equipment and simulation method
By designing hydraulic modules and linkage systems, efficient simulation of geological settlement is achieved, and the problems of slow settlement simulation rate and poor observability in the existing technology are solved, and the efficiency and effect of the experiment are improved.
Patent Information
- Application Number
- CN202411026696.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-07-30
AI Technical Summary
The existing settlement simulation experiments have the problems of slow simulation rate and poor observability, and it is difficult to effectively simulate the geological settlement process.
A geological structure deformation simulation equipment was designed, including hydraulic modules, support guide components, soil layer support components and linkage strips. The hydraulic module drives the activity of the soil layer support components, and combines the support plate linkage components and linkage strips. In combination, multi-point settlement simulation of soil layers is realized, improving simulation efficiency and observability.
A more efficient settlement simulation is achieved, which can facilitate the observation of mutual influence and interference between settlement, and solves the problems of low simulation efficiency and poor observability in traditional experiments.
Smart Images

Figure CN118566111B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of simulation devices, and in particular to geological structure deformation simulation equipment and a simulation method. Background Art
[0002] The structural simulation experiment method is one of the main methods for studying the causes of geological structures. It is often used in geomechanics research. In the experiment, the selected experimental materials are placed under certain boundary conditions and appropriate external forces are applied to simulate the actual geological structure system in nature. Through the experiment, the influence of changes in external forces and boundary conditions on the structural morphology and structural stress field can be studied, thereby exploring the relationship between stress and strain.
[0003] Settlement is a common geological structural deformation activity. Under the action of load, the foundation soil is compressed and causes vertical deformation or sinking. When the settlement is too large, additional stress will be generated in the building, causing cracks or even local component fractures, endangering the safety of the building. The settlement should be estimated during foundation design. If necessary, the settlement needs to be simulated. The current common settlement simulation is to apply a load to the soil layer after the soil layer is laid, and gradually simulate it through the gravity of the load. However, this method has the problems of slow settlement simulation rate and poor observability in the actual simulation process. Therefore, a geological structural deformation simulation device and simulation method are proposed. Summary of the invention
[0004] In order to solve the technical problems existing in the above-mentioned prior art, the present invention provides geological structure deformation simulation equipment and simulation method.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: geological structure deformation simulation equipment, including a test bench bottom plate and an external bracket arranged in the test bench bottom plate, a glass fence is fixed inside the external bracket, a support plate is fixed at the bottom of the glass fence, a plurality of groups of support guide components are arranged laterally inside the support plate, a soil layer support component for supporting the soil layer is fixed on the top of the support guide component, a support plate linkage component for linkage with the adjacent side soil layer support component is arranged at the bottom of each group of soil layer support components, linkage bars are connected between the plurality of groups of support plate linkage components, a hydraulic module is arranged at the bottom center of the test bench bottom plate, and the movable end of the hydraulic module is connected to the bottom of the soil layer support component;
[0006] The hydraulic module drives a group of soil layer supporting components to move, and the soil layer supporting components drive the remaining groups of soil layer supporting components to move through the cooperation of the supporting plate linkage components and the linkage bars. The soil layer laid in the glass fence moves with the soil layer supporting components to simulate geological settlement.
[0007] Preferably, the support plate is provided with a plurality of groups of through holes on both sides thereof, the number of the through holes matching that of the support and guide components, the support and guide components are arranged in the through holes on both sides of the support plate, the two symmetrically arranged groups of support and guide components are a corresponding group, and a plurality of corresponding groups are arranged in total, a group of soil support components is installed between the ends of a corresponding group, the support and guide components include a support rod and a spring, the support rod is sleeved in the through holes on both sides of the support plate, the spring is sleeved on the outside of the support rod, and the two ends of the spring respectively conflict with the support plate and the soil support component arranged at the top of the support and guide components.
[0008] Preferably, the soil layer support assembly includes a soil layer support plate and a soil layer support cloth, the soil layer support plate is installed between a corresponding group end of the support guide assembly, several groups of soil layer support plates are arranged side by side to form a complete soil layer support plane, and the soil layer support cloth is sleeved inside several soil layer support plates.
[0009] Preferably, the width of the soil layer supporting cloth is consistent with the width of the soil layer supporting plate, and a group of symmetrical arc-shaped protrusions are formed at both ends of the interior of the soil layer supporting plate. The soil layer supporting cloth is located between the arc-shaped protrusions of the soil layer supporting plate, and the total length of the soil layer supporting cloth is longer than the total length of several groups of soil layer supporting plates arranged horizontally.
[0010] Preferably, the number of the supporting plate linkage assemblies is consistent with the number of the soil layer supporting assemblies, and the supporting plate linkage assemblies arranged at the bottom of each group of soil layer supporting assemblies are arranged horizontally along the same axis. The linkage bar passes through each group of supporting plate linkage assemblies in sequence, and the supporting plate linkage assembly includes a base, a through groove, a screw and an extrusion plate. The base is fixed at the bottom center position of the soil layer supporting plate, the through groove is opened inside the base, the screw is opened at the bottom of the base and connected to the through groove, the extrusion plate is threadedly connected in the screw, and the end of the screw extends into the through groove, the extrusion plate is arranged inside the base, and the extrusion plate is rotatably connected to the end of the screw, and an adjustable fixed space is formed between the extrusion plate and the through groove, and the linkage bar is located in the fixed space formed in each group of supporting plate linkage assemblies when passing through the supporting plate linkage assembly.
[0011] Preferably, the surface of the linkage bar is ground, the total length of the linkage bar is longer than the total length of the spacing between several groups of supporting plate linkage components, and the surface of the linkage bar is printed with scale marks.
[0012] Preferably, the linkage bar also includes a linkage plate, which is provided with a plurality of length specifications. The width of the linkage plate of each length specification is consistent with the width of the through-slot, and the lengths of the linkage plates of different length specifications are in a multiple relationship. The length of the shortest linkage plate is the same as the spacing between the center points of the two sets of support plate linkage components.
[0013] Preferably, the movable end of the hydraulic module is connected to a connecting frame, the connecting frame is designed in a "U" shape, the connecting frame is fixedly connected to the soil support plate by bolts, and the hydraulic module drives the soil support plate to move through the connecting frame.
[0014] Preferably, the surface of the bottom plate of the test bench is provided with a plurality of groups of optional hydraulic module mounting holes corresponding to the linkage bars, and the hydraulic module is connected to the mounting holes by bolts.
[0015] A simulation method of a geological structure deformation simulation device comprises the following steps:
[0016] Step A, device preparation;
[0017] Prepare the soil layer for simulation and spread it evenly on the surface of the soil support component;
[0018] Determine the specific area within the glass fence where the simulated settlement is located. The specific area can be one or more;
[0019] Fix the hydraulic module on the bottom plate of the test bench and in the installation holes below the specific area of simulated settlement;
[0020] Connect the two ends of the connection frame to the hydraulic module and the soil support assembly respectively;
[0021] Step B, adjusting the sedimentation acceleration rate;
[0022] Pass the linkage bar through each set of supporting plate linkage components in sequence;
[0023] According to the required speed, estimate the descending interval between the two sets of support plate linkage components;
[0024] According to the estimated descending interval, adjust the length of the linkage bar reserved between the two sets of supporting plate linkage components;
[0025] The screw is rotated so that the screw pushes the extrusion plate upward in the screw through the threaded connection with the through groove. The extrusion plate after upward movement cooperates with the through groove to play a role in compressing and limiting the linkage bar, thereby completing the fixation;
[0026] Step C, sedimentation acceleration;
[0027] The hydraulic module is controlled to move downward at a uniform speed through an external hydraulic source;
[0028] During the downward movement, the hydraulic module pulls the soil layer support assembly downward through the connecting frame, and the soil layer laid on the soil layer support assembly moves downward with the soil layer support assembly, simulating soil layer settlement;
[0029] During the downward movement of the soil layer support component, the soil layer support component is dislocated with the adjacent group of soil layer support components. The soil layer support cloth is exposed from the soil layer support plate as the soil layer support plate moves and dislocated. The exposed soil layer support cloth fills the gap between the dislocated soil layer support plates of different groups and takes over the soil layer support plate to support the soil layer.
[0030] The supporting plate linkage assembly moves downward under the drive of the soil layer supporting assembly, and the downwardly moved supporting plate linkage assembly pulls the supporting plate linkage assembly on the adjacent side and the corresponding soil layer supporting assembly downward through the connected linkage bar;
[0031] All the supporting plate linkage components and the corresponding soil layer supporting components are driven by the linkage bars and the initial supporting plate linkage components to sink one by one to complete the simulation.
[0032] Compared with the prior art, the present invention provides a geological structure deformation simulation device and simulation method, which has the following beneficial effects:
[0033] The present invention is provided with a hydraulic module, a support guide assembly, a soil layer support assembly, a soil layer support plate linkage assembly and a linkage bar. The hydraulic module drives one group of soil layer support assemblies to move. The soil layer support assembly drives the remaining groups of soil layer support assemblies to move through the cooperation of the support plate linkage assembly and the linkage bar. The soil layer laid in the glass fence moves with the soil layer support assembly to simulate geological settlement, thereby solving the problems of low simulation efficiency and poor observability in traditional settlement experiments that rely solely on load pressure.
[0034] In the present invention, multiple groups of hydraulic modules can be provided to achieve simulation of multi-point settlement, making it easier to observe mutual influence and interference between settlements. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0036] Figure 1 It is a schematic diagram of the three-dimensional structure in the embodiment;
[0037] Figure 2 It is a schematic diagram of a three-dimensional cross-sectional structure in the embodiment;
[0038] Figure 3 It is a schematic diagram of a three-dimensional cross-sectional side view structure in the embodiment;
[0039] Figure 4 This is a schematic diagram of the three-dimensional structure of the support and guide assembly in the embodiment;
[0040] Figure 5 It is a schematic diagram of the three-dimensional structure of the soil layer supporting assembly of the embodiment;
[0041] Figure 6 In the embodiment Figure 5 The enlarged structural diagram at A in the middle;
[0042] Figure 7 It is a schematic diagram of the cooperation between the soil layer support assembly and the soil layer support plate linkage assembly in the embodiment;
[0043] Figure 8 In the embodiment Figure 7 The enlarged structural diagram at B in the middle;
[0044] Fig. 9 Schematic diagram of the linkage strip and linkage plate structure in the embodiment;
[0045] Fig.10 It is a schematic diagram of the coordination structure of the linkage bar and the soil layer support plate linkage assembly in the embodiment;
[0046] Fig.11 It is a schematic diagram of the coordination structure of the linkage plate and the soil layer support plate linkage assembly in the embodiment;
[0047] Fig.12 This is a schematic diagram of the sedimentation experiment in the embodiment.
[0048] In the figure: 1. test bench bottom plate; 2. external bracket; 3. glass fence; 4. support plate; 5. support guide assembly; 51. support rod; 52. spring; 6. soil layer support assembly; 61. soil layer support plate; 62. soil layer support cloth; 7. support plate linkage assembly; 71. base; 72. through groove; 73. screw; 74. extrusion plate; 8. linkage bar; 81. linkage plate; 9. hydraulic module; 10. connection frame. DETAILED DESCRIPTION
[0049] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents the selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present invention.
[0050] like Figure 1-12As shown, the present embodiment proposes a geological structure deformation simulation device, including a test bench bottom plate 1 and an external support 2 arranged in the test bench bottom plate 1, a glass fence 3 is fixed inside the external support 2, a support plate 4 is fixed at the bottom of the glass fence 3, a plurality of groups of support guide components 5 are arranged transversely inside the support plate 4, a soil layer support component 6 for supporting the soil layer is fixed on the top of the support guide component 5, a support plate linkage component 7 for linkage with the adjacent side soil layer support component 6 is arranged at the bottom of each group of soil layer support components 6, a linkage bar 8 is connected between the plurality of groups of support plate linkage components 7, a hydraulic module 9 is arranged at the bottom center of the test bench bottom plate 1, and the movable end of the hydraulic module 9 is connected to the bottom of the soil layer support component 6;
[0051] The hydraulic module 9 drives one group of soil layer supporting components 6 to move, and the soil layer supporting components 6 drive the remaining groups of soil layer supporting components 6 to move through the cooperation of the supporting plate linkage component 7 and the linkage bar 8. The soil layer laid in the glass fence 3 moves with the soil layer supporting components 6 to simulate geological settlement.
[0052] Several groups of through holes matching the number of the support guide components 5 are provided on both sides of the support plate 4. The support guide components 5 are arranged in the through holes on both sides of the support plate 4. Two groups of support guide components 5 arranged symmetrically are a corresponding group. There are several corresponding groups in total. A group of soil layer support components 6 is installed between the ends of a corresponding group. Several groups cooperate with the soil layer support components 6 to form a complete adjustable support plane. The experimental soil used to simulate the soil layer structure is laid flat on the support plane formed by the support guide components 5 and the soil layer support components 6. The position adjustment of a single group or multiple groups of soil layer support components 6 corresponds to the terrain settlement of the area.
[0053] The support and guide assembly 5 includes a support rod 51 and a spring 52. The support rod 51 is sleeved in the through holes on both sides of the support plate 4. The support rod 51 and the through holes on both sides of the support plate 4 cooperate to form a sliding structure in the vertical direction, thereby further cooperating with the soil support assembly 6 to adjust the height in the vertical direction. The spring 52 is sleeved on the outside of the support rod 51, and the two ends of the spring 52 are respectively in contact with the support plate 4 and the soil support assembly 6 arranged on the top of the support and guide assembly 5. In the initial state, the elastic force of the spring 52 cooperates with the support rod 51 to maintain each group of support rods 51 and the soil support assembly 6 arranged on the support rod 51 in the same initial plane, and there is no need to manually adjust the position of the support rod 51;
[0054] The soil layer support assembly 6 includes a soil layer support plate 61 and a soil layer support cloth 62. The soil layer support plate 61 is installed between a corresponding group of ends of the support guide assembly 5. Several groups of soil layer support plates 61 are arranged side by side to form a complete soil layer support plane. The soil layer support cloth 62 is sleeved in several soil layer support plates 61. When different groups of soil layer support plates 61 are dislocated from each other, gaps are formed between different groups of soil layer support plates 61. The soil layer support cloth 62 is exposed from the soil layer support plate 61 as the soil layer support plate 61 moves and dislocates. The exposed soil layer support cloth 62 fills the gaps formed between different groups of soil layer support plates 61 and takes over the soil layer support plate 61 to support the soil layer.
[0055] The width of the soil layer supporting cloth 62 is consistent with the width of the soil layer supporting plate 61, so that when the soil layer supporting cloth 62 supports the soil layer, it can completely take up the vacancy formed when the soil layer supporting plate 61 is misplaced. A group of symmetrical arc-shaped protrusions are formed at both ends of the soil layer supporting plate 61. The soil layer supporting cloth 62 is located between the arc-shaped protrusions of the soil layer supporting plate 61. The arc-shaped protrusions inside the soil layer supporting plate 61 play a role in limiting the sliding of the soil layer supporting cloth 62. Under the action of contact friction, when different groups of soil layer supporting plates 61 are misplaced, the soil layer The soil layer supporting cloth 62 inside the soil layer supporting plate 61 will be straightened under the action of friction, so as to better support the soil layer and avoid the problem of irregular deformation of the soil layer supporting cloth 62 caused by the supported soil layer pressing down on the soil layer supporting cloth 62 due to the soft material of the soil layer supporting cloth 62 itself. The total length of the soil layer supporting cloth 62 is longer than the total length of several groups of soil layer supporting plates 61 arranged horizontally. A soil layer supporting cloth 62 that is long enough can better adapt to various types of settlement experiments and, at the same time, bring greater friction to better limit the position of the soil layer supporting cloth 62.
[0056] The number of the supporting plate linkage components 7 is consistent with the number of the soil layer supporting components 6. The supporting plate linkage components 7 arranged at the bottom of each group of soil layer supporting components 6 are arranged horizontally along the same axis. The linkage bars 8 pass through each group of supporting plate linkage components 7 in sequence. The supporting plate linkage components 7 move downward under the drive of the soil layer supporting components 6. The downwardly moved supporting plate linkage components 7 pull the supporting plate linkage components 7 on the adjacent side and the corresponding soil layer supporting components 6 downward through the connected linkage bars 8. The downward movement time difference between the two groups of supporting plate linkage components 7 is determined by the length of the linkage bars 8 reserved between the two groups of supporting plate linkage components 7. The longer the length of the linkage bars 8, the greater the downward movement time difference. Conversely, the shorter the length of the linkage bars 8, the smaller the downward movement time.
[0057] The supporting plate linkage assembly 7 is used to complete the fixing of the linkage bar 8 for adjusting the reserved length. The supporting plate linkage assembly 7 includes a base 71, a through groove 72, a screw 73 and an extrusion plate 74. The base 71 is fixed at the bottom center position of the soil layer supporting plate 61, the through groove 72 is opened inside the base 71, the screw 73 is opened at the bottom of the base 71 and is connected to the through groove 72, the extrusion plate 74 is threadedly connected in the screw 73, and the end of the screw 73 extends into the through groove 72, the extrusion plate 74 is arranged inside the base 71, and the extrusion plate 74 and the screw The end of 73 is rotatably connected, and an adjustable fixed space is formed between the extrusion plate 74 and the through groove 72. When the linkage bar 8 needs to be fixed, the screw rod 73 is rotated so that the screw rod 73 pushes the extrusion plate 74 to move upward in the screw rod 73 through the threaded connection with the through groove 72. The extrusion plate 74 after moving upward cooperates with the through groove 72 to play a compressive and limiting role on the linkage bar 8, thereby completing the fixation. When the linkage bar 8 passes through the support plate linkage assembly 7, it is located in the fixed space formed in each group of support plate linkage assemblies 7, and is restricted and fixed by the support plate linkage assembly 7.
[0058] The surface of the linkage bar 8 is ground. When the linkage bar 8 is set in the fixed space formed in each group of supporting plate linkage components 7, the ground surface can improve the contact friction with the through groove 72 and the extrusion plate 74, so as to ensure the stability of the connection. The total length of the linkage bar 8 is longer than the total length of the spacing between several groups of supporting plate linkage components 7. When the reserved length position of the linkage bar 8 is adjusted between different groups of supporting plate linkage components 7, the linkage bar 8 has enough length for adjustment to simulate different activity drops. At the same time, the surface of the linkage bar 8 is printed with scale marks. When adjusting the reserved length, the reserved drop can be intuitively confirmed by the drop, which is convenient for data recording.
[0059] The linkage bar 8 also includes a linkage plate 81, which is provided with a variety of length specifications. The width of the linkage plate 81 of each length specification is consistent with the width of the through-slot 72. When the linkage plate 81 enters the fixed space formed between the extrusion plate 74 and the through-slot 72, the linkage plate 81 can completely contact the through-slot 72, thereby ensuring the connection stability between the linkage plate 81 and the through-slot 72. The length of the shortest linkage plate 81 is the same as the spacing between the center points of the two groups of support plate linkage assemblies 7. The lengths of the linkage plates 81 of different length specifications are in a multiple relationship. The shortest linkage plate 81 is used for the connection between the two groups of bases 71, and linkage plates 81 of different lengths are used for the linkage between different groups of bases 71, so that the number of soil layer support plates 61 that move downward synchronously can be controlled according to needs through the bases 71 linked by the linkage plate 81.
[0060] The movable end of the hydraulic module 9 is connected with a connecting frame 10, and the hydraulic module 9 is connected to the soil layer support plate 61 through the connecting frame 10 and drives the soil layer support plate 61 to move up and down. The connecting frame 10 is designed in a "U" shape, and the connecting frame 10 is fixedly connected to the soil layer support plate 61 by bolts. The "U"-shaped connecting frame 10 can avoid the support plate linkage assembly 7 at the bottom of the soil layer support plate 61 to ensure the normal cooperation between the soil layer support plate 61 and the support plate linkage assembly 7;
[0061] The surface of the test bench bottom plate 1 is provided with several groups of optional installation holes of the hydraulic module 9 corresponding to the linkage bars 8. The hydraulic module 9 is connected to the installation holes by bolts. When it is necessary to perform settlement simulation from one side of the glass fence 3, the installation position of the hydraulic module 9 can be adjusted to transfer the hydraulic module 9 to the installation hole corresponding to the one side of the glass fence 3 on the test bench bottom plate 1. The transferred linkage bar 8 drives the soil layer supporting plate 61 to descend through the connecting frame 10, thereby realizing the demand for settlement simulation from one side.
[0062] The simulation method of the simulation device in this embodiment is as follows: prepare a soil layer for simulation, evenly spread the soil layer on the surface of the soil layer support assembly 6, determine the specific area within the glass fence 3 where the simulated settlement is located, the specific area can be one or more, fix the hydraulic module 9 on the bottom plate 1 of the test bench and in the installation hole below the specific area of the simulated settlement, and connect the two ends of the connection frame 10 to the hydraulic module 9 and the soil layer support assembly 6 respectively;
[0063] The linkage bar 8 is passed through each group of supporting plate linkage components 7 in sequence. According to the required speed, the descending interval between the two groups of supporting plate linkage components 7 is estimated. According to the estimated descending interval, the length of the linkage bar 8 reserved between the two groups of supporting plate linkage components 7 is adjusted. The screw rod 73 is rotated so that the screw rod 73 pushes the extrusion plate 74 upward in the screw rod 73 through the threaded connection with the through groove 72. The extrusion plate 74 after upward movement cooperates with the through groove 72 to play a role in compressing and limiting the linkage bar 8, thereby completing the fixation.
[0064] The hydraulic module 9 is controlled by an external hydraulic source to move downward at a uniform speed. During the downward movement, the hydraulic module 9 pulls the soil layer support component 6 downward through the connecting frame 10, and the soil layer laid on the soil layer support component 6 moves downward with the soil layer support component 6 to simulate soil layer settlement. During the downward movement, the soil layer support component 6 is dislocated with the soil layer support components 6 of the adjacent group. The soil layer support cloth 62 is exposed from the soil layer support plate 61 as the soil layer support plate 61 moves and dislocated. The exposed soil layer support cloth 62 makes up for the dislocation of different groups. The gap formed between the soil layer supporting plates 61 is replaced by the soil layer supporting plate 61 to support the soil layer. The supporting plate linkage assembly 7 moves downward under the drive of the soil layer supporting assembly 6. The downward moving supporting plate linkage assembly 7 pulls the supporting plate linkage assembly 7 on the adjacent side and the corresponding soil layer supporting assembly 6 downward through the connected linkage bar 8. All the supporting plate linkage assemblies 7 and the corresponding soil layer supporting assemblies 6 are driven by the initial supporting plate linkage assembly 7 to sink one by one under the drive of the linkage bar 8 to complete the simulation.
[0065] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. In addition, in the description of the present invention, unless otherwise specified, "plurality" means two or more.
[0066] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. A geological structure deformation simulation device, comprising a test bench bottom plate (1) and an external bracket (2) arranged inside the test bench bottom plate (1), characterized in that: A glass fence (3) is fixed inside the outer bracket (2), a support plate (4) is fixed at the bottom of the glass fence (3), a plurality of groups of support guide components (5) are arranged transversely inside the support plate (4), a soil layer support component (6) for supporting the soil layer is fixed on the top of the support guide component (5), the soil layer support component (6) comprises a soil layer support plate (61) and a soil layer support cloth (62), the soil layer support plate (61) is installed between a corresponding group of ends of the support guide component (5), a plurality of groups of soil layer support plates (61) are arranged side by side to form a complete soil layer support plane, and the soil layer support cloth (62) is sleeved inside the plurality of soil layer support plates (61); A support plate linkage assembly (7) for linkage with an adjacent side soil layer support assembly (6) is provided at the bottom of each group of soil layer support assemblies (6); the number of the support plate linkage assemblies (7) is the same as the number of the soil layer support assemblies (6); the support plate linkage assemblies (7) provided at the bottom of each group of soil layer support assemblies (6) are arranged transversely along the same axis; the linkage bar (8) passes through each group of support plate linkage assemblies (7) in sequence; the support plate linkage assembly (7) comprises a base (71), a through slot (72), a screw rod (73) and an extrusion plate (74); the base (71) is fixed to the bottom center of the soil support plate (61), a through groove (72) is opened inside the base (71), the screw rod (73) is opened at the bottom of the base (71) and is connected to the through groove (72), the extrusion plate (74) is threadedly connected in the screw rod (73), and the end of the screw rod (73) extends into the through groove (72), the extrusion plate (74) is arranged inside the base (71), and the extrusion plate (74) is rotatably connected to the end of the screw rod (73), and an adjustable fixed space is formed between the extrusion plate (74) and the through groove (72); A linkage bar (8) is connected between the plurality of groups of support plate linkage assemblies (7); when the linkage bar (8) passes through the support plate linkage assemblies (7), it is located in a fixed space formed in each group of support plate linkage assemblies (7); a hydraulic module (9) is provided at the bottom center of the test bench bottom plate (1); and a movable end of the hydraulic module (9) is connected to the bottom of the soil layer support assembly (6); The hydraulic module (9) drives one group of soil layer support components (6) to move, and the soil layer support components (6) drive the remaining groups of soil layer support components (6) to move through the cooperation of the support plate linkage components (7) and the linkage bars (8), and the soil layer laid in the glass fence (3) moves with the soil layer support components (6) to simulate geological settlement.
2. The geological structure deformation simulation device according to claim 1, characterized in that: The support plate (4) has a plurality of groups of through holes on both sides thereof, the number of which matches that of the support guide components (5). The support guide components (5) are arranged in the through holes on both sides of the support plate (4). The two groups of support guide components (5) arranged symmetrically are a corresponding group. A plurality of corresponding groups are arranged in total. A group of soil support components (6) is installed between the ends of a corresponding group. The support guide component (5) comprises a support rod (51) and a spring (52). The support rod (51) is sleeved in the through holes on both sides of the support plate (4). The spring (52) is sleeved outside the support rod (51). The two ends of the spring (52) respectively contact the support plate (4) and the soil support component (6) arranged at the top of the support guide component (5).
3. The geological structure deformation simulation device according to claim 1, characterized in that: The width of the soil layer support cloth (62) is consistent with the width of the soil layer support plate (61), and a group of symmetrical arc-shaped protrusions are formed at both ends of the soil layer support plate (61). The soil layer support cloth (62) is located between the arc-shaped protrusions of the soil layer support plate (61), and the total length of the soil layer support cloth (62) is longer than the total length of a plurality of groups of soil layer support plates (61) arranged horizontally.
4. The geological structure deformation simulation device according to claim 1, characterized in that: The surface of the linkage bar (8) is subjected to a grinding treatment, the total length of the linkage bar (8) is longer than the total length of the spacing between the plurality of groups of support plate linkage components (7), and the surface of the linkage bar (8) is printed with scale marks.
5. The geological structure deformation simulation device according to claim 1, characterized in that: The linkage bar (8) further comprises a linkage plate (81), wherein the linkage plate (81) has a plurality of length specifications, wherein the width of the linkage plate (81) of each length specification is consistent with the width of the through-slot (72), and the lengths of the linkage plates (81) of different length specifications are in a multiple relationship, wherein the length of the shortest linkage plate (81) is the same as the distance between the center points of the two sets of support plate linkage components (7).
6. The geological structure deformation simulation device according to claim 1, characterized in that: The movable end of the hydraulic module (9) is connected to a connecting frame (10), the connecting frame (10) is designed to be "U"-shaped, the connecting frame (10) is fixedly connected to the soil layer support plate (61) by bolts, and the hydraulic module (9) drives the soil layer support plate (61) to move through the connecting frame (10).
7. The geological structure deformation simulation device according to claim 1, characterized in that: The surface of the test bench bottom plate (1) is provided with a plurality of groups of optional hydraulic module (9) mounting holes corresponding to the linkage bars (8), and the hydraulic modules (9) are connected to the mounting holes via bolts.
8. A simulation method for the geological structure deformation simulation device according to any one of claims 1 to 7, characterized in that: The following steps are included: Step A, device preparation; Step A1, prepare the soil layer for simulation, and spread the soil layer evenly on the surface of the soil support assembly (6); Step A2, determining the specific area within the glass fence (3) where the simulated settlement is located, and the specific area may be one or more; Step A3, fixing the hydraulic module (9) on the bottom plate (1) of the test bench in a mounting hole below the specific area of simulated settlement; Step A4, connecting the two ends of the connection frame (10) to the hydraulic module (9) and the soil support assembly (6) respectively; Step B, adjusting the sedimentation acceleration rate; Step B1, passing the linkage bar (8) through each set of supporting plate linkage components (7) in sequence; Step B2, estimating the descending interval between the two sets of supporting plate linkage assemblies (7) according to the required speed; Step B3, adjusting the length of the linkage bar (8) reserved between the two sets of support plate linkage components (7) according to the estimated descending interval; Step B4, rotating the screw rod (73) so that the screw rod (73) pushes the extrusion plate (74) upward in the screw rod (73) through the threaded connection with the through groove (72), and the extrusion plate (74) after moving upward cooperates with the through groove (72) to exert a pressure and limit effect on the linkage bar (8), thereby completing the fixation; Step C, sedimentation acceleration; Step C1, controlling the hydraulic module (9) to move downward at a uniform speed through an external hydraulic source; Step C2, during the downward movement, the hydraulic module (9) pulls the soil layer support component (6) downward through the connection frame (10), and the soil layer laid on the soil layer support component (6) moves downward along with the soil layer support component (6), simulating soil layer settlement; Step C3, during the downward movement of the soil layer support assembly (6), the soil layer support assembly (6) is dislocated with the soil layer support assembly (6) of the adjacent group, and the soil layer support cloth (62) is exposed from the soil layer support plate (61) as the soil layer support plate (61) moves and dislocates, and the exposed soil layer support cloth (62) fills the gap formed between the dislocated soil layer support plates (61) of different groups, and takes over the soil layer support plates (61) to support the soil layer; Step C4, the supporting plate linkage assembly (7) moves downward under the drive of the soil layer supporting assembly (6), and the supporting plate linkage assembly (7) that moves downward pulls the supporting plate linkage assembly (7) on the adjacent side and the corresponding soil layer supporting assembly (6) to move downward through the connected linkage bar (8); Step C5, all the supporting plate linkage components (7) and the corresponding soil layer supporting components (6) are driven by the initial supporting plate linkage component (7) to sink one by one under the drive of the linkage bar (8), thereby completing the simulation.