A large-screen intelligent quay crane operation monitoring system and its visual management method
Through the data fusion, safety situation assessment and early warning notification functions of the intelligent quayside bridge operation monitoring large-screen system, the problem of the lack of risk warning in the existing technology of the large-screen monitoring system under warning weather is solved, and real-time risk identification and monitoring of quayside bridge operations are realized. Safety and security.
Patent Information
- Application Number
- CN202411047605.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-08-01
AI Technical Summary
The existing large-screen monitoring system lacks effective risk warning capabilities in the face of warning weather and cannot obtain key safety information in a timely manner. As a result, managers cannot respond quickly, which may lead to economic losses and threats to the safety of operators.
An intelligent large-screen quay crane operation monitoring system is designed, including a data fusion center, a safety situation assessment unit, an early warning notification unit and an interactive display platform. Through real-time aggregation and synchronization of comprehensive monitoring data, the hidden danger assessment model is used to identify safety hazards and Generate behavior warning information based on personnel activity information, and graphically display equipment operating status, safety hazards and warning information.
Effectively identify risks in quayside bridge operations under warning weather, send early warning notices in a timely manner, ensure the safety of operators, and improve environmental monitoring and safety.
Smart Images

Figure CN118570990B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of quay crane monitoring, and in particular to an intelligent quay crane operation monitoring large-screen system and a visual management method thereof. Background Art
[0002] A monitoring screen usually refers to one or more large display screens that are used to display and monitor key operational information, data, and activities in real time. In the fields of industry, transportation, and safety monitoring, monitoring screens can help operators monitor and manage complex systems or processes more effectively. At present, existing monitoring screens can only monitor basic content such as the operating parameters of operating equipment, operating progress, environmental parameters, personnel status, and safety indicators. When facing warning weather, there is often a lack of effective risk warning capabilities. Due to the lack of real-time monitoring and early warning of emergencies, managers may not be able to obtain key safety information in a timely manner, and thus cannot respond quickly to prevent or mitigate potential damage, which will not only result in economic losses, but may also pose a threat to the safety of operators.
[0003] Therefore, the present invention provides an intelligent quay crane operation monitoring large-screen system and a visual management method thereof. Summary of the invention
[0004] The present invention provides an intelligent quay crane operation monitoring large-screen system and a visual management method thereof. Through a data fusion center, a safety situation assessment unit, an early warning notification unit and an interactive display platform, the equipment operation status, safety hazard information and behavior early warning information during the quay crane operation process are displayed in real time in a graphical manner. This method can not only improve the environmental monitoring capability, but also improve safety.
[0005] The present invention provides an intelligent quay crane operation monitoring large screen system, including a data fusion center, a safety situation assessment unit, an early warning notification unit and an interactive display platform; wherein,
[0006] The data fusion center is used to aggregate and synchronize the comprehensive monitoring data generated during the quay crane operation in real time;
[0007] Comprehensive monitoring data includes equipment operation data, environmental data, and personnel activity data;
[0008] The safety situation assessment unit is used to determine the equipment operation status based on the comprehensive monitoring data; and to identify the safety hazards of quay crane operations under warning weather conditions by using the hidden danger assessment model;
[0009] The early warning notification unit is used to generate behavioral early warning information based on safety hazards and personnel activity information;
[0010] The interactive display platform is used to display equipment operating status, safety hazard information and behavioral warning information in a graphical manner.
[0011] In an practicable manner, the data fusion center includes a data receiving unit, a data purification unit, a real-time processing unit and a signal enhancement unit, wherein:
[0012] The data receiving unit is used to receive the real-time comprehensive monitoring data collected by various sensors and monitoring equipment, and perform integrity verification;
[0013] The data purification unit is used to clean and synchronize the comprehensive monitoring data after verification;
[0014] The real-time processing unit is used to analyze the real-time environmental data using the abnormal monitoring strategy and preliminarily identify abnormal patterns; when abnormal patterns appear, the hidden danger assessment model is awakened.
[0015] In an practicable manner, the steps of using the hazard assessment model to identify safety hazards of quay crane operations in warning weather include:
[0016] Extract key features that directly affect the risks of quay crane operations from comprehensive monitoring data;
[0017] Input key features into the trained hazard assessment model to evaluate the probability of each risk factor occurring under warning weather conditions and its potential impact on quay crane operations;
[0018] Construct a risk matrix and determine the corresponding risk level of each risk factor based on the probability of occurrence and potential impact of each risk factor.
[0019] In an practicable manner, the early warning notification unit includes a behavior restriction unit, a behavior analysis unit and a response unit; wherein,
[0020] The behavior constraint unit is used to determine the behavior standards of operators according to the risk level corresponding to each risk factor;
[0021] The behavior analysis unit is used to compare the current personnel activity information with the determined behavior standards to determine the abnormal behavior of the operating personnel;
[0022] The response unit is used to automatically trigger the early warning mechanism when there is abnormal behavior.
[0023] In one practicable manner, the steps of comparing the current personnel activity information with the determined behavior standard and determining the abnormal behavior of the operator include:
[0024] Preset the behavior standards corresponding to each risk level of each risk factor;
[0025] Extract behavioral features from personnel activity data and convert the behavioral features into numerical vectors;
[0026] Based on the behavior recognition model, the real-time behavior feature vector is compared with the preset behavior standard. If there is a significant difference between the behavior feature vector and the standard behavior model, it is identified as abnormal behavior.
[0027] In an practicable manner, the interactive presentation platform includes an adaptive cache unit, and the adaptive cache unit is used to:
[0028] Evaluate the historical access frequency of equipment operation status, safety hazard information, and behavioral warning information, and dynamically build a cache list based on the evaluation results; dynamically adjust the cache list based on the freshness of the data.
[0029] On the other hand, the present invention also provides a visual management method for intelligent quay crane operations, comprising the following steps:
[0030] Real-time aggregation and synchronization of comprehensive monitoring data generated during quay crane operations; comprehensive monitoring data includes equipment operation data, environmental data, and personnel activity data;
[0031] Determine the equipment operation status based on comprehensive monitoring data; use the hidden danger assessment model to identify the safety hazards of quay crane operations under warning weather conditions;
[0032] Generate behavioral warning information based on safety hazards and personnel activity information;
[0033] Display equipment operation status, safety hazard information and behavior warning information in a graphical way.
[0034] In one practicable manner, the steps of real-time aggregating and synchronizing the comprehensive monitoring data generated during the quay crane operation process include:
[0035] Receive real-time comprehensive monitoring data collected by various sensors and monitoring equipment, and perform integrity checks;
[0036] After verification, the comprehensive monitoring data is cleaned and synchronized;
[0037] Use anomaly monitoring strategies to analyze real-time environmental data and preliminarily identify abnormal patterns; when abnormal patterns appear, activate the hidden danger assessment model.
[0038] In an practicable manner, the steps of using the hazard assessment model to identify safety hazards of quay crane operations in warning weather include:
[0039] Extract key features that directly affect the risks of quay crane operations from comprehensive monitoring data;
[0040] Input key features into the trained hazard assessment model to evaluate the probability of each risk factor occurring under warning weather conditions and its potential impact on quay crane operations;
[0041] Construct a risk matrix and determine the corresponding risk level of each risk factor based on the probability of occurrence and potential impact of each risk factor.
[0042] In one practicable manner, the steps of generating behavioral warning information based on safety hazards and personnel activity information include:
[0043] Determine the behavior standards for operators based on the risk levels corresponding to each risk factor;
[0044] Compare current personnel activity information with determined behavioral standards to detect abnormal behavior of operators;
[0045] When there is abnormal behavior, the early warning mechanism is automatically triggered.
[0046] The beneficial effects that can be achieved by the present invention are: the intelligent quay crane operation monitoring large-screen system of the present application can effectively identify the risks in quay crane operations under warning weather conditions, and send early warning notifications based on personnel activity information to ensure the safety of operators.
[0047] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings.
[0048] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0050] Figure 1 This is a structural diagram of the large-screen system for monitoring intelligent quay crane operations in Example 1 of the present invention;
[0051] Figure 2 This is a flow chart of steps for identifying potential safety hazards of quay crane operations under warning weather conditions in Example 1 of the present invention;
[0052] Figure 3 This is a flowchart of the steps for triggering the early warning mechanism in Example 1 of the present invention. DETAILED DESCRIPTION
[0053] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0054] This embodiment 1 provides a large-screen intelligent quay crane operation monitoring system, including a data fusion center, a safety situation assessment unit, an early warning notification unit and an interactive display platform; wherein,
[0055] The data fusion center is used to aggregate and synchronize the comprehensive monitoring data generated during the quay crane operation in real time;
[0056] Comprehensive monitoring data includes equipment operation data, environmental data, and personnel activity data;
[0057] The safety situation assessment unit is used to determine the equipment operation status based on the comprehensive monitoring data; and to identify the safety hazards of quay crane operations under warning weather conditions by using the hidden danger assessment model;
[0058] The early warning notification unit is used to generate behavioral early warning information based on safety hazards and personnel activity information;
[0059] The interactive display platform is used to display equipment operating status, safety hazard information and behavioral warning information in a graphical manner.
[0060] The working principle of the above technical solution is:
[0061] This application realizes the visual display of the operating status of the display equipment, safety hazard information and behavioral warning information through the data fusion center, security situation assessment unit, early warning notification unit and interactive display platform.
[0062] The specific process is as follows:
[0063] First, the comprehensive monitoring data generated during the quay crane operation process is aggregated and synchronized in real time. The comprehensive monitoring data is real-time data collected by various sensors and cameras, including quay crane operation data, equipment status monitoring data, environmental monitoring data, video monitoring data, personnel location and status data, etc. In the specific implementation process, the data fusion center also differentially encodes the equipment operation data based on the equipment operation data, and divides the equipment operation data into the operation data of the monitoring equipment and the operation data of the quay crane operation equipment according to the difference value of the differential code; after the data is divided, the operation data of the quay crane operation equipment is associated with the monitoring large screen system.
[0064] Then, the quay crane operation data, equipment status monitoring data, and environmental monitoring data are analyzed to determine the equipment operation status (operation efficiency, progress, etc.). The hidden danger assessment model is used to analyze the environmental monitoring data, quay crane operation data, and equipment status monitoring data to identify the safety hazards of quay crane operations under warning weather, such as risk level or probability. Next, the personnel activity information is analyzed to determine whether the personnel behavior meets the specifications under the current safety hazards. If there is currently inappropriate behavior, behavior warning information is generated. Finally, the equipment operation status, safety hazard information, and behavior warning information are displayed in a graphical manner.
[0065] Beneficial effects of the above technical solution:
[0066] The intelligent quay crane operation monitoring large-screen system of the present application can effectively identify the risks in quay crane operations under warning weather conditions, and send early warning notifications based on personnel activity information to ensure the safety of operators.
[0067] Based on Example 1, the data fusion center includes:
[0068] Data receiving unit: used to receive real-time comprehensive monitoring data collected by various sensors and monitoring equipment, and perform integrity verification;
[0069] Data purification unit: used to clean and synchronize the comprehensive monitoring data after verification;
[0070] Real-time processing unit: used to analyze real-time environmental data using abnormal monitoring strategies and preliminarily identify abnormal patterns; when abnormal patterns appear, the hidden danger assessment model is awakened.
[0071] The working principle of the above technical solution is:
[0072] See also Figure 1 The data fusion center of the present application includes a data receiving unit, a data purification unit and a real-time processing unit. The data receiving unit is used to receive monitoring data from sensors and monitoring equipment in real time, and perform data integrity verification, thereby ensuring the accurate reception of monitoring data. In the specific implementation process, the detection data of the integrity verification is divided into multiple data blocks based on hash functions, and the data blocks are quantitatively stored. The checksum of each data block is used to determine whether the data is damaged and abnormal. Then, when there is damage and abnormality, quantitative storage technology is used to compare redundant information to determine the data block with abnormalities, thereby achieving comprehensive data verification and locating the data damage area.
[0073] After verification, the data purification unit cleans the data to remove noise and outliers, and synchronizes the data to ensure the consistency of the data in time.
[0074] Finally, the real-time processing unit’s anomaly monitoring strategy analyzes environmental data in real time to quickly identify abnormal patterns. Once an anomaly is detected, the hidden danger assessment model is immediately activated to conduct in-depth risk assessment and analysis.
[0075] Beneficial effects of the above technical solution:
[0076] This application can achieve real-time monitoring of quay crane operation data, promptly detect and respond to abnormal situations, thereby improving the safety and efficiency of operations.
[0077] Based on Example 1, the steps of identifying the potential safety hazards of quay crane operations in warning weather include:
[0078] Extract key features that directly affect the risks of quay crane operations from comprehensive monitoring data;
[0079] Input key features into the trained hazard assessment model to evaluate the probability of each risk factor occurring under warning weather conditions and its potential impact on quay crane operations;
[0080] Construct a risk matrix and determine the corresponding risk level of each risk factor based on the probability of occurrence and potential impact of each risk factor.
[0081] The working principle of the above technical solution is:
[0082] See also Figure 2 First, the key features that directly affect the risk of quay crane operations are extracted from the comprehensive monitoring data. Then the key features are input into the trained hidden danger assessment model to evaluate the probability of each risk factor occurring under warning weather and its potential impact on quay crane operations. Next, a risk matrix is constructed to determine the corresponding risk level of each risk factor based on the probability of occurrence and potential impact of each risk factor.
[0083] Beneficial effects of the above technical solution:
[0084] This application can accurately identify the safety risks of quay crane operations under warning weather conditions and take corresponding measures to ensure the safety of quay crane operations under warning weather conditions.
[0085] Based on Example 1, the early warning notification unit includes a behavior restriction unit, a behavior analysis unit and a response unit; wherein,
[0086] The behavior constraint unit is used to determine the behavior standards of operators according to the risk level corresponding to each risk factor;
[0087] The behavior analysis unit is used to compare the current personnel activity information with the determined behavior standards to determine the abnormal behavior of the operating personnel;
[0088] The response unit is used to automatically trigger the early warning mechanism when there is abnormal behavior.
[0089] The working principle of the above technical solution is:
[0090] See also Figure 3 The early warning notification unit includes a behavior constraint unit, a behavior analysis unit, and a response unit. The behavior constraint unit is responsible for setting appropriate behavior norms for operators according to the risk level corresponding to each risk factor. The behavior analysis unit is responsible for comparing the monitored behavior information with the pre-set behavior norms to determine whether there is any abnormal behavior. Once any behavior that does not meet the norms is found, an alarm will be immediately issued to the response unit. After receiving the alarm issued by the behavior analysis unit, the response unit will immediately activate the early warning mechanism to remind the operator to pay attention to abnormal situations and take timely actions.
[0091] Beneficial effects of the above technical solution:
[0092] The early warning notification unit of this application can issue an alarm in time in dangerous situations, reminding operators to pay attention to changes in the surrounding environment to avoid accidents. It can also provide more accurate risk assessment and suggestions.
[0093] Based on the above embodiment, the automatic triggering of the early warning mechanism includes the following steps:
[0094] Acquire key data of abnormal behavior and abnormal behavior characteristics corresponding to the key data; the key data is a behavior characteristic image containing complete abnormality;
[0095] According to the behavior feature image, respond to the corresponding warning strategy in the preset warning mechanism and generate warning location information corresponding to the key data;
[0096] Mark and display the warning location information on the monitoring screen;
[0097] Among them, during the marking display process, based on the marking display interface, the operating personnel in the warning area are determined, and an alarm broadcast is generated for the corresponding operating personnel.
[0098] First, the system needs to obtain the key data of abnormal behavior and the abnormal behavior features corresponding to these data. These key data are behavioral feature images that contain complete abnormalities. For example, for abnormal behavior during quay crane operations, key data such as the ship deviating from the scheduled route, speeding too fast or too slow, and the corresponding abnormal behavior feature images can be obtained.
[0099] Secondly, based on the behavior feature image, the system responds to the corresponding warning strategy in the preset early warning mechanism and generates the warning location information corresponding to the key data. This warning location information will be used for subsequent annotation display and alarm broadcasting.
[0100] Then, the system will mark and display the generated warning location information on the monitoring screen. In this process, the system will determine the specific location of the warning area based on the marking display interface, and mark the location information on the screen in real time, so that the operator can understand the actual situation of the warning area in a timely manner.
[0101] Finally, during the process of marking and displaying, the system will further generate an alarm broadcast for the corresponding operator based on the warning area determined by the marking display interface. These alarm broadcasts will remind the operator to pay attention to safety through voice or other means to avoid accidents caused by negligence.
[0102] In general, the intelligent quay crane operation monitoring large-screen system of the present invention realizes all-round monitoring of the intelligent quay crane operation process by automatically triggering the early warning mechanism. It can not only detect abnormal situations in time and improve the safety of operations, but also effectively manage the operation progress and improve operation efficiency.
[0103] Based on Example 1, the steps of comparing the current personnel activity information with the determined behavior standard to determine the abnormal behavior of the operator include:
[0104] Preset the behavior standards corresponding to each risk level of each risk factor;
[0105] Extract behavioral features from personnel activity data and convert the behavioral features into numerical vectors;
[0106] Based on the behavior recognition model, the real-time behavior feature vector is compared with the preset behavior standard. If there is a significant difference between the behavior feature vector and the standard behavior model, it is identified as abnormal behavior.
[0107] The working principle of the above technical solution is: first preset the behavioral standards corresponding to each risk level of each risk factor. Then, extract behavioral features from the personnel activity data and convert the behavioral features into numerical vectors. For example, for text data, use natural language processing technology to convert it into a digital string, and then use algorithms such as the bag-of-words model and TF-IDF to convert it into a numerical vector. Then, based on the behavior recognition model, compare the real-time behavior feature vector with the preset behavior standard. If there is a significant difference between the behavior feature vector and the standard behavior model, it is identified as abnormal behavior. The behavior recognition model can be a deep learning model. When the difference between the behavior feature vector and the preset behavior standard is large, it can be identified as abnormal behavior.
[0108] The beneficial effects of the above technical solution: This application can effectively prevent and reduce the occurrence of safety accidents by identifying and monitoring the abnormal behavior of operators, thereby improving work efficiency and ensuring personal safety.
[0109] Based on Example 1, the interactive display platform includes an adaptive cache unit, which is used to:
[0110] Evaluate the historical access frequency of equipment operation status, safety hazard information, and behavioral warning information, and dynamically build a cache list based on the evaluation results; dynamically adjust the cache list based on the freshness of the data.
[0111] The working principle of the above technical solution: The adaptive cache unit of the present application can evaluate the historical access frequency of the equipment operation status, safety hazard information and behavior warning information, and dynamically build a cache list based on the evaluation results. At the same time, the cache list is dynamically adjusted based on the freshness of the data.
[0112] The beneficial effects of the above technical solution are as follows: the present application can quickly provide the required data while avoiding caching of infrequently accessed data, thereby avoiding waste of system resources.
[0113] Embodiment 2 provides a visual management method for intelligent quay crane operations, comprising the following steps:
[0114] Real-time aggregation and synchronization of comprehensive monitoring data generated during quay crane operations; comprehensive monitoring data includes equipment operation data, environmental data, and personnel activity data;
[0115] Determine the equipment operation status based on comprehensive monitoring data; use the hidden danger assessment model to identify the safety hazards of quay crane operations under warning weather conditions;
[0116] Generate behavioral warning information based on safety hazards and personnel activity information;
[0117] Display equipment operation status, safety hazard information and behavior warning information in a graphical way.
[0118] The working principle of the above technical solution is: first, real-time aggregation and synchronization of comprehensive monitoring data generated during the operation of the quay crane. The comprehensive monitoring data is real-time data collected by various sensors and cameras, including quay crane operation data, equipment status monitoring data, environmental monitoring data, video monitoring data, personnel location and status data, etc. Then analyze the quay crane operation data, equipment status monitoring data, and environmental monitoring data to determine the equipment operation status (operation efficiency, progress, etc.). And use the hidden danger assessment model to analyze the environmental monitoring data, quay crane operation data, and equipment status monitoring data to identify safety hazards of quay crane operations under warning weather, such as risk level or probability. Then, analyze the personnel activity information to determine whether the personnel behavior meets the specifications under the current safety hazards. If there is currently inappropriate behavior, generate behavior warning information. Finally, display the equipment operation status, safety hazard information, and behavior warning information in a graphical manner.
[0119] Beneficial effects of the above technical solution: The intelligent quay crane operation monitoring large-screen system of the present application can effectively identify the risks in quay crane operations under warning weather conditions, and send early warning notifications based on personnel activity information to ensure the safety of operators.
[0120] Based on Example 1, the steps of real-time aggregation and synchronization of comprehensive monitoring data generated during the quay crane operation process include:
[0121] Receive real-time comprehensive monitoring data collected by various sensors and monitoring equipment, and perform integrity checks;
[0122] After verification, the comprehensive monitoring data is cleaned and synchronized;
[0123] Use anomaly monitoring strategies to analyze real-time environmental data and preliminarily identify abnormal patterns; when abnormal patterns appear, activate the hidden danger assessment model.
[0124] The working principle of the above technical solution is: monitoring data from sensors and monitoring equipment is received in real time, and data integrity verification is performed to ensure accurate reception of monitoring data. Once the verification is correct, the data is cleaned to remove noise and outliers, and the data is synchronized in time to ensure the consistency of the data in time. Finally, the environmental data is analyzed in real time through the abnormal monitoring strategy to quickly identify abnormal patterns. Once an abnormality is detected, the hidden danger assessment model is immediately activated for in-depth risk assessment and analysis.
[0125] The beneficial effects of the above technical solution: This application can realize real-time monitoring of quay crane operation data, promptly detect and respond to abnormal situations, thereby improving the safety and efficiency of operations.
[0126] Based on Example 1, the steps of identifying the safety hazards of quay crane operations in warning weather by using the hidden danger assessment model include:
[0127] Extract key features that directly affect the risks of quay crane operations from comprehensive monitoring data;
[0128] Input key features into the trained hazard assessment model to evaluate the probability of each risk factor occurring under warning weather conditions and its potential impact on quay crane operations;
[0129] Construct a risk matrix and determine the corresponding risk level of each risk factor based on the probability of occurrence and potential impact of each risk factor.
[0130] The working principle of the above technical solution is: first extract the key features that directly affect the risk of quay crane operations from the comprehensive monitoring data. Then input the key features into the trained hidden danger assessment model to evaluate the probability of each risk factor occurring under warning weather and its potential impact on quay crane operations. Then, construct a risk matrix to determine the corresponding risk level of each risk factor based on the probability of occurrence and potential impact of each risk factor.
[0131] Beneficial effects of the above technical solution: This application can accurately identify the safety risks of quay crane operations under warning weather conditions, and take corresponding measures to ensure the safety of quay crane operations under warning weather conditions.
[0132] On the basis of Example 1, the steps of generating behavior warning information according to safety hazards and personnel activity information include:
[0133] Determine the behavior standards for operators based on the risk levels corresponding to each risk factor;
[0134] Compare current personnel activity information with determined behavioral standards to detect abnormal behavior of operators;
[0135] When there is abnormal behavior, the early warning mechanism is automatically triggered.
[0136] The working principle of the above technical solution is as follows: The behavior constraint unit is responsible for setting appropriate behavior norms for operators according to the risk level corresponding to each risk factor. The behavior analysis unit is responsible for comparing the monitored behavior information with the pre-set behavior norms to determine whether there is any abnormal behavior. Once any behavior that does not meet the norms is found, an alarm will be immediately sent to the response unit. After receiving the alarm from the behavior analysis unit, the response unit will immediately activate the early warning mechanism to remind the operator to pay attention to abnormal situations and take timely actions.
[0137] Beneficial effects of the above technical solution: The early warning notification unit of the present application can issue an alarm in time in dangerous situations, reminding operators to pay attention to changes in the surrounding environment to avoid accidents. It can also provide more accurate risk assessment and suggestions.
[0138] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. An intelligent quay crane operation monitoring large screen system, characterized in that: It includes data fusion center, security situation assessment unit, early warning notification unit and interactive display platform; among them, The data fusion center is used to aggregate and synchronize the comprehensive monitoring data generated during the quay crane operation in real time; the comprehensive monitoring data includes equipment operation data, environmental data and personnel activity data; The safety situation assessment unit is used to determine the equipment operation status based on the comprehensive monitoring data; and to identify the safety hazards of quay crane operations under warning weather conditions by using the hidden danger assessment model; The early warning notification unit is used to generate behavioral early warning information based on safety hazards and personnel activity information; The interactive display platform is used to display equipment operation status, safety hazard information and behavior warning information in a graphical manner; The data fusion center includes: Data receiving unit: used to receive real-time comprehensive monitoring data collected by various sensors and monitoring equipment, and perform integrity verification; Data purification unit: used to clean and synchronize the comprehensive monitoring data after verification; Real-time processing unit: used to analyze real-time environmental data using abnormal monitoring strategies and preliminarily identify abnormal patterns; when abnormal patterns appear, the hidden danger assessment model is activated; Using the hidden danger assessment model, the steps to identify the safety hazards of quay crane operations in warning weather include: Extract key features that directly affect the risks of quay crane operations from comprehensive monitoring data; Input key features into the trained hazard assessment model to evaluate the probability of each risk factor occurring under warning weather conditions and its potential impact on quay crane operations; Construct a risk matrix and determine the corresponding risk level of each risk factor based on the probability of occurrence and potential impact of each risk factor; The early warning notification unit comprises: Behavior constraint unit: used to determine the behavior standards of operators according to the risk level corresponding to each risk factor; Behavior analysis unit: used to compare the current personnel activity information with the determined behavior standards to determine the abnormal behavior of the operator; Response unit: used to automatically trigger the early warning mechanism when there is abnormal behavior; The steps of comparing the current personnel activity information with the determined behavior standards and determining the abnormal behavior of the operator include: Preset the behavior standards corresponding to each risk level of each risk factor; Extract behavioral features from personnel activity data and convert the behavioral features into numerical vectors; Based on the behavior recognition model, the real-time behavior feature vector is compared with the preset behavior standard. If there is a significant difference between the behavior feature vector and the standard behavior model, it is identified as abnormal behavior.
2. The intelligent quay crane operation monitoring large screen system according to claim 1, characterized in that: The interactive display platform includes an adaptive cache unit, which is used to: Evaluate the historical access frequency of equipment operation status, safety hazard information, and behavior warning information, and dynamically build a cache list based on the evaluation results; Based on the freshness of the data, the cache list is dynamically adjusted.
3. A visual management method for intelligent quay crane operations, characterized in that: The following steps are involved: Real-time aggregation and synchronization of comprehensive monitoring data generated during quay crane operations; comprehensive monitoring data includes equipment operation data, environmental data, and personnel activity data; Determine the equipment operation status based on comprehensive monitoring data; use the hidden danger assessment model to identify the safety hazards of quay crane operations under warning weather conditions; Generate behavioral warning information based on safety hazards and personnel activity information; Display equipment operation status, safety hazard information and behavior warning information in a graphical way; The steps to aggregate and synchronize the comprehensive monitoring data generated during the quay crane operation in real time include: Receive real-time comprehensive monitoring data collected by various sensors and monitoring equipment, and perform integrity checks; After verification, the comprehensive monitoring data is cleaned and synchronized; Use anomaly monitoring strategies to analyze real-time environmental data and initially identify abnormal patterns; when abnormal patterns appear, activate the hidden danger assessment model; Using the hidden danger assessment model, the steps to identify the safety hazards of quay crane operations in warning weather include: Extract key features that directly affect the risks of quay crane operations from comprehensive monitoring data; Input key features into the trained hazard assessment model to evaluate the probability of each risk factor occurring under warning weather conditions and its potential impact on quay crane operations; Construct a risk matrix and determine the corresponding risk level of each risk factor based on the probability of occurrence and potential impact of each risk factor; The steps to generate behavioral warning information based on safety hazards and personnel activity information include: Determine the behavior standards for operators based on the risk levels corresponding to each risk factor; Compare current personnel activity information with determined behavioral standards to detect abnormal behavior of operators; When there is abnormal behavior, the early warning mechanism is automatically triggered; The steps of comparing the current personnel activity information with the determined behavior standards and determining the abnormal behavior of the operator include: Preset the behavior standards corresponding to each risk level of each risk factor; Extract behavioral features from personnel activity data and convert the behavioral features into numerical vectors; Based on the behavior recognition model, the real-time behavior feature vector is compared with the preset behavior standard. If there is a significant difference between the behavior feature vector and the standard behavior model, it is identified as abnormal behavior.