A ramp intersection management method, system and device
By calculating the congestion index and status judgment, the collaborative or forced control method is used to adjust the ramp intersection signal, which solves the problems of uncoordinated and unstable ramp intersection management in the traditional method, and improves the efficiency of traffic flow and road capacity.
Patent Information
- Application Number
- CN202411052374.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-08-02
AI Technical Summary
Traditional ramp intersection management methods cannot respond to changes in road traffic status in a timely manner, resulting in traffic conflicts and congestion between main roads and ramps. They also lack coordinated regulation of the entire intersection and cannot accurately adjust according to the congestion level and traffic flow of the specific intersection, resulting in The effect is inconsistent and inefficient.
By calculating the congestion index of main roads and entrance ramps, we can determine their smooth status, and use collaborative control or forced control methods to adjust the signal light duration and coordinate the traffic flow of main roads and entrance ramps, including traffic flow data calculation module, status judgment module, signal Control regulation module, collaborative control module and mandatory control module.
It realizes the adjustment of signal control according to real-time congestion conditions, improves the efficiency of traffic flow guidance, reduces traffic congestion, enhances road traffic capacity, and monitors traffic conditions in real time through cameras and GPS, providing timely feedback to the traffic police to improve traffic management effects.
Smart Images

Figure CN118571040B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of ramp management, and in particular to a ramp intersection management method, system and equipment. Background Art
[0002] A ramp is a short road connecting a main road and an auxiliary road, which is used to provide a passage for vehicles to enter or leave the main road. It is usually located in road systems such as highways and expressways. As an important part of traffic flow, a ramp allows vehicles to enter or leave the main road. By regulating the flow of traffic on the ramp, the traffic flow on the main road can be controlled, effectively alleviating the degree of road congestion.
[0003] Traditional methods usually perform signal control based on fixed time intervals or manual inspections, which cannot respond to changes in road traffic conditions in a timely manner, resulting in the inability to accurately guide traffic flow. In addition, in traditional methods, signal control of main roads and entrance ramps is often performed independently, lacking coordinated control of the entire intersection, which can easily lead to traffic conflicts and congestion between main roads and ramps. Moreover, traditional methods usually adopt simple timing control schemes or flow-based control schemes, which cannot be accurately adjusted according to the congestion level and traffic flow of specific intersections, resulting in unstable and inefficient results. Summary of the invention
[0004] The object of the present invention is to provide a ramp intersection management method, system and device to solve the problems raised in the above background technology.
[0005] To achieve the above object, the present invention provides the following technical solution: a ramp intersection management method, comprising the following steps:
[0006] S1. Calculating the congestion index of the main road and the congestion index at the entrance ramp of the target road section based on the traffic flow data of the target road section;
[0007] S2. Compare the congestion index of the main road and the congestion index at the entrance ramp with the preset maximum congestion index of the main road and the maximum congestion index at the entrance ramp, so as to determine whether the main road and the entrance ramp are in a smooth state;
[0008] S3. If both the main road and the entrance ramp are in a smooth state, the signal control schemes of the main road and the entrance ramp are adjusted according to their original ones;
[0009] S4. If the trunk road is in an unobstructed state and the entrance ramp is in an unobstructed state, or if the trunk road is in an unobstructed state and the entrance ramp is in an unobstructed state, the trunk road and the entrance ramp are adjusted by a coordinated control method;
[0010] S5. If both the main road and the entrance ramp are in a blocked state, the main road and the entrance ramp are adjusted by a forced control method.
[0011] Preferably, in step S1, the congestion index expression of the trunk road is as follows:
[0012] ;
[0013] in, represents the congestion index of the main road, Indicates the duration of the signal light control cycle. represents the time it takes for the i-th vehicle to approach the entrance ramp via the main road, It indicates the number of vehicles approaching the entrance ramp on the main road;
[0014] The congestion index expression at the entrance ramp is as follows:
[0015] ;
[0016] in, represents the congestion index at the entrance ramp, represents the number of lanes of the entrance ramp, represents the weight of the i-th lane in the entire entrance ramp intersection, represents the weight of the j-th traffic flow in the ith lane in the direction of the entrance ramp, represents the queue congestion of the j-th traffic flow in the i-th lane, represents the number of vehicles in the i-th lane;
[0017] ;
[0018] in, represents the queue congestion of the j-th traffic flow in the i-th lane, represents the actual queue length of the j-th traffic flow in the i-th lane, It represents the maximum acceptable queue length of the j-th traffic flow in the ith lane.
[0019] Preferably, in step S2, the congestion index of the main road and the congestion index at the entrance ramp are compared with the preset maximum congestion index of the main road and the maximum congestion index at the entrance ramp, so as to determine whether the main road and the entrance ramp are in a smooth state, including the following steps:
[0020] S201: If the congestion index of the trunk road and the congestion index at the entrance ramp are both smaller than the preset maximum congestion index of the trunk road and the maximum congestion index at the entrance ramp, it is determined that the trunk road and the entrance ramp are both in a smooth state;
[0021] S202: If the congestion index of the trunk road is greater than the preset maximum congestion index of the trunk road, and the congestion index at the entrance ramp is less than the preset maximum congestion index at the entrance ramp, it is determined that the trunk road is in a blocked state and the entrance ramp is in a unobstructed state;
[0022] S203: If the congestion index of the trunk road is less than the preset maximum congestion index of the trunk road, and the congestion index at the entrance ramp is greater than the preset maximum congestion index at the entrance ramp, it is determined that the trunk road is in a smooth state, and the entrance ramp is in a blocked state;
[0023] S204: If the congestion index of the main road and the congestion index at the entrance ramp are both greater than the preset maximum congestion index of the main road and the maximum congestion index at the entrance ramp, it is determined that both the main road and the entrance ramp are in a blocked state.
[0024] Preferably, in step S4, the collaborative control method includes the following steps:
[0025] A1. Calculate the local control adjustment rate of the entrance ramp by the first formula;
[0026] A2. Calculate the total flow overflow of the main road and entrance ramp using the second formula;
[0027] A3. Calculate the coordination control mediation rate based on the overall flow overflow through the third formula;
[0028] A4. Calculate the final control adjustment rate of the entrance ramp by using the fourth formula based on the local control adjustment rate and the coordinated control adjustment rate;
[0029] A5. Determine the unit green light extension or delay time in the interweaving area of the main road and the entrance ramp based on the final control mediation rate;
[0030] A6. Based on the unit green light extension or delay time of the main road and the entrance ramp intersection area, the signal light duration is adjusted using the fifth formula.
[0031] Preferably, in step A1, the first formula is as follows:
[0032] ;
[0033] in, represents the local control adjustment rate of the k-th unit control step entrance ramp, represents the local adjustment rate of the entrance ramp of the k-1th unit control step, represents the traffic volume ratio of the main road turning into the entrance ramp at the k-1th unit control step, It is expressed as the minimum allowable value of the entrance ramp regulation rate, It is expressed as the maximum allowable value of the entrance ramp regulation rate, It represents the percentage of remaining capacity of the trunk line in the k-1th period, represents the congestion index of the main road, Represents the congestion index at the entrance ramp.
[0034] Preferably, in step A2, the second formula is as follows:
[0035] ;
[0036] in, represents the flow overflow in the interweaving area of the main road and the entrance ramp at the kth unit control step, represents the kth unit control step length entering the main road traffic flow, represents the k-th unit control step entrance ramp traffic flow, represents the state capacity of the kth unit control step trunk road and entrance ramp, and Usually set manually, depending on the weather at that moment. represents the maximum value function, Indicates the main road and the entrance ramp Segments, It indicates the overall flow overflow of the main road and entrance ramp of the kth unit control step.
[0037] Preferably, in step A3, the third formula is as follows:
[0038] ;
[0039] in, represents the k-th unit control step entrance ramp coordinated control mediation rate, represents the k-th unit control step entrance ramp traffic flow, It indicates the overall flow overflow of the main road and entrance ramp of the kth unit control step.
[0040] Preferably, in step A4, the fourth formula is as follows:
[0041] ;
[0042] in, represents the k-th unit control step entrance ramp coordinated control mediation rate, represents the local control adjustment rate of the k-th unit control step entrance ramp, represents the mediation rate of the coordinated control of the entrance ramp with the kth unit control step.
[0043] Preferably, in step A6, the fifth formula is as follows:
[0044] ;
[0045] in, Indicates the effective green light time of the main road and the entrance ramp intersection. Indicates the effective green light time of the main road and the entrance ramp weaving area in the previous cycle. Indicates the shortest effective green light time in the intersection area between the main road and the entrance ramp. Indicates the extension or delay of the green light time at the intersection of the main road and the entrance ramp.
[0046] Preferably, in step S5, the forced control method comprises the following steps:
[0047] B1. Use cameras at the intersection of the main road and the entrance ramp to photograph the area, thereby obtaining a traffic congestion image of the area;
[0048] B2. Use GPS to locate the area where the main road and the entrance ramp intersect, so as to obtain the location information of the area;
[0049] B3. Send the obtained traffic congestion image and positioning information to the intelligent terminal of the nearest traffic police.
[0050] The present invention also provides the following technical solution: a ramp intersection management system, which is applicable to the ramp intersection management method, comprising:
[0051] A traffic flow data calculation module, which is used to calculate the congestion index at the main road and the entrance ramp through a calculation algorithm according to the traffic flow data of the target road section to evaluate the traffic conditions;
[0052] A state judgment module, which is used to compare the congestion index at the main road and the entrance ramp with a preset maximum congestion index to determine whether the main road and the entrance ramp are in a smooth state;
[0053] A signal control and adjustment module, which is used to adjust according to their original signal control schemes to maintain the status quo when both the main road and the entrance ramp are in an unobstructed state;
[0054] A collaborative control module, wherein the collaborative control module is used to adjust the main road and the entrance ramp using a collaborative control method when the main road and the entrance ramp are in different states, that is, one is in a smooth state and the other is in a blocked state;
[0055] A forced control module is used to adjust the main road and the entrance ramp using a forced control method when both the main road and the entrance ramp are in a blocked state.
[0056] The present invention also provides the following technical solution: a ramp intersection management device, which is applicable to the ramp intersection management method, comprising: at least one processor and a memory;
[0057] The memory is used to store computer-executable instructions;
[0058] The at least one processor is used to execute the computer-executable instructions stored in the memory to implement a ramp intersection management method as described.
[0059] Compared with the prior art, the present invention has the following beneficial effects:
[0060] The present invention timely adjusts the signal control scheme according to the real-time congestion status of the main road and the entrance ramp, so that the traffic flow is effectively guided and the road traffic efficiency is improved. In addition, in the case where the status of the main road and the entrance ramp are inconsistent, the coordinated control method is used to adjust the traffic flow of the main road and the entrance ramp, effectively coordinate the traffic flow of the main road and the entrance ramp, reduce traffic congestion, and improve the road operation effect. When the main road and the entrance ramp are both in a blocked state, the forced control method is used to adjust the main road and the entrance ramp, forcibly divert traffic, reduce traffic congestion, and improve the road traffic capacity. In addition, through photography and positioning technology, the traffic conditions of the main road and the entrance ramp can be monitored in real time, and the relevant information can be fed back to the intelligent terminal of the traffic police, so that the traffic police can take countermeasures in time and strengthen traffic management. BRIEF DESCRIPTION OF THE DRAWINGS
[0061] Figure 1 A schematic diagram of the overall method flow provided by an embodiment of the present invention;
[0062] Figure 2 A flowchart of step S2 provided in an embodiment of the present invention;
[0063] Figure 3 A flowchart of a collaborative control method provided by an embodiment of the present invention;
[0064] Figure 4 A flowchart of a forced control method provided by an embodiment of the present invention;
[0065] Figure 5 A flowchart of the overall system provided by an embodiment of the present invention;
[0066] Figure 6 A flow chart of the overall device provided by an embodiment of the present invention.
[0067] In the figure: 1. Traffic flow data calculation module; 2. State judgment module; 3. Signal control and adjustment module; 4. Cooperative control module; 5. Forced control module; 6. Processor; 7. Memory; 8. Bus. DETAILED DESCRIPTION
[0068] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0069] Embodiment 1
[0070] See also Figure 1-4 The present invention provides a technical solution: a ramp intersection management method, comprising the following steps:
[0071] S1. Calculating the congestion index of the main road and the congestion index at the entrance ramp of the target road section based on the traffic flow data of the target road section;
[0072] S2. Compare the congestion index of the main road and the congestion index at the entrance ramp with the preset maximum congestion index of the main road and the maximum congestion index at the entrance ramp, so as to determine whether the main road and the entrance ramp are in a smooth state;
[0073] S3. If both the main road and the entrance ramp are in a smooth state, the signal control schemes of the main road and the entrance ramp are adjusted according to their original ones;
[0074] S4. If the trunk road is in an unobstructed state and the entrance ramp is in an unobstructed state, or if the trunk road is in an unobstructed state and the entrance ramp is in an unobstructed state, the trunk road and the entrance ramp are adjusted by a coordinated control method;
[0075] S5. If both the main road and the entrance ramp are in a blocked state, the main road and the entrance ramp are adjusted by a forced control method.
[0076] In step S1, the congestion index of the trunk road is expressed as follows:
[0077] ;
[0078] in, represents the congestion index of the main road, Indicates the duration of the signal light control cycle. represents the time it takes for the i-th vehicle to approach the entrance ramp via the main road, It indicates the number of vehicles approaching the entrance ramp on the main road;
[0079] The congestion index expression at the entrance ramp is as follows:
[0080] ;
[0081] in, represents the congestion index at the entrance ramp, represents the number of lanes of the entrance ramp, represents the weight of the i-th lane in the entire entrance ramp intersection, represents the weight of the j-th traffic flow in the ith lane in the direction of the entrance ramp, represents the queue congestion of the j-th traffic flow in the i-th lane, represents the number of vehicles in the i-th lane;
[0082] ;
[0083] in, represents the queue congestion of the j-th traffic flow in the i-th lane, represents the actual queue length of the j-th traffic flow in the i-th lane, It represents the maximum acceptable queue length of the j-th traffic flow in the i-th lane;
[0084] In step S2, the congestion index of the main road and the congestion index at the entrance ramp are compared with the preset maximum congestion index of the main road and the maximum congestion index at the entrance ramp, so as to determine whether the main road and the entrance ramp are in a smooth state, including the following steps:
[0085] S201: If the congestion index of the trunk road and the congestion index at the entrance ramp are both smaller than the preset maximum congestion index of the trunk road and the maximum congestion index at the entrance ramp, it is determined that the trunk road and the entrance ramp are both in a smooth state;
[0086] S202: If the congestion index of the trunk road is greater than the preset maximum congestion index of the trunk road, and the congestion index at the entrance ramp is less than the preset maximum congestion index at the entrance ramp, it is determined that the trunk road is in a blocked state and the entrance ramp is in a unobstructed state;
[0087] S203: If the congestion index of the trunk road is less than the preset maximum congestion index of the trunk road, and the congestion index at the entrance ramp is greater than the preset maximum congestion index at the entrance ramp, it is determined that the trunk road is in a smooth state, and the entrance ramp is in a blocked state;
[0088] S204: If the congestion index of the trunk road and the congestion index at the entrance ramp are both greater than the preset maximum congestion index of the trunk road and the maximum congestion index at the entrance ramp, it is determined that both the trunk road and the entrance ramp are in a blocked state;
[0089] In step S4, the collaborative control method includes the following steps:
[0090] A1. Calculate the local control adjustment rate of the entrance ramp by the first formula;
[0091] A2. Calculate the total flow overflow of the main road and entrance ramp using the second formula;
[0092] A3. Calculate the coordination control mediation rate based on the overall flow overflow through the third formula;
[0093] A4. Calculate the final control adjustment rate of the entrance ramp by using the fourth formula based on the local control adjustment rate and the coordinated control adjustment rate;
[0094] A5. Determine the unit green light extension or delay time in the interweaving area of the main road and the entrance ramp based on the final control mediation rate;
[0095] A6. Based on the unit green light extension or delay time of the main road and the entrance ramp intersection area, the signal light duration is adjusted by the fifth formula;
[0096] In step A1, the first formula is as follows:
[0097] ;
[0098] in, represents the local control adjustment rate of the k-th unit control step entrance ramp, represents the local adjustment rate of the entrance ramp of the k-1th unit control step, represents the traffic volume ratio of the main road turning into the entrance ramp at the k-1th unit control step, It is expressed as the minimum allowable value of the entrance ramp regulation rate, It is expressed as the maximum allowable value of the entrance ramp regulation rate, It represents the percentage of remaining capacity of the trunk line in the k-1th period, represents the congestion index of the main road, represents the congestion index at the entrance ramp;
[0099] In step A2, the second formula is as follows:
[0100] ;
[0101] in, represents the flow overflow in the interweaving area of the main road and the entrance ramp at the kth unit control step, represents the kth unit control step length entering the main road traffic flow, represents the k-th unit control step entrance ramp traffic flow, represents the state capacity of the kth unit control step trunk road and entrance ramp, and Usually set manually, depending on the weather at that moment. represents the maximum value function, Indicates the main road and the entrance ramp Segments, It indicates the total flow overflow of the main road and entrance ramp of the kth unit control step;
[0102] In step A3, the third formula is as follows:
[0103] ;
[0104] in, represents the k-th unit control step entrance ramp coordinated control mediation rate, represents the k-th unit control step entrance ramp traffic flow, It indicates the total flow overflow of the main road and entrance ramp of the kth unit control step;
[0105] In step A4, the fourth formula is as follows:
[0106] ;
[0107] in, represents the k-th unit control step entrance ramp coordinated control mediation rate, represents the local control adjustment rate of the k-th unit control step entrance ramp, represents the mediation rate of the coordinated control of the entrance ramp at the kth unit control step;
[0108] In step A6, the fifth formula is as follows:
[0109] ;
[0110] in, Indicates the effective green light time of the main road and the entrance ramp intersection. Indicates the effective green light time of the main road and the entrance ramp weaving area in the previous cycle. Indicates the shortest effective green light time in the intersection area between the main road and the entrance ramp. Indicates the extension or delay of the green light time of the main road and the entrance ramp intersection;
[0111] In step S5, the forced control method includes the following steps:
[0112] B1. Use cameras at the intersection of the main road and the entrance ramp to photograph the area, thereby obtaining a traffic congestion image of the area;
[0113] B2. Use GPS to locate the area where the main road and the entrance ramp intersect, so as to obtain the location information of the area;
[0114] B3. Send the obtained traffic congestion image and positioning information to the intelligent terminal of the nearest traffic police.
[0115] Embodiment 2
[0116] See also Figure 5 The present invention also provides a technical solution: a ramp intersection management system, comprising:
[0117] Traffic flow data calculation module 1, the traffic flow data calculation module 1 is used to calculate the congestion index at the main road and the entrance ramp through a calculation algorithm according to the traffic flow data of the target road section, so as to evaluate the traffic conditions;
[0118] State judgment module 2, which is used to compare the congestion index at the main road and the entrance ramp with the preset maximum congestion index to determine whether the main road and the entrance ramp are in a smooth state;
[0119] The signal control and adjustment module 3 is used to adjust the signal according to their original signal control schemes to maintain the status quo when the main road and the entrance ramp are both in an unobstructed state;
[0120] The collaborative control module 4 is used to adjust the main road and the entrance ramp by using a collaborative control method when the main road and the entrance ramp are in different states, that is, one is in a smooth state and the other is in a blocked state;
[0121] The compulsory control module 5 is used to adjust the main road and the entrance ramp by using a compulsory control method when both the main road and the entrance ramp are in a blocked state.
[0122] Embodiment 3
[0123] See also Figure 6 , a ramp intersection management device, comprising: at least one processor 6 and a memory 7;
[0124] The memory 7 is used to store computer execution instructions;
[0125] At least one processor 6 is used to execute computer-executable instructions stored in the memory 7 to implement a ramp intersection management method;
[0126] Optionally, the memory 7 can be independent or integrated with the processor 6. When the memory 7 is independently provided, the device further includes a bus 8 for connecting the memory 7 and the processor 6.
[0127] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0128] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A ramp intersection management method, characterized in that: The following steps are involved: S1. Calculating the congestion index of the main road and the congestion index at the entrance ramp of the target road section based on the traffic flow data of the target road section; S2. Compare the congestion index of the main road and the congestion index at the entrance ramp with the preset maximum congestion index of the main road and the maximum congestion index at the entrance ramp, so as to determine whether the main road and the entrance ramp are in a smooth state; S3. If both the main road and the entrance ramp are in a smooth state, the signal control schemes of the main road and the entrance ramp are adjusted according to their original signal control schemes; S4. If the trunk road is in an unobstructed state and the entrance ramp is in an unobstructed state, or if the trunk road is in an unobstructed state and the entrance ramp is in an unobstructed state, the trunk road and the entrance ramp are adjusted by a coordinated control method; In step S4, the collaborative control method includes the following steps: A1. Calculate the local control adjustment rate of the entrance ramp by the first formula; A2. Calculate the total flow overflow of the main road and entrance ramp using the second formula; A3. Calculate the coordination control mediation rate based on the overall flow overflow through the third formula; A4. Calculate the final control adjustment rate of the entrance ramp by using the fourth formula based on the local control adjustment rate and the coordinated control adjustment rate; A5. Determine the unit green light extension or delay time in the interweaving area of the main road and the entrance ramp based on the final control mediation rate; A6. Based on the unit green light extension or delay time of the main road and the entrance ramp intersection area, the signal light duration is adjusted by the fifth formula; In step A1, the first formula is as follows: ; in, represents the local control adjustment rate of the k-th unit control step entrance ramp, represents the local adjustment rate of the entrance ramp of the k-1th unit control step, represents the traffic volume ratio of the main road turning into the entrance ramp at the k-1th unit control step, It is expressed as the minimum allowable value of the entrance ramp regulation rate, It is expressed as the maximum allowable value of the entrance ramp regulation rate, It represents the percentage of remaining capacity of the trunk line in the k-1th period, represents the congestion index of the main road, represents the congestion index at the entrance ramp; In step A2, the second formula is as follows: ; in, represents the flow overflow in the interweaving area of the main road and the entrance ramp at the kth unit control step, represents the kth unit control step length entering the main road traffic flow, represents the k-th unit control step entrance ramp traffic flow, represents the state capacity of the kth unit control step trunk road and entrance ramp, and Usually set manually, depending on the weather at that moment. represents the maximum value function, Indicates the main road and the entrance ramp Segments, It indicates the total flow overflow of the main road and entrance ramp of the kth unit control step; In step A3, the third formula is as follows: ; in, represents the k-th unit control step entrance ramp coordinated control mediation rate, represents the k-th unit control step entrance ramp traffic flow, It indicates the total flow overflow of the main road and entrance ramp of the kth unit control step; S5. If both the main road and the entrance ramp are in a blocked state, the main road and the entrance ramp are adjusted through a forced control method.
2. A ramp intersection management method according to claim 1, characterized in that: In step S1, the congestion index of the trunk road is expressed as follows: ; in, represents the congestion index of the main road, Indicates the duration of the signal light control cycle. represents the time it takes for the i-th vehicle to approach the entrance ramp via the main road, It indicates the number of vehicles approaching the entrance ramp on the main road; The congestion index expression at the entrance ramp is as follows: ; in, represents the congestion index at the entrance ramp, represents the number of lanes of the entrance ramp, represents the weight of the i-th lane in the entire entrance ramp intersection, represents the weight of the j-th traffic flow in the ith lane in the direction of the entrance ramp, represents the queue congestion of the j-th traffic flow in the i-th lane, represents the number of vehicles in the i-th lane; ; in, represents the queue congestion of the j-th traffic flow in the i-th lane, represents the actual queue length of the j-th traffic flow in the i-th lane, It represents the maximum acceptable queue length of the j-th traffic flow in the i-th lane.
3. A ramp intersection management method according to claim 2, characterized in that: In step S2, the congestion index of the main road and the congestion index at the entrance ramp are compared with the preset maximum congestion index of the main road and the maximum congestion index at the entrance ramp, so as to determine whether the main road and the entrance ramp are in a smooth state, including the following steps: S201: If the congestion index of the trunk road and the congestion index at the entrance ramp are both smaller than the preset maximum congestion index of the trunk road and the maximum congestion index at the entrance ramp, it is determined that the trunk road and the entrance ramp are both in a smooth state; S202: If the congestion index of the trunk road is greater than the preset maximum congestion index of the trunk road, and the congestion index at the entrance ramp is less than the preset maximum congestion index at the entrance ramp, it is determined that the trunk road is in a blocked state and the entrance ramp is in a unobstructed state; S203: If the congestion index of the trunk road is less than the preset maximum congestion index of the trunk road, and the congestion index at the entrance ramp is greater than the preset maximum congestion index at the entrance ramp, it is determined that the trunk road is in a smooth state, and the entrance ramp is in a blocked state; S204: If the congestion index of the main road and the congestion index at the entrance ramp are both greater than the preset maximum congestion index of the main road and the maximum congestion index at the entrance ramp, it is determined that both the main road and the entrance ramp are in a blocked state.
4. A ramp intersection management method according to claim 1, characterized in that: In step A4, the fourth formula is as follows: ; in, represents the k-th unit control step entrance ramp coordinated control mediation rate, represents the local control adjustment rate of the k-th unit control step entrance ramp, represents the mediation rate of the coordinated control of the entrance ramp with the kth unit control step.
5. A ramp intersection management method according to claim 1, characterized in that: In step A6, the fifth formula is as follows: ; in, Indicates the effective green light time of the main road and the entrance ramp intersection. Indicates the effective green light time of the main road and the entrance ramp weaving area in the previous cycle. Indicates the shortest effective green light time in the intersection area between the main road and the entrance ramp. Indicates the extension or delay of the green light time at the intersection of the main road and the entrance ramp.
6. A ramp intersection management method according to claim 1, characterized in that: In step S5, the forced control method includes the following steps: B1. Use cameras at the intersection of the main road and the entrance ramp to photograph the area, thereby obtaining a traffic congestion image of the area; B2. Use GPS to locate the area where the main road and the entrance ramp intersect, so as to obtain the location information of the area; B3. Send the obtained traffic congestion image and positioning information to the intelligent terminal of the nearest traffic police.
7. A ramp intersection management system, which is applicable to a ramp intersection management method according to any one of claims 1 to 6, characterized in that: include: A traffic flow data calculation module (1), the traffic flow data calculation module (1) being used to calculate the congestion index at the main road and the entrance ramp according to the traffic flow data of the target road section through a calculation algorithm to evaluate the traffic conditions; A state judgment module (2), the state judgment module (2) is used to compare the congestion index at the main road and the entrance ramp with a preset maximum congestion index to judge whether the main road and the entrance ramp are in a smooth state; A signal control and adjustment module (3), the signal control and adjustment module (3) being used to adjust according to their respective original signal control schemes to maintain the status quo when the main road and the entrance ramp are both in an unobstructed state; A collaborative control module (4), the collaborative control module (4) being used to adjust the main road and the entrance ramp using a collaborative control method when the main road and the entrance ramp are in different states, that is, one is in a smooth state and the other is in a blocked state; A forced control module (5) is used to adjust the main road and the entrance ramp using a forced control method when both the main road and the entrance ramp are in a blocked state.
8. A ramp intersection management device, which is applicable to a ramp intersection management method according to any one of claims 1 to 6, characterized in that: include: at least one processor (6) and memory (7); The memory (7) is used to store computer-executable instructions; The at least one processor (6) is used to execute the computer-executable instructions stored in the memory (7) to implement a ramp intersection management method as claimed in any one of claims 1 to 6.
Citation Information
Patent Citations
Urban expressway entrance ramp signal control method based on congestion state grading
CN115035734A